Loading...
RC-15-545 (3) INSPECTION RECORD d POST ON SITE Perm/tNO RC-3-15 545 Miami Shores Village 10050 N.E.2nd Avenue 1 0rrl6 Mott - Miami Shores,FL 33138-0000 Why G1Ft.4S1/C8� 11tera�Cn �yo,4 Phone: (305)795-2204 Fax: (305)758-8972 r0 > Issue Date:4/8/2015 Expires: 10/05/2015 INSPECTION REQUESTS: (305)762-4949 or Log on at https://bidg.miamishoresvillage.com/cap REQUESTS ARE ACCEPTED DURING 8:30AM-3:30PM FOR THE FOLLOWING BUSINESS DAY. Requests must be received by 3 pm for following day Inspections. Residential Construction Parcei #:11321)50120120 Owner's Name:STEPHEN MARINO Owner's Phone: 305-812-0629 <<i Job Address: 1066 blE 94 StreetTotal Square Feet: 4000 Miami Sharpy FL 331,18- i Bond Number: Total Job Valuation: $ 167,000.00 WORK IS ALLOWED MONDAY THROUGH SATURDAY, Contractor(s) Phone Primary Contractor 7:30AM-6:00PM.NO WORK IS ALLOWED ON W SUNDAY OR HOLIDAYS. DENMAR CONSTRUCTION GROUP (954)372-6623 Yes BUILDING INSPECTIONS ARE DONE MONDAY THROUGH THURSDAY. ROOFING INSPECTIONS ARE DONE MONDAY THROUGH FRIDAY. NO BUILDING INSPECTIONS DONE ON FRIDAY. THI'S t U J EM 'PAB AT E OF 10111 log NO INSPECTION WILL BE MADE UNLESS THE PERMIT CARD IS DISPLAYED AND HAS BEEN APPROVED. PLANS ARE READLY AVAILABLE. IT IS THE PERMIT APPLICANTS RESPONSIBILITY TO ENSURE THAT WORK IS ACCESSIBLE AND EXPOSED FOR INSPECTION PURPOSES. NEITHER THE BUILDING OFFICIAL NOR THE CITY SHALL BE LIABLE FOR EXPENSE ENTAILED IN THE REMOVAL OR REPLACEMENT OF ANY MATERIAL REQUIRED TO ALLOW INSPECTION. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY, A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR Alia ATTORNEY BEFORE COMMENCING WORK OR RECORDING YOUR NOTICE OF. COMMENCEMENT. _ '"^tirJ" ewes. k- . -+Ka,. '-.,h}`� ..,,y„ ..�. •n� a,A�,. ^+..T+ _ _�P - Certificate of Completion Miami Shores Village 10050 NE 2 Ave, Miami Shores FI, 33138 Tel: 05-795-2204 Fax: 305-756-8972 Building Inspection Department na � 1 This certificate issued pursuant to the requirements of the Florida Building Code 106.1.2 certifying that at the time of issuance this structure was in compliance with the various ordinances of the jurisdiction regulating building construction or use. For the following: t Permit Type RESIDENTIAL CONSTRUCTION Bldg.Permit No. RC15-646 Owner STEPHEN MARINO Contractor DENMAR CONSTRUCTION GROUP I 4� A Subdivision/Project NONE 12/04/2015 J x�, Date Issued q s - �� Occupancy `a Construction Type V-B Load 4 , •. Occupancy Square Footage 4000 Type R-2 a,k INTERIOR RENOVATION Description of Applicable 2010 FLORIDA BUILDING Work Code ° Location Flood Zone N/A F.F.E N/A 4 1066 NE 94 ST Miami Shores FL 33138 "7�t� a A [ Y , 1 xR- r Building Officials Approval Ismael Naranjo,CBO � v` Not Transferable Fx0n OST IN A CONSPICUOUS PLACE 4 gin. -r +, c tJ F' R ei I� - ltli't� Y I{ /' Nr t Y �•'f >. �' Sid 'tf iy �:"A.-i�. ,,��Sn.5 'lam -,-� 3ti ..�� } � � ��a ��'"`� — ��--". a� ""-- F• �---„- � Yom— �_ �� $ _ c?. _ R.'s ' a^r• �fCAnv. : /a<�F I f-W- Sc4JT GF-F (-vim Sro . INSPECTION �:ECORD ZONING INSPECTION ■ DA E UCTURAL IN PI INSPECTION DATE.INSP INSPEC170N D -___I_SP Foundation Zoning Final 4/ d Stemwall ZONING COMME Rough Water Service Slab e Rou Columns 1st Lift TOD Columns 2nd Lift Out S er Fire S nkiers Tie Beam Truss/Rafters Se Tank Sheathin t°"' Vii. i!/ :3 Sewer Hook-up i Bucks R Drains Windovvslboors A LP T interior' amin l ,�+ I SPEC DATE {NSP WeNank fr Insulation Te ra ale Ceilin Grid 30 Da" Tempo Lawn S rfnkle s D alld �: Pool.Rondln Main Drain Firewall Poot Deck Bondina Pool PI in Wire Lath Pool Wet Niche Backflow Prevento Pool Steel Under round interim or Pool Deck Footer Ground Catch Basins Final Pool $lab Condensate Drains Final Fence Wall Rough HRS Final S Screen Enclosure Ceiling Rough Driveway Roug PLUMBING COMMENTS Driveway Base Telephone Rough Tin Cap efe one Final Roof in Progress TV Rough L� Mo in Progress 1TV Final el''""" Final Roof Cable Rough Shutters Attachment Gelate Final Final Shutters tntdreom ou h Rails and Guardrails Intercom Final Alarm Rauh DATE INSP ADAcorn liance Under round Pipe Ea vu I` Atatn. incl DOCUM NTS Fire Alarm Rough Soil searingCert Fire Alarm Final r Rough Soil Treatment Cert IService Work With Ventilation Rough Floor Elevation Survey Reinf Unit Mas CertELECTRICAL.C MMENTS_ Hood Rough Insulation Certificate Pressure Test Spot Survey Final Hood Final Survey tv�� ! Final Ventilation Truss CertificationFinal Pool Heater STR CT RAL OMM FFIRE inal Vacuum ICAL MECHANC OMMEWS MISPEC1,I, IDATE INSP • Final Sprinkler Final Alarm BUILDING PHtNUf W. UMLATIOAI INS MALLATION CERTIFICATE R,9,W Addlmi Z' 9 /Kkl(1*.A."u'-s & shed CRYstwo ZIP TVAVSteT4r RMP amftboo Lot Ma doidynd Newby aaetffi:S 20 bion has been bi deM in t e aboe e4asabed piopwW b m dit rnk*mm rega�riee�B for R-VAw oft o Fb*b EMW Eftbn W CAft 89 fereOM 1. EM=CM waft Flava beat �(�ale OM WM b a O0 Mckness of _ d hedues,rdiide eatcknem a000rR CC Roots VAd Barts , O Patystyr0le vAVWsn'WvMwof t'/:st b3q3pffsctmeteat O OSW E)ft&r(Fame VAft)haus been k=Aaf ed mft(Chid*aye from Bee c*xm st ® B righq m e tla+�v of itciees, fhidaaess,a000r�ng 13 Rack V"SM ® moan FW to O PdAleame vA yM an'R'v"of O Outer 2 CeWnp(ten"tme been woLdam vAh(Charts aye frau Bre woks m b to � Losse FiilFifi d"b a i amm of ,>a btdm~*&bum aw dbg O Roe*VlW BIS vA*W an'W vabm O RMA VOW Laose Fl O cculftso Inose FM of 3C, O cow O McSTAMBankes 9 N� tom been hmdaMd vft Pima one trap Do O FMasMs LaM FU aateam b the d9hb b a aWa ms of brdles► %"ch WdmesM O Flo*vvbo! ownimm O Roftumd t,00se Fie 9tp yleid value O Cel AmtDomeFi i O obw d 3. [rete>e'iorKneeWatshavebean6tasefa�dvaB+altBneealfibaa't3�baiiioloeeserd ��e�e�s,rAefrh .oto vdyte MIrvalmo/ 4L Gavage ParglM via%dooneiitateed�8 alae testis been 6e6eblsd ba BY199eers3d �,NRtttfe eaooadie9te vmytaldeen9t%OwQf 6 matotoa+ingson brienalbem or Ol• Dow t�1rs � j� PAUUR M OAUY .firl.�u.e0/ dIIlotry Pu@Ilt-Siwe►01 iloriAl Mr coag►.E�rea(lei Z.zatzr �:� CWmftWw 0 FF CNi t TEA41TE & PEST MANAGEMENT QUALITY • SERVICE • RELIABILITY 12233 S.W. 132nd Ct, Miami, Flori 6 Tel:(305)251-8445•Fax:(305)251-8986• a pexpestsenrices.com SOIL TREATMENT ERTIFICATE ❑ SOIL PRE-TREATMENT SOIL FINAL TREATMENT ACCOUNT #: /3Q9 DATE: // ZS / BILL TO: R srlulG ifs ,C��.y�1.67�1 .�. X_> Ae f BUYER'S NAME ONTRACTOR [04C wE7 9,/ s7- 2 �uw ql7 TREATING ADDRESS BILLING ADDRESS M/�hon� 3-&-6 33 n TY STATE ZIP CITY S -ATE ZIP TYPEO UARANTEE: TYPE F TREATMENT: NUALLY RENEWABLE SPRAY ONLY FIVE (5) YEARS SPRAY AND TAMP ONE (1) YEAR INEAL FOOTAGE �Z(a,3Z8 CENTS ❑ SQUARE FOOTAGE A CENTS TOTAL TREATMENT COSTS $__/Vte UNDER THE COMPANY'S CONTINUOUS PROTECTION PLAN, THE ABOVE NAMED PROPERTY CAN BE RENEWED ON THE (DATE) / UPON PAYMENT OF THE INITIAL TREATMENT COST,AND ANN ALLY THERAFTER IN(MONTH) (YEAR)___Z0 ZO.A GUARANTEE WILL BE EFECTIVE FOR AN INITIAL PERIOD OF 6-0 MONTHS AND THEREAFTER SO LONG AS PAYMENTSARE MADE IN ACCORDANCE WITH TERMS AND CONDITIONS OF THIS CONTRACT. A PRE-SLAB TREATMENT FOR SUBTERRANEAN TERMITES WAS GIVEN TO THE ABOVE PREMISES ACCORDING TO THE STANDARDS OF THE NATIONAL PEST CONTROL ASSOCIATION,AND MEETING SOUTH FLORIDA BUILDING CODE UNDER SECTION 2913.5 LICENSE NO. JB141106 APEX TERMITE & PES INC. X LIEN ZAMORA,PRESIDENT BU THORIZED AGENT SUBJECT TO TERMS AND CONDITIONS NOTED ON BACK PAGE A2233 S.W. 132nd Ct, Miamii,Florida 33186 vsv�9vm �A_ SUBTERRANEAN TERMITE CONTROL LIMITED WARRANTY SUBJECT THE GENERAL TERMS AND CONDITIONS LISTED BELOW.THE COMPANY WILL ISSUE A LIMITED WARRANTY FOR THE CONTROL OF SUBTERRANEAN TERMITES AND,AT NO ADDITIONAL CHARGE,APPLY ANY REQUIRED TREATMENT TO THE PREMISES IF SUBTERRANEAN TERMITE INFASTATION IS FOUND THEREIN DURING THE PERIOD OF THE WARRANTY. TERMS AND CONDITIONS 1. This warranty will commence on the date of the initial treatment and be effective for the period noted on the reverse side,providing the customer pays the annual renewal fee(if applicable)within thirty(30)days of the anniversary date.APEX TERMITE&PEST MANAGEMENT reserves the right to make a reasonable adjustment of this fee at the end of three(3)years. 2. This agreement covers the property identified on the reverse side as of the original treatment.In the event the premises is structurally altered,or otherwise changed or if sold is removed or added around the foundation,owner will notify APEX TERMITE&PEST MANAGEMENT and arrange to purchase additional treatment required by the changes incurred.Failure to do so will terminate this agreement automatically without further notice.In the event of structural modification,APEX reserves the right to adjust the annual renewal charge. 3. Structural and mechanical defects,which result in moisture problems in the interior areas or through the roof or exterior walls of the premises,may destroy the effectiveness of APEX'S treatment thereby permitting an infestation of subterranean termites after the date of the initial treatment.The customer will responsible for making any timely repairs necessary to correct any structural of mechanical defects upon completion of such repairs, APEX will provide additional treatment to control the infestation in the area.Failure to correct the above defects or the following conditions will result in the immediate termination of the agreement. (a) Earth to wood contact. (b) Unremoved form boards. (c) Hidden expansion joints or cracks in slab or foundation. (d) Stucco over wood frame where wood or stucco are below grade level. 4. Disclaimer (a) This agreement provides treatment for subterranean termites only(Reticulitermes sp.,heterotermes sp.)Formosan termites(Coptotermes sp.),Drywood termites (kalotermessp.,Ineisitermessp.,Cryptotermes sp.,)and all other wood destroying organisms are NOT COVERED. (b) APEX TERMITE&PEST MANAGEMENT's liability shall terminate should we be denied access to the identified property for any purpose contained in this agreement or by acts of GOD,duly constituted government authority,act of war or any other catastrophic circumstances beyond the company's control. (c) This agreement does not cover and APEX TERMITE&PEST MANAGEMENT will not responsible for any and all damages to the structure or it's contents resulting from termite infestation. (d) APEX TERMITE&PEST MANAGEMENT disclaims any liability for special, (e) Incidental or consequential damages.The warranty of retreatment as stated in this implied,including any warranty of merchantability or fitness for any particular purpose. i v, TERMITE & PEST MANAGEMENT QUALITY • SERVICE • RELIABILITY 12233 S.W. 132nd Ct, Miami, Florida 33186 Tel:(305)251-8445•Fax:(305)251-8986•www.apexpestservices.com S IL TREATMENT CERTIFICATE SOIL PRE-TREATMENT ❑ SOIL FINAL TREAT"ENT P ACCOUNT#: r' ` DATE: ` ,` ,�;`q, BILL TO: y BUYER'S NAME CONTRACTOR i TREATING ADDRESS BILLING ADDRESS CITY STATE ZIP CITY STATE ZIP TYPE OF GUARANTEE: TYPE OF TREA'T'MENT: ANNUALLY RENEWABLE SPRAY ONLY . FIVE (5) YEARS SPRAY AND TAMP —ONE (1) YEAR ❑ LINEAL FOOTAGE CENTS f$SQUARE FOOTAGE ` ' (a, 3.,," CENTS TOTAL TREATMENT COSTS $ "i UNDER THE COMPANY'S CONTINUOUS PROTECTION PLAN,THE E ABOVE NAMED PROPERTY CAN BE RENEWED ON THEDATE ' -' ( ) � ,�`�' �: -°{_,__..UPON PAYMENT OF THE INITIAL TREATMENT COST,AND ANNUALLY THERAFTER IN (MONTH) �)4, , A GUARANTEE WILL BE EFECTIVE FOR AN INITIAL PERIOD OF °"° ` ' MONTHS AND THEREAFTER SO LONG AS PAYMENTSARE MADE IN,ACCORDANCE WITH TERMS AND CONDITIONS OF THIS CONTRACT. A PRE-SLAB TREATMENT FOR SUBTERRANEAN TERMITES WAS GIVEN TO THE ABOVE PREMISES ACCORDING TO THE STANDARDS OF THE NATIONAL PEST CONTROL ASSOCIATION,AND MEETING SOUTH FLORIDA BUILDING CODE UNDER SECTION 2913.5 LICEN9 NO. JB�,41106 � APEX TERMITE& PEST MANAGEMENT INC. ti LIEN ZAMORA,PRESIDENT BUYER OR AUTHORIZED AGENT SUBJECT TO TERMS AND CONDITIONS NOTED ON BACK PAGE 12233 S.W. 132nd Ct, Miami,Florida 33186 Mission: Rick Scott To protect,promote&Improve the health Governor of all people in Florida through integrated 3Ek' Annstron state,county&community efforts. 0 John H. g, MD, FACS HEALTHState Surgeon General&Secretary Vision:To be the Healthiest State in the Nation May 08, 2015 Alicia Sepe 1030 NE 42 Terrace Homestead, FL 33033 RE: Modification to a Single Family Residence - No Bedroom Addition Application Document Number: AP1182782 Centrax Permit Number: 13-SC-1597091 1066 NE 94 Street Miami, FL 33138 Lot: 14 Block: 41 Subdivision: Dear Applicant, This will acknowledge receipt of a floor plan and site plan on 03/31/2015 for the use of the existing onsite sewage treatment and disposal system located on the above referenced property. Proposed new driveway and interior remodeling. No objection letter was issued by C. Icaza on 05/08/15. This office has reviewed and verified the floor plan and site plan you submitted, for the proposed remodeling addition or modification to your single-family home. Based on the information you provided, the Health Department concludes that the proposed remodeling addition or modification is not adding a bedroom and that it does not appear to cover any part of the existing system or encroach on the required setback or unobstructed area. No existing system inspection or evaluation and assessment, or modification, replacement, or upgrade authorization is required. Because an inspection or evaluation of the existing septic system was not conducted, the Department cannot attest to the existing system's current condition, size, or adequacy to serve the proposed use. You may request a voluntary inspection and assessment of your system from a licensed septic tank contractor or plumber, or a person certified under section 381.0101, Florida Statutes. If you have any questions, please call our office at (305) 623-3500. Sincerel Car za Engineer III Department of Health in Dade County Florida Department of Health www.floridahealth.gov In Dade County• •,Florida TWITTER:HealthyFLA PHONE: (305)623-3500 FACEBOOK:FLDepartmentofHealth YOUTUBE:fldoh UNIVERSAL Project No.: 2110.1500037 ENGINEERING SCIENCES Report No.: 21-352-1 consultants In:Geotechnical Engineering•Environmental Date: April 10, 2015 Engineering•construction Materials Testing•Threshold p ENGINEERING inspection.Private Provider Inspection SCIENCES 451 NE 189th St•Miami,FL 33179.305-249-8434 Client: Denmar Construction Group Project: Marino Residence CMT; 1066 NE 94 Street; Miami Shores, FL 33138 Sample Location: Native Sample Description: Tan brown sand with rocks Intended Use: Backfill Sampled By: BV Date Tested: April 7,2015 Date Sampled: March 27, 2015 SUMMARY OF TEST RESULTS Sample Number: 352 Test Method: ASTM D1557 (3) k Maximum Dry Density, pcf: 110.1 Optimum Moisture,%; 15 Passing No.4 Sieve, W 62 AA Passing No. 200 Sieve, W 47.4 DESCRIPTION OF PROCTOR TESTS 135 (1)Standard (2)Modified (3)Modified Test Method(1,2 or 3): ASTM D 698 ASTM D 1557 ASTM D 1557 (AASHTO T99) (AASHTO T780) (AASHTO T180) 44rt.Ola.Mold 41n.Die.Mold 6-in.Dia.Mold Vol.of Cylinder,cu.fL irao 1/30 1113.333 130 Hames WeW,lbs. 5.5 10 10 Hammer Drop.In. 12 18 18 Hamner Blows per Layer 25 25 56 125 Number of Layers 3 5 5 R �E Y. 12.375 58.59 58.259 120 Curves of 100%Saturation for Specific Gravity Equal to: 115 c 2.65 110 � 2'70 2.75 O 105 100 0 `,�itiiii��tl�4', % Asus Re9leo*e�1 : 42 • . �. 95 l[t�#itt 1 i ring Scit3icC1� 0 5 10 15 20 25 3� of/Autt tion Ni Moisture Content(°Io) ? `t Aa 1 W Sampled according to AASHTO T 002 Brat agage O!k .� FL Pry 2% 2242 This report shall not be reproduced,except in full,without the written approval of Universal Engineering Scienay.4w41��,, i UNIVERSAL Project N .: 2 � 0 110.1500037 ENGINEERING SCIENCES Report No.: 21-359-1 Consultants In:Geotechnical Engineering•Environmental Date: Ap ri124 2015 Engineering Construction Materials Testing•Threshold ENGINEERING Inspection•Private Provider Inspection SCIENCES 451 NE 189th St•Miami,FL 33179.305-249-8434 Client: Denmar Construction Group Project: Marino Residence CMT; 1066 NE 94 Street; Miami Shores, FL 33138 Sample Location: Imported Sample Description: Limerock Intended Use: Backfill Sampled By. JM Date Tested: April 16, 2015 Date Sampled: April 14,2015 SUMMARY OF TEST RESULTS Sample Number. 359 Test Method: AASHTO T-180 (3) Maximum Dry Density, pd: 129 Optimum Moisture,%: 7 Passing No.4 Sieve, W 49.5 a- Passing No.200 Sieve, W 8.4 DESCRIPTION OF PROCTOR TESTS 135 (1)standard (2)Modified (3)McdUled Test Method(1,2 or 3): ASTM D M ASTM D 1557 ASTM D 1557 (AASHTO T99) (AASHTO T780) (AASHTO T180) 44m Dla.Mold 44n.Da.MoN Sdn.Dia.Mold Vol.of Cylinder,au.tL 1130 1130 1113.333 130 Hemmer Weight,lbs. 5.5 10 10 Hammer Drop,In. 12 13 1a Hammer Blows per Layer 25 25 58 125 Number of Layers 3 S b % � rW, 12.375 58.259 88.258 120 Curves of 100%Saturation for Specific Gravity Equal to: v CL V 115 2.65 110 2.70 2.75 0 105 100 ,��lrtattt`i/� i 95 8tgaaEn�lne$ring cue 0 5 10 15 20 25 3t.., Comte tom` orizati n 9 Moisture Content ( -- �a� Il1�S. Sampled according to AASHTO T 002. BrAp"'Ian t. O •' �!i ®� FL Pfefesih�l� r�t '.7 2242 11 11 i This report shall not be reproduced,except in full,without the written approval of Universal Engineering Silences.�nc. UES Project No: 2110.1500037.0000 UNIVERSAL UES DOCS No: 21-2 UES Report No: 10616 ENGINEERING SCIENCES On-Site Time(hm): 1.00 Consultants In:Geotechnical Engineering a Environmental Sciences Lab Time(hra): 0.00 Geophysical Services•Materials Testing a Threshold Inspection Travel Time(hre): 0.50 Building Code Administration,Compliance Inspection&Plan Review Total Time(hre): 1.50 451 NE 189th Street,Miami,FL 33179 -P:305.249.8434 -F:305.249.8479 Activity Record Client: Denmar Construction Group 3180 NW 97th Way Sunrise, FL 33351 Project: Marino Residence CMT; 1066 NE 94 Street; Miami Shores, FL 33138 1066 NE 94th Street , Miami, Miami-Dade County, 33138 Date of Activity: 04/07/2015 Technician: Jacoby Salien As Requested, a Universal Engineering Sciences Technician was present at the above referenced location for the purpose of earthwork (testing)for the stem wall located below living room floor. While on site, the technician observed the general condition of the areas to be tested and performed soil density tests. All tests were performed in accordance with the nuclear gauge method and results are pending due to proctor value. *Picked up 1 representative proctor sample and transported to UES lab for soils testing. This test was performed without deviation from ASTM procedures. This report shall not be reproduced,except in U1,without the written approval of Universal Engineering Sciences. UNIVERSAL UES Project No: 21 - 0037.0000 Workorder No: 210616616-11 ENGINEERING SCIENCES Report Date: 04/10/2015 Consultants Im Geotechnical Engineering•Environmental Sciences Geophysical Services•Materials Testing•Threshold Inspection Building Code Administration,Compliance Inspection&Plan Review 431 NE 189th Street,Miami,FL 33179 -P:305.249.8434 -F:305.249.8479 In-Place Density Test Report Client: Denmar Construction Group UES Technician: Jacoby Salien 3180 NW 97th Way Date Tested: 04/07/2015 Sunrise, FL 33351 Project: Marino Residence CMT; 1066 NE 94 Street; Miami Shores, FL 33138 1066 NE 94th Street, Miami, Miami-Dade County, 33138 Tvtie of Test: Area Tested: Stem wall Field: ASTM D-2937 Drive Cylinder Method Material: Native Laboratory: ASTM D1557 Modified Proctor Reference Datum: 0 =Bottom of Footing The tests below meet the minimum 95%relative soil compaction requirement of Laboratory Proctor maximum dry density. Maximum Optimum Field Dry Field soil Native Pass Test Density Moisture Density Moisture Compaction Depth or No. Location of Test Range (PCI) (%) (pcf) (%) (%) (inch) Fall 1 East of footing 12 in 110.1 15.0 94.4 18.8 86 12.00 Fall 2 Center of footing 12 in 110.1 15.0 95.3 17.3 87 12.00 Fall 011%J11111111111,41 11%ttt11t urrr,4 S V . ''.. p� JneeRi Qgnces of Au r*M.00000549 maldo J.Vita,Mfff,Pi lanch Managge� '� TE O� L%'R'-IDAQ e 1^, 4essionI.En8PgRbr i+1&42 i , ,0,*04®SFS S W,%'% To establish a mutual protection to Universal's clients,the Public and ourselves,alf reports are submitted as confidential property of our clients and authorization for publication of statements,conclusions or extracts from or regarding Universals reports is reserved pending oyr written approval. UNIVERSAL Project p No: 21068250 CT 04 015 210682 ENGINEERING SCIENCES WO OLallo. 15A514-C Consultants In:Geotechnical Engineering-Environmental Sciences Geophysical Services-Materials Testing-Threshold Inspection ED Building Code Administration,Compliance inspection&Plan Review 451 NE 189th Street,Miami,FL 33179 -P:395.249.8434 -F:305.249.8479 Compressive Strength of Grout Prism Test Specimens (ASTM C-1019) Client: Denmar Construction Group 3180 NW 97th Way,Sunrise,FL 33351 Project: Marino Residence CMT; 1066 NE 94 Street; Miami Shores, FL 33138 1066 NE 94th Street, Miami,Miami-Dade County, 33138 Structural Element: Shear Wall _ _ Sample Location: New room-Sampled at New room Set 4 1 of 1 total sets Sample From: Concrete Truck Sample By: Misael Galvani Trend On 04/10/2015 General Information Specified Strength/Sampling Times Placement Information General Contractor. Dave Constr. — s Specified Strength: 3000 psi @ 28 days--i Truck Load: 102.00 cu yds. - Supplier. Concrete ready mix Mix Design Strength: 3000 psi @ 28 days ; Cumulative Quantity: WA Truck Number. 102 Water Added at Site:_WA_ j Total Placement for the WA Ticket Number. 89158 Time Batched: 12:30 PMDay: Mbt Design: 450 OT Time Sampled: 1:30 PM Admixture: N/A Weather Condition: Sunny _ Field Test Results Air Content: N/A Slump: 6.00 inches Ambient Temp: 95 If 1 Concrete Temp: 90-F Unit Weight: N/A Results of Laboratory Testing Type Actual Actual Avg. Test Max Test Test Date Age Of Dimen.1 Dimen.2 Dimon. X-Sect. Compressive Compressive Average Results Tested Days Fracture (in) (in) (in) Area(in3) Load(Ibs) Strength(psi) (psi) 1 04/17/2015 7 - 3.06 3.06 3.06 9.36 16,100 1,720 - 2 05/08/2015 28 - 3.06 3.06 3.06 9.36 31,040 3,320 - 3 05/08/2015 28 - 3.06 3.06 3.06 9.36 25,880 2,770 3,050 4-H- 05/08/2015 28 - 3.06 3.06 3.06 9.36 24,060 2,570 - Remarks Grout Prisms are tested at seven(7)days to gel an early indication of the potential strength of the concrete,but the seven(7)day results are not to be used for concrete acceptance.When the compressive strength of the concrete has reached 70%of the specified strength,it is a reasonable practice to use this as an indication that 100%of the specified strength will be attained by twenty-eight(28)days. Note --H'-Hold Cylinder 'D'-Defective Cylinder,Un-testable -'E'-Excluded From Average Tested in Lab to C39 Cured in C-511 `�tt�rtl�iarf� Sampled 8i Molded in C-1019 Re�%`eJ�j$-•V/Cf ie ,, •� 0 L9 ® � LUoGW6316000549 'S- � � .... � ado J.Villa'AA.S.,8(E. �v 8d$nCh Manager 4:�Z STS OFF A Iginer�8p�•-1g 0�.r � S S 10. r11r6111� " To establish a mutual protection to Universal's clients,the Public and ourselves,ell reports are submitted as confidential property of our clients and authorization for publication of statements,conclustons or extracts from or regarding Universal's reports is reserved pending our written approval. Revised March 2014 UNIVERSAL UES Project No: 2110.1500037.0000 UES DOCS No: UES Report No: 21-210700 ENGINEERING SCIENCES On-Site Time(hre): 2.50 Consultants In:Geotechnical Engineering•Environmental Sciences Lab Time(hre): 0.00 Geophysical Services a Materials Testing•Threshold Inspection Travel Time(hrs): 1.00 Building Code Administration,Compliance Inspection&Plan Review Total Time(hrs): 3.50 451 NE 189th Street,Miami,FL 33179 -P:385.249.8434 -F:305.249.8479 Activity Record Client: Denmar Construction Group 3180 NW 97th Way Sunrise, FL 33351 Project: Marino Residence CMT; 1066 NE 94 Street; Miami Shores, FL 33138 1066 NE 94th Street, Miami, Miami-Dade County, 33138 Date of Activity: 04/11/2015 Technician: Misael Galvani Trenco As Requested, a Universal Engineering Sciences Technician was present at the above referenced location for the purpose of earthwork testing. The technician also picked up one set of grout prisms previously cast. This test was performed whhout deviation from ASTM procedures. This report shall not be reproduced,except in full,without the written approval of Universal Engineering Sciences. � orko510037.0000UNIVERSAL Wotlr N : 210700 ENGINEERING SCIENCES Report Date: 04/28/2015 Consultants Im Geotechnical Engineering•Environmental Sciences Geophysical Services•Materials Testing•Threshold Inspection ED Building Code Administration,Compliance Inspection&Plan Review 451 NE 789th Street,Miami,FL 33179 -P:305.249.8434 -F:305.249.8479 In-Place Density Test Report Client: Denmar Construction Group UES Technician: Misael Galvani Trenco 3180 NW 97th Way Date Tested: 04/11/2015 Sunrise, FL 33351 Project: Marino Residence CMT; 1066 NE 94 Street; Miami Shores, FL 33138 1066 NE 94th Street, Miami, Miami-Dade County, 33138 Type of Test: Area Tested: Living room-footing Field: ASTM D-6938 Nuclear Gauge Method Material: Native Laboratory: ASTM D1557 Modified Proctor Reference Datum: 0= Bottom of Footing The tests below do not meet the minimum 98%relative soil compaction requirement of Laboratory Proctor maximum dry density. Note: Retest pending client's authoriation Maximum Optimum Field Dry Field Soil Native Pass Test Density Moisture Density Moisture Compaction Depth or No. Location of Test Range (pat) (%) (pct) (°k) (%) (inch) Fall 1 Living room-center footing loft 110.1 15.0 83.6 21.0 76 12.00 Fall 2 Living room-center footing loft 110.1 15.0 %WV! t #'J7,0 80 12.00 Fall s1 j I ed0�t.N S E �. i�hli(e tnging rl�n9 Sc(ences y�e3rfica a Bf orization No' 000549 Lu Reirtaldd- , pq . h.Marreig er p C? S'G1tE bF,F�LQI Ip11�.• =dam Pf0 E n r g fit'42 To establish a mutual protection to universal's clients,the Public and ourselves,all reports are submitted as confidential property of our d lents and authorization for publication of statements,conclusions or extracts from or regarding universal's reports is reserved pending our written approval. UES Project No: 2110.1500037.0000 UNIVERSAL UES DOCS No: UES Report No: 21-210740 ENGINEERING SCIENCES On-Site Time(hrs): 2.00 Consultants Im Geotechnical Engineering•Environmental Sciences Lab Time hrs • 0.00 Geophysical Services•Materials Testing•Threshold Inspection Travel Time(hrs): 1.00 Building Code Athnirfattation,Compliance Inspection&Plan Review Total Time(hrs): 3.00 451 NE 189th Street,Miami,FL 35179 -P:305.249.8434 -F:305.249.8479 Activity Record Client: Denmar Construction Group 3180 NW 97th Way Sunrise, FL 33351 Project: Marino Residence CMT; 1066 NE 94 Street; Miami Shores, FL 33138 1066 NE 94th Street , Miami, Miami-Dade County, 33138 Date of Activity: 04/14/2015 Technician: Joseph Morgan As Requested, a Universal Engineering Sciences Technician was present at the above referenced location for the purpose of earthwork(inspection /testing)for the proposed interior stem wall footing. While on site, the technician observed the general condition of the areas to be tested and performed two (2) soil density tests. All tests were performed in accordance with the nuclear gauge method and were found to meet the project compaction requirements of 95% of the maximum dry density per ASTM (D1557) / D698). The Contractor was notified of the test results or a copy was left for their records. The density tests are attached to this report. Also while onsite, UES field technician picked up one (1) proctor sample for lab analysis. This test was performed without deviation from ASTWI procedures. This report shall not be reproduced,except In full,without the written approval of Universal EngineeringSciences. UES Project No: 2110.1500037.0000 UNIVERSAL Workorder No: 210740-1 ENGINEERING SCIENCES Report Date: 04/16/2015 Consultants In:Geotechnical Engineering•Environmental Science Geophysical Services•Materials Testing•Threshold Inspection 93 Building Code Administration,Compliance inspection&Plan Review 451 NE 189th Street,Miami,FL 33179 -P:305.249.8434 -F:305.249.8479 In-Place Density Test Report Client: Denmar Construction Group UES Technician: Joseph Morgan 3180 NW 97th Way Date Tested: 04/14/2015 Sunrise, FL 33351 Project: Marino Residence CMT; 1066 NE 94 Street; Miami Shores, FL 33138 1066 NE 94th Street, Miami, Miami-Dade County, 33138 Type of Test: Area Tested: Proposed interior stem wall footing Field: ASTM D-6938 Nuclear Gauge Method Material: Fill Laboratory: ASTM D1557 Modified Proctor Reference Datum: 0 =Top of Fill The tests below meet the minimum 95%relative soil compaction requirement of Laboratory Proctor maximum dry density. Maximum Optimum Field Dry Field Soil Fill Pass Test Density Moisture Density Moisture Compaction Depth or No. Location of Test Range (pcf) (%) (pcf) (%) (%) (inch) Fall 1 East side of footing 12 inch 110.1 15.0 115.2 10.0 105 12.00 Pass 2 West side of footing 12 inch 110.1 15.0 114.4 9.5 104 12.00 Pass r., i6nces .� nna a of fib O.0 000549 • Np cc liinaldo J.Villa,M P. ch( ►pff�c • W FLORI 4':•�� iii Er .7.2242 FS,SI 0 N P','W To establish a mutual protection to Universal's clients,the Public and ourselves,all reports are submitted as confidential property of our clients and authorization for publication of statements,conclusions or extracts from or regarding Urdversars reports is reserved pending our written approval. i Project : 2110.1500037.00 UNIVERSAL ReportNo: 210812-1 CT 04117715 WorkorderNo.: 210812 ENGINEERING SCIENCES Lab No.: 15A546-C Consultants Im Geotechnical Engineering•Environmental Sciences Geophysical Services-Materials Testing-Threshold Inspection ED Building Code Administration,Compliance Inspection&Plan Review 451 NE 189th Street,Miami,FL 33179 -P:305.249.8434 -F:305.249.8479 Compressive Strength of 4"x 8" Cylinder Test Specimens (ASTM C-39) Client: Denmar Construction Group 3180 NW 97th Way,Sunrise,FL 33351 Project: Marino Residence CMT; 1066 NE 94 Street;Miami Shores,FL 33138 1066 NE 94th Street,Miami,Miami-Dade County, 33138 Structural Element: Foo ing;Column Sample Location: interior stem wall footer and exterior column(s)-Sampled at Interior stem wall footer and exterior columns Set d 1 of 1 total sets Sample From: Concrete Truck Sample By:Client Cast On 04/17/2015 General Information Specified strength/Sampling Times Placer,ont Information General Contractor. Denmar Constriction � Specified Strength: 3000 psi @ 28 days Truck toad: 3.00 cu yds. Group Supplier. CONCRETE RE:AY Mix Design Strength: 3000 psi @ 28 days Cumulative Quantity: 3.00 cu yds. MDUJOB MIX INC Truck Number. 108 Water Added at Site: WA Total Placement for the 3.00 cu yds. Ticket Number: 89350 Time Stitched: 1:00 PM Day' Mix Design: PUMPMIX3W Time Sampled: 1:45 PM - Admixture: WA f Weather Condition: Partly Cloudy Field Test Results Air Content: N/A Slump: 1.00 inches Ambient Temp: 1°F I Concrete Temp: 1 OF Unit Weight: N/A Results of Laboratory Testing Type Actual Actual Avg. Test Max Test Test Date Age Of Dimen.1 Dimen.2 Dimon. X-Sect. Compressive Compressive Average Results Tested Days Fracture (in) (in) (in) Area(inq Load(Ibs) Strength(psi) (psi) 1 04/24/2015 7 1 4.04 4.04 4.04 12.82 19,560 1,530 - 2 05/15/2015 28 - - - - - - - _ 3 05/15/2015 28 4-H- 05/1512015 28 - - - - - - - Remeft Cylinders are tested at seven(7)days to get an early indication of the potential strength of the concrete,but the seven(7)day results are not to be used for concrete acceptance.When the compressive strength of the concrete has reached 70%of the specified strength,it is a reasonable practice to use this as an indication that 100%of the specified strength will be attained by Mrenty-eight(28)days. Note 1-*H*-Hold Cylinder -.I'D*-Defective Cylinder,Un-testable --E'-Excluded From Average Reviewe By �tlaive�a Engineering Sciences editgt of Au"tWorization No.00000549 ° ReiOaI J.Villa,_M.S:',,JP.E. ranch Planag STATE OF FLORIDA Professional Engineer No.72242 To establish a mutual protection to UMversals clients,the Public and ourselves,all reports are submitted as confidential property of our clients and authorization for publication of statements,condusions or extracts from or regarding Universal's reports is reserved pending our written approval. Revised Mach 2014 E A A,6001388 August 11, 2015 Miami Shores Village Building Department 10050 NE 2nd Avenue p AUG �01� Miami Shores, Florida 33138 Final Inspection Letter Permit Number: RC 15-545 Address: 1066 NE 94th Street Building Department, I, Victor J. Bruce and Architect of Record, having performed visual observations of the project, hereby attest to the best of my knowledge, belief, and professional judgment, the structural and envelope components of the above referenced renovation are in compliance with the approved plans. I also attest that to the best of my knowledge, belief, and professional judgment, the approved permit plans represent the as built condition of the structural envelope component of the said structure. Please contact me at 305.310.5030 if you have any questions and/or comments. Si cerely, • Victor J. Bruce A.I.A., L ED AP . . "•• • Architect '• ' •• • AR-0017103 •••••• •• •••••• •••• • ••••• •••••• • • ••••• •• •• • •••••• • • • • • •••••• 370 NE 1015 Street Miami Shores,Florida 33138 telephone 305-310-5030 fax 1-877-408-8280 email vbruce@ai-associates.net