Loading...
ACT-07-776Inspection Worksheet Miami Shores Village 10050 N.E. 2nd Avenue Miami Shores, FL Phone: (305)795-2204 Fax: (305)756-8972 Nem Memm, u-va fk% Inspection Date: 07/19/2007 Inspector: Grande, Claudio Owner: SMITH, MARY LESLIE Job Address: 1053 94 Street NE Miami Shores Village, FL 33138- Project: <NONE> Contractor: ATLANTIC AWNINGS CORP Permit Type: Awnings/Canopies/Tents Inspection Type: Final Work Classification: New Block: Phone Number (305)347-4083 Parcel Number 1132050120090 Lot: Phone: (305)229-0555 Building Department Comments INSTALLATION OF AWNINGS 5 AUL 2 0 Am Passed Inspector Comments Failed Correction Needed Re-Inspection Fee ($75) No Additional Inspections can be scheduled re-inspection fee is paid. until Thursday, July 19, 2007 Page 1 of 2 Miami Shores Village � I Plo- g Building Department p 10050 N.E.2nd Avenue, Miami Shores, Florida 33138 Tel: (305) 795.2204 Fax: (305) 756.8972 BUILDING 1 E PERMIT APPLICATIOl APR 1 8 20071 FBC 2004 Permit Type (circle): Owner's Name (Fee Simple Titleholder) Owner' Address , /, 416 qy City �h BY: Electrical Plumbing Mechanical Roofing Phone # 3d5 327/ 7 s�1 v " 3 I-1 Permit No. N1- -Tkio Master Permit No. /2 , State Zip �j 31,_ S Tenant/Lessee Name Phone # Job Address (where the work is being done) /0 08 / , 91 /2 5 City Miami Shores Village County Miami -Dade Zip 3Y,' 5Z' FOLIO / PARCEL # / I°' 3ACS S o /61-- 0090 Is Building Historically Designated YES NO Contractor's Company Name 4`rL 2 )41 , ,4(. JAJ i, .S Phone # 3 0 , Contractor's Address / 0133 if S'ck.i /s-6 ct vie, 305 • O b 5 . GT R9 33 it r City m lA ma State Zip Qualifier Name J O / / 9 6 /11/1 Phone # 7 f' 7d e' (1/31 State Certificate or Registration No. Certificate of Competency No. 04, c'3 .S co Co 1 3 Architect/Engineer's Name (if applicable) Phone # Value of Work For this Permit $ Square / Linear Footage Of Wprk: Type of Work: ['Addition Describe Work: Al eration (mil ['New ❑ Repair/Replace ❑ Demolition OTA 1 8 ` 5\ 0' (1_ 3 \ -1' Ok) ********* * * *** * ** *** * ** **** * ** *** * * ** *Fe % **,r *** * * * * ** * * *,r * * * * **** * * *** *,r **** * * *** * ** Submittal Fee $ Permit Fee $ / -.***-- CCF $ �' �f CO /CC Notary $ — Training/Education Fee $ Scanning $ O Radon $ DPBR $ Technology Fee $ ? '50 Zoning $ Bond $ Code Enforcement $ Double Fee $ Structural Review. $ Total Fee Now Due $ /1 - See Reverse side -+ Bonding Company's Name (if applicable) Bonding Company's Address City State Zip Mortgage Lender's Name (if applicable) Mortgage Lender's Address City State Zip Application is hereby made to obtain a permit to do the work and installations as indicated. I certify that.no work or installation has commenced prior to the issuance of a permit and that all work will be performed to meet the standards of all laws regulating construction in this jurisdiction. I understand that a separate permit must be secured for ELECTRICAL WORK, PLUMBING, SIGNS, WELLS, POOLS, FURNACES, BOILERS, HEATERS, TANKS and AIR CONDITIONERS, ETC OWNER'S AFFIDAVIT: I certify that all the foregoing information is accurate and that all work will be done in compliance with all applicable laws regulating construction and zoning. "WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT." Notice to Applicant: As a condition to the issuance of a building permit with an estimated value exceeding $2500, the applicant must promise in good faith that a copy of the notice of commencement and construction lien law brochure will be delivered to the person whose property is subject to attachment. Also, a certified copy of the recorded notice of commencement must be posted at the job site for the first inspection which occurs seven (7) days after the building permit is issued In the absence of such posted notice, the inspection will not be approved and a reinspection fee will be charged Agent The foregoing instrument was acknowledged before me this day of 200, by %�')�+"� (es m1 2 , who is personally known to me or who has produced NOTARY PUBLIC: /77X y Sign: Print: As identification and who did take an oath. 1 My Commission Expires: * * * * * * * * * * * * * * * * * * * * * * * ** ** MAYLINO DIAZ-cLARK MY COMMISSION # DD Signature Contra The foregoing in ���' ent was acknowledged before me this day of J(o ! 20 07 by � � 16A' S'LL 1 A) who is erso ally known to me�or who has produced NOTARY PUBLI ii: Sign: Print: W AV L!4 : ; VN1AN SUAREZ r$ ..� , ?'Y COMMISSION # DD 606833 5622 My Commission Expires _ EXPIRES: October 18, 2010 M.... ggp�gy asridentification and who did take an oath. * * * * * * * * * * * * * * * * * ** ** APPLICATION APPROVED BY: (Revised 02/08/06) ncy Holder) ****************** *** * ** * * * * * ** * * ** * * * * * * ** * * ** ** Plans Examiner Engineer Zoning STATE OF FLORIDA) COUNTY OF DADE) Miami s tiir49e 2)efrovetmeffe 10050 NE Zed Ave Miami Shores, Fl 33138 Phone 305-795-2204; Fax 305-756-8972 www.miamishoresvillage.com AFFIDAVIT APR 1 8 2007 B Y: The undersigned Affiant, 7-12? r ,�4 . � ' , does hereby attest that erty over) The attached survey, performed by 66 I /1 ,46s-Dc. 1n C (name of surveyor's company) for address: J053 /U, " Sep in sag s s FL, performed on Y % /( (date of survey) is an accurate representation of the existing conditions and locations of all structures on the property as of this date. The purpose of this Affidavit is to induce Miami Shores Village to issue a building permit for the property without first providing a survey less than six (6) months old. The Affiant, as property owner, further agrees to remove or obtain permits for any structures which now may exist on the property which are not permitted or which may violate zoning or building code regulations. The Affiant further understands that the existence of any such structures may affect final inspections as applicable to this or other permits. Further, ffiant sayeth nau Property Owner Signature ,57014 Property Owner Print Name SWORN TO AND SUBSCRIBED before me this / day of ,Mam'.I deaf . t Affiant is personally known to me,— pi'edueed rii,p( STEPHAMEA. COLAS MY COMMISSION # DD 179130 EXPIRES: Mardi 20, 2007 .,94, Boied uR alo�ry Pu,c Unden Notary ,Age we r. 6/4, Planning and Zoning Criteria Miami Shores Village 10050 N.E. 2nd Avenue Miami Shores, FL 33138 -0000 Phone: (305)795 -2204 Fax: (305)756 -8972 Permit NO. ACT -4 -07 -776 Issue Date: Not Issued Expires:Not Issued Folio Number:1132050120090 Owner's Name: MARY LESLIE SMITH Job Address: 1053 94 Street NE Miami Shores Village, FL 33138- Owner's Phone: (305)347 -4083 Total Square Feet: Total Job Valuation: $ 3,000.00 0 Planning and Zoning Criteria and Comments Approved: Yes Date Approved: 6/19/2007 : Yes Comments: FABRIC CAN NOT BE USED TO COVER A PORCH IN THE FRONT YARD. 6/19/07 NEW PLAN OK, AWNING MUST NOT EXTEND MORE THAN 36" INTO SIDE YARD COVER SHEET Structural Calculations for Canvas Awning •• • . • • • ••• • •• •. • • • •••• • • • • •••• • • • • • • • • • • • • •• •• • • • •••• • • • • • • • •••• • • • • • • •• • • • •••• • • • • • • •••• • • • • • Project: Scott Porter 1053 NE 94 St Miami Shores, FL 33138 INFINITY ENGINEERING Infinity Engineering Services, Inc. 14746 SW 60 St Miami, FL 33193 Tel: 786- 287 -3922 www.1nfinityEng.us CA# 26963 Victo eron, PE Civil PE# 63023 Scott Porter 1B, 1053 NE 94 St, Miami Shores, FL 33138.xmcd 1 of 4 06/01/2007 DESIGN WIND LOADING FOR CANVAS AWNING ASCE 7 -02 (C&C, h <60 ft) Z =25ft V = 90 mph FBC 2004 3105.4.2.1 = 0.77 Exposure_Category = "C' Kzt = 1.0 qz:= 0.00256•Kz•Kzt•Kd•V2•I Length = 4.17 ft Area := Length •Width Zone = "4" Pdesign = gz•(GCp + GCp• PDesignVert = —12.5 psf UPLIFT LOADING Widtheff Uplift := 2 PDesignVert LATERAL LOADING 1 Lateral1 = —14pIf Kd =0.85 Kz =0.95 GCp = —1.09 Width = 3 ft Area = 12.5 ft 2 qz = 12.83 psf GC • = 0.00 •• • • •• • ••• • • • Pdesign = —14.0 psf ••••• • • • ••. • • • • • • • PdesignLat = —6.2 psf Uplift = —21 pif Widtheff'913.315„ ft • • •••• • •• • • • • • • • • • • • • • • • • • • • • • •• • • • •••• • • •••• • • •••• Scott Porter 1B, 1053 NE 94 St, Miami Shores, FL 33138.xmcd 06/01/2007 2 of 4 CHECK MEMBERS CLRFD) SECTION PROPERTIES ND =0.75 in L =7.00ft OD= 1.05in ID =0.82 in t =0.11 in K =0.9 Fy = 35 ksi E = 29000 ksi Cross_Sectional Area = 0.33 in2 Weight = 1.13- I = 0.0370 in4 r = 0.334 in S = 0.07 in3 Z = 0.1 in3 -Kt_ = 226.6 r k =9.29 kp =39.77 kr =9.29 AXIAL K.L Fy kc r•7s E Q := = 2.51 2 Q•0.658 -Fy if kc•ra <_ 1.5 0.877 �2 c (i)c:= 0.85 FLEXURE •• . • .■M • • •••• • • •••• • • • • • • • • • • • • • • • • • • •• • • • • •••. Fy if xc•i > 1.5 Pn := Fcr•Cross_Sectional Area EyZ•if A <_X,p 07 E +1\ "CO Fy •• • {• •Fy•S if kp<X <_kr •0.880 ;E 0.448•E ••• S if X,r<X. <_ F ••tty� y • •. q.• • •• CHECEINTERAwTION Applied Axial = 193 Ib P„ := 1.6 Applied Axial M„ := 1.6•Applied_Moment Pu Mu - 0.22 = 0.31 Oc'Pn 4)b'Mn I :_ 1 if X. S kr 0.0379E 2 OD + 3 if X >?�r Fy t Q =1 Fcr = 4.89 ksi Pn = 1627 Ib cbc•Pn = 1383 Ib Mn = 291 ft-lb (kb := 0.9 4)b•Mn = 262 ft•Ib Applied_Moment = 51 ft•Ib P„ = 309 Ib Mu = 82 ft•Ib Pu 8 • Mu if Pu >_ 0.2 1 = 0.50 (I)c.Pn 9 (0b•Mn Oc'Pn Pu Mu Pu if < 0.2 2'(1)c'Pn cb'Mn (l)c'Pn if(I <1.0,"OK" , ,,NG ") = "OK" Scott Porter 1B, 1053 NE 94 St, Miami Shores, FL 33138.xmcd 06/01/2007 3 of 4 CHECKS ANCHOR BOLTS Utilising 3/8" Dia x 1 -1/4" Embed Hilti HLC Sleeve Anchors into Hollow Block No of Bolts = 1 CHECK TENSION Bolt_Tensile_Capacity = 435 Ib Applied_Tension = 159 Ib Allowable_Tension := 1 .33•Bolt_Tensile_Capacity•No_of Bolts Allowable_Tension = 579 Ib CHECK SHEAR Bolt Shear Capacity = 800 Ib Allowable_Shear:= 1.33. Bolt_Shear Capacity•No_of Bolts CHECK INTERACTION Applied_Tension Applied_Shear I ._ + Allowable_Tension Allowable_Shear Applied_Tension - 0.27 Allowable_Tension Applied_Shear = 93 Ib Allowable_Shear = 1064 Ib Applied_Shear Allowable_Shear - 0.09 = 0.36 if(I <_ 1.0, "O.K. ", "N.G. ") = "O.K." •• • • • • •••• • • • - • • •••- • • • • • •- •- ••• • • • •• •- - • • • • •••• • • - •••• • • • • • •• • • • - • -••• •• • • • • - --•• Scott Porter 1B, 1053 NE 94 St, Miami Shores, FL 33138.xmcd 06/01/2007 4 of 4 • •• COVER SHEET Structural Analysis for Canvas Awning • . • • • • •• • • • • • •• •••• • • • • •••• • • • • • • • • • • • • • •• • • • • • •••• •••• • • •••• • • • •• •• • • ••••• • • .•• • • •• • • • • • • Project: Scott Porter 1053 NE 94 St Miami Shores, FL 33138 Page 1 of 6 INFINITY ENGINEERING Infinity Engineering Services, Inc. 14746 SW 60 St Miami, FL 33193 Tel: 786- 287 -3922 www.InfinityEng.us CA# 26963 Vict6FCeron, PE Civil PE# 63023 LOOZ aunt 60 OS • • • • • ••• •• • • • • • • • • • •• • • • •• ••• •• • • ••• ••• • • • • • • • • • • • • • • • • • • • • • • 00 • • • • • • • • • • •• •• • • • • •• • • • ••• • • ••• • • • • ••• • • • • • • • • • • • ••• • • • • • • • • • • • • • •• •• • • • •• •• • • • 000 • • • 000 52138Wf1N 1:1W9 Orri ?CON • • .•. • • • ••• •. .• • • • •. .• • • • • • • • • • • • • • • • • • • • • • • • • ••• • • • • ••• LOOZ aunt 60 JNIavO1 1JIldfl 0) 0 0 0 0 w m 0) of 3 D- o N r CO CO o o n '--M 0) LOOZ aunt 60 •• • • • • • ••• •• • • • • • • • • • •• • • • •• ••• •• • • ••• ••• • • • • • • • • • • • • • • • • • • • • • • •• • • • • • • • • • • •• •• • • • • •• • • • ••• • • ••• • • • • ••• • • • • • • • • • • • ••• • • • • • • • • • • • • • Of •• • • • •• •• • • • ••• • • • ••• ONIaVO11V IAti Cn O 0 fD w O 07 W Z m coo 3 0 m Sr) r w Q 0)O O a rn LOOZ aunt 60 • • ••• • • • ••• •• •• • • • •• •• • • • • • • • • • • • • • • ••• • • • • • • • • • • • • • ••• • • • • ••• Section Properties Name HY (in) HZ (in) AX (In2) IX (in) IY (in4) IZ (in) Material P 0.75 1.05 1.05 0.333 0.074 0.037 0.037 STEEL A53 Forces - Envelope - Cases: 1 2 4 Bar FX (Ib) MY (Ibft) Length (ft) Section 1 / MAX -49 0 3.00 P 0.75EP 1 / MIN -159 -29 3.00 P 0.75EP 3 / MAX 127 0 3.35 P 0.75EP 3 / MIN -0 -26 3.35 P 0.75EP 8 / MAX 177 51 7.00 P 0.75EP 8 / MIN 9 -20 7.00 P 0.75EP 9 / MAX -27 33 7.00 P 0.75EP 9 / MIN -193 -35 7.00 P 0.75EP Reactions: Envelope in the coordinate system: global - Cases: 1 Node FX (Ib) FY (Ib) FZ (Ib) MX (Ibft) MY (Ibft) MZ (Ibft) 5 /MAX -49 -1 -0 0.0 0 -0 5 / MIN -159 -9 -10 0.0 -0 -0 8 /MAX 112 2 3 0 0 -0 8 / MIN -23 -10 -93 -0 -0 -0 9 /MAX -49 9 -0 0.0 0 0 9 /MIN -159 1 -10 -0 0.0 0 12 /MAX 112 10 3 0 0 0 12 1 MIN -23 -2 -93 0.0 -0 0.0 15 / MAX -3 0.0 -5 0 0 0 15 / MIN -55 0.0 -93 -0 -0 -0 •• • It • .• • ••• • • • •• • • •••• • • • • • •••• • • • • •• •• • • • • • • • • • • •••• • • • •••• • • • • • • • •• • • • • • • •••• • • •••• •• • • • • • •••• • • Scott Porter 1B, 1053 NE 94 St, Miami Shores, FL 33138.doc 01 June 2007 6 of 6 Section Properties Name HY (in) HZ (in) AX (in2) IX (in4) IY (in4) IZ (in4) Material P 0.75 1.05 1.05 0.333 0.074 0.037 0.037 STEEL A53 Forces - Envelope - Cases: 1 2 4 Bar FX (Ib) MY (Ibft) Length (ft) Section 1 / MAX -38 -0 3.00 P 0.75EP 1 / MIN -125 -23 3.00 P 0.75EP 3 /MAX 100 0 3.35 P 0.75EP 3 / MIN -0 -21 3.35 P 0.75EP 8 / MAX 107 31 5.50 P 0.75EP 8 / MIN 5 -12 5.50 P 0.75EP 9 /MAX -16 20 5.50 P 0.75EP 9 /MIN -117 -22 5.50 P 0.75EP Reactions: Envelope in the coordinate system: global - Cases: 1 2 4 Node FX (Ib) FY (Ib) FZ (Ib) MX (Ibft) MY (Ibft) MZ (Ibft) 5 / MAX -38 -0 -0 0.0 -0 0 5 / MIN -125 -5 -8 0.0 -0 -0 8 /MAX 88 1 2 0 0 0 8 / MIN -18 -6 -73 -0 -0 -0 9/ MAX -38 5 -0 0 0 0 9 /MIN -125 0 -8 -0 -0 0 12 /MAX 88 6 2 -0 0 -0 12 / MIN -18 -1 -73 -0 -0 -0 15 /MAX -2 0.0 -4 0 0 0 15 / MIN -44 0.0 -74 -0 0.0 -0 •• • • .• • ••• • • • • • • • • •••• • • • • • • •••. • • • • • • •• •• •• • • • • • • •• • •••• • • • •••• • • • •••• • •• • •••• • • • • • •••• • • •••• • • • • • Scott Porter 1, 1053 NE 94 St, Miami Shores, FL 33138.doc 18 March 2007 6 of 6 • • ••• • • • ••• •• •• • • • •• •• • • • • • • • • • • • • • • ••• • • • • • • • • • • • • • ••• • • • • ••• • • • • • • • ••• • • •• • • • • • • • • • i.. • • • •• • pX • ••• • • • • • • • • • • • • • • • • ••• •• • • • • • • • • • • • • • • •• • • • • • •i •• Cases: 4 (UL +L1) M lb/ft LOOZ 4OJBW 86 LOOZ yoaeW 81. Cases: 2 {' bib IbMMt TE .. • • • • • .. • .. • • • • • • • • • •. • • • .. ... .. • • ••• • • • • • • • • • • • • • • • • ••• • • • • • • • • • • • • • • • • • •• . • • • • • • • • • ••• • • •.. • • • • *10 • • • • • • • • • • • •.• • • • • • • • • • • • • • • •• •• • • • •• 00 • • • 000 • • • •.• JNlaVO1 1V 1:121V1 • • ... • • • ... .. .. • • • .• .. • • • • • • • • • • • • • • • • • ... • • • • • • • • • • • • • • • • ..• • • • • ... • • • • • •.. • • • .. • • • • • • • • • • • • • • • • •.• • • • • • • • • ill if • Cases: 1 {UPLIFT} lb/ft •. • • • • • 4100 •• • • . • • • • • • • 41000.0• 4141 . • • •• ••• 00 • • •.• 0 • • • • • • • • • • • • • • ••• • • • • • • • • • • • • • • • • •• • • • • • • • • • • • • • 0400 • • 0.0 • • • • .•• • • • • • • • • • • • • • • ••• • • • • • • • • • • • • • • • •. •• • 0 • •• •• • • • 0041 • • • 005 •• •• • -• • ••• • • •••• • • •••• • • • • • • • • COVER SHEET Structural Analysis for Canvas Awning • • • •• • • ••••• • •• • • • • •• • • • • • • •. •• • •• • •••• • ••••• •••• •• •• • • •••• • • • •• •• • • • Project: Scott Porter 1 1053 NE 94 St Miami Shores, FL 33138 Page 1 of 6 INFINITY ENGI CEDING Infinity Engineering Services, Inc. 14746 SW 60 St Miami, FL 33193 Tel: 786- 287 -3922 www.InfinityEng.us CA# 26963 Victor Ceron, PC Civil PE# 63023 CHECK ANCHOR BOLTS Utilising 3/8" Dia x 1 -1/4" Embed Hilti HLC Sleeve Anchors into Hollow Block CHECK TENSION Bolt_Tensile_Capacity = 435 Ib Allowable_Tension := 1.33. Bolt_Tensile_Capacity•No_of Bolts CHECK SHEAR Bolt_Shear Capacity = 800 Ib No of Bolts = 1 Applied_Tension = 125 Ib Allowable_Tension = 579 Ib Applied_Tension _ 0.22 Allowable_Tension .• • • • • Applied_Shear = 74 Ib • • • • • ••• • • • •••• • • • • Allowable_Shear := 1.33• Bolt Shear Capacity • No_of Bolts Allowable_SOm: 1064 Itz • • • CHECK INTERACTION Applied_Tension Applied_Shear Allowable_Tension Allowable_Shear Scott Porter 1, 1053 NE 94 St, Miami Shores, FL 33138.xmcd 4 of 4 • • • • • •• • Apaied_Shear • •••••.•0.07 Plitt able Shear' • • • • • • • • • • • •••• • • • • •• • •••• • • '•' •I..0.29 • • •••• if(I <_ 1.0 , "O.K." , "N.G." ) = "O.K." 3/18/2007 CHECK MEMBERS CLRFD) SECTION PROPERTIES ND =0.75 in L =5.50ft OD =1.05 in ID =0.82 in t =0.11 in K =0.9 Fy = 35 ksi E = 29000 ksi Cross_Sectional Area = 0.33 in2 Weight = 1.13 —lb ft K•L I = 0.0370 in4 r = 0.334 in S = 0.07 in3 Z = 0.1 in3 — = 178 r k =9.29 ?.p =39.77 AXIAL K•L FY ;••�c: =— — kc =1.97 • • • •••• r t •Z • • • •••• • • • • • •••• • • • • • • •••••• • • • • •• • • • • 'F"cr •_ kr =9.29 Q :_ 1 if X, <Xr Q =1 0.0379-E 2 OD +3 if X. >kr •••••• Q 2 f '•0!038 • Fy if �.c•� <_ 1.5 Fur = 7.92 ksi c • • • y 0 s�� . iF if c > 1.5 • •0•• ••�,•c••• • •••• • •• • ••• c 0•85' : Pn Fcr•Cross_SectionalArea • ••••' FLEXURE Mn Fy•Z if k <_ ?gyp r 0.0207 E +1 •Fy•S if AT OD F <_)r Y t � 0.330.E 0.448.E OD S if r < A. FY t CHECK INTERACTION Applied Axial = 125 Ib Pu := 1.6•Applied Axial Mu := 1.6•Applied_Moment Pu Mu = 0.09 (i)c•Pn — 0.19 (1)b•Mn :_ Pn = 2635 Ib (1)c•Pn = 2240 Ib Mn = 291 ft-lb := 0.9 b•Mn = 262 ft-lb Applied_Moment = 31 ft. lb Pu = 200 Ib Mu = 50 ft-lb Pu 8 Mu Pu if >— 0.2 I = 0.23 (0c•Pn 9 (l)b•Mn (kc•Pn Pu Mu Pu if < 0.2 24c•Pn (0b•Mn Oc•Pn if(I < 1.0 ,"OK" , "NG ") = "OK" Scott Porter 1, 1053 NE 94 St, Miami Shores, FL 33138.xmcd 3/18/2007 3 of 4 DESIGN WIND LOADING FOR CANVAS AWNING ASCE 7 -02 ( CSC, h <60 ft) Z =25ft V = 90 mph FBC 2004 3105.4.2.1 I = 0.77 Exposure_Category = "C' Kzt = 1.0 Kd = 0.85 Kz =0.95 •• • •• •• ••• • • • • • • •••• • • •• • • •••• • gz:= 0.00256•Kz•Kzt•Kd•V2•I qz = 12.849f.• • • • •• •• •• •• • • • •0•• • • • • Length = 4.17 ft Width = 3 ft •"" •••• • • • • • • • Area := Length .Width Area = 12.5 ft 2 ••:• • • •0 ••OS • • • • • • • •••• ' 0 •••• Zone = "4" GCp = —1.09 GCpi = 0.00 Pdesign := gz•(GCp + GCpi) Pdesign = — PDesignVert = —12.5 psf PdesignLat = —6.2 psf UPLIFT LOADING Widtheff Uplift := 2 PDesignVert LATERAL LOADING 1 Lateral1 = -14pif Uplift = —21 pif Scott Porter 1, 1053 NE 94 St, Miami Shores, FL 33138.xmcd 2 of 4 14.0 psf Widtheff = 3.35 ft 3/18/2007 COVER SHEET Structural CaIcuIations for Canvas Awning •• • • • • • ••• • •• • • • • • •••• • • • • •••• • • • • • • • • • • • • • •• • • •a • • ••"t •• •• • • • • • • • • •" • • •••• • • •••• • • •••• • • •• • • • • •••• • • • • • •••• Project: Scott Porter 1 1053 NE 94 St Miami Shores, FL 33138 INFINITY ENGINEERING Infinity Engineering Services, Inc. 14746 SW 60 St Miami, FL 33193 Tel: 786- 287 -3922 www.InfinityEng.us CA# 26963 Victor Caron, PC Civil PE# 63023 Scott Porter 1, 1053 NE 94 St, Miami Shores, FL 33138.xmcd 1 of 4 JUN fl 8 2007 lI\?fl 3/18/2007 • • • • • • •. • • • • • • • •• BOUNDARY SURVEY P L SCALE: 1" = 20' RI P. 4I /2.n .1 G6..• 4d • • • • • • • •• • • • •• • • •• • • ••• • •••• ••• • • •• •• •• •• • • •••• • • •••• • ONE STORY C.B.S. RES. No. 1053 L.F.E.= 8.53' • •• • • • • • oiXe .p_ co.*. lam• Ga• Saelk.= la' Pclveme�� 94th ' TREET r - ELEVATIONS WHEN SHOWN ARE REFERRED TO N.G.V.D. PROPERTY ADDRESS 1053 N.E. 94th STREET, MIAMI, FLORIDA LEGAL DESCRIPTION LOT 9 BLOCK SUBDMSION KIRBYS ADDITION TO MIAMI SHORES ACCORDING TO THE PLAT THEREOF AS RECORDED IN PLAT BOOK 41 AT PAGF 44 OF THE PUBLIC RECORDS OF MIAMI -DADE COUNTY, FLORIDA 2E- I2 LOCATION SKETCH SCALE 1'= 200' k jc THE wow FLED INSURANCE RATE ttAP DATED 07-17-'995 PUBLISHED BY THE FEDERAL EMERGENCY MANAGEMENT AGENCY DELINEATES THE HEREIN DESCRIEED LAND TO BE SITUATED WITHIN ZONE ia$�) COt IHBTY No 120652 P, , 093 . L I HEREBY CERTIFY: That the BOUNDARY SURVEY of the above described property is true and correct to the beet of my knowledge and belief as recently surveyed under my direction, also that there are no above ground encroachments unless shown. This survey meets the minimum technical standards set forth by the Florida Board of Professional Surveyors and Mappers, in Chapter 61617 -6, Florida Administrative Code, pursuant to section 472.027 Florida Statutes. Examination of the abstract of title will have to be made to determine recorded instruments, if any, affecting the property. Location and identification of utilities adjacent to the property were not secured as such information was not requested ip is subject to opinion of title. This survey is not intended for design nor construction purposes. For those purposes a Topographic Ownership Survey Is required. CEA ItD T0: MARIE LASLIE SMITH ILEANA M. GARCIA, ESQUIRE ATTORNEYS TITLE INSURANCE FUND, INC. UNION PLANTERS BANK, N.A. its successors and /or assigns. JUAN J. BONFLL PROFESSIONAL 1 "' `i ` AND STATE OF FLOR DATE: 09 -14-00 NOT VAUD WITHOUT THE ORIGINAL RAISED SEAL AND SIGNATURE OF A FLORIDA LICENSED SURVEYOR AND MAPPER. • J. Bonfill & Associates, Inc. Registered Surveyor and Mapper, State of Florida. LB No. 3398 9360 S.W. 72nd STREET, Suite 265 Miami, Florida 33173 (305) 598 -8383 FAX: 598 -0023 REVISION. REVISION. CLIENT: ORDER NO 00 -0636 A W 0 a A 4 0 FBI 4 w A A 4 2 g 31111a 0 . . .. ... 0 Ati,g6L 1 1 ir V TAlig IV �, �J •• • ••• • •• • • • •••• • • • • •••■ • • • • • • •••••• •• • •• •• • • • • • • • •• • •••• • • • • •••• • • •••• • •••• • •• • • • •••• • • • • •••• GENERAL NOTES:. 1. ALL STRUCTURAL MEMBERS TO BE SCHEDULE 40 GALVANISED STEEL PIPE UON. 2. MINIMUM 5" EDGE DISTANCE FOR ALL. ANCHORS. 3. ALL CONNECTIONS TO BE FULLY WELDED: TYP 4. ALL WELDS TO COMPLY WITH THE AWS CODE (LATEST EDITION). 5. ALL WELDS COVERED WITH CORROSION RESISTANT COATING. 6. ALL. STRUCTURES DESIGNED IN ACCORDANCE WITH 2004 FLORIDA BUILDING CODE AND ASCE 1 -02 (V =90 MPH, I =0.11). Z. NOTIFY ENGINEER OF ANY ERRORS /OMISSIONS FOUND OR IF ANY PART OF THE DRAWINGS IS NOT UNDERSTOOD. S. CONTRACTOR TO NOTIFY OWNER THAT FABRIC AWNINGS WILL REQUIRE REMOVAL OF THE FABRIC WHEN A HURRICANE WARNING IS ISSUED. 9. CONTRACTOR TO FIELD VERIFY SUBSTRATE CONDITIONS PRIOR TO FABRICATION AND PRIOR TO ATTACHING FRAMEWORK SHOULD SUBSTRATE CONDITIONS IN THE FIELD DIFFER FROM THOSE NOTED ON PLAN, ENGINEER MUST BE NOTIFIED BEFORE PROCEEDING. 3/16' TYP 1/4 "x2 "x2" STEEL fiE TO HOLLOW BLOCK WITH (1) 1/2"x3" HILTI I-ILC SLEEVE ANCHORS (MIN. 11/2" EMBED) DETAIL A SCALE: 3"=P-0" 1/4"x3 "x6" STEEL fiE TO HOLLOW BLOCK WITH (2) 1/25(3" HILTI HLC SLEEVE ANCHORS (MIN. 11/2" EMBED) NOTE: ALL PIPES 344 "4'. DETAIL A (TYPICAL OF 1) TYP /3/16" D T4IL 5 SCALE: 3"=1'-0" NOTE: CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS PRIOR TO FA5RICATION. DETAIL 8 (TYPICAL OF 2) DETAIL C (TYPICAL OF 2) PROPOSED CANOPY 1 SCALE: 3/8 " =1' —0" JJ6" Ji6" 3/16" TYP '/4 "x3 "x6" STEEL fiE TO HOLLOW BLOCK WITH (2) 1/2"X3" HILT! HLC SLEEVE ANCHORS (MIN. 11/2" EMBED) DETAIL C SCALE: 3".11-0" SCOTT FC TE R 4: Zw ,Z_Au C7 M C7 W N LJL U co c.) cnN c to W o co c y C co n VICTOR CERON PE* 63023 CIVIL Pate: 1S- Mar -2001 Sea, is: AS SHOWN Sheet: J •• •• • ••• •••• • • • • •• • • • • • • • • • • • •• •• • • • • • • • •• • • • • •••• • •••• • • • • •• • • • • • GENERAL NOTES: 1. ALL STRUCTURAL MEMBERS TO BE SCHEDULE 40 GALVANISED STEEL PIPE UON. 2. MINIMUM 5" EDGE DISTANCE FOR ALL ANCHORS. 3. ALL CONNECTIONS TO BE FULLY WELDED: TYP l/S 11 4. ALL WELDS TO COMPLY WITH THE AWS CODE (LATEST EDITION). 5. ALL WELDS COVERED WITH CORROSION RESISTANT COATING. 6. ALL STRUCTURES DESIGNED IN ACCORDANCE WITH 2004 FLORIDA BUILDING CODE AND ASCE 1-02 (V =90 MPH, 1= 011). 1. NOTIFY ENGINEER OF ANY ERRORS /OMISSIONS FOUND OR IF ANY PART OF THE DRAWINGS IS NOT UNDERSTOOD. 8. CONTRACTOR TO NOTIFY OWNER THAT FABRIC AWNINGS WILL REQUIRE REMOVAL OF THE FABRIC WHEN A HURRICANE WARNING 15 ISSUED. 9. CONTRACTOR TO FIELD VERIFY SUBSTRATE CONDITIONS PRIOR TO FABRICATION AND PRIOR TO ATTACHING FRAMEWORK SHOULD SUBSTRATE CONDITIONS IN THE FIELD DIFFER FROM THOSE NOTED ON PLAN, ENGINEER MUST BE NOTIFIED BEFORE PROCEEDING. "x2 "x2" STEEL iE TO HOLLOW BLOCK WITH (1) 1/2"x3" HILTI HLC SLEEVE ANCHORS (MIN. 11/2" EMBED) DETAIL A SCALE: 3"=1'-0" 1/4"x3 "x6" STEEL le TO HOLLOW BLOCK WITH (2) 1/2"x3" HILTI HLC SLEEVE ANCHORS (MIN. 11/2" EMBED) NOTE: ALL FIFES 3/4 "c1). DETAIL A (TYPICAL OF 1) TYP 3/16' DETAIL 5 SCALE: 3".1'.-0" NOTE: CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS PRIOR TO FABRICATION. DETAIL 8 (TYPICAL OF 2) DETAIL C (TYPICAL OF 2) r PROPOSED CANOPY 1 SCALE: 3 /s "= I'-0" Y2n Y2" 3/16" TYP 1/4"x3 "x6" STEEL fiE TO HOLLOW BLOCK WITH (2) 1/2"x3" HILTI HLC SLEEVE ANCHORS (MIN. 11/2" EMBED) DETAIL C SCALE: 3 " =1' -0" SCOTT FOIRTER VICTOR CERON PE* 63023 CIVIL Date: 1- Jun -2001 Seale: AS SHOWN 1 tcNA • • • • • • •••• • • • • • • •••• • • • • • •• •• • • • • • •••• • • . •••• • • • • • • • • • • • •••• • • • • •••• • • • • • • • • • 6 i s Certifiratr ,Ntant e Resistance REGISTERED APPLICATION CONCERN No. ( A -246 1 ISSUED BY Excello Fabric Finishers, Inc. 802 S. Second St. Coshocton, Ohio 740 -622 -7444 This is to certify that the materials described below have been E & M DISTRIBUTOR IN S r--� 8790 WEST 9TH COURTji L — V NIALEA FL 33012 FOR •••r•- • • • • • ••• • • • APR 1 8 2007 BY:_ -iiit‘- - Certification is hereby made that: (Check "at or'r!)") !1 � (a) The articles described below this Certificate have been treated wit : • registered by the State Fire Marshal and that the application ofsaid'reim ova one i • eie Mate of California and the Rules and Regulations of the State Fire Marshal. • •••• Name (ef clemica l used • Date treated or manufactured 1 -10 -2007 a:ne- retardant treated or are inherently nonflammable). EXCELLO • '•• 11- tethodoog�pplication Plant Controlled • • • • • • •• . TradeinAple of flame - resistant fabric or material used • • PYRttNE 60" • Chem. Reg. ical approved and onformance with the No. C -65 (,..The astiales.tlescribed below are made from a flame- resistant fabric or material registered and approved by the ••• State: iie•Marshal for such use. • • •Trade tTameeof flame- resistant fabric or material used Reg. No. The Flame-Retardant Process Used WILL NOT Be Removed By Washing The Exceilo Fabric Finishers, Inc. William J. Stenner A'aune of Applicator or Production Superintendent By President Control Number 99218 Order Number 03878 PO Number . Invoice Number 1346538 Quantity ~PERMIT #: cT Miami APPROVED ZONING DEPT BLDG DEPT Shores villa'!' BY SUBJECT TO COMF! STATE AND COL'- - alk te,u3 Atzr■ktens Kar is0,41.e., 1053 1AE ciLl'-‘1/ 5 Kvarel■ 9nor€5,-C‘. 33k3c\