Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
DGT-16-1859
Inspection Worksheet Miami Shores Village 10050 N.E.2nd Avenue Miami Shores, FL Phone: (305)795-2204 Fax: (305)756-8972 Inspection Number: INSP-262495 Permit Number: DGT-7-16-1859 Scheduled Inspection Date: November 01,2016 Permit Type: Decks/Gazebos/Trellises Inspector: Mesa, Michel Inspection Type: Final Owner: MUELLER,ADAM&ALAYNA Work Classification: Deck -Wood Job Address:9190 NW 1 Avenue Miami Shores, FL Phone Number (786)402-0330 Parcel Number 1131010160030 Project: <NONE> Contractor: HOME OWNER Building Department Comments EXPANSION OF WOOD DECK IN BACK YARD. Infractio Passed Comments INSPECTOR COMMENTS False TO REPLACE PERMIT#DGT15-1226 Inspector Comments Passed 9 1 Failed Correction ❑ Needed Re-Inspection ❑ Fee No Additional Inspections can be scheduled until re-inspection fee is paid November 01,2016 For Inspections please call: (305)762-4949 Page 11 of 38 1x S` All ill`4, I Alb 3; 1a1 E 3 E 3 N R ffll�. i ` 0- Miami Shores Village a �C$� et�r, Q 10050 N.E.2nd Avenue NW � & Miami Shores,FL 3313 ........ &0000 n s,% Phone: (305)795-2204 Eyes a IgE zoE "�X 111912016 Expiration: 01116/2017 Project Address Parcel Number Applicant 9190 NW 1 Avenue 1131010160030 Miami Shores, FL Block: Lot: ADAM&ALAYNA MUELLER Owner Information Address Phone Cell ADAM&ALAYNA MUELLER 9190 NW 1 Avenue (786)402-0330 MIAMI SHORES FL 33150- 9190 NW 1 Avenue MIAMI SHORES FL 33150- Contractor(s) Phone Cell Phone Valuation: $ 3,000.00 HOME OWNER w__ u .,,... ...... ,_ Total Sq Feet: 600 Approved:In Review Available Inspections: Comments: Inspection Type: Date Approved::In Review Final Date Denied: Foundation Type Const:Wood Deck Additional Info:EXPANSION OF WOOD DECK IN BA Framing in Progress Classification:Residential Scanning:0 Review Planning Scanning:0_ Review Building Fees Due Amount Pay Date Pay Type Amt Paid Amt Due CCF $1.80 Invoice# DGT-7-16-60443 DBPR Fee $3.38 07/05/2016 Credit Card $50.00 $200.56 DCA Fee $3.38 Education Surcharge $0.60 07/19/2016 Credit Card $200.56 $0.00 Notary Fee $5.00 Permit Fee $225.00 Scanning Fee $9.00 Technology Fee $2.40 Total: $250.56 In consideration of the issuance to me of this permit, I agree to perform the work covered hereunder in compliance with all ordinances and regulations pertaining thereto and in strict conformity with the plans,drawings,statements or specifications submitted to the proper authorities of Miami Shores Village. In accepting this permit I assume responsibility for all work done by either myself, my agent, servants, or employes. I understand that separate permits are required for ELECTRICAL,PLUMBING,MECHANICAL,WINDOWS,DOORS,ROOFING and SWIMMING POOL work. OWNERS AFFIDAV T: I rtify that all the foregoing information is accurate and that all work will be done in compliance with all applicable laws regulating construction and zo Ing. F thermore,I authorize the above-named contractor to do the work stated. July 19,2016 Autho Si"n ture:Owner / Applicant / Contractor / Agent Date Building Department Copy July 19,2016 1 � Miami Shores Village Building Department ����'�� JUL .06 2016 10050 N.E.2nd Avenue, Miami Shores, Florida 33138 Tel:(305)795-2204 Fax:(305)756-8972 BY INSPECTION LINE PHONE NUMBER:(305)762-4949 FBC 20t,--k S BUILDING Master Permit No.D(S-m s PERMIT APPLICATION Sub Permit No. ❑BUILDING ❑ ELECTRIC ❑ ROOFING ❑ REVISION ❑ EXTENSION RENEWAL ❑PLUMBING ❑ MECHANICAL [:]PUBLICWORKS ❑ CHANGE OF [:] CANCELLATION ❑ SHOP CONTRACTOR DRAWINGS JOB ADDRESS: 01 lot 0 N0 rAJfi City: Miami Shores Countv: Miami Dade zip: 3316 o Folio/Parcel#: 11310101&003 C7 Is the Building Historically Designated:Yes NO Occupancy Type: Load: Construction Type: Flood Zone: 14 0 BFE: FFE: OWNER: Name(Fee Simple Titleholder): ADA M uf,l -6A_ Phone#: 7 Q�(,-1• 01-0%S17 Address:x'(10( 0 �tA 0-_1 A 4f City: M 1AMc SAU 2ES State: cc Zip: 33110 Tenant/Lessee Name: Phone#: Email: ; CONTRACTOR:Company Name: ®�- 1�� Phone#: Address: City: State: Zip: Qualifier Name: Phone#: State Certification or Registration#: Certificate of Competency#: DESIGNER:Architect/Engineer: Phone#: Address City: State: Zip: Value of Work for this Permit:$_ Square/Linear Footage of work: &OrD Type of Work: ❑ Addition I;/Alteration ❑ New ❑ Repair/Replace ❑ Demolition r-- Description of Work: 000 OfaLt^ —k R Al _T134 B Specify color (o�f�color thru tile: Submittal Fee$ 7-� Permit Fee$ CCF$ 1 CO/CC$ Scanning Fee$ Q r � Radon Fee$ �' DBPR$ S`J Notary$ Technology Fee$ D' ® Training/Education Fee$ Q - cG O Double Fee$ Structural Reviews$ Bond$ TOTAL FEE NOW DUE$ a Oy ' (Rev1sed02/24/2014) 5 Bonding Company's Name(if applicable) Bonding Company's Address City State Zip Mortgage Lender's Name(if applicable) Mortgage Lender's Address City State Zip Application is hereby made to obtain a permit to do the work and installations as indicated. I certify that no work or installation has commenced prior to the issuance of a permit and that all work will be performed to meet the standards of all laws regulating construction in this jurisdiction. I understand that a separate permit must be secured for ELECTRIC, PLUMBING, SIGNS, POOLS, FURNACES,BOILERS,HEATERS,TANKS,AIR CONDITIONERS,ETC..... OWNER'S AFFIDAVIT: I certify that all the foregoing information is accurate and that all work will be done in compliance with all applicable laws regulating construction and zoning. "WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT." Notice to Applicant: As a condition to the issuance of a building permit with an estimated value exceeding$2500, the applicant must promise in good faith that a copy of the notice of commencement and construction lien law brochure will be delivered to the person whose property is subject to attachment. Also,a certified copy of the recorded notice of commencement must be posted at the job site for the first inspection which occurs seven (7) days after the building permit is issued. In the absence of such posted notice, the inspection will not be approved and a reinspection fee will be charged. SignaturerJ6 Signature OWNER or AGENT CONTRACTOR The foregoing instrument was acknowledged before me this The foregoing instrument was acknowledged before me this QS day of ��l.� 20 l 6 ,by day of ,20 ,by ` ip( 1 &kH who is personally known to ,who is personally known to me or who has produced lie (A,OE P A me or who has produced as identification and who did take an oath. identification and who did take an oath. NOTARY PUBL NOTARY PUBLIC: Sign: Sign: Print: N��i �� �J Print: Seal: �,yaraoB4 Notary Public State at Florida eal: Sindia Alvarez c my Commission FF 156750 OF�o� Expires 09103/2018 �x�***+r<�**�xs*�x***pax*x�w�x� * * **�***pax****wax**�+��x*•��**�*�x�******��x***��x**�x*******�x**�*�� 7 13 ►e APPROVED BY � / Plans Examiner Zoning Structural Review Clerk (Revised02/24/2014) f r 5� Miami Shores Village seemap Building Department 10050 N.E.2nd Avenue Miami Shores, Florida 33138 Tel:(305)795.2204 Fax:(305)756.8972 OWNER BUILDER DISCLOSURE STATEMENT NAME: AbAN1 Mujl c f_d DATE:_-7II� ADDRESS:910(� ate %` Al'E i t-AlAtAi Sira(LrES, f-'L 3316-1) Do hereby petition the Village of Miami Shores to act as my own contractor pursuant to the laws of the State of Florida,F.S 489.103(7).And I have read and understood the following disclosure statement,which entities me to work as my own contractor;I further understand that I as the owner must appear in person to complete all applications. State Law requires construction to be done by a licensed contractor.You have applied for a permit under an exception to the law.The exemption allows you,as the owner of your property,to act as your own contractor even though you do not have a license.You must supervise the construction yourself.You may build or improve a one-family or two-family residence.You may also build or improve a commercial building at a cost of$25,000.00 or less(The new form states 75,000).The building must be for your own use and occupancy.It may not be built for sale or lease.If you sell or lease a building you have built yourself within one year after the construction is complete,the law will presume that you built for sale or lease,which is a violation of this exemption.You may not hire an unlicensed person as a contractor.It is your responsibility to make sure the people employed by you have licenses required by state law and by county or municipal licensing ordinances.Any person working on your building who is not licensed must work under your supervision and must be employed by you,which means that you must deduct F.I.C.A and with-holdings tax and provide workers'compensation for that employee,all as prescribed by law.Your construction must comply with all applicable laws,ordinances,buildings codes and zoning regulations. Please read and initial each paragraph. 1. 1 understand that state law requires construction to be done by a licensed contractor and have applied for an owner-builder permit under an exemption from the law.The exemption specifies that I,as the owner of the property listed,may act as my own contractor with certain restrictions even though I do not have a license. Initial 2. 1 understand that building permits are not required to be signed by a property owner unless he or she is responsible for the construction and is not hiring a licensed contractor to assume responsibility. Initial 3. 1 understand that,as an owner builder,I am the responsible party of record on a permit.I understand that I may protect myself from potential financial risk by hiring a licensed contractor and having the permit filed in his or her name instead of my own name.I also understand that the contractor is required by law to be licensed in Florida and to list his or license numbers on permits and contracts. Initial 4. 1 understand that I may build or improve a one family or two-family residence or a farm outbuilding.I may also build or improve a commercial building if the costs do not exceed$75,000.The building or residence must be for my use or occupancy. It may not be built or substantially improved for sale or lease.If a building or residence that I have built or substantially improved myself is sold or leased within 1 year after the construction is complete,the law will presume that I built or substantially improved it for sale or lease,which violates the exemption. Initial 11 S. I understand that,as the owner-builder,I must provide direct,onsite supervision of the construction. Initial 6. 1 understand that I may not hire an unlicensed person to act as my contractor or to supervise persons working on my building or residence.It is my responsibility to ensure that the persons whom I employ have the license required by law and by county or municipal ordinance. Initial_ 7. 1 understand that it is frequent practices of unlicensed persons to have the property owner obtain an owner-builder permit that erroneously implies that the property owner is providing his or her own labor and materials.I,as an owner-builder,may be held liable and subjected to serious financial risk for any injuries sustained by an unlicensed person or his or employees while working on my property.My homeowner's insurance may not provide coverage for those injuries. I am willfully acting as an owner-builder and am aware of the limits of my insurance coverage for injuries to workers on my property. Initial 8. 1 understand that I may not delegate the responsibility for supervising work to be a licensed contractor who is not licenses to perform the work being done.Any person working on my building who is not licensed must work under my direct supervision and must be employed by me,which means that I must comply with laws requiring the withholding of federal income tax and social security contributions under the Federal Insurance Contributions Act(FICA)and must provide workers compensation for the employee.I understand that my failure to follow these may subject to serious financial risk. Initial 9. 1 agree that,as the party legally and financially responsible for this proposed Construction activity,I will abide by all applicable laws and requirement that govern owner-builders as well as employers.I also understand that the Construction must comply withal[applicable laws,ordinances,building codes, and zoning regulations. Initial 10. 1 understand that I may obtain more information regarding my obligations as an employer from the Internal Revenue Service,the United States Small Business Administration,and the Florida Department of Revenues.I also understand that I may contact the Florida Construction Industry Licensing Board at 850.487.1395 or http://www.myfloridalicense.com/dbpr/pro/cilb/index.htmi Initial 11. 1 am aware of,and consent to;an owner-builder building permit applied for in my name and understands that I am the party legally and financially responsible for the proposed construction activity at the following address: 110 J%J ► AVJE4 pArA&4l gk3yi2�$ n`� Initial,�[� 12. 1 agree to notify Miami Shores Village immediately of any additions,deletions,or changes to any of the information that I have provided on this disclosure. A Initial n/V� Licensed contractors are regulated by laws designed to protect the public.If you contract with a person who does not have a license,the Constr4uction Industry Licensing Board and Department of Business and Professional Regulation may be unable to assist you with any financial loss that you sustain as a result of contractor may be in civil court.It is also important for you to understand that,if an unlicensed contractor or employee of an individual or firm is injured while working on your property,you may be held liable for damages.If you obtain an owner-builder permit and wish to hire a licensed contractor,you will be responsible for verifying whether the contractor is properly licensed and the status of the contractor's workers compensation coverage. Before a building permit can be issued,this disclosure statement must be completed and signed by the property owner and returned to the local permitting agency responsible for issuing the permit.A copy of the property owner's driver license,the notarized signature of the property owner,or other type of verification acceptable to the local permitting agency is required when the permit is issued. Was acknowledged before me this 5 day of 1 20 U I By 6bf-TI JOi4N V 1�'�who was personally known to me or who has Produced there License or LkCY-tJ 1a as identification. Notary Pubiic Sate of Florida VVVV !ER r Sindia Alvarez a My Commission GF 158750 OWNER NOTARYoF�°� Expires 0 9/0 312 01 8 r , s Ordered By: + z ,,,s��, We need to take y. m NE a every opportunity Othman 9 �E e possible to thank our amazing clients obin NE 92ati st Q, for their support... CX ��S1 St S1 NE 67st St TATTORNEYS AT LAW fswsmst� NE9"-St Thank You ! ! ! NNN 99th Sr Hca($2012 G gt6 JS I BE UN bw J A I ___P P OB ®`di1 ppbO:N:P:ING C F-- -- -----_--.�, a I7EDEJRA 113 y DATE U "IME OF DA I P y BLDG DL PT SUftJr-CT 10 COMPLIANCE WITH ALLSTATE AND COON h9 RULES AND REGULAT N � O C C�Ll�lD MAY.T 7 a 0 BY: too pt, „ a o r qo hl a�' PER PLAT % .0 V y `C) r I I o 37.50' o z S 00'22'34 E 124.48' 28.6• tn pa 8.7' •• DECK ° 8.8 • • (Ar 00 +►a o N O I ;` 1511 , . w. °� 4.4' CJ1 25 72' 00 64.40' Gl N Ul ( cr�RZ 00 ASPHALT ` � O :3 96' �0�., 11.70'ot �+� r rn ii 14.75' N ton Op Q 18.50' 0p w t" ALE t'an p p� • 15.49 O v 4' ir .37.14' ` w I 39.53' �� .y .... .. ... N 00.22'36" W 124.48 • • • 0 11' ASPHALT • ' ;. .; 20' PARKWAY .' ". •. • O � 20' ASPHALT PAVEMENT • N. W. Ist AVENUE ' Accepted By: Property Address: 9190 N.W. 1 AVENUE NOTES: FENCES ENCROACH ALONG SOUTH LOT MIAMI SHORES, FL 33150 LINE. REPRESENTATIONOFASURV AR RM 'DIRECTION.THIS COMPLIES WITH THE MINIMUM MIGUEL ESPINOSA LAND SURVEYING INC. TECHNICAL STANDARDS, FORTH BY THE TE OF FLORIDA BOARD OF PROFESSIONAL LAND + SURVEYORS IN CHAPTER 17 BG�F �� tj DMIN TIVE CODE PURSUANT TO 472.027,FLORIDA STATUTES. 10665 SW 190TH Street Suite 3110 SIGNED FOR THE FIRM MIAMI, FL 33157 PHONE:(305)740-3319 MIGUEL SA STATE OF �a P.S.M.No.5101 STATE OF DA`x FAX#:(305)669-3190 _i6_ NOT VALID WITHOUT AN A ��f-E EC NATURE AND AUTHENTICATED ELECTRONIC SEAL ANDIOR LB#6463 THIS MAP IS NOT VALID WITH AND THE ORIGINAL RAISED SEAL OF A LICENSED SURVEYOR AND MAPPER. ^ Survey: A-30556 Client File#: 12-086 Page 1 of 2 Not valid without all pages. { Surveyor's Legend , PROPERTY LINE STRUCTURE FND FOUND IRON PIPE B.R. BEARING REFERENCE TEL TELEPHONE FACILITIES / ® CONC. BLOCK WALL PIN AS NOTED ON PLAT 0 CENTRAL ANGLE OR DELTA U.P. UTILITY POLE -X-X- CHAIN-LINK FENCE OR WIRE FENCE LIB# LICENSE # - BUSINESS R RADIUS OR RADIAL E.U.B. ELECTRIC UTILITY BOX WOOD FENCE LS# LICENSE # - SURVEYOR RAD. RADIAL TIE SEP. SEPTIC TANK IRON FENCE CALC CALCULATED POINT N.R. NON RADIAL D.F. DRAINFIELD ---- EASEMENT SET SET PIN TYP. TYPICAL A/C AIR CONDITIONER --- CENTER LINE A CONTROL POINT I.R. IRON ROD S/W SIDEWALK ® WOOD DECK 0 CONCRETE MONUMENT I.P. IRON PIPE DWY DRIVEWAY BENCHMARK N&D NAIL & DISK SCR. SCREEN O CONCRETE ELEV ELEVATION PK NAIL PARKER-KALON NAIL GAR GARAGE ® ASPHALT P.T. POINT OF TANGENCY D.H. DRILL HOLE ENCL ENCLOSURE P.C. POINT OF CURVATURE ® WELL N.T.S. NOT TO SCALE BRICK / TILE P.R.M. PERMANENT REFERENCE MONUMENT ® FIRE HYDRANT F.F. FINNISHED FLOOR WATER P.C.C. POINT OF COMPOUND CURVATURE ® M.H. MANHOLE T.0.8. TOP OF BANK P.R.C. POINT OF REVERSE CURVATURE O.H.L OVERHEAD LINES E.O.w. EDGE OF WATER APPROXIMATE EDGE OF WATER P.O.B. POINT OF BEGINNING TX TRANSFORMER E.O.p EDGE OF PAVEMENT COVERED AREA P.O.C. POINT OF COMMENCEMENT CAN CABLE TV RISER C.V.G. CONCRETE VALLEY GUTTER P.C.P. PERMANENT CONTROL POINT W.M. WATER METER B.S.L, BUILDING SETBACK LINE TREE M FIELD MEASURED p/E POOL EQUIPMENT S.T.L, SURVEY TIE UNE POWER POLE P PLATTED MEASUREMENT CONC. CONCRETE SLAB CENTER LINE ® CATCH BASIN D DEED ESMT EASEMENT R/W RIGHT-OF-WAY C.U.E. COUNTY UTILITY EASEMENT C CALCULATED D.E. DRAINAGE EASEMENTP.U.E. PUBLIC UTILITY EASEMENT I.E./E.E. INGRESS / EGRESS EASEMENT LM.E. LAKE OR LANDSCAPE MAINT. ESMT. LB.E. LANDSCAPE BUFFER EASEMENTC.M.E. CANAL MAINTENANCE EASEMENT U.E. UTILITY EASEMENT R.O.E. ROOF OVERHANG EASEMENT LA.E. LIMITED ACCESS EASEMENTA.E. ANCHOR EASEMENT Property Address: General Notes: 1. The Legal Description used to perform this survey was supplied by others. 9190 N.W. 1 AVENUE This survey does not determine or is not to imply ownership. 2. This survey only shows above ground improvements. Underground MIAMI SHORES, FL 33150 utilities,footings, or encroachments are not located on this survey map. 3. If there is a septic tank,well, or drain field on this survey,the location of Flood Information' such items was shown to us by others and the information was not verified. 4. Examination of the abstract of title will have to be made to determine recorded instruments, if any, effect this property. The lands shown herein Community Number: NA were not abstracted for easement or other recorded encumbrances not shown Panel Number: NA on the plat. 5. Wall ties are done to the face of the wall. Suffix: L 6. Fence ownership Is not determined. Date of Firm Index: 9/11/2009 7. Bearings referenced to line noted B.R. S. Dimensions shown are platted and measured unless otherwise shown. Flood Zone: X 9. No identification found on property comers unless noted. Base Flood Elevation: NA 10. Not valid unless sealed with the signing surveyors embossed seal. 11. Boundary survey means a drawing and/or graphic representation of the Date of Field Work: 5/17/2012 survey work performed in the field, could be drawn at a shown scale and/or not to scale. Date of Completion: 5/18/2012 12. Elevations if shown are based upon NGVD 1929 unless otherwise noted. 13. This is a BOUNDARY SURVEY unless otherwise noted. 14. This survey is exclusive for the use of the parties to whom it is certified. The certifications do not extend to any unnamed parties. Legal Description: LOT 3, OF SUBDIVISION MIAMI SHORES MANOR, ACCORDING TO THE PLAT THEREOF AS RECORDED IN PLAT BOOK 45, PAGE 13, OF THE PUBLIC RECORDS OF MIAMI-DADE COUNTY, FLORIDA Cert a o: D OT & ;• • PRINTING INSTRUCTIONS: OBIN, P.A.; OLD REPUBLIC NATIONAL!XXT•L'E INSCIRANCIL . COMPANY; NYCB MORTGAGE COMPAt4r,1:LC; •o ••�' •' While viewing the survey in any Acrobat Reader, select the Its'successors and/or assigns as their intef0•s1"rpay dpp'�ar. :• File Drop-down and select"Print" Select a color printer, if available, or at least one with 8.5" x :. 14" paper. so ••• •• Select ALL for Print Range, and the#of copies you would like ' to print out. Under the "Page Scaling" please make sure you have selected "None." Florida Land AFFILIATE Do not check the "AutoRotate and Center" button. Title Check the "Choose Paper size by PDF"checkbox. F�;1'q MEMBERS Click OK to Print. M.E. LAND SURVEYING, INC. 10665 SW 190TH Street, Suite 3110 MIAMI, FL 33157 PHONE:(305) 740-3319 FAX#:(305) 669-3190 LB # 6463 VVM.M ELAN DSERVICES.COM Survey: A-30556 Client File#: 12-086 Page 2 of 2 Not valid without all pages. 1r, APP Doc #AP 1200907 STATE OF FLORIDA PERMIT #: 13-SC-1625027 DEPARTMENT OF HEALTH DATE PAID 08/17/2015 ONSITE SEWAGE TREATMENT AND DISPOSAL SYSTEM APPLICATION FOR CONSTRUCTION PERMIT FEE PAID: 70.00 + RECEIPT #:13-PID-2743553 APPLICATION FOR: ( ] New System [X] Existing System [ ] Holding Tank [ ] Innovative [ ] Repair [ ] Abandonment [ ] Temporary [ l APPLICANT: Adam Mueller AGENT: Statewide Septic TELEPHONE: 1 (305)661-6633 MAILING ADDRESS: po box 3865 Hollywood, FL 33083 TO BE COMPLETED BY APPLICANT OR APPLICANT'S AUTHORIZED AGENT. SYSTEMS MUST BE CONSTRUCTED BY A PERSON LICENSED PURSUANT TO 489.105(3) (m) OR 489.552, FLORIDA STATUTES. IT IS THE APPLICANT'S REPONSIBILITY TO PROVIDE DOCUMENTATION OF THE DATE THE LOT WAS CREATED OR PLATTED (MM/DD/YY) IF REQUESTING CONSIDERATION OF STATUTORY GRANDFATHER PROVISIONS. LOT: 3 BLOCK: na SUBDIVISION: PLATTED: 01/01/1950 PROPERTY ID #: 11-3101-016-0030 ZONING: I/M OR EQUIVALENT: [ Y PROPERTY SIZE: 0.25 ACRES WATER SUPPLY: [ ]PRIVATE [X]<=2000GPD [ 1>2000GPD IS SEWER AVAILABLE AS PER 381.0065, FS? [ Y /� DISTANCE TO SEWER: FT PROPERTY ADDRESS: 9190 NW 1 Ave Miami, FL 33150 DIRECTIONS TO PROPERTY: BUILDING INFORMATION: [X] RESIDENTIAL [ ] COMMERCIAL Type of No. of Building # Persons Total Design Flow Establishment Bedrooms Area Ft Served For This Unit 3 1850 6 300 OCT 2015 [ ] Floor/Equipment Drains [ ] Other (Specify) SIGNATURE: DA : 08/17/2015 DH 4015, 08/09 (Obsoletes previous editions which may not be used) Incorporated 64E-6.001, FAC C Page 1 of 4 1.0,0 a zzo°907 FlCre'Nmealth is -Dade County O.S.T.D.S ell P gram APP DOC #: AP1200907 STATE OF FLORIDA PERMIT NO. 13-SC-1625027 DEPARTMENT OF HEALTH ONSITE SEWAGE TREATMENT AND DISPOSAL SYSTEM DATE PAM: 08/17/2015 APPLICATION FOR CONSTRUCTION PERMIT FEE PAID: 70.00 40 RECEIPT #: 13-PID-2743553 Additional Notes and Comments: County Notes Fields: County Process#: Sent To Legal for Outstanding Balance Enforcement: Box#sent to storage: Zone: Agency Name: County Status: Sent to Collections("Y"=Yes,blank=no): Special Program(i.e.After School Meal Program): Government Entity(City,County,State,Federal): General Comments: Proposed deck enlargement. No objection letter was issued by C. Icaza on 09/01/15. v 1.0.0 AP1200907 EID1625027 ,RKwAs '0S" W 86. 401 ,7. 41- ALL CORNERS gra *~ cV fi1J. 2' a2X 00 '` 25.4, 'd- • 4X 26.05 _ `I_ , 1 'STORY -�; 6.6` SINGLE FAA41L Y Q a RESIDENCE 45' w _ .. # 9190 r VVV ! 4.2.51 1 V t� ,16-,L % 14.45 ,37k Oo` qdoBj1Fc-r1oN � �arlda Health Niiamil`paogrGam my LENGTH � v ® w ` o.s.T D.S.&w®_ o o � ., pp�lication No.: -a=-�-.�-------- LL ; Q �occ s nature Z LU CL � •1 � wQ- 89 "53108""' 189 "53'08", E. 86, 40 , �: 15' ALLEY 2 3 0 S I I I I 1 � � � � I � I � �/�-� � j. Y s ImNmm Aimrral4sPmbmpptDYrgn wA I (fl v9'le9bolewm..mm. I I I I I I I I I I I �� �` 6 C� c s..9dmaDrKsenawacx�mmmma .\� `\. a,aan,nm.mcmmmartmamaPu D [tri fim,wO��tA'bgMDxM�w,,Ms - C SmNtgvbv[r�mtrdmm¢.anpn � b9aaeywb[romAermmtlm ID h�utlmmDbtrmmmtaearmmDdmm aammmar-cnatvr 0. - - [&19 a.'mbyp. r Ca10b9fE D3WMi � 91 I CVRR ------- _—_——_—_ ------ —_—_—_—_ —_—_—_— \l � , r_ .'�,1����f arrmmm�mrtcs artrmme�rd iy�jj� �m FOmNmtrarmwnld4r.*� '��� Y�.:ti. � [a wlc[omcerrtrrsLm x ✓r• c a,9mreawa —c c �' o D:aa�mdm9-eeeasnemamdesaoo_T trva.aa.v� >anmaa+g�, r red+w�a xmw�mrrmm b YQWOUWDWNIW w+� "° i a � � � iw rmas��Mvery^ran�aaq�xetrvm I I I I I I n NEW WOOD DECK n STAIR DETAILS �X �_® I I I I I I �99�°Pp I I I I I ,1P I a1P I [JP I I I I I I I I I I I CORI I I I I I I I I �cKH oRADE T.OF I I I I I I I I LI Ul Ld LI I A DECK ELEVATION "m1 n°m e'ruar D^[ NEW PATIO WOOD DECK ma �iwmYenA,xLa[ 9WNWtAVE Er-1 g TIItRA rCcAoiOA.n�9,samaw gr,dw `�`°°1pM °� 'm w neos -mmew hASFpRE$PL,337 90.209 WOOD DECK FLOOR PLAN AND 2 ELEVATION " ' " " " " " 44 SPACM 27� i---, - I All"' 11, I w J-' -11h-L --------------- " wl CM" Em xw " NEW PA11OV400D DECK E�73-0-1. WAN SHORIM M 33160420 DECK FRAMING AND FOUNDA'nON . . . . 2 3 9 5 6Cd.E OF MtlAK ALLWORKONM PROJECTI6MTENDEDTOFULLYCON.+LYR.TNOUT TERRA CONSULTING INC EKCEFTIONNTTN TANDAR O, ND Mi COMF PRION,INC COM ALL REFERENCE STANDARDS,AND THE FLORIDA FIRE PREVENTION CODE 2010 EDITION 3191 Coral Way-Suite 648 CONSTRUCTION OF NEW WOOD DECK A6 PER PLANE.FRAMMi6 D Miami, FI, 33145 0 $TRUGn=L spEmmmm., D 786.385.9502 MAD LOAD 7.10) �FaN 40PW terraconsultinginc@gmail.com "6�' a CONCRETE 400.P61 NEW PATIO WOOD DECK r EXPOSME WOOD FRAAIOVO: P'.PME•NM ORAD£ 9190 NW 1 AVE MIAMI SHORES, FL, 33150-2249 c C 0 y 9 MUELLER FAMILY 9190 NW 1 AVE MIAMI SHORES, FL - - 'SIE 6 1 - -77 7_177- WIN � I A �, LNE916tb1 A g 411.916150. CONSTRUCTION SET LOCATION MAP i 0'2234 " E 124- 48"1% 28.8' 1.2' �i�� cc DRA/NF/ELD _ SEPTIC ANK 8.7 n ti .kv 00 red shadeEC d area 4.4' • 19.8 - Y 2a 72 C� aj I indicates new deck 84. 0 Cp location... NOT TO 40 L � v , ENCROACH p AS [,� WITHIN 5 OF 3.96 �'� 11.70' � I PROPERTY LINE 1tj 1.0" P ` 14.75' A, r"� cin 00 r1l rn Wogal 0) to 18.5x' •(�,• • • • • • 15.49 •• • •• • • • •• . . j . . . . . y s 37. 14' • •• •• • • • •• •• ' r INSTALLATION i; PRAV_ 0L INSTALLATION INSTRUCTIONS PRAVOL DURA-SHIELD COMPOSITE DECK BOARDS Before you install: Prior to installing any composite decking system it is recommended that you check with local building codes for any special requirements or restrictions. The diagrams and instructions outlined in this guide are for illustration purposes only and are not meant or implied to replace a licensed professional.Any construction or use of Pravol Dura-Shield must be in accordance with all local zoning and/or building codes.The ■ consumer assumes all risks and liability associated with the construction and use of this product. Safety: When dealing with any type of construction project it is necessary to wear appropriate safety equipment to avoid any risk of injuries. Pravol Dura-Shield recommends but is not limited to the following safety equipment when handling,cutting,and installing Pravol Dura-Shield:gloves, a respiratory protection,long sleeves,pants,and safety glasses. Tools: Standard woodworking tools may be used. It is recommended that all blades have a carbide tip.Standard stainless steel or acceptable coated deck screws and nails are recommended. Environment: A clean,smooth,flat,and strong surface is needed to install Dura-Shield Composite Decking correctly.Please check with local building codes before ever installing any type of decking. If installation does not occur immediately Dura-Shield Composite Decking needs to be put on a flat surface at all times. Never ever should it be put on a surface that isn't flat. Planning: Plan a layout for your deck before starting it to ensure the best possible looking deck for your project. Building codes and zoning ordinances generally apply to permanent structures, meaning anything that is anchored to the ground or attached to the house. So nearly every kind of deck requires permits and inspections from a local building department.We recommend drawing out a site plan of your proposed project that you intend to do to minimize errors and make your perfect deck. - Construction: Pravol Dura-Shield Composite Decking is NOT intended for use as columns, support posts, beams, joist stringers or other primary load- bearing members. Pravol Dura-Shield must be supported by a code-compliant substructure.While Pravol Dura-Shield pVfte%are great for deck re-planking (removing old deck surface planks and installing Pravol Dura-Shield on code-complia4substructure), Pr*avbl Dura-11IT18 V boards CANNOT be installed on existing deck boards. • • • Routing: .. . . .. ..... Pravol Dura-Shield Composite Decking SHOULD NOT be routed aside from routing a groove on the side of�oliD boards for start/stop of Duva- • • • •• •• • ••••• Shield Composite Decking locking systems. ••�•.� '..�.' ������ • Static: i•••i• •••••• Static build-up is a natural occurring phenomenon that can occur with many plastic products.Dry and wind?910 jiments rgay gVke thiiMe.: more apparent,this all varies depending on the climate and age of the deck. • TM For more information on this product or M Build"'Irezo(:,� to order samples call 1-877-631-2845 or visit our website at builddirect.com Page 1 INSTALLATION GPRA- VOL Ventilation: Pravol Dura-Shield Composite Decking CANNOT be directly installed onto a flat surface. It must be installed onto a substructure, so there is adequate and unobstructed air flow under the deck to prevent excessive water absorption.A minimum of 6"of continuous net free area under the deck surface is required for adequate ventilation on all decking so air can circulate between adjacent members to promote drainage and drying. Heat and Fire Excessive heat on the surface of Pravol Dura-Shield Composite Decking from external sources such as but not limited to fire or reflection of sunlight from energy efficient window products, Low-emissivity (Low-E) glass can potentially harm Pravol Dura-Shield Composite Decking products. Low-E glass is designed to prevent passive heat gain within a structure and can cause unusual heat build-up on exterior surfaces. This extreme elevation of surface temperatures,which exceeds that of normal exposure, can possibly cause Pravol Dura-Shield Composite Decking products to melt,sag,warp,discolor, increase expansion/contraction,and accelerate weathering. Current or potential Pravol Dura-Shield Composite Decking customers that have concerns about passible damage by Low-E glass should contact BuildDirect if the product which contains Low-E glass for a solution to reduce or eliminate the effects of reflected sunlight. Fasteners When fastening Dura-Shield Composite Decking all screws that are face fastened should always be driven in at a 90 degree angle to the decking surface. Toe nailing/screwing should never been down to Dura-Shield Composite Decking.An extra joist should be added if a 90 degree angle cannot be driven into the board. Use white chalk,straight boards,or string lines as templates for straight lines.NEVER USE COLORED CHALK.Colored chalk will permanently stain Dura-Shield Composite Decking and is highly not recommended. Face fastening should follow the guidelines set out on page#4 of this installation guide.All nails/screws that are face fixed should always be stainless steel. Depending on the screws that you use when face fixing there could be potential bulging or mushrooming. It is recommended to take care of these mushrooms/bulges by taking a rubber mallet and patting them down to give your deck a better look. - When choosing which screws/nails to use always check first with your local home centers and hardware stores to see if they have screws that are engineered specifically for composite decking. These screws/nails will always work and give Dura-Shield Composite Decking the best looking outcome, using other screws/nails that are not recommended for composite could potentially damage/harm time deck. If you are 6 6 unsure which screw/nail to use contact your manufacturer for more information. ; 6•• •••• ••••0• ••66 000 • 6 Board Spacing • 666 •• 66 660006 Two boards should NEVER be installed on the same joist,when butting up the ends of the board they haveto to install"on separate joist's 6 60 66660 with separate clips. 6666 6 6 666606 000000 6666• 66 6• 66 6 6666•• 66.666 • 6 • 0 • • 0000•• 666.66 6 6 • 6 6 • • •66666 60 6 6 006 6 6 00.0 6 6 6 • TM For more information on this product or 19 BuildOl10111 M C 161- to order samples call 1-877-631-2845 or visit our website at buiiddirect.com Page 2 INSTALLATION P--- R A- VO! L--- Calculating Gap Requirements What you will need to know(CANADA): • Coefficient of Linear Expansion (CLE):0.04 mm/m°C • Installation Temperature(°C) • Max or Minimum Temperature in your region (°C) -When installing at a low temperature always use the maximum temperature in your region to calculate -When installing at a high temperature always use the minimum temperature in your region to calculate • Length of the Board (meters) What you will need to know(USA): • Coefficient of Linear Expansion (CLE): 20.2 x 10E-6 inch/inch/°F • Installation Temperature(°F) • Max or Minimum Temperature in your region (°F) When installing at a low temperature always use the maximum temperature in your region to calculate When installing at a high temperature always use the minimum temperature in your region to calculate • Length of the Board (inches) Example(CANADA): Amount of gapping required for Length of Board = Coefficient of Linear Expansion (CLE)x Length of the Board (meters) x (Max. or Min. Temp. in your region-Installation Temp.) Amount of gapping required for a 4.88 meter Board=0.04 mm/m°C x 4.88 meters x(40°C-20°C) Amount of gapping required for a 4.88 meter Board=3.904 mm (1.952 mm on each end or 3.904 mm on a single end) Note:Always round up to the nearest mm to make the gapping easier,like in the example above 1.952 or 3.904 mm would round up to 2 and 4 mm respectively. Note:If the calculation comes out to be negative disregard the negative and take only the value Note: There needs to be at least a minimum of 1 mm for the end of each board regardless if the calculation made is less than 2 mm. Example(USA): Amount of gapping required for Length of Board=Coefficient of Linear Expansion(CLE)x Length of the Board (inches)x(Max.or Min. Temp. in your region-Installation Temp.) ..•. Amount of gapping required for a 192 inch Board=20.2 x 10E-6 inch/inch/°F x 192 inches x(104 °F-68;F) •• *see •••• • Amount of gapping required for a 192 inch Board= 1.396 inches(0.698 inches on each end or 1.396 inches on a single endl. : •. 0000.. .. 0000.. Note:Always round up to the nearest mm to make the gapping easier,like in the example above 0.698 or 4.i;6 jrWhes would round up to 0.7 and 1.4 inches respectively. 000000 •• • .0000..0 Note:If the calculation comes out to be negative disregard the negative and take only the value • • •• '•;0•. 000••0 .• . 0.••• Note: There needs to be at least a minimum of 0.04 inches for the and of each board regardless if the call;^V made%188j than 0.N •• . inches. 000060 . . • • • . 0000.. 000••0 000 . • . • . 0 t For more information on this product or ■ TM to order samples call 1-877-631-2845 or Build'LArec visit our website at builddirect.com Page 3 GPRAVOL INSTALLATION Framing First, determine the decking span, that is , how far apart your joists willbe. The frame needs to be completely level before installing any boards. `J M " - Note:Adequate spacing in the joists is required to keep the deck boards from bending. Please review the chart on page 9 of this COriCt8t81@.tQl; installation guide to see what spacing is required for your profile. Diagram 1 Decking When installing the deck the first and last board of your project will need to be nailed,screwed, or use a starting accessory. Every other board will use the hidden fastener for its installation. Option 1: Screw from the side 1. After calculating the decking span and making the frame of your deck the first board is ready to be installed. I ' ______J 01st 2. First pre-drill a hole for the screw through the groove of , the board and into the joist. - 3. Next,fix the screw into the hole shown in Diagram 1 &2. Concrete ground:: ,••••• _<•------s' 0000 00.00• • 6 • TMA0�000•• •• 6960•0 r"V7r' J 9 9 • 9 696• 66••99 •• • • • • 9 • • • 0000 ••• ••• 996696 969 6 • 666.69 • • 0 6 9 06 96 66 • 0600•• 6 •6066• 6 • • 6 • • •9006• 999669 • 0 • • • • • 0000•• 69 6 • 696 9 6 • 6 9 - ■ � ' �® TM For more information on this product or to order samples call 1-877-631-2845 or visit our website at builddirect.com Page 4 INSTALLATION 6PRA- VOL Option 2: Screw from the top - 1. After calculating the decking span and making the frame of your deck the first board is ready to be installed. • 2. First, mark where you will drill on the top of board as shown in Diagram 3 �, � Joist � a� Note: When face fastening the minimum distance is: -From the ends of the board 1-1 1/2"(38mm) Concrete ground -From the sides of the board 1"(26 mm) Diagram 3 3. Pre-drill a hole for the screw through the board from above and into the joist. 4. Next,fix the screw into the hole shown in Diagram 4. a 5. Repeat steps 1-4 for each joist for the first and last board of your deck. Note: When making the final cuts we recommend snapping a chalk line and using a circular saw to the cut the deck boards that rani Joist O s` i ` s wild during installation. F Concrete ground Diagram 4 2mm Option 3: Starting accessory ,.':: ------_ _ -- •' - ', . : _ • • 0000 0000•• I 1. A starting accessory can be used by first drilling the —j • •• ; • accessory into the joist. 000000 �•: 0000:• 2. First pre-drill into the joist then fix the starting accessory ` gtaRh—� • • into the joist as shown in Diagram 5 't • •' • _ • •0 •�. •0.0• Mat= 3. Then take your first board and push it into the starting _:; •.r _.: 0 _- 00;000 accessory as shown in Diagram 5 'y •0 •' • 000000 0 _ Concretetopnndi� • ••••i• 000000 • • • • • • • 00.00• DiaMM—M 3 • ••• 0 • •• El BUUCIIDO TM for more information on this product or WIO�'Oklt to order samples call 1-877-631-2846 or visit our website at builddirect.com Page 5 INSTALLATION PR A- VOL Glidden Fasteners f`` r hr r Installing hidden fasteners with Dura-Shield Composite Decking is relatively simple and quick compared to regular lumber. lhagtam 6 Before you installing hidden fasteners into Dura-Shield Composite Decking always figure out which type of style/pattern you will be doing for your deck. Plan out where the locking and moving clips will be going on each joist. Prestige Series Composite Decking Clips System(T-Clips) 1. First slide the TC-1 and TC-2 clips into the groove of the boards with screws facing up. 2. After getting all the TC-1 and TC-2 clips into position take your next board and slide them into the fasteners as shown in Diagram 6&7. DIW=7 3. Next screw down the TC-1 and TC-2 clips from the top 4. Repeat steps 1-3 until the deck is finished. Note:For an easier install with the T-Clip System try first pushing all the boards together and then coming back in and sliding the clips into the • •••• • •••••• grooves and then into place on each joist as shown in Diagram 8 • • ••• • •• • 0000•• • 0000•000 so 0 • • • •0•••• • • • • • • 0 0•••0• • • •••0•• Di4 a&8 • ••• • • ■ ��� �� TM for more information on this product or 1- to order samples call 877-631-2845 or visit our website at builddirect.com Page 6 6PRA- VOL Gap INSTALLATION Fascia Board First make sure you know which type of installation you are doing for your fascia board.There are two types: O' Option 1: Installing against the length of decking A blo of wood asci Board 1. First the distance from where the board is locked to the end of deck where the fascia board is to be installed needs to be measured. Diagram 1 2.After measuring remember that your gapping will be 2mmlmeter from the locking clip. 3.Since there will be a gap at the end of the deck an extra piece of i wood will need to be added at the end of the joist to make up the gapping distance. 43he fascia board will now be installed into the block of wood and into the joist as show in Diagram 13 lJiagram 14 Option 2: Installing against the width of decking 1. If you have installed where the edge of the board hangs over the joist a block of wood will need to be used under as shown in Diagram 15.If you have installed where the edge of the board is flush with the `S joist than the fascia will just be installed through the joist as shown in Diagram 16 2.First pre-drill the holes forthe fascia board.The fascia board should ihagram 1� be drilled with bigger holes or routed to allow for expansion and contraction and fixed either at either end or in the middle as shown in Diagram 17. When fixing the bigger holes it is recommended to use washers. sees 3. The fascia board will be installed into the the block wood and e • •ice, ` • • . • • through the joist. 000000ease 0 • • • •• ••• Note:NEVER install the fascia by drilling into the decking as shown s e so @*0 o* e in Diagram 14. ALWAYS install the fascia into rhA WO Al WAYS •0:00- 0108• 0000.e s •. •e . .•.••. • pre-drill the fascia board •� • .:0 ••0.0 0.1.0 0• :•• e•0 as •• Diagram 17 3 TM For more information on this product or to order samples call 1-877-631-2845 or visit our website at builddirect.com Page 7 INSTALLATION UPRAVOL MAXIMUM DEC ° ' CENTER TO CENTER (OC) OF JOISTS ALLOWED PROFILE 400 mm (16 in) For Pravol Dura-Shield Composite ®ecking SOLID Solid Board with Grooves 400 mm (16 in) For Pravol Dura-Shield Composite Decking HOLLOW Series Circle Hollow Board with Grooves 00000— = 400 mm (16 in) For Pravol Dura-Shield Composite Decking EURO Style Channeled Circle Hollow Board with Grooves •"+`• • . 0660 0000•• • • e 0600.• •• 0006•• 400 rfl.(. •.6?n) 00000 :0600: 0060 • •• 06•06 0600•0 0. 0 00600 • • 6 • • Thls profile Is only for 400 m �16:n) ,ResiVntial u-v,ago cannot - ., r� + • • be used forstair treads • • For more information on this product or A'j Buildl(Arac'T to order samples call 1-877-631-2845 or visit our website at builddirect.com Page 8 INSTALLATION P,.- R- - -- A__ V0L ParallelLayout One Board: © r FA:if there is no wall on both sides or walls on both sides: 00 locking down in the middle. Remember to leave minimum 2mm a for every mgr of decking board.when CEC clip against wall. CEC clip.7gainst Wall: lotkingclip against Trail; B: If only one side has a wall: lock down closest to the wall min 2mm gtipdsm bawd no gap Two Boards: Lock down where the two boards meet on butt joints 0 13 . . .... ...... yet mrtsjwen n+�ddlL to jrd Three or More Boa►aii•• •• •• i•s•.: 20)M qop On each SAP • • . • • ••• • ••••• Lock down along the cVClr�iline on•the•k�ult joinj%Q�Oghe - neighbor boards of w •tbby medtjbb jAiddle jbpjV0• Locking Clip: 909660 0 • Prestige Series Composite The middle board shoe ld Re'as shoat as possible ass, ® CEC Clip: Decking Clips no_I_ongec than 2 mQto_�sson,�Ioov_c mm aponLe ch&id9s. see Single screw through groove -Note: Always pre-drill when nailing/ser®taing onto the boards for the best results. Never use 2 locking clips on one board. ulld�Jrer r�L,T�' l=or more information on this product or `6 to order samples call 1-877-631-2845 or visit our website at builddirect.com Page 9 INSTALLATION R A- VOL -Brick Layout 2-1-2 Layout: Lock down along the central lino on the butt joints. R�®l�mber)�lacus minimum 2mm aao for g�gry meter of dek�g brtctd.when CEC clip against wall. '' Al 3.2.3 Layout: Nail down along the control line on the butt joints using ` A AL screws at 45 degree angle into the groove 8 joint,to - lock down one side of the board.Use the some method __f to lock down the neighbor boards where they meet the middle boord. The_middle boord should be as short as possible and no IQrig�r whQn_2_melers._ond.le_oxo 2mmg9p on_eosla_ de . JL 1W G o ,a7 to between tvoddVe board •••••• ••i ••••i• ?Mr" gap on r.101-odt, Locking Clip:..:. . . . • ••" �rpstTc,�Series Corn CEC Clip: •�... ...•.Deckin CZi s inns- • Q Single scriyV. r0ugli.6roove'0 . . . . ...... 4-Now Always pre-drill when nailing/screwing into the boards .'. :....: for the best results. Novo( use 2 Locking clips on one board. '..' ■ Bui1dL TM For more information - this product or rift 1 to order samples call 1-877-631-2845 or visit our website at builddirect.com Page 10