RC-13-1170 (4)Inspection Worksheet
Miami Shores Village
10050 N.E. 2nd Avenue Miami Shores, FL
Phone: (305)795-2204 Fax: (305)756-8972
Inspection Number: INSP-220329 Permit Number: RC -5-13-1170
Scheduled Inspection Date: September 26, 2014 Permit Type: Residential Construction
Inspector: Rodriguez, Jorge
Owner: ANDREOPOULOS, FOTIOS
Job Address: 118 NW 101 Street
Miami Shores, FL
Project: <NONE>
Inspection Type: Final
Work Classification: Alteration
Phone Number (305)301-7828
Parcel Number 1131010220200
Contractor: EJD CONSTRUCTION CONSTRACTORS & INVESTMENT CO Phone: (305)433-4843
comments
MASTER SUITE ADDITION AND KITCHEN REMODEL ' ----- -- ' -
INSPECTOR COMMENTS False
Inspector Comments
Passed07—
Failed _0 I -E-1
Correction ❑
Needed
Re -Inspection ❑
Fee
No Additional Inspections can be scheduled until
re -inspection fee is paid.
September 25, 2014 For Inspections please call: (305)762-4949 Page 24 of 24
• DIY' _15F1,�s:.,
I MffQW`R*V'W1
DYNATECH ENGINEERING CORP.
- ---- --------- --
Miami, May 23, 2014
Mr. Eric Scarborough
EJD CONSTRUCTION CONTRACTORS
1700 Northeast 143`d Street
North Miami, FL 33181
Re: Addition @
118 NW 101St Street
Miami Shores, FL
Dear Mr. Scarborough:
MATERIAL TESTING
DRILLING SERVICES
INSPECTION SERVICES
ROOF TESTING
Pursuant to your request, Dynatech Engineering Corp. (DEC) performed a Compaction Test on
May 23, 2014 at the above referenced project. DEC was authorized to perform a compaction test
only. The purpose of our test was to determine the degree of compaction of the tested layer of
material only. In no way shall a compaction test replace a demucking inspection, soil bearing
capacity determination, or a pad certification. A soil boring test must be performed by client if
not yet done, prior to construction to verify subsoil conditions. Underlying soils below test
levels must be verified to prevent future settlements. (DEC) was not contracted to perform
supervision and certification of the building pad preparation.
Our findings are relative to the date and areas of our site work and should not be relied upon to
represent conditions on other areas or dates. Any subsequent site disturbances due to water
erosion, rain, storm gutters discharging at footings, construction activities, excavations,
overgrown, vegetation, traffic and other disturbances will void this test and the site must be re -
compacted and re -tested prior to construction.
Environmental analysis of the soil materials is not part of the scope of services. If environmental
analysis of the soils is required, we can provide a proposal for performing an environmental
analysis of the soil materials. No other analysis is implied or warranted.
As a mutual protection to clients, the public and ourselves, all reports are submitted as the
confidential property of clients, and authorization for use, publication of statements, conclusions
or extracts from or regarding our reports is reserved pending our written approval.
Enclosed find copies of the compaction test results. It has been a pleasure working with you and
look forward to do so in the near future.
a,, z
Sincerely yours,
aamani, P.E. -�
D ATECH ENGINEERING CORP. "a
Florida Reg. No. 39584' '
Special Inspector No. 757 `
C%'&'Wte ° ''treRzfil�`�' V,$i�AN9 618 Phone: (305) 828-'1499fI ax: (305) 828-9598
E -Mail: Dynatech@bellsouth.net
DYNATECH
ENGINEERING CORP
750 WEST 84TH STREET
HIALEAH, FLORIDA 33014
(305) 828-7499
MOISTURE -DENSITY RELATIONS OF SOILS
PROCTOR COMPACTION TEST
DATE: May 23, 2014
CLIENT: EJD CONSTRUCTION
PROJECT: Addition n,
ADDRESS: 118 NW 101St Street, Miami Shores, FL
CONTRACTOR: EJD Construction
MATERIAL DESCRIPTION: White sand
SAMPLED BY: RN TESTED BY: RN
TEST RESULTS
Sample Number 1
The following compaction test was conducted in accordance with the Standard Methods for Moisture Density Relations of soil using a
10 lb. Hammer and an 18" drop ASTM D-1557.
% MOISTURE DRY DENSITY
6.4
104.2
7.0
105.1
7.9
106.0 108
11.2
102.4
Optimum Moisture 8.6 Percent
100% Maximum Dry Density 106.8 lbs./cu.ft.
% Passing %" Sieve 89 Percent
Sampled By: RN
Tested By: RN
Checked By: WN
106
104
102
100
98
° 0 "'A",
6 8 10 12 14
il ,M
ly s b itted,
As a mutual protection to clients, the public and ourselves, all report cq,
are submitted as the confidential property of clients, and authorization -�
for use, publication of statements, conclusions or extracts from or riga 6* Wissan aamani, P.E.
our reports is reserved pending our written approval. -44pass° D TECH ENGINEERING CORP.
Florida Reg. No. 39584
�r
Certificate of Authorization No.: CA 5491
D
R
Y
D
E
N
S
I
T
Y
DYNATECH
ENGINEERING CORP.
750 WEST 84TH STREET
HIALEAH, FLORIDA 33014
(305) 828-7499
FIELD DENSITY TEST OF COMPACTED SOILS
DATE:
May 23, 2014
CLIENT:
EJD CONSTRUCTION
PROJECT:
Addition (a�
ADDRESS:
118 NW 101" Street, Miami Shores, FL
CONTRACTOR: EJD Construction
Test No. 1
Location: North side of addition pad underslab
Test No. 2
Location: Center of addition pad underslab
Test No. 3
Location: South side of addition pad underslab
Test No. 4
Location: West side of addition pad underslab
Test No.
Location:
Description of Material: White sand
TEST NO.
1
2
3
4
DEPTH
12"
12"
12"
12"
FIELD DENSITY
105.1
104.8
105.6
105.3
MOISTURE CONTENT %
7.2
7.1
7.6
7,4.
MAX. DENSITY IN THE FIELD %
98,4
98,1
98.8
98,5
COMPACTION REQUIREMENTS
% OF MAXIMUM DENSITY
98%
98%
98%
98%
100% MAXIMUM DENSITY (LAB)
106.8
106.8
106.8
106.8
REMARKS: ALL ABOVE TEST RESULTS COMPLY WITH COMPACTION REQUIREMENTS
Respectfully submitted,
Sampled By: RN
Tested By: RN
Checked By: WN F /s
ATECH ENGINEERING CORP.
'Florida Reg. No. 39584
�„ t ertificate of Authorization No.: CA 5491
•A density test determines the degree of compaction of the tested layer-bimaterial only `-.In no way shall a density test replace a soil bearing capacity detemunation.
A soil boring test must be provided by client, prior to' cbnstntction toy;Wf #I q#Conditions. As a mutual protection to the clients, the public and ourselves, all
reports are submitted as the confidential property of clients ti ridauti►orizat�' i for publication of statement conclusions or extracts from or regarding our reports is
reserved pending on our written approval.1�
BUILDING & ZONING DEPARTMENT
111 N.W. FIRST STREET
SUITE 1010
INSULATION CERTIFICATE
BUILDING PERMIT NO.:
PROJECT NAME:
JOB ADDRESS: -57T
MIAMI, FLORIDA 33128-1974
(305)375-2500
STATEMENT OF COMPLAINCE:
We, the undersigned, hereby certify that the THERMAL INSULATION has been installed in the above
referencedproject, in compliance. with the latest edition of the STATE OF FLORIDA ENERGY CODE
the ApPROVED ENERGY CALCULATIONS and Plans, and in accordance with good construction
practice. The insulation furnished and installed has the characteristics shown below.
1). Exterior CBS Walls Insulation: R- (Min.): Material:
Thickness: inch(es); Density: x lb/ft: Mfgr:
2). Exterior Frame/Metal Stud Walls: R (Min.): Material:
Thickness' inch(es); Density:
Ib/ft: Mfgr.
3). Exterior solid cone'ete walls: R- S (Min.): Material: -
Thickness: 51,9 inch(es); Density: ,r ,e 1b/ft: gr. -
4). Interior walls separating A/C from non -A/C spaces insulation: R -
Material• ; Thickness' inch(es); Density lb/ft
5), NNII TT R �Y RESIDENTIAL CONSTRUCTION ONLYThe COMMON (Party) Walls
tlgerent tenants shall be insulated as follows: FRAMES""-ETAL &M �W ._ACLS R-
1'1(MQ0-'CHS or oncrete walls R-3 (Min,) by Enersv Code requirements. See ENERGY CODE Rev.
1/87, paragraph 9032 (b), on page 9-17, latest edition. These ' ' leveh of hwMW , are not
included in the Energy Calculations, but shall be installed in the field.
6). Above deck type ROOF INSULATION: R (Min.) Material:
Thickness' inch(es); Density: lb/ft: Mfgr:
7). Ceiling insulation: R 30 (Min.); Material' &V t S
Thickness' /v -1-1
inch(es); Density: lb/ft: Mfgr.
8).. NOTE Densities pf sprayed -on, loose fill, or any other composed -on-site insulation shall be the
P.C.F (lb/$3) average of three (3) "DRY SAMPLES" ation.
I�1.led br.C,lk F INSULATION
I�nNam
,tetioit' Contractor CC#�: 16643 Certified on:
Dace
OCjBuilder:
Company Name
Biding Contractor CC# —
0.CJBui1der's Sime
Certified on:
Data
U.S. DEPARTi)1ENT OF HOMELAND SECURITYVTI®N ��I��I�I
FEDERAL EMERGENCY MANAGEMENT AGENCY
CATE
National Flood Inoloaace Program IMPORTANT: Follow the instructions on pages 1-9.
SECTION A - PROPERTY
Al. Building Owner's Name FOTIOS ANDREOPOULOS
OMB No. 1660-0008
Expiration Dat' :July 31, 2015
i
FOR INSURANCECOMPANY USE
Policy Number:
A2. Buildin Street Address ((includin Apt., Unit, Suite, and/or Bldg. No.) or P.O. Route and Box No. company NAIL Number:
1 R NVV 101 gTPr-[=
Cit MIAMI SHORES state FL ZIP code 33150.
A3. Property Description (Lot and Block Numbers, Tax Parcel Number, Legal Description, etc.)
11 3101 022 0200
A4. Building Use (e.g., Residential, Non -Residential, Addition, Accessory, etc.) RESIDENTIAL
A5. Latitude/Longitude: Lat.'y 5940 Long. 80.1210 Horizontal Datum:. ❑ NAD 1927 ® NAD 1983
A6. Attach at least 2 photographs of the building if the Certificate is being used to obtain flood insurance.
A7. Building Diagram Number 1 R
A8. For a building with a crawlspace or enclosure(s): A9. For a building with an attached garage:
a) Square footage of crawlspace or enclosure(s) 0 sq ft a) Square footage of attached garage 150 I sq ft
b) Number of permanent flood openings in the crawlspace b) Number of permanent flood openings in the attachedigarage
or enclosure(s) within 1.0 foot above adjacent grade 0 within 1.0 foot above adjacent grade 10
c) Total net area of flood openings in A8.b 0 sq in c) Total net area of flood openings in A9.b 1573 sq in
d) Engineered flood openings? ❑ Yes ® No d) Engineered flood openings? ❑ Yes ® No
SECTION B - FLOOD INSURANCE RATE MAP (FIRM) INFORMATION
B1. NFIP Community Name & Community Number
B2. County Name
I
B3. State
VILLAGE OF MIAMI SHORES 120652
MIAMI-DADE
® feet
FL
B4. Map/Panel Number
B5. Suffix
B6. FIRM Index Date
B7. FIRM Panel Effective/
B8. Flood Zone(s)
B9. Base Flood Elevation(s) (Zone
® feet
❑ meters
11 ,
Revised Date
® feet
A0, use base flood depth)
12086LO302
L
09/11/2009
09/11/2009
X
N/A
B10. Indicate the source of the Base Flood Elevation (BFE) data or base flood depth entered in Item B9:
❑ FIS Profile ® FIRM ❑ Community Determined ❑ Other/Source:
B11.Indicate elevation datum used for BFE in Item 139: ® NGVD 1929 ❑ NAVD 1988 ❑ Other/Source:
B12. Is the building located in a Coastal Barrier Resources System (CBRS) area or Otherwise Protected Area (OPA)? ❑ Yes ® No
Designation Date: / / ❑ CBRS ❑ OPA
SECTION C - BUILDING ELEVATION INFORMATION (SURVEY REQUIRED)
Cl. Building elevations are based on: ❑ Construction Drawings* ❑Building Under Construction* ® Finished Construction
*A new Elevation Certificate will be required when construction of the building is complete.
C2. Elevations - Zones Al -A30, AE, AH, A (with BFE), VE, V1 V30, V (with BFE), AR, AR/A, AR/AE, AR/A1-A30, AR/AH, AR/A0. Complete Items
C2.a-h below according to the building diagram specified in Item A7. In Puerto Rico only, enter meters.
Benchmark Utilized: MDCBM ELEV = 10.89 Vertical Datum: NGVD 1929
Indicate elevation datum used for the elevations In items a) through h) below. ® NGVD 1929 ❑ NAVD 1988 ❑ Other/Source:
Datum used for building elevations must be the same as that used for the BFE. Check the measurement used
a) Top of bottom floor (including basement, crawlspace, or enclosure floor)
b) Top of the next higher floor
c) Bottom of the lowest horizontal structural member (V Zones only)
d) Attached garage (top of slab)
e) Lowest elevation of machinery or equipment servicing the building
(Describe type of equipment and location In Comments)
f) Lowest adjacent (finished) grade next to building (LAG)
g) Highest adjacent (finished) grade next to building (HAG)
h) Lowest adjacent grade at lowest elevation of deck or stairs, including
structural support
13 ,
35
®feet
❑meters
N ,
A
® feet
❑meters
N ,
A
® feet
❑ meters
11
17
® feet
❑ meters
11 ,
49
® feet
meters
10 ,
9
® feet
p
meters
11 .
0
® feet
meters
N .
A
IN feet
d
meters
SECTION D - SURVEYOR, ENGINEER, OR ARCHITECT CERTIFICATION
This certification is to be signed and sealed by a land surveyor, engineer, or architect authorized by law to certify elevation
information. i cer* that the information on this Certificate represents my best efforts to Interpret the data available.
I understand that any false statement may be punishable by fine or imprisonment under 18 U.S. Code, Section 1001.
® Check here If comments are provided on back of form. Were latitude and longitude in Section A provided by a
® Check here if attachments. licensed land surveyor? IR Yes ❑ No
D1 arG
SEAL
ERE.
9/9 2014'
LS5709
FEMA Form 086-0-33 (Revised 7/12) See reverse side for continuation. ! Replaces all previous editions.
ELEVATION CERTIFICATE, page 2
IMPORTANT: In these spaces, copy the corresponding Information from Section A.
Building Street Address (including Apt., Unit, Suite, and/or Bldg. No.) or P.O. Route and Box No.
City
MIAMI
State ZIP Code
FL 33150
w
FOR INSURANCE COMPANY USE
Policy Number:
Company NAIC Number:
SECTION D - SURVEYOR, ENGINEER, OR ARCHITECT CERTIFICATION (CONTINUED)
Copy both sides of this Elevation Certificate for (1) community official, (2) insurance agent/company, and (3) building owner.
Comments '(PARTIAL TOPOGRAPHIC) LONG & LATT OBTAINED IN FIELD C2E=A/C
JOB # 14-40623
Signature Date 09/09/2014
SECTION E - BUILDING ELEVATION INFORMATION (SURVEY NOT REQUIRED) FOR ZONE AO AND ZONE A (WITHOUT BFE)
For Zones AO and A (without BFE), complete Items E1—E5. If the Certificate is intended to support a LOMA or LOMR-F request, complete Sections A, B,and C.
For Items E1—E4, use natural grade, If available. Check the measurement used. In Puerto Rico only, enter meters.
E1. Provide elevation information for the following and check the appropriate boxes to show whether the elevation is above or below the highest adjacent
grade (HAG) and the lowest adjacent grade (LAG).
a) Top of bottom floor (including basement, crawispace, or enclosure) is ❑ feet []meters ❑ above or ❑ below the HAG.
b) Top of bottom floor (including basement, crawlspace, or enclosure) is ❑ feet ❑ meters ❑ above or ❑ below the LAG.
E2. For Building Diagrams 6-9 with permanent flood openings provided in Section A Items 8 and/or 9 (see pages 8-9 of Instructions),
the next higher floor (elevation C2.b in the diagrams) of the building is ❑ feet ❑ meters ❑ above or ❑ below the HAG.
E3. Attached garage (top of slab) Is ❑ feet ❑ meters ❑ above or ❑ below the HAG.
E4. Top of platform of machinery and/or equipment servicing the building Is ❑ feet ❑ meters ❑ above or ❑ below the HAG.
E5. Zone AO only: If no flood depth number Is available, Is the top of the bottom floor elevated in accordance with the community's floodplain management
ordinance? ❑ Yes ❑ No ❑ Unknown. The local official must certify this Information in Section G.
SECTION F — PROPERTY OWNER (OR OWNER'S REPRESENTATIVE) CERTIFICATION
The property owner or owner's authorized representative who completes Sections A, B, and E for Zone A (without a FEMA -Issued or community -Issued BFE) or
Zone AO must sign here. The statements in Sections A, B, and E are correct to the best of my knowledge.
Property Owner or Owner's Authorized Representative's Name
Address City State ZIP Code
Signature Date Telephone
Comments
❑ Check here If attachments.
SECTION G — COMMUNITY INFORMATION (OPTIONAL)
The local official who is authorized by law or ordinance to administer the community's floodplain management ordinance can complete Sections A, B, C (or E), and
G of this Elevation Certificate. Complete the applicable Item(s) and sign below. Check the measurement used in Items G8—G10. In Puerto Rico only, enter meters.
G1. ❑ The information in Section C was taken from other documentation that has been signed and sealed by a licensed surveyor, engineer, or architect
who Is authorized by law to certify elevation Information. (Indicate the source and date of the elevation data in the Comments area below.)
G2. ❑ A community official completed Section E for a building located In Zone A (without a FEMA -issued or community -Issued BFE) or Zone A0.
G3. ❑ The following Information (Items G4—G10) is provided for community floodplain management purposes.
G4. Permit Number G5. Date Permit Issued G6. Date Certificate Of Compliance/Occupancy Issued
G7. This permit has been Issued for: ❑ New Construction ❑ Substantial Improvement
G8. Elevation of as -built lowest floor (including basement) of the building: ❑ feet ❑ meters Datum
G9. BFE or (in Zone AO) depth of flooding at the building site: ❑ feet ❑ meters Datum
G1 O.Community's design flood elevation: ❑ feet ❑ meters Datum
Local Official's Name Title
Community Name Telephone
Signature Date
Comments r
❑ Check here If attachments.
FEMA Form 086-0-33 (Revised 7/12) Replaces all previous editions.
ELEVATION CERTIFICATE, page 3 BUILDING PHOTOGRAPHS
See Instructions for Item A6.
IMPORTANT: In these spaces, copy the corresponding information from Section A. FOR INSURANCE COMPANY USE
Building Street Address (including Apt., Unit, Suite, and/or Bldg. No.) or P.O. Route and Box No. Policy Number:
118 NW 101 STREET
City State ZIP Code Company NAIC Number:
MIAMI SHORES FL 33150
If using the Elevation Certificate to obtain NFIP flood insurance, affix at least 2 building photographs below according to the instructions
for Item A6. Identify all photographs with date taken; "Front View" and "Rear View"; and, if required, "Right Side View" and "Left
Side View." When applicable, photographs must show the foundation with representative examples of the flood openings or vents, as
indicated in Section A8. If submitting more photographs than will fit on this page, use the Continuation Page.
FRONT VIEW
REARVIEW
FEMA Form 086-0-33 (Revised 7/12) Replaces all previous editions.
DIVISIO14 OF
Environmental Health
Florida Health
0� Miami -Dade County
OSTDSAVell Division O
Q11805 SW 26th Street - Miami, FL 33175 PO
Inspector Nimie &unlbS Date
Address -m N w 101 S�r -e OSTDS # M
Comments:
Signature
DYNATECH ENGINEERING CORP.
Miami, March 31, 2014
Mr. Erick Scarborough
EJD CONSTRUCTION
1700 North West 143rd Street
Miami, FL 33181
Re: Addition @
118 NW 1011h Street
Miami, FL
Dear Mr. Scarborough:
MATERIAL TESTING
DRILLING SERVICES
INSPECTION SERVICES
ROOF TESTING
Pursuant to your request, Dynatech Engineering Corp. (DEC) performed a Compaction Test on
March 31, 2014 at the above referenced project. DEC was authorized to perform a compaction
test only. The purpose of our test was to determine the degree of compaction of the tested layer
of material only. In no way shall a compaction test replace a demucking inspection, soil bearing
capacity determination, or a pad certification. A soil boring test must be performed by client if
not yet done, prior to construction to verify subsoil conditions. Underlying soils below test
levels must be verified to prevent future settlements. (DEC) was not contracted to perform
supervision and certification of the building pad preparation.
Our findings are relative to the date and areas of our site work and should not be relied upon to
represent conditions on other areas or dates. Any subsequent site disturbances due to water
erosion, rain, storm gutters discharging at footings, construction activities, excavations,
overgrown, vegetation, traffic and other disturbances will void this test and the site must be re -
compacted and re -tested prior to construction.
Environmental analysis of the soil materials is not part of the scope of services. If environmental
analysis of the soils is required, we can provide a proposal for performing an environmental
analysis of the soil materials. No other analysis is implied or warranted.
As a mutual protection to clients, the public and ourselves, all reports are submitted as the
confidential property of clients, and authorization for use, publication of statements, conclusions
or extracts from or regarding our reports is reserved pending our written approval., , ®,,®,d
Enclosed find copies of the compaction test results.
look forward to do so in the near future.
Sincerely yours,
Ds 16t4
Wiss Naamani, P.E.
DYNATECH ENGINEERING CORP.
Florida Reg. No. 39584
®®
9p,M Si W, ®�k
It has been a pleasi#orlone °W,
m 9 � r^'.
0
c a
® i, szhi TC ®
°`0 'w
�Ox �dDA
A� e.
618 - Phone: (305) 828-7499 - Fax: (305) 828-9598
DYNATECH
ENGINEERING CORP.
750 WEST 84' STREET
HIALEAH, FLORIDA 33014
(305) 828-7499
MOISTURE -DENSITY RELATIONS OF SOILS
PROCTOR COMPACTION TEST
DATE: March 28, 2014
CLIENT: EJD CONSTRUCTION
PROJECT: Addition @
ADDRESS: 118 North West 101St Street, Miami, FL
CONTRACTOR: EJD Construction
MATERIAL DECRIPTION: Gray sand
SAMPLED BY: JA TESTED BY: JA
TEST RESULTS
Sample Number 1
The following compaction test was conducted in accordance with the Standard Methods for Moisture Density Relations of soil using a
10 lb. Hammer and an 18" drop ASTM D-1557.
% MOISTURE DRY DENSITY
5.3
97.1
7.1
100.6
8.6
103.3 105
13.7
102.2
15.2
99.7
103
101
Optimum Moisture 11.5 Percent
100% Maximum Dry Density103.9 lbs./cu.ft. 99
% Passing V Sieve 97.1 Percent
Sampled By: JA
Checked By: WN
8 10 12 14 16
Z
�. ely submitted,
As a mutual protection to clients, the public and ourselves, all repor®o �� �' V=im
are submitted as the confidential property of clients, and authorizatic� �®�,°
for use, publication of statements, conclusions or extracts from or re `� ' A ° ` - ��' Wissam Naamani, P.E.
our reports is reserved pending our written approval. g �®®�OFESS ®�m ®� DYNATECH ENGINEERING CORP.
p Florida Reg. No. 39584
Certificate of Authorization No.: CA 5491
D
R
Y
D
E
N
S
I
T
Y
DYNATEC ENGINEERING CORP.
750 WEST 84' STREET
HIALEAH, FLORIDA 33014
(305) 828-7499
FIELD DENSITY TEST OF COMPACTED SOILS
DATE: March 28, 2014
CLIENT: EJD CONSTRUCTION
PROJECT: Addition nu,
ADDRESS: 118 North West 101St Street, Miami, FL
CONTRACTOR: EJD Construction
Test No. 1 Location: Center of west footer
Test No. 2 Location: Center of south footer
Test No. 3 Location: Center of east footer
Test No. Location:
Test No. Location:
Description of Material: Gray sand
TEST NO.
1
2
3
DEPTH
12"
12"
12"
FIELD DENSITY
102.9
102.4
103.0
MOISTURE CONTENT %
8,4
7,3
7.9
MAX. DENSITY IN THE FIELD %
99.2
98.7
99.3
COMPACTION REQUIREMENTS
% OF MAXIMUM DENSITY
95%
95%
95%
100% MAXIMUM DENSITY (LAB)
103.7
1 103.7
103.7
REMARKS: ALL ABOVE TEST RESULTS COMPLY WITH COMPACTION REQUIREMENTS
Respectfully submitted,
Sampled By: JA ��®y�b6 a l j/�S ,D J pis.
Checked By: WN � � ® WAAA, � �s—
�� �o m� Nissam Naamani, P.E.
,F .0 15YNATECH ENGINEERING CORP.
e gg `Jlojrida Reg. No. 39584
;o° e uCeftificate of Authorization No.: CA 5491
LU
*A density test determines the degree of compactiorR the tested laye�ri° inateritfl ®In iio way shall a density test replace a soil bearing capacity determination.
A soil boring test must be provided by client, priori cS ction to veri tions. As a mutual protection to the clients, the public and ourselves, all
reports are submitted as the confidential property ofIfocation of statement conclusions or extracts from or regarding our reports is
reserved pending on our written approval. ��®��®��� ® T&, • "
Certificate of Compliance for Termite Protection
As required by Florida Building Code (FBC)1816.7)
m -c rypton
Pest Control Co.
2215 West 78th. St., Hialeah, FL 33016
Dade: (305) 828-2999 / Broward. (954) 779-1535
118 NW 101 STREET,MIAMI, FL. 33138
Address of treatment or Lot/Blk# of treatment
SQTT- TRRATMF.NT
Method of termite treatment - soil barrier, wood treatment, bait system, other (describe)
The building has received a complete treatment for the prevention of subterranean termites.
Treatment is in accordance with rules and laws established by the Florida Department of Agriculture and
Consumer Services.
a
A
F
Todd D. Osborn, Architect
3484 Belmont Terrace
Davie, FL 33328
954-881-3457
September 12, 2014
Miami Shores Village
Building Department
10050 NE 2"d Avenue
Miami Shores, FL 33138
Re: Permit #13-1170
Folio #11-3101-022-0200
Attn: Building Department
I, Todd D. Osborn, have performed and approved the required inspections at the renovation
and addition of the Andreopoulos residence at 118 NW 101st Street in Miami Shores. I hereby
attest to the best of my knowledge, belief and professional judgment, the structural and
envelope components of the above referenced renovation are in compliance with the approved
plans and other approved permit documents. I also attest that to the best of my knowledge,
belief and professional judgment, the approved permit plans represent the as -built condition of
the structural and envelop components of said structure.
This document is prepared in accordance with Chapter 1 of the Florida Building Code and must
be submitted to the Village of Miami Shores Building Department in conjunction with the
application for a Certificate of Completion for the above referenced structure.
Should you have any questions or need any additional information please do not hesitate to
contact me.
Sincerely,
Todd D. Osborn, Architect
State of Florida License # AR92877
SEP 1 014
PROPERTY ADDRESS:
118 NW 101 STREET
MIAMI SHORES, FL. 33150
WN
BLOCK CORNER
F/P 1/2" 0'1 1+3
NO I.D. \;6c;
O
Revision' : Scale: I" = 20'
9/9/2014
LOCATION OF FIELD IMPROVEMENTS CARD: LJ
�
I QA / QC: DG
CBS
REMAINDER OF
CLF
N - `
LOT 5BLK. 3
W
r•
-.y
D
- DELTA (CENTRAL ANGLE)
`•.
O
e
O
O
FF
= FINISHED FLOOR
Y.
F/P 1/2"
W I.
O
.107.49'
� NO i D
= FOUND IRON PIPE
_
4' (CLr? (CHICKENW/RQ
9.T
�
1-Z
g0° k
':"` '� •'� .:;,'
� L
w
a
29.8'
d A/C
_
27.2' WEST 1/2 OF
0
Q
LOT 5 BLK. 3
L
20.8'
0
m
WZ
U)
Q
E
a
2 Z
W
®�
3.3'
U
�
>
tau
®
d
tiJ
O10-U
Q
0
Z
`.��,BR%CKDf7%VE •a
oo
I$
AX
W
Q
Z
N
M Q
CI
vii �
PROPERTY ADDRESS:
118 NW 101 STREET
MIAMI SHORES, FL. 33150
WN
BLOCK CORNER
F/P 1/2" 0'1 1+3
NO I.D. \;6c;
O
Revision' : Scale: I" = 20'
9/9/2014
LOCATION OF FIELD IMPROVEMENTS CARD: LJ
�
I QA / QC: DG
CBS
REMAINDER OF
CLF
N - `
LOT 5BLK. 3
DE
= DRAINAGE EASEMENT
D
- DELTA (CENTRAL ANGLE)
`•.
EASTLINE
N
O
eRic 2AL,_conic`..
FF
= FINISHED FLOOR
LOT4BLK. 3�'
F/P 1/2"
NO i D
.107.49'
� NO i D
= FOUND IRON PIPE
_
4' (CLr? (CHICKENW/RQ
9.T
`900
ss�
1-Z
g0° k
':"` '� •'� .:;,'
STEPS
a
29.8'
d A/C
I
27.2' WEST 1/2 OF
0
W/M
LOT 5 BLK. 3
L
20.8'
Flood Data:
ZONE: X
COMMUNITY NUMBER: 120652
PANEL & SUFFIX: 0302 L
DATE OF FIRM: 9/11/2019
FF ELEV = 13.35
GARAGE = 11.17
F/P 1/2" 107,59'
NOID,
O
K
J F/P 1/2"
o NO I.D.
\0 rl+r5
IV\O
Date:
Revision' : Scale: I" = 20'
9/9/2014
LOCATION OF FIELD IMPROVEMENTS CARD: LJ
�
I QA / QC: DG
CBS
Invoice No. 14-40623
CLF
N - `
CONC = CONCRETE
DE
= DRAINAGE EASEMENT
D
- DELTA (CENTRAL ANGLE)
`•.
EASTLINE
X 0.00' = EXISTING ELEVATION
O
eRic 2AL,_conic`..
FF
= FINISHED FLOOR
LOT4BLK. 3�'
=FOUND NAIL
INV
=INVERT
ONE STORY
= FOUND IRON PIPE
CONC
U
FND
1
CBS RESIDENCE
':"` '� •'� .:;,'
STEPS
a
®
= NAIL AND DISC
#118
W/M
20.8'
®�
3.3'
�
of
M
N
LO
`.��,BR%CKDf7%VE •a
oo
AX
36.3'
49.6'
89'p4'17"
Flood Data:
ZONE: X
COMMUNITY NUMBER: 120652
PANEL & SUFFIX: 0302 L
DATE OF FIRM: 9/11/2019
FF ELEV = 13.35
GARAGE = 11.17
F/P 1/2" 107,59'
NOID,
O
K
J F/P 1/2"
o NO I.D.
\0 rl+r5
IV\O
Date:
Revision' : Scale: I" = 20'
9/9/2014
LOCATION OF FIELD IMPROVEMENTS CARD: LJ
�
I QA / QC: DG
CBS
Invoice No. 14-40623
CLF
Sheet No. 1 of 1
CERTIFICATIONS:
Sure or's Notes
1. The angular information shown hereon is per the recorded plat.
2. Legal description provided by client.
3. No attempt was made to locate any underground utilities, except as
shown.
4. The information shown hereon is for title purposes only, and, unless
otherwise specified, should not be used for construction.
5. The dimensions shown hereon have an estimated horizontal
positional accuracy of 0.10 feet.
6. This survey is not valid without the signature and original raised seal of
a Florida licensed Surveyor and Mapper.
7. This survey was prepared without benefit of a title commitment. There
may be additional matters of record, not shown, which can be found in
the Public Records of the corresponding county noted hereon.
8. Benchmark Reference: Miami -Dade County Benchmark Elevation
=10.89
The elevations shown hereon are referenced to the National Geodetic
Vertical Datum of 1929 (NGVD 1929).
GENERAL LEGEND:
BCR
- BROWARD COUNTY RECORDS
BM
=BENCHMARK
C/L
= CENTERLINE
CBS
= CONCRETE BLOCK STRUCTURE
CLF
= CHAIN LINK FENCE
CONC = CONCRETE
DE
= DRAINAGE EASEMENT
D
- DELTA (CENTRAL ANGLE)
ELM
= ELEVATION
X 0.00' = EXISTING ELEVATION
EOW
= EDGE OF WATER
FF
= FINISHED FLOOR
FN
=FOUND NAIL
INV
=INVERT
FIP
= FOUND IRON PIPE
FIR
= FOUND IRON ROD
FND
= FOUND NAIL AND DISC i
L
= ARC LENGTH
MDCR
- MIAMI DADE COUNTY RECORDS'
N/D
= NAIL AND DISC
DENNIS J. CABRIELE
PROFESSIONAL SURVEYOR AND MAPPER
NO. L.S. 5709 STATE OF FLORLDA
ORB
= OFFICIAL RECORDS BOOK
PB
= PLAT BOOK
PBCR
= PALM BEACH RECORDS
PCP
= FOUND NAIL AND CAP
PG
= PAGE
POB
- POINT OF BEGINNING
POC
= POINT OF COMMENCEMENT
R
= RADIUS
RNV
- RIGHT OF WAY
SNV
=SIDEWALK
SIR
= SET J' IRON ROD
SND
= SET NAIL & DISC
UE
= UTILITY EASEMENT
ALL COUN y SUR YOR-
I
O
SUR O RS
UCEME NO. 66
FILE: (954) 777-4
AX: (954) 777-270
5400 SOUTH UNIVERSITY DRNE
DAVIE, FLORIDA 33328 SUITE 21