Loading...
RC-5-13-984_Plans AIR-CONDITIONING GENERAL NOTES 1. THE ABBREVIATION "A.C." USED HENCEFORTH IN THIS GENERAL AIR CONDITIONING SPECIFICATION SHALL BE CONSTRUED TO MEAN AIR CONDITIONING CONTRACTOR, 2. THE "GENERAL CONDITIONS OF THE CONTRACT", CURRENT EDITION, PUBLISHED IN STANDARD FROM BY THE AMERICAN INSTITUTE OF ARCHITECTS SHALL BE PART OF THIS CONTRACT, 3. ALL WORK AND MATERIALS SHALL BE IN FULL ACCORDANCE WITH OSHA AND ALL STATE AND LOCAL CODES THAT APPLY, 4, THE A.C. SHALL CHECK ALL EQUIPMENT FOR CORRECT VOLTAGE RATING BEFORE INSTALLATION. 5. THE A.C. SHALL TAKE OUT PERMITS, PROCURE CERTIFICATES, AND PAY ALL FEES ASSOCIATED WITH THE WORK, HE SHALL ALSO BE RESPONSIBLE FOR MAKING ALL INSPECTIONS AND TESTS. 6. THE DRAWINGS ARE DIAGRAMMATIC AND ARE INTENDED TO SHOW APPROXIMATE LOCATIONS. THE A.C. SHALL NOT SCALE THE DRAWINGS. 7. BIDDERS SHALL VISIT THE SITE AND FAMILIARIZE THEMSELVES WITH ALL CONDITIONS INVOLVING THE WORK. 8, IT SHALL BE THE RESPONSIBILITY OF THE A.C. FOR THE ADVANCE ORDERING OF LONG LEAD ITEMS SO AS NOT TO DELAY OTHER TRADES RESULTING IN ANY DOWN OR LAG TIME. 9. THE G,C, SHALL FURNISH ALL EQUIPMENT, LABOR, MATERIALS AND SUPERVISION TO INSTALL A COMPLETE AND PROPERLY OPERATING AIR -CONDITIONING SYSTEM AS DESCRIBED HEREIN AND AS SHOWN AND/OR NOTED ON THE DRAWINGS. 10, THE A.C. SHALL FURNISH AND INSTALL ALL MINOR ITEMS WHICH ARE OBVIOUSLY AND REASONABLE NECESSARY TO COMPLETE THE INSTALLATION WHETHER OR NOT SPECIFIED AS SHOWN ON THE PLANS. 1 1, THE A.C. SHALL BE A LICENSED MECHANICAL CONTRACTOR. 12. THE A.C. IS REFERRED TO THE ARCHITECTURAL, FIRE PROTECTION PLANS AND SPECIFICATIONS. SUCH PLANS AND SPECIFICATIONS ARE CONTRACT DOCUMENTS, VERIFY ALL REQUIREMENTS PRIOR TO INSTALLATION. 13. THE A.C. SHALL EXAMINE THESE SPECIFICATIONS AND THE WHOLE CONTRACT BY SECURING A COMPLETE SET OF DRAWINGS OF THE WHOLE CONTRACT. 14, THE A.C. SHALL BE RESPONSIBLE FOR THE FULL COORDINATION OF HIS WORK WITH THAT OF THE GENERAL CONTRACTOR AND OTHER SUBCONTRACTORS TO MUTUALLY AVOID CONFLICT, 15. THE A.C. SHALL BE RESPONSIBLE FOR VERIFICATION OF CEILING CONSTRUCTION BEFORE INSTALLING DIFFUSERS. 16. ALL AIR CONDITIONING WORK SHALL NOT INTERFERE WITH CLEARANCES REQUIRED FOR GENERAL AND MECHANICAL CONSTRUCTION. SHOULD AIR CONDITIONING WORK BE INSTALLED WHICH INTERFERES WITH THE WORK OF OTHER CONTRACTORS, SUCH WORK SHALL BE CHANGED AT NO ADDITIONAL COST TO THE OWNER. 17, THE A.C. SHALL VERIFY ALL NOTES AND DIMENSIONS PRIOR TO PROCEEDING WITH BID, ANY DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT. 18. THE A.C. SHALL SUBMIT REQUESTS FOR SUBSTITUTIONS IN WRITING. 19. THE A.C. SHALL TOUCH UP OR REFINISH THE FACTORY FINISH OF EQUIPMENT MARRED DURING SHIPMENT OR INSTALLATION, THE IS RESPONSIBLE TO REPAIR TO ORIGINAL CONDITION ANY AND ALL DAMAGES TO BUILDING SURFACES, EQUIPMENT, AND FURNISHINGS CAUSED DURING PERFORMANCE OR WORK. 20, THE A.C. SHALL FURNISH AND INSTALL DISCONNECT SWITCHES, WIRING AND CONNECTIONS ON AIR-CONDITIONING SYSTEM AS SHOWN ON PLANS, MOTOR STARTERS AND CONTROLS ARE TO BE SUPPLIED BY A.0 CONTRACTOR AND CONNECTED BY ELECTRICAL CONTRACTOR. CONTROL WIRING SHALL BE PROVIDED BY THE ELECTRICAL CON TRACTOR. 21. ALL PENETRATIONS SHALL BE PROPERLY FLASHED AND SEALED BY THE GENERAL CONTRACTOR. 22. NO CONDUITS OR PIPES ARE TO BE RUN IN DUCTWORK, 23. THE ELECTRICAL CONTRACTOR IS RESPONSIBLE TO PROVIDE TYPE WRITTEN PANEL SCHEDULES FOR ALL PANELS, THE A.C. SHALL COORDINATE WITH THE ELECTRICAL CONTRACTOR IN ORDER THAT THE SAME NOMENCLATURE IS USED AS PROVIDED ON THE A/C PLANS. 24, ALL MATERIALS SHALL BE NEW, OF AMERICAN MANUFACTURE, AND IN COMPLIANCE WITH UNDERWRITERS LABORATORIES OR OTHER RECOGNIZED TESTING AGENCY, UNLESS SPECIFIED OTHERWISE, 25. THE A.C. SHALL BE RESPONSIBLE FOR ANY DAMAGE TO MECHANICAL EQUIPMENT DUE TO REMOVAL OR INSTALLATION OF ANY WORK. 26, ALL STRUCTURAL CUTTING AND PATCHING SHALL BE DONE BY THE GENERAL CONTRACTOR, CLEAN-UP NOTES 1. CLEAN UP OF SITE: UPON COMPLETION OF THE PROPO$fO WORK, THE PERMIT HOLDER SHALL LEAVE THE SITE CLEARED OF RUBBISH, DEBRIS, CONSTRUCTION SHEDS OR MATERIALS OF CONSTRUCTION. IN THE EVENT THERE HAS BEEN DAMAGE TO PUBLIC PROPERTY OR THAT RUBBISH, DEBRIS, CONSTRUCTION SHEDS OR MATERIALS OF CONSTRUCTION HAVE BEEN LEFT AT THE SITE, THEN THE BUILDING OFFICIAL SHALL REFUSE TO MAKE FINAL INSPECTION AND SHALL NOTIFY THE PERMIT HOLDER TO CORRECT THE CONDITION OF VIOLATION WITHIN FIVE DAYS. FOR FAILURE TO COMPLY WITH SUCH NOTICE AFTER SUCH PERIOD OF FIVE DAYS, THE PERMIT HOLDER IS SUBJECT TO THE PENALTIES SPECIFIED BY THE DADE COUNTY CODE, AND THE BUILDING OFFICIAL SHALL HAVE THE CLEAN-UP WORK DONE AND PUBLIC PROPERTY RESTORED AND SHALL NOTIFY THE LEGAL AUTHORITIES, WHO SHALL INSTITUTE THE NECESSARY ACTION TO HAVE THE COSTS PLACED AS A LIEN AGAINST THE PROPERTY IN RELATION TO WHICH THE PERMIT WAS ISSUED, 2. THE A.C. SHALL KEEP ALL AREAS IN WHICH WORK IS BEING PERFORMED FREE FROM DEBRIS AT ALL TIMES, AND SAID AREA SHALL BE LEFT BROOM CLEAN AT THE END OF EACH WORKING DAY. 3. AT THE COMPLETION OF THE WORD, THE A.C. SHALL REMOVE ALL RUBBISH CAUSED BY HIS WORK, AND SHALL THOROUGHLY CLEAN ALL FIRE PROTECTION EQUIPMENT. GUARANTEE 1 . ALL WORK, MATERIAL ETC, SHALL BE FULLY GUARANTEto FOR (1) YEAR BY THE A.C. CONTRACTOR. THE 1 YEAR PERIOD SHALL `COMMENCE AFTER FINAL APPROVAL BY THE ARCHITECT/ENGINEER, 2. THE A.C. SHALL FURNISH A WRITTEN GUARANTEE COVERING A ONE (1) YEAR PERIOD FOR ALL EQUIPMENT AND AN ADDITIONAL FOUR (4) YEAR PERIOD FOR THE COMPRESSORS. AIR-CONDITIONING SCHEDULE 'NARK AHU-1 (NEW) CU-1 (NEW DUCT SMOKE DETECTOR • z SERVES ENTIRE HOUSE MANUFACTURER RHEEM O X FIRE RATED ENCLOSURE - COOLING BTUH ISENSIBLE 31,400 ITOTAL 46,000 TOTAL EXT.STAT PR. X SMOKE CONTROL NOMINAL TONS 4 SEER 16.00 REFRIGERANT R-41 OA w 0 = MODEL # RHLL-HM4821 TOTAL CFM 1,400 1 600 OUTSIDE AIR CFM - FAN MOTOR HP F.L.A. 3/4 - MOUNTING HORIZONTAL SIZE H X W X L 50.5" X 21 X 19.5 S A OPENING 19-3/4" X 10-5 16 OPERATING WEIGHT LBS. 150 MCA MAX OCPD 5 15 SERVICE ELECTRIC KW STRIP HEAT RXBH1724C10J w BTUH HEATING - J w MODEL # 14AJM49AO1 COMPRESSOR - COND. FAN F.L.A. 1.9 COMPRESSOR R.L.A. 19,9 COMPRESSOR L.R.A. 109 v SIZE L x W x H 31-5/8 X 31-5/8 X 35-3/8 OPERATING WEIGHT LBS 249 REF LINES SUCT LIQ. 3/811 3/8)$ MIN CKT AMPS 27 MAX 0.C,P.D. 45 w THERMOSTAT RXBH1724C10J - SERVICE SWITCH YES FIRESTAT NO O SMOKE DETECTOR NO 0 Ln v u Q INTERLOCK WITH FAN NO SPECIAL FEATURES NONE REMARKS NONE INSULATE SUCTION LINE YES HVAC DESIGN REQUIREMENTS YES NO DUCT SMOKE DETECTOR • X FIRE DAMPER (S) 1) r-milsill X SMOKE DAMPERS X FIRE RATED ENCLOSURE X FIRE RATED ROOF/FLOOR CEILING ASSEMBLY X FIRE STOPPING X SMOKE CONTROL X BUILDING PLAN h" GALV WIRE ROPE IN CLEAR VINYL TUBE WRAP UNIT SO THAT REMOVABLE PANEL ARE SECURED -� cu NOTES : 1. PITCH DRIP PAN TO DRAIN. NOTE THE EMERGENCY DRIP PAN SHALL BE FABRICATED OF 24 GAUGE 2. CLEAN ALL DEBRIS OUT OF DRIP PAN. GALVANIZED SHEET METAL WITH ALL SEAMS SOLDERED. 3. INSTALL UNION IN EMERGENCY CONDENSATE LINE 4. ALL HARDWARE SHALL BE GALVANIZED. WOOD TRUSS 5. INSTALL HANGERS AND PAN IN ORDER THAT THEY DO NOT INTERFERE WITH THE REMOVAL OF ACCESS PANEL. WASHER AND HEXNUT I SCOPE OF WORK 3/8 D IA ROD 1. REMOVE EXISTING CU-1 � VIBRATION ISOLATOR AHU 2. . C, . AND TRAF REMOVE EXISTING AHU-1 UNION o STEEL CHANNEL n I 3. INSTALL NEW CU-1 AND AHU-1 USING I CONDENSATE DRAIN EXISTING REFRIGERANT LINE AND COND. � � � �_ CHAIN W/S HOOKS DRAIN PIPE 3/4 COPPER NIPPLE 4. ALL DUCTWORK, AIR SUPPLY DIFFUSERS EMERGENCY DRIP PAN FLUSH AND RETURN AIR GRILL ARE EXISTING TO DBL HEX NUTS AND CEILING LINE WASHERS %%77i77 REMAIN. EMERGENCY CONDENSATE DRAIN STORAGE COVERED PATIO III CU-1 All IN CEILING SPACE C III III N.T.S. Illl-1 I 7 � I REF. W.I.C. I CD U I I I II I I I LAUNDRY EXIST, REF. AND COND, LINES TO � I � EX. R E MA I N !CONTRACTOR TO VERIFY 10"x8'SAG 10"x8" SAG CONDITIONS OF EXIST, AND PIPESi 200 CFM BEDROOM 1 300 CFM AND UNIT REQUIREMENTS). o KITCHEN EX. �I �� ' SAG CL. EX. 6"x1d F h �x --� ELECTRICAL 180 CFM METER \\ �I MASTER BEDROOM r' EX, 10 x8 SAG T I I _ FAMILY ROOM j 170 CFM Q EX. " " " 6'x6 SAG 60 CFM ® III MASTER j - BATHRO A OM .I CL. \ I I � AHU-1 7.. BREAKFAST I� EX CAR PORT „ 36"x 18' J COVERED CAR PARK ~� ----------------------------------------J RAG EX ------------------ EX. EX. � 6 x6 � G I�iI ® 10"x8" SAG 40 CF 10"x8" SAG ® � 200 CFM y y 210 CFM -�-� BATHROOM 2 EX. 10"x8"SAG I 240 CFM v DINING ROOM LIVING ROOM ' I BEDROOM 2 CL, i i I I 42 2"X2"X2" LONG 16 GA GALV STEEL ANGLE CLIP -REF LINES 2 # 14 SCREWS AND 1 Y4" TAPCON WITH 1 W.P. EMBEDMENT GFI (BAY ECMT 100 EXTREME 4 - CONDITION MOUNTING KIT BY - -- AMERICAN STANDARD) \/ CONCRETE SLAB 4"X4" KORPAD AS NFGD BY KORFUND SECTION A �- 1/4" 0 TURN BUCKLE LOOP WIRE ROPE Y4" EYE BOLT AND SECURE WITH A NOTES; BURNDY CONNECTOR 1, WRAP WIRE ROPE AROUND CONDENSING UNIT IN TWO DIRECTIONS. 2. SEE MECHANICAL SITE PLAN FOR j EQUIPMENT LAYOUT. CONC, SLAB A 3. SEE ELECTRICAL DRAWINGS FOR DISCONNECT SWITCH & DUPLEX •. +•.; ,' , ' RECEPTACLES, 4, ALL HARDWARE SHALL BE GALVANIZED 4 ELEVATION CONDENSING UNIT MOUNTING DTL N.T.S. 0 79 ON TES: 1. X=2" FOR UNITS UP TO 3 TONS. 2, X=3" FOR UNITS OVER 3 TONS. 3. CONNECTIONS TO THE UNIT DRAIN PANS MAY BE EITHER FLEXIBLE CONNECTIONS OR RIGID PIPING. FLEXIBLE CONNECTIONS USED TO FORM A TRAP SHALL NOT EXCEED 18 INCHES IN LENGTH, 4. THE UNIT DRAIN PAN IS PART OF THE EQUIPMENT PLUG CLEANOUT x HORIZONTAL RUN.PITCH / 1/8"/FT L/ MEC ANA o.�. PLAN 1'�D" NOTES: 1 . X=2" FOR UNITS UP TO 3 TONS. 2. X=3" FOR UNITS OVER 3 TONS, 3. CONNECTIONS TO THE UNIT DRAIN PADS ° MAY BE EITHIrR t i'LEXIBLE CONNECTION$ ° OR RIGID PIPING. FLEXIBLE CONNECTIONS USED TO FORM -A TW SHALL NOT EXCEED 18 1NNEaS IN LENGTH, 0 4. THE UNIT pRAIN PAN IS PART OF THE \ EQUIPMENT c 0 °o � o O CD UNION TRAP DEPTH AS SHOWN) OR AS REQUIRED TO MAKE PROPER SEAL CONDENSATE CONN. TO A/C,, ri N.T.S. D t 1) r-milsill � lmmail, ffi�l 01 oo� cu NOTES : 1. PITCH DRIP PAN TO DRAIN. NOTE THE EMERGENCY DRIP PAN SHALL BE FABRICATED OF 24 GAUGE 2. CLEAN ALL DEBRIS OUT OF DRIP PAN. GALVANIZED SHEET METAL WITH ALL SEAMS SOLDERED. 3. INSTALL UNION IN EMERGENCY CONDENSATE LINE 4. ALL HARDWARE SHALL BE GALVANIZED. WOOD TRUSS 5. INSTALL HANGERS AND PAN IN ORDER THAT THEY DO NOT INTERFERE WITH THE REMOVAL OF ACCESS PANEL. WASHER AND HEXNUT I SCOPE OF WORK