Loading...
MC-11-639Inspection Worksheet Miami Shores Village 10050 N.E. 2nd Avenue Miami Shores, FL Phone: (305)795 -2204 Fax: (305)756 -8972 vo-v* Inspection Number: INSP - 158267 Permit Number: MC -4 -11 -639 Scheduled Inspection Date: March 12, 2012 Inspector: Perez, JanPierre Owner: , BARRY UNIVERSITY Job Address: 11300 NE 2 Avenue Benincasa Hall Miami Shores, FL 33138 -0000 Project: BARRY UNIVERSITY Contractor: JORDA MECHANICAL Permit Type: Mechanical - Commercial Inspection Type: Final Work Classification: A/C Replacement Phone Number Parcel Number 1121360010160 -34 Phone: (305)262 -0095 Building Department Comments INSTALLATION OF 4 VERTICAL PTAC UNITS 1 PER FLOOR TO TO PROVIDE AC TO CORRIDOR 3 Inspector Comments Passed Failed Correction Needed Re- Inspection Fee No Additional Inspections can be scheduled until re- inspection fee is paid. March 09, 2012 For Inspections please call: (305)762 -4949 Page 2 of 31 SENDER: COMPLETE THIS SECTION COMPLETE THIS SECTION ON DELIVERY • Complete.iteifls , and 3. Also complete Item 4 if RestriCr Delivery Is desired. • Print your name and address on the reverse so that we can retum the card to you. • Attach this card to the back of the mailplece, or on the front if space permits. 1. Article Addressed to: / P 14 \r i-1i0n%n 23 22 ` JLSk --/46 Ad-e4.k 33QQ1( -f Ne Act rrk 'i CSC (ei. B. Received by (Printed Name) ❑ Agent ❑ Addressee C. Date of Delivery D. Is delivery address different from item 1? ❑ Yes If YES, enter delivery address below: ❑ No ceTYPe rtifed Mail ❑ Express Mall Registered etum Receipt for Merchandise ❑ Insured Mali ❑ O.D. 4. Restricted Delivery? (Extra Fee) ❑ Yes 2. Article Number (transfer from service Labe° 91 7108 2133 3939 3785 5083 PS Form 3811, February 2004 Domestic Retum Receipt 102595 -02 -M -1540 (2 1--1(a U LDING PERMIT APPLICATION FBC 20 Permit Type: MECHANICAL Miami Shores Village Building Department 10050 N.E.2nd Avenue, Miami Shores, Florida 33138 Tel: (305) 795.2204 Fax: (305) 756.8972 INSPECTION'S PHONE NUMBER: (305) 762.4949 DEC L Permit No. AC- - !I - 6 7 Master Permit No. 6.6 Owner's Name (Fee Simple Titleholder) V Attxl i Un 0�9�,(fi `�+/ Phone # ?!OS' X99 3995 Owner's Address 1.30 o 1,e. 2ND Meow- City City t a44. $♦1o+ee,s State FL- Zip 33161 Tenant/Lessee Name Phone # Email Job Address (where the work is being done) MO NO 1 S41% Sfreek City Miami Shores Villa ' e County Miami -Dade Zip 33161 FOLIO / PARCEL # Is Building Historically Designated YES NO X Flood Zone Contractor's Company Name �o r�a Ike ClitRw�' C�1 Phone # ;or - 2G 2 -0°15- Contractor's Address $P 11 �.k) 1'-1' SA-Ted- City tk e.." i State CC Zip 3S1,24 Qualifier Name `.r r c i 6 V.:5 t.Sao(A Phone # State Certificate or Registration No. a 1' CC Oo14 1`1 Certificate of Competency No. Contact Phone E -mail Architect/ Engineer's Name (if applicable) I4.t. ENl i &rrdekt, Cod vairktPhone # Ilor - "or "UM.- Value of Work For this Permit $ ZJ i 000 Square / Linear Footage Of Work: Type of Work: Addition ['Alteration ['New ❑ Repair/Replace ❑ Demolition Describe Work: A1rj 4 \44c Procc, very -r.j 'TO Pko ri'i)t%r NC, - co g$ ******** * * *** * * * * * * * * * ** * * * * * * * *� * **F ************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** Submittal Fee $ Permit Fee $ Liv CCF $ CO /CC $ Notary $ Training/Education Fee $ Technology Fee $ Scanning $ Radon $ DPBR $ Bond $ Double Fee $ Violation date: Structural Review. $ Total Fee Now Due $ See Reverse side Bonding Company's Name (if applicable) Bonding Company's Address City State Zip Mortgage Lender's Name (if applicable) Mortgage Lender's Address City State Zip Application is hereby made to obtain a permit to do the work and installations as indicated. I certify that no work or installation has commenced prior to the issuance of a permit and that all work will be performed to meet the standards of all laws regulating construction in this jurisdiction. I understand that a separate permit must be secured for ELECTRICAL WORK, PLUMBING, SIGNS, WELLS, POOLS, FURNACES, BOILERS, HEATERS, TANKS and MR CONDITIONERS, ETC $a,, OWNER'S AFFIDAVIT: I certify that all the foregoing information is accurate an, 1, th all wogk will.by done in compliance with all applicable laws regulating construction and zoning. _ J°y,�ir , °tt'ti, "WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPEIp'Y.. IF .YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR L 4DEIt -OR AN ATTORNEY BEFORE RECORDING YOUR-NOTICE OF COMMENCEMENT." Notice to Applicant: As a condition to the issuance of a building permit with an estimated value exceeding $2500, the applicant must promise in good faith that a copy of the notice of commencement and construction lien law brochure will be delivered to the person whose property is subject to attachment. Also, a certified copy of the recorded notice of commencement must . posted at the job site for the first inspection which occurs seven (7) days after the building permit is issued. In the absence of ch posted notice, the inspection will not be approve . a reinspection fee will be charged. Owner or Agent The foregoing instrument was acknowledged before me this i11' p day °RV. , 201 , by 41L4 I3 aUfitaO who is personally k08wii to iiie'or- who'has produced . °6.7,44 , As identification and who did take an oath. NOTARY PUBLIC: Si , gn: tAtai Print: APPROVED BY Signature Contrac The foregoing instrument was acknow dged before me this day of a'61. i €b9 6 20 , by WIa'jsipere'anatIly known to me or who has produced E sc.)6915; as identification and who did take an oath. NOTARY PUBLIC: ....................................................... �)ans Examiner Zoning Engineer Clerk checked (Revised 07 /10 /07)(Revised 06/10/2009) Miami Shores Village Building Department 10050 N.E.2nd Avenue Miami Shores, Florida 33138 Tel: (305) 795.2204 Fax: (305) 756.8972 Permit No. Job Name Date Date / __A«NICAi, CRITIQLE SHEET BEILU C?NSTRUCTI CZ) N CCO. GENERAL CONTRACTORS • CONSTRUCTION MANAGERS 2100 PONCE DE LEON BLVD., SUITE 825, CORAL GABLES, FL 33134 305- 445-0819 • FAX: 305-447-0941 CGC 042059 • CGC 1516384 JAMES B.D. BEAUCHAMP, Chief Executive Officer DONALD L. CRISSEY, Executive Chairman of the Board DEAN A. THOMAS. President BENJAMIN K. ARTZi'. Senior Vice President November 9, 2011 Mr. Adrian F. Gonzalez A &P Air Conditioning 2322 West 78th Street Hialeah, FL 33016 DANIEL L BEAUCHAMP. Senior Vice President BRADFORD N. SMITH, Vice President MARIBEL HART, Corporate Treasurer BLAIK P. ROSS, Corporate Secretary a� DEC 0 5 261 E BY Thank you for your participation in the Barry University Benincasa Dormitory AC Addition. We really appreciate you help getting this project moving. For various reasons, Gorda Construction will be performing the HVAC scope related to permit # MCI 1 -639. This letter is to inform you that we will officially change the contractor associated with this permit so that A &P will no longer be held responsible for any of the work associated with this permit. Thank You for you Help, Zachary R Senior Project Manager ' rncpal www.beauchampco.com 1W1-0,MWMIfil Nt DEC 0 5 2011 Li B Y: .. ..... Miami hores Village Building Department 10050 N.E.2nd Avenue Miami Shores, Florida 33138 Tel: (305) 795.2204 Fax: (305) 756.8972 CHANGE OF CONTRACTOR ARCHITECT Permit N. Pit 4-11- 1231 Owners Name (Fee Simple Title Holder) N k);.1 co\ Owners Address: iliop gt AVPAti& City: liti4r4; 111.0J State : Phone #: 30r-11,- Mir Job Address (Of where work is being done): MC NJ 115 th Zip Code3 1 City: Miami Shores State:_Florida Zip Code: _VI(' ) .e.-/-ditVene .._,..45 Contractor's Company Name: JO ei).4 It3a6- 242 -- 7- Address: Cky: QAL. State: FZ.,_ Zip Code: ....5/ .. Qualifier's Name : ....4-1,-,015,...4049 Lic. Number: C/k1 ete-,E44. Architect/ Engineer of Record Name: Phone #: Address: City: State: Zip Code: Describe Work: V174\194 it, Ise,(ImA., Pee, 44 C1—ocits 5cf,o-q40.- 444NA I hereby certify that the work has been abandoned and/or the contractor/architect is unable or unwilling to complete the contract. I hold the Building Official and the mi Shores harmless for all legal inv ement. Signature ifioAte Aer firar Gr Signature owner or Agent The fomgoing instrument was aknowledgeci before me this day of DE(1/457204 • by_kkaliVale Who is personally known to me or who has produced as indenlification The foregoing instrument was afinowledged before me this ZL _ day of /3".0. Pi I by _MET,..605o%seet whols.m_sonaliy known to me or who has produced as indentification. at. ..) . MIIINA CO. AI 416 1111■1 Ivii, .4 Expires January 8, 2012 ,.: - sontiedmr, nay Fain Imams 800485-7019 e IAMI-DADE COUNTY TAX COLIECTOR 40 W. FLAGLER ST. FLOOR ft, W13° ‘aaa.laaaaa4,„aaa,,,,,a.4,alaYti 2011 LOCAL BUSN TAX RECEIPT 2012 MIAMI-DADE cor STATE OF FLORIDA IRE SEM 30,2012 MUST EE DISPLAYEWATPLACE OF SUSINESS PI.IFISUANT TO wo ° TY CODE CHAP - ART. & 10 aalt ThtSiS 401' A L CONTRACTOR NW 14 $1 6 OtlitAL $ "OA ENTERPRISES INC IrcetettAL MECHANICAL CONTRACTOR t4t1R1( 1(111S 4 EttraAL 'Mt ttEeeliq. it TM ' Ti:xly °Pt , um oF THE DO NOT FORWARD cmss. tioa FII1ST-CLASS U.S. POSTAGE PAID rtA1. L PRMIT N0, .261 t4OT PAY , TAT c i00499 s 110356-7' 0 Mr0 11 "111 011 MEUSE J.AW. VMS'S OT A FICATION IfOLOSMS aUAU1:IC4' aaa 07/10/2011 0050000167 8048.00 SEE OTHER SIDE JORDA MECHANICAL CONTRACTOR JORGE GUISASOLA 8011 NW 14 ST DORAL FL 33126 Ills t allo Ail t I snail ti I th t 411141101411 BATCH NUMBER Ism AC D` CERTIFICATE OF LIABILITY INSURANCE DATE (MMIDD/YYYY) 10/4/2011 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. APORTANT: If the certificate holder is an ADDITIONAL INSURED, the pollcy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER Brown & Brown of FL, Inc. - Fort Myers 3820 Colonial Boulevard Suite 200 Fort Myers FL 33912 CONTACT NAME: Stephanie Wilkinson PHONE (A/C. No. Ext:239- 2_74 -1430 ADDRESS: swilkinson ®bbftmyers . com FAX (A/C, No):239- 278 -5306 PRODUCER CUSTOMER ID #: INSURED Jorda Enterprises, Inc. DBA Jorda Mechanical Contractors 8011 NW 14th St. Miami FL 33126 INSURER(S) AFFORDING COVERAGE : I INSURERA:National Trust Ins Co NAIC # INSURER B: FOCI Insurance Company INSURER C : INSURER D: INSURER E : INSURER F REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. 1NSR LTR TYPE OF INSURANCE ADDL ■ : SUB al , POLICY NUMBER POLICY EFF MM/D. POLICY EXP MM/D �- LIMITS A GENERAL LIABILITY COMMERCIAL GENERAL LIABILITY OCCUR GL00096722 12/31/2010 12/31/2011 EACH OCCURRENCE $1,000,000 X PREMISES SES (EaEoccurrence) $100,000 CLAIMS -MADE X MED EXP (My one person) $5,000 PERSONAL & ADV INJURY $1,000,000 GENERAL AGGREGATE $2,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: F7 LOC PRODUCTS - COMP /OP AGG $2,000,000 PRO- POLICY POLICY [ I $ AUTOMOBILE LIABILITY ANY AUTO ALL OWNED AUTOS SCHEDULED AUTOS HIRED AUTOS NON -OWNED AUTOS CA00150332 12/31/2010 12/31/2011 COMBINED SINGLE LIMIT (Ea accident) $1,000,000 X BODILY INJURY (Per person) $ BODILY INJURY (Per accident) $ PROPERTY DAMAGE (Per accident) $ $ $ A X UMBRELLALIAB EXCESS LIAB X OCCUR CLAIMS -MADE UMB00099902 12/31/2010 12/31/2011 EACH OCCURRENCE $3,000,000 AGGREGATE $3,000,000 DEDUCTIBLE RETENTION $10,000 $ X $ g WORKERS COMPENSATION EMPLOYERS' LIABILITY ANY PROPRIETOR/PARTNER /EXECUTIVE OFFICER/MEMBER EXCLUDED? (Mandatory In NH) If yes, describe under DESCRIPTION OF OPERATIONS Y/N N / A 67339 10/7/2011 10/7/2012 X WC STATU- TORY LIMITS ER TORY E.L EACH ACCIDENT $500,000 N E.L. DISEASE - EA EMPLOYEE $500,000 below E.L DISEASE - POLICY LIMIT $500, 000 DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (Attach ACORD 101, Additional Remarks Schedule, H more space Is required) 30 days notice of cancellation except 10 days notice for non - payment i CERTIFICATE HOLDER CANCELLATION Miami Shores Building & Zoning 10050 NE 2nd Avenue Miami Shores FL 33138 -2304 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE © 1988-2009 ACORD CORPORATION. All rights reserved. ACORD 25 (2009/09) The ACORD name and logo are registered marks of ACORD \ 2-1) Miami Shoe Village Ch Buildin g Department -4T4 Ace - i 10050 N.E.2nd Avenue, Miami Shores, Florida 33138 Tel: (305) 795.2204 Fax: (305) 756.8972 �Q}y I'NSPECTION'S PHONE NUMBER: (305) 762.4949 BUILDING PERMIT APPLICATION FBC 20 Permit Type: MECHANICAL II=; Permit No. rrN1 TO VI »'i Master Permit No. cc 10.4 %6 Owner's Name (Fee Simple Titleholder) EAG2- y i J 'L v/ Phone # t Owner's Address —_l. C 300 iq v Z..y! p,,1,° city_ Mt,.I'At 5 (L C State rL •— Zip Tenant/Lessee Name Phone # Email Job Address (where the work is being done) u_ Z )J ' ' Ate City . Miami Shores Village County FOLIO / PARCEL # Is Building Historically Designated YES Miami -Dade Zip _ NO Flood Zone Contractor's Company Name A 4 ` ; Co(ct \ 1\O t\ Contractor's Address 26 Li, l ' 1 -' _ - ; City *COtC0\ State -\Oi tCkCL Qualifier Name:. AGd; t Ct(1 Phone /I State Certificate or Registration No. C. Cg, Certificate of Competency No. Zip -c Contact Phone Architect/Engineer's Name (if applicable) Phone # (5a 55U � � �{ ot E -mail I r\ @A: R(26-1 i r Phone# Value of Work For this Permit SQ__ Square / Linear Footage Of Work: Type of Work: ❑Addition DAlteration New ❑ Repair/Replace ❑ Demolition Describe Work: * * **,.. -: ** A ***'** *kA * * * *>:s' ** **AA *A -rt** *** Fees * * ****k * * * **** * *k * *** *'1:* *uric * *k*** **A * * * ** * ** Submittal Fee $ Permit Fee $ Notary $ Scanning $ Double Fee $ Structural Review. $ 1 Training/Education Fee $ Radon $ CCF $ DPBR $ Violation date: CO/CC $ Technology Fee $ Bond $_ Total Fee Now Due See Reverse side - qf Bonding Company's Name (if applicable) BondingConlpany's Address City State Mortgage Lender's Name (if applicable) _ Mortgage Lender's Address City State Application is hereby Made to obtain a permit to do the work and installations as indicated. 1 certify that no work or installation has commenced prior to the issuance of a permit and that all work will be - performed to meet the standards of all laws regulating construction in this jurisdiction. 1 understand that a separate permit must be secured for ELECTRICAL WORK, PLUMBING, SIGNS, WELLS; !POOLS; FURNACES, BOILERS, HEATERS, TANKS and AIR CONDITIONERS, ETC OWNER'S AFFIDAVIT: 1 certify that all the foregoing information is accurate and that all work will be done in compliance•with all applicable laws regulating construction and zoning. "WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT." Notice to Applicant: As a condition to the issuance of a building permit with an estimated value exceeding $2500, the applicant must promise in good faith that a copy of the notice of commencement and construction lien lmv brochure- will be delivered to the person whose property is subject to attachment. Also, a certified copy of the recorded notice of commencement must be posted at the job site for the first :inspection .which occurs seven (7) days after the building permit is issued. In the absence of such. posted notice,. the inspection will »olbe..appr nc e ,•einspection fee will be charged. --_ Signature Owner or Agent The foregoing instalment was acknowledged before me this day of _411A1.- , 20 1 , by Q("talA jebV OAP who 'sr.sauaii !c awn to me or who has produced As identification and who did take an oath. NOTARY PUBLIC; Sign: Print; My Commission :4 is -k i; -.4 * * ikde * fYtY+ktk+kaktk.:kie9F k yY* ..k * -:: I'< * * i4 A� •k APPROVED BY Signature Contractor The foregoing instrument was acknowledged before me this day of , , 20 Il , by who is personally kno vn to me or who has produced s identification and who did take an oath. NOTARY P LIC: Sign: Print: ti My C ki.k '****.:*i:** ****'* ** 'tans Examiner (Revised 07 /10 /07)(Revised 06 10/2009) Engineer 'Tl t xpires: MARIAM c'AEZ Notary Public 'eate of Florida My Ccinm. E s Aug 10, 2014 F — "f�Comm s:. # EE 12856 „o -, Zoning Clerk checked 05104/2011 15:21 (FAR) P.0011001 IIISEEMEEZIE HVAC CONTRACTOR • COMMERCIAL • INDUSTRIAL • RESIDENTIAL • LICENSED SCOPE OF WORK I DATE: 01/20/2011 PROJECT: BARRY UNIVERSITY RESIDENCE 2 CORRIDOR UPGRADE ASE BID. 1/4 LTI -SPLIT A/C UNITS BY MITSUBISHI OR EQUAL LATED COPPER REFRIGERATION LINES HO ' • NTAL FAN COIL SUPPORTS AUXII.1 DRAIN PANS W/ OVERFLOW DEVI MID FIBER ASS DUCTWORK FOR ?LE - S INSULATED HE FLEXIBLE DU , c • K FOR BRANCH LINES STANDARD WHITE UMINUM : DISTRIBUTION GALVANIZED SHEETM TSIDE AIR DUCTWORK ALUMINUM BRICK STARTUP OF A/C % MENT TIONED ABOVE PERMIT FEES OCIATEI) WITH v; OVE- MENTIONED WORK MANUFA• • - •'S WARRANTY ON • PARTS AS WELL AS ONE (1) YEAR WARRANTY ON ALL LABOR FRO % ATE OF STARTUP TAL BID PRICE $ 45,800. ALTERNATE BID: FOUR (4) 2 -TON VERTICAL PTAC A/C UNITS WALL SLEEVES Sc LOUVERS CONDENSATE OVERFLOW DEVICES RIGID FIBERGLASS DUCTWORK FOR PLENUMS INSULATED HELIX FLEXIBLE DUCTWORK FOR BRANCH LINES STANDARD WHITE ALUMINUM AIR DISTRIBUTION STAit r UP OF A/C EQUIPMENT MENTIONED ABOVE PERMIT FEES ASSOCIATED WITH ABOVE- MENTIONED WORK MANUFACTURER'S WARRANTY ON ALL PARTS AS WELL AS ONE (1) YEAR WARRANTY ON ALL LABOR FROM DATE OF START UP TOTAL ALT. PRICE $ 28,900.00 liftOT INCLUDED • CONDENSATE DRAIN LINES AND /OR CONNECTION TO A/C UNITS • CONCRETE SLAB FOR CONDENSING UNIT • CUTTING AND/OR PATCI•IING OF WALLS AND /OR FLOORS • LOW VOLTAGE (CONTROL) WIRING, DISCONNECTS • ANYTHING NOT SPECIFICALLY MENTIONED ABOVE x Adrian F. Gonzalez Vice President A & P Air Conditioning X Date Authorized Signature Date A & P Air Conditioning Corporation 2322 West 78th Street, Hialeah, Florida 33016 Miami -Dade: 305.556.7849 • Broward: 954.384.1081 • Fax: 305.558.8186 www.anairconditionina.com CAC058427 486570 -6 BUSINESS PAL °COD ITI ONI NG CORP 2322. W 78 ST 33016 HIALEAH THIS IS NOT A BILL — DO NOT PAY RENEWAL RECEIPT NO. 507804 -3 STATE* CACO58427 As P AIR CONDITIONING CORP Sec. Type of Business WORKER /S 196 SPEC MECHANICAL CONTRACTOR 10 _,OtY. A LOCAL TAX agaElPt. The YE :PM TORY OR THE DO NOT FORWARD FIRST -CLASS U.S. POSTAGE PAID MIAMI, FL PERMIT NO. 23 TAX 7/110181 01 00045.00 SEE OTHER SIDE A & P AIR CONDITIONING CORP ADRIAN F GONZALEZ PRES 2322 W 78 ST HIALEAH FL 33016 1„11i"llallnsmil,11,,, 111 ,,11111,1,1.11„„,141,1111,1,1;1 1 1 1 1 Project Address Miami Shores Village 10050 N.E. 2nd Avenue NE Miami Shores, FL 33138 -0000 Phone: (305)795 -2204 Parcel Number Applicant 11300 NE 2 Avenue Number: Benincasa Hall 1121360010160 -34 Miami Shores, FL 33138 -0000 Block: Lot: BARRY UNIVERSITY INC Owner Information Address Phone CeII BARRY UNIVERSITY INC 11300 NE 2 Avenue MIAMI SHORES FL 33161 -6628 Contractor(s) Phone Cell Phone A&P AIR CONDITIONING CORP 305 - 556 -7849 Valuation: Total Sq Feet: $ 28,900.00 0 Tons: Additional Info: A/C INSTALLATION Classification: Commercial Approved: In Review Comments: Date Denied: Scanning: 11 Date Approved: : In Review Type of Work: MECHANICAL Fees Due CCF CCF DBPR Fee DBPR Fee DCA Fee DCA Fee Education Surcharge Education Surcharge Permit Fee Permit Fee Scanning Fee Scanning Fee Technology Fee Technology Fee Total: Amount $0.00 $17.40 $15.17 $0.00 $0.00 $15.18 $0.00 $5.80 $0.00 $887.00 $0.00 $33.00 $0.00 $23.20 $976.75 Pay Date Pay Type Invoice # MC -4-11 -40611 04/11/2011 Credit Card 05/11/2011 Credit Card Amt Paid Amt Due $ 50.00 $ 926.75 $ 926.75 $ 0.00 Available Inspections: Inspection Type: Final In consideration of the issuance to me of this permit, I agree to perform the work covered hereunder in compliance with all ordinances and regulations pertaining thereto and in strict conformity with the plans, drawings, statements or specifications submitted to the proper authorities of Miami Shores Village. In accepting this permit I assume responsibility for all work done by either myself, my agent, servants, or employes. I understand that separate permits are required for ELECTRICAL PLUMBING, MECHANICAL WINDOWS, DOORS, ROOFING and SWIMMING POOL work. OWNERS AFFIDAVIT: I certify that all the foregoing information is accurate and that all work will be done in compliance with all applicable laws regulating construction and zoning. Futhermore, I authorize the above -named contractor to do the work stated. Authorized Signature: Owner / Applicant / Contractor / Agent Building Department Copy May 11,2011 Date May 11, 2011 1 Barry University Residence 2 Corridors Location Building owner Program user Company Comments By Dataset name Calculation time TRACE® 700 version Location Latitude Longitude Time Zone Elevation Barometric pressure Air density Air specific heat Density- specific heat product Latent heat factor Enthalpy factor 140 NW 115 St Miami Shores Barry University Cesar Herren PE 11:56 AM on 04/03/2011 6.2.6.5 Miami, Florida 25.0 deg 80.0 deg 5 7 29.9 0.0760 0.2444 1.1151 4,908.6 4.5619 ft in. Hg lb/cu ft Btu /Ib• °F Btu /h•cfm• °F Btu•min /h•cu ft Ib- min /hr•cu ft Summer design dry bulb 91 °F Summer design wet bulb 78 °F Winter design dry bulb 47 °F Summer clearness number 0.95 Winter clearness number 0.95 Summer ground reflectance 0.20 Winter ground reflectance 0.20 Carbon Dioxide Level 400 ppm Design simulation period January - December Cooling Toad methodology TETD -TA1 Heating load methodology UATD 's►►►►►IN0000I as • •• • ■ M•o.• 6 ••• - 3• •• • • • as •114, • Y ,7 � , • ••• IN .C' •• •• r•►�►► ® ►e • • • • • • • • • • •• •• • • '.1" 3 • • • • TRACEmo omprehen.WO building analysis soflwam from Iran. System Checksums AC -1 Computer Room Unit COOLING COIL PEAK Peaked at Time: Mo /Hr: 8 / 15 Outside Air: OADB/WB /HR: 91 / 78 / 125 Space Sens. + Lat. Btu /h Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass /Door Cond Wail Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total =_> Internal Loads Lights People Misc Sub Total =_> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov /Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> CLG SPACE PEAK Mo /Hr: Sum of OADB: Peaks Plenum Net Percent Space Percent Sens. + Lat Total Of Total Sensible Of Total Btu /h Btu /h ( %) Btu /h ( %) 0 0 0 0 0 0 0 0 O 0 0 0 O 0 0 0 0 0 0 0 O 0 0 0 962 962 1,004 O 0 0 O 0 0 0 3,879 3,879 1 1,137 4,841 0 4,841 2 2,141 1 5,324 1,331 6,655 31 5,324 43 O 0 0 0 0 0 4,437 0 4,437 21 4,437 36 9,761 1,331 11,092 51 9,761 78 575 -575 0 0 575 5 O 0 5,819 27 0 0 O 0 0 0 0 0 0 0 0 0 0 0 -202 -202 -1 0 0 0 0 0 O 0 0 0 0 O 0 0 15,177 554 21,550 100.00 ' 12,477 100.00 HEATING COIL PEAK Mo /Hr: Heating Design OADB: 47 Space Peak CoII Peak Percent Space Sens Tot Sens Of Total Btu /h Btu /h ( %) Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Adj Air Trans Heat Ov /Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Total Capacity ton MBh Main Clg 1.8 21.6 Aux Clg 0.0 0.0 Opt Vent 0.0 0.0 Total 1.8 21.6 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB /HR MBh cfm °F °F gr /Ib 14.8 543 78.8 66.1 75.7 0.0 0 0.0 0.0 0.0 0.0 0 0.0 Leave DB/WB/HR °F °F gr /Ib 54.4 53.1 58.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name Barry Corridors.trc O 0 0.00 0 0 0.00 O 0 0.00 0 0 0.00 O 0 0.00 0 0 0.00 -1,499 -1,499 11.88 0 0 0.00 0 0 0 -1,667 -1,667 13.21 -3,166 -3,166 25.09 0 0 0 0 0 0 0 0 -3,166 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 -2,501 19.82 0 0 0 0.00 0 0.00 0 0.00 0 0.00 -6,951 55.09 0 0.00 0 0.00 - 12,618 100.00 AREAS Gross Total Glass ft2 ( %) Floor 1,625 Part 168 Int Door 0 ExFIr 0 Roof 0 0 0 Wall 0 0 0 Ext Door 0 0 0 TEMPERATURES Cooling SADB 54.4 Ra Plenum 76.1 Return •••745-1 Ret/OA • 78.8 C I4t hD •••t.0 FA 131d1'D • • too FPI F,ieb •••• 0.0 • Heating 75.2 70.0 70.0 65.9 •b.0.:• 0.0• • •0••• •••••• AIRMANS •••• DU•M se: terminal Sec Fat, Nom Vent AWIJYant Intl! MlnStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups s • • • G▪ �ooling Hea isrg • "��43 "5'4'3' •• '543 ••564:' • 543 548 • • • 0 •••p•• • 98 • 98 • • • 98 VIA': •65 65 • 543 543 608 608 163 163 O 0 O 0 O 0 O 0 ENGINEERING CKS % OA cfm /ft2 cfm /ton ft2 /ton Btu /hr•ft2 No. People Cooling 18.0 0.33 302.16 904.89 13.26 0 Heating 18.0 0.33 -7.77 HEATING COIL SELECTION CapacityCoil Airflow Ent MBh cfm °F Main Htg -12.6 ux Htg 0.0 Preheat 0.0 Reheat -12.5 Humidif 0.0 Opt Vent 0.0 Total -12.6 Lvg °F 543 54.4 75.2 0 0.0 0.0 O 0.0 0.0 543 54.4 75.0 0 0.0 0.0 o 0.0 0.0 RACE® 700 v6.2.6.5 calculated at 11:56 AM on 04/03/2011 Alternative - 1 System Checksums Report Page 1 of 4 System Checksums AC -2 Computer Room Unit COOLING COIL PEAK Peaked at Time: Mo /Hr: Outside Air: OADB/WB /HR: Space Sens. + Lat. Btu /h Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass /Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total =_> Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov /Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Plenum Sens. + Lat Btu /h 8/15 91/78/125 Net Percent Total Of Total Btu /h ( %) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 962 962 0 0 0 0 0 4,536 4,536 1 5,497 0 5,497 2 6,225 1,556 7,782 0 0 0 3,891 0 3,891 10,116 1,556 11,672 718 -718 0 0 0 6,803 0 0 0 0 -253 -253 0 0 0 0 0 0 0 0 16,332 585 23,721 33 0 16 49 0 29 0 0 0 -1 0 0 0 0 0 100.00 CLG SPACE PEAK Mo /Hr: Sum of OADB: Peaks Space Sensible Btu /h Percent Of Total ( %) 0 0 0 0 0 0 1,004 0 0 1,330 1 2,334 1 6,225 4 0 3,891 3 10,116 7 718 0 0 0 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Adj Air Trans Heat Ov /Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat DIff. Additional Reheat HEATING COIL PEAK Mo/Hr: Heating Design OADB: 47 Space Peak Space Sens Btu /h 0 0 0 0 0 0 -1,499 0 0 -1,949 -3,448 Underflr Sup Ht Pkup Supply Air Leakage 13,168 100.00 ' Grand Total =_> Total Capacity ton MBh Main CIg 2.0 23.7 Aux CIg 0.0 0.0 Opt Vent 0.0 0.0 Total 2.0 23.7 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DBIWB/HR MBh cfm °F °F gr/lb Leave DB/WB /HR °F °F gr /Ib 15.8 554 79.2 66.5 77.2 53.7 52.5 57.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name. Barry Corridors.trc 0 0 0 0 0 0 Coil Peak Percent Tot Sens Of Total Btu /h ( %) 0 0.00 0 0.00 O 0.00 0 0.00 O 0.00 O 0.00 -1,499 11.08 O 0.00 0 0 -1,949 14.41 -3,448 25.49 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 -2,924 21.61 0 0 0 0 0 0.00 0 0.00 0 0.00 O 0.00 -7,155 52.89 -3,448 0 0.00 0 0.00 - 13,527 100.00 AREAS Gross Total Glass Floor 1,900 Part 168 Int Door 0 ExFIr 0 Roof 0 Wall 0 Ext Door 0 ft2 ( %) O 0 O 0 O 0 TEMPERATURES Cooling Heating 53.7 75.6 76.2 70.0 76.2 70.0 • '? 9.E 65.3 •••0.0 •0.9••• •.Q41 0.0• • SADB Ra Plenum Return Ret/OA I1 MrrTp n�IdT • •••••• AIRFL•OWS •••• tbbting I'hRmftfal Maisu ea Spec ran: Nom Vont may VeDt Infil MinStop /Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups ••••654 • • • 654 • 554 • • 0 •••••1'14 • 114 • • J6 ' 554 630 190 0 0 0 0 -• • • • He5t1i3i • • •66A• • 664•• 559 • •••Q.• • • 114 ••144•• • 76 • 554 630 190 0 0 0 0 ENGINEERING CKS % OA cfm /ft2 cfm /ton ft2 /ton Btu /heft' No. People Cooling 20.6 0.29 280.32 961.19 12.48 0 Heating 20.6 0.29 -7.12 HEATING COIL SELECTION CapacityCoil Airflow Ent MBh cfm °F Main Htg ux Htg Preheat Reheat Humidif Opt Vent Total -13.5 0.0 0.0 -13.2 0.0 0.0 -13.5 Lvg °F 554 53.7 75.6 0 0.0 0.0 0 554 0 0 0.0 53.7 0.0 0.0 00 75.0 0.0 0.0 'RACE® 700 v6.2.6.5 calculated at 11:56 AM on 04/03/2011 Alternative - 1 System Checksums Report Page 2 of 4 System Checksums AC -3 Computer Room Unit COOLING COIL PEAK Peaked at Time: Mo /Hr: 8 / 15 CLG SPACE PEAK Mo /Hr: Sum of HEATING COIL PEAK Mo/Hr: Heating Design TEMPERATURES Cooling Heating Outside Air: OADB/WB /HR: 91 / 78 / 125 OADB: Peaks OADB: 47 SADB 53.7 75.6 Ra Plenum 76.2 70.0 Space Plenum Net Percent Space Percent Space Peak Coil Peak Percent Return 76.2 70.0 Sens. + Lat. Sens. + Lat Total Of Total Sensible Of Total Space Sens Tot Sens Of Total Ret/OA • • • f9.i 65.3 Btu /h Btu/ Btu/ ( %) Btu/h ( %) Btu /h Btu/ ( %) Pn MtrrD • • 01.0 •0.9 • Envelope Loads Envelope Loads ?rbOldTb • •Q.9 0.0 •' Skylite Solar 0 0 Skylite Solar 0 0.00 F„n;rjgt• ••:•°.° •Q Q• Skylite Cond 0 0 Skylite Cond 0 0.00 • Roof Cond 0 Glass Solar 0 0 0 Roof Cond 0 Glass Solar 0 0.00 0.00 • • • • • • • AIRFIaOWS • • • • Glass/Door Cond 0 0 Glass/Door Cond 0 0.00 • •. • CbUfing Heting' Wall Cond 0 Partition/Door 962 Floor 0 96 0 1,004 0 Wall Cond 0 Partition/Door -1,499 Floor 0 -1,49 0.00 11.08 0.00 Qi gar' • 1�Tmfrtal • • 654 •664 •••1654 •664 Adjacent Floor 0 0 0 Adjacent Floor 0 0 Naiofas • 554 55g' Infiltration 4,536 4,53 1 1,330 1 Infiltration -1,949 -1,94 14.41 deorar • • 0 •••Q; Sub Total = => 5,497 0 5,49 2 2,334 1 Sub Total = => -3,448 -3,44 25.49 Nom Vent l'• • •'14 4 • 114 Mil feAt 114 •A44� Internal Loads Internal Loads 101 • • • J6 • 76 Lights 6,225 1,556 7,782 33 6,225 47 Lights 0 0 0.00 MinStop /Rh • 554 554 People 0 0 0 0 0 0 People 0 0 0.00 Return 630 630 Misc 3,891 0 3,891 16 3,891 30 Misc 0 0 0.00 Exhaust 190 190 Sub Total = => 10,116 1,556 11,672 49 10,116 77 Sub Total =_> 0 0 0.00 Rm Exh Auxiliary 0 0 0 0 Ceiling Load 718 -718 0 0 718 5 Ceiling Load 0 0 0.00 Leakage Dwn 0 0 Ventilation Load 0 0 6,803 29 0 0 Ventilation Load 0 -2,924 21.61 Leakage Ups 0 0 Adj Air Trans Heat 0 0 0 0 0 Adj Air Trans Heat 0 0 0 Dehumid. Ov Sizing 0 0 Ov /Undr Sizing 0 0 0.00 Ov /Undr Sizing 0 0 0 0 0 Exhaust Heat 0 0.00 ENGINEERING CKS Exhaust Heat Sup. Fan Heat -253 -253 -1 0 0 OA Preheat Diff. RA Preheat Diff. 0 0.00 0 0.00 Cooling Heating Ret. Fan Heat 0 0 0 Additional Reheat -7,155 52.89 % OA 20.6 20.6 Duct Heat Pkup 0 0 0 cfm /ft2 0.29 0 29 Underflr Sup Ht Pkup 0 0 Underflr Sup Ht Pkup 0 0.00 cfm /ton 280.32 Supply Air Leakage 0 0 0 Supply Air Leakage 0 0.00 ft2 /ton 961.19 Btu /hr•ft2 12.48 -7.12 Grand Total = => 16,332 585 23,721 100.00' 13,168 100.00 ' Grand Total =_> -3,448 - 13,527 100.00 No. People 0 COOLING COIL SELECTION AREAS HEATING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DBIWB/HR Leave DB/WB/HR Gross Total Glass CapacityCoil Airflow Ent Lvg ton MBh MBh cfm °F °F gr /Ib °F °F gr /Ib ft2 ( %) MBh cfm °F °F Main Clg 2.0 23.7 15.8 554 79.2 66.5 77.2 53.7 52.5 57.0 Floor 1,900 Main Htg -13.5 554 53.7 75.6 Aux Clg 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Part 168 . ux Htg 0.0 0 0.0 0 0 Opt Vent 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Int Door 0 Preheat 0.0 0 0.0 0 0 ExFIr 0 Reheat -13.2 554 53.7 75.0 Total 2.0 23.7 Roof 0 0 0 Humidif 0.0 0 0.0 0 0 Wall 0 0 0 Opt Vent 0.0 0 0.0 0.0 Ext Door 0 0 0 Total -13.5 Project Name: Dataset Name' Barry Corridors.trc RACE® 700 v6.2.6.5 calculated at 11:56 AM on 04/03/2011 Alternative - 1 System Checksums Report Page 3 of 4 System Checksums AC-4 Computer Room Unit COOLING COIL PEAK CLG SPACE PEAK HEATING COIL PEAK TEMPERATURES Peaked at Time: Mo /Hr: 8 / 16 Mo /Hr: Sum of Mo /Hr: Heating Design Cooling Heatinc Outside Air: OADB/W1311-1R: 91 / 78 / 122 OADB: Peaks OADB: 47 SADB 55.7 77.( Ra Plenum 80.5 68.1 Space Plenum Net Percent Space Percent Space Peak Coil Peak Percent Return 80.5 68.; Sens. + Lat. Sens. + Lat Total Of Total Sensible Of Total Space Sens Tot Sens Of Total Ret/OA •••13119, 65.f Btu/ Btu /h Btu /h ( %) Btu/ ( %) Btu/ Btu /h ( %) • • • a0 00 Envelope Loads Envelope Loads Fn �T13 DA 0 ( Skylite Solar 0 0 0 Skylite Solar 0 0.00 Fp j; tigf; • ••:4" Q. Skylite Cond 0 0 0 Skylite Cond 0 0.00 • •' �''- ' • • • Roof Cond 2,884 2,884 23 Roof Cond -793 10.22 Glass Solar 0 0 0 Glass Solar 0 0.00 • • • • • AIRFLOW6 Glass/Door Cond 0 0 0 Glass/Door Cond 0 0.00 •••• Cddifhg Heatit Wall Cond 0 0 0 Wall Cond 0 0.00 Dftl�r4 %r: • Partition/Door 98 988 8 1,00 1 Partition/Door -1,49 -1,499 19.30 •••:2: 327 Floor 0 0 Floor 0 0.00 Tarfniftal • • •3i 3; Adjacent Floor 0 0 0 Adjacent Floor 0 0 Me kl •327 0 Infiltration 1,67 1,676 13 48 Infiltration -74 -749 9.64 ac Fan • • • • • Sub Total = => 2,66 2,884 5,548 44 1,491 21 Sub Total =_> -2,24 -3,041 39.16 Npm VAnt • ANi1 Ver1t 44 • ■ 44 • • Internal Loads Internal Loads Infii • • • • • • • •:29 • • Lights 2,392 598 2,990 24 2,392 34 Lights 0 0 0.00 MinStop /Rh 327 3: People 0 0 0 0 0 0 People 0 0 0.00 Return 356 3: Misc 1,869 0 1,869 15 1,869 27 Misc 0 0 0.00 Exhaust 73 Sub Total = => 4,260 598 4,858 39 4,260 60 Sub Total = => 0 0 0.00 Rm Exh Auxiliary 0 0 Ceiling Load 1,282 -1,282 0 0 1,298 18 Ceiling Load -292 0 0.00 Leakage Dwn 0 Ventilation Load 0 0 2,514 20 0 0 Ventilation Load 0 -1,123 14.46 Leakage Ups 0 Adj Air Trans Heat 0 0 0 0 0 Adj Air Trans Heat 0 0 0 Dehumid. Ov Sizing 0 0 Ov/Undr Sizing 0 0 0.00 Ov/Undr Sizing 0 0 0 0 0 Exhaust Heat 103 -1.32 ENGINEERING CKS Exhaust Heat -451 Sup. Fan Heat Ret. Fan Heat 0 Duct Heat Pkup 0 -451 0 0 0 -4 0 0 0 OA Preheat Diff. RA Preheat Diff. Additional Reheat 0 0.00 0 0.00 -3,705 47.70 Cooling % OA cfm /ft2 Heatini 13.4 13, 0.45 0 4 Underflr Sup Ht Pkup 0 0 Underflr Sup Ht Pkup 0 0.00 cfm /ton 314.56 Supply Air Leakage 0 0 0 Supply Air Leakage 0 0.00 ft2 /ton Btu /hr•ft2 702.55 17.08 -10.6 Grand Total = => 8,206 1,749 12,469 100.00 7,049 100.00 Grand Total =_> -2,540 -7,767 100.00 No. People 0 COOLING COIL SELECTION AREAS HEATING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB /HR Leave DB/WB /HR Gross Total Glass CapacityCoil Airflow Ent I °F ton MBh MBh cfm °F °F gr/lb °F °F gr /Ib 52 ( %) MBh cfm Main Clg 1.0 12.5 9.6 327 81.9 66.4 72.5 55.7 54.1 60.0 Floor 730 Main Htg -7.8 327 55.7 7 Aux Clg 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Part 168 • ux Htg 0.0 0 0.0 Opt Vent 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Int Door 0 ExFir 0 Preheat 0.0 Reheat -7.1 0 0.0 327 55 7 7 Total 1.0 12.5 Roof 730 0 Wall 0 0 0 0 Humidif 0.0 Opt Vent 0.0 0 0.0 0 0 0 Ext Door 0 0 0 Total -7.8 Project Name: Dataset Name: Barry Corridors.trc •• y'• 7• 111• g 7 6 3 0 0 0 0 5 vg "F 7.0 0.0 •• • • •• • •• • • • • •• • •• • •. 0.0 5.0 00 o.o RACE® 700 v6.2.6.5 calculated at 11:56 AM on 04/03/2011 Alternative - 1 System Checksums Report Page 4 of 4 F da Energy Efficie y Code For Building C` n Florida Depa Department Community E� auge :Su l t® FIa/C -2008, Eif olrnan or c.:aamt>rercl Short Desc: Corridors Owner: Barry University Addressl: 140 NW 115 St Address2: Type: School/University Jurisdiction: MIAMI SHORES VILLAGE, MIAMI -DADE COUNTY, FL (232600) Conditioned Area: 6115 SF Conditioned & UnConditioned Area: 6115 SF No of Stories: 4 Area entered from Plans 240 SF Permit No: 0 Max Tonnage 1.9 If different, write in: PROJECT SUMMARY Description: Residence 2 City: MIAMI SHORES State: Florida Zip: 0 Class: Renovation to existing buildi 4/3/2011 •. •.• • • • • • •. • os • • • • • • •• .•• .• • • • •• ••• •. • • • • • • • • • • • • • • • • • ••• • • • • • • •• •• • . • • • • • • • • • • EnergyGauge Summit® Fla/Com -2008. Effective: March 1, ... . . . . ... . 2009 • • • • • • • • • • • • ••• • • • • • • • • • • • • • • •• • •• • • • •• • •• .•• • • • ••• • • Page 1 of 9 Compliance Summary Component Design Criteria Result Gross Energy Cost (in $) 1,161.0 1,208.0 PASSED LIGHTING CONTROLS PASSES EXTERNAL LIGHTING None Entered HVAC SYSTEM PASSES PLANT None Entered WATER HEATING SYSTEMS None Entered PIPING SYSTEMS None Entered Met all required compliance from Check List? Yes/No/NA IMPORTANT MESSAGE Info 5009 -- -- -- An input report of this design building must be submitted along with this Compliance Report 4/3/2011 •• ••• • • • • • •• • • • • • • • • •• ••• •• • • • •• ••• ••• • • • • • • • • • • • • • • • • • • • ••• • • • • • • •• •• • • • • • • • • • • • • • EnergyGauge Summit® Fla/Com -2008. Effective: March 1, 2009 ••• • • • • • • ••• • • • • • • • • • • • • • • ••• • • • • • • • • • • • • • • • • • • •• • • • • • •• ••• • • • ••• • • Page 2 of 9 CERTIFICATIONS • • . • • • I hereby certify that the plans and specifications covered by this calculation are inQppliance wi* 1524 the . • • ...**1 Florida Energy Code .p STATE OF ;1 , :�Q• • �' Prepared By: CESAR PE Building Hcial: ® Q' • Date: ���ees�o�i�� -� ®`� t®®oa• Date: I certify that this building is in compliance with the FLorida Energy Efficiency Code Owner Agent: Date: If Required by Florida law, I hereby certify ( *) that the system design is in compliance with the FLorida Energy Efficiency Code Architect: Reg No: Electrical Designer: ZOILA MORALES, PE Reg No: 64981 Lighting Designer: Reg No: Mechanical Designer: CESAR HERRAN, PE Reg No: 71524 Plumbing Designer: Reg No: ( *) Signature is required where Florida Law requires design to be performed by registered design professionals. 4/3/2011 • •• ••• • • • • • •• • • • • • • • •• ••• •• • • • •• •• • • • • • • • • • • • • • • •• • • • • • • ••• • • • • • • •• •• • • • • • • • • • • • • • EnergyGauge Summit® Fla/Com -2008. Effective: March 1, 2009 ••• • • • • ••• • • • • • • • • • • • • • • • ••• • • • • • • • • • • • • • • •• •• • • • •• ••• ••• • • • ••• • • Page 3 of 9 Project: Corridors Title: Residence 2 Type: School/University (WEA File: FL_MIAMI_OPA_LOCKA.tm3) Building End Uses 1) Proposed 2) Baseline Total 74.80 91.20 $1,161 $1,422 ELECTRICITY(MBtulkWhl$) 74.80 91.20 21914 26723 $1,161 $1,422 AREA LIGHTS 28.10 32.00 8232 9363 $436 $498 MISC EQUIPMT 12.20 12.20 3584 3584 $190 $191 SPACE COOL 30.40 32.80 8900 9607 $472 $511 VENT FANS 4.10 14.20 1198 4169 $63 $222 Passing requires Proposed Building cost to be at most 85% of Baseline cost. This Proposed Building is at 81.7% PASSES External Lighting Compliance Description Category Tradable? Allowance Area or Length ELPA (W/Unit) or No. of Units (W) (Sqft or ft) CLP (W) •• ••• • • • • • .• • • • • •• . - - •• ••• •• • • • ••( None I 4/3/2011 ••• ••• • • • • •••• • • • • •••• • • • • • •• •• • • • • • • • • • • • • ••. • • ••• EnergyGauge Summit® Fla/Com -2008. Effective: March 1, 2009 •.• • • • • ••• • • • • • • • • • • • • • ••. • • • • • • • • • • • • • • •• •• • • • •• •• ••• • • • ••• • • Page 4 of 9 Project: Corridors Title: Residence 2 Type: School University (WEA File: FL MIAMI OPA LOCKA.tm3) Lighting Controls Compliance Acronym Ashrae Description ID Area (sq.ft) Design CP Min Compli- CP ance 1ST FL 2ND FL 3RD FL 4TH FL 5 Corridor 5 Corridor 5 Corridor 5 Corridor 1,625 1,900 1,860 730 2 2 2 2 1 PASSES 1 PASSES 1 PASSES 1 PASSES PASSES 4/3/2011 •. ••• • • • • • •• • • • • • • • • • •• ••• •• • • • •• ••• ••• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •• •• •••• ••• • • • • EnergyGauge Summit® EIaialm- 2008.•Eifer#iY�: March j, 2009 • • • • • • • • • • • ••• • • • • • • • • • • • • • • • •• •• • • • •• •• ••• • • • ••• • • Page 5 of 9 Project: Corridors Title: Residence 2 Type: School/University (WEA File: FL_MIAMLOPA_LOCKA.tm3) System Report Compliance AC -1 1ST FL Constant Volume Packaged No. of Units System -902 1 Component Category Capacity Design Eff Design IPLV Comp - Eff Criteria IPLV Criteria liance Cooling System Air Conditioners Air Cooled < 65000 Btu/h Cooling Capacity Heating System Electric Furnace Air Handling Air Handler (Supply) - System - Supply Constant Volume Air Distribution ADS System System 12.50 12.23 12.50 PASSES 1.00 1.00 PASSES 0.25 0.90 PASSES 4.20 PASSES AC -2 2ND FL Constant Volume Packaged No. of Units System -902 1 Component Category Capacity Design Eff Design IPLV Comp - Eff Criteria IPLV Criteria liance Cooling System Air Conditioners Air Cooled < 65000 Btu/h Cooling Capacity Heating System Electric Furnace Air Handling Air Handler (Supply) - System - Supply Constant Volume Air Distribution ADS System System 12.50 12.23 12.50 PASSES 1.00 1.00 PASSES 0.25 0.90 PASSES 4.20 PASSES AC -3 3RD FL Constant Volume Packaged No. of Units System -902 1 Component Category Capacity Design Eff Design IPLV Comp - Eff Criteria IPLV Criteria liance Cooling System Air Conditioners Air Cooled < 65000 Btu/h Cooling Capacity Heating System Electric Furnace Air Handling Air Handler (Supply) - System -Supply ADS Constant AirtD System System 12.50 12.23 12.50 PASSES • • °°: : t.00• • : :.00 • PASSES • • •: • •Q.2; : :. b.9Q PASSES • • • • • • • •• 4.20 • • • • PASSES ••. ... • • • . • • • • • • ••• • • • • • . •. .. • • • • • • . • 4/3/2011 EnergyGauge Summit® Ela/Com- 20Q8..Eftecti March • • • • • • • • • • ••• • • • • • • • • • •• •• • • • •• • ••• • • • • • ••• • , 2009 Page 6 of 9 AC -4 4TH FL Constant Volume Packaged No. of Units System - -902 1 Component Category Capacity Design Eff Design IPLV Comp - Eff Criteria IPLV Criteria liance Cooling System Air Conditioners Air Cooled 12.30 12.23 9.50 PASSES < 65000 Btu/h Cooling Capacity Heating System Electric Furnace 1.00 1.00 PASSES Air Handling Air Handler (Supply) - 0.40 0.90 PASSES System - Supply Constant Volume Air Distribution ADS System 4.20 PASSES System PASSES Plant Compliance Description Installed Size Design Min Design Min Category Comp No Eff Eff IPLV IPLV liance None Water Heater Compliance Description Type Category Design Min Design Max Comp Eff Eff Loss Loss liance None 4/3/2011 ....... • .. .. • • • • • • .. ... .. • .... .. • • • • • • • • • .... • • • .... • • • • • • • • • ... • • • • • • • • EnergyGauge SummitC1Fla/Cpm -2Q08. Fffe; e: jvlarcfl1, 2009 • • • • • • • • • • • • • • • • • • • • • • • • • • • • ... • • • ... • • Page 7 of 9 4/3/2011 .. ... • • • • • .. • . . . . • • • .. ... .. • • • .. . . . ... • • • • • • • • • • .. • • • • • • ... • • • • • • • .. .. • • • • • • • • • • EnergyGauge Summit®ilahCom- 2008..Effec�ius: March , 2009 • • • • • • • • • • . . • • • . • . . • • • • • • .• • .. • • . .. .. ... • • • ... • • Page 8 of 9 Piping System Compliance Category Pipe Dia [inches] Is Operating Ins Cond Ins Req Ins Compliance Runout? Temp [Btu -in/hr Thick [in] Thick [in] [F] .SF.F1 None 4/3/2011 .. ... • • • • • .. • . . . . • • • .. ... .. • • • .. . . . ... • • • • • • • • • • .. • • • • • • ... • • • • • • • .. .. • • • • • • • • • • EnergyGauge Summit®ilahCom- 2008..Effec�ius: March , 2009 • • • • • • • • • • . . • • • . • . . • • • • • • .• • .. • • . .. .. ... • • • ... • • Page 8 of 9 Project: Corridors Title: Residence 2 Type: School/University (WEA File: FL MIAMI OPA LOCKA.tm3) Other Required Compliance Category Section Requirement (write N/A in box if not applicable) Check Report Operations Manual Windows & Doors Joints /Cracks Dropped Ceiling Cavity System Reheat HVAC Efficiency HVAC Controls Ventilation Controls ADS HVAC Ducts Balancing Piping Insulation Water Heaters Swimming Pools Hot Water Pipe Insulation Water Fixtures Motors Lighting Controls 13 -101 13- 102.1, 13 -410, 13-413 13- 406.AB.1.1 13- 406.AB.1.2 13- 406.AB.3 13-407 13 -407.B 13- 407,13 -408 13- 407.AB.2 13- 409.AB.3 13-410 13- 410.AB 13- 410.AB.4 13- 411.AB 13- 412.AB 13- 412.AB.2.6 13- 411.AB.3 13- 412.AB.2.5 13-414 13- 415.AB Input Report Print -Out from EnergyGauge FlaCom attached Operations manual provided to owner Glazed swinging entrance & revolving doors: max. 1.0 cfin/ft2; all other products: 0.4 cfrn/ft2 To be caulked, gasketed, weather - stripped or otherwise sealed Vented: seal & insulated ceiling. Unvented seal & insulate roof & side walls HVAC Load sizing has been performed Electric resistance reheat prohibited Minimum efficiences: Cooling Tables 13- 407.AB.3.2.1A -D; Heating Tables 13- 407.AB.3.2.1B, 13- 407.AB.3.2.1D, 13- 408.AB.3.2.1E, 13- 408.AB.3.2F Zone controls prevent reheat (exceptions); simultaneous heating and cooling in each zone; combined HAC deadband of at least 5 °F (exceptions) Motorized dampers reqd, except gravity dampers OK in: 1) exhaust systems and 2) systems with design outside air intake or exhaust capacity 5300 cfm Duct sizing and Design have been performed Air ducts, fittings, mechanical equipment & plenum chambers shall be mechanically attached, sealed, insulated & installed per Sec. 13-410 Air Distribution Systems HVAC distribution system(s) tested & balanced. Report in construction documents In accordance with Table 13- 411.AB.2 Performance requirements in accordance with Table 13- 412.AB.3. Heat trap required Cover on heated swimming pools: Time switch (exceptions); Readily accessible on/off switch Table 13- 411.AB.2 for circulating systems, first 8 feet of outlet pipe from storage tank and between inlet pipe and heat trap Shower hot water flow restricted to 2.5 gpm at 80 psi. Public lavatory fixture how water flow 0.5 gpm max; if self - closing valve 0.25 gallon recirculating, 0.5 gallon non recirculating Motor efficiency criteria have been met •• ••• • • • • • •• Automatic control reeNgectf r itterict lighting in buildings >5,000 s.f.; Space c' ontro1:Ette=`ior pio=d $enst %; Tandom wiring with 1 or 3 linear fluu•rescent l•nips>30W • " 4/3/2011 ... • • • .. • .. • • • • • • • • • • • • • • • • .. • • • • • • •.. • • • • • • • EnergyGauge Summit® it om- 2008..Egec�iy8: I4arch j, 2009 • • • • • • • • • • • •.• • • • • • • • • • • • • • • • • •• •• • • • •• •• ••• • • • ••• • • Page 9 of 9 EnergyGauge Summit® v3.22 INPUT DATA REPORT • •••• •- •• • • •• • . • Zones 119. ..ttronym Description Type Area Multiplier Total Area [sfl [st] 1 1ST FL 1ST FL CORRIDOR CONDITIONED 2 2ND FL 2ND FL CORRIDOR CONDITIONED 3 3RD FL 1ST FL CORRIDOR CONDITIONED 4 4TH FL 4TH FL CORRIDOR CONDITIONED 1625.0 1 1625.0 ❑ 1900.0 1 1900.0 ❑ 1860.0 1 1860.0 ❑ 730.0 1 730.0 ❑ 4/3/2011 EnergyGauge Summit v3.22 1 • • • • . • • • .• • • • •••• Project Name: Corridors Project Title: Residence 2 Address: 140 NW 115 St . • • • • . •.• State: Florida hip: 0 .• •• • • • • • Miler: Barry University •.•• • • • Proi ect Information North School/University Renovation to existing building 4 6115 SF Orientation: Building Type: Building Classification: No.of Stories: GrossArea: • •••• •- •• • • •• • . • Zones 119. ..ttronym Description Type Area Multiplier Total Area [sfl [st] 1 1ST FL 1ST FL CORRIDOR CONDITIONED 2 2ND FL 2ND FL CORRIDOR CONDITIONED 3 3RD FL 1ST FL CORRIDOR CONDITIONED 4 4TH FL 4TH FL CORRIDOR CONDITIONED 1625.0 1 1625.0 ❑ 1900.0 1 1900.0 ❑ 1860.0 1 1860.0 ❑ 730.0 1 730.0 ❑ 4/3/2011 EnergyGauge Summit v3.22 1 4/3/2011 EnergyGauge Summit® v3.22 2 Spaces No Acronym Description Type Depth [ft] Width [ft] Height [ft] Multi Total Area plier [sf] Total Volume [cf] In Zone: 1ST FL 1 1ST FL CORRIDOR Corridor 1.00 1625.00 9.00 1 1625.0 14625.0 fl In Zone: 2ND FL 1 2ND FL CORRIDOR Corridor 1.00 1900.00 9.00 1 1900.0 17100.0 0 In Zone: 3RD FL 1 3RD FL CORRIDOR Corridor 1.00 1860.00 9.00 1 1860.0 16740.0 ❑ In Zone: 4TH FL 1 4TH FL CORRIDOR Corridor 1.00 730.00 9.00 1 730.0 6570.0 Lighting • • • • ' No ' Type Category • No. of Watts per Power Control Type No.of • • • • Luminaires Luminaire [W] Ctrl pts . .. •• •• In genes' 1StFd•'•• •11R'6pace: 4ST'.FL •••• ' .1••• ' Recessed Fluorescent - General Lighting 12 64 768 Manual On/Off 2 ❑ • No vent • In Zoti!' 2NT7I"L "114. Space: : 2 13 f L • " ". '1 ' Recessed Fluorescent - General Lighting •••• No vent 12 64 768 Manual On/Off 2 0 In Zone: 3RD FL In Space: 3RD FL 1 Recessed Fluorescent - General Lighting 12 64 768 Manual On/Off 2 0 No vent In Zone: 4TH FL In Space: 4TH FL 1 Recessed Fluorescent - General Lighting 6 64 384 Manual On/Off 2 ❑ No vent 4/3/2011 EnergyGauge Summit® v3.22 2 4/3/2011 EnergyGauge Summit® v3.22 3 Walls No Description Type Width H (Effec) Multi Area DirectionConductance Heat Dens. R -Value [ft] [ft] plier [sf] [ Btu/hr. sf. F] Capacity [Ib /cf] Ih.sf.F /Btu] [Btu/sf.F] In Zone: Windows No Description Type Shaded U SHGC Vis.Tra [ Btu/hr sf F] W H (Effec) Multi Total Area [ft] [ft] plier [sf] In Zone: In Wall: • • • • • • . • • • Doors • N ''®t;cription • •• • •• •• • • Type Shaded? Width H (Effec) Multi [ft] [ft] plier Area Cond. Dens. Heat Cap. R -Value Isfl [ Btu/hr. sf. FI Ilb /cf] [Btu /sf. F] Ih.sf.F /Btu] •••• •••• In*• •• '•••• • • In Wall: • ❑ : . . • • •••• • • • •••• Roofs No Description Type Multi Area Width H ( Effec) Mu t [ft] [ft] plier Isfl Tilt Cond. Heat Cap Dens. R -Value p [deg] [Btu/hr. Sf. F] [Btu/sf. F] [lb /cfl [h.sf.F /Btu] In Zone: 4TH FL 1 PrOZo5Rfl Blt -up roof -R -30 insul. -7 "conc. -acc tl/drywall 73.00 10.00 1 730.0 0.00 0.0291 17.47 63.33 34.4 ❑ 4/3/2011 EnergyGauge Summit® v3.22 3 • • • • ' • • • • • Systems Skylights No Description Type U SHGC Vis.Trans W H (Effec) Multiplier [Btu/hr sf F] [ft] [ft] Area Total Area [Sf] [Sf] In Zone: In Roof: ._ CMonent • • •Category Capacity Efficiency IPLV • • • • 1 • • tooling System • •••• 2 Heating System 3 Air Handling System - Supply 4 Air Distribution System 22700.00 12.50 17050.00 1.00 700.00 0.25 4.20 12.50 Floors No Description Type Width H (Effec) Multi Area Cond. Heat Cap. Dens. [ft] [ft] plier [sf] [Btu/hr. sf. F] [Btu/sf. F] [Ib /cf] R -Value [h.sf.F /Btu] In• • • • • ' • • • • • Systems A(3.4. .... 1ST FL ' • - -- Constant Volume Packaged System - -902 No. Of Units 1 ._ CMonent • • •Category Capacity Efficiency IPLV • • • • 1 • • tooling System • •••• 2 Heating System 3 Air Handling System - Supply 4 Air Distribution System 22700.00 12.50 17050.00 1.00 700.00 0.25 4.20 12.50 ❑ 4/3/2011 EnergyGauge Summit® v3.22 4 AC -2 2ND FL Constant Volume Packaged System - -902 No. Of Units 1 Component Category Capacity Efficiency IPLV 1 Cooling System 2 Heating System 3 Air Handling System - Supply 4 Air Distribution System 22700.00 12.50 17050.00 1.00 700.00 0.25 4.20 12.50 AC -3 3RD FL Constant Volume Packaged System - -902 No. Of Units 1 Component Category Capacity Efficiency IPLV 1 Cooling System 2 Heating System 3 Air Handling System - Supply • • 4 • Air.Distribution System 22700.00 12.50 17050.00 1.00 700.00 0.25 4.20 12.50 D Ar 4•: 4TH FL • • • . ' Constant Volume Packaged System - -902 No. Of Units 1 tdd?iponent • • C=ategory Capacity Efficiency IPLV •••E •.... • 1 •. c p viing System • 2 •.i- iaatingSystem • 6:'. 3 ' • Itl i- landling System - Supply .... 4 • • Mir Distribution System • ••••• 16500.00 12.30 11590.00 1.00 450.00 0.40 4.20 9.50 D EJ ❑ Plant Equipment Category Size Inst.No Eff. IPLV Water Heaters W- Heater Description Capacit3Cap.Unit UP Rt. Efficiency Loss 4/3/2011 EnergyGauge Summit® v3.22 5 • • • • • • • • • • •• • • • • •• • •. •• • • Fenestration Used • • •••• Name •••• • • • •••• Glass Type • • •• No. of Panes Glass Conductance [Btu/h.sf.F] SHGC VLT •••• '._. • as • • 0 Materials Used Mat No Acronym Description Only R -Value RValue Thickness Conductivity Density SpecificHeat Used [h.sf.F/Btu] [ft] [Btu/h.ft.F] [lb /cf] [Btu/Ib.F] 187 Mat1187 CIYP OK PLAS No 0.4533 0.0417 0.0920 X0.00 0.2000 LJ BOARD,1 /21N 48 Mat148 6 in. Heavyweight concrete No 0.5000 0.5000 1.0000 140.00 0.2000 ❑ 94 Mat194 BUILT -UP ROOFING, 3 /8IN No 0.3366 0.0313 0.0930 70.00 0.3500 ❑ 4/3/2011 EnergyGauge Summit® v3.22 6 Ext- Lighting Description Category No. of Watts per Area/Len/No. of units Luminaires Luminaire [sf/ft/No] Control Type Wattage [W] Piping No Type Operating Insulation Nomonal pipe Temperature Conductivity Diameter [F] [ Btu- in/h.sf.F] [in] Insulation Thickness [in] Is Runout? • ❑ • • • • • • • • • • •• • • • • •• • •. •• • • Fenestration Used • • •••• Name •••• • • • •••• Glass Type • • •• No. of Panes Glass Conductance [Btu/h.sf.F] SHGC VLT •••• '._. • as • • 0 Materials Used Mat No Acronym Description Only R -Value RValue Thickness Conductivity Density SpecificHeat Used [h.sf.F/Btu] [ft] [Btu/h.ft.F] [lb /cf] [Btu/Ib.F] 187 Mat1187 CIYP OK PLAS No 0.4533 0.0417 0.0920 X0.00 0.2000 LJ BOARD,1 /21N 48 Mat148 6 in. Heavyweight concrete No 0.5000 0.5000 1.0000 140.00 0.2000 ❑ 94 Mat194 BUILT -UP ROOFING, 3 /8IN No 0.3366 0.0313 0.0930 70.00 0.3500 ❑ 4/3/2011 EnergyGauge Summit® v3.22 6 404 Mat1404 407 Mat1407 80 Mat180 R -11 Generic Insulation R -19 Generic Insulation AIR LAYER, 4IN OR MORE, HORIZ. ROOFS No No Yes 11.0000 19.0000 0.9200 0.2401 0.0218 0.30 0.2000 ❑ 0.4147 0.0218 0.30 0.2000 ❑ El Constructs Used No Name Simple Massless Conductance Heat Capacity Density RValue Construct Construct [Btu/h.sf.F] [Btu /sf.F] [Ib /cf] ]h.sf.F/Btu] 1061 Blt -up roof -R -30 insul. -7 "conc. -acc tl/drywall No No 0.03 17.47 63.33 34.4 ❑ Layer Material No. Material Thickness Framing [ft] Factor 1 94 BUILT -UP ROOFING, 3 /8IN 0.0313 0.000 • • 2 404 R -11 Generic Insulation 0.2750 0.000 • • •• • • • • 3. 407 R -19 Generic Insulation 0.4250 0.000 • • • • • 4• 48 6 in. Heavyweight concrete 0.5800 0.000 • •• • • • • "•S 80 AIR LAYER, 41N OR MORE, HORIZ. 0.000 • • •• • ROOFS •••• • • • •••• • • • •6 187 GYP OR PLAS BOARD,1 /2IN 0.0417 0.000 • •••• • •••• •••• • • •• • • • • 4/3/2011 11100 o o Ei Ei EnergyGauge Summit® v3.22 7 Florida Energy Efficiency Code For Building Construction Florida Department of Community Affairs EnergyGauge Summit@ Fla/Com -2008, Effective March 1, 2009 -- Form 400A -2008 Method A: Whole Building Performance Method for Commercial Buildings PROJECT SUMMARY Short Desc: Corridors Description: Residence 2 Owner: Barry University Addressl: 140 NW 115 St City: MIAMI SHORES Address2: State: Florida Zip: 0 Type: School/University Class: Renovation to existing buildi Jurisdiction: MIAMI SHORES VILLAGE, MIAMI -DADE COUNTY, FL (232600) Conditioned Area: 6115 SF Conditioned & UnConditioned Area: 6115 SF No of Stories: 4 Area entered from Plans 240 SF Permit No: 0 Max Tonnage 1.9 If different, write in: 4/3'2011 • •• ••• • • • • • •• • • • • • • •• .•• • • •• • • • •• ••• ••• • • • • • • • • • • • • • • • • • • • • • ••• • • • • • • • •• •. • • • • • • • • • • • • • • • • EnergyGauge Summit® Fla/Com -2008. Effective: March 1, 2009 ••• • • • • • • ••• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •• ••• • • • • •• •• ••• • • • ••• • • Page 1 of 9 Compliance Summary Component Design Criteria Result Gross Energy Cost (in $) 1.161.0 1.208.0 PASSED LIGHTING CONTROLS PASSES EXTERNAL LIGHTING None Entered HVAC SYSTEM PASSES PLANT None Entered WATER HEATING SYSTEMS None Entered PIPING SYSTEMS None Entered Met all required compliance from Check List? Yes/No/NA IMPORTANT MESSAGE Info 5009 — -- — An input report of this design building must be submitted along with this Compliance Report 4,3/2011 • •• ••• • • • • • •• • • • • • • • • •• ••• •• • • • •• ••• ••• • • • • • • • •• •• • • • • • ••• • • • • • • • • • ••• • • • • • • • • • • • • • EnergyGauge Summit® Fla /Com -2008. Effective. March 1, 2009 ••• • • • • ••• • • • • • • • • • • • • • ••• • • • • • • • • • • • • • • •• •• • • • •• •• ••• • • • ••• • • Page 2 of 9 CERTIFICATIONS 0011/1e®ess4, 91\R H E,Q�A* *j, ENS •\� F •• • - j • • \C0.71524 .. • . • . * * • *: 1 hereby certify that the plans and specifications covered by this calculatioar�i omplr�Ar &VOFthe ; Florida Energy Code : oc •• <G a se �{,•, <ORIviP.$(1. 0:° Prepared By: CESAR HERRAN. PE Building Officiaf,®�' ' ' ° e® �s ONAL . efeasee1111 Date: Date: I certify that this building is in compliance with the FLorida Energy Efficiency Code Owner Agent: Date: If Required by Florida law, I hereby certify ( *) that the system design is in compliance with the FLorida Energy Efficiency Code Architect: Reg No: Electrical Designer: ZOILA MORALES, PE Reg No: 64981 Lighting Designer: Reg No: Mechanical Designer: CESAR HERRAN, PE Reg No: 71524 Plumbing Designer: Reg No: ( *) Signature is required where Florida Law requires design to be performed by registered design professionals. 4-3`2011 •. ••• • • • • • • • • • •• ••• •• • • • •• • • • .••• ••• ••• • • • • • • •••• • • • • • • • • • ••••• • • • • •• •• •••• ••• • • • • • • EnergyGauge Summit® Fla/Com -2008. Effective: March 1, 2009 ••• • • • • ••• • • • • • • • • • • • • • 000 • • • • • • • • • • • • • • •• 01 • • • •• •• ••• • • • ••• • • Page 3 of 9 Project: Corridors Title: Residence 2 Type: School/University (WEA File: FL_MIAM1_OPA_LOCKA.tm3) Building End Uses 1) Proposed 2) Baseline Total 74.80 91.20 $1,161 $1,422 ELECTRICITY(MBtu /kWh /$) 74.80 91.20 21914 26723 $1,161 $1,422 AREA LIGHTS 28.10 32.00 8232 9363 $436 $498 MISC EQUIPMT 12.20 12.20 3584 3584 $190 $191 SPACE COOL 30.40 32.80 8900 9607 $472 $511 VENT FANS 4.10 14.20 1198 4169 $63 $222 Passing requires Proposed Building cost to be at most 85% of Baseline cost. This Proposed Building is at 81.7% PASSES External Lighting Compliance Description Category Tradable? Allowance Area or Length ELPA (W/Unit) or No. of Units (W) (Sqft or ft) CLP (W) •• ••• • • • • • •• • • • •• • • e . • - - • E•3 • •• ••• •• • • • •• None 4'3/2011 ••• ••• • • • • • • • • • • •••• • • • • •• •• • • • • • • • • • • • • • EnergyGauge Summit® Fla /Com -2008. Effective: March 1. 2009 • • • ••• • • ••• • • • • • • • • • • •• • ••• • • • ••• • • • • • • • • ••• • • • • • • • • • • • • •• •• • ••• • • Page 4 of 9 Project: Corridors Title: Residence 2 Type: SchooLtiniversit3 (WEA File: FL_MIAMI_OPA_LOCKA.tm3) Lighting Controls Compliance Acronym Ashrae Description ID Area (sq.ft) Design CP Min Compli- CP ance 1ST FL 2ND FL 3RD FL 4TH FL 5 Corridor 5 Corridor 5 Corridor 5 Corridor 1,625 1,900 1,860 730 2 2 2 2 1 PASSES 1 PASSES 1 PASSES 1 PASSES PASSES 4/3 %2011 ••• ••• • • • • • • • • • • • •• ••• •• • • • •• • • • • . • • • • •• ••• ••• • • • • • I••• • • • • • • • • •. • • • • • • • • • •• • • • • • • • • • • • • • EnergyGauge Summit® Fla /Com -2008. Effective: March 1, 2009 • • • • ••• • • • • • • • • .• • • • • ••• • t • • • • • • • • • • •• • • • • • • •• • ••• • • • Page 5 of 9 Project: Corridors Title: Residence 2 Type: School/University (WEA File: FL_IVIIAMI_OPA_LOCKA.tm3) Syste , ' 1 epic rt Compliance AC -1 1ST FL Constant Volume Packaged No. of Units System --902 1 Component Category Capacity Design Eff Design IPLV Comp - Eff Criteria IPLV Criteria liance Cooling System Air Conditioners Air Cooled 12.50 12.23 12.50 PASSES < 65000 Btu/h Cooling Capacity Heating System Electric Furnace 1.00 1.00 PASSES Air Handling Air Handler (Supply) - 0.25 0.90 PASSES System - Supply Constant Volume Air Distribution ADS System 4.20 PASSES System AC -2 2ND FL Constant Volume Packaged No. of Units System-902 1 Component Category Capacity Design Eff Design IPLV Comp - Eff Criteria IPLV Criteria liance Cooling System Air Conditioners Air Cooled 12.50 12.23 12.50 PASSES < 65000 Btu/h Cooling Capacity Heating System Electric Furnace 1.00 1.00 PASSES Air Handling Air Handler (Supply) - 0.25 0.90 PASSES System - Supply Constant Volume Air Distribution ADS System 4.20 PASSES System AC -3 3RD FL Constant Volume Packaged No. of Units System-902 1 Component Category Capacity Design Eff Design IPLV Comp - Eff Criteria IPLV Criteria liance Cooling System Air Conditioners Air Cooled 12.50 12.23 12.50 PASSES < 65000 Btu/h Cooling Capacity Heating System Electric Furnace 1.00 1.00 PASSES Air Handling Air Handler (Supply) - • •• • •• •• • • 0.25 • •.0.90 PASSES System - Supply Constant Volume • Air Distribution ADS System • • • ••• ' • • ' • •4.z0 • ••• PASSES System ••• • • • • • • • • • • • • • • • • • • • • • • ••• • • 4/3,2011 •• • • • • • EnergyGauge Summit® Fla /Com -2008. Effective March 1, 2009 ••• • • • • ••• • • • • • • • • • • • • ♦ ••• • • • • • •• •• • • • • ••• • • ••• • • • • • • • • • •• 00 Page 6 of 9 AC -4 4TH FL Constant Volume Packaged No. of Units System--902 1 Component Category Capacity Design Eff Design IPLV Comp - Eff Criteria IPLV Criteria Iiance Cooling System Air Conditioners Air Cooled 12.30 12.23 9.50 PASSES < 65000 Btu/II Cooling Capacity Heating System Electric Furnace 1.00 1.00 PASSES Air Handling Air Handler (Supply) - 0.40 0.90 PASSES System - Supply Constant Volume Air Distribution ADS System 4.20 PASSES System 1 PASSES I Plant Compliance Description Installed Size Design Min Design Min Category Comp No Eff Eff IPLV IPLV liance I None I Water Heater Compliance Description Design Min Design Max Comp escription Type Category Eff Eff Loss Loss Hance I None I 4%3/2011 •• ••• • • • .. •• • • • . • . • • • •• ••• .• • • • •• ••• •. . • • • • •• • • • • .. • • •••• ••. • • • • • • •• •• • . • • • . • • . • • • • EnergyGauge Summit® Fla /Com -2008. Effective March 1, 2009 ••• • • • • • •••• • • • • • • • • • • • • • • ••• • • • • • • • •• • ... . • •• •• • • • •• •• ••• • • • • • ••• • . Page 7 of 9 Piping System Compliance Category Pipe Dia Is Operating Ins Cond Ins Req Ins Compliance [inches] Runout? Temp [Btu -in/hr Thick [in] Thick [in] [F] .SF.F] None 413/2011 •• ••• • • • • • • • • • • • • • • •• • • • •• •• ••• •• ••• ••• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • ••. • • • • • • • • • • • • • • • • • • EnergyGauge Summit® Fla /Com -2008. Effective: March 1, 2009 ••• • • • • •• • • • • • •• • • • ••• • • • • • • •• •• • • • ••• • • • ••• • • • • • • • • • •• •• Page 8 of 9 Project: Corridors Title: Residence 2 Type: School/University (WEA File: FL_MIAMI_OPA_LOCKA.tm3) Other Required Compliance Category Section Requirement (write N/A in box if not applicable) Check Report Operations Manual Windows & Doors Joints /Cracks Dropped Ceiling Cavity System Reheat HVAC Efficiency HVAC Controls Ventilation Controls ADS HVAC Ducts Balancing Piping Insulation Water Heaters Swimming Pools Hot Water Pipe Insulation Water Fixtures Motors Lighting Controls 13 -101 13- 102.1, 13- 410,13 -413 13- 406.AB.1.1 13- 406.AB.1.2 13- 406.AB.3 13-407 13 -407.B 13 -407, 13-408 13- 407.AB.2 13- 409.AB.3 13-410 13- 410.AB 13- 410.AB.4 13- 411.AB 13- 412.AB 13- 412.AB.2.6 13- 411.AB.3 13- 412.AB.2.5 13-414 13- 415.AB Input Report Print -Out from EnergyGauge FlaCom attached Operations manual provided to owner Glazed swinging entrance & revolving doors: max. 1.0 cfin/ft2; all other products: 0.4 cfn/ft2 To be caulked, gasketed, weather - stripped or otherwise sealed Vented: seal & insulated ceiling. Unvented seal & insulate roof & side walls HVAC Load sizing has been performed Electric resistance reheat prohibited Minimum efficiences: Cooling Tables 13- 407.AB.3.2.1A -D; Heating Tables 13- 407.AB.3.2.1 B, 13- 407.AB.3.2.1 D, 13- 408.AB.3.2.1E, 13- 408.AB.3.2F Zone controls prevent reheat (exceptions); simultaneous heating and cooling in each zone; combined HAC deadband of at least 5 °F (exceptions) Motorized dampers reqd, except gravity dampers OK in: 1) exhaust systems and 2) systems with design outside air intake or exhaust capacity <300 cfin Duct sizing and Design have been performed Air ducts, fittings, mechanical equipment & plenum chambers shall be mechanically attached, sealed, insulated & installed per Sec. 13-410 Air Distribution Systems HVAC distribution system(s) tested & balanced. Report in construction documents In accordance with Table 13- 411.AB.2 Performance requirements in accordance with Table 13- 412.AB.3. Heat trap required Cover on heated swimming pools: Time switch (exceptions); Readily accessible on/off switch Table 13- 411.AB.2 for circulating systems, first 8 feet of outlet pipe from storage tank and between inlet pipe and heat trap Shower hot water flow restricted to 2.5 gpm at 80 psi. Public lavatory fixture how water flow 0.5 gpm max; if self - closing valve 0.25 gallon recirculating, 0.5 gallon non recirculating Motor efficiency criteria have been met Autola atw.Qpr roj required for interior lighting in buildings >5,000 s.f.;:Space connrp=; Pxtpriprpheto sensor; Tandom wiring with 1 or 3 linear fluuoresrn=14n$ OW .• ••• •• • • • .. ... .•. • • • • • • • • • • • • • • • • . •• •. • • • • • • • • • • EnergyGauge Summit® Fla /Com -2008. Effective. March 1, 2009 1!3 /2011 ••`. .,••••• • • • • • • • •• •• • • • •• •.• ••• • • • ••• • • • • • ••. • • Page 9 of 9 • EnergyGauge Summit® v3.22 INPUT DATA REPORT • • • • • • •• • • •• ••••• • $.t Project Name: Project Title: Address: • •• • • • • • • • State: •• . .• • Zip: • • • Corridors Residence 2 140 NW 115 St Florida 0 Owner: Barry University • Project Information Orientation: North Building Type: School /University Building Classification: Renovation to existing building No.of Stories: 4 GrossArea: 6115 SF •... • • •••• • •• • • Zones No Acronym Description Type Area Isfl 1 1ST FL 1ST FL CORRIDOR CONDITIONED 2 2ND FL 2ND FL CORRIDOR CONDITIONED 3 3RD FL 1ST FL CORRIDOR CONDITIONED 4 4TH FL 4TH FL CORRIDOR CONDITIONED 1625.0 1900.0 1860.0 730.0 Multiplier Total Area Isfl 1 1625.0 1 1900.0 1 1860.0 1 730.0 4/3/2011 EnergyGauge Summit® v3.22 1 • • • • • eeeeee • • • • • • • 4/3/2011 EnergyGauge Summit® v3.22 2 Spaces No Acronym Description Type Depth Iftj Width (ft] Height [ft] Multi Total Area plier Isf[ Total Volume Icf[ In Zone: 1ST FL 1 IST FL, CORRIDOR Corridor 1.00 1625.00 9.00 1 1625.0 14625.0 In Zone: 2ND FL 1 2ND FL CORRIDOR Corridor 1.00 1900.00 9.00 1 1900.0 17100.0 In Zone: 3RD FL I 3RD FL CORRIDOR Corridor 1.00 1860.00 9.00 1 I860.0 16740.0 In Zone: 4TH FL 1 4TH FL CORRIDOR Corridor 1.00 730.00 9.00 1 730.0 6570.0 • • • •• • • • Lighting • • • • ••� •.�•o • Type Category • • • .. .. • •• . . No. of Luminaires Watts per Luminaire Power [WI Control Type No.of Ctrl pts ...• IA•ZiMne: i EA: 6G • In Spaee:.•1ST FL •••• ••••41. Recessed Fluorescent - General Lighting • 12 64 768 Manual On /Off 2 •••• • .. No vent •ITT•Zdge: 2ND aL ".• In Space: 2ND FL 1 Recessed Fluorescent - General Lighting 12 64 768 Manual On /Off 2 0 No vent In Zone: 3RD FL In Space: 3RD FL 1 Recessed Fluorescent - General Lighting 12 64 768 Manual On /Off 2 No vent In Zone: 4TH FL In Space: 4TH FL 1 Recessed Fluorescent - General Lighting 6 64 384 Manual On /Off 2 No vent 4/3/2011 EnergyGauge Summit® v3.22 2 • • 000000 • • • • • •••... • • 00000 • • • • • • • Walls No Description Type Width H (Effec) Multi Area DirectionConductance Heat Dens. R -Value [ft] [ft] plier IsfI [Btu /hr. sf. F] Capacity IIb /cf[ Ih.sf.F /BtuI I Btu /sf.FI In Zone: Windows No Description Type Shaded U SHGC Vis.Tra W H (Effec) Multi Total Area [Btu /hr sf FI [ft] [ft] plier (sti In Zone: In Wall: • a .. - -. • • • • • . • . ..: Doors .•• ". Jfe.+Description • •• •••••• ••.. •••• • - Type Shaded? Width [ft] H (Effec) Multi [ft] plier Area Isfl Cond. Dens. Heat Cap. IBtu /hr. sf. FI Ilb /cfl [Btu/sf. FI R -Value Ih.sf.F /Btul In done: .... In V1rair'•• • •••• . •• • _ • • • •... Roofs No Description Type Width H (Effec) Multi Area Tilt Cond. Heat Cap Dens. R -Value [ft] [ft] plier IsfI [deg] [Btu /hr. Sf. FI [Btu/sf. FI Ilb /cf[ Ih.sf.F /BtuI In Zone: 4T11 FL 1 PrOZo5Rfl Blt -up roof -R -30 73.00 10.00 1 730.0 0.00 0.0291 17.47 63.33 34.4 insul.- 7 "conc. -acc tl /drywall 4/3/2011 EnergyCauge Summit® v3.22 3 • • • • • ••••• • • • • • • •` . • • . •'•"• .•• .•• • • •• Systems Skylights 4 .•••. 1ST FL •,fit • • •.•. • - No Description Type U SHCC Vis.Trans W H (Effec) Multiplier (Btu /hr sf F] [ft] [ft] Area Total Area ISfI ISfI In Zone: In Roof: Capacity Efficiency IPV ,••••• 1 ••• c olingSystem •••• 2 Heating System 3 Air Handling System - Supply 4 Air Distribution System 22700.00 12.50 17050.00 1.00 700.00 0.25 4.20 12.50 ❑ (] ❑ ❑ Floors No Description Type Width H (Effec) Multi Area Cond. Heat Cap. Dens. Ift1 Ift1 plier Isf1 IBtu /hr. sf. F1 IBtu /sf. F1 IIb /cfl R -Value Ih.sf.F /Btul • .. .. Ir,Lone: , • .. • • ❑ . • • . •'•"• .•• .•• • • •• Systems 4 .•••. 1ST FL •,fit • • •.•. • - Constant Volume Packaged System - -902 No. Of Units 1 ..•• .,,romponont .. Category Capacity Efficiency IPV ,••••• 1 ••• c olingSystem •••• 2 Heating System 3 Air Handling System - Supply 4 Air Distribution System 22700.00 12.50 17050.00 1.00 700.00 0.25 4.20 12.50 ❑ (] ❑ ❑ 4/3/2011 EnergyGauge Summit® v3.22 4 • • • • • • • • • • • • AC -2 2ND FL Constant Volume Packaged No. Of Units 1 System - -902 Component Category Capacity Efficiency IPLV 1 Cooling System 22700.00 12.50 12.50 ❑ 2 Heating System 17050.00 1.00 ❑ 3 Air Handling System - Supply 700.00 0.25 ❑ 4 Air Distribution System 4.20 ❑ AC -3 3RD FL Constant Volume Packaged No. Of Units 1 System - -902 Component Category Capacity Efficiency IPLV 1 Cooling System 22700.00 12.50 12.50 ❑ 2 Heating System 17050.00 1.00 ❑ ' 3 Air Handling System - Supply 700.00 0.25 ❑ • • • 4 ••••MtDistribution System 4.20 ❑ AC-4 • • • 4TH FL Constant Volume Packaged No. Of Units 1 •• • ••. •System - -902 • • • • • • • • ••€emponenl•••Category Capacity Efficiency IPLV • - "" 1 •••C?ooling System 16500.00 12.30 9.50 ❑ • • ••• 2 • • ft °Mating System 11590.00 1.00 ❑ •••: 3 • .Air Handling System - Supply 450.00 0.40 ❑ • •• ••• 4 ••' AUr Distribution System 4.20 ❑ Plant Equipment Category Size Inst.No Eff. IPLV u Water Heaters W- Heater Description Capacit3Cap.Unit I/P Rt. Efficiency Loss 4/3/2011 EnergyGauge Summit® v3.22 5 • • • • • • •••0•• • • • • • 0 • • • lb • • • •. • • • • •• •••• ,•0••° . • • • • •• •• •000 Fenestration Used MQame • Glass Type •••• • 0000 • • ••• • •• • • • • No. of Panes Glass Conductance l Btu /h.sf. F1 SHGC VLT Materials Used Mat No Acronym Description Only R -Value Used RValue Thickness Conductivity Density SpecificHeat llb /cfl ]Btu /Ib.F) [ h.sf.F/Btu] [ft] l Btu /h.ft.F) 48 Mat148 94 Mat194 BOARD,1 /2IN 6 in. Heavyweight concrete No BUILT -UP ROOFING, 3 /8IN No 0.5000 0.3366 0.5000 0.0313 1.0000 0.0930 140.00 0.2000 ❑ 70.00 0.3500 ❑ 4/3/2011 EnergyGauge Summit® v3.22 6 Ext- Lighting Description Category No. of Luminaires Watts per Area /Len /No. of units Luminaire 1st/ft/No] Control Type Wattage (Wj Piping No Type Operating Temperature [F] Insulation Nomonal pipe Conductivity Diameter 1 Btu- in/h.sf.F] lin] Insulation Thickness [in] Is Runout? • • lb • • • •. • • • • •• •••• ,•0••° . • • • • •• •• •000 Fenestration Used MQame • Glass Type •••• • 0000 • • ••• • •• • • • • No. of Panes Glass Conductance l Btu /h.sf. F1 SHGC VLT Materials Used Mat No Acronym Description Only R -Value Used RValue Thickness Conductivity Density SpecificHeat llb /cfl ]Btu /Ib.F) [ h.sf.F/Btu] [ft] l Btu /h.ft.F) 48 Mat148 94 Mat194 BOARD,1 /2IN 6 in. Heavyweight concrete No BUILT -UP ROOFING, 3 /8IN No 0.5000 0.3366 0.5000 0.0313 1.0000 0.0930 140.00 0.2000 ❑ 70.00 0.3500 ❑ 4/3/2011 EnergyGauge Summit® v3.22 6 • • • • • • • • • • • • • • • 404 407 80 Mat1404 R -11 Generic Insulation No 11.0000 0.2401 0.0218 Mat1407 R- I9 Generic Insulation No 19.0000 0.4147 0.0218 MatI80 AIR LAYER, 4IN OR Yes 0.9200 MORE, HORIZ. ROOFS 0.30 0.30 0.2000 0.2000 ❑ ❑ ❑ Constructs Used No Simple Massless Conductance Heat Capacity Name Construct Construct 1Btu/h.sf.F1 1Btu /sf.FI Density 1Ib /cfl RValue 1h.sf.F /Btul 1061 Blt -up roof -R -30 insul. -7 "conc. -acc tl /drywall No No 0.03 17.47 63.33 34.4 ❑ •••••. • • • • • • • •• • • • • •• •••• •••••• • •••• • .••• •••• • Layer Material Material Thickness Framing No. lftl Factor I 94 BUILT -UP ROOFING, 3/81N 0.0313 0.000 • •• 2 404 R -11 Generic Insulation 0.2750 0.000 •�• • • • • 407 R -19 Generic Insulation 0.4250 0.000 • • • �• •: 48 6 in. Heavyweight concrete 0.5800 0.000 • • 5 80 AIR LAYER, 41N OR MORE, HORIZ. 0.000 •••• ROOFS • • •••• 6 187 GYP OR PLAS BOARD,1 /2IN 0.0417 0.000 • • •• • • • • • • • ❑ ❑ ❑ ❑ ❑ • 4/3/2011 EnergyGauge Summit® v3.22 7 B ==:. ER ��nIU1 =0 CONSTRUCTION CO. General Contractors • Construction Managers CGC 042059 • CGC 1516384 ZACHARY J. RAPPAPORT Senior Project Manager 1 Principal 2100 Ponce de Leon Blvd., Sulte 825, Coral Gables, Florida 33134 305 -445 -0819 • Fax 305 -447 -0941 • Cell: 305 - 975 -2600 zrappaport @beauchampco.com