RF-06-2940 (2)Inspection Worksheet
Miami Shores Village
10050 N.E. 2nd Avenue Miami Shores, FL
Phone: (305)795 -2204 Fax: (305)756 -8972
Inspection Number: IIP- 34097
Perm
Num
IMF- 1.2 -09 -2940
Inspection Date: 03/27/2007
Inspector: Grande, Claudio
Owner: MANGHAM, MICHAEL AND ALICIA
Job Address: 1065 94 Street NE
Miami Shores Village, FL
Project: <NONE>
Contractor: JOHN BUSTA ROOFING INC
Block:
Permit Type: Roof
Inspection Type: Final Roof
Work Classification: Roof - New
Phone Number
Parcel Number 1132050120100
Lot:
Phone: (305)757 -7620
Building Department Comments
RE -ROOF REAR GARAGE SLOPED AND FLAT ROOF
AND HOLE ROOF
COLOR THRU TILE CEMENT
'4
% AR 2 8 gli
Inspector Comments
/ Dr_____- 0
4(f•
‘,....i.....„____________
Passed
v
Failed
Correction
Needed
Re- Inspection
Fee
($75)
No Additional Inspections can be scheduled
re- inspection fee is paid.
until
Monday, March 26, 2007
Page 2 of 2
Miami Shores Village 1 -
Building Department jet
10050 N.E.2nd Avenue, Miami Shores, Florida 33138
Tel: (305) 795.2204 Fax: (305) 756.8972
BUILDING @ M E �%
PERMIT APPLICATION OCT 1 0 2006 kit
FBC 2004 BY: M Wk
Permit No.
Master Permit No.
Permit Type (circle): Building Electrical Plumbing Mechanical
Owner's Name (Fee Simple Titleholder) ,e/1/f/i7) Phone # 9 4S' s7s-7
Owner's Address 7340 A J q $ -
City/ /// /eSWz2legS
Tenant/Lessee Name
State rf---
Zip 33/3S
Phone #
Job Address (where the work is being done) 73/' 11 Sr
City Miami Shores Village County . Miami -Dade Zip 33/ 3 g
FOLIO / PARCEL #
Is Building Historically Designated YES NO
Contractor's Company Name .291,67.-/ (-N `4% Phone # 3O 75115' 72_
Contractor's Address g AdA) /0l7r 57--
City //f f / xx State - Zip 33/&
Qualifier Name Za4 2S Phone #
State Certificate or Registration No. 5 7/ 9 0 Certificate of Competency No.
Architect/Engineer's Name (if applicable) Phone #
Value of Work For this Permit $ 2.167)-- Square / Linear Footage Of Work:«'
Type of Work: ['Addition ['Alteration ❑New Repair/Replace ❑ Demolition
Describe Work•. , E4i 1 t VW 6 -rut', r ` /,O 'LfC /X
1267-401)6 /0 77_t /,_ RAS '-' LE. W/1 € e64nOVW
Val/1,0K, i p2o)c -n LE . iz.el°la`tc bap `cUum6 ,1'A-Ti-CL- UN eLA- jm C/4 ,—.
Submittal Fee $ Permit Fee $ i OD �� 4. CCF $ I - /SO CO /CC
Notary $ 5 f-- Training/Education Fee $ o 0 Technology Fee $ Z.• 5
Scanning $ ta ,C,0 Radon $ DPBR $ Zoning $
Bond $ Code Enforcement $ Double Fee $
Structural Review. $
Total Fee Now Due $
See Reverse side -3
cd14.,AA
Bonding Company's Name (if applicable)
Bonding Company's Address
City State Zip
Mortgage Lender's Name (if applicable)
Mortgage Lender's Address
City State Zip
Application is hereby made to obtain a permit to do the work and installations as indicated. I certify that no work or installation has
commenced prior to the issuance of a permit and that all work will be performed to meet the standards of all laws regulating
construction in this jurisdiction. I understand that a separate permit must be secured for ELECTRICAL WORK, PLUMBING, SIGNS,
WELLS, POOLS, FURNACES, BOILERS, HEATERS, TANKS and AIR CONDITIONERS, ETC
OWNER'S AFFIDAVIT: I certify that all the foregoing information is accurate and that all work will be done in compliance with all
applicable laws regulating construction and zoning.
"WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR
PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING,
CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF
COMMENCEMENT."
Notice to Applicant: As a condition to the issuance of a building permit with an estimated value exceeding $2500, the applicant must
promise in good faith that a copy of the notice of commencement and construction lien law brochure will be delivered to the person
whose property is subject to attachment. Also, a certified copy of the recorded notice of commencement must be posted -at the job site
for the first inspection which occurs seven (7) days after the building permit is issued. In the absence of such posted notice, the
inspection will not be approved and a reinspection fee will be charged.
Owner or Agent
The foregoing instrument was acknowledged before me this 22.
day of
tivho is personally'known to me or who has prod
is
// As identification and who did take an oath.
'NOTARY) PUBLI :
Sign:
Print:
My Co
11 It
Signature _s
D
Contractor
The foregoing instrument was acknowledged before me this 16
rtlax of Q T ,20® by C11,11ffl 'emu (t
who is
own to me or who has produced
as identification and who did take an oath.
ission Expires:
NOTARY PUBLIC:
Sign:
9 Print: 0`K' (.6(
9
Expires: Jui 13,20 My Commission Expir,
Fionded y,',
,rgrit sr fir* * * * * * *li * * * * * * * * * * * * **
APPLICATION APPROVED BY:
(Revised 02/08/06)
Gva
Plans Examiner
Engineer
Zoning
Reileh Engineering Corp.
(Consulting Engineer)
P.O. Box 22011
Hialeah, Florida 33002
Tel : 305-823-8008
Fax: 305-823-3300
March 15, 2007
John Busta Roofing
300 Northeast 91 Street
Miami Shores, Florida
Project:
Dear Sirs;
ROOF TILE UPLIFT TEST REPORT
Residential Home
1065 Northeast 94 Street
North Miami, Florida
Information provided by client.
Permit Number: RF062940
Date Completion: March 07, 2007
Roofing Contractor: John Busta Roofing
Project Number: 07 -0851
(Testing Laboratory Certificate #06- 0501.15)
In accordance with your request and authorization, a representative of Reileh Engineering
Corporation completed the Roof Tile Uplift Test at the above referenced project. This testing was
performed in general accordance with Roofing Application Standard TAS No.106 -- Standard
procedure for field verification of the bonding of mortar or adhesive set tile system and mechanically
attached, rigid, discontinuous roof systems.
The total of the tested roof surface area was less than 10000 square feet, and the mean height of the
roof is less than 40 feet above ground surface. The type of tile used for this project was reported to
be Cement/Clay Roof Tile. This tile was reported to have been foamed in place.
At the time of our inspection, the entire area of the roof was examined for loose tiles. Not less than
one (1) tile in ten (10) of all components in the field area and one (1) tile in five (5) of all tiles in the
perimeter and comer areas were physically examined. A minimum of one (1) test per every two (2)
squares in the field, one (1) test per square in the perimeter area and (1) in the comer areas were
conducted.
Based on our test results, we conclude that the installation of the roof tile at the above referenced
project meets the test requirement outlined in the above - mentioned protocol. Attached please find
a copy of our test report for your review.
Reileh Engineering Corporation appreciates the opportunity of assisting you in this project. If you
have any questions or if we may be of further assistance, please do not hesitate to contact the
undersigned.
Respectfully submitted;
Reileh Engineering Corporation
Moh., ad Sonny Salleh, P.E.49014
Project Manager
TILE UPLIFT TEST
Residential Home
1065 Northeast 94 Street
North Miami, Florida
Reileh Engineering Corporation -- Project Number - 07 -0851 — Page 2 of 6
Report of
TILE UPLIFT TEST
for
Residential Home
1065 Northeast 94 Street
North Miami, Florida
Project Number: 07 -0851
Test Number
Test Load (lbf)
Test Status
1
35
Pass
2
35
Pass
3
35
Pass
4
35
Pass
5
35
Pass
6
35
Pass
7
35
Pass
8
35
Pass
9
35
Pass
10
35
Pass
11
35
Pass
12
35
Pass
13
35
Pass
14
35
Pass
15
35
Pass
16
35
Pass
17
35
Pass
18
35
Pass
19
35
Pass
20
35
Pass
21
35
Pass
22
35
Pass
23
35
Pass
24
35
Pass
Reileh Engineering Corporation -- Project Number - 07 -0851 — Page 3 of 6
Test Number
Test Load (lbf)
Test Status,
25
35
Pass
26
35
Pass
27
35
Pass
28
35
Pass
29
35
Pass
30
35
Pass
31
35
Pass
32
35
Pass
33
35
Pass
34
35
Pass
35
35
Pass
36
35
Pass
37
35
Pass
38
35
Pass
39
35
Pass
40
35
Pass
41
35
Pass
42
35
Pass
43
35
Pass
44
35
Pass
45
35
Pass
46
35
Pass
47
35
Pass
48
35
Pass
49
35
Pass
50
35
Pass
51
35
Pass
52
35
Pass
53
35
Pass
54
35
Pass
Reileh Engineering Corporation -- Project Number - 07 -0851 — Page 4 of 6
Test Number
Test Load Obi)
Test Status
55
35
Pass
56
35
Pass
57
35
Pass
58
35
Pass
59
35
Pass
60
35
Pass
61
35
Pass
62
35
Pass
63
35
Pass
64
35
Pass
65
35
Pass
66
35
Pass
67
35
Pass
68
35
Pass
69
35
Pass
70
35
Pass
71
35
Pass
72
35
Pass
73
35
Pass
74
35
Pass
75
35
Pass
76
35
Pass
77
35
Pass
78
35
Pass
79
35
Pass
80
35
Pass
81
35
Pass
82
35
Pass
83
35
Pass
84
35
Pass
Reileh Engineering Corporation -- Project Number - 07 -0851 — Page 5 of 6
Test Number
Test Load (lbf)
Test Status
85
35
Pass
86
35
Pass
87
35
Pass
Reileh Engineering Corporation -- Project Number - 07 -0851 — Page 6 of 6
45
83
47
59
60
61
51
56
53
52
84
57
56
55
54
62
85
77
71
81
75
76
B0
14
79
78
72 73
41
42
44
40
45
38
46
37
69
`6
49
62
50
22
25
24
33
20
34
30
29
b
2
19 0
36
17
35
II
12 16
63
64
69 68
67
70
65 66
Z6
27
28
31
87
32
5
0
15
3
14 9
7
8
381
07 -08
APPPDX, t OOF 1151' 1- 0CATION5 ANI717IM510N5
09/29/2886 11:51 3057549852 DLEYROOFING
SECTION R4402.13
HIGH VELOCITY HURRICANE ZONES — REQUIRED OWNT
FOR ROOFING CONSIDERATIONS
R4402.111 Scope. As it pertains to the sermon, it is the responsibility of roofing
with the required roofing permit, and to explain to the owner the content of the > t;
R4402 govern the minimum requirements and standards of the industry for roofus
Additionally, the following items should be addressed as pan of the agreement
owner's initial in the designated space indicates that the lam has been explained.
Aesthetics- Workmanship: the workmanship provisions of won R4402 are
se of providing that the roof system meets the wind resistance and water
performance standards. Aesthetics (appearance) are not a consideration with
workmanship provisions. Aesthetic issues such as color or architectural
ce, that are not part of a zoning code, should be addressed as part of the agreement
the owner and the contractor.
Renailing wood decks: When replacing roofing, the existing wood roof deck
ve to be renailed in accordance with the current provisions of Section R4403. (The
k is usually concealed prior to removing the existing roof system).
Common roofs: Common roofs are those which have no visible delineation
neighboring units (i.e., townhouses, condominiums, etc.) In buildings with
on roofs, the roofing contractor and/or owner should notify the occupants of adjacent
f roofing to be performed.
4. Exposed Ceiling Exposed., open beam ceilings are where the underside of the
roof decking can be viewed from below. The owner may wish to maintain the architectural
appearance; therefore, roofing nail penetration of the underside of the decking may not be
acceptable. The provides the option of maintaining the appearance.
co
5. Pointing water The current roof system and/or deck of the building may not
drain well and may cruse wad to pond (accumulate) in low-lying areas of the roof.
Ponding can be an indication of structural distress and may rcquica the review of a
professional structural engineer. Pending may shorten the life expectancy and performance
-=1 of the new roofing system_ Ponding conditions may not be evident until the original roofing
® 51 system is removed. Ponding conditions should be corrected.
1-, 6. Overflow scuppers (wall outlets): It is required that rainwater flow off so that
® the roof is not, overloaded from a buildup of water. Perimeter /edge wall or other roof
extension may block this discharge if overflow scuppers (wall outlets) are not provided. It
may be necessary to install overflow scuppers in accordance with the requirements of
Sections R4402, R4403 and R4413.
.. ... • • • • • ..
7. .Yent j 1
tioq: Kai itof gtructures should have some ability to vent natural
airflow througb tbst idteiids,8f the staictu re assembly (the building itself). The existing
amount of attic ventilation shall not be reduced. It may be beneficial to consider additional
venting which rest* it t xteitnding due service life of the roof. • .P.J‘ F0 . • : : 7 Voko Wilt fb
•
Owner /Agent s tgnature Date
.... ....... •
• • . . . • • •
• • • • • • • • • • • • • •
• ...... • • • • •
.... • • ••• • •
Contractor Signature Date
4
Page
High Velocity Hurricane Zone Uniform Roofing Permit Application Form
IMAO® -DADS COUNTY BUILDING DEPARTMENT ELECTRONIC APPUCATION
Section A (General Information)
Master Permit Na Process No.
I VO
Contractor's Name: Job Address:
I 1914.01 itoo h 1 -7340 iv '9 s
I— Low Slope
✓ Asphaltic Shingles
✓ Prescriptive BUR -RAS 150
Roof Category
✓ Mechanically Fastened The
✓ Metal Panel/Shingles
✓ Other:I
Roof Type
I— New Roof r Re-Roofing r Recovering , Repair r Maintenance
Are there Gas Vent Stacks located on the roof? r Yes r No If yes, what type? r Natural F LPGX
Roof System Information
Steep Sloped area (ft ?) I / 0 0
r Mortar/Adhesive Set Tile
r Wood Shingles/Shakes
Low slope roof area (ft.2) 1
Section B (Roof Plan)
Total (ft.2) 1 /Od
Sketch Roof Plate Illustrate a0 Levels and sections, roof drains, scuppers, overfow scuppers end overflow drains. Inctude dimensions
of sections and levels, dearly identify dimensions of etevated pressure zones and Location of parapets.
Perimeter Width pit 1 Comer Size (a'
4
• •
• ••.. ,.. • • ••• • ▪ . •• •
•• ••• •e4, • • •••
• • • ••• • •••
• • • • • • • • • •
• • • • • • • • • •
• • • • • •
• • • • • •• • • ••
•• •
••• • • • • ••• •P •
• • • • • • • •
• • • ••• • • •
fits . /ivxp A tron ,mTlnemtritontc\irrn•40A•af r, 1t' i • • • i
.•• • • • •
ononnn'