Loading...
RF-14-202Inspection Worksheet Miami Shores Village 10050 N.E. 2nd Avenue Miami Shores, FL Phone: (305)795 -2204 Fax: (305)756 -8972 Inspection Number: INSP- 206573 Scheduled Inspection Date: March 24, 2014 Inspector: Rodriguez, Jorge Owner: PICHA, STEVE Job Address: 1210 NE 91 Terrace Miami Shores, FL 33138- Project: <NONE> Contractor: OBENOUR ROOFING SHEET METAL & SUPPLY CO. INC Building Department Comments REPAIR FLAT Permit Number: RF -2 -14 -202 Permit Type: Roof Inspection Type: Final Roof Work Classification: Repair Roof Phone Number Parcel Number 1132050010500 Phone: 305- 757 -2612 Infractio Passed Comments INSPECTOR COMMENTS False March 21, 2014 For Inspections please call: (305)762 -4949 Page 10 of 27 Inspector Comments Passed Failed Correction Needed ❑ Re- Inspection ❑ Fee No Additional Inspections can be scheduled until re- inspection fee is paid. March 21, 2014 For Inspections please call: (305)762 -4949 Page 10 of 27 S' S Miami Shores Village � Building Department ?� Florida 33138 �` 90050 N.E.2nd Avenue, Miami Shores, Tel: (305) 795.2204 Fax: (305) 756.8972 INSPECTION'S PHONE NUMBER: (305) 762.4949 t 0 O j BUILI)nw PERMIT APPLICATION Permit Type: BUILDING JOB ADDRESS: 1, It 015 ` I -�tY D E CQaW FU 9A LUIS: y_ -_ - -Q-. FBC 20 10 Permit No. /'+ Master Permit No. ( `" ROOFIN City: Miami Shores County: Miami Dade Zip: ,1:7? r Folio/Parcel #: / Is the Building Historically Designated: Yes NO // Flood Zone: OWNER: Name (Fee Simple Titleholder): Address:_ 1.210 Alf '?/ -k r ✓ 7 WMI City: N admi State: A Zip: 3 / Tenant/Lessee Name: Phone#: Email: CONTRACTOR: Company Name: Address: y City: Qualifier Name: ,Mar 71.7-2412-- L zip: 3K i State Certification or Registration #: CC C Or 5� 6 V/ Contact Phone#. " 7, ,P —e-� r _L— Email Address: DESIGNER: Architect/Engineer: Value of Work for this Permit: $_ 112300, Square/Linear Footage of Work: 3 p Type of Work: ❑Addition ❑Alteration ❑New We air/Replace ❑Demolition Description of Work: ` e4 pfd e r6 aeo� 5va oviz usLit " f e //1 ®sue 1'f►.,�.e Submittal Fee $ Permit Fee $ Scanning Fee $ Notary $ CCF $ CO /CC $ Radon Fee $ DBPR $ Training/Education Fee $ Technology Fee 9 Double Fee $ Structural Review $ TOTAL FEE NO $ondiQ Company's Name (if applicable) Bonding Company's Address City State Mortgage Lender's Name (if applicable) Mortgage Lender's Address City State Zip Zip Application is hereby made to obtain a permit to do the work and installations as indicated. I certify that no work or installation has commenced prior to the issuance of a permit and that all work will be performed to meet the standards of all laws regulating construction in this juri$ icdon. I understand that a separate permit must be secured for ELECTRICAL WORK, PLUMBING, SIGNS, WELLS, POOLS, FURNACES, BOILERS, HEATERS, TANKS and AIR CONDITIONERS, ETC..... OWNER'S AFFIDAVIT: I certify that all the foregoing information is accurate and that all work will be done in compliance with all applicable laws regulating construction and zoning. "WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT: ' Notice to Applicant. As a condition to the issuance of a building permit with an estimated value exceeding $2500, the applicant must promise in good faith that a copy of the notice of commencement and construction lien law brochure will be delivered to the person whose property is subject to attachment. Also, a certified copy of the recorded notice of commencement must be posted at the job site for the first inspection which occurs seven (7) days after the building permit is issued In the absence of such posted notice, the inspection will nopbe-approved and a reinspection fee will be charged Owner or Agei The foregoing i ment was acknowledged before me this t fm of , 20 �, , who ' perso y known to me or who h produced As identification and who did take an oath. NOTARY PUBLIC: Sign: Alm Print: My Commission APPROVED BY Sohdre Dee Hart My Commission FF 010844 Expires 04/21/2017 Sign V Contractor The foregoing instrument was acknowledged before me this ' day of 2d(_,-� by AIQS . ­1JZXA who is personally known to me or who has produced as identification and who did take an oath. NOTARY PUBLIC: Plans Examiner Structural Review (Revised 3 /12/2012)(Revised 07110/07)(Revised 06/10t2009)(Revised 3/15109) Sign: Print: -- - - - -- - - - - - - a - My Co m Dee Hart Commistn FF 010844 orw Expires04f21017 Zoning Clerk ROOF ASSEMBLIES AND ROOFTOP STRUCTURES I Florida Building Code Edio, -High Velocity Hurricane Zone Unifmm Permit I Sec. on A (General Into f�aa���e>�ltTfo: Contractor's Name Job Address ®y e. O � ROOF CATEGORY 541x0 -IN Low slope 0 Mechanically Fastened Tile 0 Mortar�Ad a Set 'n O Asphaltic Shingles 0 Metal Panel/Shingles O Wood S�hingkssJ6 as O Prescriptive BUR -RAS ISO ROOF TYPE 0 New Roof O Reroofing 0 Recovering Repair Maintenance ROOF SYSTEM INFORMATION Low Slope Roof Area (SF) Steep Sloped Roof Area (SF) Total (SF) Section B (Roof Plan) Ske tch Roof Plan: Illustrate all levels and sections, roof drains, scuppers, overflow fTd ns. Include dimensions of sections and levels, clearly Identify dimensions of elevated p re 1 n of i�pet& 15.34 2010 FLORIDA BUILDING CODE — BUILDING COUNTY �" MIAMI-DARE COUNTY PRODUCT CONTROL SECTION 11805 SW 26 SUee4 Room 208 DEPARTMENT OF REGULATORY AND ECONOMIC RESOURCES (RER) Miami, Florida 33175 -2474 BOARD AND CODE ADMINISTRATION DIVISION T (786)315 -2590 F (786) 315 -2599 NOTICE OF ACCEPTANCE (NOA) www.miamiaaae.¢ov�econamv GAF 1361 Alps Road Wayne, NJ 07470 SCOPE: This NOA is being issued under the applicable rules and regulations governing the use of construction materials. The documentation submitted has been reviewed and accepted by Miami -Dade County RER - Product Control Section to be used in Miami Dade County and other areas where allowed by the Authority Having Jurisdiction (AHJ). This NOA shall not be valid after the expiration date stated below. The Miami -Dade County Product Control Section (In Miami Dade County) and/or the AHJ (in areas other than Miami Dade County) reserve the right to have this product or material tested for quality assurance purposes. If this product or material fails to perform in the accepted manner, the manufacturer will incur the expense of such testing and the AHJ may immediately revoke, modify, or suspend the use of such product or material within their jurisdiction. RER reserves the right to revoke this acceptance, if it is determined by Miami -Dade County Product Control Section that this product or material fails to meet the requirements of the applicable building code. This product is approved as described herein, and has been designed to comply with the Florida Building Code including the High Velocity Hurricane Zone of the Florida Building Code. DESCRIPTION: GAF TOPCOAT® Roof Membrane and Maintenance Coatings. LABELING: Each unit shall bear a permanent label with the manufacturer's name or logo, city, state and following statement: "Miami -Dade County Product Control Approved ", unless otherwise noted herein. RENEWAL of this NOA shall be considered after a renewal application has been filed and there has been no change in the applicable building code negatively affecting the performance of this product. TERMINATION of this NOA will occur after the expiration date or if there has been a revision or change in the materials, use, and/or manufacture of the product or process. Misuse of this NOA as an endorsement of any product, for sales, advertising or any other purposes shall automatically terminate this NOA. Failure to" comply with any section of this NOA shall be cause for termination and removal of NOA. ADVERTISEMENT: The NOA number preceded by the words Miami -Dade County, Florida, and followed by the expiration date may be displayed in advertising literature. If any portion of the NOA is displayed, then it shall be done in its entirety. INSPECTION: A copy of this entire NOA shall be provided to the user by the manufacturer or its distributors and shall be available for inspection at the job site at the request of the Building Official. This NOA revises NOA No. 12- 1121.05 and consists of pages 1 through 9. The submitted documentation was reviewed by Juan E. Collao, R.A. NOA No.: 13-0603.25 OE couw r�r Expiration Date: 05 /15/18 .. Approval Date: 08/01/13 Page 1 of 9 ROOFING COMPONENT APPROVAL Category: Roofing Sub - Category: Cement - Adhesive - Coatings Materials: Elastomeric SCOPE: This approves the roof maintenance and restoration coating system using TOPCOAT® Roof Membrane and Maintenance Coatings, to be used on existing roof assemblies as manufactured GAF, as described in this Notice of Acceptance, designed to comply with the Florida Building Code and the High Velocity Hurricane Zone of the Florida Building Code. TRADE NAMES OF PRODUCTS MANUFACTURED OR LABELED BY APPLICANT: TABLE 1 Product Dimensions Test Product Specification Description TOPCOAT® Elastomeric 1, 5 or 55 gal. ASTM D6083 An acrylic, water based elastomeric Roofing Membrane membrane system used to protect various types of roofing surfaces. TOPCOAT® Flashing Grade 1, 5 gal. or TAS 139 Water -based flashing compound. 1 qt tube TOPCOAT® Liquid Fabric 5 or 55 gal. Proprietary Water - based, high elasticity flashing Flashing Grade compound. TOPCOAT® Fastener Grade 1, 5 gal. or Proprietary Water -based sealant for fastener lqt tube detailing. TOPCOAT Flashing Fabric 4 ", 6 ", 12" or 36" Proprietary Non -woven polyester reinforcing Widths fabric. TOPCOAT® MP -300 5 or 55 gal. Proprietary Primer for rusty metal. TOPCOAT M)3 Plus 5 or 55gal. Proprietary Water based, low VOC primer used to block asphalt bleed - through. TOPCOAT® Sky -Lite 5 or 55 gal Proprietary Solvent or water based coating used for protecting and restoring fiberglass skylight panels. TOPCOAT Pre�cote 5 gal Proprietary Solvent based primer for corrugated asbestos (transite) roof panels TOPCOAT Surface Seal 5 or 55ga1 ASTM D6083 Solvent based sprayable thermoplastic SB rubber sealant used to protect and restore aged roof surfaces and to increase a roof s reflectivity TOPCOAT® Flexsee 1, 5 gal. or lqt TAS 139 Solvent based flashing compound for tube gutters and other detailing r NOA No.: 13- 0603.25 Expiration Date: 05/15/18 Approval Date: 08/01/13 Page 2 of 9 TOPCOAT®- FireShield® SB 5 or 55 gal. TOPCOAT® EPDM Coating 5 or 55 gal. TOPCOAT® EPDM System 5 gal. Cleaner TOPCOAT* WallcoteTM 5 or 55ga1 Block Primer TOPCOAT® WallcotOm 5 or 55gal Flashing Sealant FireOutrm Fire Barrier 5 or 55ga1 Coating MANUFACTURING LOCATION: 1. Walpole, MA. EVIDENCE SUBMITTED: ASTM D6083 Solvent based liquid thermoplastic Test Agency rubber sealant designed to restore roof Momentum Technologies, Inc. surfaces, formulated to provide fire Exterior Research & Design, LLC. protection and to increase a roof s ASTM D 903 reflectivity ASTM D6083 Water -based acrylic reflective coating PRI Asphalt Technologies Inc. designed to protect and provide ASTM D 6083 reflectivity on EPDM roofs Proprietary Surface preparation treatment for ' EPDM substrates Proprietary A clear, water -based primer formulated FM 4470 for porous or chalking concrete and FM 4470 masonry surface. Proprietary A light gray, water -based synthetic rubber sealant for wall penetrations. Proprietary Low VOC, water -based fire barrier coating Test Agency Test Identifier Momentum Technologies, Inc. EX14A3A Exterior Research & Design, LLC. 18026.03.02 -1 ASTM D 903 18026.03.02 -R2 ASTM D 6083 G6040.03.07 PRI Asphalt Technologies Inc. GAF - 082 -02 -01 ASTM D 6083 GAF - 065 -02 -01 TAS 139 GAF - 054 -02 -01 ' GAF- 087 -02 -01 ASTM D 6083 GAF - 110 -02 -01 FM 4470 GAF - 122 -02 -01 FM 4470 GAF -084 -02 -01 Factory Mutual Research Corp. 3015619 3026767 Underwriters Laboratories 05NK11032 C APPROVED Test Name / Report Date ASTM D 6083 02/26/04 TAS 114 -D 03/17/06 TAS 114-D 12/05/07 TAS 114 -D 12/06/07 ASTM D 903 05107/06 ASTM D 6083 12/14/04 TT- C -555B 07/11/04 ASTM D 6083 09/26/05 TAS 139 02/15/06 TAS 139 05/07/06 ASTM D 6083 05/07/06 FM 4470 03/15/05 FM 4470 02/01/07 UL 790 10/12/05 NOA No.: 13-0603.25 Expiration Date: 05/15/18 Approval Date: 08/01/13 Page 3 of 9 PHYSICAL PROPERTIES OF COMPONENTS: Trade name: TOPCOAT® Elastomeric Roofing Membrane Substrates: Structural concrete, Galvanized metal roof, Smooth surface asphaltic BUR and Trade name: APP modified bitumen cap sheets; Granule surface SBS and APP modified Substrates: bitumen cap sheets, PVC, TPO and EPDM membranes. Application Rate: This material is applied by spray equipment, roller or brush. For systems approvals, refer to specific Roof Assembly, Product Control Notice of Acceptance. Specifications: ASTM D6083 Description: An acrylic based elastomeric used to protect various types of roofing surfaces. Container Size: 1, 5, 55 gallons. Note all cautions on container label. Trade name: TOPCOAT® Surface Seal SB Substrates: Smooth surface asphaltic BUR cap sheets; Granule surface SBS and APP modified bitumen cap sheets and EPDM membranes. Application Rate: This material is applied by spray equipment, roller or brush. For systems approvals, refer to specific Roof Assembly, Product Control Notice of Acceptance. Specifications: ASTM D6083 Description: A solvent based elastomeric used to protect various types of roofing surfaces. Container Size: 5, 55 gallons. Note all cautions on container label. Trade name: TOPCOAT® FireShicie SB Substrates: EPDM membranes. Application Rate: This material is applied by spray equipment, roller or brush. For systems approvals, refer to specific Roof Assembly, Product Control Notice of Acceptance. Specifications: ASTM D6083 Description: A solvent based elastomeric used to protect EPDM roofing surfaces. Container Sip: 5, 55 gallons. Note all cautions on container label. Trade name: TOPCOAT® EPDM Coating Substrates: EPDM membranes. Application Rate: This material is applied by spray equipment, roller or brush. For systems approvals, refer to specific Roof Assembly, Product Control Notice of Acceptance. Specifications: ASTM D6083 Description: An acrylic based elastomeric used to protect EPDM roofing surfaces. Container Size: 5, 55 gallons. Note all cautions on container label. NOA No.: 13-0603.25 Expiration Date: 05/15/18 Q~MHMMDE COUNTY Approval Date: 08/01/13 MW =NN 4 of 9 APPROV19D INSTALLATION PROCEDURES: COATING APPLICATIONS: Substrate: Galvanized Metal Roof Systems All General Limitations apply. All GAF TOPCOAT® products-shall be installed in accordance with manufacturer's specifications. The following are installation guidelines. Consult the GAF TOPCOAT® Specification Manual or Technical Service for specific /complete installation instructions. Substrate Preparation: The roof substrate must be completely sound, clean and dry before application of TOPCOAT® products. According to manufacturer's application instructions. Tighten and/or replace loose or missing fasteners. Install crickets to divert water and complete other necessary sheet metal repairs. Base Coat: Apply a base coat of TOPCOAT® Elastomeric Roofing Membrane at a specified rate of 1.0 to 1.5 gallons per 100 square feet depending on specification and warranty requirements. Allow 24 hours to dry and inspect base coat for defects. Correct unsatisfactory conditions prior to proceeding. Finish Coat(s): Apply one or more finish coat(s) of TOPCOAT® Elastomeric Roofing Membrane at a rate of 1.0 to 1.75 gallons per 100 square feet. Allow 24 hours to dry- before inspection of roof surface. Inspect completed system for defects and correct as required. 0 NOA No.: 13- 0603.25 rw►r�innuE Expiration Date: 05/15/18 C , , , Approval Date: 08/01/13 counmr Page 5 of 9 Substrate:' Existing or New EPDM All General Limitations apply. All GAF TOPCOAT® products shall be installed in accordance with manufacturer's specifications. The following are installation guidelines. Consult the GAF TOPCOAT® Specification Manual or Technical Service for specific /complete installation instructions. Substrate Preparation: The roof substrate must be completely sound, clean and dry before application of TOPCOAT® products. Any areas where EPDM is torn, cracked and/or buckled must be repaired with like materials. Substrate to receive coating shall be pre - cleaned with TOPCOAT EPDM System Cleaner by spray applying at a rate of I gallon per 500 square feet. Allow EPDM System Cleaner to dry completely before pressure washing with water to remove dirt, dust, chalk and other loose materials. Base Coat:(solvent based)- Fully Adhered EPDM only TOPCOAT Surface Seal SB or TOPCOAT® FireShieie SB is roller applied in two coats at a rate of 0.5 gal per 100 square feet for each coat. Allow the first coat to dry before applying the second coat. Allow the second coat to dry and inspect base coat for defects. Correct unsatisfactory conditions prior to proceeding. Finish Coat(sl:(solvent based) Fully Adhered EPDM only Apply one or more finish coat(s) of TOPCOAT® Surface Seal SB or TOPCOAT® FireShiele SB at a rate of 1.5 gallons per 100 square feet. Allow 24 hours drying time prior to allowing foot traffic or inspection of roof surface. Inspect completed system for defects and correct as required. OR Base Coat:(water based) TOPCOAT® EPDM Coating is roller applied at a rate of 1.0 gal/sq. Allow 24 hours to dry and inspect base coat for defects. Correct unsatisfactory conditions prior to proceeding. Finish Coat(s1I(water based) Apply one or more finish coat(s) of TOPCOAT® EPDM at a rate of 1.0 gallons per 100 square feet. Allow 24 hours drying time prior to allowing foot traffic or inspection of roof surface. Inspect completed system for defects and correct as required. NOA No.: 13-0603.25 hpAMbM COUNTY Expiration Date: 05/15/18 ... Approval Date: 08/01113 Page 6 of 9 Substrate: Smooth BUR and APP Granule SBS and APP All General Limitations apply. All GAF TOPCOAT® products shall be installed in accordance with manufacturer's specifications. The following are installation guidelines. Consult the GAF TOPCOAT Specification Manual or Technical Service for specific /complete installation instructions. Substrate Preparation: The roof substrate must be completely sound, clean and dry before application of TOPCOAT® products. Roof substrate must be swept to remove debris and loose granules followed by rinsing with water to remove dirt, dust, chalk and other loose materials. Any areas where the BUR or MB has blistered, buckled and/or become wet must be removed and repaired using similar products. All areas where the BUR or MB surface has significantly craze cracked (i.e. gaps in width or depth greater than 1/1611) must be repaired with TOPCOAT Flexseal to bring the substrate to a smooth, workable surface. *Substrate to receive coating shall be primed with TOPCOAT MB Plus at a rate of 1.0 to 1.25 gallons per 100 square feet depending on specification requirements and substrate. Allow TOPCOAT MB Plus to dry completely before applying base coat. *Optional when TOPCOAT Surface Seal SB is used or when TOPCOAT Elastomeric Roofing Membrane is applied over granular SBS modified bitumen cap sheets. Base Coat:(water based) For granular SBS cap sheets and Smooth BUR or APP cup sheets. Apply a base coat of TOPCOAT Elastomeric Roofing Membrane at a rate of 1.0 to 1.25 gallons per 100 square feet depending on specification requirements and substrate. Allow to dry and inspect base coat for defects. Correct unsatisfactory conditions prior to proceeding. Finish Coat(s):(water based) Apply one or more finish coat(s) of TOPCOAT Elastomeric Roofing Membrane at a rate of 1.75 gallons per 100 square feet depending on specification requirements and substrate. Allow 24 hours drying time prior to allowing foot traffic or inspection of roof surface. Inspect completed system for defects and correct as required. Do not use TOPCOAT® Surface Seal SB over water - based, base coatings. OR Base Coat:(s61vent based) For granular SBS or APP cap sheets and Smooth BUR cap sheets. Apply a base coat TOPCOAT Surface Seal SB at a rate of 1.0 to 1.25 gallons per 100 square feet depending on specification requirements and substrate. Allow to dry and inspect base coat for defects. Correct unsatisfactory conditions prior to proceeding. Finish Coat(s):(solvent based) Apply one or more finish coat(s) of TOPCOAT® Surface Seal SB at a rate of 1.75 gallons per 100 square feet depending on specification requirements and substrate. Allow 24 hours drying time prior to allowing foot traffic or inspection of roof surface. Inspect completed system for defects and correct as required. Do not use TOPCOAT® Surface Seal SB over water -based, base coatings. NOA No.: 13-0603.25 Expiration Date: 05115118 M�AMMADECOUNTY Approval Date: 08/01/13 Page 7 of 9 Substrate: Existing PVC All General Limitations apply. All GAF TOPCOAT® products shall be installed in accordance with manufacturer's specifications. The following are installation guidelines. Consult the GAF TOPCOAT® Specification Manual or Technical Service for specific /complete installation instructions. Substrate Preparation: The substrate must be older than one year. The roof substrate must be completely sound, clean and dry before application of TOPCOAT® products. Any areas where substrate is torn, cracked and/or buckled must be repaired with like materials. Substrate to receive coating shall be pre - cleaned by pressure washing with water and TSP to remove all dirt, dust, chalk and other loose materials. Base Coat: Apply a base coat of TOPCOAT Elastomeric Roofing Membrane at a rate of 1.0 gallons per 100 square feet. Allow 24 hours to dry and inspect base coat for defects. Correct unsatisfactory conditions prior to proceeding. Finish Coa t(s): Apply one or more finish coat(s) of TOPCOAT Elastomeric Roofing Membrane at a rate of 1.5 gallons per 100 square feet. Allow 24 hours drying time prior to allowing foot traffic or inspection of roof surface. Inspect completed system for defects and correct as required. FIRE BARRIER APPLICATION: Deck Description: Wood Deck System Type: Fire barrier for use under mechanically attached anchor sheets All General Limitations apply. All GAF TOPCOAT products shall be installed in accordance with manufacturer's specifications. The following are installation guidelines. Consult the GAF TOPCOAT Specification Manual or Technical Service for specific /complete installation instructions. Substrate Pre61ratlon: Wood deck must be clean, dry and free from any foreign matter before application of FireOutTm Fire Barrier Coating liquid applied fire barrier coating. Fire Barrier: FireOutTM Fire Barrier Coating is designed to provide fire barrier protection over wood decks. Apply 1 gallon per 100 square feet. Allow to dry prior to application of roof cover. Consult a current Approved Roofing Materials Directory for applicable fire ratings. *See General Limitation # 1. NOA No.: 13-0603.25 CMI-MM�COUNW Expiration Date: 05/15/18 • • • • UM Approval Date: 08/01/13 Page 8 of 9 BUILDING PERMIT REQUIREMENTS: Application for building permit shall be accompanied by copies of the following: 1. This Notice of Acceptance. 2. Any other documents required by the Building Official or applicable Building Code in order to properly evaluate the installation of this system. GENERAL LINIITATIONS: 1. Fire classification is not part of this acceptance; refer to a current Approved Roofing Materials Directory for fire ratings of this product. 2. TOPCOAT® Roof Membrane and Maintenance Coatings shall not be applied in in weather conditions. See manufacturer's specification and application instructions for weather and temperature instructions. 3. The product listed herein are components of roof assemblies and are approved for use with roof assemblies that list any of the products listed herein as part of their roof assemblies Notice of Acceptance. If a product is not listed as part of roof assemblies Notice of Acceptance, a request may be made to the local building official or Miami Dade Product Control for approval provided that appropriate documentation is provided. 4. All products listed herein shall have an unannounced follow -up quality control program from an approved listing agency, and shall have a quality assurance audit in accordance with the Florida Building Code and Rule 9N -3 of the Florida Administrative Code. Follow up test results shall be made available to Miami -Dade Product Control upon request. 5. Change in materials, use, or manufacture of any of the products listed herein shall be cause for termination of this Notice of Acceptance. 6. This maintenance coating system shall not be applied over, prepared roofing; i.e., fiber- cement shingles, quarry slate, cement or clay roof tile, metal shingles, wood shingles or shakes. 7. TOPCOAT® Roof Membrane and Maintenance Coatings shall be applied in accordance with manufacturer's published application instructions. 8. TOPCOAT' Roof Membrane and Maintenance Coatings shall be used as a roof maintenance coating system in accordance with applicable Building Code. TOPCOAT® Roof Membrane and Maintenance Coatings are not approved to be used as a repair or recover system. 9. All approved products listed herein shall be labeled in compliance with TAS 121 and shall bear the mprint or identifiable marking of the manufacturer's name or logo, city, state and following statement: "Miami -Dade County Product Control Approved" or the Miami -Dade County Product Control Seal as shown below. _ M4MM EC .10 END OF THIS ACCEPTANCE NOA No.: 13-0603.25 Expiration Date: 05/15/18 MIAM4nADE COUMY Approval Date: 08/01/13 "' ' Page 9 of 9 SECTION R4402.13 HIGH VELOCITY HURRICANE ZONES REQUIRED OWNERS NOTIFICATION FOR ROOFING CONSIDERATIONS R440t13.1 Scope. As it pertains to this section, it is the responsibility of the roofing contractor to provide the owner with the required roofing permit, and to explain to the owner the content of this section. The provisions of Section R4402 govem the minimum requirements and standards of the industry for roofing system installations. Additionally, the following items should be addressed as part of the agreement between the owner and the contractor. The owner's initial in the adjacent box indicates that the item has been explained. 1. Aesthetics - Workmanship: The workmanship provisions of Section R4402 are for the purpose of providing that the roofing system meets the wind resistance and water intrusion performance standards. Aesthetics (appearance) are not a consideration with respect to workmanship provisions. Aesthetic issues such as color or architectural appearance, that are not part of a zoning code, should be addressed as part of the agreement between the owner and the contractor. 2. Renailing Wood Decks: When replacing roofing, the existing wood roof deck may have to be renailed in accordance with the current provisions of Section R4403. (The roof deck is usually concealed prior to removing the existing roof system.) 3. Common Roofs: Common roofs are those which have no visible delineation between neighboring units (i.e. townhouses, condominiums, etc.) in buildings with common roofs, the roofing contractor and/or owner should notify the occupants of adjacent units of roofing work to be performed. �v_ 4. Exposed Ceilings: Exposed, open beam ceilings are where the underside of the roof decking can viewed from below. The owner may wish to maintain the architectural appearance, therefore, roofing nail penetrations of the underside of the decking may not be acceptable. This provides the option of maintaining this appearance. � 5. Ponding Water: The current roof system and/or deck of the building may not drain well and may cause water to pond (accumulate) in low -lying areas of the roof. Ponding can be an indication of structural distress and may require the review of a professional structural engineer. Ponding may shorten the life expectancy and performance of the new roofing system. Ponding conditions may not be evident until the original roofing system is removed. Ponding conditions should be corrected. 6. Overflow scuppers (wall outlets): It is required that rainwater flow off so that the roof Is not overlAded from a build up of water. Perimeter /edge walls or other roof extensions may block this discharge if overflow scuppers (wall outlets) are not provided. It may be necessary to install overflow scuppers in accordance with the requirements of Sections R4402, R4403 and R4413. 7. Ventilation: Most roof structures should have some ability to vent natural airflow through the interior of the structural assembly (the building itself). The existing amount of attic ventilation shall not be reduced. It may be beneficial to consider additional venting which can result in extending the service life of the roof. Exception: Attic spaces, designed by a Florida licensed engineer or registered architect to eliminate the attic venti nting shall not be required. Own s /Agent's Sloiature Date ntractor's Signature Property Address Permit Number CUMULATIVE SUBSTANTIAL IMPROVEMENT VERIFICATION WORK SHEET In accordance with FEMA regulation and Miami Shores Village Flood Damage Prevention Ordinance the costs of all improvements must be monitored. The costs of any improvements in the past 12 months and the costs of any proposed improvements must be shown on the worksheet. The cost of improvements must include demolition, raw and finished materials (include those donated), labor (including volunteer and self- performed), construction supervision and management, and overhead and profit. A list of items the costs of which are to be included as well as those excluded is attached for your reference. (A Copy of the Contract must attached) PROPERTY OWNER: �, a- errs `f$ h 4 PERMIT # ADDRESS: l,a N q/ S� FOLIO NUMBER: FLOOD ZONE: BASE FLOOD ELEVATION: FREEBOARD: EAST OF FL.CCCL: COST OF PAST IMPROVEMENTS (12 MONTHS): COST OF PROPOSED IMPROVEMENTS: (ATTACH COPY OF CONTRACT) TOTAL CUMULATIVE COST OF IMPROVEMENTS (past and proposed): VALUE OF PRINCIPAL OWNERS SIGNA' (attach appraisal): 4'e ' J0 I DATE: PLAN REVIEWER SIGNATURE: DATE: Created on June 2009