Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
426 NE 102 St (12)
w q /f9 /, APPLICATION FOR CERTIFICATE OF RE- OCCUPANCY 1, {7Lp,yh to re- occupy the single family residence known as : (address) 'i /o 2 Legal Description: Lot: Applicant Contact Name: Comments: Inspected by: F. LUB I EN .Block' I hereby certify that I understand that the zoning of the property is for single -family residential use and that it is unlawful for more than one family to reside therein. I also understand that any Certificate of Re- Occupancy that may be issued by Miami Shores Village, certifies only that the referenced property is being used for single- family purposes and that such Certificate does not constitute any representation, warranty or certification as to the condition of the dwelling or other structures on such property. G A c. PAGE 1 0F 2 , Mani Shores, Florida. Date « — ,'d `l 7 PB & PG: Print Name For purposes of conducting the inspection required by Section 902 of the Miami Shores Land Development and Zoning Code, please contact: Buyer Seller Realtor Company Name Application Fee ($50) paid: Cash Check No. Le 7C Approved X Denied ereby apply for a certificate Telephone: 95-; %; 7_) D Y Date 4/21/99 CERTIFICATE OF RE- OCCUPANCY On behalf of Miami Shores Village, Florida, the undersigned certifies that the property described in the above application has bee inspected for purposes of re- occupancy pursuant to Sections 901 and 902 of the Miami Shores Land Development and Zoning Code and that such property may be re- occupied by the above applicant for single- family residential purposes. PAGE 2 OF 2 MIAMI SNORES VII .TAGE, FLORIDA By: Date of Certification:4 / 21/99 THIS CERTIFICATE VERIFIES THAT THE REFERENCED PROPERTY HAS BEEN INSPECTED BY f RE MIAMI SHORES VILLAGE AND HAS BEEN DE TO PRESENTLY COMPLY WITH THE SCHEDULE OF REGULATIONS OF THE MIAMI SHORES LAND AND DEVELOPMENT CODE AT EACH PERTAINING SOLELY TO THE REQUIREMENT ONE-FAMILY DWELLING IS USED AND INTENDED TO BE USED FOR A ONE - FAMILY DWELLING PURPOSE ONLY; HOWEVER, THIS CERTIFICATE DOES NOT CONSTITUTE ANY REPRESENTATION OR WARRANTY AS TO THE. CONDITION OF THE DWELLING OR OTHER STRUCTURES ON THE UCH PREMISES DESCRIBED HEREIN, OR ANY ASPECT OF CONDITION, AND INTERESTED PERSONS ARE ADVISED AND ENCOURAGED TO MAKE THEIR OWN INSPECTION OF THE PREMISES IN ORDER TO DETERMINE THE CONDITION, THEREOF. BUILDING ELECTRICAL PLUMBING ROQFI G Owner of Building Architect Contractor or Builder ✓' �'r:#' O. Legal Lat wj Description MIAMI SHORES VILLAGE, FLORIDA Date 1/ 2 C PERMIT Bl ? 9394 Contractor's 45#3 / License No Work to be performed under this Permit BY Subdi- vision Sq. Ft. Address o f r'" tr"` V alue of Amount of �""'•�*• Building �'l,� Project $ �� Permit $ This permit is granted to the contractor or builder named above to construct the building or to install the equipment or device described in the applica- tion herefor in strict compliance with all ordinances pertaining thereto and with the understanding that the work will be performed in compliance with any plans, drawings, statements or specifications that may have been submitted to and approved by the proper municipal authorities. This Permit may be revoked at any time if the work is not done in compliance with such ordinances or if the plans are changed without authorization. A further condition upon which this permit is granted is the understanding that the contractor or builder named above assumes the responsibility for a thorough knowledge of the ordinances and regulations pertaining to the work covered hereby whether shown on the plans or drawings or in the statements or specifications and that he assumes respon- sibility for work done by his agents, servants or employees. g (INSPECTOR) BY In consideration of the issuance to me of this permit agree to perform the work covered hereunder in compliance with all ordinances and regulations pertaining thereto and in strict conformity with the plans, d swings, statements or specifications submitted to the proper authorities of Miami Shores Village. In accepting this permit I assume responsibility for all work done by either, myself agent, servant or employee. CONTRACTOR or BUILDER AUTHORITY APPLICATION 9� VIKANE X FOR PERMIT TO FUMIGATE WITH CYANIDE METHYL BROMIDE ACRITET APPLICATION NO. DATE //— -t 19 6 1. Location of building to be fumigated 10. Date whem fumigation will be begun 5 2. Name and address of owner of premises 3. Type, size and construction of building 4. Is entire building to be fumigcneu: 5. If not, state what portion 6. Approximate number of cubic feet of space in building or in portion to be fumigated. • ,.• •.,1.. 7. Kind and quantity of fumigant to be used and manner of application and length of fumigation period Vikanc - Approx 20 hour3 8. Distance of nearest building and direction from building to be fumigated 9. In what manner will vents to exterior of building be sealed? Nylon tent Nov_ 17, 1967 (Signature f certified pe of this fumigation job.) Time 110:30 A_.M, 11. It is hereby agreed to station a guard on the premises to be fumigated during the fumigation period and to post suitable placards at each entrance into the building bearing the following words in letters at least two inches by one inch in size: "DANGER" — THIS BUILDING UNDER FUMIGATION WITH A DEADLY GAS." 12. It is hereby agreed to make such provisions that all openings into the building may be opened from the outside after the period of fumigation is over and to take such other precautions as may be necessary to insure that all of the fumigant is removed from the building before anyone is permitted to enter. 13. It is , hereby agreed to notify the County Health Department when the building has been prepared for fumigation. FIRM NAME: TRULY NOLEN, INC. 600 N. W. 7th Avenue Miami 36, Florida t contr erator in c MASONRY Only masonry units carrying the :appxo'bal Ins. , sha .1i be used thruout the Yob: All m masofry'•oement as folloWe ;. 2 parte Masonr OenIvent, and 9 parts sand, w th a minimum At CARPENTRY ti All lumber, unless otherwise specified, s Yellow Pine as follows: Joist Plates interior Joist Plates - exterior, Floor Joists . Bridging crossed Sub- flooring . Sole Plates Furring Firestops Ceiling Joist Plates Rafter Plates Ceiling Joists 2"x6u Roof Rafters Roof Sheathing 1t►x8I Roof Bracing 2ux4W Studs 2 ° xtui Mr . & Hrs. J. E. Bauer GENtRAL It is the intent of these plans and specifications to provide all labor and .material to completely finish the work, and . they shall be considered at all times as .a .part of the construction contract. The General Contractor and the various sub - contractors shall each be held responsible fdr the various phases of their: work, . They shall carry `workmant's liability, . and fire and vandal /sit insurance as their respective interests shall appear in They shall obtain and pay for all permits and licenses, : comply with all laws and ordinances, and shall hold the owner blameless Hof all loss. All bidders are • advised to visit the site and become, Tamil .ar with the conditions. Upon completion of the job but . befor.e it is turned over to the owner, it shall.b,e left tbroom clean1 and.'ready in every way for use and occupancy. 2"xeu Long 'L 2i1 X4°. It 2 " X10" lux4u 1 $8 or 1'. x 80 20 x40 1 1x20 2!'x4" 2 "X4,N 2, & 2'x8" 2.irxgn or l +'xeu or 1 & 2 "x8 EXCAVATION AND BACKFILL The contractor shall clear the site ; c.f all underbrush. All trees, .stumps, ;etc, within the building area shall be removed. Any trees and bushes to shall be designated by the owner and they shall then be protected' by the contractor. Excavation shall be carried to firm, hard, virgin` soil, and where practicable, footing trenches, shall be out in exact. size. All sand pockets shall be completely dug out. ; All footing and other trenches shall be .backfiiled, well puddled and tamped as soon as they have served their purposes CONCU TE WORD All concrete, unless .otherwise s eciled, shall. be` of a mix not less than 1:2i:4 (2,000 pounds strength) , using only domestic Portland Cement, a d clean, well _washed aggregate. It. shall `ba,tnaohine 'mixed for at least 1 minutes with o,, Minimum of water. Reinforcing steel shall be new, . straight, and free , of 1qO sB r zst f.14kes and dirt. Splices 'shall not be. less 40 diameters iii ter gth. Aa"eas: t© Altfe" a..rte *ment fi isah shall have an additional 1-0-topping of a 1 1r Mix' 'trOi eled' down tao a 4hooth, hard finish. Underwriter's Laboratories, hall be ready prepared. 1 par t Portland 16 ono d.oubl cunt. 18?' c-c. 16'� i!l sol ho izontal 32" c. L " c. Page One vertical oor & ceiling et= gered joints bolts 41 0-AO. MILLWORK Millwork shall be as follows: Exterior door. frames 1 3/8" CQyp --fir rabbeted Exterior doors (main 1 3/4 cyp -fir stock 15 1t. (2 1 3/4" cyp. or fir 4 It & 3 pant (1 pair 1 3/4" cyp.. 10 lt. French (1 1 3/4" cyp. stock slab Interior door frmes 7/8" cyp. planted stops Interior doors 1 3/8" cyp—fir stock single panel Screen doors 1 1/8" cyp -fir stock. patterns Kitchen Cabinet shall be as detailed, framed of 7/8" cypress and finished to take tile on all drain and splash areas. Bed Room dlOsets shall be completely cedar lined and shall then have a 1012" shelf supported On a 1 "x4" hook strip which shall also support a 3/4" G. I. pipe the full length of each closet. Trim thruout the building shall be of the narrow stock type applied before plastering. Aluminum interlocking thresholds shall be provided for both front and rear exterior doors. These doors shell be equopt with cylinder locks with matched keys. Interior doors shell have tumbler locks. ROOFING, All roof surfaces shall be cofered with white cement barrel tile, with first course nailed in place and all tiles set in cement mortar. Weep holes shall be provided under ell bottom cover tiles. This roof shall be applied over a 90# S. S. Roll Roofing tin capped along the upper edge of each str ip thoroly mopped into place over a 30# felt tin- capped on 12" centers SHUT #AL WORK Galvanized Termite Shield shall be provided under all floor joist plates and over piers. It shall extend 3 ", beyond the edge of the foundation under the house and to wi thin 3" of the outer edge of the masonry. All joints shall be soldered, and all perforations in ` the meta], shall be well filled with "an asphaltic mastic before ti#ibers_ -axe placed. The material shall be not less than 26 gauge. Copper Lave Stripe shall be applied at all eaves. These shall be not Tess than 4" wide and extending 3" under the lower edge of the S. S. bate. Valleys ¢lattI1 be of copper not less than 16" in width — 8" on each side of the valley. Flashing shall be of copper. The material shall be not less than 16 oz, roofing quality. VENETIAN BLIND GUIDES Venetian Blind Guides to finish flush with plaster shall be installed thruout the building. # LATHING, PLASTERING, AND STUCCO Plaster Base shall be 3/8" gypsum in panels 16 "x48 ". It shall be nailed on approximately 5 inch centers along edges with 3d 1 1/8" 13 ga. 3/8" heads,.,blued lathing nails, with a minimum bearing of 5/8" on each stud and all joints staggered. Vertical joints on opposite sides of same studs. All interior corners shall have metal lath extending at least 3" on each side of the corner. Mr. . & Mrs. J. E. Bauer Page Two All plastering shall be 2 -coat 'work. The scratch coot shall be of gypsum plaster applied with sufficient pressure to 'obtain a full key and with sufficient material to diver the It shall be brought Out to the grounds and straightened to a trie• surface with rod and. darby. The finish comb' shall be composed of one part`' gauging plaster and three parts lime putty and shall be applied over a dry base coat,' scratched in thdroly and laid on well, and then doubled back and filled out to an even .surface,. This shall be allswed to dray.„ ft a' few minutes and then shall be well troweled.. "tq ar a�,roo'ti ,surfa, e. 'Te tture, as selected by ` the owner, shall then be appl:ie G'. Color shall be added to the .finish coat ,as selected by the owner.. All stucco shall, be ap].1ed in two Coate k The firs t :shall be composed of one pqr t B-or tland. . dement , and three' Parts-sand with the addition of part lime. putty. Thi�e shat]. be well rodded 'ert1. brought to a true and even diirface ready for the finish coat. The final coat shall be composed of . one part Portland Cement 'and .three :parts eland and shall be mixed, with an integral 'waterproofing. This shall be brought to a true and even surface and floated with a cork float. Care shall be taken to float out all shrinkage cracks, blisters, and other imperfections. TILE WORK The concrete fill for tile shall be not less than 3 plus a its mortar setting bed. All tile shall be brought to the job in original unopened containers.. Floors shall be finished flush with adjacent floors. BATH FLOOR - shall be of small ceramic tile of white: with a few colored tiles scattered thru the whole. `Base shall be of 4Itx4+ interior wall tiles to finish flush with plaster. Wainscoting of Glazed Tile. DRAIN ..AND . SPLASH AREAS - of Kitchen Cabinet : shall be of 4 interior tile With necessary . caps, coves and nosings. WINDOW STOOLS - shall be of bullnosed tile. ENTRY STOOP AND STEPS shall be of red quarry tile. P INNTIN S coo ' shall ha e 2 coats of start arid,, lime -wash with waterPrOofing and color added.. Exterior woodwork shall have 3 coats of standard fiouee paint. Kitchen and Bath plastered surfaces shall have .3 coats finishing with Semi-luster. Interior woodwork shall have 3 coats : finishing with an Enameloid.` Except for the lime wash, all paint shall be delivered to the .job in original unopened packages and handled according to the' =ttufa.cturerxs directions. All :. surfaces shall be dry and clean ,before the prime coat is applied and. all defects and nail holes shall be pa ttied after the prime coat and' before the sedond coat is applied. `LO ORING Except in'Bath and Kitchen this :shall be 1 " Select Red Oak, securely nailed and pulled snug but not forced. Kitchen shall be 1 B & Better Yellow Pine. •These : shall be sanded smooth and cleaned. Oak floors shall also be filled, given 2 coats of shellac and waxed. Kitchen floor shall have applied standard gauge linoleum according to the manufacturers directions. Mr. & Mr .s. J.. E. Bauer Page 'emc BATHROOM NO, 1 0 3308 0 3866 -B 0 33581 -E 0 4962-B 0 2500 0 32165 C33980' C 38-A -235, C 11104 0 15025 C.32589 C 14484 C 14510 Mr. & Irs. J. E. Bauer STEEL SASH All windows shall be Residence _ -Type Casements, the. combined weight of frame and vent members of ur.1 toh ' ehaa l be "na t less than 2 pounds : per lineal foot,, and shall canir w .th l - coat' of gray rust - resisting paint,. Hardware„sha11 include standard thru section locking handle and rotary und.erecreen type operators. Screens shall be of a flat type applied inside ° 'Of window frame.. Breen .frame's shall galvanizes : enci,, eeigned to allow replacement of s4reen'c .oth' whibh .s 11' beN,16 meah`'bronze. They shall have Z 'shop =cast of paifit.'eame, as windows. Scra.ene shell be easily removed from Window frames and easily replaced. SOLAR WATER HEAD SYSTEM This shall include a heater system together with a storage system. The heater shall be an all -metal unit of not less than 24 gauge galvanized`iron built on a structural frame to prevent sag.. Coil tubes shall be not less than 3/4" 'inside diameter annealed copper. and shall be !soldered .continuously to the copper backing. Cover shall be of DS glass secured in place to preclude any leaks of rain water from entering the coil box. Storage system shall include a heavy duty, ' •electrio welded, galvanized both inside and 'out tank tested to 150' pOt nde hydrostatic pressure. This shall be enclosed in a cabinet of sufficient size to allow at least 5 inches of insulation of re- granulated "cork or equal material on all sides and top of tank. The entire;, system shall carry a g guarantee against defects . in material and workmgnethip for a period of one ' year. ELECTRICAL All materials and fixtures shall be approved by the Underwr.terrs Laboratories, Ina., and the entire job shall be guaranteed's.gainst defects in materials and workmanship for a period of one year. All regular convenience outlets shall be of the duplex type. All oover plates shall be of Bakelite or similar material. The system. shhall include 'a radio outlet and door signal consisting of button, transformer, and buzzer. PLUMBwNet A].l water pipe, shall be of 3/4" glays.nized or 1/2" copper minimum. Coil` pipe $hall be standard weight cast iron. Fixtures shall be in vi ttA a , and '.at least equal to the ollowi :` -by Crane; 5t Oorwith Bath CP Bath and Shower Fixture OP Waste 1 "x62" CP Curtain Rod. 17"x19" Neuday. Lavatory CP Supply and Waste Fixture ltd" CP 17 Ga. F -Trap CP Supplies Hanover 0loset Combination White Seat OP Angle Stop Floor " Flange China. Bolt Caps Page Four BATHROOM C C N0. 2 3866 -.B 34682 4962 -B 2500 32165 33980 38 -A -235 11104 15025 32589 14484 14510 Mr. & AJrs. J. E. Bauer CP S Fi xtur e CP Midget Drain CP 1" x38" Curtain Rod 17u x19" Neuday - Lavatory CP Supply and Waste Fixture 34 CP 17 . Ga . P --Trap CF B'u.pplieis Hanover C1oset Combination White -Seat. CF Angle . ' Stop Floor Fl China Bolt Caps K I T C H E N F 0 19350 -X 18 "x24" A 4 Enamel Flat Rim Sink C 32751 -AS CP Swing Faucet C' 19770 _; CP Waste C 33980 i4" OP 17 Ga. P -Trap 0 32688 Hose Bibs (3) SEPTIC TAI. A 350 gallon precast septic tank and 75 of 4" diameter cement drain tie shall be installed: ALLOWANCES These shall be as follows: Finish Hardware - * Medicine Cabinets (2) Electrical Fi.tur es - Storm Shutters - APPROVED 'MANUFACTURERS For the purpose of establishing '. quality standards of manufacturers is approved: . Cement - Masonry Cement Plaster Waterproofing Paint - - - Tile Linoleum Har dwar e Plumbing Fixtures Electric Fixtures Venetian Blinds, Water Heater r „- Roof Tiles Pr : . Ventilators... Shuttera -- IOW • r - $25.00 15.00 20.00 35.00 the following list 1lor ida Portland Florida Masonry Acme Sec Pratt & Lambert Cambridge Armstrong Dexter Crane Lightolier Br eneman Solar Co. Brady .00/curs Barron Slide -on Wage Five