RF-07-923Inspection Worksheet
Miami Shores Village
10050 N.E. 2nd Avenue Miami Shores, FL
Phone: (305)795 -2204 Fax: (305)756 -8972
Inspection Number: INSP -48353 Permit Number: RF -5 -07 -923
Scheduled Inspection Date: September 09, 2009
Inspector: Bruhn, Norman
Owner: QUINTON, ALBERT
Job Address: 457 NE 95 Street
Miami Shores, FL 33138-
Project: <NONE>
Contractor: SOUTHERN ENGINEERING CONSTRUCTION LLC
Permit Type: Roof
Inspection Type: Final Roof
Work Classification: Tile
Phone Number
Parcel Number 1132060140630
Phone: (305)251 -3000
Building Department Comments
NEW ROOF FOR CABANA COLOR THRU TILE
Passed
Failed
Correction
Needed
Re- Inspection
Fee
No Additional Inspections can be scheduled until
re- inspection fee is paid.
Inspector Comments
C...11......L.e. A4 70110
For Inspections please call: (305)762 -4949
D.+...4fl..F 47
CIVIL
ENGINEER
Reileh Engineering Corp.
(Consulting Engineer)
P.O. Box 22011
Hialeah, Florida 33002
Tel : 305-823-8008
Fax: 305-823-3300
September 2, 2009
Double Diamond Construction
Miami, Florida
Project:
Dear Sirs;
ROOF TILE UPLIFT TEST REPORT
Gazebo
457 Northeast 95 Street
Miami, Florida
Information provided by client: R � � � o
Permit Number: Not Provided
Date Completion: August 28, 2009
Roofing Contractor: Double Diamond Construction
Project Number: 09 -0845
(Testing Laboratory Certificate #06- 0501.15)
In accordance with your request and authorization, a representative of Reileh Engineering Corporation
completed the Roof Tile Uplift Test at the above referenced project. This testing was performed in general
accordance with Roofing Application Standard TAS No.106 -- Standard procedure for field verification
ofthe bonding of mortar or adhesive set tile system and mechanically attached, rigid, discontinuous roof
systems.
The total ofthe tested roof surface area was less than 10000 square feet, and the mean height of the roof
is less than 40 feet above ground surface. The type of file used for this project was reported to be Barrel
Roof Tile. This tile was reported to have been foamed in place.
At the time of our inspection, the entire area ofthe roof was examined for loose tiles. Not less than one
(1) tile in ten (10) of all components in the field area and one (1) tile in five (5) of all tiles in the perimeter
and comer areas were physically examined. A minimum of one (1) test per every two (2) squares in the
field, one (1) test per square in the perimeter area, ridge caps and (1) in the comer areas were conducted.
Based on our test resu lts, we
meets the test requirement outl in
test report for your review.
de that the
heabdv
�lati nofthera
- mentioned prot
e at the above .referenced project
Attached please find a copy of our
Reileh Engineering Corporation appreciates the opportunity of assisting you in this project. Ifyou have
any questions or if we may be of further assistance, please do not hesitate to contact the undersigned.
Respectfully submitted;
Reileh Engineering Corporation
Mohamad Sonny Salleh, P.E.49014
Project Manager
TILE UPLIFT TEST
Gazebo
457 Northeast 95 Street
Miami, Florida
Reileh Engineering Corporation — Project Number - 09 -0845 — Page 2 of 5
Report of
TILE UPLIFT TEST
for
Gazebo
457 Northeast 95 Street
Miami, Florida
Project Number: 09 -0845
Test Number
Test Load
1
35
Pass
2
35
Pass
3
35
Pass
4
35
Pass
5
35
Pass
6
35
Pass
7
35
Pass
8
35
Pass
9
35
Pass
10
35
Pass
11
35
Pass
12
35
Pass
13
35
Pass
14
35
Pass
15
35
Pass
16
35
Pass
17
35
Pass
18
35
Pass
19
35
Pass
20
35
Pass
21
35
Pass
22
35
Pass
23
35 Pass
Reileh Engineering Corporation -- Project Number - 09 -0845 — Page 3 of 5
24
•
Test Load (ibf}
35
Pass
25
35
Pass
26
35
Pass
27
35
Pass
28
35
Pass
29
30
r
35
Pass
35
Pass
31
35
Pass
32
35
Pass
33
35
Pass
34
35
Pass
35
35
Pass
36
35
Pass
37
35
Pass
38
35
Pass
39
35
Pass
40
35
Pass
41
35
Pass
42
35
Pass
43
35
Pass
44
35
Pass
45
35
Pass
46
35
Pass
47
35
Pass
48
35
Pass
49
35
Pass
50
35
Pass
51
35
Pass
Reileh Engineering Corporation -- Project Number - 09 -0845 — Page 4 of 5
52
35
Pass
53
35
Pass
54
35
Pass
55
35
Pass
56
35
Pass
57
35
Pass
58
35
Pass
59
35
Pass
60
35
Pass
61
35
Pass
62
35
Pass
63
35
Pass
64
35
Pass
65
35
Pass
66
35
Pass
67
35
Pass
68
35
Pass
A few loose tiles were noted.
Reileh Engineering Corporation -- Project Number - 09 -0845 — Page 5 of 5
•
48'
9I 29
92
99
57
94 95
9
4
15
16
12
28
27
17
40
41
42
49
49
99 98
47
90
51
52
57
98
59
59
60
61
62
69
66
67'
68
69
19
20
46
49
56
55
54
8
29
2
22
4
10
26
9
24
9
2
29
9 6
8
7
28'
09 -084
APPPDX. root MST ILOCA110N5 ANI7171WN510N5