1175 NE 102 St (6)BOILDI
PERMI
Framing
Air Cond.
*iami �h'Pe4 Uilla�e
NO.
BUILDING,
Tie Beam 4
SPECIAL
Sidewalks and Clean-Up
THIS CARD MUST BE DISPLAYED ON FRONT OF JOB.,
PLUMBING
Temporary Toilet
Septic Tanl 5 , : 'fi i
ELECTRICAL
Temporary Service
Yard Spaces
Sheathing
Slab
Rough
Fixtures
Rough
Ducts
,,
Owner A ,A , r �
Contractor
Lot
SAMPZI et
ri
Address
1
Pool — Floor
Walls
A it
Subdivision
Final
Top Out and Tub
Mechanical
Block
N O T I C E: All Sub - Contractors Must Obtain
LICENSES and PERMITS Before Work is Started.
No Work on Sunday
No Work Before 7:30 A.M.
No Night Work.
Foundation 0
Roofing
Fixtures Final Serv.
Slab
NOTICE TO BUILDER: Protect This Card and Return To Building Department For Certific* ti
t
ITEMS
SUB CONTRACTORS & SUPPLIERS
NAME & ADDRESS
-
1. Architectural Fee (aans)
r , / ,,{/4 - i_ei r 5 i r 'I
. .
2, r walks, drives, etc.) !'.n
3. • Cabinets - Bath Vanity
4. Cabinets - Kitchen
5. Cabinets Medicine
6. Cabinets - Unit Closet
7. Cleaning
8. Clearing Site
•
9. Concrete - Foundation Slabs Beams
10. Concrete - Walks dr.ives.etc. •
11. Contractors Fee
12. Electric Fixtures
•
13. Electric ,Tiring
3,tJ / I-So M
14. Equipment Rental
-
15. Excavation
16. Fill for Slab
17. Floors - Finish 'wood & kitchen .
18, Floors - Terrazzo
19. Garage Doors
20. Glass Sliding Doors`
.
21. Hardware - Finish. .
22. Hardware - Ro u _h
23. Heatin: .: • e„
v. ,. 4....1-- i G . e. „l.
24. Insurance - Liabilit com . -bond
25. Labor - Pa o11
'.
6. Labor - Contract
.
27. Labor - Contract
28. Landscaping, Fill, Grading
ID tirc., 0-4,57 %i.[
29. Lath, Plaster, Stucco
30. Lumber (A11)
31. Masonr Labor
a ► .
32. Masonry Materials, Block .P.-
-
•
33. Millwork •
34. Miscellaneous
35. Ornamenta1 i Work s 1 N.e
.574-1K1 .1 Iv.ST,
36. Oven & Plate - Built -in
37. Overhead
.
38. Paintin.
/9,9444d .0,57779/Y4OPk
39. Permits, Tem•orar Power
•
40. Pilin Foundation
41. Plumbing Complete
a - ' L u A. . i
i
AZA8i eR O 00 F/ i �1
U
42, Pool - SI
43. Roofing & Sheet Metal Work
44. Roof Trusses - Pre -•fab.
45. Screen. Enclosures •
• •
•
46. Septic Tank or Sewerae
, // G 77,./ Ai
'
47. Shower or Tub Enclosures
48. Steel - keinforcin & strl.
49. Su ervision
{ se-
50. Surveys
51. Tile & Marble ✓
INII 4] I _ 0
52. :dater - Public
53. :dater - j•Ie11 & Pump 0
/
54. Windows - Glaziiy & Screens
'
55. Window Frames - Concrete
s
I•IIAMI SHORES VILLAGE
APPLICATION FOR FINAL INSPECTION
Prior to a final inspect:;..'n this application must be filled out; if sub contractors have
failed to take out permits the general contractor shall be responsible for the permit and
fee. A final inspection must be made prior to the release to Florida Power and Light Co.
'and the issueance of a certificate of occupancy. •
•
04-,y/.J { ..4TH Nh ,re.�✓i/.rle.,_7N4OB ADDRESS //,'7,571/.474 7i
•
LOT BLOCK f �✓'� SUB. j fl/Z ' 5, q» $' J c, 6
BUILDER f 7 DAY LABOR CONTRACT DATE 19
• TOTAL
ClAr
Mr. William Bradford
Building Dept.
Viallge of Miami Shores,
Miami Shores, Fla.
Dear Mr. Bradford:
Since
1
ely yo
DANTE F. VENTRIERE, Architect - Planner
HITECTURAL CONSULTANTS, LTD.
New Office Address:
814 Ponce de Leon Blvd.
Suite 408, Tel. 446 -4204
Coral Gables, Fla. 33134
M. LOUIS KROMAN, AIA
Architect
DANTE F. VENTRIERE
Planning Consultant
4
K
1 46541 • 1 18 . 1-2
_33 -1-
May 10, 1976
Re: Residence for
Mr. A. Stanhope
This is to f inf orm you that our office approves the deletion
of the 8 x 12 conc. tie cols. at the ends of the garage door
and the glass wall shown in the vestibule on the plans for
the project of reference.
In place of the columns we require the installation of two
No. 5 steel roods ib1ti u the cells of the block, tied to the
tie beam and the conc. floor slab or footing. This block cell
is to be filled with concrete.
In the hope that this change will meet with your approval
we are glad to remain
rs
M. Louis Kroman, A.I.A. Architect
By Dante F. Ventriere Planning Associate
248 KIPLING BLDG., P.O. BOX F257 TELEPHONE: 352 -2101
FREEPORT, GRAND BAHAMA ISLAND