Loading...
RC-11-968BUILDING Miami Shores Village Building Department 10050 N.E.2nd Avenue, Miami Shores, Florida 33138 Tel: (305) 795.2204 Fax: (305) 756.8972 INSPECTION'S PHONE NUMBER: (305) 762.4949 PERMIT APPLICATION FBC 20 Permit Type: BUILDING ROOFING r Permit No,o I —,'�'r 'K Master Permit No OWNER: Name (Fee Simple Titleholder): 00 6 -F-, lam, Phone #: 3 0 S— - 76, y Address: O , z City: M + cD JIA L S State: L Zip: 3 Tenant/Lessee Name: Phone #: Email: C b r + e.1�- l�o� , c ° r►•, JOB ADDRESS: 10 �® G- � 5 �; T City: Miami Shores County: Miami Dade Zip: ; j 5 Folio/Parcel #: Is the Building Ilistorically Designated: Yes NO Flood Zone: CONTRACTOR: Company Name: t-(- Phone #: 3 05 ' ? 6 9 - J6 Y y Address: ° /� `L q I S i v'7 City: b !TM ► g1'+N &Z 5 State: f -- Zip: _ Qualifier Name: Phone #: State Certification or Registration #: Certificate of Competency #: _ Contact Phone #: Email Address: DESIGNER: Architect/Engineer: Value of Work for this Permit: $ Square/Linear Footage of Work: Type of Work: DAddition Alteration ONew ORepair/Replace ODemolition Description of Work: AL' 9�--- P LAc..t= Cg45 -4 k t S G1 A g,01ASIV cS <� iL 1, C.-a /Z- i L C %:� 411 nl Ew R l.� �,/J F,•e� -� c� tF 4Z-A t S T. -f b LN-aA -' . S Submittal Fee �__�� Permit Fee $ D CCF $ CO /CC $ Scanning Fee $ Radon Fee $ Notary $ Training/Education Fee $ Double Fee $ Structural Review $ DBPR $ Bond $ Technology Fee $ TOTAL FEE NOW DUE $ 1 Bonding Company's Name (if applicable) Bonding Company's Address City State .. . 9f "S Mortgage Lender's Name (if applicable) Mortgage Lender's Address City State zip zip i , Application is hereby made to obtain a permit to do the work and installations as indicated. I certify that no work or installation has commenced prior to the issuance of a permit and that all work will be performed to meet the standards of all laws regulating construction in this jurisdiction. I understand that a separate permit must be secured for ELECTRICAL WORK, PLUMBING, SIGNS, WELLS, POOLS, FURNACES, BOILERS, HEATERS, TANKS and AIR CONDITIONERS, ETC..... OWNER'S AFFIDAVIT: I certify that all the foregoing information is accurate and that all work will be done in compliance with all applicable laws regulating construction and zoning. "WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT." Notice to Applicant: As a condition to the issuance of a building permit with an estimated value exceeding $2500, the applicant must promise in good faith that a copy of the notice of commencement and construction lien law brochure will be delivered to the person whose property is subject to attachment. Also, a certified copy of the recorded notice of commencement must be posted at the job site for the first inspection which occurs seven (7) days after the building permit is issued. In the absence of such posted notice, the inspection will not be approved and a reinspection fee will be charged. Signature er or Agent The foregoing instrument was was acknowledged before me this day of , 20 ! by (X"7 who is personally known to me or who has produced V'— l -1 As identification and who did take an oath. NOTARY PUBLIC: S Si /V'' / /,, `� .•pig''• �` 03 � 12012 Sign: _ Print: My Commission Expires: ''.�C'l,9 • D d .. .. Signature, Contractor The foregoing instrument was acknowledged before me this day of , 20 _, by , who is personally known to me or who has produced as identification and who did take an oath. NOTARY PUBLIC: Sign: Print: My Commission Expires: s4 YdhaYeYde9c4rd: Y$e &4nY� Y9e�:FtkeR4e Y�eY�YoY Yk3 :,�.Y��Y�k�.de9ededl4r4e�Y�Yk YsF7k3c Y. 4�Y& aY�Y4nt3a4nYir4e4rBe4e�Tr8i�Y4e4e4e4c�Fr9r�Y�Y3e�4rar4e�& ��Y: Y3e3e�Y :'e9e�Y�Y9F9e3:9F�k�4eFrde3:d. k�Y�Y APPROVED BY �y_�'�l! Plans Examiner Zoning Structural Review Clerk (Revised 07 /10 /07)(Revised 06 /10 /2009)(Revised 3/15/09) 1 k 4 Miami Shores Village B�ritdin �rDeparttment - liami Shores, Fl0_rida`33138 x Tel: (305) 795.2204 Fax: (305) 756.8972 OWNER BUILDER DISCLOSURE STATEMENT IAIE.f ADDRESS: �- �/ ji��' r Do hereby petition the Village of Miami Shores to act as my own contractor pursuant to the laws of the State of Florida, KS 489.103(7). And I have read and understood the following disclosure statement, which entitles me to work as my own contractor; I further understand that I as the owner must appear in person to complete all applications. State Law requires construction to be done by a licensed contractor. You have applied for a permit under an exception to the law. The exemption allows you, as the owner of your property, to act as your own contractor even though you do not have a license. You must supervise the construction yourself. You may build or improve a one - family or two- family residence. You may also build or improve a commercial building at a cost of $25,000.00 or less (The new form states 75,000). The building must be for your own use and occupancy. It may not be built for sale or lease. If you sell or lease a building you have built yourself within one year after the construction is complete, the law will presume that you built for sale or lease, which is a violation of this exemption. You may not hire an unlicensed person as a contractor. It is your responsibility to make sure the people employed by you have licenses required by state law and by county or municipal licensing ordinances. Any person working on your building who is not licensed must work under your supervision and must be employed by you, which means that you must deduct F.I.C.A and with- holdings tax and provide workers' compensation for that employee, all as prescribed by law. Your construction must comply with all applicable laws, ordinances, buildings codes and zoning regulations. Please read and initlal each paragraph. 1. I understand that state law requires construction to be done by a licensed contractor and have applied for an owner- builder permit under an exemption from the law. The exemption specifies that I, as the owner of the property listed, may act as my own contractor with certain restrictions even though I do not have a license. j�, Initial� 2. 1 understand that building permits are not required to be signed by a property owner unless he or she is responsible for the construction and is not hiring a licensed contractor to assume responsibility. Initial 3. 1 understand that as an owner builder, I am the responsible party of record on a permit I understand that II may protect myself from potential financial risk by hiring a licensed contractor and having the permit filed in his or her name instead of my own name. I also understand that the contractor is required by law to be licensed in Florida and to list his or license numbers on permits and contracts. Initial 4. 1 understand that I may build or improve a one family or two- family residence or a farm outbuilding. I may also build or improve a commercial building if the costs do not exceed $75,000. The building or residence must be for my use or occupancy. It may not be built or substantially improved for sale or lease. If a building or residence that I have built or substantially improved myself is sold or leased within 1 year after the construction is complete, the law will presume that I built ors tantially improved it for sale or lease, which violates the exemption. Initial 5. 1 understand that as the owner- builder, I must provide direct, onsite supervision of the construction. Initi al 6. 1 understand that I may not hire an unlicensed person to act as my contractor or to supervise persons working on my building or residence. It is my responsibility to ensure that the persons whom I employ have the license required by law and by county or municipal ordinance. Initial 7 I understand -that rt is frequent practices of unlicensed persons.to have the property owner obtain an owner builder permit that , r !mAn P t O e ts- b lib -- oivn k�Etor�4 t alai R1 r ult �#�e tl 4 ����ae�; �' '.r. .z.� y >�� .�+ra�= :t7�•�' awi3er- brJikJef aiitl am aware of tf�e limits bf ' rnsutance sous €a "e fbr in'" ' Y prsiR2rfy = > - _ - rny' g iunes-to�orkers on'm Initial_ 8. 1 understand that I may not delegate the responsibility for supervising work to be a licensed contractor who is not licenses to perform the work being done. Any person working on my building who is not licensed must work under my direct supervision and must be employed by me, which means that I must comply_it1h laws. requInrQ;the withhoidmg , federal income tan and srtciaLsecur�tj coL igns undet the red� l lnstxa se rtnT ons:Act ft and tt�u t rvSd wrvr cdmpet7saHoa for i3ae atoy€ t unatastd thatiyihneotooudse CIA risk 9. 1 agree that, as the party legally and financially responsible for this proposed construction activity, I will abide by all applicable laws and requirement that govern owner - builders as well as employers. I also understand that the Construction must comply with all applicable laws, ordinances, building codes, and zoning regulations. Initial 10. 1 understand that I may obtain more information regarding my obligations as an employer from the Internal Revenue Service, the United States Small Business Administration, and the Florida Department of Revenues. I also understand that I may contact the Florida Construction Industry Licensing Board at 850.487.1395 or htta:/ hrr ww. mvfloddalicense .com/dbar /aro /cilbrindex.html Initial 11. 1 am aware of, and consent to; an owner - builder building permit applied for in my name and understands that I am the party legally and financially responsible for the proposed construction activity at the following address: Initial 12. 1 agree to notify Miami Shores Village immediately of any additions, deletions, or changes to any of the information that I have provided on this disclosure. Initial Licensed contractors are regulated by laws designed to protect the public. If you contract with a person who does not have a license, the Constr4uction Industry Licensing Board and Department of Business and Professional Regulation may be unable to assist you with any financial Ices that you sustain as a result of contractor may be in civil court. It is also important for you to understand that, if an unlicensed contractor or employee of an individual or firm is injured while working on your property, you may be held liable for damages. If you obtain an owner - builder permit and wish to hire a licensed contractor, you will be responsible for verifying whether the contractor is properly licensed and the status of the contractor's workers compensation coverage. Before a building permit can be issued, this disclosure statement must be completed and signed by the property owner and returned to the local permitting agency responsible for issuing the permit A copy of the property owner's driver license, the notarized signature of the property owner, or other type of verification acceptable to the local permitting agency is required when the permit is issued. Was acknowledged before me this day of dam'`? , 20� By 1AiTAUk, who was personally known tome or who has Produced there License or -C l _ ast'a;it �•``� 3/ O �xPir A /'► '� i n �785901 .•'Q, FL01, /����'''�n11 \����\ r % , 74 Miami shores Village Building Department 10050 N.E.2nd Avenue Miami Shores, Florida 33138 Tel: (305) 795.2204 Fax: (305) 756.8972 Several properties in Miami Shores Village are located in a Special Flood Hazard Area (SFHA) as determined by the Flood Insurance Rate Map (FIRM). Development in a SFHA requires special attention to help protect life and property in the unfortunate event of a flood. Miami Shores Village Flood Damage Prevention Ordinance requires that the Building Department determine if a structure will be "Substantially Improved" prior to issuing any permits for improvement or repair. "Substantial Improvement" is defined in Miami Shores Village Flood Damage Prevention Ordinance as follows: "any reconstruction, rehabilitation, addition, or other improvement of a structure, the cost of which equals or exceeds 50 percent of the market value of the structure before the "start of construction" of the improvement. This term includes structures that have incurred "substantial damage" regardless of the actual repair work performed." The starting date to determine cumulative costs will be 12 months prior to the issuance of any permit under consideration. All future work considered would require appropriate approvals prior to construction. All cumulative costs will be re- evaluated at the time the permits are issued. Q: Why was the 50% figure chosen as the substantial improvement threshold? A: The 50% threshold was chosen as a compromise between the extremes of 1) prohibiting all investment to structure in SFHA and 2) allowing structures to be improved in any fashion without regard to the hazard present. In the first alternative there is potential for causing hardship to those who have located in a SFHA without knowledge of the risk because the structure was constructed prior to the designation of the area as flood prone. These individual could not improve their structures as damage or age contributed to their deterioration. The second alternative provides no mechanism to ensure that increased investment in SFHA will receive needed protection from flood risk, thus contributing to the increased peril of life and property. The threshold is thus a compromise at a halfway point. "Market Value" is defined in Miami Shores Village Flood Damage Prevention Ordinance as follows: " the building value, which is the property value excluding the land value and that of the detached accessory structures and other improvements on site (as agreed to between a willing buyer and seller) as established by what the local real estate market will bear. Market value can be established by an independent certified appraisal (other than a limited or curbside appraisal, or one based on income approach), Actual Cash Value (replacement cost depreciated for age and quality of construction of building), or adjusted tax - assessed values." Note: The "Market Value" does not include the value of the land or other improvements on the property. (ie: pool, gazebo etc.) Created on June 2009 # ? It A "substantially improved" structure in a Flood Zone must be brought into compliance with Miami Shores Village Flood Damage Prevention Ordinance for new construction. This means a residential structure must be elevated to or above the level of the 100 -year or base flood and a commercial structure must be effectively "flood proofed" and meet other applicable requirements. These regulations are based upon the Federal Emergency Management Agency (FEMA) requirements and affect your flood insurance costs. Existing residential structures can be "substantially improved" by interior renovations or new additions or other improvements. EXAMPLE: In order to determine whether a proposed construction project would be classified as a substantial improvement, the market value of the building needs to be determined. This value is found on the official tax assessor's card for the property or may be obtained by a licensed property appraiser. That number is then divided by 2 to determine the substantial improvement threshold. Therefore, a home with a market value of $100,000.00 could have no more than $50.000 worth of new construction /renovations and /or repairs before the house would have to be elevated above the 100 year base flood elevation as shown on the Flood Insurance Rate Maps. It is the responsibility of the Building Department staff to ensure that the market value estimates are accurate and the cost estimate reflects the actual costs to fully repair the damage and make any other improvements to the structure. The staff requires that the permit applicant or owner of the building supply the proposed construction cost estimate, or contractor's contract, to make the determination. The staff then uses the latest "Means Square Foot Costs" and "Means Construction Cost Data" books to determine the accuracy of the estimate. These are nationally accepted manuals, which itemize all components involved with construction. The manual provides adjustment rates to handle the varying construction costs throughout the country. Q: What should be included in a contractor's estimate? A: Basically, the only items that are not included in the cost include plans, specifications, surveys and permit fees. All materials that are permanently a part of the structure should be included in the cost estimate. These items include, but are not limited to: windows, doors, hardwood floors, wall to wall carpeting, sheetrock, lumber, roofing material, footings, pilings, kitchen cabinets and counter tops, bathroom vanities, tiling, plumbing fixtures, new furnaces, hot water heaters, heating and air conditioning systems, electrical work and labor. The cost of all materials involved in new construction or replacing and restoring a structure to its pre - damaged condition must be included. Even if volunteer labor or self -labor is used, it must be estimated based on minimum -hour wage scales for the type of construction work that is done. Created on June 2009 4 a e CUMULATIVE SUBSTANTIAL IMPROVEMENT VERIFICATION WORK SHEET In accordance with FEMA regulation and Miami Shores Village Flood Damage Prevention Ordinance the costs of all improvements must be monitored. The costs of any improvements in the past 12 months and the costs of any proposed improvements must be shown on the worksheet. The cost of improvements must include demolition, raw and finished materials (include those donated), labor (including volunteer and self - performed), construction supervision and management, and overhead and profit. A list of items the costs of which are to be included as well as those excluded is attached for your reference. (A Copy of the Contract must be attached) PROPERTY OWNER: PERMIT ADDRESS: FOLIO NUMBER: FLOOD ZONE: BASE FLOOD ELEVATION: FREEBOARD: EAST OF FL.CCCL: COST OF PAST IMPROVEMENTS (12 MONTHS): COST OF PROPOSED IMPROVEMENTS: (ATTACH COPY OF CONTRACT) TOTAL CUMULATIVE COST OF IMPROVEMENTS (past and proposed): VALUE OF PRINCIPAL STRUCTURE (attach appraisal): OWNERS SIGNATURE: DATE: PLANREVIEWER• PLAN REVIEWER SIGNATURE: DATE: Created on June 2009 SUBSTANTIAL IMPROVEMENT / DAMAGE LIST (NOTE. THIS LIST IS INTENDED FOR GUIDANCE ONLY, AND IS NOT ALL INCLUSIVE) ITEMS TO BE INCLUDED ALL STRUCTUAL ELEMENTS, INCLUDING Foundations including; Spread footing, Continuous footing, isolated footing, piles and pile caps Slabs including; Monolithic, floating, elevated Walls including; Exterior walls, Bearing walls, Shear walls Beams, Tie Beams, Columns and Posts Wood decking, Floor and Roof Sheathing Trusses, Joist Windows /Doors ALL BUILDING ELEMENTS, INCLUDING Interior Partitions, Walls, Columns Drywall, Ceilings, Built in Furniture, Cabinets, Vanities All Fixtures Flooring, Tile, Carpet, Stone, Linoleum, ect. All Finishes including Drywall, Paint, Stucco Plaster, Paneling, Tile, Marble, and Moldings Roofing Material ALL HARDWARE ALL UTILITY and SERVICE EQUIPMENT HVAC Electrical System and Equipment Plumbing System and Equipment Security System and Equipment Central Vacuum System Plumbing Fixtures Lighting Fixtures and Ceiling Fans Water Systems including Softeners /Filtration Created on June 2009 ALSO: All Labor and other Costs associated with Demolition, Removing, Replacing, Installing Building or Altering Building Components Construction Management / Supervision Overhead and Profit Equivalent cost for: Donated Materials Volunteer Labor (including owners and friends) Any Improvements Beyond Pre - damaged Condition, including; Utility Upgrades Code Upgrades ITEMS TO BE EXCLUDED Plans and Specifications Survey Costs Elevation Certificate Costs Permit fees Debris Removal Items not considered to be REAL Property Rugs, Furniture, Refrigerator, Appliances not Built -in Outside Improvements, Including; Landscaping Sidewalks Patios Fences Yard lights Sheds Gazebos Irrigation Pool . vim a o rM m to � ,r f I t t, 5g 4kc- / Tl� / . 12��cs, NX 2 ur- � f;Ktsr,0 f- 0- - a f-v42,3 /z_ Miami Shores Viiia go APPROVED BY 1?ATE ZONING DEPT BLDG DEPT St#UFCT TO COMM MiC E WIN AL FMM STATE AND COUNTY RULES AND REGUlLAWNS INSP;f�IONNRECORD I.ffAl Tank Pressure Test Final Hood Final Vkbntilation Final Pool Heater Final Vacuum r. 1 1 Interior Final Tin Cap Roof in Mop in I ment rinal ,nutters Rails and Guai DA comMian • DC Soil Bearin G Soil Treatment Floor Elevation Insulation INSP u 30 TIO Wet Intercom Intercom Alarm Finai -7 'ice Work With - RECORD INSPECTION DATE INSP ough fZSf,P ater Service 2nd Rough Top Out Fire Sprinklers Se tic Tan Sewer Hook -u T 4® Vlz NOTICE OF COMMENCEMENT A RECORDED COPY MUST BE POSTED ON THE JOB SITE. AT TIME OF FIRST INSPECTION PERMIT NO TAX FOLIO NO. STATE OF FLORIDA: COUNTY OF MIAMI -DADE: THE UNDERSIGNED hereby-'Ives notice that Improvements will be made to certain real property, and in accordance with Chapter 713, Florida Statutes, the following information Is provided in this Notice of Commencement. OR Bk 27721. Ps 17961 (Ipp) RECORDED 06/14/2011 13 =2E - -4�9 HARVEY RUVINP . CLERi4 OF. COURT MIAMI -DADE COUNTYP FLORIDA LAST PAGE above reserved for use of recording office 1. Legal description of property and street/address: /m 3 S ME StOa! T An • -0 0 r SW_42ef 2. Description of Improvement: 11 iwe j frc,"— 0iff Z 3.Owner(s) name and address: A J000"_ La S r d k- IQ 3!C A K !f f X;'2aeT . /+-4 - i Xs t X. Interest In property: Name and address of fee simple titleholder: 4. Contractor's name, address and phone number OV-0ty r✓L. 1 o i el °l STS . n�+ ..�w► . �o2�s 5. Surety: (Payment bond required by owner from contractor, if any) �n Name, address and phone number: /mss ,�..E c- S Amount of bond 6. Lender's name and address: 7. Persons within the State of Florida designated by Owner Upon whom notices or other documents may be served as provided by Section 713.13(1)(a)7., Florida Statutes, Name; address and phone number. 8. In addition to himself. Owners designates the following persons) to receive a copy of the Lienor's Notice as provided in Section Name, address and phone number: 9. Expiration date of this Notice of Commencement:: (the expiration date is 1 year from the bate of recording unless a different date. Is specified) WARNING TO OWNER: ANY PAYMENTS MADE BY THE OWNER AFTER THE EXPIRATION OF THE NOTICE OF COMMENCEMENT ARE CONSIDERED IMPROPER PAYMENTS UNDER CHAPTER 713, PART 1, SECTION 713.13. FLORIDA STATUTES, AND CAN RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE COMMENCING WORK OR RECORDING YOUR NOTICE OF COMMENCEMENT Signature(s) of Owners) or Owner(s)' Authorized Officer/Director/Partner/Manager , Prepared By. :.XL P.repared`By Print Name aA". . 64.0 .STICI- b Print Name Title /Office >} osc- * s _ffs - :S',�� Titie /Office STATE OF FLORIDA •''""` r gs40�� COUNTY OF MIAMI -FADE l ,l 1 The fo going i ent w acknow edg before me this ` day of Ck ❑ individually, or Was for v. El Personally known, or P produced the following type of identification: i L=c - Signature of Notary Public: Print Name: (SEAL) a*TARY PUBLIC - STATE OF FLORIDA VERIFICATION PURSUANT TO SECTION 92525. FLORIDA.STATUTES Ig Linda M. i tneni Under penalties of perjury, I declare that I have read the foregoing and N Commission # DD842267 that the facts stated in it are true, to the best of my knowledge and belief. Expires: DEC. 02;2012 )NOED THN AT(A1MMG BOMBING CO..1A. Signatures ) or Owner(s)'s Authorized .Qfficer/ Director /Partner/Manager. who:signed above: By By 123.0752 P - �aL STATE OF FLORIN, CO LINTY CIF i�DE I HEREBY WTFY W gig ig a its OW<atffa€ YNAT >;f�at_ cafdf