Loading...
REV-16-3347 Miami Shores Village RECEIVED Building Department DEC 1'2 2016 10050 N.E.2nd Avenue, Miami Shores, Florida 33138 Tel:(305)795-2204 Fax:(305)756-8972 $Y: INSPECTION LINE PHONE NUMBER:(305)762-4949 FBC 201+ BUILDING Master Permit No. Q,G-12- ►5 " 31Z7 PE IT APPLICATION Sub Permit No.�.,0�1 tb — 3341 BUILDING ❑ ELECTRIC ❑ ROOFING REVISION ❑ EXTENSION ❑RENEWAL ❑PLUMBING ❑ MECHANICAL ❑PUBLIC WORKS [:] CHANGE OF ❑ CANCELLATION ❑ SHOP CONTRACTOR DRAWINGS JOB ADDRESS: D"r— Cit : Miami Shores County: Miami Dade zip: Folio/Parcel#: 1� '�J�S —01) ' OSbo Is the Building Historically Designated:Yes NO Occupancy Type: Load: Construction Type: Flood Zone: BFE: FFE: OWNER: Name(Fee Simple Titleholder): (•lUN bib offs -U-1 Phone#: Address: r'1-2>01 0 Ga1.C)nor\Q, City: M•,C&KA� tJA0rP.& State: tel✓ Zip: •53 13k Tenant/Lessee Name: Phone#: Email: CONTRACTOR:Company Name: CO'\SyU S elyk-- f� Phone#: Address: 1\ 6'K -7 SW UU AUL City: N(' A i State: Zip: 331n Qualifier Name: 0 i I(AeC11 Phone#: State Certification or Registration#: c C 1,!! Certificate of Competency#: DESIGNER:Architect/Engineer: Phone#: Address: City: State: Zip: Value of Work for this Permit:$ k P0 Square/Linear Footage of Work: r. r,L Type of Work: ❑ Addition Alteration ❑ New ❑ Repair/Replace ❑ Demolition Description of Work: NA VOJ1. '(70. �o 1,,\+ ri 0r aoor v� `1VOOJk -CAS -i 00iOA IR I, J Specify color of color thru tile: --� Submittal Fee$ 6 Permit Fee$ `� + CCF$ CO/CC$ Scanning Fee$ 18 Radon Fee$ DBPR$ Notary$ Technology Fee$ Training/Education Fee$ Double Fee$ Structural Reviews$ Bond$ sa TOTAL FEE NOW DUE$ (Revised02/24/2014) Bonding Company's Name(if applicable) Bonding Company's Address _ City State Zip Mortgage Lender's Name(if applicable) Mortgage Lender's Address City State Zip Application is hereby made to obtain a permit to do the work and installations as indicated. I certify that no work or installation has commenced prior to the issuance of a permit and that all work will be performed to meet the standards of all laws regulating construction in this jurisdiction. I understand that a separate permit must be secured for ELECTRIC, PLUMBING, SIGNS, POOLS, FURNACES, BOILERS, HEATERS,TANKS,AIR CONDITIONERS, ETC..... OWNER'S AFFIDAVIT: I certify that all the foregoing information is accurate and that all work will be done in compliance with all applicable laws regulating construction and zoning. "WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT." Notice to Applicant. As a condition to the issuance of a building permit with an estimated value exceeding$2500, the applicant must promise in good faith that a copy of the notice of commencement and construction lien law brochure will be delivered to the person whose property is subject to attachment. Also, a certified copy of the recorded notice of commencement must be posted at the job site for the first inspection which occurs seven (7) days after the building permit is issued. In the absence of such posted notice, the inspection will not be approved and a reinspection fee will be charged. Signature A Signature +NER or AGENT CONTRACTOR The foregoing instrument was acknowledged before me this The foregoing instrument was acknowledged before me this � 'K—day of 0 Ck°bg-r 120 )b by (') day of 0 CJDb.b(- 20 16 by r-1 CIMK.��,who is personally known to 0 U'114d�rC< who is personally known to me or who has produced as me or who has produced tSY) ' lL'VOxv- as identification and who did take an oatho identification and who did take an oath. NOTARY PUBLIC: NOTARY PUBLIC: Sign: Sign: Print: �G - U Print: , ANALUCIASIERRA ;x: :, MY COMMISSION#FF 22 104 Seal: ANA LUCIA SIERRA Seal: _ 'a? EXPIRES:April 23,2019 ,'q' °`•' Bonded Thru Notary Public Unda*tm ;s MY COMMISSION#FF 224104 a ' AI --a` EXPIRES:April 23,2019 o.f4d Bonded Thru Notary Public Undenxriters **************************** ****** ***r********************************************************************* APPROVED BY ` Plans Examiner Zoning Structural Review Clerk (Revised02/24/2014) 0 A R C H I T E C T U R E December 7, 2016 City of Miami Shores Permit No. RC-12-15-3127 Re: Client Revision Narrative for: Kurlandski Residence Renovation and Addition for 9301 N. Bayshore Drive, Miami Shores, FL. Changes and revisions in this submittal are as follow: Architectural A-1.1 (Rev. 4) Revision to Interior Door Schedule due to A/C and A/V closet reconfiguration A-1.2 (Rev.3) Reconfigured Family Room A/C closet to include an A/V closet A-2.1 (Rev.3) Reconfigured Family Room Ceiling and lighting layout Mechanical M-0.0 (Rev. 6) Revised A/C Schedule M-1.0 (Rev. 6) Relocated dryer exhaust, revised Family Room A/C closet with new A/V closet ELECTRICAL E-1.0 (Rev. 6) Revised Family Room Lighting layout E-1.1 (Rev. 6) Updated Panel Schedules due to revised A/C units Should you have any questions, do not hesitate to contact this office. :...:. Sincerely, •• • ...... •••••• Mike Stroh •�•••• •"" Project Manager •••••• •• "••• • USA CAYMAN ISLANDS 0 17100 Collins Ave. Ste. 220 6104 Forum Lane Sunny Isles Beach, FI 33160 Camana Bay,Grand Cayman 1.305.940.0555 1.345.525.0777 FORM R405-2014 RESIDENTIAL ENERGY CONSERVATION CODE DOCUMENTATION CHECKLIST Florida Department of Business and Professional Regulation Simulated Performance Alternative (Performance) Method Applications for compliance with the 2014 Florida Building Code, Energy Conservation via the residential Simulated Performance method shall include ❑ This checklist ❑ A Form R405 report that documents that the Proposed Design complies with Section R405.3 of the Florida Energy Code. This form shall include a summary page indicating home address, a-ratio and the pass or fail status along with summary areas and types of components, whether the home was simulated as a worst-case orientation, name and version of the compliance software tool, name of individual completing the compliance report(1 page) and an input summary checklist that can be used for field verification (usually 4 pages/may be greater). ❑ Energy Performance Level(EPL) Display Card(one page) ❑ Mandatory Requirements(three pages) Required prior to CO for the Performance Method: ❑ Air Barrier and Insulation Inspection Component Criteria checklist(Table R402.4.1.1 - :009:0 0000.. one page) • ❑ A completed Envelope Leakage Test Report(usually one page) ••• •• • 0000 0000.. 0000.. 0000 . 0000. ❑ if Form R405 duct leakage type indicates anything other than "default leakage;.t6ep�corr�eteo 0 9; 0• Form R405 Duct Leakage Test Report(usually one page) ••0•• •••0 0000.. 0000.. 0000.. .. 0000 EnergyGauge®-USRCSB v5.1 12/8/2016 9:40:53 AM Page 1 of 1 FORM R405-2014 FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION Florida Department of Business and Professional Regulation - Residential Performance Method Project Name: Kurlandski Residence Builder Name: Street: 9301 N.Bayshore Drive Permit Office: Miami City,State,Zip: Miami Shores,FL, Permit Number: Owner: Mr.&Mrs.Kurlandski Jurisdiction: Design Location: FL, Miami County:: Miami-Dade(Florida Climate Zone 1 ) 1. New construction or existing Existing(Projecte 9. Wall Types(2899.6 sqft.) Insulation Area 2. Single family or multiple family Single-family a.Concrete Block-Int Insul,Exterior R=5.0 2772.10 ft2 b.Concrete Block-Int Insul,Adjacent R=11.0 127.50 ft2 3. Number of units,if multiple family 1 c.N/A R= ft2 4. Number of Bedrooms 4 d.N/A R= ft2 10.Ceiling Types (3404.0 sqft.) Insulation Area 5. Is this a worst case? No a.Under Attic(Vented) R=30.0 3404.00 ft2 6. Conditioned floor area above grade(ft2) 3549 b.N/A R= ft2 Conditioned floor area below grade(ft2) 0 c.N/A R= ft2 11.Ducts R ft2 7. Windows(770.3 sqft.) Description Area a.Sup:family Room,Ret:family Room,AH:family 6 80 a. U-Factor: Sgl,U=1.03 770.33 ft2 b.Sup: existing master bedroom,Ret:existing mast 6 29 SHGC: SHGC=0.40 c.Sup:guest suite,Ret:guest suite,AH:guest suite 6 14 b. U-Factor: N/A ft2 12.Cooling systems kBtu/hr Efficiency SHGC: a.Central Unit 45.0 SEER:16.00 b.Central Unit 29.0 SEER:16.00 c. U-Factor: N/A ft2 c.Central Unit 24.0 SEER:16.00 SHGC: 13.Heating systems kBtu/hr Efficiency d. U-Factor: N/A ft2 a.Electric Strip Heat 7.6 COPA.00 SHGC: b.Electric Strip Heat 5.4 COP:1.00 Area Weighted Average Overhang Depth: 4.973 ft. c.Electric Strip Heat 4.5 COP:1.00 Area Weighted Average SHGC: 0.400 14.Hot water systems 8. Floor Types (3539.0 sqft.) Insulation Area a.Propane Tankless Cap: 1 gallonsEF:0.940 a.Slab-On-Grade Edge Insulation R=4.0 3182.00 ft2 b. Conservation features b.Floor over Garage R=11.0 357.00 ft2 None c.N/A R= ft2 15.Credits CF,CV,Pstat Glass/Floor Area: 0.217 Total Proposed Modified Loads: 138.73 Total Baseline Loads: 143.71 •• •_ •. ...... . ..... I hereby certify that the plans and specifications covered by Review of the plans and omm ST,q • • this calculation are in compliance with the Florida Energy specifications covered by this • • �• Code. I calculation indicates complianceIII • \ , with the Florida Energy Code. • r�aq. .,:: PREPARED ' d I n Before construction is completed DATE: W this building will be inspected for ;6 compliance with Section 553.908 0 • t u • • ; p Florida Statutes. • f I hereby ce3til Va�'thi Si as desggn_d, is in compliance 00 �r �c` .. with the Fiari(io Ener 0k IMIT. J BUILDING OFFICIAL: DATDATE: i - Complian efjt�lr�'by the air handler unit manufacturer that the air handler enclosure qualifies as certified f o ���� , ��grFbtitiance with R403.2.2.1. -Compliance require ah lir Barrier and Insulation Inspection Checklist in accordance with R402.4.1.1 and an envelope leakage test report in accordance with R402.4.1.2. 12/8/2016 9:40 AM EnergyGauge®USA-FlaRes2014 Section R405.4.1 Compliant Software Page 1 of 6 FORM R405-2014 PROJECT Title: Kurlandski Residence Bedrooms: 4 Address Type: Street Address Building Type: User Conditioned Area: 3549 Lot# Owner: Mr.&Mrs.Kurlandski Total Stories: 2 Block/SubDivision: #of Units: 1 Worst Case: No PlatBook: Builder Name: Rotate Angle: 0 Street: 9301 N.Bayshore Drive Permit Office: Miami Cross Ventilation: Yes County: Miami-Dade Jurisdiction: Whole House Fan: No City,State,Zip: Miami Shores, Family Type: Single-family FL, New/Existing: Existing(Projected) Comment: CLIMATE / IECC Design Temp Int Design Temp Heating Design Daily Temp �/ Design Location TMY Site Zone 97.5% 2.5% Winter Summer Degree Days Moisture Range FL,Miami FL_MIAMI_INTL_AP 1 51 90 70 75 149.5 56 Low BLOCKS Number Name Area Volume 1 Blockl 2244 19269 2 Blockl 803 6905.8 3 Block3 502 4413.6 SPACES Number Name Area Volume Kitchen Occupants Bedrooms InfilID Finished Cooled Heated 1 family Room 370 3182 No 4 1 Yes Yes Yes 2 office 186 1599.6 No 1 0 1 Yes Yes Yes 3 powder room 49 392 No 0 0 1 Yes Yes Yes 4 kitchen 404 3474.4 Yes 2 0 1 Yes Yes Yes 5 existing foyer 248 2132.8 No 0 0 1 Yes Yes Yes 6 living Room 750 6450 No 8 0 1 Yes Yes Yes 7 bedroom 1 237 2038.2 No 1 1 1 • .Yes ;' � .X A• 8 bedroom 2 259 2227.4 No 1 1 1 •• Ylss ;•0 Y% Yes"• 0000.• • •• ••••• 9 existing master bed 273 2347.8 No 2 1 1 ••• �Ye •Yes •Yes 0000. 10 master Bathroom 113 971.8 No 0 0 1 ••••#(s • Yes •Yes 11 master closet 80 688 No 0 0 1 • Yes • Yes OYas• 0.0.00 •• • 0000. 12 bath 1 39 335.4 No 0 0 1 ••0 0 As : •.Yfas •YaS• • 13 bath 2 39 335.4 No 0 0 1 ; 0:Yes 'fes Yes"• • • • • 00000 14 laundry Room 145 1247 No 1 0 1 OYes ;•••YDS •Yes 15 guest suite 241 2169 No 1 1 1 •• l;s 0•• � •Yes • 16 guest bathroom 71 610.6 No 0 0 1 Yes 0 0 Yes Yes 17 wic guest suite 45 387 No 0 0 1 Yes Yes Yes 12/8/2016 9:40 AM EnergyGauge®USA-FlaRes2014 Section R405.4.1 Compliant Software Page 2 of 6 FORM R405-2014 FLOORS # Floor Type Space Perimeter Perimeter R-Value Area Joist R-Value Tile Wood Carpet 1 Slab-On-Grade Edge Insulatio family Room 34 ft 4 370 ft2 ---- 0 0 1 2 Slab-On-Grade Edge Insulatio office 12 ft 4 186 ft2 ---- 0 0 1 3 Slab-On-Grade Edge Insulatio powder room 7.9 ft 4 39 ft2 ____ 0 0 1 4 Slab-On-Grade Edge Insulatio kitchen 30 ft 4 404 ft2 ---- 0 0 1 5 Slab-On-Grade Edge Insulatio existing foyer 10.6 ft 4 248 ft2 ---- 0 0 1 6 Slab-On-Grade Edge Insulatio living Room 25 ft 4 750 ft2 ---- 0 0 1 7 Slab-On-Grade Edge Insulatio bedroom 1 14 ft 4 237 ft2 ____ 0 0 1 8 Slab-On-Grade Edge Insulatio bedroom 2 101 ft 4 259 ft2 _--- 0 0 1 9 Slab-On-Grade Edge Insulatio existing master b 33 ft 4 273 ft2 ---- 0 0 1 10SIab-On-Grade Edge Insulatio master Bathroom 11 ft 4 113 ft2 ____ 0 0 1 11SIab-On-Grade Edge Insulatio master closet 5 ft 4 80 ft2 ____ 0 0 1 12SIab-On-Grade Edge Insulatio bath 1 1 ft 4 39 ft2 ---- 0 0 1 13SIab-On-Grade Edge Insulatio bath 2 1 ft 4 39 ft2 ____ 0 0 1 14SIab-On-Grade Edge Insulatio laundry Room 15 ft 4 145 ft2 ____ 0 0 1 15Floor over Garage guest suite _--- ____ 241 ft2 11 0 0 1 16Floor over Garage guest bathroom ---- ___- 71 ft2 11 0 0 1 17Floor over Garage wic guest suite ---- ---- 45 ft2 11 0 0 1 ROOF Roof Gable Roof Solar SA Emitt Emitt Deck Pitch V # Type Materials Area Area Color Absor. Tested Tested . Insul. (deg) • •0000 1 Hip Composition shingles 4157 ft2 0 ft2 Light 0.6 No •• 0.9 Nb0 • 0 22A ATTIC 0.00•• • 0000. 0000.. / 0000 0000. V # Type Ventilation Vent Ratio(1 in) Area RBS • *I RCC •. . 00000 .• .. . .. 0000• 1 Full attic Vented 150 3838 ft2 Y N 0 • • . 0000•• 12/8/2016 9:40 AM EnergyGauge®USA-FlaRes2014 Section R405.4.1 Compliant Software Page 3 of 6 FORM R405-2014 CEILING # Ceiling Type Space R-Value Ins Type Area Framing Frac Truss Type 1 Under Attic(Vented) family Room 30 Batt 370 ft2 0.11 Wood 2 Under Attic(Vented) office 30 Batt 186 ft2 0.11 Wood 3 Under Attic(Vented) powder room 30 Batt 49 ft2 0.11 Wood 4 Under Attic(Vented) kitchen 30 Batt 404 ft2 0.11 Wood 5 Under Attic(Vented) existing foyer 30 Batt 248 ft2 0.11 Wood 6 Under Attic(Vented) living Room 30 Batt 750 ft2 0.11 Wood 7 Under Attic(Vented) bedroom 1 30 Batt 237 ft2 0.11 Wood 8 Under Attic(Vented) bedroom 2 30 Batt 259 ft2 0.11 Wood 9 Under Attic(Vented) existing master b 30 Batt 273 ft2 0.11 Wood 10 Under Attic(Vented) master Bathroom 30 Batt 113 ft2 0.11 Wood 11 Under Attic(Vented) master closet 30 Batt 80 ft2 0.11 Wood 12 Under Attic(Vented) bath 1 30 Batt 39 ft2 0.11 Wood 13 Under Attic(Vented) bath 2 30 Batt 39 ft2 0.11 Wood 14 Under Attic(Vented) guest suite 30 Batt 241 ft2 0.11 Wood 15 Under Attic(Vented) wic guest suite 30 Batt 45 ft2 0.11 Wood 16 Under Attic(Vented) guest bathroom 30 Batt 71 ft2 0.11 Wood WALLS Adjacent Space Cavity Width Height Sheathing Framing Solar Below _ 1 N Exterior Concrete Block-Int InsLibmily Room 5 15 8 6 127.5 ft2 4 0 0.75 0 2 S Exterior Concrete Block-Int Instibmily Room 5 19 8 152.0 ft2 4 0 0.75 0 3 N Exterior Concrete Block-Int Insul office 5 12 4 8 6 104.8 ft2 4 0 0.75 0 _ 4 N Exterior Concrete Block-Int Inspbwder room 5 7 10 8 6 66.6 ft2 4 0 0.75 0 5 N Exterior Concrete Block-Int Insul kitchen 5 30 4 8 6 257.8 ft2 4 0 0.75 0 6 E Exterior Concrete Block-Int Insul kitchen 5 13 4 8 6 113.3 ft2 4 0 0.75 0 _ 7 W Exterior Concrete Block-Int Insekisting foyer 5 9 9 8 6 82.9 ft2 4 0 0.75 0 8 E Exterior Concrete Block-Int Ins living Room 5 25 10 8 6 219.6 ft2 4 0 0.75 0 9 W Exterior Concrete Block-Int Insubedroom 1 5 14 10 8 6 126.1 ft2 4 4 .0.75 0 10 S Exterior Concrete Block-Int Insubedroom 2 5 13 10 8 6 117.6 ft2 • 4. Q 8.75 •.•9. _11 E Exterior Concrete Block-Int Insetxisting mast 5 17 8 6 144.5 ft2 **4 ' Q' .0.75 Q 12 S Exterior Concrete Block-Int Insakisting mast 5 16 8 6 136.0 ft2 0 0.75 ...0 13 S Exterior Concrete Block-Int Insehaster Bathr 5 11 5 8 6 97.0 ft2 ..a. 0. .0.75 ;"�' 14 N Exterior Concrete Block-Int Insalaster closet 5 5 8 6 42.5 ft2 •• to 0, 0.75 0000* 15 W Exterior Concrete Block-Int Inslalundry Room 5 7 2 8 6 60.9 ft2 :*4*: d'. *9.75 ••a _16 S Exterior Concrete Block-Int InsWundry Room 5 20 4 8 6 172.8 ft2 .4: 0 0.75 Q• _17 E Exterior Concrete Block-Int Insialundry Room 5 7 2 8 6 60.9 ft2 : 4 : o •0.75 .••g: 18 W Exterior Concrete Block-Int Insubuest suite 5 22 4 9 201.0 ft2 fit'. Q 0.75 :0090: 19 N Exterior Concrete Block-Int Insuguest suite 5 11 0 9 99.0 ft2 4 0 6.75 * 0 _20 S Exterior Concrete Block-Int Insuguest suite 5 9 10 9 88.5 ft2 4 0 0.75 0 _21 S Exterior Concrete Block-Int InsglJest bathroo 5 9 9 9 87.8 ft2 4 0 0.75 0 _22 E Exterior Concrete Block-Int Insg(jest bathroo 5 9 5 9 84.8 ft2 4 0 0.75 0 _23 W Exterior Concrete Block-Int Insubedroom 2 5 14.9 8.6 128.1 ft2 4 0 0.75 0 _24 N Garage Concrete Block-Int Insdtamily Room 11 15 8 6 127.5 ft2 4 0 0.75 0 12/8/2016 9:40 AM EnergyGauge®USA-FlaRes2014 Section R405.4.1 Compliant Software Page 4 of 6 FORM R405-2014 DOORS # Omt Door Type Space Storms U-Value Width Height Area Ft In Ft In 1 W Wood existing foyer None .46 6 8 48 ft' WINDOWS Orientation shown is the entered,Proposed orientation. Wall Overhang V # Ornt ID Frame Panes NFRC U-Factor SHGC Area Depth Separation Int Shade Screening 1 S 2 Metal Single(Tinted) Yes 1.03 0.4 72.0 ft' 3 ft 0 in 1 ft 0 in Drapes/blinds None 2 N 3 Metal Single(Tinted) Yes 1.03 0.4 36.0 ft' 3 ft 0 in 1 ft 0 in Drapes/blinds None 3 N 4 Metal Single(Tinted) Yes 1.03 0.4 9.0 ft' 3 ft 0 in 1 ft 0 in Drapes/blinds None 4 N 5 Metal Single(Tinted) Yes 1.03 0.4 18.0 ft' 3 ft 0 in 1 ft 0 in Drapes/blinds None 5 E 6 Metal Single(Tinted) Yes 1.03 0.4 80.0 ft' 22 ft 0 in 1 ft 0 in Drapes/blinds None 6 N 5 Metal Single(Tinted) Yes 1.03 0.4 29.3 ft' 3 ft 0 in 1 ft 0 in Drapes/blinds None 7 E 8 Metal Single(Tinted) Yes 1.03 0.4 160.0 ft' 3 ft 0 in 1 ft 0 in Drapes/bfinds None 8 E 11 Metal Single(Tinted) Yes 1.03 0.4 120.0 ft' 3 ft 0 in 1 ft 0 in Drapes/blinds None 9 S 12 Metal Single(Tinted) Yes 1.03 0.4 18.0 ft' 3 ft 0 in 1 ft 0 in Drapes/blinds None 10 S 13 Metal Single(Tinted) Yes 1.03 0.4 9.0 ft' 3 ft 0 in 1 ft 0 in Drapes/blinds None 11 W 23 Metal Single(Tinted) Yes 1.03 0.4 36.0 ft' 3 ft 0 in 1 ft 0 in Drapes/blinds None 12 W 9 Metal Single(Tinted) Yes 1.03 0.4 36.0 ft' 3 ft 0 in 1 ft 0 in Drapes/blinds None 13 S 16 Metal Single(Tinted) Yes 1.03 0.4 36.0 ft' 3 ft 0 in 1 ft 0 in Drapes/blinds None 14 W 18 Metal Single(Tinted) Yes 1.03 0.4 36.0 ft' 3 ft 0 in 1 ft 0 in Drapes/blinds None 15 W 18 Metal Single(Tinted) Yes 1.03 0.4 48.0 ft' 3 ft 0 in 1 ft 0 in Drapes/blinds None 16 S 21 Metal Single(Tinted) Yes 1.03 0.4 18.0 ft' 3 ft 0 in 1 ft 0 in Drapes/blinds None 17 E 22 Metal Single(Tinted) Yes 1.03 0.4 9.0 ft' 3 ft 0 in 1 ft 0 in Drapes/blinds None GARAGE # Floor Area Ceiling Area Exposed Wall Perimeter Avg.Wall Height Exposed Wall Insulation 1 400 ft' 43 ft' 47 ft 10.11 ft 1 INFILTRATION 0000.. 0000. # Scope Method SIA CFM 50 ELA EgLA ACH '••'ACH 50 •• • •' 1 Wholehouse Proposed ACH(50) .000383 3568.6 195.91 368.44 .3257 ••0: •7 0000•. • • 0000 . • • HEATING SYSTEM 0.00•. 0000 • 00000 0 00 . • 0 . # System Type Subtype Efficiency Capacity •0. • • ,Sloe dLbt100 - 00000, 1 Electric Strip Heat None COPA7.6 kBtu/hr •• 1+ sys#1 0• 2 Electric Strip Heat None COPA 5.4 kBtu/hr : • 2• sy9#2•: 0000•• 3 Electric Strip Heat None COP:1 4.5 kBtu/hr 0 .0. • 3 sy t • o. 0• 0 0000 12/8/2016 9:40 AM EnergyGauge®USA-FlaRes2014 Section R405.4.1 Compliant Software Page 5 of 6 FORM R405-2014 COOLING SYSTEM # System Type Subtype Efficiency Capacity Air Flow SHR Block Ducts 1 Central Unit Split SEER: 16 45 kBtu/hr 1350 cfm 0.75 1 sys#1 2 Central Unit Split SEER: 16 29 kBtu/hr 870 cfm 0.75 2 sys#2 3 Central Unit Split SEER:16 24 kBtu/hr 720 cfm 0.75 3 sys#3 HOT WATER SYSTEM # System Type SubType Location EF Cap Use SetPnt Conservation 1 Propane Tankless Exterior 0.94 1 gal 60 gal 120 deg None SOLAR HOT WATER SYSTEM FSEC Collector Storage Cert # Company Name System Model# Collector Model# Area Volume FEF None None ft2 DUCTS / ---Supply-- --Return-- Air CFM 25 CFM25 HVAC# �/ # Location R-Value Area Location Area Leakage Type Handler TOT OUT QN RLF Heat Cool 1 family Room 6 80 ft2 family Room 80 ft2 Default Leakage family Roo (Default) (Default) 1 1 2 existing mast 6 29 ft2 existing mast 320 ft2 Default Leakage master Bat (Default) (Default) 2 2 3 guest suite 6 14 ft2 guest suite 15 ft2 Default Leakage guest suite (Default) (Default) 3 3 TEMPERATURES Programable Thermostat:Y Ceiling Fans: N Coolin Jan Feb Mar Apr May [X]Jun Jul Au Se [ ]Oct Nov Dec HeatinJan Feb Mar Apr E May E ]Jun f Jul f AuSe [ ]Oct Nov Dec VentingJan Feb X Mar Apr [ May ]Jun [ Jul [ Aug Sep [X]Oct Nov Dec Thermostat Schedule: HERS 2006 Reference Hours Schedule Type 1 2 3 4 5 6 7 8 9 10 11 12 Cooling(WD) AM 78 78 78 78 78 78 78 78 80 80 80 80 PM 80 80 78 78 78 78 78 78 78 78 78 78 Cooling(WEH) AM 78 78 78 78 78 78 78 78 78 78 :9..75 78 PM 78 78 78 78 78 78 78 78 0 78 0 78 • 78 •780.9 Heating(WD) AM 66 66 66 66 66 68 68 68 68PM 68 68 68 68 68 68 68 68 •B8••• 68 9•'•69 two 9 Heating(WEH) AM 66 66 66 66 66 68 68 68 PM 68 68 68 68 68 68 68 68 •.68.•• 68 • •66 68 68 ON"' •••• • Osseo 90.0.. •9 • 90.90 e• 90 0 90 00.000 • •9.••• • . • . . 9 .0000• 900..• . . . •0069. .. . 0000 • • . • 12/8/2016 9:40 AM EnergyGauge®USA-FlaRes2014 Section R405.4.1 Compliant Software Page 6 of 6 FORM R405-2014 ENERGY PERFORMANCE LEVEL (EPL) DISPLAY CARD ESTIMATED ENERGY PERFORMANCE INDEX* = 97 The lower the EnergyPerformance Index, the more efficient the home. 9301 N. Bayshore Drive, Miami Shores, FL, 1. New construction or existing Existing(Projecte 9. Wall Types Insulation Area 2. Single family or multiple family Single-family a.Concrete Block-Int Insul,Exterior R=5.0 2772.10 ft2 b.Concrete Block-Int Insul,Adjacent R=11.0 127.50 ft2 3. Number of units,if multiple family 1 c.N/A R= ft2 4. Number of Bedrooms 4 d.N/A R= ft2 5. Is this a worst case? No 10.Ceiling Types Insulation Area a.Under Attic(Vented) R=30.0 3404.00 ft2 6. Conditioned floor area(ft2) 3549 b.N/A R= ft2 7. Windows" Description Area c.N/A R= ft2 a. U-Factor: Sgl,U=1.03 770.33 ft2 11.Ducts R ft2 a.Sup:family Room,Ret:family Room,AH:family 6 80 SHGC: SHGC=0.40 b.Sup: existing master bedroom,Ret:existing mast 6 29 b. U-Factor: N/A ft2 c.Sup:guest suite,Ret:guest suite,AH:guest suite 6 14 SHGC: 12.Cooling systems kBtu/hr Efficiency c. U-Factor: N/A ft2 a.Central Unit 45.0 SEER:16.00 SHGC: b.Central Unit 29.0 SEER:16.00 d. U-Factor: N/A ft2 c.Central Unit 24.0 SEER:16.00 13.Heating systems kBtu/hr Efficiency SHGC: a. Electric Strip Heat 7.6 COP:1.00 Area Weighted Average Overhang Depth: 4.973 ft. b.Electric Strip Heat 5.4 COP:1.00 Area Weighted Average SHGC: 0.400 c.Electric Strip Heat 4.5 COP:1.00 8. Floor Types Insulation Area 14.Hot water systems a.Slab-On-Grade Edge Insulation R=4.0 3182.00 ft2 a.Propane Cap:1 gallons EF:0.94 b.Floor over Garage R=11.0 357.00 ft2 c.N/A R= ft2 b. Conservation features None 15.Credits CF,CV,Pstat I certify that this home has complied with the Florida Energy Efficiency Code for Building Construction through the above energy saving features which will be installed (or exceeded) • ••• vo? s - �'• in this home before final inspection. Otherwise, a new EPL Display Card will be completed •••• ��i°',,,,� • +� �, • based on installed Code compliant features. •00; �.. ',�,, o • y ••• Builder Signature: Date: •••• V ��•• •• Address of New Home: City/FL Zip: WIE •••••• r4.�D � ••:• 0000.. • 0 0 .0000. 0000.. *Note: This is not a Building Energy Rating. If your Index is below 70, your home may quaQfy for energ;efficient mortgage(EEM) incentives if you obtain a Florida EnergyGauge Rating. Contact the EnergyGauge Hotlict'e'a41321) ' 638-1492 or see the EnergyGauge web site at energygauge.com for information and a list of certified Raters. ror information about the Florida Building Code, Energy Conservation, contact the Florida Building Commission's support staff. **Label required by Section R303.1.3 of the Florida Building Code, Energy Conservation, if not DEFAULT. 12/8/2016 9:40 AM EnergyGauge®USA-FlaRes2014 -Section R405.4.1 Compliant Software Page 1 of 1 FORM R405-2014 Florida Department of Business and Professional Regulations Residential Whole Building Performance and Prescriptive Methods ADDRESS: 9301 N.Bayshore Drive Permit Number: Miami Shores,FL, MANDATORY REQUIREMENTS See individual code sections for full details. 0 401.3 Energy Performance Level(EPL)display card(Mandatory). The building official shall require that an energy performance level(EPL) display card be completed and certified by the builder to be accurate and correct before final approval of the building for occupancy.Florida law [Section 553.9085,Florida Statues]requires the EPL display card to be included as an addendum to each sales contract for both presold and nonpresold residential buildings.The EPL display card contains information indicating the energy performance level and efficiencies of components installed in a dwelling unit.The building official shall verify that the EPL display card completed and signed by the builder accurately reflects the plans and specifications submitted to demonstrate compliance for the building.A copy of the EPL display card can be found in Appendix C. 0 R402.4 Air leakage(Mandatory). The building thermal envelope shall be constructed to limit air leakage in accordance with the requirements of Sections R402.1 through R402.4.4. 0 R402.4.1 Building thermal envelope. The building thermal envelope shall comply with Sections R402.4.1.1 and R402.4.1.2.The sealing methods between dissimilar materials shall allow for differential expansion and contraction. • R402.4.1.1 Installation. The components of the building thermal envelope as listed in Table R402.4.1.1 shall be installed in accordance with the manufacturer's instructions and the criteria listed in Table 402.4.1.1,as applicable to the method of construction. Where required by the code official,an approved third party shall inspect all components and verify compliance. • R402.4.1.2 Testing. The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 5 air changes per hour in Climate Zones 1 and 2,and 3 air changes per hour in Climate Zones 3 through 8.Testing shall be conducted with a blower door at a pressure of 0.2 inches w.g.(50 Pascals).Where required by the code official,testing shall be conducted by an approved third party.A written report of the results of the test shall be signed by the party conducting the test and provided to the code official.Testing shall be performed at any time after creation of all penetrations of the building thermal envelope. During testing: 1.Exterior windows and doors,fireplace and stove doors shall be closed,but not sealed,beyond the intended weatherstripping or other infiltration control measures; 2.Dampers including exhaust,intake,makeup air,backdraft and flue dampers shall be closed,but not sealed beyond intended infiltration control measures; 3.Interior doors,if installed at the time of the test,shall be open; 4.Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed; 5.Heating and cooling systems,if installed at the time of the test,shall be turned off;and 6.Supply and return registers,if installed at the time of the test,shall be fully open. O R402.4.2 Fireplaces. New wood-burning fireplaces shall have tight-fitting flue dampers and outdoor combustion air. O R402.4.3 Fenestration air leakage.Windows,skylights and sliding glass doors shall have an air infiltration rate of no more than 0.3 cfm per square foot(1.5 Us/m2),and swinging doors no more than 0.5 cfm per square foot(2.6 Us/m2),when tested according to NFRC 400 or AAMA/WDMA/CSA 101/I.S.2/A440 by an accredited,independent laboratory and listed and labeled by the manufacturer. Exception: Site-built windows,skylights and doors. O R402.4.4 Recessed lighting. Recessed luminaires installed in the building thermal envelope shall be sealed to limit air leakage between conditioned and unconditioned spaces.All recessed luminaires shall be IC-rated and labeled as having an kJaakage rate not more than 2.0 cfm(0.944 Us)when tested in accordance with ASTM E 283 at a 1.57 psf(75 Pa)pre4sure cliigerential All recessed "•••• luminaires shall be sealed with a gasket or caulk between the housing and the interior wall or ceiling c&Arine. •• • • 0 R403.1.1 Thermostat provision(Mandatory). At least one thermostat shall be provided for each separate hea piny*n`cooling system. • 0 R403.1.3 Heat um su lementa heat Mandato Heat um s havin su lementa electric-resistancesti"shall hays controls 6 0 P P pP rY ( rY)• P P 9 PP ry • • that,except during defrost,prevent supplemental heat operation when the heat pump compressor can meet the 4%vg f load. :••••• ••••• 0 R403.2.2 Sealing(Mandatory)AII ducts,air handlers,and filter boxes and building cavities that form the primaiyVfcurttainmepll• • **:**a passageways for air distribution systems shall be considered ducts and plenum chambers,shall be constructed�a nd* aled in icondsnce ..a••• with Section C403.2.7.2 of the Commercial Provisions of this code and shall be shown to meet duct tightness ciiWoo J)4 post-constryction •' or rough-in testing below. ; • ; & • •• Duct tightness shall be verified by testing to Section 803 of the RESNET Standards by either an energy rater cortified.in accor nce wirh Section • 553.99,Florida Statutes,or as authorized by Florida Statutes,to be"substantially leak free"by either of the foll8wipa: 1. Post-construction test:Total leakage shall be less than or equal to 4 cfm(113 Umin)per 100 square feet(9.29 m2)of conaitfonetl floor area when tested at a pressure differential of 0.1 inches w.g.(25 Pa)across the entire system,including the manufacturer's air handler enclosure.All register boots shall be taped or otherwise sealed during the test. 2. Rough-in test:Total leakage shall be less than or equal to 4 cfm(113 Umin)per 100 square feet(9.29 m2)of conditioned floor area when tested at a pressure differential of 0.1 inches w.g.(2513a)across the system,including the manufacturer's air handler enclosure.All registers shall be taped or otherwise sealed during the test.If the air handler is not installed at the time of the test,total leakage shall be less than or equal to 3 cfm (85 Umin)per 100 square feet(9.29 m2)of conditioned floor area. Exceptions: 1. The total leakage test is not required for ducts and air handlers located entirely within the building envelope. 2. Duct testing is not mandatory for buildings complying by Section R405 of this code. 12/8/2016 9:40 AM EnergyGauge®USA-FlaRes2014 -Section R405.4.1 Com Page 1 of 3 FORM R405-2014 MANDATORY REQUIREMENTS - (Continued) ❑ R403.2.3 Building Cavities(Mandatory). Building framing cavities shall not be used as ducts or plenums. ❑ R403.3 Mechanical system piping insulation(Mandatory). Mechanical system piping capable of carrying Fluids above 105•F(41•C) or below 55°F(13°C)shall be insulated to a minimum of R-3., R403.3.1 Protection of piping insulation. ❑ R403.4.1 Circulating hot water systems(Mandatory). Circulating hot water systems shall be provided with an automatic or readily accessible manual switch that can turn off the hot-water circulating pump when the system is not in use. ❑ R403.4.3 Heat traps(Mandatory). Storage water heaters not equipped with integral heat traps and having vertical pipe risers shall have heat traps installed on both the inlets and outlets.External heat traps shall consist of either a commercially available heat trap or a downward and upward bend of at least 3'/2 inches(89 mm)in the hot water distribution line and cold water line located as close as possible to the storage tank. ❑ R403.4.4 Water heater efficiencies(Mandatory). 0 R403.4.4.1 Storage water heater temperature controls • R403.4.4.1.1 Automatic controls. Service water heating systems shall be equipped with automatic temperature controls capable of adjustment from the lowest to the highest acceptable temperature settings for the intended use.The minimum temperature setting range shall be from 100•F to 140°F(38°C to 60°C). • R403.4.4.1.2 Shutdown. A separate switch or a clearly marked circuit breaker shall be provided to permit the power supplied to electric service systems to be turned off.A separate valve shall be provided to permit the energy supplied to the main burner(s) of combustion types of service water heating systems to be turned off. O R403.4.4.2 Water heating equipment. Water heating equipment installed in residential units shall meet the minimum efficiencies of Table C404.2 in Chapter 4 of the Florida Building Code,Energy Conservation,Commercial Provisions,for the type of equipment installed. Equipment used to provide heating functions as part of a combination system shall satisfy all stated requirements for the appropriate water heating category. Solar water heaters shall met the criteria Section R403.4.4.2.1. R403.4.4.2.1 Solar water heating systems. Solar systems for domestic hot water production are rated by the annual solar energy factor of the system.The solar energy factor of a system shall be determined from the Florida Solar Energy Center Directory of Certified Solar Systems.Solar collectors shall be tested in accordance with ISO Standard 9806,Test Methods for Solar Collectors, and SRCC Standard TM-1,Solar Domestic Hot Water System and Component Test Protocol,Collectors in installed solar water heating systems should meet the following criteria: 1. Be installed with a tilt angle between 10 degrees and 40 degrees of the horizontal;and 2. Be installed at an orientation within 45 degrees of true south. ❑ R403.5 Mechanical ventilation(Mandatory). The building shall be provided with ventilation that meets the requirements of the Florida Building Code, Residential or Florida Building Code,Mechanical,as applicable,or with other approved means of ventilation. Outdoor air intakes and exhausts shall have automatic or gravity dampers that close when the ventilation system is not operating,a•:• ❑ R403.6 Heating and cooling equipment(Mandatory). The following sections are mandatory for cooling and** n j equipo e�. • • 00 O R403.6.1 Equipment sizing. Heating and cooling equipment shall be sized in accordance with AC�&A"al S based on the • equipment loads calculated in accordance with ACCA Manual J or other approved heating and cooling;jIGWation methodoLogies, :00**: based on building loads for the directional orientation of the building.The manufacturer and model nuvnber ofrthe out4"ar# indoor units(if split system)shall be submitted along with the sensible and total cooling capacities at the resign conditions •: • described in Section R302.1.This code does not allow designer safety factors,provisions for future ell!*%bD or othrictdrs ••••• which affect equipment sizing.System sizing calculations shall not include loads created by local intefrfiitt@l t mecharffcal l2ntilation •••••• such as standard kitchen and bathroom exhaust systems. :90:0: • • R403.6.1.1 Cooling equipment capacity. Cooling only equipment shall be selected so thatlts total capacitQ is :I#ss thart1W calculated total load,but not more than 1.15 times greater than the total load calculated accord:g t%IV proce8ure selected in•• • Section 403.6,or the closest available size provided by the manufacturer's product lines.The coorespoeding lateattaapacity of tVe • equipment shall not be less than the calculated latent load. 12/8/2016 9:40 AM EnergyGauge®USA-FlaRes2014 -Section R405.4.1 Com Page 2 of 3 FORM R405-2014 MANDATORY REQUIREMENTS - (Continued) 0 R403.6.1.1 Cooling equipment capacity.(continued) The published value for AHRI total capacity is a nominal,rating-test value and shall not be used for equipment sizing.Manufacture's expanded performance data shall be used to select cooling-only equipment.This selection shall be used to select cooling-only equipment.This selection shall be based on the outdoor design dry bulb temperature for the load calculation(or entering water temperature for water-source equipment),the blower cfm provided by the expanded performance data, the design value for entering wet bulb temperature and the design value for entering dry bulb temperature. Design values for entering wet bulb and dry bulb temperature shall be for the indoor dry bulb and relative humidity used for the load calculation and shall be adjusted for return side gains if the return duct(s)is installed in an unconditioned space. Exceptions: 1. Attached single-and multi-family residential equipment sizing may be selected so that its cooling capacity is less than the calculated total sensible load but not less than 80 percent of that load. 2. When signed and sealed by a Florida-registered engineer,in attached single-and multi-family units,the capacity of equipment may be sized in accordance with good design practice. 0 R403.6.1.2 Heating equipment capacity • R403.6.1.2.1 Heat pumps. Heat pumps sizing shall be based on the cooling requirements as calculated according to Section R403.6.1.1 and the heat pump total cooling capacity shall not be more than 1.15 times greater than the design cooling load. • R403.6.1.2.2 Electric resistance furnaces. Electric resistance furnaces shall be sized within 4 kW of the design requirements calculated according to the procedure selected in Section R403.6.1. • R403.6.1.2.3 Fossil fuel heating equipment. The capacity of fossil fuel heating equipment with natural draft atmospheric burners shall not be less than the design load calculated in accordance with Section R403.6.1. 0 R403.6.1.3 Extra capacity required for special occasions. Residences requiring excess cooling or heating equipment capacity on an intermittent basis,such as anticipated additional loads caused by major entertainment events,shall have equipment sized or controlled to prevent continuous space cooling or heating within that space by one or more of the following options: 1. A separate cooling or heating system is utilized to provide cooling or heating to the major entertainment areas. 2. A variable capacity system sized for optimum performance during base load periods is utilized. ❑ R403.7 Systems serving multiple dwelling units(Mandatory). Systems serving multiple dwelling units shall comply with Sections C403 and C404 of the Commercial Provisions in lieu of Section R403. ❑ R403.8 Snow melt system controls(Mandatory). Snow and ice-melting systems,supplied through energy service to the building,shall include automatic controls capable of shutting off the system when the pavement temperature is above 55°F,and no precipitation is falling and an automatic or manual control that will allow shutoff when the outdoor temperature is above 40'F. ❑ R403.9 Swimming pools,inground spas and portable spas(Mandatory). The energy requirements for residential pools and inground spas shall be as specified in Sections R403.9.1 through R403.9.3 and in accordance with ANSI/APSP-15.The energy requirements for portable spas shall be in accordance with ANSI/APSP-14. Q R403.9.1 Pool and spa heaters. All pool heaters shall be equipped with a readily accessible on-off switch that is mounted outside the heater to allow shutting off the heater without adjusting the thermostat setting. R403.9.1.1 Gas and oil-fired pool and spa heaters. All gas-and oil-fired pool and space heaters shall have a minimum thermal efficiency of 82 percent for heaters manufactured on or after April 16,2013 when tested in accordance with ANSI Z 21.56. Pool heaters fired by natural gas or LP gas shall not have continuously burning pilot lights. R403.9.1.2 Heat pump pool heaters. Heat pump pool heaters shall have a minimum COP of 4.0 when test jr&Jgpordance with AHRI 1160,Table 2,Standard Rating Conditions-Low Air Temperature.A test report from in inA ndent faboratory is •••• • required to verify procedure compliance.Geothermal swimming pool heat pumps are not required b meet this standard. • 0 . O R403.9.2 Time switches. Time switches or other control method that can automatically turnoff and•on heaters and•pumps accordin'g'to a•• preset schedule shall be installed on all heaters and pumps.Heaters,pumps and motors that have Will Ih'tiMhrs shall be deemed in;••••; compliance with this equipment. •0 0• • 0 • .000% Exceptions: 0000 0 00000 • 1. Where public health standards require 24-hour pump operations. ••:••: :•• •• •••••• 2. Where pumps are required to operate solar-and waste-heat-recovery pool heating systefhs!• • •• 000000 3. Where pumps are powered exclusively from on-site renewable generation. •••••• • •• O R403.9.3 Covers. Heated swimming pools and inground permanently installed spas shall be equippe8 with a%por-rgt@rq p:.cover oR 5i ••• at the water surface or a liquid cover or other means proven to reduce heat loss. • • • • • . • 0000•• Exception: Outdoor pools deriving over 70 percent of the energy for heating from site-recovereeltnerty,sucl�Q3jfteat puml9or • solar energy source computed over an operating season. 0• ❑ RR404.1 Lighting equipment(Mandatory). A minimum of 75 percent of the lamps in permanently installed lighting fixtures shall be high-efficacy lamps or a minimum of 75 percent of permanently installed lighting fixtures shall contain only high efficacy lamps. Exception: Low-voltage lighting shall not be required to utilize high-efficacy lamps. O R404.1.1 Lighting equipment(Mandatory). Fuel gas lighting systems shall not have continuously burning pilot lights ❑ R405.2 Performance ONLY. All ducts not entirely inside the building thermal envelope shall be insulated to a minimum of R-6. O R405.2.1 Performance ONLY, Ceilings shall have minimum insulation of R-19.Where single assemby of the exposed deck and beam type or concrete deck roofs do not have sufficent space,R-10 is allowed. 12/8/2016 9:40 AM EnergyGauge@ USA-FlaRes2014 -Section R405.4.1 Com Page 3 of 3 FORM R405-2014 TABLE 402.4.1.1 AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA Project Name: Kurlandski Residence Builder Name: Street: 9301 N.Bayshore Drive Permit Office: Miami City,State,Zip: Miami Shores,FL, Permit Number: Owner: Mr.&Mrs.Kurlandski Jurisdiction: Design Location: FL, Miami COMPONENT CRITERIA CHECK Air barrier and thermal barrier A continuous air barrier shall be installed in the building envelope. Exterior thermal envelope contains a continuous barrier. Breaks or joints in the air barrier shall be sealed. Air-permeable insulation shall not be used as a sealing material. Ceiling/attic The air barrier in any dropped ceiling/soffit shall be aligned with the insulation and any gaps in the air barrier shall be sealed. Access openings,drop down stairs or knee wall doors to unconditioned attic spaces shall be sealed. Corners and headers shall be insulated and the junction of the foundation Walls and sill plate shall be sealed. The junction of the top plate and the top or exterior walls shall be sealed. Exterior thermal envelope insulation for framed walls shall be installed in substantial contact and continuous alignment with the air barrier. Knee walls shall be sealed. Windows, skylights and doors The space between window/doorjambs and framing and skylights and L� framing shall be sealed. Rim joists Rim joists are insulated and include an air barrier. v^ Floors (including above-garage Insulation shall be installed to maintain permanent contact with underside and cantilevered floors) of subfloor decking. The air barrier shall be installed at any exposed edge of insulation. Crawl space walls Where provided in lieu of floor insulation, insulation shall be permanently attached to the crawlspace walls. Exposed earth in unvented crawl spaces shall be covered with a Class 1 vapor retarder with overlapping joints taped. Shafts, penetrations Duct shafts,utility penetrations,and flue shaft openings to exterior or unconditioned space shall be sealed. Narrow cavities Batts in narrow cavities shall be cut to fit,or narrow cavities shall be filled by insulation that on installation readily conforms to the available cavjty •• 1/ •• •• spaces. • Garage separation Air sealing shall be provided between the garage and conditioned..sipmes. • .•L/... :. Recessed lighting Recessed light fixtures installed in the building thermal envelope �a�l•be • L�.. . air tight, IC rated,and sealed to the drywall. . ... .. Plumbing and wiring Batt insulation shall be cut neatly to fit around wiring and plumwml irs. .. . ... .• exterior walls,or insulation that on installation readily conforms.to au81able : • .L/=.. .0 space shall extend behind piping and wiring. ...... Shower/tub on exterior wall Exterior walls adjacent to showers and tubs shall be insulated gnd the air :•• o•e barrier installed separating them from the showers and tubs. • • • 000 .. • Electrical/phone box on The air barrier shall be installed behind electrical or communication boxes or•• air sealed boxes shall be installed. HVAC register boots HVAC register boots that penetrate building thermal envelope shall be (� sealed to the sub-floor or drywall. Fireplace An air barrier shall be installed on fireplace walls. Fireplaces shall have Basketed doors 12/8/2016 9:40 AM EnergyGauge®USA-FlaRes2014 Section R405.4.1 Compliant Software Page 1 of 1 FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION Envelope Leakage Test Report Prescriptive and Performance Method Project Name: Kurlandski Residence Builder Name: Street: 9301 N.Bayshore Drive Permit Office: Miami City,State,Zip: Miami Shores,FL, Permit Number: Design Location: FL,Miami Jurisdiction: Cond.Floor Area:: 3549 sq.ft. Cond.Volume: 30588 cu ft. Envelope Leakage Test Results Leakage Characteristics Regression Data: C: n: R: CFM(50): Single or Multi Point Test Data HOUSE PRESSURE FLOW: ELA' 1 Pa cfm Eq LA: 2 Pa cfm ACH: 3 Pa cfm ACH(50): 4 Pa cfm 5 Pa cfm SLA. 6 Pa cfm R402.4.1.2 Testing. The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 5 air changes per hour in Climate Zones 1 and 2,3 air changes per hour in Climate Zones 3 through 8.Testing shall be conducted with a blower door at a pressure of 0.2 inches w.g.(50 Pascals).Where required by the code official,testing shall be conducted by an approved third party.A written report of the results of the test shall be signed by the party conducting the test and provided to the code official.Testing shall be performed at any time after creation of all penetrations of the building thermal envelope. During testing: 1.Exterior windows and doors,fireplace and stove doors shall be closed,but not sealed,beyond the intended weatherstripping or other infiltration control measures; 2.Dampers including exhaust,intake,makeup air,backdraft and flue dampers shall be closed,but not sealed beyond intended infiltration control measures; 3.Interior doors,if installed at the time of the test,shall be open; 4.Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed; ;..•;, 5.Heating and cooling systems,if installed at the time of the test,shall be turned off;and • • • • 6.Supply and return registers,if installed at the time of the test,shall be fully open. .••••. : ••• .•..;• • I hereby certify that the above envelope leakage Where required by the code official, •,,,• O�Tb �rF •• • performance results demonstrate compliance testing shall be conducted by an v ,,,: ,,, O� •• with Florida Energy Code requirements in approved third party.A written y "'� r '�i; `;,, • accordance with Section R402.4.1.2. report of the results of the test shall �' 'r"" `� °;°'3" p� • be signed by the third party x . _ ,. conducting the test and provided to 0•• *• "I' a• •• SIGNATURE: the code official. PRINTED NAME: r�COp we DATE: BUILDING OFFICIAL: DATE: 12/8/2016 9:40 AM EnergyGauge®USA-FlaRes2014 -Section R405.4.1 Compliant Software Page 1 of 1 Building Input Summary Report PROJECT Title: Kurlandski Residence Bedrooms: 4 Address Type: Street Address Building Type: User Bathrooms: 3 Lot# Owner: Mr.&Mrs.Kurlandski Conditioned Area: 3549 sq.ft. Block/SubDivision: #of Units: 1 Total Stories: 2 PlatBook: Builder Name: Worst Case: No Street: 9301 N. Bayshore Drive Permit Office: Miami Rotate Angle: 0 County: Miami-Dade Jurisdiction: Cross Ventilation: Yes City,State,Zip: Miami Shores, Family Type: Single-family Whole House Fan: No FL, New/Existing: Existing(Projected) Terrain: Suburban Year Construct: 1955 Shielding: Suburban Comment: CLIMATE Design Design Temp Int Design Temp Heating Design Daily Temp Location Tmy Site 97.5% 2.5% Winter Summer Degree Days Moisture Range FL, Miami FL MIAMI INTL AP 51 90 70 75 149.5 56 Low UTILITY RATES Fuel Unit Utility Name Monthly Fixed Cost $/Unit Electricity kWh EnergyGauge Default 0 0.1188 Natural Gas Therm EnergyGauge Default 0 1.72 Fuel Oil Gallon EnergyGauge Default 0 1.1 Propane Gallon EnergyGauge Default 0 2.401 SURROUNDINGS Shade Trees Adjacent Buildings Ornt Type Height Width Distance Exist Height Width Distance N None Oft Oft Oft Oft Oft Oft NE None Oft Oft Oft Oft Oft Oft E None Oft Oft Oft Oft Oft Oft SE None Oft Oft Oft Oft Oft Oft S None Oft Oft Oft Oft Oft Oft SW None Oft Oft Oft Oft Oft Oft W None Oft Oft Oft Oft Oft Oft NW None Oft Oft Oft Oft peflee;e Oft BLOCKS •• •• • Number Name Area Volume •••••• • • • sees • . . • 1 Block1 2244 19269 • • •••••• eeee sees. 2 Block2 803 6905.8 •••••• •• • ••••• 3 Block3 502 4413.6 • SPACES a sees•• Number Name Area Volume Kitchen Occupants Bedrooms Finished e•tooled Tieated• 1 family Room 370 3182 No 4 Yes Yes Yes 2 office 186 1599.6 No 1 0 Yes Yes Yes 3 powder room 49 392 No 0 0 Yes Yes Yes 4 kitchen 404 3474.4 Yes 2 0 Yes Yes Yes 12/8/2016 9:49 AM EnergyGauge®/USRCSB v5.1 Page 1 of 8 5 existing foyer 248 2132.8 No 0 0 Yes Yes Yes Building Input Summary Report SPACES Number Name Area Volume Kitchen Occupants Bedrooms Finished Cooled Heated 6 living Room 750 6450 No 8 0 Yes Yes Yes 7 bedroom 1 237 2038.2 No 1 1 Yes Yes Yes 8 bedroom 2 259 2227.4 No 1 1 Yes Yes Yes 9 existing master bed 273 2347.8 No 2 1 Yes Yes Yes 10 master Bathroom 113 971.8 No 0 0 Yes Yes Yes 11 master closet 80 688 No 0 0 Yes Yes Yes 12 bath 1 39 335.4 No 0 0 Yes Yes Yes 13 bath 2 39 335.4 No 0 0 Yes Yes Yes 14 laundry Room 145 1247 No 1 0 Yes Yes Yes 15 guest suite 241 2169 No 1 1 Yes Yes Yes 16 guest bathroom 71 610.6 No 0 0 Yes Yes Yes 17 wic guest suite 45 387 No 0 0 Yes Yes Yes FLOORS (Total Exposed Area= 3539 sq.ft.) # Floor Type Space Perimeter Perimeter R-Value Area Joist R-Value Tile Wood Carpet 1 Slab-On-Grade Edge Insulation family Room 34 ft 4 370 ft2 0 0 1 2 Slab-On-Grade Edge Insulation office 12 It 4 186 ft2 ____ 0 0 1 3 Slab-On-Grade Edge Insulation powder room 7.9 It 4 39 ft2 0 0 1 4 Slab-On-Grade Edge Insulation kitchen 30 It 4 404 ft2 0 0 1 5 Slab-On-Grade Edge Insulation existing foyer 10.6 ft 4 248 ft2 0 0 1 6 Slab-On-Grade Edge Insulation living Room 25 It 4 750 ft2 0 0 1 7 Slab-On-Grade Edge Insulation bedroom 1 14 ft 4 237 ft2 0 0 1 8 Slab-On-Grade Edge Insulation bedroom 2 101 ft 4 259 ft2 ____ 0 0 1 9 Slab-On-Grade Edge Insulation existing master b 33 ft 4 273 ft2 ____ 0 1 :A••:• 00 0 10 Slab-On-Grade Edge Insulation master Bathroom 11 It 4 113 ft2 _ 009 • 0 A •....0 0 00 000000 -0 • 11 Slab-On-Grade Edge Insulation master closet 5 ft 4 80 ft2 0 0 :•••A: . • 9090.. 12 Slab-On-Grade Edge Insulation bath 1 1 ft 4 39 ft20 0 �9 13 Slab-On-Grade Edge Insulation bath 2 1 ft 4 39 ft2 —� 0 0 •�. :0:000 00 14 Slab-On-Grade Edge Insulation laundry Room 15 ft 4 145 ft2 040000• 0 10 • . • 0090.• .• • 9000 15 Floor over Garage guest suite —__ __— 241 ft2 11 •0�• 0 0 1 16 Floor over Garage guest bathroom ____ ____ 71 ft2 11 0 0 1 17 Floor over Garage wic guest suite 45 ft2 11 0 0 1 12/8/2016 9:49 AM EnergyGauge®/USRCSB v5.1 Page 2 of 8 Building Input Summary Report ROOF Roof Gable Roof Solar SA Emitt Emitt Deck Pitch # Type Materials Area Area Color Absor. Tested Tested Insul. (deg) 1 Hip Composition shingles 4157 ft2 0 ft2 Light 0.6 No 0.9 No 0 22.6 ATTIC # Type Ventilation Vent Ratio(1 in) Area RBS IRCC 1 Full attic Vented 150 3838 ft2 Y N CEILING (Total Exposed Area= 3404 sq.ft.) # Ceiling Type Space R-Value Ins.Type Area Framing Fraction Truss Type 1 Under Attic() family Room 30 Batt 370 ft2 0.11 Wood 2 Under Attic() office 30 Batt 186 ft2 0.11 Wood 3 Under Attic Q powder room 30 Batt 49 ft2 0.11 Wood 4 Under Attic() kitchen 30 Batt 404 ft2 0.11 Wood 5 Under Attic() existing foyer 30 Batt 248 ft2 0.11 Wood 6 Under Attic() living Room 30 Batt 750 ft2 0.11 Wood 7 Under Attic() bedroom 1 30 Batt 237 ft2 0.11 Wood 8 Under Attic() bedroom 2 30 Batt 259 ft2 0.11 Wood 9 Under Attic() existing master b 30 Batt 273 ft2 0.11 Wood 10 Under Attic() master Bathroom 30 Batt 113 ft2 0.11 Wood 11 Under Attic() master closet 30 Batt 80 ft2 0.11 Wood 12 Under Attic() bath 1 30 Batt 39 ft2 0.11 Wood 13 Under Attic() bath 2 30 Batt 39 ft2 0.11 Wood 14 Under Attic() guest suite 30 Batt 241 ft2 0.11 Wood 15 Under Attic() wic guest suite 30 Batt 45 ft2 0.11 Wood 16 Under Attic() guest bathroom 30 Batt 71 ft2 0.11 Wood WALLS (Total Exposed Area= 2900 sq.ft.) Wall orientation below is as entered. Actual orientation is modified by rotate angle shown in"Project'section above. Adjacent Space Cavity Width Height Sheathing Framing Solar Below Ft In Area R-Value Fraction Absor. Grade/o 1 N Exterior Concrete Block-Int Insul family Room 5 15 8 6 127.5 ft2 4 :Coo**0.75 .••.1L 2 S Exterior Concrete Block-Int Insul family Room 5 19 8 152.0 ft2 •• 4• :CP. • 0.75 •*0 3 N Exterior Concrete Block-Int Insul office 5 12 4 8 6 104.8 ft2 •4 0 0.75 0 4 N Exterior Concrete Block-Int Insul powder room 5 7 10 8 6 66.6 ft2 ..•4 .0 . 0.75 ; tL' • • ••.••. 5 N Exterior Concrete Block-Int Insul kitchen 5 30 4 8 6 257.8 ft2 0004 00 0.75 •0:0 6 E Exterior Concrete Block-Int Insul kitchen 5 13 4 8 6 113.3 ft2 • 4• :0• • 0.75 '***'0 7 W Exterior Concrete Block-Int Insul existing foyer 5 9 9 8 6 82.9 ft2 ..•.4. 0 0.75 .00 8 E Exterior Concrete Block-Int Insul living Room 5 25 10 8 6 219.6 ft2 ' 4• ;Q..;. 0.75 0 0 •'0• 9 W Exterior Concrete Block-Int Insul bedroom 1 5 14 10 8 6 126.1 ft2 •4• 00 0.75 •••�P 10 S Exterior Concrete Block-Int Insul bedroom 2 5 13 10 8 6 117.6 ft2 4 �0. : 0.75 0 11 E Exterior Concrete Block-Int Insu2xisting master 5 17 8 6 144.5 ft2 4 0 0.75 0 12 S Exterior Concrete Block-Int Insuixisting master 5 16 8 6 136.0 ft2 4 0 0.75 0 12/8/2016 9:49 AM EnergyGauge®/USRCSB v5.1 Page 3 of 8 Building Input Summary Report WALLS (Total Exposed Area= 2900 sq.ft.) Wall orientation below is as entered. Actual orientation is modified by rotate angle shown in"Project'section above. Adjacent Space Cavity Width Height Sheathing Framing Solar Belo w # Ornt To Wall Type R-Value Ft In Ft In Area R-Value Fraction Absor. Grade/o 13 S Exterior Concrete Block-Int Insutnaster Bathroo 5 11 5 8 6 97.0 ft2 4 0 0.75 0 14 N Exterior Concrete Block-Int Insul master closet 5 5 8 6 42.5 ft2 4 0 0.75 0 15 W Exterior Concrete Block-Int Insullaundry Room 5 7 2 8 6 60.9 ft2 4 0 0.75 0 16 S Exterior Concrete Block-Int Insullaundry Room 5 20 4 8 6 172.8 ft' 4 0 0.75 0 17 E Exterior Concrete Block-Int Insullaundry Room 5 7 2 8 6 60.9 ft2 4 0 0.75 0 18 W Exterior Concrete Block-Int Insul guest suite 5 22 4 9 201.0 ft2 4 0 0.75 0 19 N Exterior Concrete Block-Int Insul guest suite 5 11 0 9 99.0 ft2 4 0 0.75 0 20 S Exterior Concrete Block-Int Insul guest suite 5 9 10 9 88.5 ft2 4 0 0.75 0 21 S Exterior Concrete Block-Int Insu@uest bathroom 5 9 9 9 87.8 ft2 4 0 0.75 0 22 E Exterior Concrete Block-Int Insu@uest bathroom 5 9 5 9 84.8 ft2 4 0 0.75 0 23 W Exterior Concrete Block-Int Insul bedroom 2 5 14.9 8.6 128.1 ft2 4 0 0.75 0 24 N Garage Concrete Block-Int Insul family Room 11 15 8 6 127.5 ft2 4 0 0.75 0 Total Exposed Gross Wall Area: 2900 sq.ft. Total Window Area: 770 sq.ft. Total Door Area: 48 sq.ft. Net Wall Area: 2081 sq.ft. DOORS (Total Exposed Area= 48 sq.ft.) Width Height # Ornt Adjacent to Door Type Space Storms U-Value Ft In Ft In Area 1 W Exterior Wood existing foyer None .46 6 8 48 ft2 WINDOWS (Total Exposed Area= 770 sq.ft.) Wall Overhang # Ornt ID Frame Panes NFRC U-Factor SHGC Storm Area Depth Separation Interior Shade Screening 1 S 2 Metal Single(Tinted) Yes 1.03 0.4 N 72.0 ft2 3 ft 0 in 1 ft 0 in Drapes/blinds None 2 N 3 Metal Single(Tinted) Yes 1.03 0.4 N 36.0 ft2 3 ft 0 in 1 ft 0 in Drapes/blinds None 3 N 4 Metal Single(Tinted) Yes 1.03 0.4 N 9.0 ft2 3 ft 0 in 1 ft 0 in Drapes/blinds None 4 N 5 Metal Single(Tinted) Yes 1.03 0.4 N 18.0 ft2 3 ft 0 in 1 ft 0 in Drapes/blinds None 5 E 6 Metal Single(Tinted) Yes 1.03 0.4 N 80.0 ft2 22 ft 0 in 1 ft 0 in Drapes/blinds None 6 N 5 Metal Single(Tinted) Yes 1.03 0.4 N 29.3 ft2 3 ft 0 in 1 ft 0 in Drapes/blinds None 7 E 8 Metal Single(Tinted) Yes 1.03 0.4 N 160.0 ft2 3 ft 0 in 1 ft 0 in Drape/¢Ilyd;. None 8 E 11 Metal Single(Tinted) Yes 1.03 0.4 N 120.0 ft2 3 ft 0 in 1 ft in• .Drapes/blinds None 9 S 12 Metal Single(Tinted) Yes 1.03 0.4 N 18.0 ft2 3 ft 0 in 1 ftDjq...Drapej1bfr>iC;' wqr;. . 10 S 13 Metal Single(Tinted) Yes 1.03 0.4 N 9.0 ft2 3 ft 0 in 1 ft 104iR•••Drapes/blirrds %rLe..; 11 W 23 Metal Single(Tinted) Yes 1.03 0.4 N 36.0 ft2 3 ft 0 in 1 ft-07 *Drapes/"* None � 12 W 9 Metal Single(Tinted) Yes 1.03 0.4 N 36.0 ft2 3 ft 0 in 1 ftDjq...Drape4linds l QorL.- 13 S 16 Metal Single(Tinted) Yes 1.03 0.4 N 36.0 ft2 3 ft 0 in 1 ft Vin•• Drapes/blirM MerV s• 14 W 18 Metal Single(Tinted) Yes 1.03 0.4 N 36.0 ft2 3 ft 0 in 1 ftain:*:Drapes/blinds None• 15 W 18 Metal Single(Tinted) Yes 1.03 0.4 N 48.0 ft2 3 ft 0 in 1 ftp in . Drapeit"A. gone . 16 S 21 Metal Single(Tinted) Yes 1.03 0.4 N 18.0 ft2 3 ft 0 in 1 ft 04M •Drapel/bItip, Mone • 17, E 22 Metal Single(Tinted) Yes 1.03 0.4 N 9.0 ft2 3 ft 0 in 1 ft 0 in Drapes/trends* None 12/8/2016 9:49 AM EnergyGauge®/USRCSB v5.1 Page 4 of 8 Building Input Summary Report INFILTRATION # Scope Method SLA CFM 50 ELA EgLA ACH ACH 50 Space(s) 1 Wholehouse Proposed ACH(50) .000383 3568.6 195.91 368.44 .3257 7 All GARAGE # Floor Area Roof Area Exposed Wall Perimeter Avg.Wall Height Exposed Wall Insulation 1 400 ft2 43 ft2 47 ft 10.11 ft 1 MASS Mass Type Area Thickness Furniture Fraction Space No Added Mass 0 ft2 0 ft 0.3 family Room No Added Mass 0 ft2 0 ft 0.3 office No Added Mass 0 ft2 0 ft 0.3 powder room No Added Mass 0 ft2 0 ft 0.3 kitchen No Added Mass 0 ft2 0 ft 0.3 existing foyer No Added Mass 0 ft2 0 ft 0.3 living Room No Added Mass 0 ft2 0 ft 0.3 bedroom 1 No Added Mass 0 ft2 0 ft 0.3 bedroom 2 No Added Mass 0 ft2 0 ft 0.3 existing master bed No Added Mass 0 ft2 0 ft 0.3 master Bathroom No Added Mass 0 ft2 0 ft 0.3 master closet No Added Mass 0 ft2 0 ft 0.3 bath 1 No Added Mass 0 ft2 0 ft 0.3 bath 2 No Added Mass 0 ft2 0 ft 0.3 laundry Room No Added Mass 0 ft2 0 ft 0.3 guest suite No Added Mass 0 ft2 0 ft 0.3 guest bathroom No Added Mass 0 ft2 0 ft 0.3 wic quest suite HEATING SYSTEM # System Type Subtype Efficiency Capacity —Geothermal HeatPump--- Ducts Block Entry Power Volt. Curr 1 Electric Strip Heat None COPA 7.6 kBtu/hr . 0 . 0 ;'G"' sys#1....i 2 Electric Strip Heat None C0P:1 5.4 kBtu/hr •"0 • 0 :09 •• sys#2 • 3 Electric Strip Heat None COPA 4.5 kBtu/hr 0 . 0 0 s s#3 COOLING SYSTEM0000 '0'0• • . 0000.. # System Type Subtype Efficiency Capacity Air FjgA 0 SHR.. .Ducts ,.090 1 Central Unit Split SEER:16 45 kBtu/hr 1350 L_tm••0 0.75• •• sys#1 ••••1• 2 Central Unit Split SEER:16 29 kBtu/hr 870 s>:*: 0.75 • sys#2 3 Central Unit Split SEER:16 24 kBtu/hr 720 ;fm . 0.75;""'s s#3 3 12/8/2016 9:49 AM EnergyGauge®/USRCSB v5.1 Page 5 of 8 Building Input Summary Report HOT WATER SYSTEM # System Type SubType Location EF Cap Use SetPnt Fixture Flow Pipe Ins. Pipe length 1 Propane Tankless Exterior 0.94 1 gal 60 gal 120 deg Standard None 104.24962907930 Recirculation Recirc Control Loop Branch Pump DWHR Facilities Equal DWHR Other Credits System Type length length power Connected Flow Eff No NA NA NA NA No NA NA NA None SOLAR HOT WATER Collector Surface Absorp. Trans Tank Tank Tank Heat PV Pump Collector Type Tilt Azimuth Area Loss Coef. Prod. Corr. Volume U-Value Surf Area Exch Eff Pumped Energy DUCTS DUCT Supply-- ----Return--- Air CFM 25 CFM25 HVAC# # Location R-Value Area Location R-Value Area Leakage Type Handler TOT OUT QN RLF Heat Cool 1 family Room 6 80 ft2 family Room 6 80 ft= Default Leakage family Roo (Default) (Default) 1 1 2 existing mast 6 29 ft2 existing mast 6 320 ft2 Default Leakage master Bat (Default) (Default) 2 2 3 auest suite 6 14 ft2 guest suite 6 15 ft2 Default Leakage guest suite (Default) (Default) 3 3 TEMPERATURES Programable Thermostat:Y Ceiling Fans: N CoolingJan Feb Mar Apr May X Jun X Jul rj Au Se Oct ]Nov HDec Heatinf X Jan HFeb f X�Mar f Apr f May f Jun Jul Au �Xj SeP E_�Oct X]Nov Dec Ventin [ Jan Feb X Mar [X A r [ Ma [ Jun Jul Aug Se [X Oct [X]Nov Dec Thermostat Schedule: HERS 2006 Reference Hours Schedule Type 1 2 3 4 5 6 7 8 9 10 11 12 Cooling(WD) AM 78 78 78 78 78 78 78 78 80 80 80 80 PM 80 80 78 78 78 78 78 78 78 78 78 78 Cooling(WEH) AM 78 78 78 78 78 78 78 78 78 78 78 78 PM 78 78 78 78 78 78 78 78 78 78 78 78 Heating(WD) AM 66 66 66 66 66 68 68 68 68 68 68 68 PM 68 68 68 68 68 68 68 68 68 68 66 66 Heating(WEH) AM 66 66 66 66 66 68 68 68 68 68 68 68 PM 68 68 68 68 68 68 68 68 68 68 66 66 9900•• • • • 9640•6 •• • •• • • 0 • • 4 ••00.69 • •• •000•• • 9999•• • • 6 060.99 • • 90006• 9999 • 9999• 009.6• •• • 6•090 •• •• 6 •6 00.00••• 9999•• • • • • • • • • • 6 9999•• •••6.9 • • • •0000• 00 *000 12/8/2016 9:49 AM EnergyGauge®/USRCSB v5.1 Page 6 of 8 Building Input Summary Report APPLIANCES& LIGHTING Appliance Schedule: HERS 2006 Reference Hours Schedule Type 1 2 3 4 5 6 7 8 9 10 11 12 Ceiling Fans(Summer) AM 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.33 0.33 0.33 0.33 0.33 %Released: 100 PM 0.33 0.33 0.33 0.33 0.33 1 0.9 0.9 0.9 0.9 0.9 0.65 Annual Use: 0 kWhNr Peak Value: 0 Watts Clothes Washer AM 0.105 0.081 0.046 0.046 0.081 0.128 0.256 0.57 0.849 1 0.977 0.872 %Released: 60 PM 0.779 0.698 0.605 0.57 0.581 0.57 0.57 0.57 0.57 0.488 0.43 0.198 Annual Use: 0 kWhNr Peak Value: 0 Watts Dishwasher AM 0.139 0.05 0.028 0.024 0.029 0.09 0.169 0.303 0.541 0.594 0.502 0.443 %Released: 60 PM 0.377 0.396 0.335 0.323 0.344 0.448 0.791 1 0.8 0.597 0.383 0.281 Annual Use: 0 kWhNr Peak Value: 0 Watts Dryer AM 0.2 0.1 0.05 0.05 0.05 0.075 0.2 0.375 0.5 0.8 0.95 1 %Released: 10 PM 0.875 0.85 0.8 0.625 0.625 0.6 0.575 0.55 0.625 0.7 0.65 0.375 Annual Use: 0 kWhNr Peak Value: 0 Watts Lighting AM 0.16 0.15 0.16 0.18 0.23 0.45 0.4 0.26 0.19 0.16 0.12 0.11 %Released: 90 PM 0.16 0.17 0.25 0.27 0.34 0.55 0.55 0.88 1 0.86 0.51 0.28 Annual Use: 3294 kWhNr Peak Value: 1076 Watts Miscellaneous AM 0.48 0.47 0.47 0.47 0.47 0.47 0.64 0.71 0.67 0.61 0.55 0.53 %Released: 90 PM 0.52 0.5 0.5 0.5 0.59 0.73 0.79 0.99 1 0.96 0.77 0.55 Annual Use: 0 kWhNr Peak Value: 0 Watts Pool Pump AM 0 0 0 0 0 0 0 0 0 1 1 1 %Released: 0 PM 1 1 1 1 0 0 0 0 0 0 0 0 Annual Use: 0 kWhNr Peak Value: 0 Watts Range AM 0.057 0.057 0.057 0.057 0.057 0.114 0.171 0.286 0.343 0.343 0.343 0.4 %Released: 100 PM 0.457 0.343 0.286 0.4 0.571 1 0.857 0.429 0.286 0.229 0.171 0.114 Annual Use: 0 kWhNr Peak Value: 0 Watts Refrigeration AM 0.85 0.78 0.75 0.73 0.73 0.73 0.75 0.75 0.8 0.8 0.8 0.8 %Released: 100 PM 0.88 0.85 0.85 0.83 0.88 0.95 1 0.98 0.95 0.93 0.9 0.85 Annual Use: 0 kWhNr Peak Value: 0 Watts Well Pump AM 0.05 0.05 0.05 0.05 0.05 0.05 0.1 0.1 0.1 0.1 0.1 0.1 %Released: 0 PM 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 Annual Use: 0 kWhNr Peak Value: 0 Watts HARD WIRED LIGHTING ID Type Screen Location Total# Qualify# Comp FI All Other FL txtBulbtype Schedule Watts per bulb ...... 1 Hard-Wir Default Exterior 20 2 0 2 Incandes •H ERS201 60 ••00:9 2 Hard-Wir Default Garage 20 2 0 2 Incandes* kRSAT. •.60 �. . .. MISC ELECTRICAL LOADS Geese* • ID Type Screen Item Quantity Catagory Operating Locatiert•• Schedule Off Startl y• 1 MiscElec Simple Default 1 1 Main ..•..fIERS2;1r..•1 ...... . . 12/8/2016 9:49 AM EnergyGauge®/USRCSB v5.1 Page 7 of 8 Building Input Summary Report APPLIANCES& LIGHTING SCHEDULES Appliance Schedule: HERS2014 Hours Schedule Type 1 2 3 4 5 6 7 8 9 10 11 12 Occupancy peak: 400 Btu AM 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.98 0.46 0.27 0.27 0.27 %Released: 100% PM 0.27 0.27 0.27 0.27 0.33 0.61 1 1 0.93 0.93 0.93 0.93 refrig peak: 0 W AM 0.824 0.804 0.784 0.764 0.744 0.734 0.744 0.754 0.764 0.794 0.814 0.854 %Released: 100% PM 0.854 0.864 0.884 0.904 0.925 0.945 0.925 0.915 0.904 0.894 0.874 0.854 cWash peak: 0 W AM 0.2 0.1 0.05 0.05 0.05 0.075 0.2 0.375 0.5 0.8 0.95 1 %Released: 30% PM 0.875 0.85 0.8 0.625 0.625 0.6 0.575 0.55 0.625 0.7 0.65 0.375 E-cDry peak: 0 W AM 0.2 0.1 0.05 0.05 0.05 0.075 0.2 0.375 0.5 0.8 0.95 1 %Released: 15% PM 0.875 0.85 0.8 0.625 0.625 0.6 0.575 0.55 0.625 0.7 0.65 0.375 dWash peak: 0 W AM 0.139 0.05 0.028 0.024 0.029 0.09 0.169 0.303 0.541 0.594 0.502 0.443 %Released: 60% PM 0.376 0.396 0.334 0.323 0.344 0.448 0.791 1 0.8 0.597 0.383 0.281 E-rOven peak: 0 W AM 0.057 0.057 0.057 0.057 0.057 0.114 0.171 0.286 0.343 0.343 0.343 0.4 %Released: 80% PM 0.457 0.343 0.286 0.4 0.571 1 0.857 0.429 0.286 0.229 0.171 0.114 TVs peak: 252 W AM 0.1 0.05 0.05 0.05 0.1 0.2 0.4 0.45 0.4 0.2 0.1 0.1 %Released: 100% PM 0.05 0.05 0.15 0.45 0.85 1 0.95 0.8 0.5 0.25 0.15 0.1 cFan peak: 0 W AM 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.25 0.25 0.25 0.25 0.25 %Released: 100% PM 0.25 0.25 0.25 0.25 0.25 0.25 0.55 0.6 0.6 0.6 0.6 0.6 Igts-in peak: 0 W AM 0.16 0.15 0.16 0.18 0.23 0.45 0.42 0.26 0.19 0.16 0.12 0.11 %Released: 100% PM 0.16 0.17 0.25 0.27 0.34 0.55 0.6 0.88 1 0.88 0.51 0.28 Igts-out peak: 74 W AM 1 1 1 1 1 0.75 0.75 0 0 0 0 0 %Released: 0% PM 0 0 0 0 0 0 0 0.5 0.75 0.75 0.75 1 Igts-gar peak: 37 W AM 0 0 0 0 0 0.5 0.75 1 0.75 0.5 0 0 %Released: 0% PM 0 0 0.5 0.5 0.75 1 0.75 0.5 0 0 0 0 MEL peak: 0 W AM 0.5 0.5 0.5 0.75 0.75 0.85 1 1 1 1 0.9 0.9 %Released: 90% PM 0.9 0.9 1 1 1 1 1 1 1 0.85 0.75 0.75 0000•• • • 0..000 0000•• • •• 0000•• • 0000•• • • • • • 0000•• 0000 • .0000 • 0000•• •• • .0000 • 9 • • • .• •• • .• 0000••0 ••••9• 9 • 0.000• •• 9 0090 9 • 12/8/2016 9:49 AM EnergyGauge®/USRCSB v5.1 Page 8 of 8 Air System Sizing Summary for ahu-1 Project Name: Kurlanski Residence 151013 12/08/2016 Prepared by: Delta G 09:43AM Air System Information Air System Name------------------------------------------------------------ahu-1 Number of zones--------------------------_........................ ............. Equipment Class - -----------------------------.-SPLT AHU Floor Area ------------------ ------------------------------------------2007.0 ft' Air System Type-----------------------------------------------------------SZCAV Location..--_-._........-------------------------------------Miami IAP,Florida Sizing Calculation Information Calculation Months ........... Jan to Dec Zone CFM Sizing---------------------Sum of space airflow rates Sizing Data ----------------------------------Calculated Space CFM Sizing.--.............Individual peak space loads Central Cooling Coil Sizing Data Total coil load............................................................-----------3.5 Tons Load occurs at .------....----------.....--............--------------Aug 1500 Total coil load--........----------------------------......---------..........41.7 MBH OA DB/WB...................................-..............................91.0/77.0 °F Sensible coil load--.----------------------------------------------------------39.1 MBH Entering DB/WB........................................................75.0/62.7 °F Coil CFM at Aug 1500-----------------------------------------------------1955 CFM Leaving DB/WB.........................................................56.5/55.4 °F Max block CFM.-------..........................---............-------------..1955 CFM Coil ADP............-------------------------------------------------------------- --54.5 °F Sum of peak zone CFM..................------..---- -----_.....--1955 CFM Bypass Factor ------------------------------------------------------------......0.100 Sensible heat ratio--------------------------------------------------------0.936 Resulting RH.------------....................... -----------------........----------....49 % ft'/Ton.----.......- ------------------------------------------------------576.9 Design supply temp................................................................55.0 °F BTU/(hr-ft').................................................-- ---------------20.8 Zone T-stat Check.------------------...-------------------------------- 1 of 1 OK Water flow @ 10.0°F rise------------------------------------------------N/A Max zone temperature deviation_..-------------------------------------- ° - -- --0.0 F Central Heating Coil Sizing Data Max coil load ............................ - ............-----------...16.6 MBH Load occurs at ---------------------------------------- Des Htg CoilCFM at Des Htg.-----------------------------------------------------1955 CFM BTU/(hr-ft')-----....._.._...............................................................8.3 Max coil CFM---------------------------------------------------------------.-1955 CFM Ent. DB/Lvg DB---------------------------------------------------------69.9/77.7 °F Water flow @ 20.0°F drop .............- .......................N/A Supply Fan Sizing Data Actual max CFM..............................................................1955 CFM Fan motor BHP.-..-.. ------------------ ------..................0.27 BHP Standard CFM----------------------.............................................1954 CFM Fan motor kW --------------....................................----................0.21 kW Actual max CFM/ft' - ...............................0.97 CFM/ft' Fan static .-------......------------------..................--------......------......0.50 in wg Outdoor Ventilation Air Data Design airflow CFM--.........- ..........----------------------------------0 CFM CFM/person..............................................................................0.00 CFM/person CFM/ft' .-----...----------....--.-----...................--..............0.00 CFM/ft' p34 J UA V/ ...... (� NSE ��`. �{�ij�/• 0.00•• ' �•�• • '• '• B!/ X00. ' ..G * • •• 0000•• OFZ — 0000•• ��P�� , ...a� . • • 0�,;.�`. :....• 0000. FLOW.` 4;40,0• •• . 00000 FSSIONP���..... .' so. •• • 0000 • • • • Hourly Analysis Program v4.91 Page 1 of 3 Air System Sizing Summary for ahu-2 Project Name:Kurlanski Residence 151013 12/08/2016 Prepared by: Delta G 09:43AM Air System Information Air System Name_... —-------------------------------------------------ahu-2 Number of zones -- --------------------------------------.................. 1 Equipment Class 000.0_-_-----------------------------------------SPILT AHU Floor Area.._...-.._-.-_-_----------------------------------------------.--_-......1040.0 ft' Air System Type---------------------................................_...-SZCAV Location ..................Miami IAP,Florida Sizing Calculation Information Calculation Months--------------- Jan to Dec Zone CFM Sizing---------------------Sum of space airflow rates Sizing Data..............................................................Calculated Space CFM Sizing----------------Individual peak space loads Central Cooling Coil Sizing Data Total coil load........................---..0000...................................2.1 Tons Load occurs at...---........---...---......................-... Aug 1500 Total coil load --.....................................----------------------25.8 MBH OA DB/WB.....................................------------...........91.0/77.0 °F Sensible coil load...............................................................23.0 MBH Entering DB/WB---------------------.............-------.-........-----74.1 /62.1 °F Coil CFM at Aug 1500.....................................................1134 CFM Leaving DB/WB.........................................................55.3/54.2 °F Max block CFM................................................000__0.-0000.-.1134 CFM Coil ADP..... -- .---.........................................................53.2 °F Sum of peak zone CFM-------------------------------- 1134 CFM Bypass Factor................................--.....--...--------.---.---....------.0.100 Sensible heat ratio .................................................0.894 Resulting RH---------------------------------------- ------------..------- ....48 % ft2/Ton. ............................................................................484.5 Design supply temp........--................ --------------------------------55.0 °F BTU/(hr-ft') --------------------------------------------------------------------------24.8 Zone T-stat Check...............---------------------- -----------........1 of 1 OK Water flow @ 10.0°F rise------------------------------------------------N/A Max zone temperature deviation.-.--------------.........................0.0 °F Central Heating Coil Sizing Data Max coil load.------------------------------------------------------------ ........9.2 MBH Load occurs at._._......_..-------------------------------------------------Des Htg Coil CFM at Des Htg..........------------------------------------ -1134 CFM BTU/(hr-ft')................ --------------------------------------- ............8.9 Max coil CFM------------------— -------------------......-------........1134 CFM Ent. DB/Lvg DB------------------------------ ...............70.3/77.9 °F Water flow @ 20.0°F drop-----------------------------------------------N/A Supply Fan Sizing Data Actual max CFM..............................................................1134 CFM Fan motor BHP---------------------------------......................................0.16 BHP Standard CFM----------------------------.............0000.............. 0000 1134 CFM Fan motor kW ------------------------- ..........................................0.12 kW Actual max CFM/ft2 .............................................. 1.09 CFM/ft' Fan static .................. __................................... 0.50 in wg Outdoor Ventilation Air Data Design airflow CFM-------------------------------------------------_....-----.0 CFM CFM/person--------------------------------------.........................................0.00 CFM/person CFM/ft' --------------------......................... -----0.00 CFM/ft2 � AN / • ... .• 0000.. i ��; �� 0000•• .. . 0000• i � • • • • • • •• •• • s• 0000:• . . •0000• .. • 00.0 0 • Hourly Analysis Program v4.91 Page 2 of 3 r - Air System Sizing Summary for ahu-3 Project Name: Kurlanski Residence 151013 12/08/2016 Prepared by: Delta G 09:43AM Air System Information Air System Name............................................................ahu-3 Number of zones------------------------------------------------ ----- Equipment ---Equipment Class...................................................SPLT AHU Floor Area-.............................................................................--603.0 ft= Air System Type.................................................. SZCAV Location.---...................................................Miami IAP,Florida Sizing Calculation Information Calculation Months----------------------------------------------Jan to Dec Zone CFM Sizing.....................Sum of space airflow rates Sizing Data......................................................User-Modified Space CFM Sizing................Individual peak space loads Central Cooling Coil Sizing Data Total coil load--------------------------------.......----- ......--.------.1.5 Tons Load occurs at---------------------------------------------------------------Oct 1600 Total coil load--------_-----------------------------------------------------------17.8 MBH OA DB/WB..... ----------------------------------------------------------86.7/74.9 °F Sensible coil load_-------------------------------------- - ..-...... 16.8 MBH Entering DB/WB---------------------------------------------------.....74.5/68.1 °F Coil CFM at Oct 1600------------------------------------------------------1778 CFM Leaving DB/WB------------------------------------------------------.65.7/65.1 °F Max block CFM------------------------------ -----_......__..........---..1778 CFM Coil ADP------------------------ -----------------------------------_.--------------64.8 °F Sum of peak zone CFM .....................................1778 CFM Bypass Factor-----------------------------------------------------------------------0.100 Sensible heat ratio--------------------------------------- ___--- 0.949 Resulting RH------------------------------------------------------------------- ..70 % ft'fTon ------------------------------------------------------ ......................407.5 Design supply temp.- --------------------------------------------------------55.0 °F BTU/(hr-ft2) ----------------------- --------------------------------------..29.5 Zone T-stat Check.----_----------------------------------------------------1 of 1 OK Water flow @ 10.0°F rise................................................N/A Max zone temperature deviation..................--.---------.----------.0.0 °F Central Heating Coil Sizing Data Max coil load....................--- .............................................8.4 MBH Load occurs at--------- ...........------... -- .-----....................Des Htg Coil CFM at Des Htg.-----.................... - --------------------1778 CFM BTU/(hr-ft2)...........................................................................--..14.0 Max coil CFM...................... .-......................................1778 CFM Ent. DB/Lvg DB ...................................... .........70.6/75.0 °F Water flow @ 20.0°F drop...............................................N/A Supply Fan Sizing Data Actual max CFM--.............................................................1778 CFM Fan motor BHP.................................. - ...... - ...... 0.24 BHP Standard CFM.................................... ...... ..1777 CFM Fan motor kW---------- ----------_-_...........................................0.19 kW Actual max CFM/ft2--.............. ....... .........................2.95 CFM/ft= Fan static----------------------------.......................................................0.50 in wg Outdoor Ventilation Air Data Design airflow CFM--------------------------- .......... -...0 CFM CFM/person --..------.............. ---------------------------------------------0.00 CFM/person CFM/ftz...........----------------------------------------- -...................0.00 CFM/ft' NWU )v �//� 0000•• W U1 0000•• 1999 • • • • • 0000•• Z i0•• • 90000 03 •9000• •• • 0.000 ,• Q�, x`•00.0 0 09.0 0.00.0 FESS1o �\ ' :900:0 9 ...:. 00 9 Hourly Analysis Program v4.91 Page 3 of 3