MC-14-1502 Inspection Worksheet
Miami Shores Village
10050 N.E. 2nd Avenue Miami Shores, FL
Phone: (305)795-2204 Fax: (305)756-8972
Inspection Number: INSP-247333 Permit Number: MC-7-14-1502
Scheduled Inspection Date: November 09, 2015 Permit Type: Mechanical - Commercial
Inspector: Perez,JanPierre Inspection Type: Final
Owner: , BARRY UNIVERSITY Work Classification: Addition/Alteration
Job Address: 11300 NE 2 Avenue Health &Sports
Miami Shores, FL 33138-0000 Phone Number
Parcel Number 1121360010160-23
Project: BARRY UNIVERSITY
Contractor: ARCHON AIR MANAGEMENT CORP Phone: (305)592-8552
Building Department Comments
REPLACE R.T.U'S AND RUN CHILLED WATER LINES Infractio Passed Comments
INSPECTOR COMMENTS False
I , V
V
Inspector Comments
Passed
Failed
Correction ❑
Needed
Re-Inspection ❑
Fee
No Additional Inspections can be scheduled until
re-inspection fee is paid.
November 06,2015 For Inspections please call: (305)762-4949 Page 33 of 42
CEIVED
Miami Shores Village JUL 14 Zola
Building Department By-
I31 I�y 10050 N.E.2nd Avenue, Miami Shores,Florida 33138
J Tel:(305)795-2204 Fax:(305)756-8972
INSPECTION LINE PHONE NUMBER:(305)762-4949
FBC 200®
BUILDING Master Permit No. —" /'50P
PERMIT APPLICATION Sub Permit No.
❑BUILDING F� ELECTRIC ROOFING ❑ REVISION ❑ EXTENSION ❑RENEWAL
❑PLUMBINGMECHANICAL ❑PUBLIC WORKS ❑ CHANGE OF ❑ CANCELLATION SHOP
99 CONTRACTOR DRAWINGS
JOB ADDRESS: 1 ® � 1v
City: Miami Shores County: Miami Dade Zip:
Folio/Parcel#: Is the Building Historically Designated:Yes NO L,
Occupancy Type: ( Load: Construction Type: Flood Zone: BFE: FFE:
® G
OWNER:Name(Fee Simple Titleholder): �l ��° Phone#:—WS—�9
Address: 113 X 00 Q,� �i�
City: Ul.� 14,4ai 54MA& State: TC Zip: 3-316 0
Tenant/Lessee Name: Phone#: �
Email:
CONTRACTOR:Company Name: � `t�
Address: ��� ( o Li, b 'kv
City:— _ 14t&1 State: TC Zip:
Qualifier Name: �
�"R��� /�. i� 'B7- 6 Phone#: .� � 2-- !!!e) Z
State Certification or Registration#: TCertificate of Competency#:
DESIGNER:Architect/Engineer: ° I Phone#: • ^.0 20
Address:_4 2-77 1 is; Ao 0 13 2-'r=r- City: State:.VL'Zip:
Value of Work for this Permit:$ Square/Linear Footage of Work:
Type of Work: ❑ Addition ❑ Alteration ❑ New dRepair/Replace ❑.Dgm.olition'
Description of Work: � C� IS "Y'. �J.�) �'igm L-'
Specify color of color thru tile:
Submittal Fee$ Permit Fee$ � `trr�,,�/ I ° C $ CO/CC$
Scanning Fee$ Radon Fee$ DBPR$ Notary$
Technology Fee$ Training/Education Fee$ Double Fee$
Structural Reviews$ Bond$
TOTAL FEE NOW DUE$ 20 14L�
(Revised02/24/2014)
Bonding Company's Name(if applicable)
Bonding Company's Address
City State Zip
Mortgage Lender's Name(if applicable)
Mortgage Lender's Address
City State Zip
Application is hereby made to obtain a permit to do the work and installations as indicated. I certify that no work or installation has
commenced prior to the issuance of a permit and that all work will be performed to meet the standards of all laws regulating
construction in this jurisdiction. I understand that a separate permit must be secured for ELECTRIC, PLUMBING, SIGNS, POOLS,
FURNACES,BOILERS,HEATERS,TANKS,AIR CONDITIONERS,ETC.....
OWNER'S AFFIDAVIT: I certify that all the foregoing information is accurate and that all work will be done in compliance with all
applicable laws regulating construction and zoning.
"WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY
RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND
TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING
YOUR NOTICE OF COMMENCEMENT."
Notice to Applicant: As a condition to the issuance of a building permit with an estimated value exceeding$2500, the applicant must
promise in good faith that a copy of the notice of commencement and construction lien law brochure will be delivered to the person
whose property is subject to attachment. Also,a certified copy of the recorded notice of commencement must be posted at the job site
for the first inspection which occurs seven (7) days after the building permit is issu In the absence of such posted notice, the
inspection will not be approved and a reinspection fee will be charged.
Signature 6maaj Signatu
OWNER or AGENT CONTRACTOR
The foregoing instrument was acknowledged before me this The foregoing instrument was acknowledged before me this
i
day of ��b .20 � by �j 7 day of uAJ 20 �� by
SUQN ►(b 1, who is personally known to 4" D/* �Cc7 who is personally known to
me or who has produced as meter who has produced as
identification and who did take an oath. identification and who did take an oath.
NOTARY PUBLIC: NOTARY PUBLIC:
ail
Sign: Sign:
Print: u Print:
Seal: �l.OZ � '� JEMY J.YAO !► -9041
MY COMhIIMSION 0 EMOV9 Seal: .wo$��1T
%��� ExpMm:Nov®ba 12,2014
I,gpp iPI07pRY F'1�'Y Da..d Anw'CQ'
wwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwww**wwww**www***wwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwww
APPROVED BY A ^
Plans Examiner Zoning
Structural Review Clerk
(Revised02/24/2014)
. {[tom' 31
r
mom
DATE BA H NUMBEF
rfiCRSE l a
S - 82
�rh� �As �B . tRbDt��N> R ��
a a{�d bei oar JS C1aRTTiE?IFD ;� ,- a
IIncler the p=ovisa ons of :Chap
Expiration dales Ate :31, 2014 ;
fA, T�
ROM�120,, CARLO - A
M�4IAGEM 91 ..,COR
250' NW 25 Sfi _
MIML FL 3:3122
i
RICK;SCOTT
--
SECRETARY
DISPLAY AS REQUIRED BY LAW —T
THIS D• • •• •o a •s• o
ACS` 6350896 STATE OF FLORIDA
DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION
CONSTRUCTION INDUSTRY LICENSING BOARD
I SEW L12091000514
- LICENSE NBR
09 10 201:2. OOOOOt3000 CMC1249975
The MECHANICAL CONTRACTOR
Named below IS CERTIFIED
Under the provisions of Chapter 489 FS,
Expiration date: AUG 31, 2014
I ROMERO, CARLOS A
i ARCHON AIR MANAGEMENT CORP
8300 SW 118TH TERRACE
MIAMI FL 33156
j RICK SCOTT KEN LAWSON
GOVERNOR SECRETARY
DISPLAY AS REQUIRED BYLAW
og1628
r £
jw
41113:-10
TIiI J31�10T 131Lk r N iA
31371263
Bti�lNf�s�NAMEi/LOt.pTllont F�EC�IFrTNO ' y r rr
?o4n1 O MAW-64ENT CORP RENE'INAL;' S
, E';P 'S F 30 X014
1;✓t3i NVV 7 .Al(E C9 404788 AAust be displayed at plac@'of business
MMI FL
331'22 Purl' t to Cgwnty'Coiie
Chapter$A—Att.9.$t 10
OWNER SEC.TYPE OF BUSINESS PAYMENT RECEIVED
ARCHON AIR MANAGEMENT CORP 196 SPEC MECHANICAL CONTRACTOR BY TAk.COLLECTOR
Workers) 2 CAC057574 $75.00 08/08/2013
TXHS1-13-044611
This local Businest Tax Receipt only confirms pay mera of the LAcal Business Tax.The Receipt is nota license,
permk,'or a certification of the holder's qualifications,to do business.Holder must comply with any governmental or
nongovernmental regulatory laws and requirements which:apply to the business.
The RECEIPT NO.above most be displayed on all commercial vehicles'—Miami4ade Code Sec Ba-276.
For more information,visit www miensi3 �g , allector
07/03/2014 10:10 3056622150 PALAU PAGE 02
' L CERTIFICATE OF LIABILITY INSURANCE DATE{MIUUI'D/Yn
THIS CERTIFICATE /2014
IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE2HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW, THIS CERTIFICATE of INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER.
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must be endorsed. If SUBROGATION IS WAIVED,Subject to
the terms and conditions of the policy,certain Policies may require an endorsement. A statement on this certificate does not confer rights to the
certificate holder in lieu of such endorsement s.
PRODUCER
Bowen,Miclatte&Britt of Florida,LLC " ME:
PNaNE
1020 N.Orlando Avenue Suite 200 E 7_ FAX
Maitland FL 32751 E-MAIL ac No: _
ADDkE6
INSURERISJ AFFORDING COVERAGE NAIC A
INSURED INSURER A: n 1
Archon Air Management Corporation ARCHONAIIRM INSURER B:
2601 NW 74th Avenue INSURER C!
Miami FL 33122 INSURER 0:
INSURER 11:
COVERAGES IN$URL=R F
CERTIFICATE NUMBER:679846912 REVISION
TH15 IS TO CERTIFY THgT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED VE FOR Oft THE POLICY PERIOD
INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TDRM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY 8E ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DI=SCRIBED HEREIN I$ SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED lay PAID CLAIMS.
ILTkR TYPE OF tN6URANCI
1 D POLICY NUINaER MM DPOLICCY EFF A POLICY EXF GENERAL LIABILITY Y Y GL00129303 M!D tIM[TS
COMMERCIAL 3/2014 312015 EACH OCCURRENCE $1,OMMERCIAL GENERAL LIABILITY 000.000
CLAIM84%DE Kj OCCUR PR M S E ce $100,000
MED EXP(An one argon $6,000
PERSONAL a AOv INJURY $300,000
GtN L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $2 000,000
POLICY X PRP- )( LOC PRODUCTS_POMP/OP AGO $2,000.000
A AUTOPADBILE LIABILITY
X ANY AUTO $
Y Y CA00201783 3/2014 312015
BCCldent 11,000 000
AIJ_OWN6p SCHEDULEb 8004Y INJURY(Per person) $
AUT06 AUTOS _
X HIRED AUTOS X NON-OWNED BODILY INJURY(Par acvoertt) $
AUTOS P PERTY D GE
Por a nt $
UMBRELLA LIAR OCCUR $
EXCESS LIAR CLAIMS-MAOI; EACH OCCURRENCE $
DEC RETENTION AWGREGATt $
WORKERS COMPENSATION
AND EMPLOYERa'LWBILrrY WC STATU_ $
ANY PROPRIETTORtpARrNE I OTH.
OFFICEWMEMBER EXCLUDED XECUTIvE r—I
(Krndatory in NH) N 1 A E.L.EACH ACCIDENT $
0yyw degC[ON elow,
under Fl.DISEASE-EA EMPLOYE s
ESCRIPTICN OF OPERATIONS b
E.L.DISEASE,POLICY LIMIT $
DESCRIPTION 01=OPERATIONS I LOCATIONS/VEHICLES (Attach ACORD 101,Aft6anal Remarks Sc119dule,If more g
The following poIIC vaoa k rarJuiredl
terms contained in the policies and/or endo sements Superrsements form sede the art of eepresen ations made hliciGo Of Insurance erein,Electronic this copies of he policy provision
and/or endorsements listed below are available by emailing: c®rtlficstes@bmbinc,com
provisions
When required by written contract,those Parties listed In said oantraot, including the certificate holder,are added as an Additional Insured,
with respect to General Liability,Auto Liability,as afforded by the policy and/or endorsements.When required by written Contract,waiver of
See Attached...
CERTIFICATE HOLDER
CANCELLATION
ANY OFMiami Shores Village Bldg Dept.
THE SHOULDTHE
N DATE HERE P NOTICE VE 13ESCPJBEDPOLICf WILL CRE CDEiLIVERED IN
10050 NE 2 Ave. ACCORDANCE WITH THE POLICY PROVISIONS,
Miami Shores FL 33138
AUTHORIZED REPRESENTATIVE
ACORD 26(2[190/05) The ACORD name and logo are registered marks of ACS DORD CORPORATION all rights reserved.
07/03/2014 10:10 305GG22150 PALAU PAGE 03
AGENCY CUSTOMER ID: ARCHONAIRM
LOC#: _
Icv�v� ADDITIONAL REMARKS SCHEDULE Pageof
AGENCY 1 1
Bowen, Miclette&Britt of Florida,LLC NAMED INSURED
Archon Air Management Corporation
POLICY NUMBER 2501 NW 74th Avenue
Miami FL 33122
CARRIER NAIc CODE
EFFECTIVE DATE:
ADDITIONAL REMARKS
THIS ADDITIONAL REMARKS FORM IS A SCHEDULE TO ACORD FORM,
FORM NUMISER; 25 FORM TITLE: CERTIFICATE OF LIABILITY INSURANCE
subrogation,with respect to General Liability,Auto Liability, is granted in favor Of Certificate Holder as afforded by the policy and/or
endorsements.The General Liability policy certified herein is primary and non-contributory to other insurance available to the certificate
holder,but only to the extent required by written contract with the Named Insured.
Jobsite:Barry University-Andreas/Gardner Bldg. 11300 NE 2 Ave., Miami Shores, FL 33161.
Archon Air Management Corporation are Mechanical Contractors,
ACORD 101 (2608/01)
(9 2008 CORD CORPORATION. All rights reserved.
The ACORD name and logo are registered marks of ACORD
07/0312014 10:10 3056622150 PALAU PAGE 04
• a CERTIFICATE OF LIABILITY INSURANCE DATE(MMIDON-NY)
THIS CERTIFICATE IS ISSUED AS A MATTER bI INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES
NOT AFFIRMATIVELY OR NEGATIVELY AMEND,EXTEND OR ALTER THE COVERAGE AFFORDE13 BY THE POLICIES BELOW,THIS CERTIFICATE OF
INSURANCE DOE8 NOT CONSTITUTE A CONTRACT BETWMN THE ISSUING 1NSUREWS),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE
CERTIFICATE HOLDER.
IMPORTANT:If the certificate holder is an ADDITIONAL INSURED,the policy(les)must be endorsed,If SUBROGATION Is WAIVED,subject to the terms and
conditions of the Polley,certain policies may require an endorsement.A statement on this certificate does not confer rights to the certificate holder in lieu of such
Andargementw.
PRODUCER 00"ACT
MAMYs
we,No,"o: 1-800-277-1620 x4aoo JZZ 727-797-0704
FRANKCRUM INSURANCE AGENCY,INC. Aa*A0-
100 S.MISSOURI AVE.
beRneB:
CLEARWATE.R FL 33756 INSURER S AFFORDING COVERAGE NAIC#
INSURED INSURER A: FRANK WINSTON CRUM INSURANCE CO. i 1800
INSURER 6:
FrankCrumINSURER C:
1-800-277-1630 INsuRER 9:
100 S MISSOURI AVENt1$
CLEARWATER FL 33758 INSURER F:
COVERAGES INSURER F:
THIS IS TO CERTIFYTHAT THE POLICIES OF INSURANCE USTPD BELOW HAVE BE CERTIFICATESS ED O THE INSURED NAMED 7ABOVE FOR THE POLEICYIP
MAY HAVE BEEN REDUCED BY PAID CLAIMS, ER1001NF&TED.
NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER bOCUMENT WIYH RESPECT TO WHICH THIS CER7IPIGATE MAYBE ISSUEO OR MAY
PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN I9 SUBJECT O ALL THE TERMS,EXCLUSIONS AND CONDITIONS OF SUCH POLICIES,UMM SHOWN
Orn TYPE OP INSURANCE ADD!, SVSR POLICY NUMBER POLICY EFF POUOY Exp
OEMERqLµpBBlTY iNaR WVO immoO/YYYY) (MNIDOIYYYY) UMITS
COMMERCIAL a,CNEPAL UABILITY EACH OCCURRENCE $
GAMAGE TO RENTED
CWM8-MAD@ o�yR "POSES Oce—C* f
MEb W M one n
PERSONAL 6 ADV INJURY $
AGGREOA"UNIT APPLIES DER: AZINIERAL AGGREOATe
oouOT PhoJrtr LOG PROOUCIS-COMP/OV AGG
ADTOMOBILE LIAbILITy DO 0 SINGLE IM $
ANY AUTO (9-0 csbeM
ALL VMED ec Lp0 BODILY INJLkY(Per Penon)
Alr7O5
NOH�OWNFJ) BODILY INJVRY(Pv yepdeXlD
HIRED ALTOS AUTOS PROP DAMAGE
UMAktiemdu,X
LUlW6 OCCUR
E(Cea¢WAS CXAIMB-MADIs EACH OCCURpesWCE
DED RETENTION= AGGI�QATE
A YdORIRRS COMPENSATION AND VUC2O1000060 $
ANY PROP IIETOW ryT 1/1/2014 1/1!2015 X TORY UTMITTS FSR
ANY OYER LtAgPAR
OFFICE-U M8EREXCLUDED? N/A
(M-Oatory Ih NJ* e.L EACH ACCIDENT
Ry"'I"Odm u d. 1000 OCO
ofs¢;MPTION OF OftPATIONB bolo., E.L.OREACE-pA EWFLOYFE $1000000
EA.DISEASE.POUDY LMT 1 COO 000 III
D�CRNnDN OP oPERAT10N8/tACAflON8/VL'kICLEB pz"a-ACORD 101 Addltlinsl Riwi,lte sr,Iy�B,IrhrolY epaoe k I.oulr
EFFECTIVE 05/08/2009,COVERAGE IS FOR 100%OF THE EMPLOYEES OF FRANKCRUM LEASED TO ARCHON AIR MANAGEMENT,CORP,
(CLIENT)FOR WHOM THE CLIENT IS REPORTING HOURS TO FRANKCRUM.COVERAGE IS NOT EXTENDED TO STATUTORY EMPLOYEES.
(CLIENT REFERENCE:SCOPE OF WORK INCLUDES MECHANICAL CONTRACTOR).
RE: BARRY UNIVERSITY-ANDREAS/GARDNER BLDG,11300 NE 2 AVE,MIAMI SHORES,FL 33161
CERTIFICATE HAI.OER
CANCELLATION
SHOULD ANY OF THE ABOVE DE80PJ V ED POLICICD QE GANCELLeD BEFORE
THE EXPIRATION DATE THEREOF,NOTICE INR L Be DELIVERED IN
MIAMI SHORES VILLAGE BLDG.DEPT. ACCORDANCE WrrH THE POLICY PROVISIONS.
10050 NE 2 AVE,
MIAMI SHORES VILLAGE,FL 33138 AVTHok¢ep REPRE89N7ATIyE
ACORO 2612010106) The AGORD name an ®1696-2010 ACORQ CORPORATION. All rlahte reserved,
p Ioya are regletered mRrkB of ACOR4
07/24/2014 16:31 3056622150 PALAU `�/��fPAAGE 02/x02
BanyUniver,4 PURCHASE ORDER L -
lc
P0148734
11.300 KE.2ND AVENUI= i
MIAMI SHC)REs,fl 3.3161-6695
PHONE(305)899^4910
Zia
"&BItL TO
V Te) �-R 1 N
^ BAS PURCHASERUNLESS INDIChTED BLOWb U M(�
E Archon Air Management Corp DELIVER: Barry University
N 2501 NW 74 Ave 11300 NE 2nd Ave.
D Miami FL 33122
O Miami Shores FL 33161
R
WORK ORDER NO
This order Is subject to the Terms and Con cifHons•on the reverse side.
BATE DATE REQUIRED BILL TO NAMEJLOCATION SILL TO DEPARTIAjNT
Jun 27, 2014 Jun 26,2014 TERMS
ITEM QUANTITY STOCK Net 30 Days
NO, AND UNIT NUMBER DESCRIPTIONDISC. EXTENDED
UNi7'PRICE % PRICE
1 1 EA Furnlsh all labor, 6
31,398.0000 6-31,398.00
material and equipment to
perform removal of
existing, installation
and all associated work
for the HSC-new chilled
water piping and new AC
rooftop units.
Payment shall be made by
perpentage of work
completedless 10%which
RECEIVED ahall be retained pending
completion of the entire I
JUI 2 5 2014 Scope of World.
10,13344.-000001
6y
Debbie Madsen Ext. 3052
Please send all invoices
to dmadsen@barry.edu and
include PO¢#and Work
Order##18537
S
ALL JNV1111'
i'
!I
I
i
roTAC.
QlZxGYPVAL BY 1 +�� ;�� .!i'� �': ::, AMOUNT 631,398,00
�� TAX EnEMPT NO.85-9nt2624)764C-7
nihrinrn Arr /:eil:p �--"
Air System Sizing Summary for Gyre AC
Project Name:Barry University-Gym 06/24/2014
Prepared by:TWR Engineers 09:51AM
Air System Information
Air System Name.......................................... Gym AC Number of zones........................................................... 1
Equipment Class ............................................ UNDEF Floor Area .......................................................... 20000.0 ft'
Air System Type ............................................. SZCAV Location ........................................... Miami IAP,Florida
Sizing Calculation Information
Zone and Space Sizing Method:
Zone CFM ...................... Sum of space airflow rates Calculation Months ....................................... Jan to Dec
Space CFM .................. Individual peak space loads Sizing Data ................................................... Calculated
Central Cooling Coil Sizing Data
Total coil load .....................................................105.9 Tons Load occurs at .................................................. Jul 1400
Total coil load ...................................................1270.8 MBH OA DB/WB................................................... 90.7176.9 OF
Sensible coil load................................................665.5 MBH Entering DB/WB ........................................... 83.4/72.6 OF
Coil CFM at Jul 1400 .........................................21970 CFM Leaving DB/WB............................................ 65.3154.7 OF
Max block CFM .................................................21970 CFM Coil ADP .................................................................. 52.2 OF
Sum of peak zone CFM .....................................21970 CFM Bypass Factor........................................................ 0.100
Sensible heat ratio..............................................0.524 Resulting RH............................................................... 65 %
ft2/Ton................................................................. 188.9 Design supply temp.................................................. 52.0 OF
BTU/(hr-ft2) ...........................................................63.5 Zone T stat Check .................................................1 of 1 OK
Water flow @ 10.0 OF rise.................................254.29 gpm Max zone temperature deviation ................................ 0.0 OF
Central Heating Coil Sizing Data
Max coil load ......................................................430.0 MBH Load occurs at ...................................................Des Htg
Coil CFM at Des Htg..........................................21970 CFM BTU/(hr-ft2)............................................................... 21.5
Max coil CFM ....................................................21970 CFM Ent.DB/Lvg DB............................................ 58.9/77.1 OF
Water flow @ 20.0 OF drop .................................43.03 gpm
Supply Fan Sizing Data
Actual max CFM ................................................21970 CFM Fan motor BHP ........................................................ 01w SQHP
Standard CFM 21960 CFM Fan motor kW 4............U& •••';'
Actual max CFM/ft2...............................................1.10 CFMfftz Fan static ................................................9...P!......... ir&vm •
••
Outdoor Ventilation Air Data •••"' 000000
Design airflow CFM .............................................9900 CFM CFM/person ....................................... ........ 9.00'CFWper;orr••;
0000
CFM/ft .................................................................0.50 CFMff0000 t2 � . • • ..•..
0000 0000 0 0
RECEIVED •0 '00.:0
0000 •
JUL a,014
0000...
. 0 0, 0000..
•
0000..
00000
�T . . • .
Bi :. •0�• ; 0000 0
���altlaaaafl,000
ID U j VV 'o.
LICEA�S s
\ F o
r N d16
C1
TY
C 0"I
P Y
/�/ 1111111``
Hourly Analysis Program v.4.3 Page 1 of 1
Zone Sizing Summary for Gym AC
Project Name:Barry University-Gym 08/24/2014
Prepared by:TWR Engineers 09:51AM
Air System Information
Air System Name.......................................... Gym AC Number of zones........................................................... 1
Equipment Class ............................................ UNDEF Floor Area .......................................................... 20000.0 ft2
Air System Type ............................................. SZCAV Location ........................................... Miami IAP,Florida
Sizing Calculation Information
Zone and Space Sizing Method:
Zone CFM ...................... Sum of space airflow rates Calculation Months ....................................... Jan to Dec
Space CFM .................. Individual peak space loads Sizing Data ................................................... Calculated
Zone Sizing Data
Maximum Design Minimum Time Maximum Zone
Cooling Air Air of Heating Floor
Sensible Flow Flow Peak Load Area Zone
Zone Name (MBH) (CFM) (CFM) Load (MBH) Or) CFM/ft'
Zone 1 545.5 21970 21970 Jul 1500 180.3 20000.0 1.10
Zone Terminal Sizing Data
No Zone Terminal Sizing Data required or this system.
Space Loads and Airflows
Cooling Time Air Heating Floor
Zone Name/ Sensible of Flow Load Area Space
Space Name Mult. (MBH) Load (CFM) (MBH) (ft') CFM/ft'
Zone e
Gym Play Area 1 100.4 Jul 1500 4042 37.2 5000.0 0.81
Gym Play with Spectador 1 445.11 Jul 15001 179281 143.21 15000.0 1.20
ee..
e •
•• •eeee•
•eeee• •
•eeeee ••••••
•e•• •ee•
• • •eeee• •eeee
•••• • •
•ee •• •
• •• • • • eeeee•
• • • •eeee•
• •
0000
Hourly Analysis Program v.4.3 Page 1 of 1
Space Design Load Summary for Gym AC
Project Name:Barry University-Gym 06/24/2014
Prepared by:TWR Engineers 09:51AM
TABLE 1.1.A. COMPONENT LOADS FOR SPACE "Gym Play Area" IN ZONE "Zone 1"
DESIGN COOLING DESIGN HEATING
COOLING DATA AT Jul 1500 HEATING DATA AT DES HTG
COOLING OA DB/WB 91.0 OF/77.0 OF HEATING OA DB/WB 45.0 OF 138.6 OF
OCCUPIED T-STAT 75.0 OF OCCUPIED TSTAT 70.0 OF
Sensible Latent Sensible Latent
SPACE LOADS Details (BTU/hr) (BTU/hr) Details (BTU/hr) (BTU/hr)
Window&Skylight Solar Loads 0 ft2 0 - 0 ft2 -
Wall Transmission 0 ft2 0 - 0 ft2 0
Roof Transmission 5000 ft2 14022 5000 ft2 4807
Window Transmission 0 ft2 0 0 ft2 0
Skylight Transmission 0 ft2 0 - 0 ft2 0
Door Loads 0 ft2 0 0 ft2 0
Floor Transmission 5000 ft2 0 5000 ft2 0 -
Partitions 0 ft2 0 0 ft2 0 -
Ceiling 0 ft2 0 - 0 ft2 0
Overhead Lighting 5000 W 17060 0 0
Task Lighting 0 W 0 0 0
Electric Equipment 0 W 0 0 0
People 100 52499 92500 0 0 0
Infiltration - 16775 16720 - 32352 0
Miscellaneous 0 0 0 0
Safety Factor 00/0/0% 0 0 0% 0 0
as Total Zone Loads 100356 109220 37959 0
TABLE 1.1.13. ENVELOPE LOADS FOR SPACE "Gym Play Area" IN ZONE "Zone 1"
COOLING COOLING HEATING
Area U-Value Shade TRANS SOLAR TRANS
(ft2) (BTU/(hr-fe..F)) Coeff. (BTU/hr) (BTU/hr) • TU/hr) ......
H EXPOSURE
ROOF 5000 0.040 - 14022 '.11807 ....:.
..� .... •
0000
Hourly Analysis Program v.4.3 Page 1 of 2
Space Design Load Summary for Gym AC
Project Name:Barry University-Gym 06/24/2014
Prepared by:TWR Engineers 09:51AM
TABLE 1.2.A. COMPONENT LOADS FOR SPACE "Gym Play with Spectador" IN ZONE "Zone 1 "
DESIGN COOLING DESIGN HEATING
COOLING DATA AT Jul 1500 HEATING DATA AT DES HTG
COOLING OA DS/WB 91.0 OF 177.0 OF HEATING OA DB/WB 46.0 OF 138.6 OF
OCCUPIED T-STAT 75.0 OF OCCUPIED T-STAT 70.0 OF
Sensible Latent Sensible Latent
SPACE LOADS Details (BTU/hr) (BTU/hr) Details (BTU/hr) (BTU/hr)
Window&Skylight Solar Loads 56 ft2 1722 - 56 ft2 -
Wall Transmission 5922 ft2 18965 5922 ft2 30188
Roof Transmission 15000 ft2 42065 15000 ft2 14420 -
Window Transmission 56 ft2 868 56 ft2 1492
Skylight Transmission 0 ft2 0 0 ft2 0 -
Door Loads 0 ft2 0 0 ft2 0 -
Floor Transmission 15000 ft2 0 15000 ft2 0
Partitions 0 ft2 0 0 ft2 0
Ceiling 0 ft2 0 - 0 ft2l 0
Overhead Lighting 15000 W 51179 0 0
Task Lighting 0 W 0 0 0
Electric Equipment 0 W 0 0 0
People 1000 279996 270000 0 0 0
Infiltration - 50326 50160 - 97057 0
Miscellaneous - 0 0 - 0 0
Safety Factor 0%/0% 0 0 0% 0 0
>>Total Zone Loads 445122 320160 143157 0
TABLE 1.2.13. ENVELOPE LOADS FOR SPACE "Gym Play with Spectador" IN ZONE "Zone 1"
COOLING COOLING HEATING
Area U-Value Shade TRANS SOLAR TRANS
(ft2) (BTU/(hr-ft2-F)) Coeff. (BTU/hr) (BTU/hr) ••fM/hr)
N EXPOSURE . • 900 �����•
WALL 2665 0.212 - 8251 •• • - " . 585
WINDOW 1 20 1.110 0.991 310 —0:048 533
S EXPOSURE 0 0''60 :000s:
00
WALL 2665 0.212 8318 ," . - • J5585 00000
WINDOW 1 20 1.110 0.991 310 443 00 . 533 .•:000
E EXPOSURE . • 0 '000000••
WALL 288 0.212 1381 . 1468 .,
WINDOW 1 16 1.110 0.991 248 • •797 . 0 426 6060'
W EXPOSURE . :,•.•:
WALL 304 0.212 1015 '•. •- ••'1350
H EXPOSURE i i 0
000
ROOF 150001 0.040 -1 420651 14420
Hourly Analysis Program v.4.3 Page 2 of 2
Air System Sizing Summary for AC RTU-3
Project Name:Barry University-Gym 11/22/2013
Prepared by:TWR Engineers 03:42PM
Air System Information
Air System Name........................................ AC RTU-3 Number of zones........................................................... 1
Equipment Class ............................................ UNDEF Floor Area ............................................................ 2803.0 ftz
Air System Type ............................................. SZCAV Location ........................................... Miami IAP,Florida
Sizing Calculation Information
Zone and Space Sizing Method:
Zone CFM ...................... Sum of space airflow rates Calculation Months ....................................... Jan to Dec
Space CFM .................. Individual peak space toads Sizing Data ................................................... Calculated
Central Cooling Coil Sizing Data
Total coil load .......................................................10.8 Tons Load occurs at .................................................Sep 1400
Total coil load .....................................................130.0 MBH OA DB/WB................................................... 88.7/75.9 OF
Sensible coil load................................................100.8 MBH Entering DB/WB ........................................... 78.7/66.8 OF
Coil CFM at Sep 1400 .........................................4737 CFM Leaving DB/WB............................................ 69.0/57.9 OF
Max block CFM ...................................................4737 CFM Coil ADP .................................................................. 56.8 OF
Sum of peak zone CFM .......................................4737 CFM Bypass Factor........................................................ 0.100
Sensible heat ratio..............................................0.775 Resulting RH............................................................... 53 %
ft'/Ton.................................................................268.7 Design supply temp.................................................. 65.0 OF
BTU/(hr-fta) ...........................................................46.4 Zone T-stat Check .................................................1 of 1 OK
Water flow @ 10.0 OF rise...................................26.02 gpm Max zone temperature deviation ................................ 0.0 OF
Central Heating Coil Sizing Data
Max coil load ........................................................48.4 MBH Load occurs at ...................................................Des Htg
Coil CFM at Des Htg............................................4737 CFM BTU/(hr-ft2)............................................................... 17.3
Max coil CFM ......................................................4737 CFM Ent.DS/Lvg DB............................................ 66.8/76.2 OF
Water flow @ 20.0 OF drop ...................................4.84 gpm
Supply Fan Sizing Data
Actual max CFM ..................................................4737 CFM Fan motor BHP ... 0.4wo VP
BHP ........................................................
Standard CFM .....................................................4735 CFM Fan motor kW .................................... bAGo kW .•.. •
+0000....a...........
Actual max CFM/ft2...............................................1.69 CFM/ftz Fan static ...........................................•...••...s... ......... Q-00• •irg ••
•• 0000••
0000•• 0
Outdoor Ventilation Air Data • �
Design airflow CFM .............................................. 570 CFM CFM/person ........................................�...........
14.24 CFM/per5assfi-0e:
.................................................0.20 CFM/fta 0000• 0000•• •0.0•
0000 0000 0
•. . 0000.
0000•: • . .
• •0 00 •. 0000•.
• •
000.0 •
• . •• • 0000.•
0000•• •
go 0
. •
.•0 : 0000 •
0000
Hourly Analysis Program v.4.3 Page 1 of 1
Air System Sizing Summary for AC RTU-2
Project Name:Barry University-Gym 11/22/2013
Prepared by:TWR Engineers 03:42PM
Air System Information
Air System Name........................................ AC RTU-2 Number of zones........................................................... 1
Equipment Class ............................................ UNDEF Floor Area ............................................................ 2613.0 ft'
Air System Type ............................................. SZCAV Location ........................................... Miami IAP,Florida
Sizing Calculation Information
Zone and Space Sizing Method:
Zone CFM ...................... Sum of space airflow rates Calculation Months ....................................... Jan to Dec
Space CFM .................. Individual peak space loads Sizing Data ................................................... Calculated
Central Cooling Coil Sizing Data
Total coil load ........................................................ 7.9 Tons Load occurs at .................................................. Jul 1300
Total coil load .......................................................94.9 MBH OA DB/WB................................................... 89.7/76.7 °F
Sensible coil load..................................................78.4 MBH Entering DB/WB........................................... 78.0/66.7 °F
Coil CFM at Jul 1300 ...........................................3718 CFM Leaving DB/WB............................................ 68.5/57.3 °F
Maxblock CFM ...................................................3718 CFM Coil ADP .................................................................. 56.3 °F
Sum of peak zone CFM .......................................3718 CFM Bypass Factor........................................................ 0.100
Sensible heat ratio ..............................................0.826 Resulting RH............................................................... 52 %
fta/Ton.................................................................317.7 Design supply temp.................................................. 65.0 °F
BTU/(hr-ftp ...........................................................37.8 Zone T-stat Check .................................................1 of 1 OK
Water flow @ 10.0°F rise...................................18.99 gpm Max zone temperature deviation ................................ 0.0 °F
Central Heating Coil Sizing Data
Max coil load ........................................................36.5 MBH Load occurs at ...................................................Des Htg
Coil CFM at Des Htg............................................3718 CFM BTU/(hr-ft2)............................................................... 14.1
Max coil CFM ......................................................3718 CFM Ent.DB/Lvg DB............................................ 68.1/76.9 °F
Water flow @ 20.0°F drop ...................................3.65 gpm
Supply Fan Sizing Data
Actual max CFM ..................................................3718 CFM Fan motor BHP ........................................................•.ew qHP
Standard CFM 3716 CFM Fan motor kW v.................... 0vW skW "'•:•
..................................................... ...................................
Actual max CFMKt2...............................................1.48 CFM/ft' Fan static ..........................................it.e i 5...;.........OAA iA wg ••
Outdoor Ventilation Air Data • •
Design airflow CFM 211 CFM CFM/person ...................................... •••••....... 17.67 CFM/perdh'•'
g .............................................. 67 •
CFM/ftz .................................................................0.08 CFM/ft' ••••• , • •••.•
•.•• Goes . •
•. • •s•G•
••G••• •
• sees •
sees
Hourly Analysis Program v.4.3 Page 1 of 1
Air System Sizing Summary for AC RTU-4 Classroom
Project Name:Barry University-Gym 10/24/2013
Prepared by:TWR Engineers 03:13PM
Air System Information
Air System Name..................... AC RTU-4 Classroom Number of zones........................................................... 1
Equipment Class ............................................ UNDEF Floor Area ............................................................ 2208.0 fta
Air System Type ............................................. SZCAV Location ........................................... Miami IAP,Florida
Sizing Calculation Information
Zone and Space Sizing Method:
Zone CFM ...................... Sum of space airflow rates Calculation Months ....................................... Jan to Dec
Space CFM .................. Individual peak space loads Sizing Data ................................................... Calculated
Central Cooling Coil Sizing Data
Total coil load ........................................................ 7.2 Tons Load occurs at ................................................. Oct 1400
Total coil load .......................................................85.8 MBH OA DB/WB ................................................... 86.7/74.9 °F
Sensible coil load..................................................61.6 MBH Entering DB/WB ........................................... 79.3/67.7 °F
Coil CFM at Oct 1400 ..........................................2822 CFM Leaving DB/WB............................................ 59.1/68.0 °F
Max block CFM ...................................................2822 CFM Coil ADP .................................................................. 56.8 °F
Sum of peak zone CFM .......................................2822 CFM Bypass Factor........................................................ 0.100
Sensible heat ratio..............................................0.717 Resulting RH............................................................... 54 %
ft2fron.................................................................308.7 Design supply temp.................................................. 55.0 °F
BTU/(hr-" ...........................................................38.9 Zone T-stat Check .................................................1 of 1 OK
Water flow @)10.0°F rise...................................17.18 gpm Max zone temperature deviation ................................ 0.0 °F
Central Heating Coil Sizing Data
Max coil load ........................................................30.1 MBH Load occurs at ...................................................Des Htg
Coil CFM at Des Htg............................................2822 CFM BTU/(hr-ft�............................................................... 13.6
Max coil CFM ......................................................2822 CFM Ent.DB/Lvg DB ............................................ 64.8/74.7 °F
Water flow @ 20.0°F drop ...................................3.01 gpm
Supply Fan Sizing Data
Actual max CFM ..................................................2822 CFM Fan motor BHP ........................................................... ................... .
Standard CFM ...... 2821 CFM Fan motor kW
Actual max CFM/ft'...............................................1.28 CFM/ft' Fan static ..........................................n.��a...0.........OLID irbwg ••
••••••
Outdoor Ventilation Air Data • • •
Design airflow CFM .............................................. 587 CFM CFM/person .......................................r.t�.t••...... 16.77*CFWpeno too
CFM/ft2 .••• •••.
.................................................................0.27 CFM/f? � . • • •.•.•
•••• •••• • •
••
to
•••••
• •
• •
Hourly Analysis Program v.4.3 Page 1 of 1
Air System Sizing Summary for AC RTU-5 Office
Project Name:Barry University-Gym 10/24/2013
Prepared by:TWR Engineers 03:13PM
Air System Information
Air System Name............................. AC RTU-5 Office Number of zones........................................................... 1
Equipment Class ............................................ UNDEF Floor Area ............................................................ 2629.0 ft2
Air System Type ............................................. SZCAV Location ........................................... Miami IAP,Florida
Sizing Calculation Information
Zone and Space Sizing Method:
Zone CFM ...................... Sum of space airflow rates Calculation Months ....................................... Jan to Dec
Space CFM .................. Individual peak space loads Sizing Data ................................................... Calculated
Central Cooling Coil Sizing Data
Total coil load ........................................................ 6.9 Tons Load occurs at ................................................ Nov 1400
Total coil load .......................................................82.4 MBH OA DB/WB................................................... 83.7/73.9 OF
Sensible coil load..................................................69.0 MBH Entering DB/WB ........................................... 77.6/65.6 OF
Coil CFM at Nov 1400 .........................................3426 CFM Leaving DB/WB............................................ 58.9/57.8 OF
Max block CFM ...................................................3426 CFM Coil ADP .................................................................. 56.8 OF
Sum of peak zone CFM .......................................3426 CFM Bypass Factor........................................................ 0.100
Sensible heat ratio..............................................0.837 Resulting RH............................................................... 52 %
ft2/Ton.................................................................368.1 Design supply temp.................................................. 65.0 OF
BTU/(hr-ft� ...........................................................32.6 Zone T-stat Check .................................................1 of 1 OK
Water flow @ 10.0 OF rise ...................................16.50 gpm Max zone temperature deviation ................................ 0.0 OF
Central Heating Coil Sizing Data
Max coil load ........................................................26.4 MBH Load occurs at ...................................................Des Htg
Coil CFM at Des Htg............................................3426 CFM BTU/(hr-ft2)............................................................... 10.0
Max coil CFM ......................................................3426 CFM Ent.DB/Lvg DB............................................ 68.4/75.2 OF
Water flow @ 20.0 OF drop ...................................2.54 gpm
Supply Fan Sizing Data
Actual max CFM ...........................3426 CFM Fan motor BHP ........................................................ 0!00' P
....................... 6666••
Standard CFM .....................................................3424 CFM Fan motor kW ...................................s........&...........1),00•*W
Actual max CFM/ft 1.35 CFM/ft2 Fan static ..*.Will..:.........Q,Qp iwwg •
•• 6666•.
Outdoor Ventilation Air Data 464.66
Design airflow CFM .............................................. 202 CFM CFM/person ....................................... ...... 20.17•CFM/peni"6 6
CFM/ft2 . 0.08 CFM/ft2 •66.66 66.6•• •6664
0 see 6666.6
46 •
•• •• 06.60
6
00
• °0� 000000
•
•6464•
• • • • '••6664•
66••6• 6 6
• • ' 6666 • •
6*00
Hourly Analysis Program v.4.3 Page 1 of 1