Loading...
RF-16-618 (2) a a gTiQ Alk ENGINEERING & TESTING, INC. Phone: (866)781-6889*Fax: (866)784-8550 www.floridaengineeringandtesting.com 250 S.W.1P Avenue Pompano Beach,FL 33069 June 16,2016 Job Order No.: 16-1895 Permit No.: RF-3-16-618 Dan Tennis Roofmg 2511 N.W.53'Street Tamarac,Florida 33309 RE: TAS-106 TILE UPLIFT TESTS Proposed Roof Tovar Residence 464 N.E.92nd Street Miami Shores,Florida Dear Sir or Madam: In accordance with your authorization,Florida Engineering&Testing Inc.,has performed Tile Uplift Testing in compliance with Testing Application Standards TAS-106 and the Florida Building Code High Velocity Hurricane Zone on June 15, 2016, at the above referenced project. The purpose of our inspection was to determine the uplift capacity of the roof tiles for the proposed addition at the above referenced project. This inspection does not include the roof tiles for the existing structure. The subject roof consisted of Clay s shaped tile foam set. The pitch of the subject roof is 4/12. Our field engineer's representative visited the site and conducted thirteen (13) uplift tests on the roof tiles. All tests were performed according to the Florida Building Code High Velocity Hurricane Zone and protocol TAS-106 using an Intercomp scale model CS200. The following is a summary of results: Field Test Results Test Number Test Location Field Uplift Pull Test Test Result 1 - 3 Corner See Attached Diagram 35 f 5 pounds Passed 4 - 9 Perimeter See Attached Diagram 35 f 5 pounds Passed 10 - 12 Field See Attached Diagram 35±5 pounds Passed 13 Ride See Attached Diagram 35 t 5 pounds Passed Quaft �� A OW amurunre Page 2 r Juqe 16,2016 Job Order No. 16-1895 FL A Dan Tennis Roofing Tovar Residence 464 N.E.92nd Street Miami Shores,Florida: All test results were found to be in compliance with TAS-106 and the Florida Building Code(see attached field sketch). The test results are limited to the tested areas. If other roof areas exhibit different conditions, it should be brought to our attention for remedial work. This uplift test is not a final roof inspection. A final roof inspection must be conducted by the building official for approval. The test results presented reflect the condition of the roof system at the time of the test. These results are time and sample dependent since roof conditions are continuously changing due to exposure to the elements. Florida Engineering & Testing, Inc. (FE&T) is an independent third party providing un- biased testing information and results. FE&T is not affiliated with our client nor do we have any financial interest in the project or determination of the test results. As mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication of statements, conclusions or extracts from or regarding our reports is reserved pending our written approval. Florida Engineering& Testing, Inc., appreciates the opportunity to be of service to you at this phase of your project. If you have any questions or comments, please give us a call. We would be pleased to help in any way we can. It has been a pleasure working with you and look forward to doing so again in the near future. Sincerely, Mark A. Mesiano,P.E. Florida Engineering&Testing, Inc. Florida Reg.No. 48202 Certificate of Authorization No. 6923 r FTL .4r___J I AFL pp i - " _ . 7 _J .r 1 y t � r@k � E I � � €_ E Field Sketch-Not to Scale Approximate Dimensions a=o.lw=o.i x 22=2.2' 464 N.E. 92nd Street a=0.4H=0.4 z 15=6' Perimeter Dimensions=3' Miami Shores, Florida Miami shores Village Building Department 10050 N.E.2nd Avenue Miami Shores, Florida 33138 ''�ORtDA Tel: (305)795.2204 Fax: (305)756.8972 RE: Permit# "3' 6 '` a DATE: INSPECTION AFFIDAVIT licensed as a(n Contracto Engineer/Architect, (Printraw and drdeLicense Tym) FS 468 Building Inspector License#: C'c C-- I TU 1�� On or about �, Az 1 did personally inspect the roof deck nailing work at i� q?W(Date&thne)L.z iY i i1w (Gorro to Job Site Address) Based upon that examination I have determined the installation was done according to the Hurricane Mitigation Retrofit Manual(Based on 53.844 F.S) Signature State of Florida County of Dade: The undersigned, being the first duly swom,deposes and says that he/she is the contractor for the above property mentioned. Sworn to and subscribed before me this 27 day ofJuyu . 2b1 Nota Public, Sate of Florida at Large�J ,fid.. °�: �` OWISSHLARY t`#HAY Notary 9 MY txaMlullSStoN#�gnat is *A-4* EXPIRES:November 24,2019 4c8WW Thru Budget Nohry Se ft %snOrsl,Building,Recdeft,or Roofing Contractors or any individrrdl Wrtif ed raaler468 P.S.to make such an inspection.indude photographs of each pbne of to roof adtlh Ak ern t#and address#dearly shown marked on the deck for each ir� ��... s .a ne�nnn�wun�rxno