PL-07-42Inspection Worksheet
Miami Shores Village
10050 N.E. 2nd Avenue Miami Shores, FL
Phone: (305)795 -2204 Fax: (305)756 -8972
Inspection Date: December 31, 2008
Inspector: Levrock, James
Owner: GARDNER, ROBERT
Job Address: 465 NE 96 Street
Miami Shores Village, FL
Project: <NONE>
Contractor: TECO PEOPLES GAS SYSTEM
Permit Type: Plumbing - Residential
Inspection Type: Final
Work Classification: Addition /Alteration
Phone Number
Parcel Number 1132060170120
Phone: (305)957 -3857
Building Department Comments
0
E.-
C
Passed
Inspector Com - is
cc
Failed
Correction
Needed
Re- Inspection
Fee
No Additional Inspections can be scheduled
re- inspection fee is paid.
until
Tuesday, December 30, 2008
Page 1 of 1
Miami Shores Village FimEEV'M
JAN 1 Y 2007
Building Department
10050 N.E.2nd Avenue, Miami Shores, Florida 33138
Tel: (305) 795.2204 Fax: (305) 756.8972
BUILDING Pub tic
PERMIT APPLICATION
FBC 2004
Permit Type (circle): Building Electrical
DOcS
Permit No. P 4 -21g 1g
Master Permit No.
Plumbing
Owner's Name (Fee Simple Titleholder) --� co ��� �� R„ " Phone # 3 a 5 '7 Z 17
(�
r
Mechanical Roofing
Owners Address
City kir AI l State
zip / C 2-
Tenant/Lessee Name Phone #
Job Address (where the work is being done
City Miami Shores Village
FOLIO / PARCEL #
Is Building Historically Designated YES
Contractor's Company Name -el r,
Contractor's Address
Ci r. 1
Qualifier Name
Phone # -7e) C 7
Zip 1�
Phone# g..-7 17-
State Certificate or Registration No ._ Certificate of Competency No.
•
Architect/Engineer's Name (if applicable)
Value of Work For this Permit
Typ'
Des
Phone #
Square / L e q, c`Of:Work:
%(,, a u1;x .
ONew ''lace O Demolition
**** ***** ** ** *** *** * * ** *** ***
Fees************* * * * * * * * * * * * * * * * * * * * * * * * * ** * * * **
Submittal Fee $ Permit Fee $ /6 V CCF $ k ` 20 CO /CC
Notary $ Training/Education Fee $ • 4C3 Technology Fee $ 4'.
Scanning $ 3-- Radon $ DPBR $ Zoning $
Bond $ Code Enforcement $ Double Fee $
Structural Review. $ Total Fee Now Due $10.60
See Reverse side
Bonding Company's Name (if applicable)
Bonding Company's Address
City State Zip
Mortgage Lender's Name (if applicable)
Mortgage Lender's Address
City State Zip
Application is hereby made to obtain a permit to do the work and installations as indicated. I certify that no work or installation has
commenced prior to the issuance of a permit and that all work will be performed to meet the standards of all laws regulating
construction in this jurisdiction. I understand that a separate permit must be secured for ELECTRICAL WORK, PLUMBING, SIGNS,
WELLS, POOLS, FURNACES, BOILERS, HEATERS, TANKS. and AIR CONDITIONERS, ETC
OWNER'S AFFIDAVIT: I certify that all the foregoing information is accurate and that all work will be done in compliance with all
applicable laws regulating construction and zoning.
"WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR
PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING,
_CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF
COMMENCEMENT."
Notice to Applicant: As a condition to the issuance of a building permit with an estimated value exceeding $2500, the applicant must
promise in good faith that a copy of the notice of commencement and construction lien law brochure will be delivered to the person
whose property is subject to attachment. Also, a certified copy of the recorded notice of commencement must be posted at the job site
for the first inspection which occurs seven (7) days after the building permit is issued In the absence of such posted notice, the
inspection will not be approved and a reinspection fee will be charged
Signature
Owner or Agent
The foregoing instrument was acknowledged before me this
day of 20 , by t it ►
who is personally known to me or who has produced
As identification and who did take an oath.
NOTARY PUBLIC
,•" "YP w LUIS MONTERO
4 44'41 "" Notary Public = State 01 Fiore
4 "' • =My Commission Expires Feb 2, 2010
Commission # DD 513850
Bonded By National Notary Assn.
Sign:
Print
My Commission
Tres:
Co ctor
The foregoing instrument was acknowledged before me this 't'
day of 2Q7 , by V e Cell —
who is personally known to me or who has produced
as identification and who did take an oath.
NOTARY PUBLIC:
Sign:
Print:
My Commission E
9
********** *t*** *,r,k*** **** *,r*** * ** * ** ** aye ** • * ** ** * *** ** ** * *** * *** * *** *sir ***
APPLICATION APPROVED BY:
(Revised 02/08/06)
/2 d 7 Plans Examiner
Engineer
Zoning
NEW RISER
X SET A BOLLARD
AORE.CARACEJ
1
CONSRUCTION NOTES:
N, R/W
••••
••
5' SIDEWALK •••• ••• •
•• • • •
•
• • •
•••41•
TIE IN TO MAIN EXTENSI�)l!. • • •
:01°41:
C �i •
•••• ••■b
• •••
On •
• •
NE 96 STREET • • • • • ��;�
• • •
• • •••• •
• • • •
•• • ••• • • •
••
••
1. ALL GAS PIPELINE CONSTRUCTION TO FOLLOW TECO PEOPLES GAS STANDARDS.
2. TRAFFIC CONTROL SHOULD BE MAINTAINED AND COORDINATED WITH THE
APPRORIATE GOVERNMENTAL AGENCY,
3. ALL DISTRUBED ASPHALT /CONCRETE /SOD AREAS TO RE RESTORED TO PRIOR
CONDITION, UNLESS OTHERWISE SPECIFIED.
S.R/W
48 HOURS BEFORE DIGGING
CALL SUNSHINE 1 -800- 432 -4770
A TLA S
M 14
SCALE:
NTS
DATE:
12/04/06
DRAWN BY:
LM
NEW 3/4" PLASTIC GAS SERVICE
445 NE 96 STREET. MIAMI SHORES
SHEET:
1/1
JO:
311
4;1
4 -fit w74
:'s 7
•
_ .
°-\\��6�
NOTES
CONSTRUCTION
1. LOCATE AND PROTECT ALL UTILITIES IN AREA OF
CONSTRUCTION. SUNSHINE # 1 -800- 432 -4770
2. RESTORE ALL AREAS TO PRIOR CONDITIONS
3. ALL CONSTRUCTION TO FOLLOW JURISDICTIONAL
GOVERNMENT AND TPG STANDARDS.
PER COFTL
4. NO FM
5. NO WM, AIR PROFILES.
6. NO DRAINAGE.
NO APPLICATIONS SUBMITTED FOR:
6. DEWATERING ( ABOVE W TABLE).
7. TRAFFIC STRIPS OR LOOPS.
LEGEND
R/W RIGHT OF WAY
P/L PROPERTY LINE
T/T TAPPING TEE
EFV EXCESS FLOW VALVE
••SVC SERVIc „ LINE
%• STE(l„,I;tASTIC• C0AT
•PE POLY•ETHVLEN: ••••
•
•
• •
••
•
• •
• •
MAX
• • ••••
•
IS
•
•• ••
• •
• •
• • •
• ••• • ••
• GAS MAIN
•
SOD RESTORATION DETAIL
SCALE NOT TO SCALE
15
12
9
6
ME 5TH STREET
z
[311_ OCK
53
CONTINUED AT STATION 00+ 033 SHEET 2 OF 2
r
ALLEY WAY
ce
PROP 2° PE BORE
16° WATER MAIN
CROSS SECTION
SCALE NOT TO SCALE
18° MINIMUM
11.-_OCK 53
NE 95TH STREEr
27'
I! 5'
PROPOSED 2' PLASTIC GAS MAI
O
IMMO =M
Oc
K 5`` it
ALLEY WAY
5'
7'
[ 3
BORE UNDER STREET
PROPOSED 2" PLASTIC GAS MAI
11E IN TO EXIS11NG 6" PLASTIC GAS MAIN
:LOCK 52
z
L
OCK54
R.MCMEWM
ig JAN 1:1 2007
B Y: eCfi -
NE 95TH STREET
EXISTING 6' PLASTIC GAS MAIN
o LOCK 005
• •
• • •
•• •
•
••••
• •
••••
• .-
•• ••
••••••
• • •
• •
• •
• • •
•• •
+ 02
••••
• •
••••
•
•
•
•
•
• •
•
• • •
•
(So• -1.i 01
•
•
••••
• •
••••
.••• •
• •
••
00 + 00
•
•
•• ••
•• •••
•
•
•
•• •••
• •
••- -•••
• •
PEOPLES GAS
k;',•(..") •
5 NE NTH STREET
I SHORES, FL
PROPOSED P.E. G: S LINES & 3/4 PE
GAS
SERVICE
NOTES
CONSTRUCTION
1. LOCATE AND PROTECT ALL UTILITIES IN AREA OF
CONSTRUCTION. SUNSHINE # 1- 800 - 432 -4770
2. RESTORE ALL AREAS TO PRIOR CONDITIONS
3. ALL CONSTRUCTION TO FOLLOW JURISDICTIONAL
GOVERNMENT AND TPG STANDARDS.
PER COFTL
4. NO FM
5. NO WM, AIR PROFILES.
6. NO DRAINAGE.
NO APPLICATIONS SUBMITTED FOR:
6. DEWATERING ( ABOVE W TABLE).
7. TRAFFIC STRIPS OR LOOPS.
LEGEND
R/W RIGHT OF WAY
P/L PROPERTY LINE
T/T TAPPING TEE
EFV EXCESS FLOW VALVE
SVC SER��C�� LINE
•• A
$P STE LASTI C0 T
•„'E POLYETHELENE •.••
• 3> vu•••
• •
SOD RESTORATION DETAIL
SCALE NOT TO SCALE
NE 5TH AVE
NE 95TH STREET
15 Z
II
00 + 03
00 + 02
.I
00 +01
00 +00
BLOCK 86
ALLEY WAY
PA TA - -- - -N P%L
LOT 17/18
BLOCK 86 ;
Qy
91—
CROSS SECTION
SCALE NOT TO SCALE
if/
ROPOSED M
/
DRIVE WAY/TURNAROUND
/ LOT 16
/ BLOCK 86
ao + 04 — - - — - - —
:I
n.�
w
ROPOSED /4" PLAS11C GAS SERVICE
5 NE 96TH STREET
LOT 19/20
BLOCK 86
DRIVE WAY/TURNAROUND
00 + 03
••••
• •
• • ••••
• • •
•• • • •
•
•
•
•••• • •
• •
•••• •
• •
BORE UNDER STI • • •
•
B
6'
7'
rSIDE WALK
LOCK 99.•
• •
• • •
•• •
SANITARY SEWER
I
PROPOSED 2" PLASTIC GAS MAIN
BORE UNDER STREET
N
J
t
• •
••••
••• •
• •
••
rGRASS DIVIDER 3
NE 95TH STREET ■►
S
SNP
•
- -- --- --- - -�- -- ----
BLOCK 53
FROM STATION 00+ 03 SHEET 1 OF 2
r--
BLOCK 5
PROPOSED 2" PLASTIC GAS MAIN
_ L
••
••
•
••
•
••
••
••
••
••
•
•
•
•
•
•
•
•
•
•••
•
•••
•
•
PEOPLES GA8
TECO / PEOPLES GAS - N. MIAMI OPERATIONS
445 NE 96TH STREET
MIAMI SHORES, FL
PROPOSED 2° P.E. GAS LINES & 314" PE GAS SERVICE
CBH 1 SCALE: 1" = 50' I DATE: 10/10/06 I SHEET 2 of 2
••
•
••
•••
•
•
•
•••
•
•••
•