312 NE 101 St (5)I
Applican
Print N.' e:
Comments:
APPLICATION FOR CERTIFICATE OF RE- OCCUPANCY
teizteae--
hereby apply for a certificate to re- occupy the single family residence known as: (address)
.2( c g A/ /0 / � , Miami Shores, Florida.
Legal description:
Lot: / / ,Block: rJ9 ,PB&PG: 49 -7D .
I hereby certify that I understand that the zoning of the property is for single - family residential use
and that it is unlawful for more than one family to reside therein. I also understand that any
Certificate of Re- Occupancy that may be issued by Marti Shores Village, Florida, certifies only
that the referenced property is being used for single- family purposes and that such Certificate does
not constitute any representation, warranty or certification as to the condition of the dwelling or
other structures on ,lch property.
*************** * * * * * * * * * * * * * * * ** * * * * * * * * * * * * **
For the purposes of conducting the inspection required by Section 902 of the Mani Shores
Development and . • Code, con
Contact Name: /f �� T� ephone:
l
Buyer: Seller. Realtor-.1 - Company Name:. %/
Application Fee (550) Paid: Cash:_ Check: Number:
Inspection: By: j . 1 pproved: j Denied: Date:
-11.3e/g/
CERTIFICATE OF RE- OCCUPANCY
On behalf of Miami Shores Village, Florida, the undersigned certifies that the property described
in the application has been inspected for the purposes of re- occupancy pursuant to Sections 901
and 902 of the Miami Shores Land Development and Zoning Code and that such property may be
re- occupied by the applicant for single - family residential purposes.
THIS CERTIFICATE VERIFIES THAT THE REFERENCED PROPERTY
HAS BEEN INSPECTED BY MIAMI SHORES VILLAGE AND HAS BEEN
DETERMINED TO PRESENTLY COMPLY WITH THE SCHEDULE OF
REGULATIONS OF THE MIAMI SHORES LAND AND DEVELOPMENT
CODE PERTAINING SOLELY TO THE REQUIREMENT THAT EACH
ONE - FAMILY DWELLING IS USED AND INTENDED TO BE USED FOR
A ONE-FAMILY DWELLING PURPOSE ONLY; HOWEVER, THIS
CERTIFICATE DOES NOT CONSTITUTE ANY REPRESENTATION OR
WARRANTY AS TO THE CONDITION OF THE DWELLING OR OTHER
STRUCTURES ON THE PREMISES DESCRIBED HEREIN, OR ANY
ASPECT OF SUCH CONDITION, AND INTERESTED PARTIES ARE
ADVISED AND ENCOURAGED TO MAKE THEIR OWN INSPECTION
OF THE PREMISES IN ORDER TO DETERMINE THE CONDITION
THEREOF.
SPECIFICATIONS
FOR
THE ERECTION 0?' DWELLING FOR
F. J. REPPENNAGEN & EM. 1. MYNA 1.1
Vo
ON ► i fi `
A} of Lot 10, and All of / o
Lot 11, Block 39, Yiami 't_y , 1) T
Shores, Florida.
1. OF S All stumps, roots and plant growth w�
h building lines must be completely removed. All rubbis \ to
be removed from site at completion of the work.
t. ATI OF PREMISES: Before submitting proposals for his
work, each bidder 1 be held to have examined the premises
and satisfied himself as to the existing Bondi tlons ander whioh
he will be obliged to operate, or that will in any manner affect
the work under his contract. No allowanee shall be made sub -
sequently in this eonneotion, in behalf of the oontraotor for any
negligence on his part,
3. WATER FOR CO4STRUCTIQN WQBI : The owners shall pay for all water
required in the oons ruo ion work.
N ARY ARRANGEMENTS: The owners shall at the beginning of the
work provide on the premises in a suitable piaoe, a temporary
enclosure with convenience for use of all workmen on the Job,
shall maintain same in a sanitary oondition and shall remove
same with its oontents at the completion of building.
5. Bills for extras will be a llow6d only when work authorized in
writing by the owners. No bills based on verbal orders will be
paid.
6. : (a) lsoh oontraotor shall oompute in his estimate and
pro lY pay and discharge any obligations due the State of
Florida under the provisions of Chapter 15, 787 Laws of Florida,
Acts of 191, known as the Documentary stamp Tax Act.
(b) Each oontraotor shall compute in his estimate and
properly pay and discharge any obligation due the United dates
of Amerios or the State of Florida under the provisions of the
Federal Social Seourity Aot, emoted by the 74th Congress.
•
(o) Each oontraotor . or suboontractor or Supply Dealer shall
eoapate is their cost and properly pay and disoharge any obli-
gation due the State of Florida under the provisions of Chapter
16,848 Laws of Florida, Aots of 1935, known as the Retail Sales
Aot, or Chain Store Aot.
7. CONSTRUCTION LDD U?T CB: The owners shall maintain
such insurance as will protest them from claims under ' Workmen' s
Compensation Acts and from any other olaims for damages for
personal injury, including death, which may arise 'fr o opera-
tions under this work, whether such operations be by themselves
or by any snb.«eoatraotor or anyone direotly or indireotiy employed
by either. Sub - contractors shall file with the owners, `oertifi-
oates of such insurance with a clause requiring at least five
days miles is the event of oanoellation and shall be subject
to their approval as to adequacy of protection.
8, Li =± OF 111 sub- oontraotors shall furnish the owners,
• or a. as payment is made, full release of liens, signed by
all material man assbeiated in any way with the work.
04BAIII; At the oonpletion of their oontraots, all sub -
eontraoFors shall leave their work clean,. and at the ooapletion
of building, owners shall have all windows, doors, woodwork,
floors, mile work, plumbing fixtures and all other equipment
olean and ready for occupancy.
10. sumt MAC; UJDZR AISTB: Level off all high spots in the grade
wider building and leave a clearance of at least 1'8" between
the under edge of floor joists and the grade under building.
This space must be left free of all wood blocks or other debris.
11. YOUNDATIQN: Reinforoed eonorete footings of widths and depths
as shown on plans. Bteel reinforcements as shown..Conorete used
to be of ready mixed typal delivered on job and run in wood forms.
Delivery to be regulated to insure a steady and oontinuous pour.
ing. Provide east stone, oopper soreened vents ens shown on
plan. Provide copper soreeled aooese door of proper size in
foundation wall. foundation Walla to be Concrete Blook of good
grade- laid in cement mortar mixed as follows: 1 part oement, 2
parts sand and $ line added.
12. i E 3H� Plane around entire interior of all excavated
area o oun at on walls a #28 gauge "Ton or "Arnett" galvanized
iron continuous termite shield which must extend into the wall and
direotly under wood plate at least 5 inches, Shield must
project from wall horizontally S inches and down on a 45 degree
angle 3 inches. Solder all joints.
13. P : Place on top of all 12" Block bearing walls a "Celoursol"
tea ed 2 x. wood plate. All plate bearing walls to be brought
up level and true with cement grout before planing wood plates.
14, 7 p OR JOISTS: Floor joists shall be 2 x 10" Long Lett Yellow
i� space 16" on centers, having 1 x 4 bridging in venter of
all spans exceeding 9 feet. All floor joists to be treated with
"Celoursol ". Double joist under all parallel portions, Space
Joists 12" on centers under bath tub.
15. wo9p sqFLS: Lay 1 z 6 i2 Y.P. sub.flooring diagonally over
en re first floor exoept garage and porch floors which are to be
oonorete slab floors, Joints out over and parallel to joists. In
bath.rooa lay sub.floor 2" below top of floor joists la preparetion
for concrete wader tile floor. Top edges of joists to be ylois$dd.
16, al EITBRI B JALLS: All exterior walls to be laid up plumb and
rue with 8" ooncrete blooks using cement mortar of the following
mix: 1 part resent, 2 parts clean sharp sand and 5% line added,
All outside oorners to have 5/8" round reinforcing rod penetrating
holes in block from foundation to reinforeed oonorete tie beam and
then tilled with concrete. (b) All exterior walls to be two
ooat assent stucco in which waterproofing compound has been
thoroughly mixed. Finish of stu000 as eeleoted by owners.
lurr inside of all exterior wails with 1 x 2 cypress furring
strips plaoed 16" on centers. Strips to be creosoted both sides
before placing,. High oarbon wire out nails shall be used for
*souring strips to blookwall s,
14, INTF.ROR NALI,3: (a) All interior walls to be 2 x 4 long leaf yellow
pine studs spaded 16" on center. Single plates at floor, double
plates at oeiling. Double studs at door openings. Double headers
and all openings over 4 feet to be trussed. solid oorner oon.
struotion to be used.
(b) Rook wall boards to be applied to all partitions and ceilings,
joints properly broken and well nailed with blued steel nails. All
corners andlangles to be wired. Falls in bath to receive wire lath
4'6" high, Garage and poroh ceiling to be wire lath and stu000.
(o) All ceilings and walls to reoeive two coats, scratch and
brown and a finish coat of white from whioh hair has been
removed. The tettnre of finish plaster to be selected by
owners. Bath and Kitchen to be smoothly troweled white finish.
CONCRBIS I4NT3 8: Form and pour continuous 8"x12" reinforced
oonorete lintel and tie beam around entire perimeter of building
on top of 8" oonorete block wall at height shown on 3/4" Section
of plan. oonorete to be read -mixed and poured continuously.
Place four 5/8" round reinforoing rods 2" from bottom of lintel
and 2" from top and 2" from sides. Tie beams to follow rake of
all roofs.
19. 0m..mat gags: Place and bolt to tie beam 5'
on oen er, wood plates for ceiling Joist bearing and rafter seat.
Plates to be oreosoted.
E0. 9 ILIA J443TS Ceiling Joists to be 2 x 6 long leaf yellow pine
16" on center, each spiked to roof rafters and every third Joist
to be trussed to roof rafters with 1 x 8.
21. (a) ROOF R AFIR8: Rafters to be 2 s 6 long leaf yellow pine
spaeed 16 on centers and every third rafter to be strapped to
bolted plate with Plumbers strap iron. Ends bt rat rcnd *oiling
beams to be spiked together. Rafters to be pitohed 33*
" to the foot.
bl A RDR�&L C41.1193: Cathedral ceiling over living-room using
4 x 6 Cypress rafters and 4 x 8 Cypress ridge. Raftera set 2'
on eenters and eovered with 1 x 8 V Joint cypress o leer.
22. RQQ7 S$$4 #: Over entire roof area except oathedral °oiling
plat,* 1 s long leaf yellow pine T & G sheathing well nailed
to rafters.
23. : Cover entire roof with 90# Slate surface roofing, fully
asp d to wood sheathing. All flashing and drip strips to be
16 oz. eopper. Bntire roof to be oovered with B.M. Rood, Norman
Dresden Clay shingle Red Clay tile laid in eement mortar. Provide
eopper leader and gutter over porch entrance.
24. P171 VIINTSs Provide l " galvanized iron pipe vents. Place not
over 3 feet apart at eaves of roof. Same to be screened with 18
mesh copper soreen wire. Baker tile screened vents in psb1e ends.
25. PIE-CABOAIMOMMT All steel sash of sizes es shun on
plane to be installed in precast ooncretee frames as mr nnfaotured
by Livesay Window Company.
26'. . CAULKING AND NNATREBRIMPING :.AII exterior door trsmea . to be
caulked. Bronze thresholds for all exterior doors except service
door in. garage. Bronze weatherstrip to be installed on two ex-
terior .doors in lieingroomi and exterior door in ki tchen.
27, SEPTIC TANK: install complete one concrete septic tank according
to nuSeeturer" s specification, size 450 gallons, with 75 feet
of drain tile,
28. SOLAR WATER PAM: Install as located on plan one Solar
heater having stopper tube coil and all metal construction with
a 65 gallon storage tank insulated, erected according to manu-
facturer's specification.
ELECTRIO WIRING: Pr. c v i de outlets as shown on plan. Provide a
complete electric wirima installation with switch and Fuse box
to meet all local, state and National requirements for this
olassi fieation of work. Service to be overhead from rear of
property to meter, Erase and awi box located in garage.
Electrical contractor to provide .proper wiring for the power
installation of eelsotrio ran a and refrigerator. flee tri cal
contractor to hang all fixtures,
Owners shall furnish all electric fixtures and an allowance of
50 dollars is made for same..
30. TILE WORK I, Bath room to have 4. 2 4 corned tile wainscot 4.6*
high and 6 over tub. Colored swap and bane and set of 7 colored
accessories. Floor to be two.4dnee color oombination. No glazed
tile shall be used in floor. All colors to be selected by owners.
A firstciass tile installation in all its respects is required.
All window sills to be tiled. Colors' selected by owners. °Bullnose.
Hearth to be laid in pattern.
TILE aim UNIT: Tile sink.drainboards and backsplaah of 4z4
colored tile nith colored trice, .. colors selected by owners.
-5-
To Ant
rir POACH AND STEPS • Front nt Porch floor amd.s4ege to be Quarry
Color &sleeted by owners. Only first grade tiles shall be
used and sage to be installed straight, true and level and well
floated. Tile contractor shall return at ocmpletion of building
and properly clean all tile. Bullnose tile on stoop and steps,
Pro »T
31, 41 b�. AO: Kitchen Cabinets to be built of clear oypress and
testa with magnolia. To be manufactured in the mill to the
satisfaction of the owners and in a000rdanoe with detail which
shall bs furnished.
Provide shelves (5) in linen oloset. All other olossts to have
s 14" shelf, hanging pole and shoe rook. All inside trig to
bs clear oypress with 13 x 4" Jambs, molded casings. All trim
to be sanded when delivered on job. All interior doors to be
white pine "ltiraels" doors except as follows: Door from livingroom
tobel
Joint slab type, one light clear cypress and to be made to detail.
Door from kitchen to rear screened poroh to be of *leer oypress
eotabination sash and *orison. All exterior doors to be 1t" thick,
Front serer* doors to be 1 " thick with fatal grill to detail'
Rear soreen door to be 1.3/8" thick.
Bass to be 1 r 4 beveled clear cypress with shoe sold. Provide
No. 1 Tennessee cedar closet lining for two bedroom closets.
All exterior door frames to be clear oypress rabbited for doors.
Garage door to be overhead type. Pressed wood on l4" ()hear cypress
molded frame.
9IA88 GUANO AN STEE 8 : All glass throughout to be D.S.f .
quality set in good grade of lead putty. Steel sash to be
of Standard, quality, ooaplete with looking handles, crank operators
and 18 mesh Bronze sorsene on metal frames,
33. Provide SO" 1 80" scuttle opening with door in ceiling of one
bedroom closet for aooess to attic.
34. FINISH HARDH&8 All interior door hardware as follows:
Bathroom door to have niokelplate brass Slags Bathroom set.
Bedroom doors to have Slags Button look sets. Closets to have
Slag* Closet sets. 8itohen to have niokelplated brass Slags
Hey look set. Front door to living room to have Slags Colonial
front door tumbler set. Door from livingrooa to garage to have
Slag ley look set. All screen doors to have 51age soreen door
sets with borer hinges. All outside doors to have 1} pair 4 x 4
butts. All inside doors to have 1 pair 31 z 3}" P.C. butts, All
doors to have metal door stops. Kitchen eabine t s to have Chran-
iva plated brass hinges, door knobs and drswer pulls.
Am allowaaee is ride for hardware for overhead garage door of
2T dollars and fifty Dents.
35. P Gt All exterior woodwork to receive 3 coats Sherwin -
Vfl ass outside paint. Colors as selected by owners. All metal
work inoluding steel sash to receive 1 ooat red lead and two
coats lead and oil paint. Exterior stucoo to receive two coats
high grade waterproofing.
Interior wood work in Kithohen, Bath, bedrooms and hall to
receive 1 prise coat, 2 Goats of flat paint and be finished in
enamel. Colors selected by owners. Living and dining roost wood
work shall reoeive 1 prime coat, two coats flat and shall then
be glazed as dirsoted.
Bathroom and Kitchen walls and ceiling shall reoeive one ooat
sealer, two coats flat and one coat or self -gloss enamel. Bed.
rooms shall reserve one Goat sealer and two coats flat, Living-
roan and dining roan walls and ceiling to reoeive one coat of
sealer, two *oats flat and then be glazed.
Sherwin - Williams paint products shall be need, a high type
paint job is required and must meet the sati sfaotion of the
owners.
36. FIN ED FTAQRS: Liviagroom, dining -roost and hall shall be
quarter.sawed red oak. Bed rooms shall be clear red oak. Sams
to be nailed over eaeh joist bearing. Kitchen floor shall be
T.P. over whi oh a felt base shall be Demented to floor. Arm-
strong inlaid standard gauge linoleum shall be oeaented and
laid over felt base. Two eornera to have inlaid Chevrons. Pattern
to be selected by owners,
After all other work la oonpleted all oak floors shall be sanded
*lean and aaooth. Floors to receive one coat filler and given two
coats shellac, sanded after each coat and then waxed.
59. PLC NG: All piping to be of standard gauge C.I. soil and
vent p pe. All hot and cold water pipe to be steel tube threaded.
The Plumbing Contractor shall provide 2 bose000k' where designated.
He shell bring water from street to inside of lot line for use
in ootstruotion. He shall pay all fees for permits neoessary to
his work and shall comply with all national, state and looal re-
quirements.
All plumbing fixtures shall be of "Crane" Manufacture, shall have
Chromium fittings and piping where exposed. The following fixtures
shall be used: re
C '7'a •ter Ov o ire) t --� .. y � s-S— �-- I►1 y Kopf d
1. Kitchen Sink 20" x 20" FLAT RIM with K 906
owing :pout fauoet and large
CoLoveC utility drain.
1 (tJr "s,
Lavatory: 20 x 24 - C 2500 MAYDAY" COMPLETE
3. Bathtub: 1 5 ft. - C - 3308 "CORWITH" "
4. Toilets 1 . 0 - 11126 "COMPACT"
144. plumbing fixtures to be of color as selected by owners.
An allowanoe of 15 dollars is made for medicine oabinet.
The owners shall complete landscaping of grounds, furnishing all
trees, shrubs, sod, top soil etc. An allowance of 130 dollars is
made for same(
39. Soreen Wi ;ei Front and rear porohes shall have 18 mesh bronze
screen wire.
40. drill,: Metal grill for front screen door to be made to detail
furs dhed. Allowance twenty -two dollars made for this item.
41. All screen doors to have Norton door closers.
•
4E. Cast Stone Mantel: Fireplace to have oast stone mantel. An allowance
of 30 dollars is Jade for same.
e. , r a An 7oit.e7 Roo ») re, f?A Cer»artZ F/ -does,
-8-
43. OE XRAL MINT WORK: Garage floor to be 4" think, of Ready-
biz concrete and to be troweled to a smooth straight surtaoe.
Ribbon Drive: Ribbons to be 4" think and 2 ft, wide, to be
laid in wood forms and to be troweled smooth and straight.
Ready -M1,x oonerete shall be used.
s •
• From street to entrance steps lay a walk 5 feet in width
a " thiek. To be laid in wood fonds and troweled smooth
and straight, Ready -Mix oonorete shall be used.
Ce ine i - r -
44. : Chimney to be laid up with " d
r o . ame to be laid in white mortar. Briok mason to lay
up chimney true, straight, plumb and level. After building
is completed, brink mason shall wash down with a solution of
lduriatio Aoid and water, exterior walls of chimney and remove
all mortar spots or other defacements. 8" x 16" terra ootta
flue lining shall be used. Fireplace to be according to
existing oode governing the location.
C Mir» R e y Tu j. 1 o f r were, Georfi.a Res)
o
S e Le ct ov dr A , , 4.41;9 in dell a Cetrreta 'th D /4.
5
S Ho wr1 0/7 P4,417.
oA,t,`r s Die WALL off " L 4'tn g
4irt rh G e •i i s Rep Zed. a writ Q Zoie3it ,
wtiire 1'0114'4T4r An,o 4s 3ttewa a n ?AAP?
OWNER
ARCHITECT , - '1„,
,
My Commission expires
Chairman
..BUILDING PERMIT RECORD
MI.AMI SHORES VILLAGE
-FLORIDA
f
DATE
APPLICATION
Application is hereby made for°the' approval of the plans and
specifications herewith 'Submitted for the building or other
structure herein described. This application is made in com-
pliance ..arid conformation with the Building Ordinance of the
Miami Shores Village, Florida, and 'all provisions of the Laws
of the. State of Florida; aTl rdinancesof.Miami Shores
Village, and all rules and regulations of the building
Department of Miami S shall.be complied with,
whether specified or not. .
CONTRACTOR
BLK3� SUBDIVISION
NEW ADDITIO REPAIRS NUMBER OF STORI C/ ROOF
COST (excluding Architect's fee, landscaping & garage)
Building to be used for and no other use.
I hereby submit all the plans and specifications for said
building.
Signed
v
STATE OF FLORIDA)
COUNTY OF DADE )
Before me, the undersigned authority, a notary public, duly
authorized to administer oaths and take acknowledgment,
personally appeared to me well
known, and who, being by me first duly sworn, upon oath
deposes and says that he is the builder of the above described
construction, that he has read the foregoing application,
and that he did sign the same, and.that facts stated by him
are true. Read, Sworn and Subscribed before me,
Notary Public (Signed)
Cubic Feet - Cubic feet required in this Block
PLANNING BOARD
•
Member
Member
Secretary
Building Inspecto
Permit No. 42 ,:issued t
Electrical Permi , , No• '� Pl
u r i
R> � ng Permit No.
; _ Date F..
ex6 . 4
0
1
Painting
Plastering
Lathing
Electrical
Mason & Concrete
Plumbing
Roofing
Glazing
Tile
Miscellaneous
LIST OF SUB- CONTRACTORS