Loading...
BPP-16-202 . Q eCt ■N Inspection Worksheet Miami Shores Village 9 10050 N.E.2nd Avenue Miami Shores,FL Phone: (305)795-2204 Fax:(305)756-8972 inspection.Number: INSP-265279 Permit Number. BPP-1-16-202 Inspection Date:August 11,2016 Permit Type: Pools/Whirlpools(Hot Tubs Inspector. Dacquisto,David Inspection Type: Survey final Owner. ROSSETTI,JOHN Work Classification: Now Job Address:548 NE 95 Street Miami Shores,FL Phone Number Parcel Number 1132060140740 Project <NONE> Contractor: PARKWOOD POOLS INC Phone;(954)583-3355 Buliding Department Comments POOL, SPA&DECK CONSTRUCTION POOL/SPA "freotlo Passed ommonts GALLONS 13,230$16,000 INSPECTOR COMMENTS False 0 DECK SET IN SAND 830 SQ FT $4,150.00 Inspector Comments Passed FailedEl Correction Needed Re-inspection ,Fee No Additional Inspections can be scheduled until re-inspection fee is paid For Inspections please call:(305)7624949 August 11,201H Page 1 of 1 c INSPECTION RECORD STRUCTURAL PLUMBING INSPECTION DATE INSP INSPECTION DATE INSP INSPECTION DATE INSP Foundation Zoning Final Stemwall ZONING COMMENTS Rough Slab Water Service Columns(1st Lift) 2nd Rough Columns(2nd Lift) Top Out Tie Beam ; Fire Sprinklers Truss/Rafters Septic Tank I Roof Sheathing Sewer Hook-up Bucks — Roof Drains Windows/Doors ELECTRICAL Gas Interior Framing INSPECTION DATE INSP LP Tank Insulation TemporarV Pole Well Ceiling Grid 30 Day Temporary Lawn.Sprinklers Drywall Pool Bonding Main Drain Firewall Pool Deck Bonding Pool Piping Wire Lath Pool Wet Niche Backflow Preventor Pool Steel Underground Interceptor Pool Deck Footer Ground Catch Basins Final Pool Slab CondensateDrains Final Fence Wall Rough HRS Final Screen Enclosure Ceiling Rough Driveway Rough PLUMBING COMMENTS Driveway Base Telephone Rough Tin Cap Telephone Final Roof in Progress TV Rough Mop in Progress TV Final Final Roof Cable Rough Shutters Attachment Cable Final r. Final Shutters Intercom Rough Rails and Guardrails Intercom Final MECHANICAL ADA compliance Alarm Rough INSPECTION DATE INSP Alarm Final Underground Pipe DOCUMENTS Fire Alarm Rough Soil Bearing Cert Fire Alarm Final Rough oil Treatment Cert Service Work With Ventilation Rough iw—Reinf Unit Mas Cert - - ELECTRiCALCOMME — HoOdIdugh - -- _ Insulation Certificate Pressure Test Spot SurveyFinal Hood' j Final SurveyFinal Ventilation Truss Certification Final Pool Beater STRUCTURAL COMMENTS Final Vacuum MECHANICAL COMMENTS INSPECTION DATE INSP Final Sprinkler Final Alarm P, d