Loading...
1200 NE 102 St (2)100' 95.5 X \ 80 ' 90 '50" A um . \ \ 83.7 \ Y 20 ga. s eel 50' 80 24 ga. 72 MEM 30' 7, _' -_II—' 64.2 -1„11111 20' 60 ,, 52.7 040" Alum. 111 \� \ 0' -10' 50 42.8 IIM 11 1 o62" Alum \ 40 \ 30 N, A TYP SECTION. r ANCHOR SCHEDULE Height above grade (ft.) Anchor spacing (inches) 1.75" _ 1.75" .074" 1.375" HEADER CA 20" See Pan. Conn. Det. See panel conn. Det. 0' -30' PANEL 30' -50' 18" 1.375" HEADER 50' -80' 16" 0 80' -200' 12" CNI s Anchor 1.75" 0 .074" TYP PANEL CONNECTION DETAIL COMPONENT PARTS 3.5 "x2.5" 16 ga. stl angle Anchor (See Sch.) : Clip - spa.--' @ 12" c -c *" bolts @ 18" c -c Panel Anchor or " -wide .046 spring steel ca•. •laced; SAE 1095 heat treate to 44/48 Rockwell C. Anchor (See Sch.) 0 or Panel 200' 100 8' 9 10' 5' 6' 7' Test Load (psf) Buildin Height (ft.) S.F.B.C. Requirements STORM PANEL CHART DESIGN CRITERIA These Storm Panels are designed and tested in accordance wigh Sec, 3511 of the So. Fla, Bldg. Code. Recovery at Test Load-- — — — — —80% min. Deflection Limit at 1.5 Safety Factor from Test Load— — — —L/80 STORM PANEL SPAN (FT.) NOTES 1) Anchors to conc. shall be 4"x1" Drive Nails for permanent type installation and 4 " -20 bolt in Star Tampin for re- movable installation. 2) Steel panels shall have a min. Y.S.=40,000 psi and U.S,= 60,000 psi. Alum. panels shall be alloy 3003 -H16. 3) Panels may be mounted horizantally as well as vertically using clear span. 4) Omit one rib for starter or end panel. Place anchors @ 30 ". 5) Anchors in conc. shall be placed II" clear to edge of conc. 6) All storm panel exceeding a clear span of 6' -0" shall have 4 " -20 bolts connecting panel located at midspan. STORM PANEL DETAIL SHEET FOR PAD -TECT4F AWNING SHUTTER CO. 701 W. 25th St. Hialeah, Florida STAN WEEKS 8x ASSOC. INC. ENGINEER 3061 NW 7th Street Miami. Flordila 8/9/66 Job Kos 631 100' 95.5 \ 80' 90 'S0" \ A um . \ 83.7 20 ga, s eel 50' 80 24 ga. 72 30' ' IMIL- 1 64.2 1111111111111111111 20' 60 Il 52.7 040" Alum.- I n \ \ 0' -10' 50 42.8 kilibliall o62" Alum. \ 40 \ 30 N A TYP SECTION. ANCHOR SCHEDULE Height above grade (ft.) Anchor spacing (inches) 1.375" HEADER @A - .074" See Pan. Conn; De See panel conn. Det. 0' -30' 20" 30' -50' 1.75" 1.75" f I l - .064" // 18" 1.375" HEADER —1.75" t (varies See Chart) • 50' -80' 16" 0 12" 80' -200' 0 Anchor TYP PANEL CONNECTION DETAIL COMPONENT PARTS .074" 1.375" 1.75" 3.5 "x2.5" 16 ga. stl angle in N Anchor (See Sch.) •:':, D.� . • r Panel Clip - spa.- @ 12" c -c *" bolts @ 18" c -c • Anchor de .046 spring steel cad. ated; SAE 1095 heat treate• to 44/ 8 Rockwell C. .050" 1.50" 0 00. O A or Panel Anchor (See Sch.) .050" .140" BASE 0 200' 100 5' 6' Test Load (psf) Building Height (ft.) S.F.B.C. Requirements 7' 8' 9' 10' STORM PANEL SPAN (FT) STORM PANEL CHART DESIGN CRITERIA. These Storm Panels are designed and tested in accordance with Sec. 3511 of the So. Fla. Bldg. Code. Recovery at Test Load-- - - - - -80% min. Deflection Limit at 1.5 Safety Factor from Test Load - - - -L/80 NOTES 1) Anchors to conc. shall be ,' "xl" Drive Nails for permanent type installation and ,' -, " -20 bolt in Star Tampin for re- movable installation. 2) Steel panels shall have a min. Y.S. =40,000 psi and U.S.= 60,000 psi. Alum. panels shall be alloy 3003-H16. 3) Panels may be mounted horizantally as well as vertically using clear span. 4) Omit one rib for starter or end panel. Place anchors @ 30 ". 5) Anchors in conc. shall be placed l2" clear to edge of conc. 6) All storm panel exceeding a clear span of 6' -0" shall have s " -20 bolts connecting panel located at midspan. STORM PANEL DETAIL SHEET FOR PO -TECTTT AWNING SHUTTER CO. 701 W. 25th St. Hialeah, Florida STAN WEEKS & ASSOC. INC. ENGINEER 3061 NW 7th Street Miami. Fiordai, 8/9/66 Job Ma, h3_1