Loading...
O-617-00 ORDINANCE NO. 617-00 AN ORDINANCE OF MIAMI SHORES VILLAGE, FLORIDA, AMENDING SECTION 6.7 OF THE CODE OF ORDINANCES BY ADDING A SECTION TO BE NUMBERED 6.7 (d)(17) ADDRESSING PERMITTING FEES FOR CONSTRUCTION ON/WITHIN VILLAGE PROPERTY, RIGHT-OF-WAYS,AND UTILITY OR OTHER EASEMENTS,PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, Insofar as the Village's Code of Ordinances does not currently contain fee provisions for construction within or other use of the Village's right-of-ways,properly or utility or other easements; and WHEREAS, The existing permitting fee structure within the Code does not provide for fees regarding construction within the Village's right-of-ways; and WHEREAS, It is in the best interests of the Village to establish a fee structure addressing building permits for construction within or other use of these specified areas; NOW, THEREFORE, BE IT ORDAINED BY THE MIAMI SHORES VILLAGE COUNCIL: Section 1. The Code of Ordinances of Miami Shores Village, Florida, is hereby amended by adding Section 6.7 (d)(17), which said Section shall read as follows: For purposes of this Ordinance, Right-of-Way means the surface,the area above, and the area below the surface of any public street,highway, lane,path, alley, sidewalk,boulevard, drive, bridge,tunnel, parkway, waterway,public easement, or similar property in which the Village now or hereafter holds any property interest,which, consistent with the purposes for which it was dedicated,may be used for the purpose of constructing, operating and repairing. Fees for right-of-way use or construction,under permit issued by the Building Department, on Village property,Village Rights-of-Way, and utility or other easements: 1) For installation, repair, or excavation of sanitary and storm sewers, water lines, gas lines,buried electric,telephone, CATV or other underground utilities: For 100 linear feet or less . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 100.00 For each additional 100 linear feet or fraction thereof. . . . . . . . . . . . . $ 30.00 2) For exfiltration drains consisting of catch basin, exfiltration trench, or slab covered trench: For each 100 linear feet or fraction thereof. . . . . . . . . . . . . . . . . . . . . . $ 75.00 3) For installation of poles or down guys for overhead utilities: For each pole or down guy . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 25.00 4) For construction or replacement of sidewalks, curbs, and gutters: For 100 linear feet or less . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 100.00 For each additional 100 linear feet or fraction thereof. . . . . . . . . . . . . $ 30.00 5) For construction of asphalt or concrete driveway approaches: For driveway approach widths of 20 feet or less consisting of 1 or drives. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 20.00 For driveway approach widths greater than 20 feet,but not greater than 40 feet, consisting of 1 or more drives . . . . . . . . . . . . . . . . . . . . . $ 40.00 For driveway approach widths greater than 40 feet(commercial).. . . . .$ 50.00 6) For construction of stamped concrete driveway approaches (Recorded Covenant of Construction and liability release must be signed by homeowner prior to permit being issued): For each drive . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$ 50.00 7) For construction of brick paver driveway approaches(Recorded Covenant of Construction and liability release must be signed by homeowner prior to permit being issued): For each drive . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 75.00 8) For construction of street pavements, including paving parkways and shoulders: One lane or two lane pavements(width of pavement being 0 -24 feet): For 100 linear feet or less . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 200.00 For each additional 100 linear feet or fraction thereof. . . . . . . . . . $ 50.00 Three or more lanes of payment(aggregate width greater than 24 feet): For 100 linear feet or less . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 300.00 For each additional 100 linear feet or fraction thereof. . . . . . . . . . $ 100.00 Fees for paving of parkways and shoulders shall be the same as those charged for street paving. 9) For the installation of embankment and/or subgrade material in dedicated or zoned rights-of-way, excluding base rock and asphalt: For 100 linear feet or less . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 100.00 For each additional 100 linear feet or fraction thereof. . . . . . . . . . . . $ 25.00 10) For construction of curb separators: For 100 linear feet or less . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 50.00 For each additional 100 linear feet or fraction thereof. . . . . . . . . . . . $ 15.00 11) For erection of street name signs,traffic or directional signs, etc: For each sign. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 15.00 12) For installation of permanent type traffic barricades, guardrails or guide posts: For each 100 linear feet or fraction thereof. . . . . . . . . . . . . . . . . . . . $ 75.00 13) For construction of street or driveway culvert: For each 100 linear feet or fraction thereof. . . . . . . . . . . . . . . . . . . . $ 100.00 14) Installation of culvert pipe to enclose existing drainage ditch or canal: For each 100 linear feet or fraction thereof. . . . . . . . . . . . . . . . . . . . $ 150.00 Section 2. This Ordinance shall become effective immediately upon passage by the Village Council on second and final reading. PASSED AND ADOPTED this 2nd day of May , 2000 on first reading. PASSED AND ADOPTED this 16th day of May , 2000 on second reading. ATTEST: �/ll Mark S. Ulmer, Mayor ` CM c Barbara A. Fugazzi, M Village Clerk APPROVED AS TO FORM: L f I Sa,�IoL Richard Sarafan, Villa e Attorney wfer,ewreora