Loading...
30 NE 100 St (8)FHA Form No. 2005 6. FLOOR FRAMING: • • No. (To be inserted by FHA) ' troia.tplit * NO. DESCRIPTION OF MATERIALS tAibts FEDERAL HOUSING ADMINISTRATION Property — --' id-- --:-I2 oa k 0 City _,144a4,4 State _ Mortgagor or Sponsor 14*--4--.44,11-• 44- -;**---liKrittlta- This exhibit will be accepted in lieu of specifications with Title I, Class 3 "Application for Property Approval," or with "Mortgagee's Application for Insurance" or "Application for Conditional Commitment" under Title II, ,Section 203. The use of this exhibit, executed in a clear and complete manner, enables the insuring office to give full credit for the material used, and facilitates processing of the application. Suggestions. out completely all spaces in the outline description below. Draw a line through all state- ments which do not apply. Place an "X" in the square opposite the description of the material to be used. If the space provided is insufficient, write "See Misc." therein and insert complete description under 27. MISCELLANEOUS. If existing construction, leave all spaces blank and describe repairs or alterations under 27. MISCELLANEOUS. NI Proposed construction. 0 Under construction. 0 Alterations or repairs. General. construction shall equal or exceed the FHA Minimum Construction Requirements, local building codes, zoning ordinances, and restrictive covenants. The materials described herein shall be new and the best of the grade or quality stated. Erection, application, or installation shall be in accordance with the manufacturer's direc- tions or the best standard practice and shall be done in a workmanlike manner. For final approval, all buildings must be complete and ready for occupancy, connections with utilities completed, and with all equipment installed in operating condition. 1. EXCAVATION: Minimum depth below finished grade, Type of bearing soil, 2. FOUNDATIONS: Concrete: Mix-1 part cement, parts sand, parts gravel or stone. Wan footings: 4. mixed. D Ha "; thickness, ixed. "; reinforcftT ;t'u El Transit mixe II*11040 01 „ . *IWO 10 OF* Pier or column footings: _ ____ " X , thickness, omrstit4 Foundation walls. ; thickness, "; veneer, (1) 18-14578 isivolaromo* Piers or columns: ; size, " X fewookalla Waterproofing: Drainage: *owe owl* Basement floor slab: ; thickness, evaah000 Areaway w ls: , __; thickness, 1 03i 0(14% bee ittlit , T 16 b Vents: ; size, " X 3. CHIMNEYS: Flues: No., ; size, " X ff " X if; lining, 4. FIREPLACE: El Wood burning. 0 Gas burning. El Circulating heater. D Imitation. Size opening, " X ". Size damper, " X " ' Size flues, " X " Fireplace lining: ; thickness, II Mantel: Facing: Hearth: Other: 5. EXT‘RIOR WALLS: 9 $1.4/00 dr* 4* OM* att Ir Solid masonry: Facing, ; backing, Waterproofing: Furring: E l Wood frame construction: Studs: ; size, " X "; c. to c., r, Sheathing: ; thickness, " (If wood): 0 Hor.; El Diag. Building paper: ; weight, #. 0 Veneer: ; bond, ; paint, 0 Wood siding: ; thickness, "; width, "; weather, r, El Shingle siding: ; size, " X "; weather, II 0 Stucco: ; lath, ; weight, #. 0 Other: Finish: 0 Paint; 0 stain. Coats, Mfr. or formula, GIRDERS JOISTS BRIDGING Material Size Material Size Spacing 16 It) " II ,, Material +4 0 A 0 4 0 Size " X II I/ " X Second floor Third floor OP" Allb ft 40 .040. ../. 0 • 0 • •+•-•-- " X " X " X ,, II r, FHA Form No. 2005 6. FLOOR FRAMING: • • No. (To be inserted by FHA) ' troia.tplit * NO. DESCRIPTION OF MATERIALS tAibts FEDERAL HOUSING ADMINISTRATION Property — --' id-- --:-I2 oa k 0 City _,144a4,4 State _ Mortgagor or Sponsor 14*--4--.44,11-• 44- -;**---liKrittlta- This exhibit will be accepted in lieu of specifications with Title I, Class 3 "Application for Property Approval," or with "Mortgagee's Application for Insurance" or "Application for Conditional Commitment" under Title II, ,Section 203. The use of this exhibit, executed in a clear and complete manner, enables the insuring office to give full credit for the material used, and facilitates processing of the application. Suggestions. out completely all spaces in the outline description below. Draw a line through all state- ments which do not apply. Place an "X" in the square opposite the description of the material to be used. If the space provided is insufficient, write "See Misc." therein and insert complete description under 27. MISCELLANEOUS. If existing construction, leave all spaces blank and describe repairs or alterations under 27. MISCELLANEOUS. NI Proposed construction. 0 Under construction. 0 Alterations or repairs. General. construction shall equal or exceed the FHA Minimum Construction Requirements, local building codes, zoning ordinances, and restrictive covenants. The materials described herein shall be new and the best of the grade or quality stated. Erection, application, or installation shall be in accordance with the manufacturer's direc- tions or the best standard practice and shall be done in a workmanlike manner. For final approval, all buildings must be complete and ready for occupancy, connections with utilities completed, and with all equipment installed in operating condition. 1. EXCAVATION: Minimum depth below finished grade, Type of bearing soil, 2. FOUNDATIONS: Concrete: Mix-1 part cement, parts sand, parts gravel or stone. Wan footings: 4. mixed. D Ha "; thickness, ixed. "; reinforcftT ;t'u El Transit mixe II*11040 01 „ . *IWO 10 OF* Pier or column footings: _ ____ " X , thickness, omrstit4 Foundation walls. ; thickness, "; veneer, (1) 18-14578 isivolaromo* Piers or columns: ; size, " X fewookalla Waterproofing: Drainage: *owe owl* Basement floor slab: ; thickness, evaah000 Areaway w ls: , __; thickness, 1 03i 0(14% bee ittlit , T 16 b Vents: ; size, " X 3. CHIMNEYS: Flues: No., ; size, " X ff " X if; lining, 4. FIREPLACE: El Wood burning. 0 Gas burning. El Circulating heater. D Imitation. Size opening, " X ". Size damper, " X " ' Size flues, " X " Fireplace lining: ; thickness, II Mantel: Facing: Hearth: Other: 5. EXT‘RIOR WALLS: 9 $1.4/00 dr* 4* OM* att Ir Solid masonry: Facing, ; backing, Waterproofing: Furring: E l Wood frame construction: Studs: ; size, " X "; c. to c., r, Sheathing: ; thickness, " (If wood): 0 Hor.; El Diag. Building paper: ; weight, #. 0 Veneer: ; bond, ; paint, 0 Wood siding: ; thickness, "; width, "; weather, r, El Shingle siding: ; size, " X "; weather, II 0 Stucco: ; lath, ; weight, #. 0 Other: Finish: 0 Paint; 0 stain. Coats, Mfr. or formula, 7. stJB LoofING: Material: * ' ; size, " X ____,, 8. FINISH FLOORING: 14. LATH AND PLASTER: Lath: 17. WINDOWS: 13. SHEET METAL WORK: Gutters: ; weight, Drain: ❑ Splash bk ,sump; ❑ sewer. Roof flashing: Valley flashing: r (1) (2) „ X • • „X u Diagonal ❑ Straight. 9. PARTITION FRAMING: Studs. ; size, " X "; c. to c., 10. CEILING FRAMING: Joists: '" {s .wa ;size, . ' " X 'w) "; c. to c., c " Bridging: t^ ! ; size, " X "; spacing, 11. ROOF FRAMING: Rafters: • ° * • ; size " X u ) "; c. to c., _ l% ___". Valley rafters ,. ; size, ____ _ °" X ___ _ ". Sheathing: ; g solid; ❑ strip. Size, 1 __" X L___. " Special: 12. ROOFING: Roofing felt: i +r ;.} i.. . „ ifi f r;. !: ; weight; ry. , 11, ❑ Wood shingles: ; length, " . ❑ Asphalt shingles: ; type, ; weight, #. ❑ Asbestos shingles: ; type, ; laid, Slate: length, "; weather, Other: '' : " l t. t% r s. s t.; # Downspouts: ; weight, #. IT • weight, t,v #. ; weight, #. v y e Plaster: ; coats, ; finish, Other: 15. DECORATING: :< 1 �. it„ Walls: t mo+ } ; -- .. Ceilings: Kitchen: Bath: Other finish: 78-14218 ; size grounds, 16. INTERIOR DOORS AND 'IM: rjt„y, Type door: ,;__ 1 ; >ltr1, ; thickness, ". Trim: Casings, ; bfre, ; other, Finish: Special: Sash material: ; type, ; thickness, "; glass, Balances: Screens: Basement windows: Special: 18. ENTRANCE AND EXTERIOR DETAI t I Main entrance door and trim: 1 • - Iii -r-t- ;- - tii thickness, urr - - - -*�' - M-- ., +L -;. - - - -* - - Service door: { -,- 4.____, _y ; thickness, 1: ,�„_ .__ " Other exterior doors: ; thickness, Hoods or canopies: Shutters: Cornice: Ornamental iron: Special: 16 -14578 " rr ri " Paper Flooring Grade Size FINISH First floor Second floor Third floor ioo... wis.. ;+a, A' ., :� }} _- _s. ..K_ _�.._ " X " X " X " " " r i..at-a •- 7-y.-1F' -r9'' 7. stJB LoofING: Material: * ' ; size, " X ____,, 8. FINISH FLOORING: 14. LATH AND PLASTER: Lath: 17. WINDOWS: 13. SHEET METAL WORK: Gutters: ; weight, Drain: ❑ Splash bk ,sump; ❑ sewer. Roof flashing: Valley flashing: r (1) (2) „ X • • „X u Diagonal ❑ Straight. 9. PARTITION FRAMING: Studs. ; size, " X "; c. to c., 10. CEILING FRAMING: Joists: '" {s .wa ;size, . ' " X 'w) "; c. to c., c " Bridging: t^ ! ; size, " X "; spacing, 11. ROOF FRAMING: Rafters: • ° * • ; size " X u ) "; c. to c., _ l% ___". Valley rafters ,. ; size, ____ _ °" X ___ _ ". Sheathing: ; g solid; ❑ strip. Size, 1 __" X L___. " Special: 12. ROOFING: Roofing felt: i +r ;.} i.. . „ ifi f r;. !: ; weight; ry. , 11, ❑ Wood shingles: ; length, " . ❑ Asphalt shingles: ; type, ; weight, #. ❑ Asbestos shingles: ; type, ; laid, Slate: length, "; weather, Other: '' : " l t. t% r s. s t.; # Downspouts: ; weight, #. IT • weight, t,v #. ; weight, #. v y e Plaster: ; coats, ; finish, Other: 15. DECORATING: :< 1 �. it„ Walls: t mo+ } ; -- .. Ceilings: Kitchen: Bath: Other finish: 78-14218 ; size grounds, 16. INTERIOR DOORS AND 'IM: rjt„y, Type door: ,;__ 1 ; >ltr1, ; thickness, ". Trim: Casings, ; bfre, ; other, Finish: Special: Sash material: ; type, ; thickness, "; glass, Balances: Screens: Basement windows: Special: 18. ENTRANCE AND EXTERIOR DETAI t I Main entrance door and trim: 1 • - Iii -r-t- ;- - tii thickness, urr - - - -*�' - M-- ., +L -;. - - - -* - - Service door: { -,- 4.____, _y ; thickness, 1: ,�„_ .__ " Other exterior doors: ; thickness, Hoods or canopies: Shutters: Cornice: Ornamental iron: Special: 16 -14578 " rr ri " • 19. CABINETS AND INTERIOR DETAIL: tli tat 1.4'd II_ 40,0,0.0 Kitchen cabinets: China cabinets: Bookcases: Medicine cabinet: SI lel ; closet equipment, Ulla it 41314: 40 Special: 20. STAIRS: Basement: El Open; El closed; treads, ; rail, 1st to 2d: Open; El closed; treads, ; trim, ; rail, _ 2d to 3d: Open; El closed; treads, ; trim, ; rail, Special: 21. SPECIAL FLOORS AND WA Floor ; wainscot, or 0.1ji wain collat;rit $.4(3 't -. 7i Bathroom: Kitchen: Other: 22. PLUMBING: Sewage disposal: El Sewer; septic tank; D cesspool. (Indicate private well, sewage disposal system on plot plan.) Water supply: El Public main; El private water system, Supply piping: Ill Brass 9 ck -tjApe; 2 tubing; El att; Ntught to's41 *4. 0 '4 2 MM. OP • height, height, 46641611104i. If 1_41,;!,(. •,.4* Waste piping: Soil pipe, zykrate nuotr pipe, ; vents, 66 Domestic hot water: Storage, gals.; fuel, automatic; El manual. FIXTURES Kitchen sink Bath tub_ Shower: l Lavatory Water closet Laundry trays MANUFACTURER 4 4 4k PLATE NUMBER 01484 3)".1.24" Lr "Aalt22eic torn% C rot,* itt 1114 WI 1111 441,4 ta4a Special: 23. HEATING: 0 Steam. 0 Vapor. DI Hot water: El 1 pipe; El 2 pipe; gravity; D forced. a Boiler; make, model: ; capacity, Radiation: ; sq. ft. IC Hot air: El Floor furnace; El Wall furnace; El pipeless; Ill gravity; El forced. Furnace; make and model: ; capacity, Fuel: El Gas Illinaer, diatlatitrit. ); El coal: El manual, []stoker ( ); 1=1 wool' El oil (burner, ) Control: El Manual; Eigautomatic, Fuel storage: El Bin; 111 tank (capacity, ) Built-in g majlettr4totei tia ota m ___t okii __Ai r _.,, e 0y 77 1 0 _ 1 4 Special: NAME utti ,,latEtia (it( I t ti 24. ELEXtRIC WIRING: Conduit. 4 +4101Ritti anenmetaalic cable. Eui Knob and tube. Switches: Outlets: Power outlets: El Oil burner; El range; water heater; LIJ 25. LIGHTING FIXTURNS10410 Allowance, $ Special: 90 26. INSULATIONt: "Pow Walls: reffitttiets, ". Roof or ceiling: Weather stripping: Mr" ; wit tows, 0 Storm doors, ; 0 Storm windows, Special: ( ; thickness, X tirt al ; E] Caulking, 16-14578 27. MISCELLANEOUS (Describe any materials or features of construction not adequately covered in the drawings or elsewhere in this exhibit): 28. PORCHES AND TERRACES: Porch: Foundation, ' d " 4 "'''' %/ flooring, '" xd) ; roof, i %''':F : •. . ; railing, *t4 t. -', ; steps, ..i_., Terrace: Foundation, ; surface, Other: 29. GARAGE: Foundation = Floor: Walls: Doors: Finished rooms: V Drainage: Plumbing: Heating: Electricity''" 30. WALKS AND DRI1ES: Walks: ; thickness, " Drives: ;thickness, 31. LANDSCAPING: Lawn: ❑ Sodded; ❑ see sp ;} .. ;. .. Planting: Allowance, , (If extensive, include planting plan.) Walls: Fences: U. S. GOVERNMENT RRINTING OFFICE 16 - 14578 ADDENDA Date, (Contractor or Builder) Date, (Mortgagor or Sponsor) (4) Roof: f'•tn ,•� - - �i �4.; a[avana►1u�w 1 • ; thickness, - IF BUILDING ELECTRICAL PLUMBING Owner of Building Architect Contractor or Builder Legal Lot Bl. Description Address of Building MIAMI SHORES VILLAGE, FLORIDA DATE 194? PERMIT N° 2206 Work to be performed under this Permit Subdi- vision Value of Project Contractor's License No. Amt. of Permit This permit is granted to the contractor or builder named above to construct the building or to install the equipment or device described in the application herefor in strict compliance with all ordinances pertaining thereto and with the understanding that the work will be performed in compliance with any plans, drawings, statements or specifications that may have been submitted to and approved by the proper municipal authorities. This Permit may be revoked at any time if the work is not done in compliance with such ordinances or if the plans are changed without authorization. A further condition upon which this permit is granted is the understanding that the contractor or builder named above assumes the responsibility for a thorough knowledge of the ordinances and regulations pertaining to the work covered hereby whether shown on the plans or drawings or in the statements or specifications and that he assumes responsibility for work done by his agents, servants or employees. Signed• By INSPECTOR In consideration of the issuance to me of this permit I agree to perform the work covered hereunder in compliance with all ordinances and regula- tions pertaining thereto and in strict conformity with the plans, drawings, statements or specifications submitted to the proper authorities of Miami Shores Village. In accepting this permit I assume responsibility for work done by either myself, my agent, servant or employee. CONTRACTOR OR BUIL ER N iii, BY AUTHORITY JOB: BUILDING PLUMBING • • • ELECTRICAL : • Inspector's Report: • • • • AD: : WORK DONE BY: The following is ready for Inspection: : REQUESTED WILL BE READY IPO JOB: ; BUILDING ELECTRICAL : PLUMBING • • Inspector's Report: ./ • • • • • • • • • • • • WORK : DONE BY: The following is ready for Inspection: AD: • • • REQUESTED WILL BE READY • JOB: (9 Ca AD: 3 0ja / a o vt BUILDING ELECTRICAL : PLU1IBING • • • Inspector's Report: .. . WORK : DONE BY: • • • • : REQUESTED 9 0 0 , A4 /2 - - l : • • • • • The following is ready for Inspection: • . WILL BE READY • • • • • • • A N\ G}2 ! MAL C:.:DITIO,.S 1. 1:10E: The "General conditions of the Contract" latest edition issued by the American Institute of Architects, shall foxy a part of tli:.s specification and shall .;overn except where modified herein, Copies of "General Conditions of i., ,e Contract" ray be referred to at the of :[ice of the Architect. 2. 1 T: It i3 the inteotion. and r.eanin ° to provj - two story blocs. ._stucco dwellin .c :_ se ccr:.plete as shown cn drawings and as specified he. ei . 3. D1=AV 2 <: : The Arc hitect sna1 l furnish tc the c ntractor, three ccr.:lete sets of plana and specifications and tree copies of each detail draviL ; . Should additional copies of plans or details be required, the c n.tractoi shall be charred with them. All drawings and specifications are the property of Lhe Area i tect and shall be returned promptly at the completion of i- e building. 4. DOD: The c r_tT actor nu. t. be qualified to secure a perforr_:ance 33or.d, "'trc` cost of wIlich will :e eid by t :. e Owncr. 5. 'BID:: The Owner or 7.7:.s Architect reserve the rir,ht to reject any a aZl bids, ao . to select t i :e successful bidder as he sees fit reardless of whetier or °_t ne Is the low bidder. G. X11. :.k .ATH..J ;, Oa: :. TI : The pro. ,Deed wort a: ci fariliarize ions affect:I:lc the proposed w . be 4jran.ted becau : e of lack o f contractor shall visit t_.e s:te of the h'r.self wth the location and coedit.. rk. No additional allowances will ._- nowled[ ;e of such cone ltions. 7. CRDE. W. CE 1.10 �.� .1< � ' �. :: Al]. rea '. x ex�ent:� of local and State ordi=��ances anc re�_,u 7=s re a;;in<; to building, s all be obseri:ed by all contractors, 8. 'Ei :IT'S: T- a General contractor shall secure a .d pay for ooex building perr_.! s. Special ..er. its shall ..e taher out and :paid for by the contractor of such work. C. P1 h' '' .t.Ti'.': The �.aae coy :izractc�z shall erect necessary boxy-.o for trees s rug; _or , etc., erect fences and walks o. d maintain warning lijits and ii' necessary at 10. TI I .hAr r3 : Ul C: The contractor shall provide ten:poravy office, s tora ;e she::, tool shed, etc., as necessary Tor I: _e proper care of `;i c loatoria1s . a 11, 6Al'I:ETAMY raT'VEI �_CEI;CES: The contractor shall erect temporary eairth cam' os7s . or The worEen o :. the job. and maintain it in a clean orderly condition al.: all time;:, At the completion of the work he shall remove same and its contents. 12, , ..7A'd'E1: As noon :.s possible the Plui bin , contractor shall take or:t and pa- ''or the re ter a''.d sere; ? c connections to same. 15. LA +T is (I OLT Ric: The c r_ ntx'actor shall check the laycu t a rxl loca' io.:: wit the Architect before proceed.• :; wit ; the work. All levels aL :d :;rakes :i :.all coni'orm to trose shown on the drawi A;s. Each contractor "nail cooperate rr1 t : e.11.otber contractors enLa;ed in work on the building to the end tat unity of action will facilitate the orderly work and poorness of tic 14. GC'TT :: D P.v'1'C ': "G: The c• .tractor• s alb do all necessary t.: e several parts ::f 'Ale work 1' Lt correct1;7 and sLal1 leave u,;e a .ld cor:laleto as one unit. 15, Sack, contractor s1.1).11 . -emove from titre to time all rubbish left by :7. ;. self, or is cubcovtractor , and keep the pretrisea clean a :3 tid* at all t'raea. 16, - LA1..A:71 ': 'Unless oTt .1e: riE.:e 4: necified all trater!al anC workman- ship shall be guarnateed against: defeats for a period of one year from date of acce Lance of tLe 1. 4) , EXCAVATI Excavate all work below the ride line. Water pacL' te botts of tLe excavations for f:urdation and tarp solid aDd level. All excavatis sI;a11 e °due befoe foot are be:lan. VIen ";:elnw t;le crade lne has been mpl.%ed and has been apbreved, efill 0::Icavated earth, pack and tatp solid and on e.:on line wit Earth taken frz excavatioi:Is shall - be used for any necessary fillin, FITG Earth used for fillin shall be free from any foreizTL matter subject to decay. Earth up fill sall c tiLt17 waterpacl:ed and taped true and solid on even nrICS. TERMITE PREVE.FT1ON 0.1 under must be cleaned of all rots, tumos, plants, etc. The c..:'.:4tlactor aai1 place as :,o].inous ttrip of 7111vaAzed iron, k27 aa not less than 12" wide, '),,tracen all bottm plates and fot.natian walls; this termite s stall project approxiately 3 inches over tc follndatio. wall and shall be bent downward at 45 deLrecs, The Silield s_1111 ex*edd at least 2 inches ito the Wall. Ali floor joists, bottom plates, furrInf-strips and all wood cGnctruction comin,7 in ecrtact w.tL rlasonry• shall receive a hea costin of emosote befc:e cane are built in. place. Before finis flors are nailed down, all debris, wood, etc. must be reLoved ftoi. under the house. 20" minimum space ali e required beween i:nderside of floor joicl,s and ;Ilade under the hc.7use. All oIlla sAA17 Le :;)ressnre treated in accordance wit the rules and the rc cf Federal Housii7c Administration. CONCRETE Footinii:s and Foundations: • for-walls, piers, etc, shall be of c lAxed In proportion Of 1 part Florida Portland cement, or equal and 2 parts clean coarse, sharp sand and 4 parts broken 1 inch rock. Footin:.8 shal becoonfined to si:7:o sLape by wooden. forms 1 shall not be removed concrete is thorou set. Concrete Lelts as Shown on the drawirrs shall be of chcrete nixed 7773755=5 cf 1 part llorida Portland, or equal cement, 2 parts clean, coarse sharp said and 4 prbs broken 1 inch rock. Belt 31 c reinforced tith steel as shown on tLe drawine. Anchors as s.Lown„ shall be embedded in belts, • . bteps: Outside steps were 85::own the drawas shall h:Ai bee of concrete specified for foot n:::8 ad shall unless oterwise shown or specified have fsh of cement 1" tick. F.. ti be troweled =ooth n shall be level aol straikt and true on all linos. Concrete Sub-floors: .Floor slabs upon vrA.ch to lay tile or keystone or for cenent frish. shall be of a t1 and reinforce with. steel as shuwn 0.. the draw 8, Concrete simll be mixed in proprtions c 1 part Florida Portland, or equal, 2 parts clean, sharp saKd and 4 parts 1I inch rock (broken), MAC=07HY Walls: Exterior walls ada foadatios walls illdicated OA. the drawi.s ao of :s ;:r7 sell :se of ccrete block or brick unless ot:leYwise.s Concrete block sLa71 be certified. Concrete A.ock 'oe of approved r:sanufactule, well cured. Concrete . slmp bleek shall be used where s:own. Aiyut entrance there a11 be 3 5/3" x 12" wits specials fol c:Tners anA a st door and widews Notes' Use holf the veneer for :Ara -e tie beam. Approved cel:ent brLch ray be u;:sed only where necessary to ,:r work to exact Sizes and vearcrlent. Blocks tLtJ brick ball ',Je laid in vortar composed of lopart Atlas or equal Portland Gwent a;.Ld parts $and and shall be L_teu,rally waterproofed with ar: aperoved wateproofit4: used 1r. L:Lcordance with rtanufactur'erts directions. Joints In exposed brick work call - oo raked. ChLses shall ce built in wall ao work prosTesses by the Wallwork L5,all include enbeddinR of anjje Irons, joist anchors, belts, dead wood, ete. Vents snail be placed in walls w'oere s3:own on the drawin:s, and Fall iC amactl: centered a:nd scree:sled on back. .re place aLali c coIlstructe of brick specified for walls, and 1LAad fire brick. tack -hearth shall c fire brick. Pirepla(e cney Jhall be lined Lrouchont with 13 x 19 inch terra cot:. flue llninc, arc eater flue vith 9 x 9 flue linirc Contractor sYall allow '6:400 for rantel, exclilsive of 1.tallation Glass irick: 1as r1ck where sa on plans Iu trict accor="6 rianufacturerfs directicns. • Keysta:c: Install Polished Keystone for hearth of fireplce . tnpoliiEed keystoe for front stoop. Workinc details 1. e subtiitted to Are itect for fikproval before proceedin it. work. • • CARPETRY L612 All framing 1=0er, not et ,pecified, shall te #2 crade lonr leaf yellow pine. Al]. board and strip 1u. ter ,iot otherwise speciiied sna be No. 2 yellow pine. All framing and joltiri, s: all ,e neat, close aid solid and s ,all as securely spied, bolted to ether. Nai]. in fl„,°sh work si•all be s Plates: for floor and ce711 , joists shall 30 of sizes an slicwn o the MW17=s, a-d a11 be made level, strairl t a:a true on all lines. Plates a'6 top shall be secu:ely bolted to coerete belt. Jtdists shall be of sizes as EL on tl,e drawl: 's aid ends thorou7417 coaed tit]: creosote. (Eee Alternate) Joiss zb.a11 e d'f,bled fel Leaders :And trir:ers and under ,artitions with they are *paralleled. Briling: Joists spannin5 over 3 stall be cross-brid-ed wit- 1" x 4" cross bridcinc do nailed, s all not nailed at bettor rLti1 ro--h vr,rk above Las been corpleted. Cellitr: Joists shall be of sizes as 1-, own o te draviis. joist savi be d'ubled for headers id trinvers. Joists shal_ be r.,e level, stralc.lt aI tri:e on all 1icS. Joists shall be anc_ored every 43" or every third joist as speC_L"ied under L:etal 17ork, RAFTERS ,e 2 x 3, 16 o/e, unless oti crwise Rafters shall e stralgLt and true of all 4heat,..L'.13 unless where otherwise specified sha 1 be Po. 2 cormon 1 x 6 or 3" T G, do .ble nailed at bearin s. Sub-floors sall be 1" x 6" or 3" ro. 2 coon Zub floor s all : e placed diagonally and iall )e b ble nailed at every bearin. Concrete Form shall Jo trovided b the Contractor and shall be properly placed to receive co. Fort x s all be cf cud s 'nd laterial, lerris i11 e mate on stral , true 1irie nb shall not be removed until concrete hvs tl'olot, '11- set. Roof BracilrP Roof shall 'Je roll srpported and held st,7ainst, thrust tr7 ties pur,ins, s ruts, etc., as ab.ow or 't draw1i s, and wLee necessity s t e work proc'yenses, Fur All exterior masonry wa11 a11 be furred witn 1" x 2" No. 1 --- dc7771 — cDrc s strips, creosoted Furrin strirs siall be place: vertically 1C" c/e and Ja11 de securely nailed to walls, Furrin- str:,8 s. all be na e 8tra ht true 11:leL to receive latLInc. LITUiDiNG: Partition wall tiall be 2" 4" studs, 10" c/c 757T1J headers ad trio, unless otherwise s own. btu2dio sail ,e nade straiht, plaub aid true on all lines. Stairs: 33»a11 naoe clear w-Ite oak tleads and risers s tLown. Treads finish°. sae as floors, Risers fildshed sae as trim. lacers: shall e select clear wi.lte oak unless ot,:erwiee Floorio s-al bo 7/8" 2:L T& a sides and ends unites otLerwise specified, Kitchen Powder Roam ac..d DressLo Roam sloall ha,e 2 rIne floor laid and sl...aae.1 a oase lor 110 cm °ors; see Linoleum 4ec1ficat1ons Floor. 1. s,a1) ,e yell drive _4 up a 1i1i4d nailed to 111-floor ns, After 1a:: flooro, $ all , y3 zac iLe..sanded smooth and even. CoAractor s all - sr 7ide al0 place so.elvi . 12" wide as s sw o—plans. Lhelvio, a all .0 -laced at pozitio - s. and dilected oy Arcitect. Kitchen CaA..,ets shall bo C. a sloze and desi -s —ow the drawincs. T contro,0767 all leave cabinets in a condition to receive T,Lle drainboard alvd splashboard, Icte: Tile Work, Kitc.o.en cabloets e delivered o toe job co: pletel:- pa..7.oLo wit hardware inotalleda These ca shall e as oan.o.facto.led I1orLEt raid Cal) reta Co.. Baoeboaros includi s,(_e s_011 oe placed Iran roams, halls ar except w ere Tile floor are specified, ilase boar): stall t2e clear c hoe aai1 e Is.".led to lloor a oot o eoard, awe s:all .0 ettndpaucre_i aroeth. Casin s: Ilaola plaster /etl:rns, 1,rot -Ito ousih a sLow o on details. 0asir s z a1i e sandpapered 'o pool' Frames: Outolae leer ,rorea 3a11 e clear c7press rabbeted for stops. — Door franc shall e of standard steel: size, desi7n and ranufacture for do of_zes os eLown on tlx Lrawinso Inside aoor fral.es o:all be of clear cypress as provided wit; nail stops. Thames i.aL1 .e ct stratiot, plumy and true. lo:alocs hall .c sandpapered sicotIl. Doers: 1:rolit door be clear cypress 2i" in, thickneso and 1r7r shown on ( Cootractor to allow 030,00 for Are3oltect to dotall) Other exterior doors shall oe1-3/4" thick, az is, own on plan :lazed with D, L. B. 7;1a.2e- secured by wood inouldin. Dent hall have wainscot of 7/3" Knotty pine MJ soown includint; desk, bunk and etc.. shown on the drawl_ 6 and bY of size same. wod. shall be shelvinc, Kitchen door shall be glazed with D. 3. 13. raass. French. doors shall :.e 71azed with. L. . E. glass.. Conr.on doors shall be Iiezo (1 . 3/8" thick) Green doors si,all. .:e as .:._;:;wn c):: the . rav, in s. =7 =7 a s wired win :I 10 mesh a screen shall e 1 �e co °per bronze A creo'_ld..�.:.. ; +.l aal1 C 1.ii. .: ,1: sl:.rctched. crccn.,n'' a .'Jc sect: elr Leld ".l,; wood rzouldL ac to frames. Porch o„enin ; stall .e screer.ca with 13 ; �ea7.. cooper screen. btools: 1 liciows be - crovi ec: vr' u:.i. :: le stools as s :ecified u.;i7� C. ±r =i. 1.c Work. Window } cas Provide 1" x ;" j rri n boards over :zeds of all • w 1_ c;ow covered ti, i t.:. metal : G . ;;,, p1a : uer "or na3.l zn . .Scuttle Where > 1:: r.A Oji plans `,:r L.. o a scuttle _'or access to Ittio cpaee. s.`::;cc € cL$ Inst:.r s'aoe-rachs all bcaros closets, Flexwocd: Walls of Powder rocs o %clL: ivo of r.r ,rror shall be Flexwood (Cr_rl: r'anle) applied in strict accordance with ini r. directions (.i �.: der walls to .c nlasered s:: .:� u t;' ,)as e) . ) :i•'lex: qas,i : Install in Powder boom where shown. CL 1.sr La.:'.i ets: All cabinet crcr'k in dz•cs ;in ..00zed as well as vanLty in L c;trde .r ;;;, ;'. 11 c as '1) the w' lo_ a.� r da Cabinet Co a-ir to . .;c: ,;ol v e;l to VC t %" ;1cbei Via:. 1;ed witA hardware at;' a,c iiei . Dl's so : .121 powder :ioor be cf tt Farlite" Loe t;schor Mfi. Co., Dubuque, I owa . Note: This - i.a �cr•ial s: 1? .e applied to approved "ease by ranufactuerer. Detail to ..'e supplied . :;y Arc:.:. t ;ect. • 3at .ro L cafe: Contractor .71a.11 : ' Bathroom Scale co2ceale . wall type w. tL. c u 3? ' : tr Y ; as L anukactu reci by Wallweih i3u:ildi ir•; Products, lel Park AJe ae, `:few York City. • OVERRLAD GARACE MGR: shall 7 e panel te door as manufactured by Buck-Cerhardt co., Inc. (Well-Luilt) Philadelphia, Pa. These doors shall - )e ins corplete liardrare. LATITT Al]. interi r wal s and ceiliv2s except where otherwise or;ecified 81401 be lfAhedwith Rock Lath as mcmuractwed by National G7psun Co. All lat1 to have bearins 1th &ai1 e nailed to every bearing No lathinE, sAall run throuh partition fron one roan: to arotber. METAL LATH Metal laths used or walls tc e covered vith tile wainscot in bathrooms and in kitchen. Metal lath c_all e 27 :au : e eanded i,ot iron, herrin - ,)one type or equal, Laths aU be wen secured tc wocdworh L;alvanized rcofin._ nails. Corner ReInforcelnelit Al). irterlor plaster corners and joins of iio177771705177 13;ia11 be reinforced with 7 1 in strips 3" wide bent 4" each way. PLA: ..LL All interior walls a d ccd1in a.t otherwise specified shall e plastered two coats. First coat shall Lc Red Top or equal plaster and clean, al:arp .;.and„ mixed and applied in accordaixo vith.kanulactureris dlIections, First ccat skall Je scraLcl_ed for seco-d cot. Second coat slall 11!:)t be applied until first coat has torou-Illy dried. Secolid coaL shall be of cold rc..d line putty and froCa piaster o' Plasterer make aplc as .LIected for tie approval of Arcllitect. Second coat sb1i '')E of textme as selected b:) Arc,itect. Seccd cc_t is k'tchen, c1oet a d1irooxn of cold rim lime putty anl fresh plaster of Paris, 3C7rD ILADLI :G. Install Spra-o-Flake sound deadenit between stud wan TaT1tTt7B Bathrour: 1e e applied by Orystex cf Flcriea, in accors:ance with nanufacturer's specl.fication. Thickness to be not less than one L'ch a c in ch mai t te t:eated partLtions shall oe completely sealeL .ver 1 .1 - e e,ltl:e area a. t' is sornd deadeninc to be c: ltth. Wire lat_ed paritlens to .c scratolacd by plasterer. Same tleat to e applied to under floor of bathroom. • Same application ,etween bathrooms "B" ad "G". PLASTER: OCUIT tetal Corners Galvanized metal coleier beads ellall.be placed or all interiel:776Tectini: plater. cornere except these of windows CorLer stri shall be extend in oee - /.Lece from base to ceiling zet atraiht and plumb. Yorm corners L Livin,and 1 r1n Rooms as ehown and as.will be de- tailed. LIITLERT FifORS Kitchen floor aed•tase eLall covered wale 7A" zrade Armstrong or equal Ilneleeee. laJstrlet17 :ee accor:.iace vitn eanufactucrer's directions. Pattern and color to be selectee 'e7,T Aree:2_tect. Linoleuz wore turned up for baeo e'eall 1)e faeteeed elth eti:eleee steel bindie. Floors of Powder leore a:7d' Drese:In roarl eLall'be cf nineleuel as speciele of Yite;:Len Weed Ince). rETAL Ail o windows all ee c'JS steel residential tyee sash as cJ. 'ey Smile er equal. Lir:Lts t,e a;2 e,LIewn. Lash zelail.'ec e:lazed L. D. e. b. :111e0 neatly piettied. Ta77 - ee Le.atelet: Tr aceorC„ance wTth ramfactuerer's directions. EfAsh feeluJe CetT;;i ailutterfly handles. Each ail 'ee well ca,l zwe. c ;ade L 1 atertht. ac::. aL1 1 full leeeLt 2CVCCf..2, provided witil 1J nech copper bole ecreeni. f,:creen fra:,:c to LT; ba:cp.ze. a:7.1 ;:ercon fl shall :el.ve facte• . : - coat of 211:Let efo:_c erection Rote: ce Alterate Gara:e Lf,aeie Las no screen, ri4nL; Virrors WLere Eirror are sl.oceiled *Leis job Lt a11 Lean plate :eirrore ef apDrove ,e_aerefactilrer, All tirrors except the rirror or: Powder reee wall 1...e - tc. circular l] Ache of Bathroom "B" shall be beveled ede, These 1.irrors semll eize ua fn plans and sirt11 be fastered 'or aplied preper 7eet. Losette heads.' IL _DES TurnLeL c-ed :Liel.;a11 approved Oellefe.el te7..,:ce for Venetian blinds at all w_dow openin: in acr:oraarce to Architect's directions, Accessories: TILE ICJ K CC.r'T41.1U1,D, MIXT PAGE: STUCCO The exterior wa11 o u11din a11 7.e ;:iven two coats of stucco. First coat shall be composed of 1 part hydrated lime, 0 pats ITET=Tertland or equig, cenent d 20 parts clean, sharp sand. FLIIsh Coat e composed o 1 pavt Atlas or equal cement zrz FaT5 cican, Waterpr22finL "Cable tite" waternroofin:,;, or equal, shall be nixed boE7 of stucco In accordance vIth manufactuererts directions, All stucco work senerally uniform in texture and shall be made straic,ht, plmb and true an all lines, Note: A T:::InI tickne,s of n 1es than 3/4" will required on all stucco, GiALiL:1kL 00 Contractor shall ran Ornar otucco on exterior as shown on the drawin' • All ornavental taco° a12. be .7;e1.ierally uniform in texture and and true on all linos, TILE ZCLY Tile work tLrou:Jlout .)e c "A" .7.:rade .. Tile of approved ranufactrie, installed i a worizianllize Ylanner by mechanics skilled in respective trade. All Tile aLall 'le set strat„ nniforn. and true lines, NoLe: Tile on screen• porch mij. entry stoop to be layed with white cement grout joint. Wainacoti7 in bathroorla e.ai1 be to a heiht of 4' and in Shower atall a over tubs ..c) a heir .;it of 6' above floor llne, Flcro s:a11.• e of Tile, Manufacture and color of e a cyitlined Tils Contractor shall obtaill Tile fr, the Miami Tile & Marble BATE:F.0M "A": Plumbinc : Corallin. Wainscotin, of 4 x 4i Mosaic Tile Base Cap Floor (3" Octacon (Matt) (with 1-1/10 Dot Color #220 35 451 " 7047 220 ACCFLUIES: • p TILE vi(;RK: Gr tT ACCEL 1 logs towel bar 1 tumbler holder 1 comb. crab & soap. holder 1 clothes hook 1 paper holder 12 bat; hcoka 1 soap h.lder: 1 ash tray with ciarette co:partrent and electric li _:ter as manufactured by Fairfacts. BAS t;r,�M "3' Plumbins: Rose Du Barry, Wain cotin 4 X 4i resale T Color IL Base Cap Floor 4. :c 4 ' " n (L ott) 0 Accessories! " 220 Jn� cd 1 Stanlard set of Accessories plus ) hems and 1 ash try with • ci garette ew.partt:ent with electric 1i hter az ranufactui°ed by Fairfacts. I3ATIII COM "c" Pluz•b ns :. Clair =c de Lune Waii scot ns: 4 x 4i Mosaic Tile Color #216 Base L Cap ft 216 Floor vtt Ifexe, on(u.S. Tile Go.) ft 231 Accessories Mosaic Tile Co. If 216 AGCis Mi:IS : 1 Standard set of Accessories plus two(2) hooks BATHS "A" 0-0 J " " 1 :ave Warble thresholds NOTE: 'Ooh D" shall have ono set of ',..tam .lard Bathroom accessories All Tile shall be left in a cicalL and polished condition. TILE: C(N'T KITCL ' N DriA :l'T?MARD: Deck, Splash and Trim: Mosaic Tile Co. With one row of 4i x 4i st1ip -one tile below cap- 1,osaic lIEDf ,:r ►.ILLS TIWYU H MT: 6 x 6 I3ullnose _1osa c rile Co., Qatr..ea1 SCREENED P 1teg ENTFY `.TOt:'1? /Y) 't EAti PORCi EPS: 3uff ROOFTTr Roof except there otherwise seciaied s .a1.1 oe of White cement interlocking th . ch butt s hi , '1e: Tile of approved manufacture. Butt of Tile ; _.all act be less t :::an two (2) inc''cs in thickness. Manufacturer of Tile shall be anroved by Architect. - Tile shall be laid over 2 thicknesses of , S30 lb felt Shingled in and back nailed with t ; n -caps 12" on center. no over with high temperature Asphalt and t] :ien cated. Siiin 1 x ; f.:i tuct be d ne: 11:1 3tx c t accordance with 'pest trade practices. Tile sLall °: c laid over f 6lt R, th Florida Portland cement, horizontal joints to .c buttered an then the entire roof s__ali :e given one coat of White cement Roof . coatin. ; as r 3nufactured by Gable-Tice. Built :Lp roof with Caravel surface shall be applied over deck on second floor. This roof to :t tLle equal of a John's Manville 15 year Bonded Roof. This Contractor to exercise pa: tic liar care zi. iz. deck entirely watert1ht. GUARA:TFE T ; s Co:, tractor shall L,uO -1t to ;:e General Contractor and the General c r:.trac for s:.:al: o ;t.t..; J to t: e: ArCi tec , befol.e Contract is awar<.icd, a Guarantee In writ! (.; 3.::nst leakat ;c in roof fo :: a period of one (1) year after acce;�ta;'ce :gate. Ti : j -. . x .. �.. ..) 4 J ,� • ., -. j General f ? i�. �; C. r,.,�:��a_�tcE ��:a__ u;a� -.e � -c 1�:�c f cz� :.�s., 4.e .,e._eral Contractor liable to a: w do : :a :e incurred -)7,* virtue r , ; r ec an:ica1 defects it reef. Color #216 6020 -A It 6507 SHEET FETAL All flash recini_ : :ed and drip str.i.,; s'ia1." "_,e 16 oz. copper, Build •co,;per as dle: as requJi.red. Plasllin aba1? be i ;Aalled in strict accor: rance with ;nest trade parctices METAL i`: r RK Wall A..!chors shall °:,e as st o-T. draw nr7 s of wrou, ht iron. ;.cfior;x a .aW n e placed on every .t:,..l rd co w1in.-; joist or every 43" e boddeJ, n ITasonry walls, Coat rodss Tile Contractor 3� provrhde and place 5;a1vanized ron i r,.�..pe fo cot rods in clothes C � • 'eta. Hods shall c placed as d i.a'ecti-ra 3 r Arch`c test and shall a 1" in diaretor. • This cr3Y: traci;or s :ali . uxs:iish an'T. install all ctiler 7nisscellaneaue iron or steel nccess_=ry completion of the job. Contractor shall a: low x; 200,00 for wrolT;h .ro :. wo_ : Installed, Install brass or ba!on e t? rec i!r:1 on.tlete I ti.: we thcrctr on all exterior doc,rs. Type to c atprcved by Architect. Doors olDeni.^.!; on ncre es sh.s ? 1. 1 considered as exterior doors. MEDIC?TL C ... .lYEl Medicine Cabinets for bathrooms s shall " c of approved manufacture as selected by Arc h tect, Cabinets shill ha e Plate Cla.z Mirror door nr. adjustable ,glass sl.elvice. Medicine cabia is rcecc:.•cd ....t.o wall. for 'sa Allow 4 ":ri0,OO foc e r cabinets, PAINTING All matorial shall be thorn dried before the application of paint. Each coat coall be thorou3nly dry oefore applicatiton of he following coat. All paantio Boa': be uniform, srooth ir coen and shall show no rain or brush narks. Prime all exterior woodwork before or Llately after exeosi_g to the weather Exterior Woodwork: All exterior woodwork vac:re not otherwise specified 77717177767=Fots, fat and pitchy places covered vrth .srain alcohol shellac aad shall then e nrimed it a thin coat of Atlaatic or equal white lead, pure )inseed oil anJ toroentine well brushed into t pores, Al]. nail holes and otl defects ;Ioall e well puttie after a priming coat is dry. Exterior woodwork alsal then 'e rloe eco ar ti coats cf De Voce or oti;er aporoved outsi e paint of colors as dArected by Owner or Architect, Celcursol: Apply one heavy coat of UelclIrsol to all surfaces and ends of lomocr, touchiu rasoory myrk. Celcurool slIa11 nct oe a3p1iei until luo-cr bas oeen cut to length, Interior Woodwork: including doors, who/0 tit otoerwise specified, 17171,7 coat c..1 a nrovod le' -d ,nn oil, noid &all then Lave all defects 1 so oth 1,7to puy. Woodwork aI.t o e ifloveo sett—a thLrd coats of De Voe or other approved insJ.de pal t, of colors os selected b7 Architect. In adj.ition to oaiob ae opocliled, woodwork of kitchen al:, 1 ,athrooms eLali 1.4o olven c e coot of a enamel. Sandpaper toobween all. co ts w!tL 00 tandpaoer. KNOJTY PINE shall Oe 4Io_shet a- follows: 1 coat of stain; 1 coat TTCYea7recirLer cold 2 coats of wax. Floors: A11 'interior wood floor &Ilan be fillea with whLte lead stain and 8118,11 c tilen riven two coats cr clear s ellac woo two coats of wax and oolished. Exterior Walls: Stucco walls aoo masor7 'al: be slool two coats of a570177, stucco paint. (GabIe-Tite) Color erall e as selected 'ult 0oa(r or Areoct, Interior Plaster of kitchen ao.: . mthrooms 3ii.a11, e oive1 coo coat 77 coats of colaucl, intelica and Cotlin shall be 'iven roe coat of aporoved primer 7.77 - o . oth tvo ocato c2 a nrved oil paint. Steel .:alsh sha',1 be riven two coats of a- apnroved retailIc rant =Er 7Trn lactc:cy cot. Colors aLl selected. Screens s taJ.J o ixen two cots of etallc ta t in addition to MBT'orr7 coat. WrooloLt Iron 81 b .i two coats o an a nroved oetallic paint a -- ti6 .7 a -- to factory coot. Colors ao selected. (All otder metal work - two (2) coats* PLECTIJC 1 ::CEL PAIrT Ir CU:TT Interior Walls cf Garace and Porch walls sLail be considered as 66T3M Interior of ,ereen Vents sofflt of ovorhang shall '.;es painted black ` rane. TIARDWALB: FifljSi. h.trdware s7:42.11 o zeleetod `37 Arcitect and shall e furnished and :uLallod ready 232 'Ice by tile Contractor. Difference In. cost of ;2.ardwIc selected allowazce nade for saw() or :Thcfucted frcn c'=tract - :)111ce of buildinc. Cantractor zLall a11 2,1(.)0.00 for fil.ish tardware, Gara door LarCAtral.e 1;are doors. Shutter hardrare incL.ded .111 a11owa:.co. All electric werl: cm17. ';o1 :n atcol me it the rules of the Natioal Board of lnderrr ters ac era. t e laws and ordinances of cres, Connect to pulic Lu at react Wire for R1] o::Lleta ‘ewn c:. s or specified. All electr:cal c a2J tLc prezIscs by the Contractor and fixtures az.11 c ir 1icL a.d ccooted ready for use by Contractor. Fixtes to be zelect,ed by Owner. Allow0165.00 for Oectrical Wall Outlets; Unless to ctio:v,:c:e si:wr or specified all licit outlet=T1 :o V from t:.c floor. OutleLs lall c of room unless otilerwise Mown en ra as cone c,a-ce thorefram, Britches La11 7. -.laced at :',ei;Lt of 43 from floor and cLail TU7177 tole tr:x. a:1,1] JO :urnIshod in 11 Ivory. Panel Box shall 1;4 placed whcre directed and system snail connect thereto. Meters shar previ.:ed for Owner. Outlets for electric rar'e a,. :elri eratea- shall be in ailed w:lere shown o1 drawl dos_ 'c, by the Architect. TELBMOLT: Run conduit for telep connections where shown 011 drawinns. Contractor 1a11 w_fe 2o: ben system as sbown on Diane. Bell system shall con: to nail w r1rx system of house. Wire for 4600 Watt •p1u;; in Booster with switch and pilot 11 • w;:,cre sJlewn. Booster to be suoplied by polar Contractor. ELECTRIC WORK: COU' T i'r0TE: Electrical shall provide. coo ble wall olu in heater room where shown ow to hanO1e 1/3 h.p. 110 volt - otor, an a install eirpty tubin7, fon sarao box to insde c± block wall of house for thermostat • wire. He shall also provide wall : o-° :t :ca. livin.r, roan where s i.cwn, for thermostat wires. FLOURE E T LIGIITIT At: Electrical Contractor shall furnis i: a tiC? eon li hti:. 1:; over window of Livzr.c Roam and Loc*i a shown on plans. L ;Or, Ji1._G' E . Solar Heater Contractcr 31 4;1.11 .ftir'nIs . and iris l.al.1 150 r :allon Solar a.;.; eor:sia ei;c with 4 00 •watt T_;ooster° zed 2 -10 1 ±' ht cols as shown on plans. FA' itDICTAR : Contractor Gall f orr..sh r:rc:a. : tai. }. c f. ncea1ed flush Sant -))ri tiairdrycr in athroor w;:eve ail � vn and az ranuf'actured by the C .icar;o I ardware Foundry Co. IIEAfiii a ,Y TEM Heat:inc Systet: (Under Ceperate Contract) The General Contractor :: aii furnish. and erect in cares a where shown, a 1 I:iour• fig c room of 3" rl ::.1car,I, ; . : . x . metal doors, and wwth c©ilinr; of'gp concrete slab, sac to �e 72" from floor, The HeatinL Contractor s'ial l furnace, with transite flue, as 3 , =n , a7;1 rer°i$tcrs, all thermostat. A•1O" x 8" 3 3 x G C 12 x d 8 x E 12 :S G • 10 x3 fern _sh an1 'n� tall Mueller EPS hot air s ; , ir fro rater, duct work ? - place, saIie to e ;;67.5.00 with The Heat in ' Contractor r,1 all pre i ie ccntL inztall One Mueller E. .i'. s furnace c. , z; p pet ;•L r . =nor, blower, filters, and thermostatic controls. He shz111 also c.' a1, 1. duct wor7 1,ece::z ar' , a::! ;gib cwn and in accordance with A: HVE ;ua es, and ;;rifles /Lid re,.? .ators for same. All duct work a1?_ rove f' :1"► radii. at 'ec ..s, ar a ,rc, an ; ler s! 11 Je - uxed. A13 luct 1 !.c ,c L«.aer t ,e floor with risers to resistors above YJaLe boards cf rLms. All re,;f.sters shall. be Mueller #311 w _th prime coat S ri s s.1) .,k, n2 sizes s :gown In schedule below. This Contractor shall also i; -...: c 17 ; ;a : 1 ne aurnace, and 6" tran_site flue for c.r ace s€-..c to 'e r..:; b }e:1 Ln. a:lead of construction alon. with Cuct work. G -12" It 6" :Li 1 2 x j 6 x 6 1r. 21 x30 E 8 x 6 • 12 x 6 General Gortracto , 11 co -opew a e ;: ic: :tcat1n : contractor in c.etting ducts properly .fra ec as sown. i'LLMli7G: • P.AVI TG: Driveway shall be pave with 0 inches of rock compressed to 0 inches with 10 percent oil coating. Driveway uaali avo ccncrete cur:) a ap`;ircve " by Arc ,tect. Note: This Contractor is •to extend ririv'cway hrou i to street. The concrec portion of Ori;re to Lastalled with strict accordance pit. no V a.11ar of 1 y aui : ere: Leres rec nents. Contractor= vi.'a,11 C,o all wcx• i a +_ eor :ance r- ti.: tale Rules and Ordinances of cf T is I .L ores, s 1orlaa, Fixture6 ie plazced wLcx°e cc;rn ca d:oaw).nf :c and as specified 'L. All .' : :tLres u:,^_a1i Le c: .pieve rea p a:'or !! „c and ti crou aaly clearie.: ccactol All f•?xt,..res : i l: +_ bo 4 ;ed for joL_ ;V:Jt, a,— cold water and all supply pipe shall .e. provide:; wit, acce:.Y: _.Jle in L : Lvicival cut-offs. • All cc :iccale water 'ol'2' i1 .; 1.: 'c hcis': c: , _ a 1 I e Central 1'u')e Co., al :arJ.zed pipe ox - equal, No e::po :ed Water - :3r .y'jI Lie Acir.L0 s ?a11 be run • .thou• the c:,•:naent of the Architect, All aca-1, pine s :all )e extra heavy vel t ai d clean out sball be provider, ai; each tG ain. Al2 ;- rauua1 2i1 > i _> cw..ves avoided. LEAD - . 1 11.” a instal'_ leaa pia^ :J.e ° all c :nc wers as called for by cede. ■•. ALTEENATEA: Contra.ctor oi all q altern: . ,,,,r1ce for teupered ProLis-wood ■.:itorm Shutter, drilled axid 5: to Eaz-11 witdows not protected • by wood taiutters. ALTEKITATE 1; Contractor Q.:: to Alternate price of •Preszure Treated of all floor Joist on first floor and sub-iloors. • MR. & MRS. J.H. POWELL RESIDENCE CURTIS E. HALEY, ARCHITECT BATIROOM "A" (CCRALLIN) =ad Shower - 2110 -DT Corallin A/R Corner Neo -angle Bath complete with B -75 C.P. fitting w/ B -274 shower head, 8+438 -NA Waste and Fiat Metal Mfg. Co. Glass Enclosure as per detail submitted by architect._ Note: Plumber to give alternate on furnishing above tub as speci- fied except w/ B -109 shower w/ 3 body sprays and B -274 shower head, B- 438 -NA Pop -up waste and F3 -348 tub filler. Lava t or 7x22" Corallin lavatory fitted with #92 C.P. supply & waste fitting; .;;180 C.P.. knee brackets, 3/8" C.P. supplies w/ stops and 1 -1/4" .'.P, 17 ga. Closet #1210 Corallin De -Luxe elongated closet w/ Plain Color special seat and cover, C,P..angle stop, flange and bolts. BATP.R OOM "B" (ROSE DU BARRY) Tub and Shower ose du Barry A/R Neo - angle Bath complete w /.B -75 C.P. fitting w/ B -274 shower head, B- 438 -NA Waste and B -295 C.P. Telescopic rod w/ pins. Lavat or Lavator 7x22" Rose du Barry lavatory same as Bathroom "A". Closet #1210 Rose du Barry closet BATF?ROOOM "C" - (CLAIRE DE Shower $ -172 C.P. shower w/ Foot Universal drain and 1x48" same as Bathroom "A ". LUNE BLUE) Tester and B -274 C.P. shower head, 2" C.P. C.P. shower rod wi pins. 4x20" Claire de Lune Blue lavaory fitted same as Bath "A ". Closet #1325 Claire de Lune Blue closet w/ Church #600 P.C. seat, C.P. angle stop, flange and bolts. (WRITE) valve shower, 2" C.P. Midget drain and 38" C.P. shower SERVANTS' BATH Shower 13 -170 C.P. two rod w/ pins. Lavatory P -4100 19x17" White E.I. lavatory w/ 3/8" C.P. supplies w 1 -1/4" C.P. 17 ga. P trap. (continued) stops and FC7 3/26/41 PorELL T: (colreii) (i) (r Closet 7-2180 whit i:down closet voi i At) BA eclat a1 cover, aerie stop, flan6 tared bolts, 111CICI) rMIrttnr,:;" A/R sink, 13-884-6r faucet complete, i989 13tralrier aral la" 17 en. 'A' trap. LAUVRY t part 'Ceriont tl" laundry tray cor1t e w/ taei . stand, faueet and trnp, Mleaatitia Tipatieft, al a railk BoistrEtetter rigi414111 L + lav X3; 3.'towered 0311041 1arz, fal,temoia to l erl sfl i gai t Cz ttbor 3 Pagniigh i#: all tielk fixes Ss sa1+d 1100$437 laogitrio 004k adfilitAt $A s tranzStai Con * e �1 4 : t 1i 7114 . Dot th «Os# a floor 113* . emd. ° SQp' wig or !lettuce elite ot Vortb. rlaot vitritca bathroan wInfieir ezt bat 0041 Geiatracim . snail ttaisaien 111.M2 s 4 1411 ragell I aclootia at Terrill" E C =MOM Wir trvae Co* atalatja Eltvtittactia ly ri,tx t o cI ({tt sct r this emot .� o' ;C. top : v im zirt britIvoctr :o3 •-, 4 esubthotig th$ r �. . 'cam= p r'u or ” L „ .tt _� , ° a trivri iLar M O ' ?E"'t -tra ' toL `y "" Q a £ it mate :441. 7 Vxd Jentiotie 1 Ai "'.. a that 1 ; selootol Vet' e•Ai t c^;:.12 Go. "mint 1 wool Imr.1,0 4 tivta 010;10.