Loading...
PL-10-1445Scheduled Inspection Date: September 20, 2010 Inspector: Hernandez, Rafael Owner: KRIVAK, BRIAN Job Address: 102 NE 102 Street Miami Shores, FL 33138- Project: <NONE> Contractor: GOBIE PLUMBING INC Building Department Comments September 17, 2010 Inspection Worksheet Miami Shores Village 10050 N.E. 2nd Avenue Miami Shores, FL Phone: (305)795 -2204 Fax: (305)756 -8972 Inspection Number: INSP- 149978 Permit Number: PL -8 -10 -1445 For Inspections please call: (305)762 -4949 Permit Type: Plumbing - Residential Inspection Type: Final Work Classification: Addition /Alteration Phone Number (917)533 -4477 Parcel Number 1132060131900 Phone: (305)235 -3523 PLUMBING REPIPE Passed Failed Correction Needed Re- Inspection Fee No Additional Inspections can be scheduled until re- inspection fee is paid. Inspector Comments Page 9 of 26 Miami Shores Village • Building Department 10050 N.E.2nd Avenue, Miami Shores, Florida 33138 Tel: (305) 795.2204 Fax: (305) 756.8972 INSPECTION'S PHONE NUMBER: (305) 762.4949 BUILDING Permit No. PERMIT APPLICATION Master Permit No. FBC 20 Permit Type: PLUMBING OWNER: Name (Fee Simple Titleholder): or V Cl Phone#' Address: 1 O ruE straa =+ Cit (th i G M ,Sh at G S state: Floc r' Ql - Zip: 33 Tenants Name: ' I Email: Kri 1�Gi I<G7t.r.S ;9 els ®g✓y-tQ: t . Go/✓'1 JOB ADDRESS: Jam ry 10.• Sr County: CONTRACTOR: Company Name: Phone#: R I -.33 -y ?77 City: Miami Shores Folio/Parcel#: Is the Building Historically Designated: Yes Value of Work for this Permit: $ 4300 r 00 Type of Work: Address OAlteration Description of Work: NO u Address: 75--a t U � .5w i37 City: Pa I m t' r � - 16a'1 State: lc 1-.. Z ' Qualifier Name t t. .) t - t r c� State Certification or Registration #: d-O� 333 Certificate of Competency #: Contact Phone#: Email Address: / �� LA DESIGNER: Architect/Engineer: Phone#: lu t�s- �o9pe Miami Dade Flood Zone: PL'8 -lilt Zip: 331 3 f Monet ? a3s ip: 331 s t L� Phone: OS- if 9 P " .4 7 / Square/Linear Footage of Work: ONew depair/Replace GlDemolition *** * ****** * * * ** a***** *** *4 nrmaas**** **F e*stw**** ****se +Raw*w **eeas®a *******aoM+* Submittal Fee $ 5 O u Permit Fee $ ,2/4 c " . P�tD Radon Fee $ Sunning Fee $ . Notary $ Training/Education Fee $ Double Fee $ Structural Review $ CCF $ CO /CC $ DBPR $ Bond $ Technology Fee $ TOTAL FEE NOW DUE $ Bonding Company's Name (if applicable) Bonding Company's Address City State Zip Mortgage Lender's Name (if applicable) Mortgage Lender's Address City State Zip Application is hereby made to obtain a permit to do the work and installations as indicated. I certify that no work or installation has commenced prior to the issuance of a permit and that all work will be performed to meet the standards of all laws regulating construction in this jurisdiction. I understand that a separate permit must be secured for ELECTRICAL WORK, PLUMBING, SIGNS, WELLS, POOLS, FURNACES, BOILERS, BEATERS, TANKS and AIR CONI)mONERS, ETC OWNER'S AFFIDAVIT: I certify that all the foregoing information is accurate and that all work will be done in compliance with all applicable laws regulating construction and zoning. "WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT." Notice to Applicant: As a condition to the issuance of a building permit with an estimated value exceeding $2.500, the applicant must promise in good faith that a copy of the notice of commencement and construction lien law brochure will be delivered to the person whose property is subject to attachment Also, a certified copy of the recorded notice of commencement must be posted at the job site for the first inspection which occurs seven (7) days after the building permit is issued. In the absence of such posted notice, the inspection will not be approved and a reinspection fee will be charged. Signatu%e Owner or Agent `J� instrument was acknowledged before me this Iv by 1 'VQt e or who has produced cation and who did take an oath. Si The fo day who is NOT Contractor befo My Commi `•'• AU •• *********************************** 11� ******lpgAtN**** **r Structural Review Clerk (Revised 07n0N7)(Revised 06/10J2009)(Revised 3/15!09) r