Loading...
CC-09-569Inspection Worksheet Miami Shores Village 10050 N.E. 2nd Avenue Miami Shores, FL Phone: (305)795 -2204 Fax: (305)756 -8972 Inspection Number: INSP - 110814 Permit Number: CC -4-09 -569 Scheduled Inspection Date: November 13, 2009 Inspector: Bruhn, Norman Owner: Job Address: 210 NE 102 Street Miami Shores, FL 33138 -2427 Project: <NONE> Contractor: IVY H SMITH COMPANY Permit Type: Commercial Construction Inspection Type: Final Building Work Classification: New Phone Number Parcel Number 1132060480010 Phone: (305)257 -0222 Building Department Comments AT &T IS PLACING A NEW CABINET FOR FUTURE SERVICE SEE ATTACHED SKETCH FOR DETAILS a_41011,09 Passede// , Failed Correction Needed Re- Inspection Fee No Additional Inspections can be scheduled until re- inspection fee is paid. Inspector Comments No Ureka Palms. Spoke with Sharon Office Manager at Ivy. NB November 12, 2009 For Inspections please call: (305)762 -4949 Page 1 of 20 Miami Shores Village Building Department 10050 N.E.2nd Avenue, Miami Shores, Florida 33138 Tel: (305) 795.2204 Fax: (305) 756.8972 BUILDING REC(0`'E Permit No. (fM .9- -(0-9,- PERMIT APPLICATION AP ®7 009 ter Permit No. FBC 2004 ' .141... Permit Type (circlet : 7Building ) Roofing Owners Name (Fee Simple Titleholder) / T ) C t C 0,7) Phone # Owner's Address L i 1 u ;'a ' -? L`q T City j') ) i fir?.) State C-- Zip Tenant/Lessee Name Phone # Job Address (where the work is being done) -°? /C. ? C City Miami Shores Village County Miami -Dade Zip FOLIO / PARCEL # Is Building Historically, Designated YES NO Contractor's Company Name II,/ I"1 . Phone # Contractor's Address I t C( 5 't : S 1 City f--)i r Y state FL Zip "ITT Qualifier Name State Certificate or Regi$tration No. Architect/Engineer's Name (if applicable) 6_21 I f h i P Fib 1 Phone # Value of Work For this Permit $ ' L C L' Phone # Certificate of Competency No. Type of Work: E A 1dition Describe Work: c r �, Square / Linear Footage Of Work: ['Alteration ❑New ❑ Repair/Replace A, FLA:: I - •b ❑ Demolition i� TIC Submittal Fee $ Permit Fee $ VIN F=; CCF $C Notary $ Training/Education Fee $ Technology Fee $ Scanning $ Radon $ DPBR $ Zoning $ Bond $ Code Enforcement $ Double Fee $ Structural Review. $ Total Fee Now Due $ See Reverse side -, Bonding Company's Name (if applicable) Bonding Company's Address City State Zip Mortgage Lender's Name (if applicable) Mortgage Lender's Address City State Zip Application is hereby made to obtain a permit to do the work and installations as indicated. I certify that no work or installation has commenced prior to the issuance of a permit and that all work will be performed to meet the standards of all laws regulating construction in this jurisdiction. I understand that a separate permit must be secured for ELECTRICAL WORK, PLUMBING, SIGNS, WELLS, POOLS, FURNACES, BOILERS, HEATERS, TANKS and AIR CONDITIONERS, ETC OWNER'S AFFIDAVIT: I certify that all the foregoing information is accurate and that all work will be done in compliance with all applicable laws regulating construction and zoning. "WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT." Notice to Applicant: As a condition to the issuance of a building permit with an estimated value exceeding $2500, the applicant must promise in good faith that a copy of the notice of commencement and construction lien law brochure will be delivered to the person whose property is subject to attachment. Also, a certified copy of the recorded notice of commencement must be posted at the job site for the first inspection which occurs seven (7) days after the building permit is issued. In the absence of such posted notice, the inspection will not be approved and a reinspection fee will be charged. Signature Owner or Agent The foregoing instrument was acknowledged before me this day of , 20 _, by who is personally known to me or who has produced As identification and who did take an oath. NOTARY PUBLIC: Sign: Print My Commission Expires: APPLICATION APPROVED BY: Signature r '; +_ Contractor The foregoing instrument was acknowledged before me thisk 1-I4' day of & , 20 0 y 177 whc is personally known to mesr'who has produced as identification and who did take an oath. NOTARYPUBLIC: Sign: Print: My, ommission Expires: Plans Examiner Engineer Zoning (Revised 07/10/07) 1/ Inspection Worksheet Miami Shores Village 10050 N.E. 2nd Avenue Miami Shores, FL Phone: (305)795 -2204 Fax: (305)756 -8972 Inspection Number: INSP - 110823 Permit Number: ELC -4 -09 -570 Scheduled Inspection Date: August 04, 2009 Inspector: Devaney, Michael Owner: Job Address: 210 NE 102 Street Miami Shores, FL 33138 -2427 Project: <NONE> Contractor: MESA ELECTRIC SYSTEMS CORP Permit Type: Electrical - Commercial Inspection Type: Final Work Classification: New Phone Number Parcel Number 1132060480010 Phone: 305 - 279 -5498 Building Department Comments ELECTRICAL WORK FOR NEW AT &T CABINET Inspector Comments Passed Failed Correction Needed Re- Inspection Fee No Additional Inspections can be scheduled until re- inspection fee is paid. niunnef nz 9nna For Inspections please call: (305)762 -4949 Dann 1 of �F Miami Shores Village Building Department 10050 N.E.2nd Avenue, Miami Shores, Florida 33138 Tel: (305) 795.2204 Fax: (305) 756.8972 BUILDING PERMIT APPLICATIO FBC 2004 Permit Type: Electrical Owner's Name (Fee Simple Titleholder) RC U Phone # Owner's Address .10 P.) E. i 0 2 s r City inj f ')I S`AORe5 State Pu Zip 3?)I ? g Tenant/Lessee Name Phone # Permit No. ELC Master Permit Noll(' O 1, - "5 E -MAIL: Job Address (where th work is being done) a1O Ne ) 0 z S T City Miami hores Village County Miami -Dade Zip 3313 FOLIO / PARCEL # Is Building Ristoricall3 Designated YES NO Contractor's Company Name In est eLE C.'TRt l'_ 5kiSTr-./>7S co Phone # Contractor's Address 1 [2_9 ® 5 l t1 yg S 7 �6 1S;- 6061+ City fT) I P /Y) % State J l - L. Zip 3316c– Qualifier Name ' 1 CAS �f atC SA''' Phone # .Z- 3� 3 cis - ��2 3-) State Certificate or Registration No. Ea '3601510 E -MAIL: Architect/Engineer's Name (if applicable) Certificate of Competency No. Value of Work For thi$ Permit $ 1 0 00 Phone # Square/ Linear Footage Of Work: .r, r='ll'ype of Work: DAddition JJAlteration New 111 Repair /Replace. ❑ Demolition $scribe Work: (T - T I S PLO- c i,i c, .P ' N r LO Ci) 8; /)ET I C FcI -Pr- s6 -kViC P set ATJ D si< TC il R LZE ricv i s E`t 15 is irxxxxx xxxxxiexxxxx xxxxxx xxxx xxxxxxxxx Fees' *". xx**** xxxxxxx*xxx**wwxxxxa:*ac***wxxxxxxxxx ub�ihitrafFee $ V Permit Fee $ /. -eo,e, ® CCF $ CO /CC ;Notary $ Training /Education Fee $ Technology Fee $ r, Scanning $ Radon $ DPBR $ Zoning $ Bond $ Code Enforcement $ Double Fee $ z Structural Review. $ ;! Total Fee Now Due $ See Reverse side --> Bonding Company's Name (if applicable) Bonding Company's Address City State Zip Mortgage Lender's Name (if applicable) Mortgage Lender's Address City State Zip Application is hereby made to obtain a permit to do the work and installations as indicated. 1 certify that no work or installation has commenced prior to the issuance of a permit and that all work will be performed to meet the standards of all laws regulating construction in this jurisdiction. 1 understand that a separate permit must be secured for ELECTRICAL WORK, PLUMBING, SIGNS, WELLS, POOLS, FURNACES, BOILERS, HEATERS, TANKS and AIR CONDITIONERS, ETC OWNER'S AFFIDAVIT: 1 certify that all the foregoing information is accurate and that all work will be done in compliance with all applicable laws regulating construction and zoning. "WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT." Notice to Applicant: As a condition to the issuance of a building permit with an estimated value exceeding $2500, the applicant must promise in good faith that a copy of the notice of commencement and construction lien law brochure will be delivered to the person whose property is subject to attachment. Also, a certified copy of the recorded notice of commencement must be posted at the job site for the first inspection which occurs seven (7) days after the building permit is issued. In the absence of such posted notice, the inspection will not be approved and a reinspection fee will be charged Signature p•A 712 Owner or Agent The foregoing instrument was acknowledged before me this day of who is p who has produced Signature The foregoing instrument was acknowledged before me this day of /4' ,206 by ho is personally known to who has produced 6 DI identification and who did take an oath. as identification and who did take an oath. NOT ',; UBLIC: Sign: Print: My ommis xxxxxxxxxxxxxxxxxxxxxx xaexxx4exxx xxxxxxx APPLICATION APPROVED BY•. (Revised 02/08/06) NOTAR UBLIC: AEI Sign: Print: My • • r• �r Ars EPIRE:May3, T ni P D 417418 ommission Expires: cx xxx xxxx xX Xx x x xx xxx xx xxx xxxx xxx x WW WWxx Y.x Plans Examiner Engineer Zoning w 0 z N w z VTLLAG OF MIA_V_I SFORFIS 'ERMIT SKTCH R/W 5' SIDEWALK NE 102ND ST N EOP GRASS AREA w \L• C /L--- - - - - -- EOP GRASS AREA 0 N "PODOCARPUS° PLANTS TO BE PLACED AROUND THE CABINET PER CITY OF MIAMI SHORES REQUIREMENTS RECEIVED APR % 8 ; '009 -�nres Village CT To - =y I-I+ALLFEDERAL STATE AND Cr • ' FiL GULATIONS / C)L0(7-5„c9 DRIVEWAY 5' SIDEWALK AT &TTHHG CONSTRUCTION NOTE SURVEY SITE AND SET PAD ELEVATION FOR A MINIMUM OF 100 YEARS FLOOD. 130' NOTE: AT &T WILL CUT & RESTORE CONCRETE SI DEWALK AND GRASS AREA. L 1 PROPOSED ALP -248 CABINET 4•2'WX2'213X4'H PROPOSED �n FPL HANOHOLE — 0 w Q EXI STI NG AT &T XBOX TO BE UPDATED WI TH SI ZE 44° WX70° HX24° D APPROX. PROPOSED 60' -1 -21 ELECTRI CAL CONDUI T 4A HOURS BEFORE YOU DIG \ CALL SUNSHINE 1 -800- 432 -4770 I T' S THE LAW 1 N FLORI DA j NO PAVEMENT TO BE CUT A TTSE PROPOSED TELEPHONE FACILITIES ON RIGHT OF WAY OF MIAMI SHORES 210 NE 102ND ST Exchange: 305751 Designer: Bafna, Gitika Phone: 305 - 222 -8237 Authorization: 9MP05034N Dwg. 1 of 2 4/7/2009 11:58:51 AM CABINET DETAIL GAS I NET 51 ZE 1'2" WX2'2" 0X1-11-1 GONGK“ E PAS 51 V�f�TIGAL- VIEW 0 GAOINET • 22s CABINET TOP VIEW 0i GA I NET POWER PEDESTAL 6' ATTSE PROPOSED TELEPHONE FACILITIES ON RIGHT OF WAY OF MIAMI SHORES 210 NE 102ND ST Exchange: 305751 Designer: Bafna, GTtika Phone: 305 - 222 -8237 Authorization: 9MP05034N Dwg. 2 of 2 4/7/2009 11:49:22 AM J 9 VILLAGE OF V JLFCTRICAJ IAVII SHORS RAWING 3 R/W 5' SIDEWALK NE 102ND ST 3 EOP GRASS AREA ----C/L----------- EOP GRASS AREA R/W w J J DRIVEWAY 5' SIDEWALK AT &TTHHG FPL CONTACT: CARLOS BEALE (305) 770 -7927 FPL PROPOSED ALP -248 CABINET 4'2•WX2'2'DX4'H PROPOSED FPL SERVICE POI NT —► EOP EXI STI NG AT &T XBOX EOP ATTSE PROPOSED TELEPHONE FACILITIES ON RIGHT OF WAY OF MIAMI SHORES - ELEC 210 NE 102ND ST Exchange: 305751 Designer: Bafna, Gitika Phone: 305 - 222 -8237 Authorization: 9MP05034N Dwg. 1 of 3 4/7/2009 11:57:23 AM RT ADDRESS: 210 NE 102ND ST 3 "3 THWN in 2' PVC SCH 40 cond. (Inside cabinet) UL891- DEADFRONT SWITCHBOARD E85938- EMERSON UL FILE NO. 3 "3 FACTORY PREWIRED XFRS SWITCH WITH 100 A OCP MECHANICAL INTERLOCK TO PREVENT SIMULTANEOUS 'TURN -ON° 100 A 100 A 3 "3 1 °8G PANEL 100 AMPS RATING MLO 60/2 3 ci, °3 1 °8 GROUND O GENERATOR OUTLET 100 AMPS RATING PANEL P SERVICE SCHEDULE MAIN CONDUCTORS GROUNDING CONDUCTOR CONDUIT AIC 100 AMPS 3 43 THWN #6 2" PC CONDUIT IOK TELEPHONE CABINET PANEL P 3/4° C 3°6THWN 1 ° 10G 3 "3 THWN in 2' PVC SCH 80 cond. (to FPL transformer) 1 °6 1 /2'C GROUND GROUND ° 6 SUPPL. GROUND FROM FRAME TO GROUND. TOTAL LOAD: 35 AMPS FPL CONTACT: CARLOS BEALE (305) 770 -7927 FPL \"/ — N/A — ATTSE PROPOSED TELEPHONE FACILITIES ON RIGHT OF WAY OF MIAMI SHORES - ELEC 210 NE 102ND ST Exchange: 305751 Designer: Phone: Bafna, Gitika 305 - 222 -8237 Authorization: 9MP05034N Dwg. 2 of 3 4/7/2009 11:57:24 AM * When installed. AC Power Pedestal should be located within Oft of the cabinet. This permits the pedestal to be grounded on the cabinet's buried ring ground system. * Use #2 AWG tin - plated bare solid copper wire for all ground connections. * Place minimum 6" of gravel in new Power Pedestal and replace gravel in any existing AC Power Pedestal re- entered. Main AC PWR Panel 1 #2 tinned GND Wire to $A1 if within 6ft of Cabinet * Route ground wire from VRAD Principal Bus Bar to the ground rod and cad weld in a 3 -way connection into the ground ring. * Insure no -oxide is applied to GND leads terminated on Principal Buss Bar. * Approved two (2) hole compression connectors with correct dye marking must be used to connect the solid #2 conductor to the cabinet ground buss. #2 VRAD 7330 Bonding and Grounding 3 -way Cad Weld m�� 3 -way Cad Weld Jog sgng lodpu;Jd OVmA +0u!gD3 OVIA OEEL Concrete Pad for DLC Cabinet #2 AWG tin - plated bare solid copper wire J 3 -way Cad Weld NOTE: Place one (1) number 2 tinned ground wire from the ground ring up into the splicing chamber and terminate the ground wire on the principle ground point bus bar. Place an additional number 2 tinned ground wire (separate from the first #2 ground wire above) from the ground ring up into the splicing chamber and terminate the ground wire on the principle ground point bus bar. The two (21 number 2 tinned ground wires should be connected to the ground ring utilizing a Cad weld connection. The first ground wire will be attached on one side of the ground ring and the second ground wire will be attached at the opposite side of the ground ring (i.e. 180 degrees apart). * Route GND wire from AC Sub PWR Panel direclly to nearest GND rod per NEC code Section 250. * Ground wire may not be spliced and should be routed as directly as possible. * The GND Ring must be below the frost line (See Notes). :m The GND Ring must be a minimum of 12in below grade. * GND Ring must also be approximately 6° to 24° from the edge of the cabinet pad. • 2 -way Cad Weld * Install minimum of four (4) (5/8° X 8° copper dad) ground rods. * All connections to the ground ring inducing the attachment to the ground rods will be Cad Weld connections. (Maximum 3 -way Cad Weld connections) No 4 -way or above connections. * All ground rods will be covered with a Flush Mount Ground Rod Closure for inspection purposes. * A minimum of 6° of gravel will be required in the ground rod inspection window. * Tag all ground conductors inside the inspection window with a °C Tag. * Place one (11#2 tinned ground wire from the ground ring up into the splicing chamber and terminate the ground wire on the principal ground point buss bar. * Place an additional #2 tinned ground wire (separate from the first #2 ground wire above) from the ground ring for termination by qualified designated contractor into the AC load center buss bar (AC Sub Electrical Panel). This panel is located in the splice chamber or attached to side of cabinet (as shown in figure above). * The two (2) number #2 tinned ground wires should be connected to the ground ring utilizing a Cad Weld connection. * The first ground wire will be attached on one side of the ground ring and the second ground wire will be attached at the opposite side of the ground ring (i.e. 180 degrees apart). * The termination of the #2 tinned ground wire to the principal ground point bus bar in the splicing chamber should be connected utilizing a compression type connection with two (2) hole lug ( #10 -3/81. Mechanical connections are NOT acceptable. * Place one (1) #2 tinned wire from the VRAD principal ground point bus bar over to the SA1 buss bar. This attachment will provide bonding and grounding connectivity between the SA1 and the VRAD. The minimum distance recommended in placing this ground wire from the VRAD to the SA1 is ten (10) feet. This procedure is best completed during the placing of the copper cable between the VRAD and the SA1. (The placing process described above will allow the isolation of the ground source for testing purposes). * Installations with multiple cabinets may be enclosed in the same ground ring if the separation between pads is 36 inches or less. Equipment on pads separated by more than 36 Inches shall have a separate ground ring. * Separate ground rings must be bonded together with a #2 AWG tin - plated bare copper conductor. * All ground rods will be covered with a Flush Mount Ground Rod Closure. A minimum of 6 inches of gravel will be required in the ground inspection windows. The gravel will be placed so that all ground connections are visible. Tag all ground conductors inside the inspection window and cabinet with a C tag. * A minimum of 6 inches of gravel will be required in the cable entrance area. ATTSE PROPOSED TELEPHONE FACILITIES ON RIGHT OF WAY OF MIAMI SHORES - ELEC 210 NE 102ND ST Exchange: 305751 Designer: Bafna, GTtika Phone: 305 - 222 -8237 Authorization: 9MPO5034N Dwg. 3 of 3 4/7/2009 11: 57: 25 AM 3 -way Cad Weld m�� 3 -way Cad Weld Jog sgng lodpu;Jd OVmA +0u!gD3 OVIA OEEL Concrete Pad for DLC Cabinet #2 AWG tin - plated bare solid copper wire J 3 -way Cad Weld NOTE: Place one (1) number 2 tinned ground wire from the ground ring up into the splicing chamber and terminate the ground wire on the principle ground point bus bar. Place an additional number 2 tinned ground wire (separate from the first #2 ground wire above) from the ground ring up into the splicing chamber and terminate the ground wire on the principle ground point bus bar. The two (21 number 2 tinned ground wires should be connected to the ground ring utilizing a Cad weld connection. The first ground wire will be attached on one side of the ground ring and the second ground wire will be attached at the opposite side of the ground ring (i.e. 180 degrees apart). * Route GND wire from AC Sub PWR Panel direclly to nearest GND rod per NEC code Section 250. * Ground wire may not be spliced and should be routed as directly as possible. * The GND Ring must be below the frost line (See Notes). :m The GND Ring must be a minimum of 12in below grade. * GND Ring must also be approximately 6° to 24° from the edge of the cabinet pad. • 2 -way Cad Weld * Install minimum of four (4) (5/8° X 8° copper dad) ground rods. * All connections to the ground ring inducing the attachment to the ground rods will be Cad Weld connections. (Maximum 3 -way Cad Weld connections) No 4 -way or above connections. * All ground rods will be covered with a Flush Mount Ground Rod Closure for inspection purposes. * A minimum of 6° of gravel will be required in the ground rod inspection window. * Tag all ground conductors inside the inspection window with a °C Tag. * Place one (11#2 tinned ground wire from the ground ring up into the splicing chamber and terminate the ground wire on the principal ground point buss bar. * Place an additional #2 tinned ground wire (separate from the first #2 ground wire above) from the ground ring for termination by qualified designated contractor into the AC load center buss bar (AC Sub Electrical Panel). This panel is located in the splice chamber or attached to side of cabinet (as shown in figure above). * The two (2) number #2 tinned ground wires should be connected to the ground ring utilizing a Cad Weld connection. * The first ground wire will be attached on one side of the ground ring and the second ground wire will be attached at the opposite side of the ground ring (i.e. 180 degrees apart). * The termination of the #2 tinned ground wire to the principal ground point bus bar in the splicing chamber should be connected utilizing a compression type connection with two (2) hole lug ( #10 -3/81. Mechanical connections are NOT acceptable. * Place one (1) #2 tinned wire from the VRAD principal ground point bus bar over to the SA1 buss bar. This attachment will provide bonding and grounding connectivity between the SA1 and the VRAD. The minimum distance recommended in placing this ground wire from the VRAD to the SA1 is ten (10) feet. This procedure is best completed during the placing of the copper cable between the VRAD and the SA1. (The placing process described above will allow the isolation of the ground source for testing purposes). * Installations with multiple cabinets may be enclosed in the same ground ring if the separation between pads is 36 inches or less. Equipment on pads separated by more than 36 Inches shall have a separate ground ring. * Separate ground rings must be bonded together with a #2 AWG tin - plated bare copper conductor. * All ground rods will be covered with a Flush Mount Ground Rod Closure. A minimum of 6 inches of gravel will be required in the ground inspection windows. The gravel will be placed so that all ground connections are visible. Tag all ground conductors inside the inspection window and cabinet with a C tag. * A minimum of 6 inches of gravel will be required in the cable entrance area. ATTSE PROPOSED TELEPHONE FACILITIES ON RIGHT OF WAY OF MIAMI SHORES - ELEC 210 NE 102ND ST Exchange: 305751 Designer: Bafna, GTtika Phone: 305 - 222 -8237 Authorization: 9MPO5034N Dwg. 3 of 3 4/7/2009 11: 57: 25 AM