Loading...
BP-2005-419Inspection Worksheet Miami Shores Village 10050 N.E. 2nd Avenue Miami Shores, FL Phone: (305)795 -2204 Fax: (305)756 -8972 Inspection Date: 08/29/2006 Inspector: Grande, Claudio Owner: RODRIGUEZ, DIEGO Job Address: 9406 9 Avenue NE Miami Shores Village, FL SEP 01 RECD Project: <NONE> Contractor: OLMO CONSTRUCTION Block: Permit Type: Imported Permit Inspection Type: Final Roof Work Classification: Roof - New Phone Number Parcel Number 1132060020030 Lot: O& MAU/ iV imP IJIa...•.v.4r vv......v Uplift Report OK, see attached. 8/31/06 CG. Passed ICly Inspector Comments Failed Correction Needed Re- Inspection Fee ($75) No Additional Inspections can be scheduled re- inspection fee is paid. until Thursday, August 31, 2006 Page 1 of 2 C•1•V•I•1 LG ENGINEERING SERVICES, INC. Consulting Engineers 2020 Northwest 7th Street Miami, Florida 33125 Tel: (305) 649 -6454 Fax: (305) 541-3298 August 23, 2006 Olmo Construction Miami, Florida Project: TILE UPLIFT TEST Residential Home 9406 Northeast 9 Avenue Miami, Florida Information provided by client: Permit Number: 2005 -4.19 Date Completion: July 25, 2006 Roofing Contractor: Olmo Construction LG Engineering Services, Inc. Project Number: LG06 -2850 (Testing Laboratory Certificate #00- 0224.07) Dear Sirs; In accordance with your request and authorization, a representative of LG Engineering Services, Inc. completed the Roof Tile Uplift Test at the above referenced project. This testing was performed in general accordance with Roofing Application Standard TAS No.106 -- Standard procedure for field verification of the bonding of mortar or adhesive set tile system and mechanically attached, rigid, discontinuous roof systems. The total of the tested roof surface area was less than 10000 square feet, and the mean height of the roof is less than 40 feet above ground surface. The type of tile used for this project was reported to be Andalusia Roof Tile. This tile was reported to have been foamed in place. At the time of this testing, one test for every corner, one test for every 100 square feet of roof tile in the perimeter area and one test for every 200 square feet of roof tile in the field area were tested. Initially the entire area of the roof was examine for loose tile. More than 10% of the roof tile located in the field area and more than 20% of the roof tile at the roof perimeter and corner were phys. 1y examined. rred l� or i i J xt eotlt LG Engineering Services, Inc. appreciates the opportunity of assisting you in this project. If you have any questions or if we may be of further assistance, please do not hesitate to contact the undersigned. Respectfully submitted; LG Engineering Services, Inc. ohamad Sonny Salleh, P.E.49014 Project Manager TILE UPLIJ 1' TEST Residential Home 9406 Northeast 9 Avenue Miami, Florida Report of TILE UPLIFT TEST for Residential Home 9406 Northeast 9 Avenue Miami, Florida Project Number: LG06 -2850 35 Pass 2 35 Pass 35 Pass 35 Pass 35 Pass 6 35 Pass 7 35 Pass 35 Pass 9 35 Pass 10 11 35 Pass 35 Pass 12 35 Pass 13 35 Pass 14 35 Pass 15 35 Pass 16 35 Pass 17 35 Pass 18 35 Pass 19 35 Pass 20 35 Pass 21 35 Pass 22 35 Pass 23 35 Pass 24 35 Pass LG Engineering Services, Inc. — Tile Uplift Test Result Project Number: LG06 -2850, Page 1 }ri, r gc- s #_�tat�� 25 35 Pass 26 35 Pass 27 35 Pass 28 35 Pass Z9 35 Pass 30 35 Pass 31 35 Pass 32 35 Pass 33 35 Pass 34 35 Pass 35 35 Pass 36 35 Pass 37 35 Pass 38 35 Pass 39 35 Pass 40 35 Pass 41 35 Pass 42 35 Pass 43 35 Pass 44 35 Pass 45 35 Pass 46 35 Pass 47 35 Pass 48 35 Pass 49 35 Pass 50 35 Pass 51 35 Pass 52 35 Pass 53 35 Pass 54 35 Pass LG Engineering Services, Inc. — Tile Uplift Test Result — Project Number: LG06 -2850, Page 2 3n[a{(�., r��y g Y �, � t 3s � rw \ x �s u Y�l. a x {.�y � � {i� i est oad (I , ,. _�.. r ._Y .. f.' Test 5�a��us� ... z r > , , 55 35 Pass 56 35 Pass 57 35 Pass 58 35 Pass 59 35 Pass 60 35 Pass 61 35 Pass 62 35 Pass 63 35 Pass 64 35 Pass 65 35 Pass 66 35 Pass 67 35 Pass 68 35 Pass 69 35 Pass 70 35 Pass 71 35 Pass 72 35 Pass 73 35 Pass 74 35 Pass 75 35 Pass 76 35 Pass 77 35 Pass 78 35 Pass 79 35 Pass 80 35 Pass 81 35 Pass 82 35 Pass 83 35 Pass 84 35 Pass LG Engineering Services, Inc — Tile Uplift Test Result — Project Number: LG06 -2850, Page 3 4 85 35 Pass 86 35 Pass 87 35 Pass 88 35 Pass 89 35 Pass 90 35 Pass 91 35 Pass 92 35 Pass 93 35 Pass 94 35 Pass 95 35 Pass 96 35 Pass 97 35 Pass 98 35 Pass 99 35 Pass 100 35 Pass 101 35 Pass 102 35 Pass 103 35 Pass 104 35 Pass 105 35 Pass 106 35 Pass 107 35 Pass 108 35 Pass 109 35 Pass 110 35 Pass 111 35 Pass 112 35 Pass 113 35 Pass 114 35 Pass LG Engineering Services, Inc. — Tile Uplift Test Result -- Project Number: LG06 -2850, Page 4 i� ��P{ .E� iP". 41 9*""'s sf[� QQ 0 y, ,��+'� {%F�M3�3 ��t 5 n4 ley. h �'lN ��t,f� il � fwy 11rWVIiATt Y^P4 v` 115 35 Pass 116 35 Pass 117 35 Pass 118 35 Pass Repair all loose tiles prior to the final inspection. LG Engineering Services, Inc. — Tile Uplift Test Result -- Project Number: LG06 -2850, Page 5 NOM 89' + + + + + + + + + + + + + + ++ + + + + + + + + + + + + ++ + + + ++ + + + + + + + + + + + + + + + ++ + I + L L + L L L L L L L L L L L + + + + + H' LOSE L tXN0IE5 fla i AM OX. OX, t;OOe 1t51" LOCATIONS MP DIWN51ON5