315 NE 101 StCLOSETS
BATH
TUBS
SHOWERS
LAVA-
TORIES
SINKS
SLOP
SINKS
LAUNDRY
TUBS
URINALS
CATCH
BASIN
FLOOR
DRAIN
DRINKING
FOUNTAINS
TOTAL
FIXTURES
..)-
f
/
Sketch position of building and lot lines in square (which represents an entire city block), showing on which
street the building and lot faces; also show exact location of "Y" in street and position of lateral or septic
tank. Show sewer and any change in direction same may make. The purpose of this plan is to have an accurate
layout of all underground pipes for future references.
WEST
NORTH
A
SOUTH
EAST
Remarks:
NORTH
SOUTH
l+7
tA
H
A -244 5 -35 5M
I herewith submit the following plan of plumbing for approval:
Employing Plumber. Work executed by
For a
Dwelling Store ❑ Garage ❑
Owner or Agent
,;//
Builder or Contractor is
Lot No. / ' ;' i4Block No. 9 e Subdivision
Address
Ground
Approved by
New [V
DIVISION OF PLUMBING INSPECTION
DEPARTMENT OF PUBLIC SERVICE
MIAMI, FLORIDA
Sewer Connections At center of St. ❑ At curb ❑ At property line ❑ Existing in alley ❑ Existing bldg. sewer ❑
To septic tank ❑ Existing bldg. drain ❑ To dry well ❑
A charge of $1.00 will be made for correcting any inaccuracies in the foregoing information.
DO NOT WRITE IN SPACE BELOW. THIS IS FOR THE USE OF THE DIVISION OF PLUMBING INSPECTION ONLY.
Date ' - ". .k)
ROUGH -IN INSPECTION
Rough -In
A M
REMARKS
Rain Leader
P M.
Condemned by
Old ❑ Story
SEWER INSPECTION
A M
Apartment ❑
Address
Address
Date—
Approved by
Condemned by
REMARKS
Plan No Sewer Permit No
P M.
Addition ❑ Remodeled ❑
Hotel ❑ Office Bldg. ❑
DatP
FINAL INSPECTION
19
A M P M
Approved by
Condemned by
REMARKS
THIS SPACE FOR ELEVATION SKETCH
In alterations to existing work show the old work in re3 ink and the new in black ink. Letter each stack to
correspond with the opening shown in floor plan or ground plan on opposite page.
A PERSPECTIVE SKETCH WILL BE SUFFICIENT
PROVIDED THE WORK CAN BE CLEARLY SHOWN
•
q 4
THIS SPACE FOR PLAN SKETCH
Show location of stacks and horizontal drains inside building, lettering each opening to correspond with the
stock connections as shown on the elevation sketch on opposite page. Where ground work is concealed, draw
floor plan of building showing location of walls, partitions, columns, etc., and the location of all horizontal
soil and waste pipes, in reference to same.
r ` �°