BP-05-1503 (5)Miami Shores Village 10050 NE 2 Ave, Miami Shores FI, 33138 Tel: 305 -795 -2204 Fax: 305- 756 - 8972 Building Inspection Department This cerltficate issued .pursuant to the requirements of the Florida Building Code106.12 certifying that at the time of issuance this structure was in compliance with the various ordinances of the jurisdiction regulating building construction or use. For the following: Permit Type Residential Construction Bldg. Permit No. BP2005 -1503 Owner JEFFREY AND YASMIN DAVIS Contractor BEJAR CONSTRUCTION, INC Subdivision /Project <NONE> Date Issued 07/17/2008 Construction Type ADDITION Occupancy Single Family 9275 BAYSHORE Drive N Miami Shores Village FL 33138 -2304 Location Bult. Officials Approval Not Transferable POST IN A CONSPICUOUS PLACE NAME: VILLAGE OF MIAMI SHORES OWNER BUILDER DISCLOSURE STATEMENT s2°K- .ck_sri..`r� .Doi-A" 5- • DATE: ADDRESS: 9275 pu . Do hereby petition the Village of Miami Shores to act as my own contractor pursuant to the laws of the State of Florida, F.S 489.103(7). And I have read and understood the following disclosure statement, which entitles me to work as my own contractor; I further understand that I as the owner must appear in person to complete all applications. State Law requires construction to be done by a licensed contractor. You have applied for a permit under an exception to the law. The exemption allows you, as the owner of your property, to act as your own contractor even though you do not have a license. You must supervise the construction yourself. You may build or improve a one-family or two-family residence. You may also build or improve a commercial building at a cost of $25,000;00 or less. The building must be for your own use and occupancy. It may not be built for sale or lease. If you sell or lease a building you have built yourself within one year after the construction is complete, the law will presume that you built for sale or lease, which is a violation of this exemption. You may not hire an unlicensed person as a contractor. It is your responsibility to make sure the people employed by you have licenses required by state law and by county or municipal licensing ordinances. Any person working on your building who is not licensed must work under your supervision and must be employed by you, which means that you must deduct F.I.C.A and with - holdings tax and provide workers' compensation for that employee, all as prescribed by law. Your construction must comply with all applicable laws, ordinances, buildings codes and zoning regulations. Please read and initial each paragraph. 1. I hold title to the above property and I am planning on doing this construction Initial 2. I understand that as an owner- builder I must abide by all zoning ordinances and building regulations in effect at the time of permit application Initial ya 2 3. .I have an understanding of the 2004 FBC & FRC and understand that this department and its inspectors are there to help enforce and interpret the code. There is a copy of the code in this office for review. Initial Y 4. I understand that the building official and inspectors are not there to design, alter or give advice on how to meet code —. only if the structure meets the minimum code. Initial /G `3313?- 5. I understand that as an owner - builder, that any contractor disputes with sub- contractors and myself must be handled in a civil court with the advice of an attorney. The department will not mitigate any contract disputes. Initial a� 6. I understand that if I compensate any person or company for work performed they are required to have a business license in the county. If for any reason they do not posses a business license I will be responsible and liable for any wrong doing from this unlicensed company or person. Initial "AO 7. I understand that if any person gets injured on my construction project—they are entitled to workmen's compensation. And if they do not posses a workmen's policy I could be held liable for all doctor and related cost which could include Loss of wages during recovery from injury. Initial Y 4 8. I understand that under state and local laws I can not do any Electrical, Plumbing, Heating, Air & Roof work on my property with out first obtaining the proper permits by licensed contractors. Was acknowledged before me this Initial y,�-1) day of U A95420l By ' �/ J / 111,`0 01-31. -au° who was personally known to me or who has Produced there License or ] CA ma Y\ PX) L, as identification. Fe.p .1�q'\13ti !i o�5/ NOTARY `04., iviiam.i v magc D U11U111 Jurcipat L111L 11L NagMEV'M la DEC 14 2006 Change of Contractor Permit No. ®5- 1Y)3 t0 SI- Y sz- c4,rei * .Past^`e. 3"\s Phone# 63c 7445 7031 Owner's Name (Fee Simple-Titleholder) Owner's Address 92-7s N o r 4- ire) ire.. .rte city ii (arY, , S1-acts. State FL Zip 33131, Tenant/Lessee Name Phone # Job Address (of where the work is being done) City t �ort.1 County 3275 Gvo.r->b.,. gal a 1,0r -4.- �. L Zip S=1— 3•(3c Legal Description Contractor's Company Name a- ineflge /t7e '! 4 J'1 .Phone # Contractor's Address 97 / /4/a/ 25 city State /cry y Qualifier / 2 K ' Describe Work: o re be �}Til /1(f�+ -� 4?5i193/ 6f16 Zip I hereby certify that the work has been abandoned and /or the contractor is unable or unwilling to complete the contract. I hold the Building Official and the Village of Miami Shores harmless from all legal involvement. Signature Owner or Agent The foregoing instrument was acknowledged before me this this day oC who is personally The foregoing instrument was acknowledged before me , 20 y Vt) nr) n V l S ^ > day of Pee_ to me or who has produced who is personally identification and who did take an oath. NOTARY P Sign: Print: My Co •'scion Expires: Rev. 09/19/03) OUP by o me or who has produced tification and who did take an oath Mabel Vargas Commission #DD 98 �, 13,2(1; 9ond ed Thr, nF Co_. In I4- NOTARY Sign: Print: iV1aoei Va.rgt y Co s ssion expires: Commission #0D23 1 984 4, Expires :i l3 2Ofv ['Iltljnr, koNkllflo Co:, Mr * * * * * * * * * * * * * * * * * * * * * * * * * * ** * * **: r*TDRaS-- ISC1.6 •• •• •e• • • • • • • • • • • • • • • ••• V.LAW OFFICES (-qIFiy (- gE Y R. DAVIS, P. A. October 1, 2006 Mark IV Construction Co., Inc. Post Office Box 145178 Coral Gables, Florida 33114 ••• • • • • • • • • • • • • • ••• • • •• •• • • • • • • • • ••• • • • • • • • • • • • •• ••• • • • • • • • ••• • • • • • • • • • • • • •• • •• • • • • • ••• . • • •• ••• ••• •• ••• • • • • •• • ••• • • • • ••• • • • • • • ••• ••• OCT 1 3 00 BY:_ Attn: Mark Mayer Re: 9275 North Bayshore Drive, Miami Shores, F133138 Dear Mr. Mayer: This will confirm that you have breached our contract and have abandoned the job. Ve truly yours Jeffr - 1' . Davis JRD/bt 1980 Coral Way • Miami Florida 33145 -2624 • Tel. (305) 577 -3777 • Fax (305) 854 -2603 jeff@jeffdavislaw. com LAW OFFICES • ��.•. FR lei 1L R. DAVIS? P.A. Mark IV Construction Co., Inc. Post Office Box 145178 Coral Gables, Florida 33114 October 4, 2006 • • ••• • ••. •• • • • •• •• ••• • • • • • • ••• • • • • • • • ••• • • • • • • • • • • • • • • • • • •• • • • ••• • • • • • • • •• • • • • • •• • • • • • • • • • • ••• . • ••• ••. ••• •• • '•:••••••:• ..•••••..• • • • • • ••• •• Mark IV Construction Co., Inc. 3540 North Bay Homes Drive Coconut Grove, Florida 33133 -6814 • Attention: Mark Mayer Re: 9275 North Bayshore Drive, Miami Shores, FL 33138 Dear Mr. Mayer: Pursuant to the terms of our contract, I am hereby requesting that you consent to resolve my outstanding claims against you by Mediation. As you are aware from our numerous telephone conversations, meetings, e-mails and correspondence, it is my contention that you have breached our contract and have caused me many thousands of dollars in damages. Please contact me, in writing, within the next five (5) business . days or I will understand that you are rejecting Mediation. JRD /jaf cc: F. Michael Steffens • • 1980 Coral Way • Miami Florida 33145 -2624 • Tel. (305) 577 -3777 • Fax (305) 854 -2603 iefffalieffrisvislsw rrrirn LAW OFFICES eFFRE Jl Mark IV Construction Co., Inc. Post Office Box 145178 Coral Gables, Florida 33114 • • .. .••• • • . • • • • • • • • • • • ... • • • • • • • • • • ... • • • . R. DAVIS, P.A.: : • •• ••: • • . .. • • • • • • • • • • i. • • • • • • • . • •.. • ... ••• • • • • • August 22, 2006 •o • • i Mr. Mark Mayer Mark W Construction Co., Inc. August 22, 2006 Page 2 • • ••• • ••. •• • • • •• •• ••• • • • ••i • • • • • • • ••• • • • . • • i • • •• • . • •• • • • • • • • ••• • •: ••• • • • • • • • • • ••• • • •• .••• • • • • • • • • • • • • • • •.. • • • . .. •••. Please provide me invoices for the steel which I partially paid•for chat Zvas' tb bt placed in the opening between the new and existing garage. If you have failed to pay for this order, I will consider that the money is being wrongfully withheld by you and will take the appropriate legal action. I still have not had a response from you regarding the check that you bounced for my generator, nor have I received the funds back regarding the same. You have not addressed the issue of all of the damage that your electrician caused to my drywall and I am in the process of obtaining estimates to replace and repair the same since it appears you have abandoned the job. You have left a portable toilet on the property and, if the same is accruing charges for use or storage, I plan to hold you responsible for the same. Please address this with the company at once. Your workers caused significant damage to an oven that they removed from my kitchen and brought to the garage. It appears that because of the way they handled it, or the way in which they placed it, they have broken the front door off it. I expect you to reimburse me for this. I am in the process of hiring a building /construction inspector to evaluate the work and performance of your company and subcontractors. I will also have this individual evaluate the damage that you have done to my home and the extreme delay that your failure of performance and job abandonment has cost. To date you have not replied to any my letters regarding the construction delay and breach of contract. I urge you to immediately address this matter and contact my office to discuss a resolution of this case as the damages now exceed $50,000.00. Please govern yourself accordingly. JRD /jaf V truly yours, Jeffrey R. avis •. •• • • LAW OP1FtClES • • ••• •• •• • • • • • • • • • • • • • • ••• • • • July 26, 2006 Via U.S. Mail and Facsimile 305/668 -8473 Mark IV Construction Co., Inc. Post Office Box 145178 Coral Gables, Florida 33114 Attention: Mark Mayer • • • • • • •• •• • • • • • ••• • • • • • • • • • • • ••• • • • • • • •• • • • • • • • • •• • • • • • • •• • • • • • • • • • • .•• • • •, •• ••• •• .. • •; •• . . • • • • • •• • •. •• • • '•' • • .•• •• � Mark W Construction Co., Inc. 3540 North Bay Homes Drive Coconut Grove, Florida 33133 -6814 Re: Florida Statute Chapter 558 - Notice of Claim 9275 North Bayshore Drive, Miami Shores, FL 33138 Contract for Construction Services CHAPTER 558, FLORIDA STATUTES, CONTAINS IMPORTANT REQUIREMENTS YOU MUST FOLLOW BEFORE YOU MAY BRING ANY LEGAL ACTION FOR AN ALLEGED CONSTRUCTION DEFECT IN YOUR HOME. SIXTY DAYS BEFORE YOU BRING ANY LEGAL ACTION, YOU MUST DELIVER TO THE OTHER PARTY TO THIS CONTRACT A WRITTEN NOTICE REFERRING TO CHAPTER 558 OF ANY CONSTRUCTION CONDITIONS YOU ALLEGE ARE DEFECTIVE AND PROVIDE SUCH PERSON THE OPPORTUNITY TO INSPECT THE ALLEGED CONSTRUCTION DEFECTS AND TO CONSIDER MAKING AN OFFER TO REPAIR OR PAY FOR THE ALLEGED CONSTRUCTION DEFECTS. YOU ARE NOT OBLIGATED TO ACCEPT ANY OFFER WHICH MAY BE MADE. THERE ARE STRICT DEADLINES AND PROCEDURES UNDER THIS FLORIDA LAW WHICH MUST BE MET AND FOLLOWED TO PROTECT YOUR INTERESTS. Dear Mark: I am sending you the enclosed statutory notice of defect letter in an effort to reconcile and resolve conditions, problems and defects of this job in order to complete the contract. I 'remain available to discuss this matter and allow you the opportunity to cure any /all defects within the applicable period in an effort to avoid litigation. Please, understand that I wish to complete the contract satisfactorily and conclude this matter amicably. 1980 Coral Way • Miami Florida 33145 -2624 • Tel. (305) 577 -3777 • Fax (305) 854 -2603 jeff@jeffdavislaw.com •. • ••• • • • • • • • • • •• •• •• • 11. • • ••• •, • • • • • ••• • • • • • Mr. Mark Ma ye Mark IV Const cl! July 26, 2006 Page 2 LAW OFFICES D) R. DAVIS PA o: • ••• • • • • • • • • • • • •• ••• • • •• • • • ••• • • • • • • • • • • • •••• • •• • • • • •• •• 0 • ••• ••. •• The defects and / or problems that require correction ancr cure' arse Is • follows: 1. Insurance: Pursuant to our Standard Form of Agreement Between Owner and Contractor, AIA document A101 -1997 (Contract), Amendment 4: Contractor is mandated to carry both worker's compensation insurance and general liability insurance of at least $500,000 combined single limits throughout the pendency of construction services at the subject property. This is an essential term of the contract. That further, Contractor agrees to provide evidence of these coverages to Owner at commencement of construction and, Owner is to be included as an additional insured on the General Liability policy. The agent or broker providing coverage must be mandated by Contractor, in writing, to notify Owner if either policy of insurance should lapse, become suspended, revoked or canceled for any reason during the pendency of the construction project. It appears that the insurance coverage information that you provided at the start of the contract for worker's compensation expired on 4/11/06 and for General Liability on 5/14/06. Unless you provide evidence that these coverages were renewed, naming Jeffrey and Yasmin Davis, as Owner, as additional insureds, you are in material breach of contract. Please furnish evidence of this insurance forthwith. 2. Protection of Property and Security: Since the beginning of the project, I have repeatedly requested that you protect, cover and secure the existing property at the house from damage and theft. It became apparent that the house was being used by -kids and /or vagrants after a series of break -ins occurred which included damage to doors, appliances and theft of tools. I made several police reports and advised you of these instances. I requested that you fence the property and secure it carefully at night. You made a half - hearted attempt at placing some plastic fencing on the side which lasted a few days. Subsequently, doors and windows were left open and my wife and I would frequently find the house unsecured 1980 Coral Way • Miami Florida 33145 -2824 • Tel. (305) 577 -3777 • Fax (305) 854 -2603' jeff@jeffdavislaw.com s Mr. Mark Mayer Mark IV Construction Co., Inc. July 26, 2006 Page 3 •• • ••• • • �•• • • • •• .•• ••. • • • • • • •. • •.. • • • • • • • • • ••• • • • • • •• • ••• • • •• . • • • • • • ••.. • • • • • • • • • • ••• • • • • • . • • • • • ••• • • • • • • • '• • • • ••• •• . after your workers left. Further, I have requested countless times, both • • • • • • in writing and in person, that your workers and subs protect my existing windows, doors and floors. The only apparent efforts you have made in this regard was removal of some carpeting from the bedroom to cover the wooden floor of the adjoining bedroom and some placement of film on several of the windows. Unfortunately, the windows and doors were not properly covered and protected and the wooden floors were never properly covered. As a result, my existing doors and windows have been scratched, chipped and have broken handles. Further, you failed to remove the screens on the existing windows and doors and nearly all of them have been ripped, bent and damaged. The wooden floors on the second level of house, especially in the master bedroom are scratched and stained due to the absence of any protection and now require complete refinishing. Accordingly, I request that you immediately clean and cover all of the windows and doors, including their frames, on the inside and out to prevent further damage. I would urge you to immediately contact Jim at your window supplier (R & S Companies) to meet at the house to order the parts necessary to replace the broken screens and repair the damaged handles on the doors. Further, it appears that you have failed to order two replacement windows that your employees damaged during installation. You had assured me that you had ordered them, but as of today's date, in a telephone conversation with Jim at R & S Windows, I learned that you did not. Protection of my existing property and windows and doors, including the frames, is essential. The sliding glass door thresholds should be covered when the workers are entering and exiting the house so as to avoid scratching the frames and bending the thresholds by dragging heavy materials and wheelbarrows over the same. This too is not being done. I urge you to correct these problems forthwith to prevent additional damage. I expect the damage to be repaired and / or fixed. 3. Site Conditions: Since the beginning of this job, you and I have had a constant tug of war over the , condition that your crew was leaving the property. Garbage, waste and materials have been strewn throughout the front, back and side yards since the inception of the project. I have already . . Mr. Mark Mayer Mark IV Construction Co., Inc. July 26, 2006 Page 4 • • ••• • •'.•• • • • • • •• •• ••. • • • • • • • ••• ••'• • • • • • • • • • • • ••• • • • • • • •• • • • • • • • • • • • •.• • .• ••• • • • • •• ° • • • • • • •• • • • • • • • • • • • • • ••• ••• • : ••• :•• :••• •• • ••• : • • • '•• ••••. received one notification from the City to clean up the mes's nn.d ydur :•• • •' • response was simply to shift it to the backyard. This is unacceptable. Additionally, inside the house, there are boards with nails protruding from them, holes that are uncovered in the floor and numerous other unsafe conditions. I have repeatedly requested that you keep the job site clean so as to avoid injury and damage to property and building materials. As of yesterday, I noted that there are piles of garbage and building materials located at each and every portion of this job which presents both a safety hazard and eyesore. It is impossible for workers to enter and exit the house without confronting hunks of concrete with rusty rebar protruding from it, splintered wood with rusty nails and loose pipes, wire and other debris. This job site is unsafe and I demand that you clean it and keep it in a reasonably safe and clean state for the remainder of the job. 4. Plumbing: As you know, the rough plumbing was completed last week. For months you have advised me that you had no contact from the plumber and that he was avoiding your calls and not appearing for work. My wife and I have met with and spoke with the plumbers directly and have learned that this is simply not the case. After making an initial deposit to them early on, you continued to advise them that you were unable to secure a commitment from the owner regarding the piping under the house. This is despite the fact that you were paid 50% of this plumbing extra back in April. This misrepresentation by you delayed the job three months since the plumber could not complete his work and, you continually deferred paying him for your own reasons. This unacceptable. As a result, I have paid the plumber directly for the remainder of his rough and for the. entire underground piping. I do not believe that you are entitled to take any percentage of the underground work (extra) since your misrepresentations delayed the job and forced me to incur thousands of dollars in extra rent and storage charges. I will now pay the plumber directly for all future services as our contract clearly allows. • 5. Air Conditioning: Mr. Mark Mayer Mark IV Construction Co., Inc. July 26, 2006 Page 5 • • 000 :041 0 00 • • • • • : • • Mr. Mark Mayer Mark IV Construction Co., Inc. July 26, 2006 Page 6 • • ••• • •• .•. • • • • •• •• '•• • • • • ••• • • • • • • • •• • • • • • • ••• • •• • •e • • • • • : •• • • • • • • •• • • • • • • • • • • • ••• • • ••• . •• • • • • ." . • • • •• ••• • • • • . • • • resulted in my losing, and continuing to lose, thousands or dollars • • • each month. Some adjustment must be made as I firmly believe the delay is due to your failure to properly manage this job, staff this job, supply this job and pay your sub - contractors. 8. Window and Door Installation: I have been advised by an architect that proper window installation is done by using a laser in order to ensure that each window is at the same height from the floor. I have noticed and advised you that at least one of the windows you installed is crooked. Worse still, you have failed to properly install the windows such that water has been entering the house each and every time it rains. This has resulted in the destruction (and resultant removal) of an existing ceiling and the growth of mold and mildew on interior walls. I asked you to replace furring strips that were covered with black mold and you replied that you would. Subsequently I have observed containers of bleach in the house indicating that cleaning attempts are being made (and not replacement). Putting insulation and sheetrock over moldy furring strips is an invitation to disaster and will result in a mold problem in the house. I urge you to remove any /all wet and moldy wood and promptly correct the waterproofing issue. Additionally, despite my wife and the architect clearly explaining the type of sliding glass doors we needed, the wrong doors were ordered. Worse still, the wrong doors were installed. Now we need to have you remove the new sliding glass doors and take them back to R & 5 Windows for their correction. Jim at R & S Windows has advised me that he has all the parts needed and awaits your delivery of the doors. This too is taking an extraordinarily long time for no apparent reason. Also, I have asked you to address the issue of the upstairs, master bedroom door opening from the center and not on the left hand side. You assured me that you would address this, but to date have not done so. As you know, as the present configuration exists in the master bedroom, I will not be able to enter the balcony. Please also note that due to your failure to protect the existing door leading from the kitchen to the pool deck, it was damaged and cost me over ', :00 to replace it. I now understand that the replacement door is in - was a new door also ordered for the laundry area? •• • • • • • Mr. Mark Mayer Mark W Construction Co., Inc. July 26, 2006 Page 7 • e•••. ••• •'• • • ••• • • • • • ••• • ••• • • • • • • • • • • • ••• • • • • ••• • • •• •• . • •i ••• • • • • • • •:. • ••'• • • • •• : • • •• •• ; • ••• • • •• •• ••• •• • • ••• • • i to Mr. Mark Mayer Mark IV Construction Co., Inc. July 26, 2006 Page 8 • •• •• ••• • • • • ••• • • • • • • • •• •• • • • • • ••• • .• • • • • • • ••• • • • • ••• • • • •• • • • • .. •••••:• • •s• ••• ••• • • • •• ••• • • .•. • . • •• that you will be unable to continue or complete this contract, plcse advise t� forthwith so that I may take any /all actions necessary. Since you have a key to the premises, access is not an issue and I assume that we are still proceeding unless I hear something from you, in writing, to the contrary. I understand that there is a pending request for payment for the slab and roof of the barbecue area. Please understand that as we presently have paid you 20% of this contract up front, and have paid for over $4,000 in plumbing services and the entire air conditioning rough, you are substantially ahead of us under the terms of otr contract. Please correct all of the above issues so that we may resume payir g and continue this job. JRD /jaf Certified Mail - Return Receipt 7006 0100 0001 4095 8980 •• • • • • .. 4 E aFa R: LAW OFFICES NI Y 0 DAVIS, P.A. February 14, 2006 The Hon. Mayor Al Davis Mayor of The Village of Miami Shores 10050 Northeast 2nd Avenue Miami Shores, Florida 33138 Re: Abandoned Boat /Damage Location of Incident to Property : 9275 North Bayshore Drive : Miami Shores, Florida 33138 : Robert Laney : 9259 North Bayshore Drive : Miami Shores, Florida 33138 Owner of Abandoned Vessel Dear Mayor Davis: I am the owner of 9275 North Bayshore Drive in Miami Shores. Although I purchased the house well over a year ago, I am still going through the approval process in order to obtain all necessary building permits so as to remodel the house. One of the improvements I made was to add a new dock and boat lift. Unfortunately, my neighbor to the south, Robert G. Laney, decided to purchase a 29 foot Sea Ray motor boat which he failed to properly secure during Hurricane Katrina. The boat sunk behind my house and Mr. Laney elected to abandon it there. Despite my multiple requests that he remove the sunken boat from behind my home, Mr. Laney advised that it would be too expensive (approximately $4,000.00), so he just left it there. When Hurricane Wilma was approaching, Mr. Laney, without my permission, decided to secure his sunken vessel to my new dock. The storm caused the sunken vessel to literally tear my new dock and boat lift to pieces thereby destroying the same. The boat has broken up into several large pieces which are now lodged under my dock and behind my property. Despite my multiple in- person requests, telephonic requests and written requests, Mr. Laney has simply ignored me and done absolutely nothing to resolve this problem that he has created. Further, he has taken no steps to remove the vessel or reimburse me for the in excess of $20,000.00 that his 1980 Coral Way • Miami Florida 33145 -2824 • Tel. [305] 577 -3777 • Fax [305] 854 -2603 ieff ©ieffdavislaw. com 4 The Hon. Mayor Al Davis Mayor of The Village of Miami Shores February 14, 2006 Page 2 negligence and carelessness has caused me. Further, he has ignored the efforts of the Florida Fish Sr Wildlife Commission who have issued him a summons to appear in court. I have notified the Coast Guard and D.E.R.M. about this situation but both claim that their organizations do not have jurisdiction. I have sued Mr. Laney in Miami -Dade County Circuit Court, but he has ignored the lawsuit and a default has been entered against him. We are proceeding to trial where I will likely obtain a judgment for damages against him. In speaking with my dock builder, Dock & Marine Construction, I have been advised that, in the past, The Village of Miami Shores has hired this company to remove debris from the Bay and canals when the same pose a nuisance or hazard. Mr. Laney's abandoned vessel not only poses a hazard by polluting our Bay, but it also prevents me from being able to repair my dock and boat lift. Further, the presence of the wreck has caused an enormous amount of garbage and other debris to collect and pile up behind my house creating an unhealthy and unsightly situation. Does The Village of Miami Shores have the ability to contract with a private salvage company, such as Dock & Marine Construction (or any company for that matter) in order to correct this problem and remove the abandoned vessel and its debris field? Since a resident of Miami Shores created this problem, could The Village not order him to correct it within a certain time frame and, if he failed to comply, correct it for him and lien his house or otherwise fine him? By way of analogy, if Mr. Laney decided to abandon a vehicle or other junk on my property, could The Village not order him to remove it due to the unsightly hazard it created? If in fact he refused to comply with The Village's orders, could The Village not correct the problem for Mr. Laney and then fine him? I look forward to hearing from your office since this situation has created tremendous financial stress and has become time consuming for my wife and The Hon. Mayor Al Davis Mayor of The Village of Miami Shores February 14, 2006 Page 3 family. We are trying to finish remodeling our new house in order to begin living here and this situation has made this process extraordinarily difficult. I look forward to hearing from you and thank you in advance for your kind anticipated attention and cooperation. V truly yours, Jeffrey I Davis cc: Richard Sarafan, Esq. The Village of Miami Shores Claudio Grande Director of Building and Zoning The Village of Miami Shores Tom Benton, Manager The Village of Miami Shores Mike Orta, Code Enforcement Department The Village of Miami Shores Kevin Lystad, Interim Chief of Police The Village of Miami Shores JEFF LAW OFFICES I') EY I'\ , DAVIS, PA. 1980 Coral Way, Miami Florida 33145 -2624 Claudio Grande Director of Building and Zoning The Village of Miami Shores 10050 Northeast 2nd Avenue Miami Shores, Florida 33138 3 i :Etri- -:•- 312 !!!1!!!! !!!!i llilt !!f!l11t1311111!!I!ll tl�!!l111Illft�!!� 11111111111111111111111111111111 1 111111111111 NOTICE OF COMMENCEMENT ARECORDED COPY MUST BE POSTED ON THE JOB SITE AT TIME OF FIRST INSPECTION PERMIT NO. TAX FOLIO NO. STATE OF FLORIDA COUNTY OF DADE THE UNDERSIGNED hereby gives notice that improvements will be made to certain real property, and in accordance with Chapter 713, Florida Statutes, the following information is provided in this Notice of Commencement: 1. Legal description of property and street address: ct 22 N ° s-1.10-ox- -F1*� 2006R0230088 OR Bk 24288 Ps 039?; (fps) RECORDED 03/03/2006 13:07:45 HARVEY RUVIN► CLERK OF COURT MIAMI -DADE COUNTY, FLORIDA LAST PAGE Pitt-Am 4- ov>~°..t 33(3e nn 2. Description of improvement: l AI n 3. Owner (s) name and address: Tr TVs hcors Interest in property: and address of fee simple titleholder. 72,0 Cara (,1(9) -4t'4 C14-n Z '(5I-1 4. Contractor's name and address: ! ' 4410 S. Surety: (Payment bond required by owner from contractor, if any) Name and address: Amount of bond: $ �� p 6. Lender's name and address: A) \( �3 (rN 7. Persons within the State of Florida designated by Owner upon whom notices or other documents may be served as provided by Section 713.13 (1) (a) 7., Florida Statutes: Cr.) 1■1\-„ Name and address: 81n addition to himself, Owner designates the following person (s) to receive a copy of the Lienor's Notice as provided in Section 713. 13 (1) (b) 7., Florida Statutes: Name and address: on ir�at Aif 9. Expiration date of this Notice of Commencement (the expiration date is year Signature of Owner Print Owner's Name r �� t T �® �� Prepared by: R% a- Sworn to and Notary Public Print Notary's before me this 30 day of 0( 20 Ql? * •i - MY COMMISSION # 00 19 p C XPI fES: January 10, 2000 �Oe Banded Thru B Notary services My Commission Exp Address: i?W J)/ 1 of e 71//a Pam 104 Inspection Date: 06/19/2008 Inspector: Dacquisto, David Inspection Worksheet Miami Shores Village 10050 N.E. 2nd Avenue Miami Shores, FL Phone: (305)795 -2204 Fax: (305)756 -8972 Owner: DAVIS, JEFFREY AND YASMIN Job Address: 9275 BAYSHORE Drive N Miami Shores Village, FL 33138 -2304 Project: <NONE> Contractor: BEJAR CONSTRUCTION, INC Permit Type: Residential Construction Inspection Type: Survey Final Work Classification: Addition Block: Phone Number (305)577 -3777 Parcel Number 1132050270570 Lot: Phone: (954)431 -5981 Building Department Comments ADDITION TO AND RENOVATION OF EXISTING RESIDENCE e I/ 707er Passed Inspector Comments t.„.......„,.,_ Failed Correction Needed Re- Inspection Fee ($75) No Additional Inspections can be scheduled re- inspection fee is paid . until Thursday, June 19, 2008 Page 2 of 2 • • •0 •• • • • • • • • • • 00• • • • • • • • • •0• • • • 0041 • • eo • • 0•• e• •• • • • • • • 010.4• BOUNDARY SURVEY • • • • s• • • • • • • • • • • • •• • • • • •• BISCAYNE BAY • • • • 0 • • • • • 0• • • • 00 000 2.4' CONC. SEAWALL PERMIT #: 0.5• CL 7 we i« IMMIWO1111 SUBJECT 10 «+ VATH STATE AND COUNT/ RULES AND REG% —x— • • • •8$. ' 6 • S 00.44' 11' •• • • • • • •.• •• RECE V1EL JUN 1 9 2008 16.25' ( 10. aN1 FLOOR 1[@ oa TERRACE 12.80• 8.43. 1L 3 LOT 3. BLOCK 4 LOT 5. BLOCK 4 2 STAY RES • 9275 CBS FINISH FLOOR ELEV. • 0.83' *0.00• I0.0' SKETCH OF SURVEY SCALE. 1- ■ 20• FAD 1/2' IP 0- BILK COR 100.70' GENERAL NOTES. 1) BASIS OF BEARING. AS PER PLAT t€ N. BAYSHORE DRIVES 00 44. 11' M) 2) ELEVATIONS SHOWN HEREON ARE RELATIVE TO NATIONAL GEODETIC VERTICAL DATUM( N. G. V. D. ) 3) LOCATION AND IDENTIFICATION OF UTILITIES ON ANEWOR ADJACENT TO THE PROPERTY WERE NOT SECURE AS SUCH INFORMATION WAS NOT REQUESTED 4) NOT VALID WITHOUT THE SIGNATURE AND THE ORIGINAL RAISED SEAL OF A FLORIDA LICENSED SURVEYOR AND MAPPER. 5) THIS SURVEY IS NOT INTENDED FOR CONSTRUCTION PURPOSES 6) ENCROACHMENTS AND VIOLATIONS ON SURVEY(IF ANTI. 4.33` STN BAYS WIVE VE I 18. B. PAVEMENT ) — - — - SS.O TOTAL Rlif CERTIFICATION OF I HEREBY CERTIFY RESPONSIBLE C AND BELIEF THI STA LAND CODE LEGAL DESCRIPTION LOT 4 IN BLOCK 4 OF BAY LURE. ACCORDING TO THE PLAT THEREOF AS RECORDED IN PLAT BOOK 44 AT PAGE 63 OF THE PUBLIC RECORDS OF DADE COUNTY. FLORIDA. VCONNUNTY HANNA 120652 2.PNEL mama 93 f serg! 3,44.FFOt 4.DATE OF FRY .SEX 7/17/95 81 ZONE 2 :5 AM AE . 045E F1. EI.EW*TgA 10.00 LEGEND. FND - FOUND CM - CONCRETE PANT IR - IRON ROD IP - IRON PIPE RAI - RIGHT OF WAY PO8 - POINT OF BEGINNING POC - POINT OF COMFENCENENT PC - POINT OF CURVE POC - POINT ON A CURVE ■— CHAIN LINK FENCE —! WOW FENCE PE) - PLAT 000IC P - PAGE M • MEASURED 0 - DEED R - RADIUS A - ARC A - CENTRAL ANGLE C - CHORD XCK• ELEVATION —I —I— NON- VEHICIAAR ACCESS LINE • CONCRETE •U• • OVEReEAOI LINE 0 - NANwOLE Mice - CATCH BAsIN C? - TREE UPDATE 5/30/08 UPDATE: 8-20-04 BOUNORY SURVEY. T THIS•SURVEY WAS MADE UNDER MY TO THE BEST OF MY KNOWLEDGE MEETS THE MINIMUM TECHNICAL BY THE BOARD OF PROFESSIONAL R GIG17 -6 FLORIDA ADMINISTRATIVE 472.027. FLORIDA STATUTES. JULIO PITA. P.L.S. - PROFESSIONAL LAND SURVEYOR LICENSE NO. PSM 5788 STATE OF FLORIDA JULIO S. PITA, P.L.S. LAND SURVEYORS 7821 CORAL WAY. SUITE 121 MIAMI. FLORIDA 33155 PHONE' C 305) 2E2-2404 SECTION: 06 - 53-42 ' COUNTY: DADE CERTIFIED TO: JEFFERY DAVIS COHEN. NORIS. SCHERER. WEINBERGER & WOLMER FIRST AMERICAN TITLE INSURANCE COMPANY 9275 N BAYSHORE DRIVE. MIAMI SHORES. FL. 33138 DATE: 8 - 22-00 I .REF: 00- 08 - 41 te DWG: GL 2634 U.�. DaEPAitTMENT OF HOMELAND SECURITY ELEVATION CERTIFICATE Federal Emergency Managemerd Agency National Flood Insurance Program Important Read the instructions on pages 1-8. OMB No. 1660 -0008 Fires February 28.2009 SECTION A - PROPERTY INFORMATION For Insurance Company lase: Al. Building Owner's Name JEFFERY DAVIS Poky Number A2. Building Street Address (including Apt., Unit, Stale, and/or Big. No) or P.O. Route and Box No. 9275 N. BAYSHORE DRIVE Company NAIC Numb City MIAMI SHORES State FL ZIP Code 33138 A3. Property Description (Lot and Block Numbers, Tax Parcel Number, Legal Descriptiou etc.) A4. Building Use (e.g., Residential, Non - Residential, Addition, Accessory, etc.) ,RS A5. Latitude/Longitude: Lat. 25-51-40.30N Long. 80-10- 17371 A6. Attach at least 2 photographs of the building 11 the Cedes is being used to obtain flood insurance. A7. Building Diagram Number 1 A8. For a building with a crawl space or enclosure(s), provide a) Square footage of crawl space or enclosure(s) 0 sq ft b) No. of permanent flood openings in the crawl space or enclosure(s) walls within 1.0 foot above adjacent grade Q c) Total net area of flood openings in As.b 0 sq in Horizontal Datum: 0 NAD 1927 ® NAD 1983 A9. For a braiding with an attached garage, provide: a) Square footage of attached garage )Q sq ft b) No of permanent flood openings in the attached garage walls within 1.0 foot above adjacent grade 0 c) Total net area of flood openings in A9.b 0 sq in SECTION B - FLOOD INSURANCE RATE MAP (FIRM) INFORMATION BI . NFIP Community Name & Community Number MIAMI SHORES 120652 BZ County Name DADE 83. State FL 84. Map/Panel Number 65. Suffix 86. FIRM Index B7. FIRM Panel 68. Fes! B9. Base Rood Elevation(s) (Zone Dam EffecrareiRevised Date Zone(s) AO, use base flood depth) 12025C0093 J 7117195 3/2/94 AE 10.0 B10. Indicate the source of the Base Flood Elevation (BFE) data or base flood depth entered in Item 89. ❑ F1S Profile ® FIRM 0 Communtyy Determined 0 Other (Desolbe) BI 1. Indicate elevation datum used for BFE in Item 09: _< NGVD 1929 ❑ NAVD 1988 ❑ Other (Describe) B12. Is the building located in a Coastal Barrier Resources System (CBRS) area or Otherwise Protected Area (OPA)? [Wes Designation Date 0 CBRS 0 OPA SECTION C - BUILDING ELEVATION INFORMATION (SURVEY REQUIRED) C1. Building elevations are based on: 0 Coon Drawings* 0 Braiding Under Finished Construction *A new Elevation Certificate will be required when construction refire budding Is complete. C2. Elevations - Zones Al -A30, AE, AH, A (with BFE), VE, V1 V30, V (with BFE), AR, ARIA, ARIAE, AR/A1 -A30, AR/AH, AR/AO. Complete Items C2.a -g below according to the building diagram specified In Item A7. Benchmark Utilized DCBM Vertical Datum NGVD Conversion/Comments a) Top of bottom floor (ncludmg basement, crawl space, or enclosure floor).. b) Top of the next higher floor c) Bottom of the lowest horizontal structural member (V Zones only) d) Attached garage (top of slab) e) Lowest elevation of machinery or equipment servicLtg the braiding ding (Describe type of equipment in Comments) f) Lowest adjacent (fimished) grade (LAG) g) Highest adjacent (fines) grade (HAG) 9.0 18.07 NJA 7•fia NJA 7.37 445 Check the measurement used. feet 0 meters (Puerto Rico only) feet 0 meters (Puerto Rico only) 0 feet 0 meters (Puerto Rico only) feet 0 meters (Puerto Rico only) O feet 0 meters (Puerto Rico only) feet 0 meters (Puerto Rico only) feet 0 meters (Puerto Rico only) SECTION D - SURVEYOR, ENGINEER, OR ARCHITECT CERTIFICATION This certification is to be signed and seated by a land surveyor, engineer, or architect authorized by taw to cedify elevation information. I certify that the information on this Certificate represents my best efforts to interpret the data available. I understand that any false statement maybe punishable by time or imprisonment ureter 18 U.S Code, Section 1001. ❑ Check here if comments are provided on back of form. Certifer's Name JULIO S. PITA Lorene Number 5789 FLORIDA FOUNDATION SYSTEMS INC. 2780 NE 16 STREET POMPANO BEACH, FL 33062 OFFICE (954) 786 - 0455 FAX (954) 782 - 9991 ATLAS FIELD INSTALLATION LOG - HELICAL PIERS PROJECT LOCATION Property Owner Michael Steffens Res. Street Address 9275 Bayshore Drive City / State Miami Shore, FL. PRODUCT SELECTION: PROJECT DATA: Date June 6, 2006 Contractor Mark IV Construction Eng./Arch. John H. Omslaer, P.E. Application New addition Pier Part Number Helical R3500.300 & R3500.300 with Bracket Installation Date May 26, 2006 & June 3-6, 2006 Helix Configuration (diameters) 12 " -14" Lift Cylinder Area N/A Gear Motor Size (ft -Ibf @psi) 12000 ft/lb 2 Speed Installation Flow 16 GPM PIER # SECTION LENGTH # OF SECTIONS DEPTH REFERENCE TOTAL LENGTH HELICAL TORQUE COMPRESSION LOAD H1 7' 5 Grade 33' Refusal 15 Tons H2 7' 5 Grade 31' Refusal 15 Tons H3 7' 5 Grade 31' Refusal 15 Tons H4 7' 5 Grade 31' Refusal 15 Tons HB6 7' 5 Grade 32' Refusal 15 Tons HB6 7' 5 Grade 35' Refusal 15 Tons NOTES: See building plans for piling locations. This log indicates pile capacity only. This log does not warranty or certify the building envelope or foundation in any way. The owner is responsible for all necessary permits and inspections. H: Helical HB: Helical with Bracket Caps: 6" X 8" X 112" Dynamic Engineering Solutions Inc. 935 N.W. 31 Ave. Suite D Pompano Beach, FL. 33069 John H. Omslaer, P.E. PE # 52733 EB # 26829 r'� 1 y f ` .10114 �w a PrAIIIIAINIIIMINIVAMMIVIIIIIIIIIIIVA1111411121111 r P•I o"hie 811 ANGLE ;OW _I. ATTACHED TO GRADE BEAM l ". EXP.-I -IILTI KWIK BOLT II ts 12' O /C. 8" CONC. 5LA5 11°' j n BLOCK UP SSE DETAIL x ! ON 5I -IEE1 S-�.I D _ 1 i�L...,...,. 1311111111111111111113011111111MIL 1111111111111131111111111111M • P -I GB -I EX T r OPIrhIIG O $ 6 "x xr ATT CUE %4"0 2 °I IN 300014)5I GR FILLED CELL sttoe,lYlm62A c%/n 03/22/2007 02:47 9544314627 BUILDING PERMIT NUMBER PROJECT NAME: ADDRESS: BEJAR CONSTRUCTION PAGE 09/09 INSULATION CERTIFICATE AIR & HEAT INSULATION INC D.B.A./ALLSTATE INSULATORS REMODELING AT; 9275 N. BAYSHORE DRIVE, M. SHORE, FT.. We the undersigned, hereby certify that the THERMAL INSULATION has been installed in the above referenced project, in compliance with the latest edition of the STATE OF FLORIDA. ENERGY CODE, the moved ENERGY CALCULATIONS, and PLANS, and in accordance with good construction practice. The insulation furnished and installed has the characteristics shown below (Only the applicable boxes are checked): ***1:::11. Exterior CBS wails insulation: R;S (Min) Materials: RIGID INSULATION Thickness: 3/4" inch(es) Density: lb /f13 Manufhcttucr: DOW 112, Exterior Fraxiae/Meta1 stud walls: (Mica) Materials: Thickness: FT13. Exterior solid concrete walls: inch(es) Density: 11,/if Manufacturer: Mira) Materials: Thickness: inches) Density: lbfft3 Manufacturer: a4. Interior walls separating WC from non -A/C spaces insulation: _ (Min) Materials: Thickness: inch(es) Density: lb/if Manufacturer: 05. MULTI FAMILY RESIDENTIAL CONSTRUCTION ONLY: The COMMON (PARTY) walls suing different tenants are insulated as follows: FRAME/METAL STUDS walls R.11 (Min), CBS or CONCRETE walls R-3 (Min), both sides (as redluired by ENERGY CODE) See ENERGY CODE, January 1993, section 602.1 ABC.1.1 on page 6.10, latest edition. These "minimum levels of insulation ", are not included hi the Energy Calculation, but shall be installed in the field_ 06. Above deck type Roof Insulation: (Min) Materials: Thickness: indi(es) Density: ib/fe Manufacturer: 114:17. Ceiling insulation Thickness: Ur 0 R-30 (Min) Materials: I3ATT FIBERGLASS inch(es) pity: Ib/fl3 Manufacturer: CERTAINTEED $. Others: R -11 SOUND ATTENUATION BATT FIBERGLASS AT INTERIOR PARTITIONS Installed by AIR & HEAT INSULATION INC D.B.A./ ALLSTATE WSL7LAORS I1ieuMMMian Corniy Nam Insulation Cont actor Certificate of Competency # 17736 C.C./ Builder. BEJAR CONSTRUCTION Building Contactor Certificate of Competency # In8Wagen Signature Certified on: 112/76607 d3.CJ Bueaer Signature Certified on: