Loading...
312 NE 101 St (5)I Applican Print N.' e: Comments: APPLICATION FOR CERTIFICATE OF RE- OCCUPANCY teizteae-- hereby apply for a certificate to re- occupy the single family residence known as: (address) .2( c g A/ /0 / � , Miami Shores, Florida. Legal description: Lot: / / ,Block: rJ9 ,PB&PG: 49 -7D . I hereby certify that I understand that the zoning of the property is for single - family residential use and that it is unlawful for more than one family to reside therein. I also understand that any Certificate of Re- Occupancy that may be issued by Marti Shores Village, Florida, certifies only that the referenced property is being used for single- family purposes and that such Certificate does not constitute any representation, warranty or certification as to the condition of the dwelling or other structures on ,lch property. *************** * * * * * * * * * * * * * * * ** * * * * * * * * * * * * ** For the purposes of conducting the inspection required by Section 902 of the Mani Shores Development and . • Code, con Contact Name: /f �� T� ephone: l Buyer: Seller. Realtor-.1 - Company Name:. %/ Application Fee (550) Paid: Cash:_ Check: Number: Inspection: By: j . 1 pproved: j Denied: Date: -11.3e/g/ CERTIFICATE OF RE- OCCUPANCY On behalf of Miami Shores Village, Florida, the undersigned certifies that the property described in the application has been inspected for the purposes of re- occupancy pursuant to Sections 901 and 902 of the Miami Shores Land Development and Zoning Code and that such property may be re- occupied by the applicant for single - family residential purposes. THIS CERTIFICATE VERIFIES THAT THE REFERENCED PROPERTY HAS BEEN INSPECTED BY MIAMI SHORES VILLAGE AND HAS BEEN DETERMINED TO PRESENTLY COMPLY WITH THE SCHEDULE OF REGULATIONS OF THE MIAMI SHORES LAND AND DEVELOPMENT CODE PERTAINING SOLELY TO THE REQUIREMENT THAT EACH ONE - FAMILY DWELLING IS USED AND INTENDED TO BE USED FOR A ONE-FAMILY DWELLING PURPOSE ONLY; HOWEVER, THIS CERTIFICATE DOES NOT CONSTITUTE ANY REPRESENTATION OR WARRANTY AS TO THE CONDITION OF THE DWELLING OR OTHER STRUCTURES ON THE PREMISES DESCRIBED HEREIN, OR ANY ASPECT OF SUCH CONDITION, AND INTERESTED PARTIES ARE ADVISED AND ENCOURAGED TO MAKE THEIR OWN INSPECTION OF THE PREMISES IN ORDER TO DETERMINE THE CONDITION THEREOF. SPECIFICATIONS FOR THE ERECTION 0?' DWELLING FOR F. J. REPPENNAGEN & EM. 1. MYNA 1.1 Vo ON ► i fi ` A} of Lot 10, and All of / o Lot 11, Block 39, Yiami 't_y , 1) T Shores, Florida. 1. OF S All stumps, roots and plant growth w� h building lines must be completely removed. All rubbis \ to be removed from site at completion of the work. t. ATI OF PREMISES: Before submitting proposals for his work, each bidder 1 be held to have examined the premises and satisfied himself as to the existing Bondi tlons ander whioh he will be obliged to operate, or that will in any manner affect the work under his contract. No allowanee shall be made sub - sequently in this eonneotion, in behalf of the oontraotor for any negligence on his part, 3. WATER FOR CO4STRUCTIQN WQBI : The owners shall pay for all water required in the oons ruo ion work. N ARY ARRANGEMENTS: The owners shall at the beginning of the work provide on the premises in a suitable piaoe, a temporary enclosure with convenience for use of all workmen on the Job, shall maintain same in a sanitary oondition and shall remove same with its oontents at the completion of building. 5. Bills for extras will be a llow6d only when work authorized in writing by the owners. No bills based on verbal orders will be paid. 6. : (a) lsoh oontraotor shall oompute in his estimate and pro lY pay and discharge any obligations due the State of Florida under the provisions of Chapter 15, 787 Laws of Florida, Acts of 191, known as the Documentary stamp Tax Act. (b) Each oontraotor shall compute in his estimate and properly pay and discharge any obligation due the United dates of Amerios or the State of Florida under the provisions of the Federal Social Seourity Aot, emoted by the 74th Congress. • (o) Each oontraotor . or suboontractor or Supply Dealer shall eoapate is their cost and properly pay and disoharge any obli- gation due the State of Florida under the provisions of Chapter 16,848 Laws of Florida, Aots of 1935, known as the Retail Sales Aot, or Chain Store Aot. 7. CONSTRUCTION LDD U?T CB: The owners shall maintain such insurance as will protest them from claims under ' Workmen' s Compensation Acts and from any other olaims for damages for personal injury, including death, which may arise 'fr o opera- tions under this work, whether such operations be by themselves or by any snb.«eoatraotor or anyone direotly or indireotiy employed by either. Sub - contractors shall file with the owners, `oertifi- oates of such insurance with a clause requiring at least five days miles is the event of oanoellation and shall be subject to their approval as to adequacy of protection. 8, Li =± OF 111 sub- oontraotors shall furnish the owners, • or a. as payment is made, full release of liens, signed by all material man assbeiated in any way with the work. 04BAIII; At the oonpletion of their oontraots, all sub - eontraoFors shall leave their work clean,. and at the ooapletion of building, owners shall have all windows, doors, woodwork, floors, mile work, plumbing fixtures and all other equipment olean and ready for occupancy. 10. sumt MAC; UJDZR AISTB: Level off all high spots in the grade wider building and leave a clearance of at least 1'8" between the under edge of floor joists and the grade under building. This space must be left free of all wood blocks or other debris. 11. YOUNDATIQN: Reinforoed eonorete footings of widths and depths as shown on plans. Bteel reinforcements as shown..Conorete used to be of ready mixed typal delivered on job and run in wood forms. Delivery to be regulated to insure a steady and oontinuous pour. ing. Provide east stone, oopper soreened vents ens shown on plan. Provide copper soreeled aooese door of proper size in foundation wall. foundation Walla to be Concrete Blook of good grade- laid in cement mortar mixed as follows: 1 part oement, 2 parts sand and $ line added. 12. i E 3H� Plane around entire interior of all excavated area o oun at on walls a #28 gauge "Ton or "Arnett" galvanized iron continuous termite shield which must extend into the wall and direotly under wood plate at least 5 inches, Shield must project from wall horizontally S inches and down on a 45 degree angle 3 inches. Solder all joints. 13. P : Place on top of all 12" Block bearing walls a "Celoursol" tea ed 2 x. wood plate. All plate bearing walls to be brought up level and true with cement grout before planing wood plates. 14, 7 p OR JOISTS: Floor joists shall be 2 x 10" Long Lett Yellow i� space 16" on centers, having 1 x 4 bridging in venter of all spans exceeding 9 feet. All floor joists to be treated with "Celoursol ". Double joist under all parallel portions, Space Joists 12" on centers under bath tub. 15. wo9p sqFLS: Lay 1 z 6 i2 Y.P. sub.flooring diagonally over en re first floor exoept garage and porch floors which are to be oonorete slab floors, Joints out over and parallel to joists. In bath.rooa lay sub.floor 2" below top of floor joists la preparetion for concrete wader tile floor. Top edges of joists to be ylois$dd. 16, al EITBRI B JALLS: All exterior walls to be laid up plumb and rue with 8" ooncrete blooks using cement mortar of the following mix: 1 part resent, 2 parts clean sharp sand and 5% line added, All outside oorners to have 5/8" round reinforcing rod penetrating holes in block from foundation to reinforeed oonorete tie beam and then tilled with concrete. (b) All exterior walls to be two ooat assent stucco in which waterproofing compound has been thoroughly mixed. Finish of stu000 as eeleoted by owners. lurr inside of all exterior wails with 1 x 2 cypress furring strips plaoed 16" on centers. Strips to be creosoted both sides before placing,. High oarbon wire out nails shall be used for *souring strips to blookwall s, 14, INTF.ROR NALI,3: (a) All interior walls to be 2 x 4 long leaf yellow pine studs spaded 16" on center. Single plates at floor, double plates at oeiling. Double studs at door openings. Double headers and all openings over 4 feet to be trussed. solid oorner oon. struotion to be used. (b) Rook wall boards to be applied to all partitions and ceilings, joints properly broken and well nailed with blued steel nails. All corners andlangles to be wired. Falls in bath to receive wire lath 4'6" high, Garage and poroh ceiling to be wire lath and stu000. (o) All ceilings and walls to reoeive two coats, scratch and brown and a finish coat of white from whioh hair has been removed. The tettnre of finish plaster to be selected by owners. Bath and Kitchen to be smoothly troweled white finish. CONCRBIS I4NT3 8: Form and pour continuous 8"x12" reinforced oonorete lintel and tie beam around entire perimeter of building on top of 8" oonorete block wall at height shown on 3/4" Section of plan. oonorete to be read -mixed and poured continuously. Place four 5/8" round reinforoing rods 2" from bottom of lintel and 2" from top and 2" from sides. Tie beams to follow rake of all roofs. 19. 0m..mat gags: Place and bolt to tie beam 5' on oen er, wood plates for ceiling Joist bearing and rafter seat. Plates to be oreosoted. E0. 9 ILIA J443TS Ceiling Joists to be 2 x 6 long leaf yellow pine 16" on center, each spiked to roof rafters and every third Joist to be trussed to roof rafters with 1 x 8. 21. (a) ROOF R AFIR8: Rafters to be 2 s 6 long leaf yellow pine spaeed 16 on centers and every third rafter to be strapped to bolted plate with Plumbers strap iron. Ends bt rat rcnd *oiling beams to be spiked together. Rafters to be pitohed 33* " to the foot. bl A RDR�&L C41.1193: Cathedral ceiling over living-room using 4 x 6 Cypress rafters and 4 x 8 Cypress ridge. Raftera set 2' on eenters and eovered with 1 x 8 V Joint cypress o leer. 22. RQQ7 S$$4 #: Over entire roof area except oathedral °oiling plat,* 1 s long leaf yellow pine T & G sheathing well nailed to rafters. 23. : Cover entire roof with 90# Slate surface roofing, fully asp d to wood sheathing. All flashing and drip strips to be 16 oz. eopper. Bntire roof to be oovered with B.M. Rood, Norman Dresden Clay shingle Red Clay tile laid in eement mortar. Provide eopper leader and gutter over porch entrance. 24. P171 VIINTSs Provide l " galvanized iron pipe vents. Place not over 3 feet apart at eaves of roof. Same to be screened with 18 mesh copper soreen wire. Baker tile screened vents in psb1e ends. 25. PIE-CABOAIMOMMT All steel sash of sizes es shun on plane to be installed in precast ooncretee frames as mr nnfaotured by Livesay Window Company. 26'. . CAULKING AND NNATREBRIMPING :.AII exterior door trsmea . to be caulked. Bronze thresholds for all exterior doors except service door in. garage. Bronze weatherstrip to be installed on two ex- terior .doors in lieingroomi and exterior door in ki tchen. 27, SEPTIC TANK: install complete one concrete septic tank according to nuSeeturer" s specification, size 450 gallons, with 75 feet of drain tile, 28. SOLAR WATER PAM: Install as located on plan one Solar heater having stopper tube coil and all metal construction with a 65 gallon storage tank insulated, erected according to manu- facturer's specification. ELECTRIO WIRING: Pr. c v i de outlets as shown on plan. Provide a complete electric wirima installation with switch and Fuse box to meet all local, state and National requirements for this olassi fieation of work. Service to be overhead from rear of property to meter, Erase and awi box located in garage. Electrical contractor to provide .proper wiring for the power installation of eelsotrio ran a and refrigerator. flee tri cal contractor to hang all fixtures, Owners shall furnish all electric fixtures and an allowance of 50 dollars is made for same.. 30. TILE WORK I, Bath room to have 4. 2 4 corned tile wainscot 4.6* high and 6 over tub. Colored swap and bane and set of 7 colored accessories. Floor to be two.4dnee color oombination. No glazed tile shall be used in floor. All colors to be selected by owners. A firstciass tile installation in all its respects is required. All window sills to be tiled. Colors' selected by owners. °Bullnose. Hearth to be laid in pattern. TILE aim UNIT: Tile sink.drainboards and backsplaah of 4z4 colored tile nith colored trice, .. colors selected by owners. -5- To Ant rir POACH AND STEPS • Front nt Porch floor amd.s4ege to be Quarry Color &sleeted by owners. Only first grade tiles shall be used and sage to be installed straight, true and level and well floated. Tile contractor shall return at ocmpletion of building and properly clean all tile. Bullnose tile on stoop and steps, Pro »T 31, 41 b�. AO: Kitchen Cabinets to be built of clear oypress and testa with magnolia. To be manufactured in the mill to the satisfaction of the owners and in a000rdanoe with detail which shall bs furnished. Provide shelves (5) in linen oloset. All other olossts to have s 14" shelf, hanging pole and shoe rook. All inside trig to bs clear oypress with 13 x 4" Jambs, molded casings. All trim to be sanded when delivered on job. All interior doors to be white pine "ltiraels" doors except as follows: Door from livingroom tobel Joint slab type, one light clear cypress and to be made to detail. Door from kitchen to rear screened poroh to be of *leer oypress eotabination sash and *orison. All exterior doors to be 1t" thick, Front serer* doors to be 1 " thick with fatal grill to detail' Rear soreen door to be 1.3/8" thick. Bass to be 1 r 4 beveled clear cypress with shoe sold. Provide No. 1 Tennessee cedar closet lining for two bedroom closets. All exterior door frames to be clear oypress rabbited for doors. Garage door to be overhead type. Pressed wood on l4" ()hear cypress molded frame. 9IA88 GUANO AN STEE 8 : All glass throughout to be D.S.f . quality set in good grade of lead putty. Steel sash to be of Standard, quality, ooaplete with looking handles, crank operators and 18 mesh Bronze sorsene on metal frames, 33. Provide SO" 1 80" scuttle opening with door in ceiling of one bedroom closet for aooess to attic. 34. FINISH HARDH&8 All interior door hardware as follows: Bathroom door to have niokelplate brass Slags Bathroom set. Bedroom doors to have Slags Button look sets. Closets to have Slag* Closet sets. 8itohen to have niokelplated brass Slags Hey look set. Front door to living room to have Slags Colonial front door tumbler set. Door from livingrooa to garage to have Slag ley look set. All screen doors to have 51age soreen door sets with borer hinges. All outside doors to have 1} pair 4 x 4 butts. All inside doors to have 1 pair 31 z 3}" P.C. butts, All doors to have metal door stops. Kitchen eabine t s to have Chran- iva plated brass hinges, door knobs and drswer pulls. Am allowaaee is ride for hardware for overhead garage door of 2T dollars and fifty Dents. 35. P Gt All exterior woodwork to receive 3 coats Sherwin - Vfl ass outside paint. Colors as selected by owners. All metal work inoluding steel sash to receive 1 ooat red lead and two coats lead and oil paint. Exterior stucoo to receive two coats high grade waterproofing. Interior wood work in Kithohen, Bath, bedrooms and hall to receive 1 prise coat, 2 Goats of flat paint and be finished in enamel. Colors selected by owners. Living and dining roost wood work shall reoeive 1 prime coat, two coats flat and shall then be glazed as dirsoted. Bathroom and Kitchen walls and ceiling shall reoeive one ooat sealer, two coats flat and one coat or self -gloss enamel. Bed. rooms shall reserve one Goat sealer and two coats flat, Living- roan and dining roan walls and ceiling to reoeive one coat of sealer, two *oats flat and then be glazed. Sherwin - Williams paint products shall be need, a high type paint job is required and must meet the sati sfaotion of the owners. 36. FIN ED FTAQRS: Liviagroom, dining -roost and hall shall be quarter.sawed red oak. Bed rooms shall be clear red oak. Sams to be nailed over eaeh joist bearing. Kitchen floor shall be T.P. over whi oh a felt base shall be Demented to floor. Arm- strong inlaid standard gauge linoleum shall be oeaented and laid over felt base. Two eornera to have inlaid Chevrons. Pattern to be selected by owners, After all other work la oonpleted all oak floors shall be sanded *lean and aaooth. Floors to receive one coat filler and given two coats shellac, sanded after each coat and then waxed. 59. PLC NG: All piping to be of standard gauge C.I. soil and vent p pe. All hot and cold water pipe to be steel tube threaded. The Plumbing Contractor shall provide 2 bose000k' where designated. He shell bring water from street to inside of lot line for use in ootstruotion. He shall pay all fees for permits neoessary to his work and shall comply with all national, state and looal re- quirements. All plumbing fixtures shall be of "Crane" Manufacture, shall have Chromium fittings and piping where exposed. The following fixtures shall be used: re C '7'a •ter Ov o ire) t --� .. y � s-S— �-- I►1 y Kopf d 1. Kitchen Sink 20" x 20" FLAT RIM with K 906 owing :pout fauoet and large CoLoveC utility drain. 1 (tJr "s, Lavatory: 20 x 24 - C 2500 MAYDAY" COMPLETE 3. Bathtub: 1 5 ft. - C - 3308 "CORWITH" " 4. Toilets 1 . 0 - 11126 "COMPACT" 144. plumbing fixtures to be of color as selected by owners. An allowanoe of 15 dollars is made for medicine oabinet. The owners shall complete landscaping of grounds, furnishing all trees, shrubs, sod, top soil etc. An allowance of 130 dollars is made for same( 39. Soreen Wi ;ei Front and rear porohes shall have 18 mesh bronze screen wire. 40. drill,: Metal grill for front screen door to be made to detail furs dhed. Allowance twenty -two dollars made for this item. 41. All screen doors to have Norton door closers. • 4E. Cast Stone Mantel: Fireplace to have oast stone mantel. An allowance of 30 dollars is Jade for same. e. , r a An 7oit.e7 Roo ») re, f?A Cer»artZ F/ -does, -8- 43. OE XRAL MINT WORK: Garage floor to be 4" think, of Ready- biz concrete and to be troweled to a smooth straight surtaoe. Ribbon Drive: Ribbons to be 4" think and 2 ft, wide, to be laid in wood forms and to be troweled smooth and straight. Ready -M1,x oonerete shall be used. s • • From street to entrance steps lay a walk 5 feet in width a " thiek. To be laid in wood fonds and troweled smooth and straight, Ready -Mix oonorete shall be used. Ce ine i - r - 44. : Chimney to be laid up with " d r o . ame to be laid in white mortar. Briok mason to lay up chimney true, straight, plumb and level. After building is completed, brink mason shall wash down with a solution of lduriatio Aoid and water, exterior walls of chimney and remove all mortar spots or other defacements. 8" x 16" terra ootta flue lining shall be used. Fireplace to be according to existing oode governing the location. C Mir» R e y Tu j. 1 o f r were, Georfi.a Res) o S e Le ct ov dr A , , 4.41;9 in dell a Cetrreta 'th D /4. 5 S Ho wr1 0/7 P4,417. oA,t,`r s Die WALL off " L 4'tn g 4irt rh G e •i i s Rep Zed. a writ Q Zoie3it , wtiire 1'0114'4T4r An,o 4s 3ttewa a n ?AAP? OWNER ARCHITECT , - '1„, , My Commission expires Chairman ..BUILDING PERMIT RECORD MI.AMI SHORES VILLAGE -FLORIDA f DATE APPLICATION Application is hereby made for°the' approval of the plans and specifications herewith 'Submitted for the building or other structure herein described. This application is made in com- pliance ..arid conformation with the Building Ordinance of the Miami Shores Village, Florida, and 'all provisions of the Laws of the. State of Florida; aTl rdinancesof.Miami Shores Village, and all rules and regulations of the building Department of Miami S shall.be complied with, whether specified or not. . CONTRACTOR BLK3� SUBDIVISION NEW ADDITIO REPAIRS NUMBER OF STORI C/ ROOF COST (excluding Architect's fee, landscaping & garage) Building to be used for and no other use. I hereby submit all the plans and specifications for said building. Signed v STATE OF FLORIDA) COUNTY OF DADE ) Before me, the undersigned authority, a notary public, duly authorized to administer oaths and take acknowledgment, personally appeared to me well known, and who, being by me first duly sworn, upon oath deposes and says that he is the builder of the above described construction, that he has read the foregoing application, and that he did sign the same, and.that facts stated by him are true. Read, Sworn and Subscribed before me, Notary Public (Signed) Cubic Feet - Cubic feet required in this Block PLANNING BOARD • Member Member Secretary Building Inspecto Permit No. 42 ,:issued t Electrical Permi , , No• '� Pl u r i R> � ng Permit No. ; _ Date F.. ex6 . 4 0 1 Painting Plastering Lathing Electrical Mason & Concrete Plumbing Roofing Glazing Tile Miscellaneous LIST OF SUB- CONTRACTORS