gTiQ Alk ENGINEERING & TESTING, INC.
Phone: (866)781-6889*Fax: (866)784-8550
www.floridaengineeringandtesting.com
250 S.W.1P Avenue
Pompano Beach,FL 33069
June 16,2016 Job Order No.: 16-1895
Permit No.: RF-3-16-618
Dan Tennis Roofmg
2511 N.W.53'Street
Tamarac,Florida 33309
RE: TAS-106 TILE UPLIFT TESTS
Proposed Roof
Tovar Residence
464 N.E.92nd Street
Miami Shores,Florida
Dear Sir or Madam:
In accordance with your authorization,Florida Engineering&Testing Inc.,has performed
Tile Uplift Testing in compliance with Testing Application Standards TAS-106 and the
Florida Building Code High Velocity Hurricane Zone on June 15, 2016, at the above
referenced project.
The purpose of our inspection was to determine the uplift capacity of the roof tiles for the
proposed addition at the above referenced project. This inspection does not include the
roof tiles for the existing structure. The subject roof consisted of Clay s shaped tile
foam set. The pitch of the subject roof is 4/12.
Our field engineer's representative visited the site and conducted thirteen (13) uplift tests
on the roof tiles. All tests were performed according to the Florida Building Code High
Velocity Hurricane Zone and protocol TAS-106 using an Intercomp scale model CS200.
The following is a summary of results:
Field Test Results
Test Number Test Location Field Uplift Pull Test Test Result
1 - 3 Corner See Attached Diagram 35 f 5 pounds Passed
4 - 9 Perimeter See Attached Diagram 35 f 5 pounds Passed
10 - 12 Field See Attached Diagram 35±5 pounds Passed
13 Ride See Attached Diagram 35 t 5 pounds Passed
Quaft �� A OW amurunre
Page 2
r Juqe 16,2016 Job Order No. 16-1895 FL A
Dan Tennis Roofing
Tovar Residence
464 N.E.92nd Street
Miami Shores,Florida:
All test results were found to be in compliance with TAS-106 and the Florida Building
Code(see attached field sketch).
The test results are limited to the tested areas. If other roof areas exhibit different
conditions, it should be brought to our attention for remedial work. This uplift test is not
a final roof inspection. A final roof inspection must be conducted by the building official
for approval.
The test results presented reflect the condition of the roof system at the time of the test.
These results are time and sample dependent since roof conditions are continuously
changing due to exposure to the elements.
Florida Engineering & Testing, Inc. (FE&T) is an independent third party providing un-
biased testing information and results. FE&T is not affiliated with our client nor do we
have any financial interest in the project or determination of the test results.
As mutual protection to clients, the public and ourselves, all reports are submitted as the
confidential property of clients, and authorization for publication of statements,
conclusions or extracts from or regarding our reports is reserved pending our written
approval.
Florida Engineering& Testing, Inc., appreciates the opportunity to be of service to you at
this phase of your project. If you have any questions or comments, please give us a call.
We would be pleased to help in any way we can. It has been a pleasure working with you
and look forward to doing so again in the near future.
Sincerely,
Mark A. Mesiano,P.E.
Florida Engineering&Testing, Inc.
Florida Reg.No. 48202
Certificate of Authorization No. 6923
r
FTL
.4r___J I
AFL
pp
i - " _ . 7
_J
.r
1 y
t �
r@k �
E
I � �
€_ E
Field Sketch-Not to Scale
Approximate Dimensions
a=o.lw=o.i x 22=2.2' 464 N.E. 92nd Street
a=0.4H=0.4 z 15=6'
Perimeter Dimensions=3' Miami Shores, Florida
Miami shores Village
Building Department
10050 N.E.2nd Avenue
Miami Shores, Florida 33138
''�ORtDA Tel: (305)795.2204
Fax: (305)756.8972
RE: Permit# "3' 6 '` a DATE:
INSPECTION AFFIDAVIT
licensed as a(n Contracto Engineer/Architect,
(Printraw and drdeLicense Tym) FS 468 Building Inspector
License#: C'c C-- I TU 1��
On or about �, Az 1 did personally inspect the roof deck nailing
work at i� q?W(Date&thne)L.z iY i i1w
(Gorro to Job Site Address)
Based upon that examination I have determined the installation was done according to the Hurricane Mitigation Retrofit
Manual(Based on 53.844 F.S)
Signature
State of Florida
County of Dade:
The undersigned, being the first duly swom,deposes and says that he/she is the contractor for the above property
mentioned.
Sworn to and subscribed before me this 27 day ofJuyu . 2b1
Nota Public, Sate of Florida at Large�J ,fid.. °�: �` OWISSHLARY t`#HAY
Notary 9 MY txaMlullSStoN#�gnat is
*A-4* EXPIRES:November 24,2019
4c8WW Thru Budget Nohry Se ft
%snOrsl,Building,Recdeft,or Roofing Contractors or any individrrdl Wrtif ed raaler468 P.S.to make such an inspection.indude photographs of each pbne of to roof adtlh
Ak ern t#and address#dearly shown marked on the deck for each ir�
��... s .a ne�nnn�wun�rxno