Loading...
O-574-95 ORDINANCE NO. _SZ4__9L5 AN ORDINANCE AMENDING PARAGRAPHS (b) (c) (d) (e) (f) (g) (h) of SECTION 6-7 OF THE CODE OF ORDINANCES OF M[lAM[I SHORES VILLAGE, FLORIDA; INCREASING PERMIT FEES, PROVIDING EFFECTIVE DATE. Section 1. Section 6-7 of the Code of Ordinances of Mami Shores Village, Florida reads as follows: (b) Reinapection, Lost and Revised Plans Fees 1. Reinspection: When extra inspection trips are necessary due to (1)wrong address being given on a call for inspection, (2) prior rejection of work due to faulty construction, (3)work not being ready for inspection at time specified, (4)failure to call for final or other inspections, (5)required corrections not being made or completed at time specified, a fee of twenty-five dollars($25.00)for each reinspection may be charged to the permit holder in the trade concerned. If it is determined by the field inspector concerned, that the job has the same problem after the reinspection fee is assessed and paid, then a second reinspection fee of fifty dollars($50.00) shall be charged. The reinspection fee requirement shall be applicable to all divisions of the Building Department. The payment of reinspection fees may be required before any further permits will be issued to the person or firm owing same, and further inspections may be refused until payment of reinspection fees have been made. Reinspection fee for inspection of existing buildings by all divisions to determine compliance with the South Florida Building Code, but not annual inspections as required by 305.1(d) shall be twenty-five dollars($25.00) per inspection. 2. Lost and Revised Plans: When plans for new buildings and additions are lost by the owner or contractor, a recertification fee will be required to review, stamp and approve a new set of plans as a field copy. Such fee shall be based on 10 percent of the original building permit fee, with a minimum fee for Group (single family resident) of twenty-five dollars ($25.00), and a minimum fee for all others of fifty dollars($50.00). Revised Plans Processing Fee: Charge for plans processing of major revisions to plans which previously were processed and permitted, such fee to be based on 30 percent of the original building permit fee, up to a maximum charge of$150.00 (M[inimum Fee applies). Lost Permit Card Fee: Charge for the loss of a Permit Inspection Record Card after a permit has been issued. A replacement fee of$10.00 for the loss of each card shall be charged. (c) Refunds. Time Limitation- Cancellations: The fees charged pursuant to this schedule provided the same are for a permit requried by Section 301.1 of the South Florida Buliding Code, may be refunded by the Director of the Building and Zoning Department, subject to the following: I No refund of permit fees shall be made on requests involving the following: (a) Permit fees of$50.00 or less. (b) Permits cancelled by court order or revoked by the building official under authority granted by the South Florida Building Code. (c) Expired permits. (d) Permits under which work has commenced as evidenced by any recorded inspection made by the Building Department. 2. A full refund of permit fees shall be allowed when a permit is issued for work outside the jurisdictional inspection area. 3. A full refund of permit fee, less $50.00 or 30% of the permit fees, whichever is greater, rounded to the nearest dollar, shall be allowed to a permit holder who files a written request therefore prior to the expiration date of the permit, provided no work has commenced under said permit as evidenced by any recorded inspection. The refund application must be accompanied by applicant's validated copy of said permit. 4. Where there is a change of contractor involving a permit for which a fee of more than $50.00 was paid to the Building Department, the original permit holder is not entitled to any refund if the permit has expired, or if work has commenced under such permit as evidenced by any recorded inspection. However, upon the issuance of a permit to a second permit holder, the original permit holder is entitled to a full refund where the permit has not expired and no work has commenced under said permit as evidenced by any recorded inspection. The second permit holder shall pay a full fee if the original permit has expired, or shall pay $75.00 to cover the cost of transferring the data from the original to the second permit in instances where work has commenced under the original unexpired permit as evidenced by any recorded inspection. The second permit holder shall pay a full fee plus $75.00 to cover the transferring and reprocessing costs where no work has commenced under the original unexpired permit, as evidenced by any recorded inspection. 5. A fee of$3 0.00 shall be paid by the permit holder who submits a written request for a permit extension as authorized under Section 304.3 (b) of the South Florida Building Code. 6. Where a permit has become null and void pursuant to paragraph 304.3 (a) of the South Flordia Building Code, and no work, as evidenced by at least one recorded inspection, has been made by the Department, a credit of fifty percent (50%) of the original permit fee shall be applied to any reapplication fee for a permit covering the same project and involving the same plans, provided that the complete reapplication is made within six(6)months of the expiration date of the original permit, and provided that no refund has been made as provided in this Section. The permit reapplication must be submitted with the plans and the applicant's validated copy of the original permit. The amount of this fee shall be at least equal to or higher than the minimum.fee for the trade concerned. (d) Building Permit Fees: The Building and Zoning Director authorized to charge the fees which were in existence prior to the effective date of this amended fee schedule for those sub-contract permits, i.e., electrical, plumbing, mechanical, etc., where the master building permit was issued prior to the effective date of this amended fee schedule, and where written evidence such as a signed and dated copy of the sub-contract is submitted to substantiate the fact that the sub- contract was entered into prior to the effective date of this amended fee schedule. Fees listed in Subsection(d) hereunder include only building permit fees and do not include plumbing, electrical, mechanical, product control, certificate of occupancy, sign permit fees or contractor/tradesmen fees which are hereinafter set forth in other sub-sections: 2 1. Special Projects: A fee equal to actual staff time and related costs shall be assessed for special projects requiring research by the Department in order to answer questions proposed by developers, attorneys, realtors, or municipalities, etc., in connection with the use, resubdivision, and development of properties, or to determine if any existing violations are on the property through a review of departmental records. Such special fees only will be levied for requests outside the scope of normal Departmental work. A minimum fee of$20.00 shall be charged. 2. Minimum Fees for Building Permit: Minimum fee for all building permits is applicable to all items in this Section, except for d(6), d(7), d(I 0), d(I 1) ...37.50 (This minimum does not apply to add-on building permits issued as supplementary to current outstanding permits for the same job.) 3. New Building or Additions: For each 100 sq. ft. or fractional part of floor area: Single Family and Duplex-Group I.................................................... 7.50 Storage and Industrial Use of Group E&F occupancies up to 20,000 sq. ft................................................................................................. 7.50 Each additional 100 sq. ft. thereafter.................................................. 4.50 Greenhouses&Buildings for agricultural uses(non-residential)when located on the premises so used......................................................... 5.25 Screen enclosures and trailer additions............................................... 6.75 Allothers........................................................................................... 7.50 4. New construction other than as specified herein: (Water towers, Pylons, Bulk storage-tank foundations, Unusual limited-use buildings, Free-standing rigid canopies, Marquees and Simialr construction) For each$1,000.00 of estimated cost or fractional part....................... 8.00 (Except for each service station underground storage tank and each approved fallout shelter which conforms to the specifications established by the Civil Defense and Mobilization agency and the South Florida BuildingCode)................................................................................... 18.00 5. Alterations and Repairs to Buildings and Other Structures Up to $1,000.00 of estimated cost or fractional part........................... 20.25 For each additional $1,000.00 of estimated cost or fractional part....... 10.15 6. Installation or Replacement of Windows and Exterior Doors in all buildings or each window or door unit..................................................................................................... 1.20 Curtain walls including windows and doors therein: For each 100 sq. ft. or fractional part thereof up to 10,000 sq. ft........ 7.50 For each additional 100 sq. ft. or fractional part thereof..................... 6.00 MinimumFee..................................................................................... 22.50 7. Moving Buildings or Other Structures: Per building or structural (minimum)................................................... 120.00 For each 100 sq. ft. or fractional part thereof(does not include cost of new foundation or repairs to building or structure).............................. 8.00 8. Concrete Slabs: (Other than paving) (Where separate installation not covered by prior permit) For first 1,000 sq. ft. or fractional part thereof.................................... 12.00 For additional 1,000 sq. ft. or fractional part of area.............................. 4.50 9. Paving: (On other than public right-of-way and excluding paving in connection with single family and duplex use) For first 1,000 sq. ft. or fractional part of area..................................... 12.00 For each additional 1,000 sq. ft. or fractional part of area.................... 4.50 3 10. Roofing: (Including reroofing per one(l) square) For each 100 sq. ft. or fractional part of area....................................... 1.00 MinimumFee...................................................................................... 30.00 11. Fences and/or Walls For first 100 lineal feet or fractional part............................................. 9.75 For each additional 100 ft. or fractional part thereof up to 1320 linealft............................................................................................... 3.75 For each additional 100 ft. or fractional part thereof........................... 1.00 MinimumFee..................................................................................... 30.00 12. Awnings and Canopies: Horizontal projection per sq. ft. of area covered................................. .25 MinimumFee..................................................................................... 37.50 13. Swimming Pools: (Electrical and Plumbing not included) For the first 20,000 gallon capacity or fractional part.......................... 75.00 For each additional 1,000 gallon capacity or fractional part................. 4.50 14. Temporary Platforms and Temporary Bleachers to be used for Public Assembly: For each 100 sq. ft. or fractional part of platform area......................... 3.00 For each 100 lineal feet or fractional part of seats................................ 2.50 MinimumFee...................................................................................... 25.00 15. Demolition of Buildings: For the first 1,000 sq. ft. or fractional part of floor area....................... 37.50 For each additional 1,000 sq. ft. or fractional part of floor area............ 4.50 16. Demolition of Signs, Fences and/or Walls and Structures Other than Above: MinimumFee...................................................................................... 37.50 (e)Plumbing Permit Fees I. Minimum plumbing or gas fee per permit (items c(2)through c(l 3)) inthis section...................................................................................... 30.00 (This minimum does not apply to add-on plumbing permits issued as supplementary to current outstanding permits for the same job.) 2. Roughing-in or Plugged Outlets For: Bathtubs, Closets, Doctors, Dentists, and Hospital Sterilizers, Autoclaves, Autopsy Tables and Other Fixtures, Appurtenaces or Other Appliances having Water Supply or Waste Outlet, or Both, Drinking Fountains, Fixtures Discharging into Traps or Safe Waste Pipes, Floor Drains, Laundry Tubs, Lavatories, Safe Waste Pipes, Showers, Sinks, Slop Sinks, Urinals, Water Heaters: For each roughing-in or plugged outlet............................................... 4.00 Fixtures set on new roughing-in or pluggged outlets or replaced on old roughing-in: each fixture.................................................................... 4.00 3. Septic Tanks, Settling Tanks, Gas and Oil Interceptros, Grease Traps: (Including draintile for the same) 1,200 gallon capacity or less............................................................... 22.50 Over 1,200 gallon capacity................................................................. 30.00 Draintilerelay.................................................................................. Minimum Fee Tank abandonment (where being abandoned)................................... Minimum Fee 4 4. Sewer: Each building storm sewer and each building sewer where connection is made to a septic tank, to a collector line or to an exisiting sewer or to a city sewer or soakage pit or to a building drain outside a building.. 9.00 Sewercapping...................................................................................... 14.00 5. Water Drainage: Rainwater roof inlet: each inlet........................................................... 5.25 Area, yard, sidewalk or rainwater drain for which no other fee is provided: CatchBasin......................................................................................... 5.25 Eachsurface inlet................................................................................ 5.25 Each soakage pit(each 200 cu. ft.)...................................................... 10.50 6. Condensate Drain(Air Conditioning): Peroutlet............................................................................................ 5.00 Except single to manifolded A/C outlet, not exceeding 5 hp................. N/C 7. Water Piping: Water service connection to a municipal or private water supply system (for each meter on each lot)................................................................. 7.50 Water connection to or outlets for appliance or installations not covered by fixtures or other permit................................................................... 5.25 Irrigation system and underground sprinkler system for each zone....... 25.00 Fire sprinkler system connection to city water..................................... 15.00 Solar waterheater installation or repairs............................................... 30.00 Swimming pool piping, not including well (new installation or replacement including service connection)........................................... 25.00 Sumppump........................................................................................ 9.00 Repairs to water piping: First $1,000........................................................................................ 22.50 Each additional $1,000....................................................................... 4.50 8. Wells: Allwells............................................................................................. 45.00 9. Natural Gas a Liquefied Petroleum: For the first outlet (includes cylinders and regulators)......................... 5.25 For each additional outlet................................................................... 3.00 For each appliance(does not include warm air heating units, but does include unvented space heaters and vented wall heaters-no duct work (See Fee Section e(3)for heating)...................................................... 3.00 For each meter(new or replacement).................................................. 5.25 For major repairs to gas pipe where no fixture or appliance installation isinvolved.......................................................................................... 7.50 Underground L.P. gas tanks............................................................... 22.50 Change of company - (no additional appliances or outlets)................. 7.50 10. Water Treatment Plants, Pumping Station, Sewage Treatment Plant and Lift Stations: Water treatment plant (Interior plant piping)....................................... 75.00 Sewage treatment plant (Interior plant piping)..................................... 75.00 Lift station(Interior station piping)..................................................... 37.50 Sewageejector................................................................................... 37.50 11. Water and Gas Mains: (On private property other than public utility easements): Each 50 feet or part thereof............................................................... 5.25 5 12. Storm or Sanitary Utility and/or Collector Lines: (On private property other than public utility easements) Each 50 feet or part thereof............................................................... 5.25 In addition- each manhole or catch basin............................................ 9.00 13. Temporary Toilets-Waterborne or Chemical: Forfirst.............................................................................................. 15.00 Foreach additional............................................................................. 7.50 (f) Electrical Permit Fees I. Minimum electrical permit fee including repair work per permit (Items d(2)through d(12)except for item d(7)in this section).......... 30.00 (This minimum does not apply to add-on electrical permits issued as supplementary to current outstanding permits for the same job.) 2. Services or Switchboards: (The following fees shall be charged for each service and for each subfeed in new installations only. No charge Will be made for subfeeds in existing installations) such service fee shall include one subfeed. Temporary for construction or test.........................................Minimum Fee 100 ampere and under......................................................................... 6.75 Over 100 ampere to 200 ampere......................................................... 9.00 Over 200 ampere to 400 ampere......................................................... 11.25 Over 400 ampere to 600 ampere......................................................... 12.00 Over 600 ampere to 800 ampere......................................................... 17.50 For each additional 100 ampere(over 800 ampere)............................. 4.50 Service repair and/or meter change.........................................Minimum Fee 3. Residential Wiring and Outlets: (a) Light, receptical, switch, sign, telephone and other low voltage outlets: Ithrough 10 outlets..................................................................... 10.50 For each additional outlet............................................................. 1.50 (b) Equipment or machine outlets, or permanent connections: For each outlet or connection....................................................... 5.25 Motors: eachup to 5 BP....................................................................... 6.00 each over 5 HP through 10 BP................................................ 10.50 each over 10 BP through 100 BP............................................ 22.50 each over 100 BP.................................................................... 45.00 (c) Air conditioners and refrigeration systems: Covers related electrical work except wall or window units. Per ton or fractional part thereof................................................. 6.00 4. Commercial Fixtures: Including floodlights, spotlights, bulbs, parking lights, and tennis court fights: (a) Lights: Ithrough 10 lamps...................................................................... 5.25 1 through 10 fluorescent tubes..................................................... 5.25 each additional lamp or tube....................................................... .75 (b) Steamers or festoon lights: First10 lights or less.................................................................... 5.25 Each addition, 10 lights or less..................................................... 5.25 6 (c) Plugmold and track lighting: First25 feet................................................................................. 5.25 Each5 feet thereafter................................................................... 2.25 5. Generators and Transformers, Commercial Heating Equipment, and Strip Heaters For Commercial, Industrial&Agricultural: Each up to 10 KVA or KW................................................................. 9.00 Each over 10 KVA or KW through 20 KVA or KW........................... 16.50 Each over 20 KVA or KW.................................................................. 37.50 6. Signs: Per sq. ft. of sign face......................................................................... 1.50 Repairs, connection and reconnection.....................................Minimum Fee 7. Temporary Work on Circuses, Carnivals, Etc.: Equipment ground, each..................................................................... 6.00 Services as per item............................................................................D(2) Outlets as per item..............................................................................D(2) &D(4) MinimumFee...................................................................................... 90.00 8. Fire Detection System: Master control.................................................................................... 15.00 Eachdevice........................................................................................ 1.35 9. Master Television and Radio Systems: Mastercontrol.................................................................................... 15.00 Eachdevice........................................................................................ 1.35 10. Burglar Alarm/Intercom Systems: Mastercontrol.................................................................................... 15.00 Eachdevice........................................................................................ 1.35 11. Energy Management Systems: MasterControl................................................................................... 15.00 Eachdevice........................................................................................ 1.35 12. Swimming Pool Electrical: Each residential pool(group 1)........................................................... 45.00 Each multi-family or commercial pool(does not include exterior lighting of deck area).......................................................................... 90.00 (g) Mechanical Permit Fees I. Minimum mechanical permit fee (Items e(2)through e(8)in this section)............................................. 30.00 (This minimum does not apply to add-on mechanical permits issued as supplementary to current outstanding permits for the same job.) 2. Air conditioning and refrigeration: (Includes all component parts of the system except that water, electric and gas lines and connections are fee'd separately.) (Where BTU rating is not known, substitute one horsepower for one ton or 12,000 BTUs for one ton.) For each ton capacity or fractional part thereof.................................. 9.75 3. Furnaces and heating equipment, including commercial dryers, ovens and other fired objects not elsewhere classified: (Includes all components parts of the system except fuel and electrical lines.) For vented and unvented wall heaters, see Section c(9). For the first 200,000 BTU per hour or fractional part.......................... 22.50 For each additional 100,000 BTU per hour or fractional part............... 9.00 7 4. Relocate or lift and set compressor to different place, same structure... 30.00 5. Fire sprinkler system: Perstandpipe...................................................................................... 12.00 Persprinkler head............................................................................... .90 Perhose rack or hose bib.................................................................... 6.00 Per cylinder of CO2 or dry powder..................................................... 9.00 Per dry chemical distribution head....................................................... .60 6. Storage tanks for flammable liquids, per tank...................................... 37.50 7. Internal combustion engines: Stationary........................................................................................... 37.50 8. Other fees: For estimated costs up to $1,000.00.................................................... 22.50 For each additional $1,000.00 or fractional part.................................. 9.25 (h) Sign Permit Fees I. Minimum sign fee............................................................................... 37.50 2. Class A(Temporary signs) Not exceeding six(6) sq. ft. and not electrically illuminated................. N/C 3. Class B Point of sale signs(occupant use products sold) per sq. ft....... .60 Painted wall signs...........................................................per sq. ft....... .60 4. Class C (commercial advertising signs) (a) Painted Class C signs(on walls of building)..............per sq. ft....... .60 (b) Semaphore signs(per standard or pole)....................per sq. ft....... .60 (c) All other Class C signs..............................................per sq. ft...... .60 5. Area fighting, standards of fixtures: From I to 5 standards or fixtures........................................................ 45.00 Each additional over 5 standards or fixtures........................................ 9.00 Section 2. Section 6-7 of the Code of Ordinances of Miami Shores Village, Florida shall stand amended to read as follows: (b) Reinapection. Lost and Revised Plans Fees I Reinspection: When extra inspection trips are necessary due to (1)wrong address being given on a call for inspection, (2) prior rejection of work due to faulty construction, (3)work not being ready for inspection at time specified, (4) failure to call for final or other inspections, (5)required corrections not being made or completed at time specified, a fee of fifty dollars($50.00)for each reinspection may be charged to the permit holder in the trade concerned. If it is determined by the field inspector concerned, that the job has the same problem after the reinspection fee is assessed and paid, then a second reinspection fee of one hundred dollars ($100.00) shall be charged. The reinspection fee requirement shall be applicable to all divisions of the Building Department. The payment of reinspection fees may be required before any further permits will be issued to the person or firm owing same, and further inspections may be refused until payment of reinspection fees have been made. Reinspection fee for inspection of existing buildings by all divisions to determine compliance with the South Florida Building Code, but not annual inspections as required by 3 05.1(d) shall be fifty dollars ($50.00) per inspection. 8 2. Lost and Revised Plans: When plans for new buildings and additions are lost by the owner or contractor, a recertification fee will be required to review, stamp and approve a new set of plans as a field copy. Such fee shall be based on 10 percent of the original building permit fee, with a minimum fee for Group (single family resident) of twenty-five dollars ($25.00), and a minimum fee for all others of fifty dollars($50.00). Revised Plans Processing Fee: Charge for plans processing of major revisions to plans which previously were processed and permitted, such fee to be based on 30 percent of the original building permit fee, up to a maximum charge of$150.00 (Minimum Fee applies). Lost Permit Card Fee: Charge for the loss of a Permit Inspection Record Card after a permit has been issued. A replacement fee of$10.00 for the loss of each card shall be charged. (c) Refunds, Time Limitatio% Cancellations: The fees charged pursuant to this schedule provided the same are for a permit requried by Section 301.1 of the South Florida Buliding Code, may be refunded by the Director of the Building and Zoning Department, subject to the following: 1. No refund of permit fees shall be made on requests involving the following: (a) Permit fees of$100.00 or less. (b) Permits cancelled by court order or revoked by the building official under authority granted by the South Florida Building Code. (c) Expired permits. (d) Permits under which work has commenced as evidenced by any recorded inspection made by the Building Department. 2. A full refund of permit fees shall be allowed when a permit is issued for work outside the jurisdictional inspection area. 3. A full refund of permit fee, less$100.00 or 50%of the permit fees, whichever is greater, rounded to the nearest dollar, shall be allowed to a permit holder who files a written request therefore prior to the expiration date of the permit, provided no work has commenced under said permit as evidenced by any recorded inspection. The refund application must be accompanied by applicant's validated copy of said permit. 4. Where there is a change of contractor involving a permit for which a fee of more than$50.00 was paid to the Building Department, the original permit holder is not entitled to any refund if the permit has expired, or if work has commenced under such permit as evidenced by any recorded inspection. However, upon the issuance of a permit to a second permit holder, the original permit holder is entitled to a full refund where the permit has not expired and no work has commenced under said permit as evidenced by any recorded inspection. The second permit holder shall pay a full fee if the original permit has expired, or shall pay $75.00 to cover the cost of transferring the data from the original to the second permit in instances where work has commenced under the original unexpired permit as evidenced by any recorded inspection. The second permit holder shall pay a full fee plus $75.00 to cover the transferring and reprocessing costs where no work has commenced under the original unexpired permit, as evidenced by any recorded inspection. 9 5. A fee of$30.00 shall be paid by the permit holder who submits a written request for a permit extension as authorized under Section 304.3 (b) of the South Florida Building Code. 6. Where a permit has become null and void pursuant to paragraph 304.3 (a) of the South Flordia Building Code, and no work, as evidenced by at least one recorded inspection, has been made by the Department, a credit of fifty percent (50%) of the original permit fee shall be applied to any reapplication fee for a permit covering the same project and involving the same plans, provided that the complete reapplication is made within six(6) months of the expiration date of the original permit, and provided that no refund has been made as provided in this Section. The permit reapplication must be submitted with the plans and the applicant's validated copy of the original permit. The amount of this fee shall be at least equal to or higher than the minimum fee for the trade concerned. (d) Building Permit Fees: The Building and Zoning Director authorized to charge the fees which were in existence prior to the effective date of this amended fee schedule for those sub-contract permits, i.e., electrical, plumbing, mechanical, etc., where the master building permit was issued prior to the effective date of this amended fee schedule, and where written evidence such as a signed and dated copy of the sub-contract is submitted to substantiate the fact that the sub- contract was entered into prior to the effective date of this amended fee schedule. Fees fisted in Subsection(d)hereunder include only building permit fees and do not include plumbing, electrical, mechanical, product control, certificate of occupancy, sign permit fees or contractor/tradesmen fees which are hereinafter set forth in other sub-sections: I. Special Projects: A fee equal to actual staff time and related costs shall be assessed for special projects requiring research by the Department in order to answer questions proposed by developers, attorneys, realtors, or municipalities, etc., in connection with the use, resubdivision, and development of properties, or to determine if any existing violations are on the property through a review of departmental records. Such special fees only will be levied for requests outside the scope of normal Departmental work. A minimum fee of$50.00 shall be charged. 2. Minimum Fees for Building Permit: Minimum fee for all building permits is applicable to all items in this Section, except for d(7) and d(l 0) ....................40.00 (This minimum does not apply to add-on building permits issued as supplementary to current outstanding permits for the same job.) 3. New Building or Additions: For each 100 sq. ft. or fractional part of floor area: Single Family and Duplex-Group I.................................................... 15.00 Storage and Industrial Use of Group E&F occupancies up to 20,000 sq. ft................................................................................................. 15.00 Each additional 100 sq. ft. thereafter.................................................. 600 Greenhouses&Buildings for agricultural uses (non-residential)when located on the premises so used......................................................... 10.00 Screen enclosures and trailer additions............................................... 10.00 Allothers........................................................................................... 15.00 4. New construction other than as specified herein: (Water towers, Pylons, Bulk storage-tank foundations, Unusual limited-use buildings, Free-standing rigid canopies, Marquees and Simialr construction) For each$1,000.00 of estimated cost or fractional part....................... 8.00 (Except for each service station underground storage tank and each approved fallout shelter which conforms to the specifications established by the Civil Defense and Mobilization agency and the South Florida BuildingCode)................................................................................... 18.00 10 5. Alterations and Repairs to Buildings and Other Structures Up to $1,000.00 of estimated cost or fractional part........................... 20.25 For each additional $1,000.00 of estimated cost or fractional part....... 10.15 6. Installation or Replacement of Windows and Exterior Doors in all buildings or each window or door unit..................................................................................................... 1.20 Curtain walls including windows and doors therein: For each 100 sq. ft. or fractional part thereof up to 10,000 sq. ft........ 7.50 For each additional 100 sq. ft. or fractional part thereof..................... 6.00 MinimumFee..................................................................................... 40.00 7. Moving Buildings or Other Structures: Per building or structural(minimum)................................................... 120.00 For each 100 sq. ft. or fractional part thereof(does not include cost of new foundation or repairs to building or structure).............................. 8.00 8. Concrete Slabs: (Other than paving) (Where separate installation not covered by prior permit) For first 1,000 sq. ft. or fractional part thereof.................................... 12.00 For additional 1,000 sq. ft. or fractional part of area.............................. 4.50 9. Paving: (On other than public right-of-way and excluding paving in connection with single family and duplex use) For firs�1'000 sq'. ft. or fractional part of area..................................... 12.00 For each additional 1,000 sq. ft. or fractional part of area.................... 4.50 10. Roofing: (Including reroofing per one(l) square) For each 100 sq. ft. or fractional part of area....................................... 3.00 MinimumFee...................................................................................... 60.00 11. Fences and/or Walls For first 100 lineal feet or fractional part............................................. 20.00 For each additional 100 ft. or fractional part thereof up to 1320 linealft............................................................................................... 8.00 For each additional 100 ft. or fractional part thereof........................... 3.00 MinimumFee..................................................................................... 40.00 12. Awnings and Canopies: Horizontal projection per sq. ft. of area covered................................. .25 MinimumFee..................................................................................... 40.00 13. Swimming Pools: (Electrical and Plumbing not included) For the first 20,000 gallon capacity or fractional part.......................... 90.00 For each additional 1,000 gallon capacity or fractional part................. 600 14. Temporary Platforms and Temporary Bleachers to be used for Public Assembly: For each 100 sq. ft. or fractional part of platform area......................... 3.00 For each 100 lineal feet or fractional part of seats................................ 2.50 MinimumFee...................................................................................... 40.00 15. Demolition of Buildings: For the first 1,000 sq. ft. or fractional part of floor area....................... 40.00 For each additional 1,000 sq. ft. or fractional part of floor area............ 4.50 16. Demolition of Signs, Fences and/or Walls and Structures Other than Above: MinimumFee...................................................................................... 40.00 11 (e)Plumbing Permit Fees I Minimum plumbing or gas fee per permit (items c(2)through c(I 3)) inthis section...................................................................................... 35.00 (This minimum does not apply to add-on plumbing permits issued as supplementary to current outstanding permits for the same job.) 2. Roughing-in or Plugged Outlets For: Bathtubs, Closets, Doctors, Dentists, and Hospital Sterilizers, Autoclaves, Autopsy Tables and Other Fixtures, Appurtenaces or Other Appliances having Water Supply or Waste Outlet, or Both, Drinking Fountains, Fixtures Discharging into Traps or Safe Waste Pipes, Floor Drains, Laundry Tubs, Lavatories, Safe Waste Pipes, Showers, Sinks, Slop Sinks, Urinals, Water Heaters: For each roughing-in or plugged outlet............................................... 600 Fixtures set on new roughing-in or pluggged outlets or replaced on old roughing-in: each fixture.................................................................... 600 3. Septic Tanks, Settling Tanks, Gas and Oil Interceptros, Grease Traps: (Including draintile for the same) 1,200 gallon capacity or less............................................................... 22.50 Over 1,200 gallon capacity................................................................. 30.00 Draintilerelay.................................................................................. Mnimurn Fee Tank abandonment (where being abandoned)................................... Nfinimum Fee 4. Sewer: Each building storm sewer and each building sewer where connection is made to a septic tank, to a collector line or to an exisiting sewer or to a city sewer or soakage pit or to a building drain outside a building.. 20.00 Sewercapping...................................................................................... 20.00 5. Water Drainage: Rainwater roof inlet: each inlet........................................................... 5.25 Area, yard, sidewalk or rainwater drain for which no other fee is provided: CatchBasin......................................................................................... 5.25 Eachsurface inlet................................................................................ 5.25 Each soakage pit(each 200 cu. ft.)...................................................... 10.50 6. Condensate Drain(Air Conditioning): Peroutlet............................................................................................ 5.00 Except single to manifolded A/C outlet, not exceeding 5 hp................. N/C 7. Water Piping: Water service connection to a municipal or private water supply system (for each meter on each lot)................................................................. 7.50 Water connection to or outlets for appliance or installations not covered by fixtures or other permit................................................................... 5.25 Irrigation system and underground sprinkler system for each zone....... 25.00 Fire sprinkler system connection to city water..................................... 15.00 Solar waterheater installation or repairs............................................... 50.00 Swimming pool piping, not including well (new installation or replacement including service connection)........................................... 50.00 Sumppump........................................................................................ 9.00 Repairs to water piping: First $1,000........................................................................................ 22.50 Each additional $1,000....................................................................... 4.50 8. Wells: Allwells............................................................................................. 45.00 12 9. Natural Gas a Liquefied Petroleum: For the first outlet (includes cylinders and regulators)......................... 5.25 For each additional outlet................................................................... 3.00 For each appliance(does not include warm air heating units, but does include unvented space heaters and vented wall heaters-no duct work (See Fee Section e(3) for heating)...................................................... 3.00 For each meter(new or replacement).................................................. 5.25 For major repairs to gas pipe where no fixture or appliance installation isinvolved.......................................................................................... 7.50 Underground L.P. gas tanks............................................................... 22.50 Change of company - (no additional appliances or outlets)................. 7.50 10. Water Treatment Plants, Pumping Station, Sewage Treatment Plant and Lift Stations: Water treatment plant(Interior plant piping)....................................... 75.00 Sewage treatment plant (Interior plant piping)..................................... 75.00 Lift station(Interior station piping)..................................................... 37.50 Sewageejector................................................................................... 37.50 11. Water and Gas Mains: (On private property other than public utility easements): Each 50 feet or part thereof............................................................... 5.25 12. Storm or Sanitary Utility and/or Collector Lines: (On private property other than public utility easements) Each 50 feet or part thereof............................................................... 5.25 In addition- each manhole or catch basin............................................ 9.00 13. Temporary Toilets-Waterborne or Chemical: Forfirst.............................................................................................. 30.00 For each additional............................................................................. 10.00 (f) Electrical Permit Fees I Minimum electrical permit fee including repair work per permit (Items d(2)through d(l 2) except for item d(7) in this section).......... 35.00 (This minimum does not apply to add-on electrical permits issued as supplementary to current outstanding permits for the same job.) 2. Services or Switchboards: (The following fees shall be charged for each service and for each subfeed in new installations only. No charge Will be made for subfeeds in existing installations) such service fee shall include one subfeed. Temporary for construction or test.........................................Mi.Wmum Fee 100 ampere and under......................................................................... 6.75 Over 100 ampere to 200 ampere......................................................... 9.00 Over 200 ampere to 400 ampere......................................................... 11.25 Over 400 ampere to 600 ampere......................................................... 12.00 Over 600 ampere to 800 ampere......................................................... 17.50 For each additional 100 ampere(over 800 ampere)............................. 4.50 Service repair and/or meter change.........................................Minimum Fee 3. Residential Wiring and Outlets: (a) Light, receptical, switch, sign, telephone and other low voltage outlets: I through 10 outlets...................................................................... 20.00 For each additional outlet............................................................. 1.50 13 (b) Equipment or machine outlets, or permanent connections: For each outlet or connection....................................................... 5.25 Motors: eachup to 5 HP....................................................................... 6.00 each over 5 HP through 10 HP................................................ 10.50 each over 10 HP through 100 HP............................................ 22.50 each over 100 HP.................................................................... 45.00 (c) Air conditioners and reffigeration systems: Covers related electrical work except wall or window units. Per ton or fractional part thereof................................................. 7.00 4. Commercial Fixtures: Including floodlights, spotlights, bulbs, parking fights, and tennis court lights: (a) Lights: I through 10 lamps...................................................................... 7.00 1 through 10 fluorescent tubes..................................................... 7.00 each additional lamp or tube....................................................... 1.00 (b) Steamers or festoon lights: First 10 lights or less.................................................................... 7.00 Each addition, 10 lights or less..................................................... 7.00 (c) Plugmold and track lighting: First25 feet................................................................................. 7.00 Each 5 feet thereafter................................................................... 3.00 5. Generators and Transformers, Commercial Heating Equipment, and Strip Heaters For Commercial, Industrial & Agricultural: Each up to 10 KVA or KW................................................................. 9.00 Each over 10 KVA or KW through 20 KVA or KW........................... 16.50 Each over 20 KVA or KW.................................................................. 37.50 6. Signs: Persq. ft. of sign face......................................................................... 1.50 Repairs, connection and reconnection.....................................Minimum Fee 7. Temporary Work on Circuses, Carnivals, Etc.: Equipmentground, each..................................................................... 6.00 Services as per item............................................................................D(2) Outlets as per item..............................................................................D(2)&D(4) MinimumFee...................................................................................... 90.00 8. Fire Detection System: Mastercontrol.................................................................................... 20.00 Eachdevice........................................................................................ 1.50 9. Master Television and Radio Systems: Mastercontrol.................................................................................... 20.00 Eachdevice........................................................................................ 1.50 10. Burglar Alarm/Intercom Systems: Mastercontrol.................................................................................... 20.00 Eachdevice........................................................................................ 1.50 11. Energy Management Systems: MasterControl................................................................................... 20.00 Eachdevice........................................................................................ 1.50 14 12. Swimming Pool Electrical: Each residential pool(group 1)........................................................... 45.00 Each multi-family or commercial pool (does not include exterior lighting of deck area).......................................................................... 90.00 (g) Mechanical Permit Fees I. Minimum mechanical permit fee (Items e(2)through e(8)in this section)............................................. 35.00 (This minimum does not apply to add-on mechanical permits issued as supplementary to current outstanding permits for the same job.) 2. Air conditioning and refrigeration: (Includes all component parts of the system except that water, electric and gas fines and connections are charged separately.) (Where BTU rating is not known, substitute one horsepower for one ton or 12,000 BTUs for one ton.) For each ton capacity or fractional part thereof.................................. 12.00 3. Furnaces and heating equipment, including commercial dryers, ovens and other fired objects not elsewhere classified: (Includes all components parts of the system except fuel and electrical lines.) For vented and unvented wall heaters, see Section c(9). For the first 200,000 BTU per hour or fractional part.......................... 25.00 For each additional 100,000 BTU per hour or fractional part............... 9.00 4. Relocate or lift and set compressor to different place, same structure... 30.00 5. Fire sprinkler system: Perstandpipe...................................................................................... 12.00 Persprinkler head............................................................................... .90 Per hose rack or hose bib.................................................................... 6.00 Per cylinder of CO2 or dry powder..................................................... 9.00 Per dry chemical distribution head....................................................... .60 6. Storage tanks for flammable liquids, per tank...................................... 37.50 7. Internal combustion engines: Stationary........................................................................................... 37.50 8. Other fees: For estimated costs up to $1,000.00.................................................... 22.50 For each additional $1,000.00 or fractional part.................................. 9.25 (h) Sign Permit Fees 1. Minimum sign fee............................................................................... 40.00 2. Class A(Temporary signs) Not exceeding six (6) sq. ft. and not electrically illuminated................. N/C 3. Class B Point of sale signs(occupant use products sold) per sq. ft....... .80 Painted wall signs...........................................................per sq. ft....... .80 4. Class C (commercial advertising signs) (a) Painted Class C signs(on walls of building)..............per sq. ft....... .80 (b) Semaphore signs (per standard or pole)....................per sq. ft....... .80 (c) All other Class C signs..............................................per sq. ft...... .80 15 5. Area fighting, standards of fixtures: From I to 5 standards or fixtures........................................................ 45.00 Each additional over 5 standards or fixtures........................................ 9.00 Section 3. This ordinance shall become effective June 20, 1995. PASSED on this 6 th day of June ' 1995. PASSED AND ADOPTED on s cond reading this 20 th day of__june , 1995. Z. La A ATTEST: Barbara A. Fugazzi Louis Im urgia, Jr., Mayor Village Clerk By: Z2zzaid C( APPROVED AS TO FORM: William Fann, whi a-geAttom ey 16