RC-11-1463_PlansDEMOLITION NOTES 1- Demolition and removal operations shall be conducted in an expedient manner, with precautions taken to prevent demolition site from disrupting normal site activities. 2- Schedule demolition and removal as to minimize the impact on adjacent areas since these areas may be occupied and their activities cannot be disturbed or interrupted during normal working hours. 3- Organize and perform demolition work to avoid damage to construction intended to remain. 4- Existing sidewalks, curbs, paving, landscaping or other existing work not specified for removal which is temporarily removed, damaged, exposed or in any way disturbed or altered by removal work shall be repaired, patched or replaced with no additional cost to owner. 5- Conduct removal operations so that traffic is maintained a long existing streets and walks keep paved streets and walkways free of debris. Remove material and other matter tracked or fallen onto traffic surfaces. (o- Transport debris material in an acceptable manner as to prevent spillage on the streets. -1- Demolition and transportation or debris shall comply with applicable codes and regulations governing these operations. The demolition contractor shall pay all fees for rubbish disposal- 0- Do not dispose of demolished materials or trees by burning. 9- Control the amount of dust resulting from construction or demolition to prevent spread of dust to other buildings and to avoid creating a nuisance in surrounding areas. Avoid the use of water to control dust when it will create objectionable conditions such as flooding. 10- Provide barriers, barricades, warning devices and /or temporary fencing to protect the public and users of adjacent facilities from the demolition work. 11- Unless otherwise indicated on drawings, do not cut or alter structural members without authorization from the architect and /or engineer - 12- Coordinate with applicable utility companies for utility line removal, if any, and related capping and utility shutdown if necessary by such demolition work. 13- Remove all related equipment such as pool pumps, filters, timers, and heater cut off i5witch. 14- Remove all mechanical, plumbing and water piping back to their source and cap as required. 15- Remove all electrical conduit, wiring, disconnect etc, and provide covers at all connecting points. "= — — — CLOSET — — 7 r BLOCKED UP TO � �0� CA In BATH CLOSET BEDROOM EXIST DEN BATH a 0 LAUNDRY PATIO GARAGE DEN N r r- N I BREAKFAST EXIST DOORS t PARTITION WALLS TO BE REMOVED \ EXIST KITCI O CABMETS i TO BE REMOVED E REPLACED -- _ DINING ROOM F i�,' MILY ROOM EXIST GLASS TO BE REMOVED Y 4BLOCKED UP KITCHEN C Q1 I N T ; I I a i I I I I I I I � v N COVERED ENTRY , ��r�7��'7 j � ,I; •J� �,;' j� AUK 10' -9 1/2 27' -5 112" -4" BY. . DEMOLITION PLAN 1/477 Eusebio M. Mora Architect Fla L[c # AR0011732 6761 Southwest 68th Terrace South Miami, Florida 33143 (305)740 -51 85 moraarch a§ belisouth.net ARENAS CONSTRUCTION 10690 NOR-TI IEAST II COLIRT MIAMI SHORES, FLORIDA 33138 PHONE (305) 893 -9484 FAX (305) 899 -8062 ARENASCON(q)AOL COM CFRTIFIFD BUR DING COVTRAC "IOR CHC 060235 TITLE FLOOR PLAN m 0 w Cn U-1 w Q 0 Cn Y Q 2 w W DRAWING FILE NO DATE 8/18/2011 SCALE NOTED SHEET NUMBER DEM01OF1 00 O VJ Q CV) Cl) V Z Cd ..Q W LL .� N Q L �W 0 = O W .�_ O 0 0 o W cd a C Cd o 0 Z CL W 0 00 t it 00 F- n. DRAWN BY SOE CHECKED BY EMM ATTACHMENT NO ATTACHMENT# DRAWING FILE NO DATE 8/18/2011 SCALE NOTED SHEET NUMBER DEM01OF1