ROOFINGTRUSS COMPANY, INC.
Roof Trusses
Filoor Truisses
25475 SW 142nd Avenue
Princeton, Florida 33032
CERTIFIED MEMBER OF THE TRUSS PLATE INSTITUTE
CC# 0391.
<< WARNING >>
EXTREME CARE IS REQUIRED IN THE HANDLING,
ERECTION, AND BRACING OF TRUSSES. REFER TO
TPI'S "HIB ". IMPROPERLY BRACED TRUSSES
MAY TOPPLE & DOMINO WITH POSSIBLE SERIOUS
INJURY TO WORKERS. INSTRUCT INSTALLERS
NEVER TO STEP ON THE CENTER PORTION OF THE
PANELS: ALWAYS AT OR NEAR THE JOINTS.
BUILDING DESIGNER
-IT IS YOUR RESPONSIBILITY TO DETERMINE
THAT DIMENSIONS CONFORM TO THE ARCHITECTURAL
PLANS AND ALL LOADS UTILIZED HEREIN MEET OR
EXCEED THE ACTUAL DEAD LOADS SPECIFIED AND/
OR IMPOSED ON THE STRUCTURE, AND THE LIVE
LOADS IMPOSED BY THE LOCAL BUILDING CODE OR
HISTORICAL CLIMATIC RECORDS. THE BEARING
CONNECTIONS AND THE USE OF THESE COMPONENTS
SHALL BE SPECIFIED BY YOU.
257 -1910
FAX 257 -1911
SERVING ALL CIF FLORID/1
ERECTOR - BUILDER
THE PROPER AND SAFE ERECTION OF ALL TRUSSES
IS YOUR EXCLUSIVE RESPONSIBILITY. YOU ARE
CAUTIONED TO SEEK PROFESSIONAL ADVICE
REGARDING ERECTION AND BRACING WHICH IS
ALWAYS REQUIRED TO PREVENT TOPPLING AND
DOMINOING. TOP AND BOTTOM CHORDS SHALL BE
ADEQUATELY BRACED IN THE ABSENCE OF PLYWOOD
SHEATHING OR RIGID CEILING RESPECTIVELY.
ERECTION BRACING IS NOT SHOWN. ONLY
STRUCTURAL BRACING REQUIRED OF SPECIFIC
TRUSS MEMBERS IS SHOWN ON THE TRUSS DESIGN.
NEVER ERECT DAMAGED TRUSSES. UNSYMMETRICAL
AND /OR NOT UNIFORMLY LOADED TRUSSES CAN ONLY
BE ERECTED ONE WAY. YOU ARE RESPONSIBLE TO
CHECK THE LAYOUT AND SPECIFIC TRUSS DESIGNS
TO INSURE PROPER INSTALLATION. CHECK ALL
FLAT TRUSSES TO INSURE AGAINST UPSIDE DOWN
ERECTION. NEVER CUT OR ALTER TRUSSES IN ANY
WAY. NEVER CONCENTRATE BUILDING MATERIALS
SUCH AS STACKS OF PLYWOOD ON THE INSTALLED
TRUSSES. «REFER TO HIB »
Job
8340
Truss
F1
Truss Type
ROOF TRUSS
Qty
11
Ply
1
BLUM RESIDENCE ( BLUM BLDR.) DWH
DECO TRUSS COMPANY INC. 3.300 s Sep 20 1995 MiTek Industries, Inc. Thu Oct 24 16:14:30 1996 Page 1
1 5-5-14 1 10-9-12 12 -9-12 18 -1 -10 23-7 -8
1 1 1
5-5-14 5-3-14 2-0-0 5-3-14 5-5-14
4x8 = 3x4 = 2x4 11 2x4 11 3x6 = 3x4 = 4x8 =
2 3 4 5 6 7 8
I
0
B
0 1
]
I
4
R
N
A 14 13 12 10
1 3x10 = 5x6 = 3x4 = 3x4 = 3x10 = 9
2x4 11 2x4 11
5-5-14 1 10-9-12 1 12 -9-12 18 -1 -10 23-7-8
I 1
5-5-14 5-3-14 2 -0-0 5-3-14 5-5-14
I
Plate Offsets (X,Y): [13:0- 0- 0,0 -3 -8]
LOADING (psf)
SPACING 2 -0 -0
CSI
DEFL (in) (Ioc) Udefl
PLATES GRIP
TCLL 40.0
Plates Increase 1.00
TC 0.80
Vert(LL) 0.38 12/11 736
M20(20ga) 258/216
TCDL 10.0
Lumber Increase 1.00
BC 0.90
Vert(TL) 0.57 12/11 490
BCLL 0.0
Rep Stress Incr YES
WB 0.79
Horz(TL) 0.06 9 n/a
BCDL 10.0
Code SFBC
(Matrix)
Min Length / LL defl = 360
Weight: 124 (Ibs)
LUMBER BRACING
TOP CHORD 2 X 4 SYP No.2D TOP CHORD Sheathed or 1 -10 -13 on center purlin spacing,
BOT CHORD 2 X 4 SYP No.2D *Except* except end verticals.
13 -9 2 X 4 SYP SS BOT CHORD Rigid ceiling directly applied, or 10 -00-00 on center bracing.
WEBS 2 X 4 SYP No.3 *Except*
1-2 2 X 6 SYP No.2D, 8-9 2 X 6 SYP No.2D
14-2 2 X 4 SYP No.2D, 10-8 2 X 4 SYP No.2D
REACTIONS (Ibs/size) 1 =1390/0 -5 -8, 9= 1390/0 -5 -8
Max Vert 1= 1413(Ioad case 2), 9= 1413(Ioad case 2)
FORCES
TOP CHORD 1 -2= -1341, 2 -3= -3473, 3 -4= -4694, 4 -5= -4694, 5 -6= -4694, 6 -7= -4694, 7 -8= -3472, 8 -9= -1340
BOT CHORD 9 -10 =0, 10-11 =3472, 11 -12 =4694, 12 -13 =3473, 13 -14 =3473, 1 -14 =0
WEBS 2-14=3651, 3-14=-1011, 3-12=1286, 4-12=-337, 5-11=-337, 7-11=1287, 7-10=-1012, 8-10=3651
NOTES
1) This truss has been checked for unbalanced loading conditions about joints 8 and 7.
LOAD CASE(S) Standard
r 4 4 0 og . . 'Op (0- -r 1 .
O C T 2 5 1996
MAHMOUD ZOLFAGHARI, P.E.
Job
8340
Truss
F2
Truss Type
ROOF TRUSS
Qty
3
Ply
1
BLUM RESIDENCE ( BLUM BLDR.) DWH
DECO TRUSS COMPANY INC.
3.300 s Sep 201995 MiTek Industries, Inc. Thu Oct 24 16:14:35 1996 Page 1
I
4-11-4
9-10-8
4-11-4
4-11 -4
4x6 =
2x4 I I 4x6 =
2
3 4
0
•
6
3x8 =
1
5
N411
2x4 11
4-11 -4
9-10-8
1
4-11 -4
4-11-4
LOADING (psf)
SPACING 2 -0 -0
CSI
DEFL (in) (loc) I/defl
PLATES GRIP
TCLL 40.0
Plates Increase 1.00
TC
0.48
Vert(LL) 0.02 3 999
M20(20ga) 258/216
TCDL 10.0
Lumber Increase 1.00
BC
0.11
Vert(TL) 0.04 3 999
BCLL 0.0
Rep Stress Incr YES
WB
0.33
Horz(TL) 0.00 5 n/a
BCDL 10.0
Code SFBC
Min Length / LL deft = 360
Weight: 55 (Ibs)
LUMBER
BRACING
TOP CHORD 2 X 4 SYP No.2D
TOP CHORD Sheathed or 4 -9-1 on center purlin spacing,
BOT CHORD 2 X 4 SYP No.2D
except end verticals.
WEBS 2 X 4 SYP No.3 *Except*
BOT CHORD Rigid ceiling directly applied, or 10 -00 -00 on center bracing.
1 -2 2 X 6 SYP No.2D, 4 -5 2 X 6 SYP No.20
Except: 5- 6:6 -3 -0.
REACTIONS (Ibs/size) 1= 565/0 -2 -8, 5= 565/0 -6 -0
FORCES
TOP CHORD 1- 2 = -518, 2 -3= -779, 3- 4 = -779, 4- 5 = -518
BOT CHORD 5 -6=0, 1 -6 =0
WEBS 2 -6 =828, 3 -6= -471, 4 -6=828
LOAD CASE(S) Standard
•
OCT ZOO"‘*9
2 5 1996
MAHMOUD ZOLFAGHARI, P,E.
Job
8340
Truss
F3
Truss Type
ROOF TRUSS
Oty
8
Ply
1
BLUM RESIDENCE (BLUM BLDR.) DWH
DECO TRUSS COMPANY INC. 3.300 s Sep 20 1995 MiTek Industries, Inc. Thu Oct 24 16:14:43 1996 Page 1
5-8-14 ` - 11 -3-12 13 -3-12 18-10 -10 24 -7 -8
' I { 1
5-8.14 5 -6-14 2-0-0 5-6-14 5-8-14
4x10 = 3x4 = 2x4 11 2x4 11 3x6 =3x4 = 4x10 =
2 3 4 5 6 7 8
n
14 13 12 11 0 K
1 3x8 =5x6 = 3x4 = 3x4 = 3x8 = 9
2x4 u 2x4 11
5-8-14 I 11 -3-12 I 13-3-12 18-10 -10 24-7 -8
I
I I 1
5-8-14 5-6-14 2-0-0 5-6-14 5 -8-14
Plate Offsets (X,Y): (10:0 -1- 12,0 -1- 8],(13:0- 0- 0,0 -3- 81,(14:0.1- 12,0 -1 -8]
LOADING (psf)
SPACING 2 -0 -0
CSI
DEFL (in) (Ioc) Vdefl
PLATES GRIP
TCLL 40.0
Plates Increase 1.00
TC 0.89
Vert(LL) 0.43 12/11 672
M20(20ga) 258/216
TCDL 10.0
Lumber Increase 1.00
BC 0.88
Vert(TL) 0.65 12/11 448
BCLL 0.0
Rep Stress Incr YES
WB 0.86
Horz(TL) 0.07 9 n/a
BCDL 10.0
Code SFBC
(Matrix)
Min Length / LL defl = 360
Weight: 127 (Ibs)
LUMBER BRACING
TOP CHORD 2 X 4 SYP SS TOP CHORD Sheathed or 2 -1 -9 on center purlin spacing,
BOT CHORD 2 X 4 SYP No.2D 'Except' except end verticals.
13 -9 2 X 4 SYP SS BOT CHORD Rigid ceiling directly applied, or 10 -00 -00 on center bracing.
WEBS 2 X 4 SYP No.3 *Except* Except: 1- 14:6 -3 -0.
1-2 2 X 6 SYP No.2D, 8-9 2 X 6 SYP No.2D
14-2 2 X 4 SYP No.2D, 10-8 2 X 4 SYP No.2D
REACTIONS (Ibs/size) 1= 1450/0 -5 -8, 9= 1450/0 -5 -8
Max Vert 1= 1473(load case 2), 9= 1473(Ioad case 2)
FORCES
TOP CHORD 1 -2= -1398, 2 -3= -3791, 3 -4= -5114, 4 -5= -5114, 5 -6= -5114, 6 -7= -5114, 7 -8= -3790, 8 -9= -1398 •
BOT CHORD 9 -10=0, 10-11 =3790, 11 -12 =5114, 12 -13 =3791, 13 -14 =3791, 1 -14 =0
WEBS 2 -14 =3969, 3 -14= -1053, 3 -12 =1387, 4 -12 =- 348, 5-11= -348, 7 -11 =1388, 7 -10= -1054, 8 -10 =3968
NOTES
1) This truss has been checked for unbalanced loading conditions about joints 8 and 7.
LOAD CASE(S) Standard
r4-304
OCT 2 5 1996
MAHMOUD ZOLFAGHARI, P.E.
Job
8340
Truss
FG4
Truss Type
ROOF TRUSS
Qty
1
Ply
1
BLUM RESIDENCE (BLUM BLDR.) DWH
DECO TRUSS COMPANY INC. 3.300 s Sep 20 1995 MiTek Industries, Inc. Fri Oct 25 08:03:51 1996 Page 1
4-11 -6 10-3 -4 12 -3-4 15-5-8
I I
4-11 -6 5-3-14 2-0-0 3-2-4
•
4x6 = 3x4 = 2x4 11 2x4 11 4x6 =
2 3 4 5 6
w
NM
c
:
®
p
M
IN o
a
1
2x4
4x6 = 3x4 = 3x6 = 10 9 8 N
7
a 2x4 n
4-11 -6 1 10-3 -4 12 15
{ 1
4-11-6 5-3-14 2-0-0 3-2 -4
LOADING (psf)
TCLL 40.0
TCDL 10.0
BCLL 0.0
BCDL 10.0
SPACING 1 -0 -0
Plates Increase 1.00
Lumber Increase 1.00
Rep Stress Incr NO
Code SFBC
CSI
TC 0.78
BC 0.97
WB 0.77
(Matrix)
DEFL (in) (loc) (/dell
Vert(LL) 0.18 10/9 993
Vert(TL) 0.27 10/9 662
Horz(TL) 0.02 7 n/a
Min Length / LL dell = 360
PLATES GRIP
M20(20ga) 258/216
Weight: 84 (lbs)
LUMBER BRACING
TOP CHORD 2 X 4 SYP No.2D TOP CHORD Sheathed or 2 -3 -12 on center purlin spacing,
BOT CHORD 2 X 4 SYP No.2D except end verticals.
WEBS 2 X 4 SYP No.3 *Except* BOT CHORD Rigid ceiling directly applied, or 10 -00 -00 on center bracing.
1 -2 2 X 6 SYP No.2D, 6 -7 2 X 6 SYP No.2D Except: 1- 10:6 -3 -0.
REACTIONS (lbs /size) 1= 844/0 -5 -8, 7= 844/0 -4 -0
FORCES
TOP CHORD 1 -2= -831, 2 -3= -1800, 3 -4= -1481, 4 -5 =- 1481, 5-6= -1481, 6 -7= -929
BOT CHORD 7 -8=0, 8 -9 =1481, 9- 10=1800, 1 -10 =0
WEBS 2- 10=1914, 3 -1 -538, 3 -9= -336, 4 -9= -132, 5 -8= -554, 6 -8 =1733
NOTES
1) This truss has been checked for unbalanced loading conditions about joint 6.
2) Designed for RAILING ABOVE.
LOAD CASE(S)
1) Lumber Increase =1.00, Plate Increase =1.00
Uniform Loads (Ibs per ft)
Vert:2- 3=- 102.5, 3-4 =- 102.5, 4 -5 =- 102.5, 5 -6 =- 102.5, 7 -8= -10.0, 8 -9= -10.0, 9 -10= -10.0, 1 -10= -10.0
Z -0001/ 1591.
OCT 2 5 19+36
MAHMOUD ZOLFAGHARI, P.E.
Job
8340
Truss
F5
Truss Type
ROOF TRUSS
Qty
2
Ply
1
BLUM RESIDENCE ( BLUM BLOB.) DWH
DECO TRUSS COMPANY INC. 3.300 s Sep 20 1995 MiTek Industries, Inc. Thu Oct 24 16:14:51 1996 Page 1
I 4-11.6 I 10-3-4 12 -3-4 17 -7 -2 23-1 -0
1 1 +
4-11 -6 5-3-14 2 -0-0 5-3-14 5-5-14
4x8 = 3x6 = 2x4 11 2x4 11 3x6 = 3x4 = 4x8 =
2 3 4 5 6 7 8
I I
141
o
®
�
B
�
i 1
14 13 12 11 0
1 3x10 = 4x6 = 3x6 = 3x4= 3x10 = 9
2x4 11 2x4 11
i 4-11 -6 i 10-3-4 12 -3-4 17-7-2 23-1-0
1 I I i
4-11 -6 5-3-14 2 -0-0 5-3-14 5-5-14
Plate Offsets (X,Y): (13:0- 0- 0,0 -3 -8]
LOADING (psf)
SPACING 2 -0 -0
CSI
DEFL (in) (loc) I/defl
PLATES GRIP
TCLL . 40.0
Plates Increase 1.00
TC 0.78
Vert(LL) 0.35 5 783
M20(20ga) 258/216
TCDL 10.0
Lumber Increase 1.00
BC 0.81
Vert(TL) 0.52 5 522
BCLL 0.0
Rep Stress Incr YES
WB 0.77
Horz(TL) 0.06 9 n/a
BCDL 10.0
Code SFBC
(Matrix)
Min Length / LL dell = 360
Weight: 123 (Ibs)
LUMBER BRACING
TOP CHORD 2 X 4 SYP No.2D TOP CHORD Sheathed or 1 -11 -5 on center purlin spacing,
BOT CHORD 2 X 4 SYP No.2D *Except* except end verticals.
13 -9 2 X 4 SYP SS BOT CHORD Rigid ceiling directly applied, or 10 -00 -00 on center bracing.
WEBS 2 X 4 SYP No.3 *Except*
1- 22X6 SYP No.2D,8- 92X6 SYP No.2D
14-2 2 X 4 SYP No.2D, 10- 82X4SYP No.2D
REACTIONS (Ibs/size) 1= 1358/0 -5 -8, 9= 1358/0 -5 -8
Max Vert 1 =1380(load case 2), 9= 1380(load case 2) •
FORCES
TOP CHORD 1 -2= -1314, 2 -3= -3113, 3 -4= -4479, 4 -5= -4479, 5 -6 =- 4479, 6-7= -4479, 7 -8 =- 3377, 8-9= -1309
BOT CHORD 9 -10=0, 10-11 =3377, 11 -12 =4479, 12- 13=3113, 13 -14 =3113, 1 -14 =0
WEBS 2 -14= 3311, 3-14= -1020, 3 -12 =1438, 4 -12 =- 367, 5-11= -315, 7 -11 =1160, 7 -10= -977, 8 -10 =3551
NOTES
1) This truss has been checked for unbalanced loading conditions about joints 8 and 7.
LOAD CASE(S) Standard
r449"4,f
OCT 25 1996
MAHMOUD ZOLFAGHARI, P.E.
Job
8340
Truss
F6
Truss Type
ROOF TRUSS
Qty
1
Ply
1
BLUM RESIDENCE ( BLUM BLDR.) DWH
DECO TRUSS COMPANY INC. 3.300 s Sep 20 1995 MiTek Industries, Inc. Thu Oct 24 16:14:58 1996 Page 1
5-0-6 1 10-7 -4 12 -7 -4 18-2 -2 23-11-0
I
1 I I 1
5-0-6 5-6-14 2 -0-0 5-6-14 5-8-14
4x8 = 3x6 = 2x4 ii 2x4 11 6x6 = 4x10 =
2 3 44 55 6 7
El
I —
In
r
El-
I1I
1 3 12 11 10 9
1 4x6 = 3x6 = 3x4 = 3x8 = 8
2x4 11 3x10 = 2x4 11
1 50.6 1 10-7 -4 12 -7 -4 18-2 -2 23-11-0
{ 1 I I
5-0-6 5-6-14 2 -0-0 5-6-14 5-8-14
Plate Offsets (X,Y): (9:0- 1- 12,0 -1- 8),(12:0- 0- 0,0 -3 -81
LOADING (psf)
SPACING 2 -0 -0
CSI
DEFL (in) (loc) I/defl
PLATES GRIP
TCLL 40.0
Plates Increase 1.00
TC 0.87
Vert(LL) 0.40 5 712
M20(20ga) 258/216
TCDL 10.0
Lumber Increase 1.00
BC 0.77
Vert(TL) 0.59 5 475
BCLL 0.0
Rep Stress Incr YES
WB 0.83
Horz(TL) 0.06 8 n/a
BCDL 10.0
Code SFBC
(Matrix)
Min Length / LL defl = 360
Weight: 122 (Ibs)
LUMBER BRACING
TOP CHORD 2 X 4 SYP No.2D *Except* TOP CHORD Sheathed or 1 -9-6 on center purlin spacing,
6.7 2 X 4 SYP SS except end verticals.
BOT CHORD 2 X 4 SYP No.2D *Except BOT CHORD Rigid ceiling directly applied, or 10 -00 -00 on center bracing.
12 -8 2 X 4 SYP SS Except: 1- 13:6 -3 -0.
WEBS 2 X 4 SYP No.3 'Except*
1-2 2 X 6 SYP No.2D, 7-8 2 X 6 SYP No.2D
13-2 2 X 4 SYP No.2D, 7-9 2 X 4 SYP No.2D
REACTIONS (Ibs /size) 1= 1408/0 -5-8, 8= 1407/0 -5 -8
Max Vert 1= 1430(load case 2), 8= 1430(Ioad case 2)
FORCES
TOP CHORD 1 -2= -1363, 2 -3 =- 3304, 3-4= -4815, 4 -5= -4815, 5 -6= -4815, 6 -7= -3628, 7 -8= -1356
BOT CHORD 8-9 =0, 9-10 =3732, 10-11 =4815, 11 -12 =3304, 12 -13 =3304, 1 -13 =0
WEBS 2 -13= 3506, 3-13= -1063, 3 -11 =1584, 4 -11= -392, 5 -10= -299, 6 -10 =1139, 6 -9= -1005, 7 -9 =3798
NOTES
1) This truss has been checked for unbalanced loading conditions about joints 7 and 6.
LOAD CASE(S) Standard
Z iesiA ' , ° / Li.
OCT 25iSS3
- MAHMOUD ZOLFAGHARI, P.E.
25475 SW 142nd Avenue
Princeton, Florida 33032
CERTIFIED MEMBER OF THE TRUSS PLATE INSTITUTE
CC # 039 ]
<< WARNING >>
EXTREME CARE IS REQUIRED IN THE HANDLING.
ERECTION. AND BRACING OF TRUSSES. REFER TO
TPI'S "HIB - 91". IMPROPERLY BRACED TRUSSES
MAY TOPPLE & DOMINO WITH POSSIBLE SERIOUS
INJURY TO WORKERS. INSTRUCT INSTALLERS
NEVER TO STEP ON THE CENTER PORTION OF THE
PANELS ALWAYS AT OR NEAR THE JOINTS.
BUILDING DESIGNER
1T IS YOUR RESPONSIBILITY TO DETERMINE
THAT DIMENSIONS CONFORM TO THE ARCHITECTURAL
PLANS AND ALL LOADS UTILIZED HEREIN MEET OR
EXCEED THE ACTUAL DEAD LOADS SPECIFIED AND/
OR IMPOSED ON THE STRUCTURE. AND THE LIVE
LOADS IMPOSED BY THE LOCAL BUILDING CODE OR
HISTORICAL CLIMATIC RECORDS. THE BEARING
CONNECTIONS AND THE USE OF THESE COMPONENTS
SHALL BE SPECIFIED BY YOU.
• ii: %Ii C: x,, i ii ::::'i' :''iF iiiiii'4iii :i:: } ?;i: ? ?i;ii::j•f;i•
TRUSS COMPANY, INC.
Roof Trusses
Filoor Trusses
257 -1910
FAX 257 -1911
SERVING ALL OF FLORIDA
ERECTOR - BUILDER
THE PROPER AND SAFE ERECTION OF ALL TRUSSES
IS YOUR EXCLUSIVE RESPONSIBILITY. YOU ARE
CAUTIONED TO SEEK PROFESSIONAL ADVICE
REGARDING ERECTION AND BRACING WHICH IS
ALWAYS REQUIRED TO PREVENT TOPPLING AND
DOMINOING. TOP AND BOTTOM CHORDS SHALL BE
ADEQUATELY BRACED IN THE ABSENCE OF PLYWOOD
SHEATHING OR RIGID CEILING RESPECTIVELY.
ERECTION BRACING IS NOT SHOWN. ONLY
STRUCTURAL BRACING REQUIRED OF SPECIFIC
TRUSS MEMBERS IS SHOWN ON THE TRUSS DESIGN.
NEVER ERECT DAMAGED TRUSSES. UNSYMMETRICAL
AND /OR NOT UNIFORMLY LOADED TRUSSES CAN ONLY
BE ERECTED ONE WAY. YOU ARE RESPONSIBLE TO
CHECK THE LAYOUT AND SPECIFIC TRUSS DESIGNS
TO INSURE PROPER INSTALLATION. CHECK ALL
FLAT TRUSSES TO INSURE AGAINST UPSIDE DOWN
ERECTION. NEVER CUT OR ALTER TRUSSES IN ANY
WAY. NEVER CONCENTRATE BUILDING MATERIALS
SUCH AS STACKS OF PLYWOO9 ON THE INSTALLED
TRUSSES. «REFER TO HIB - 91 »
Job '
8340
Truss
AG1
Truss Type
ROOF TRUSS
Qty
1
Ply
1
BLUM RESIDENCE ( BLUM BLDR.) DWH
DECO
TRUSS COMPANY INC. 3.3T s Dec 11 1996 MiTek Industries, Inc. Tue Jan 28 17:31:53 1997 Page 1
2-10-0 9-0-0 15-7 -6 22 -1 -0 3.1- 27 -9-0 32 -1 -0
1
1 { 1 +
2 -10-0 6-2-0 6-7 -6 6-5-10 1-0-0 4 -8-0 4-4-0
5x6 =
5.00 [12
4x8
3
= 2x4 II 4x8
4 5 6
=
•
N
3x4 r
3x8 s
7
2
'1'
I
11` r1
1 — 15 14 13 12 %- '
10 '' O 8
3x4 = 3x8 11 7x8 = 7x10 = 4x6= 8x12 — 3x 0 11 3x4 =
4x6 = 7x8 =
2 -6-0 2111-0 9-0-0 15-7-6 22 -1-0 13-11 27 -9-0 21.1.0 32 -1 -0
1 1 1
2 -6-0 0.4.0 6-2-0 6-7 -6 6-5-10 1-0-0 4-8-0 0-4-0 4-0-0
Plate Offsets (X,Y): 3:0- 2- 8,0- 1- 12),[6:0- 2- 0,0 -1- 12),[10:0- 0- 0,0 -5 -4), [11:0- 0- 0,0 -5- 8),(13:0- 0- 0,0 -5- 0],[15:0- 0- 0,0 -5 -4) (16:0 -2- 12,0 -2 -8)
LOADING (psf)
SPACING 2 -0 -0
CSI
DEFL (In) (Ioc) Ildefl
PLATES GRIP
TCLL 30.0
Plates Increase 1.33
TC 0.84
Vert(LL) 0.13 14/13 999
M20(20ga) 249/190
TCDL 15.0
Lumber Increase 1.33
BC 0.94
Vert(TL) 0.24 14/13 980
BCLL 0.0
Rep Stress Incr NO
WB 0.85
Horz(TL) 0.01 9 n/a
BCDL 10.0
Code SFBC
Min Length / LL defl = 360
Weight: 200 (Ibs)
LUMBER BRACING .
TOP CHORD 2 X 4 SYP No.2D TOP CHORD Sheathed or 2 -7 -7 on center purlin spacing.
BOT CHORD 2 X 6 SYP No.2D BOT CHORD Rigid ceiling directly applied, or 1- 16:6 -3 -0, 15- 16:6 -3-0. 14- 15:4 -9 -8,
WEBS 2 X 4 SYP No.3 *Except* 11- 12:3 -3 -11, 10- 11:4 -4 -10, 9- 10:5 -7 -5, 8- 9:5 -7 -5, 13- 14:4 -9 -8,
15 -2 2 X 4 SYP No.2D, 13 -5 2 X 4 SYP No.2D 12- 13:3 -3 -11 on center bracing.
WEBS 1 Row at midpt 2 -15, 3 -13, 13 -5, 11 -5
REACTIONS (Ibs/size) 16= 2379/0 -8 -0, 9= 1050/0 -8 -0, 11= 4501/0 -8 -0
Max Horz 16=- 49(load case 2)
Max Uplift 16=- 1632(load case 4), 9=- 1044(load case 2), 11=- 2716(load case 4)
FORCES
TOP CHORD 1 -2 =389, 2 -3= -2831, 3 -4= -1821, 4 -5= -1821, 5 -6 =1490, 6 -7 =1161, 7 -8 =1846
BOT CHORD 8 -9= -1690, 9 -10= -1690, 10 -11= -1071, 11 -12= -1490, 12- 13= -1490, 13 -14 =2612, 14 -15 =2612, 15 -16= -354, 1- 16 = -354
WEBS 2 -16= -2289, 2 -15 =3033, 3 -15 =979, 3 -13= -917, 4 -13 =- 587, 5-13 =3865, 5 -11= -2337, 6 -11= -1680, 6 -10 =934, 7 -10 =670, 7 -9= -959
NOTES
1) This truss has been checked for unbalanced loading conditions about joints 5 and 4.
2) This truss has been designed for the wind loads generated by 110.0 m.p.h. winds at 32.4 feet above ground level, using 2.0 p.s.f. top chord dead load and 8.0 p.s.f
bottom chord dead Toad, 1.0 miles from hurricane oceanline, on a category I enclosed building, of dimensions 80.5 by 66.5 with exposure C (ASCE 7 -93). Lumber
Increase = 1.33, Plate Increase = 1.33. No end verticals are exposed.
3) Except as shown below, special connection(s) required to support concentrated load(s). Design of connection(s) is delegated to the building designer.
4) Provide adequate drainage to prevent water ponding.
5) This truss has been designed with ANSI /TPI 1 -1995 criteria.
6) For truss to truss connections refer to attached Hanger
Sheets.
LOAD CASE(S)
1) Lumber Increase =1.33, Plate Increase =1.33
Uniform Loads (Ibs per ft)
Vert:1- 2= -90.0, 2 -3= -90.0, 3 -4= -90.0, 4 -5= -90.0, 5 -6= -90.0, 6 -7= -90.0, 7 -8= -90.0, 8 -9= -20.0, 9 -10= -20.0, ►
10 -11 =- 143.8, 11- 12=- 143.8, 12 -13 =- 143.8, 13 -14 =- 143.8, 14- 15=- 143.8, 15-16= -20.0, 1- 16 = -20.0 i
Concentrated Loads (Ibs) , f .0.1
Vert:8=- 500.0, 10 =- 1071.4, 15=- 1071.4 /
JAN 3 0 1997
MAHMOUD ZOLFAGHARI, P.E.
Job '
8340
Truss
A2
Truss Type
ROOF TRUSS
Qty
1
Ply
1
BLUM RESIDENCE ( BLUM BLDR.) DWH
DECO TRUSS COMPANY INC. 3.3T s Dec 11 1996 MiTek Industries, Inc. Tue Jan 28 17:29:03 1997 Page 1
2-10-0 6-10-5 { 11 -0-0 16-0-8 21 -1 -0 27 -9-0 32 -1 -0
1
I 1 1 1 I I
2 -10-0 4 -0-5 4-1 -11 5- 0-8 5-0-8 6-8-0 4-4-0
4x8 = 2x4 11 4x6 =
5.00172
4
5 6
a
is
3x4
3
r?
d,
2x4 u
2
/%1000027
lt4
2..
1 15 14 13 12 11 1 8
3x4 = 5x6 - 3x4 3x4 3x8 - 3x4 - 5x6 = 2x4 11 3x4 =
1 2 - 2 - 1 19 - 0 11 -0-0 16-0-8 22 -1 -0 27-9-0 2q- }-0 32 -1-0
I I 1 I
2-6-0 0-4-0 8-2 -0 5-0-8 6-0-8 5-8-0 0-4-0 4-0-0
Plate Offsets (X,Y): [1:0-0- 4,0-1- 11],[4:0- 2- 4,0 -1- 12],[8:0 -0- 12,0- 1 -11],( 10:0- 0-0,0 -3- 4],(15:0- 0- 0,0 -3-4]
LOADING (psf)
SPACING 2 -0-0
CSI
DEFL (in) (Ioc) I /defl
PLATES GRIP
TCLL 30.0
Plates Increase 1.33
TC 0.59
Vert(LL) 0.07 13/12 999
M20(20ga) 249/190 ,
TCDL 15.0
Lumber Increase 1.33
BC 0.79
Vert(TL) 0.13 15/14 999
BCLL 0.0
Rep Stress Incr YES
WB 0.73
Horz(TL) 0.01 10 n/a
BCDL 10.0
Code SFBC
Min Length l LL defl = 360
Weight: 178 (Ibs)
LUMBER BRACING
TOP CHORD 2 X 4 SYP No.2D TOP CHORD Sheathed or 5 -4 -1 on center purlin spacing.
BOT CHORD 2 X 4 SYP No.2D BOT CHORD Rigid ceiling directly applied, or 1- 15:6 -3 -0, 14- 15:6 -3 -0, 13- 14:6 -3 -0,
WEBS 2 X 4 SYP No.3 10. 11:6 -3 -0, 9- 10:6 -3 -0, 8- 9:6 -3 -0, 12- 13:6 -3 -0, 11- 12:6 -3 -0 on
center bracing.
REACTIONS Ohs/size) 15 =1319/0 -8 -0, 9= 677/0 -8 -0, 10= 1549/0 -8 -0
Max Horz 15= 61(load case 3)
Max Uplift 15 =- 923(load case 4), 9 =- 805(load case 2), 10 =- 736(Ioad case 4)
Max Vert 15= 1319(load case 1), 9= 778(Ioad case 6), 10 =1549(load case 1)
FORCES
TOP CHORD 1 -2 =369, 2 -3 =361, 3-4=-910, 4 -5= -654, 5 -6= -654, 6 -7 =493, 7 -8 =582
BOT CHORD 8- 9 =- 529, 9-10= -529, 10 -11= -124, 11- 12 = -124, 12 -13 =840, 13 -14 =840, 14 -15 =794, 1 -15= -333
WEBS 2 -15= -320, 3 -15= -1435, 3- 14 =55, 4-14=101, 4 -12= -256, 5 -12= -452, 6 -12 =1074, 6 -10= -1495, 7- 10 =79, 7 -9= -577
NOTES
1) This truss has been checked for unbalanced loading conditions about joint 5.
2) This truss has been designed for the wind Toads generated by 110.0 m.p.h. winds at 32.4 feet above ground level, using 2.0 p.s.f. top chord dead Toad and 8.0 p.s.f
bottom chord dead Toad, 1.0 miles from hurricane oceanline, on a category I enclosed building, of dimensions 80.5 by 66.5 with exposure C (ASCE 7 -93). Lumber
Increase = 1.33, Plate Increase = 1.33. No end verticals are exposed.
3) Provide adequate drainage to prevent water ponding.
4) This truss has been designed with ANSI /TPI 1 -1995 criteria.
LOAD CASE(S) Standard
r
,,
JAN 3 0 1997
MAHMOUD ZOLFAGHARI, P.C.
Job '
8340
Truss
A3
Truss Type
ROOF TRUSS
Qty
1
Ply
1
BLUM RESIDENCE ( BLUM BLDR.) DWH
DECO TRUSS COMPANY INC. 3.3T s Dec 11 1996 MiTek Industries, Inc. Tue Jan 28 17:29:15 1997 Page 1
2 -10-0 6-6-7 13-0-0 19-1-0 1 22 -1-0 27-9-0 1 32 -1 -0 1
I I { 1
2 -10-0 3-8-7 6-5-9 6-1-0 3-0-0 5-8-0 4-4-0
4x6 = 4x6 =
4 5 •
5.00p
2x4 ii
s s
6
°1
3x4 s
3
3x4 a
2x4 ii
7
2
1 13 12 11 10
biiii
9 8
3x4 = 5x6 = 3x8 = 5x8 = 2x4 11 3x4 =
3x4 =
2-6-0 2119.0 13-0-0 22 -1 -0 1 27-9-0 21.1-0 32 -1 -0 I
I 1
2 - 0-4-0 10-2 -0 9-1-0 5-8-0 0-4 -0 4-0-0
Plate Offsets (X,Y): 1:0.0- 4,0-1- 11),[8:0 -0- 12,0 -1- 11],(10:0- 0- 0,0 -3- 4],[13:0- 0- 0,0 -3 -4)
LOADING (psf)
SPACING 2 -0 -0
CSI
DEFL (in) (loc) I /defl
PLATES GRIP
TCLL 30.0
Plates Increase 1.33
TC 0.64
Vert(LL) 0.15 11/10 999
M20(20ga) 249/190
TCDL 15.0
Lumber Increase 1.33
BC 0.70
Vert(TL) 0.27 13/12 859
BCLL 0.0
Rep Stress Incr YES
WB 0.58
Horz(TL) 0.01 10 n/a
BCDL 10.0
Code SFBC
Min Length / LL deft = 360
Weight: 175 (Ibs)
LUMBER BRACING
TOP CHORD 2 X 4 SYP No.2D TOP CHORD Sheathed or 4 -3 -14 on center purlin spacing.
BOT CHORD 2 X 4 SYP No.2D *Except* BOT CHORD Rigid ceiling directly applied, or 10 -00-00 on center bracing.
1 -11 2 X 4 SYP SS Except: 1- 13:6 -3 -0, 12- 13:6 -3 -0, 9- 10:6 -3 -0, 8- 9:6 -3 -0.
WEBS 2 X 4 SYP No.3 WEBS 1 Row at midpt 12 -5, 5 -10
REACTIONS (Ibs/size) 13= 1325/0 -8 -0, 9= 723/0 -8 -0, 10= 1496/0 -8 -0
Max Horz 13= 71(load case 3)
Max Uplift 13=- 917(load case 4), 9=- 795(Ioad case 2), 10=- 749(load case 4)
Max Vert 13= 1334(load case 5), 9= 773(load case 6), 10= 1496(Ioad case 1)
FORCES
TOP CHORD 1 -2 =369, 2 -3 =361, 3 -4= -784, 4 -5= -724, 5 -6 =367, 6 -7 =367, 7 -8 =582
BOT CHORD 8 -9= -529, 9 -1 -529, 10 -11 =209, 11 -12 =209, 12 -13 =750, 1- 13 = -333
WEBS 2 -13= -307, 3 -13= -1400, 3- 12 = -29, 4 -12= -273, 5 -12 =702, 5 -10= -1164, 6-10=-389, 7-10=202, 7 -9= -622
NOTES
1) This truss has been checked for unbalanced loading conditions about joints 5 and 4.
2) This truss has been designed for the wind loads generated by 110.0 m.p.h. winds at 32.4 feet above ground level, using 2.0 p.s.f. top chord dead Toad and 8.0 p.s.f
bottom chord dead Toad, 1.0 miles from hurricane oceanline, on a category I enclosed building, of dimensions 80.5 by 66.5 with exposure C (ASCE 7 -93). Lumber
Increase = 1.33, Plate Increase = 1.33. No end verticals are exposed.
3) Provide adequate drainage to prevent water ponding.
4) This truss has been designed with ANSI /TPI 1 -1995 criteria.
LOAD CASE(S) Standard
-
JAN 3 0 1997
MAHMOUD ZOLFAGHARI, P.E.
Job '
8340
Truss
A4
Truss Type
ROOF TRUSS
Qty
1
Ply
1
BLUM RESIDENCE ( BLUM BLDR.) DWH
DECO TRUSS COMPANY INC. 3.3T s Dec 11 1996 MiTek Industries, Inc. Tue Jan 28 17:29:26 1997 Page 1
2 -10-0 8-11-14 15-0 -0 17 -1 -0 22 -1 -0 I 27 -9-0 1 32 -1 -0
1 I I I +
2 -10-0 6-1 -14 6-0-2 2 -1 -0 5-0-0 5-8-0 4-4-0
4x8 = 4x6 =
4
5
6x6: 0000000 00 111.1.1.11.1111.11°
x6
5.00 12 3
�`4:
g 3x4
4 7
3x4
3x4
8
2 `
1 1i 16 15 14 13 12 11
10 9
3x4 = 3x6 �� 4x6 = 3x4 3x4 3x4 = 3x8 5x6 = 2x4 11 3x4 =
2-6-0 2- ?C-0 8-11-14 15-0 -0 17 -1-0 I 22 -1 -0
I 27 -9-0 28I 0 32 -1 -0 1
I I I
2 -6-0 0-4-0 6-1 -14 6-0-2 2 -1 -0 5-0-0
5-8-0 0-4-0 4-0-0
Plate Offsets (X,Y): 1:0- 0- 4,0- 1- 11),[4:0- 2- 4,0 -1- 121,[9:0- 0- 4,0 -1- 111,[11:0- 0- 0,0 -3- 41,[17:0 -2- 12,0 -1 -0)
LOADING (psf)
SPACING 2 -0 -0
CSI
DEFL (in) (Ioc) Udefl
PLATES GRIP
TCLL 30.0
Plates Increase 1.33
TC 0.51
Vert(LL) 0.04 15/14 999
M20(20ga) 249/190
TCDL 15.0
Lumber Increase 1.33
BC 0.48
Vert(TL) 0.08 15/14 999
BCLL 0.0
Rep Stress Incr YES
WB 0.58
Horz(TL) 0.01 10 n/a
BCDL 10.0
Code SFBC
Min Length / LL deft = 360
Weight: 188 (Ibs)
LUMBER BRACING
TOP CHORD 2 X 4 SYP No.2D TOP CHORD Sheathed or 4 -7 -3 on center purlin spacing.
BOT CHORD 2 X 4 SYP No.2D BOT CHORD Rigid ceiling directly applied, or 1- 17:6 -3 -0, 16- 17:6 -3 -0, 15- 16:6 -3-0,
WEBS 2 X 4 SYP No.3 11- 12:6 -3 -0, 10- 11:6 -3 -0, 9- 10:6 -3 -0, 14- 15:6 -3 -0, 13- 14:6 -3 -0,
12- 13:6 -3 -0 on center bracing.
REACTIONS (Ibs/size) 17= 1330/0 -8 -0, 10= 737/0 -8 -0, 11= 1478/0 -8 -0
Max Horz 17= 82(Ioad case 3)
Max Uplift 17 =- 923(load case 4), 10=- 818(load case 2), 11=- 721(Ioad case 4)
. Max Vert 17 =1330(Ioad case 1), 10= 818(load case 6), 11= 1478(load case 1)
FORCES
TOP CHORD 1 -2 =369, 2 -3= -998, 3 -4= -617, 4 -5= -427, 5 -6= -463, 6 -7= -463, 7- 8=346, 8 -9 =582
BOT CHORD 9-1 -529, 10-11= -529, 11- 12 = -320, 12 -13= -320, 13 -14 =570, 14 -15 =925, 15 -16 =925, 16- 17 = -333, 1- 17 = -333
WEBS 2-17=-1239, 2-16=1286, 3-16=-162, 3-14=-428, 4-14=321, 4-13=-465, 5-13=-140, 7-13=993, 7-11=-1446, 8-11=222, 8-10=-637
NOTES
1) This truss has been checked for unbalanced loading conditions about joint 5.
2) This truss has been designed for the wind loads generated by 110.0 m.p.h. winds at 32.4 feet above ground level, using 2.0 p.s.f. top chord dead load and 8.0 p.s.f
bottom chord dead load, 1.0 miles from hurricane oceaniine, on a category I enclosed building, of dimensions 80.5 by 66.5 with exposure C (ASCE 7 -93). Lumber
Increase = 1.33, Plate Increase = 1.33. No end verticals are exposed.
3) Provide adequate drainage to prevent water ponding.
4) This truss has been designed with ANSI /TPI 1 -1995 criteria.
LOAD CASE(S) Standard
•
/ f I-r1
/ r
JAN 3 0 1997
MAHMOUD ZOLFAGHARI, 13,E.
Job ,
8340
Truss
A5
Truss Type
ROOF TRUSS
Qty
3
Ply
1
BLUM RESIDENCE (BLUM BLDR.) DWH
DECO TRUSS COMPANY INC. 3.3T s Dec 11 1996 MiTek Industries, Inc. Tue Jan 28 17:29:36 1997 Page 1
1 2 -10-0 1 9-5-4 16-0-8 21 -10-12 27 -9-0 32 -1-0
1 I I
2 -10-0 6-7-4 6-7-4 5 -10-4 5-10 -4 4-4-0
4x6 =
5
O.
3x4
3x4
3x4
5.00p 3x4 s 4
6
3 O
7
a.
c
F';"
._
N
3x4
3x4 .
2
8
Y
Bs
co
_ _
1 �5 14 13 12 11 �0 9
3x4 = 3x6 li 4x6 = 3x4 = 3x8 = 6x8 = 3x6 11 3x4 =
I 2-6-0 2190 9-5-4 I 16-0-8 I 21-10-12 27 -9-0 280 -0 32 -1-0
I 1
2-6-0 0-4-0 67 -4 6-7-4 5- 10-4 5-10-4 0-4-0 4-0-0
Plate Offsets (X,Y): (1:0- 0- 4,0- 1 -11), [9:0- 0- 4,0- 1 -11), [10:0- 2 -8,0- 0-12), (15:0 -2 -8,0 -0-12)
LOADING (psf)
SPACING 2 -0 -0
CSI
DEFL (in) (Ioc) Udell
PLATES GRIP •
TCLL 30.0
Plates Increase 1.33
TC 0.63
Vert(LL) 0.08 13/12 999
M20(20ga) 249/190
TCDL 15.0
Lumber Increase 1.33
BC 0.54
Vert(TL) 0.14 13/12 999
BCLL 0.0
Rep Stress Incr YES
WB 0.86
Horz(TL) 0.02 10 n/a
BCDL 10.0
Code SFBC
Min Length / LL deft = 360
Weight: 169 (Ibs)
LUMBER BRACING
TOP CHORD 2 X 4 SYP No.2D TOP CHORD Sheathed or 3 -5 -6 on center purlin spacing.
BOT CHORD 2 X 4 SYP No.2D BOT CHORD Rigid ceiling directly applied, or 1- 15:6 -3 -0, 14- 15:6 -3 -0, 13- 14:6 -3 -0,
WEBS 2 X 4 SYP No.3 10- 11:6 -3 -0, 9- 10:6 -3 -0, 12- 13:6 -3 -0, 11- 12:6 -3 -0 on center bracing.
REACTIONS (lbs/size) 15= 1666/0 -8 -0, 10= 1879/0 -8 -0
Max Herz 15=- 88(Ioad case 2)
Max Uplift 15=- 1087(load case 4), 10=- 1363(load case 4)
FORCES
TOP CHORD 1 -2 =369, 2 -3= -1575, 3 -4= -1213, 4 -5= -1213, 5 -6= -1213, 6 -7= -1213, 7 -8= -1233, 8 -9 =581
BOT CHORD 9-1 -529, 10-11= -529, 11 -12 =1166, 12 -13 =1454, 13 -14 =1454, 14 -15= -333, 1- 15 = -333
WEBS 2 -15 =- 1571, 2 -14= 1826, 3 -14 =- 245, 3 -12 =- 395, 5 -12= 373, 7- 12 = -58, 7 -11 =- 485, 8 -11= 1771, 8 -10= -1779
NOTES
1) This truss has been designed for the wind loads generated by 110.0 m.p.h. winds at 32.4 feet above ground level, using 2.0 p.s.f. top chord dead load and 8.0 p.s.f
bottom chord dead load, 1.0 miles from hurricane ocoanline, on a category 1 unclosed building, of dimensions 80.5 by 66.5 with exposure C (ASCE 7 -93). Lumber
Increase = 1.33, Plate Increase = 1.33. No end verticals are exposed.
2) This truss has been designed with ANSI/TPI 1 -1995 criteria.
LOAD CASE(S) Standard
,,
JAN 30 1997
MAHMOUD ZOLFAGHARI, P.E.
Job '
8340
Truss
A6
Truss Type
ROOF TRUSS
Qty
2
Ply
1
BLUM RESIDENCE (BLUM BLDR.) DWH
DECO TRUSS COMPANY INC. 3.3T s Dec 11 1996 MiTek Industries, Inc. Tue Jan 28 17:29:48 1997 Page 1
1 -2-6-01-10-1) 6-11 -4 1 13-6-8 19-4.12 25-3-0 29-7-0
I 1 t I
1-8-0 0-10-0 6-11-4 6-7 -4 5-10-4 5-10-4 4
4x6 =
4
in
3x6
3x6
3x4
r`
5.00 p 3x4
3
5
N
r`
3x4
7
dil
el
op.
14 13 12 11 0
8 8
3x6 II 4x6 = 3x6 = 3x8 = 6x8 = 3x6 11 3x4 =
I - 2-6-01-1013 8.11 -4 I 13 -6-8 19-4-12 25-3-0 91-0 29-7-0
I I i
1 -8-0 0-10-0 6-11-4 6-7-4 5-10-4 5-10-4 0-4-0 4-0-0
Plate Offsets (X,Y): [8:0- 0- 4,0-1- 11),[9:0- 2 -8,0 -1 -0),[14:0 -2- 12,0 -0-81
LOADING (psf)
SPACING 2 -0 -0
CSI
DEFL (in) (loc) Udell
PLATES GRIP
TCLL 30.0
Plates Increase 1.33
TC 0.75
Vert(LL) 0.07 13/12 999
M20(20ga) 249/190
TCDL 15.0
Lumber increase 1.33
BC 0.40
Vert(TL) 0.12 13/12 999
BCLL 0.0
Rep Stress Incr NO
WB 0.78
Horz(TL) 0.02 9 n/a
BCDL 10.0
Code SFBC
(Matrix)
Min Length / LL dell = 360
Weight: 171 (Ibs)
LUMBER BRACING
TOP CHORD 2 X 4 SYP No.2D TOP CHORD Sheathed or 2 -10 -9 on center purlin spacing.
BOT CHORD 2 X 4 SYP No.2D BOT CHORD Rigid ceiling directly applied, or 13- 14:6 -3-0, 12- 13:6 -3 -0, 9- 10:6 -3 -0,
WEBS 2 X 4 SYP No.3 8- 9:6 -3 -0, 11- 12:6 -3 -0, 10- 11:6 -3-0 on center bracing.
REACTIONS (lbs/size) 14=1531/0 -8 -0, 9= 1904/0 -8 -0
Max Horz 14=- 174(Ioad case 2)
Max Uplift 14 =- 788(Ioad case 4), 9 =- 1388(Ioad case 4)
FORCES
TOP CHORD 1 -2= -1927, 2 -3= -1411, 3 -4= -1359, 4 -5= -1364, 5 -6= -1390, 6 -7= -1449, 7 -8 =512
BOT CHORD 8 - 9= -370, 9 -1 -370, 10-11 =1276, 11 -12 =1697, 12 -13 =1697, 13 -14 =0
WEBS 1 -14= -1476, 1 -13 =1731, 2 -13= -195, 2 -11= -621, 4 -11 =542, 6 -11= -132, 6 -10= -480, 7 -10 =1720, 7 -9= -1778
NOTES
1) This truss has been checked for unbalanced loading conditions about joint 4.
2) This truss has been designed for the wind Toads generated by 110.0 m.p.h. winds at 32.4 feet above ground level, using 2.0 p.s.f. top chord dead Toad and 8.0 p.s.f
bottom chord dead Toad, 1.0 miles from hurricane oceanline, on a category I enclosed building, of dimensions 80.5 by 66.5 with exposure C (ASCE 7 -93). Lumber
Increase = 1.33, Plate Increase = 1.33. No end verticals are exposed.
3) Studs to be fastened with 2x3 M20 plates.
4) This truss has been designed with ANSI/7P! 1 -1995 criteria.
LOAD CASE(S)
1) Lumber Increase =1.33, Plate Increase =1.33 •
Uniform Loads (Ibs per ft)
Vert:1 -2- -90.0, 2 -3= -90.0, 3 -4= -90.0, 4 -5= -90.0, 5 -6= -90.0, 6 -7= -90.0, 7 -8= -90.0, 8 -9= -20.0, 9 -10= -20.0,
10-11= -20.0, 11 -12= -20.0, 12 -13= -20.0, 13- 14 = -20.0
Concentrated Loads (Ibs)
Vert:1= -197.5
JAN 3 0 1997
MAHMOUD ZOLFAGHARI, P.E.
Job ■
8340
Truss
AG7
Truss Type
ROOF TRUSS
Qty
1
Ply
2
BLUM RESIDENCE (BLUM BLDR.) DWH
DECO TRUSS COMPANY INC. 3.3T s Dec 11 1996 MiTek Industries, Inc. Tue Jan 28 17:29:58 1997 Page 1
4.0.0 I 8-9-2 136-8 1 20-6-4 25-3-0 29-7-0
4-0-0 4-9-2 4-9-6 6 -11 -12 4 -8-12 4 -4-0
5x6 =
_ 5.00P 5
r
3x6:
3x4
4
6 3x8
%'
f, 7
5x12
N
3
'`
5x10
2x4 11 d.
8
2
�' 14 13 12 11 9 lo
I
10)(10= 3x10 I 10x10 = 10x16 = 10x10 = 4x10 11 4x8 =
l 4-0-0 I 841-2
l 13-6-8 I 20-6-4 25-3-0 29-0 7 29-7-0
4-0-0 4-9-2
l l
4-9-6 6 -11 -12 4-8-12 0-4-0 4-0-0
Plate Offsets (X,Y): [1:0- 0-0,0 -7 -01,[3:0- 0- 0,0 -1- 8],[10:0- 3- 0,0 -3- 12),[11:0- 0- 0,0 -7 -0] ,[12:0- 0- 0,0 -6- 8],[13:0- 0 -0,0 -6- 12),(14:0- 3- 4,0 -0-0]
LOADING (psf)
SPACING 1 -0 -0
CSI
DEFL (in) (loc) I /deft
PLATES GRIP
TCLL 30.0
Plates Increase 1.33
TC 0.88
Vert(LL) 0.18 12/11 999
M20(20ga) 249/190
TCDL 15.0
Lumber Increase 1.33
BC 0.78
Vert(TL) 0.33 12/11 900
BCLL 0.0
Rep Stress Incr NO
WB 0.90
Horz(TL) 0.06 10 n/a
BCDL 10.0
Code SFBC
Min Length / LL deft = 360
Weight: 218 (Ibs)
LUMBER., BRACING
TOP CHORD 2 X 4 SYP No.2D TOP CHORD Sheathed or 4 -3 -13 on center purlin spacing,
BOT CHORD 2 X 8 SYP SS except end verticals.
WEBS 2 X 4 SYP No.3 *Except* BOT CHORD Rigid ceiling directly applied, or 10 -00-00 on center bracing.
1 -2 2 X 8 SYP No.2D, 1 -3 2 X 4 SYP No.2D Except: 11- 12:7 -6 -6, 1- 14:8 -4 -2, 13- 14:8 -1 -2, 12- 13:7 -1 -14.
12- 52X4SYP No.2D, 11 -72 X 6 SYP No.2D
11 -8 2 X 4 SYP No.2D, 10 -8 2 X 6 SYP No.2D
REACTIONS (Ibs/size) 1 =9045/0 -8 -0, 10=8806/0 -8 -0
Max Horz 1 =- 81(load case 2)
Max Uplift 1 =- 5935(load case 4), 10=- 5951(load case 4)
FORCES
TOP CHORD 1- 2 = -85, 2 -3 = -0, 3-4 =- 11696, 4 -5 =- 9217, 5-6= -9217, 6 -7= -9217, 7 -8=- 10473, 8 -9 =622
BOT CHORD 9-10= -573, 10-11= -573, 11 -12 =9667, 12 -13= 10795, 13 -14= 10506, 1 -14 =10506 _
WEBS 1 -3=- 13028, 3-14 =2843, 3 -13 =334, 4 -13 =3012, 4 -12= -3225, 5 -12 =6829, 7 -12= -1323, 7 -11 =750, 8 -11= 11005, 8 -10= -8715
NOTES
1) 2 -ply truss to be connected together with 10d nails as follows: Top chords connected with 1 row(s) at 12 inches on center. Bottom chords connected with 1 row(s) at
5 Inches on center. Webs connected with 1 row at 6 inches on center.
2) This truss has been designed for the wind loads generated by 110.0 m.p.h. winds at 32.4 feet above ground level, using 2.0 p.s.f. top chord dead Toad and 8.0 p.s.f
bottom chord dead load, 1.0 miles from hurricane oceanline, on a category I enclosed building, of dimensions 80.5 by 66.5 with exposure C (ASCE 7 -93). Lumber
Increase = 1.33, Plate Increase = 1.33. No end verticals are exposed.
3) Except as shown below, special connection(s) required to support concentrated load(s). Design of connection(s) is delegated to the building designer.
4) This truss has been designed with ANSI /TPI 1 -1995 criteria.
5) For truss to truss connections refer to attached Hanger
Sheets.
LOAD CASE(S)
1) Lumber Increase =1.33, Plate Increase =1.33
Uniform Loads (Ibs per ft) r
Vert:2 -3=- 45.0, 3-4= -45.0, 4 -5= -45.0, 5 -6= -45.0, 6 -7= -45.0, 7 -8= -90.0, 8 -9= -90.0, 9 -10= -20.0, 10- 11= -20.0,
11 -12 =- 666.5, 12- 13 =- 666.5, 13 -14 =- 666.5, 1- 14= -666.5 ( f ifrit
Concentrated Loads (Ibs)
Vert:11 =- 2409.0
JAN 3 0 1997
MAHMOUD ZOLFAGHARI, P.E.
Job
8340
Truss
BG1
Truss Typo
ROOF TRUSS
Qty
1
Ply
1
BLUM RESIDENCE ( BLUM BLDR.) DWH
DECO TRUSS COMPANY INC. 3.3T s Dec 11 1996 MiTek Industries, Inc. Tue Jan 21 11:46:36 1997 Page 1
2-10-0 1 9-0-0 1 14 -11 -4 20 -8-12 26-8-0
1
i 1 1
2 -10-0 6-2-0 5-11 -4 5-9-8 5-11-4
4x8 = 2x4 6 3x4 = 3x4 = 4x6 =
5.00p 3
4 5
14,
6 7
tl.�i
14
'7
3 2
'
LI i
OM EN
1 : 12 11 10 9
3x4 = 13 Bx12 = 4x6 =3x8 = 3x8 = 8
3x8 II 3x8 II
•
1 2 - 2 - 1 1(}0 30.0 I 14 -11 -4 20-8-12 26.8.0
1 1 1
2-6-0 0-4-0 6-2 -0 5-11 -4 5-9-8 5-11 -4
Plate Offsets (X,Y): [3:0- 2- 8,0- 1- 12],(8:0 -2- 12,0 -3- 4],[12:0- 0- 0,0 -5- 4],(13:0 -2 12,0 -2 -8)
LOADING (psf)
SPACING 2 -0 -0
CSI
DEFL (in) (loc) I /defl
PLATES GRIP
TCLL 30.0
Plates Increase 1.33
TC 0.80
Vert(LL) 0.14 11/10 999
M20(20ga) 249/190
TCDL 15.0
Lumber Increase 1.33
BC 0.77
Vert(TL) 0.25 11/10 999
BCLL 0.0
Rep Stress Incr NO
WB 0.76
Horz(TL) 0.03 8 n/a
BCDL 10.0
Code SFBC
Min Length / LL defl = 360
Weight: 167 (Ibs)
LUMBER BRACING
TOP CHORD 2 X 4 SYP SS 'Except' TOP CHORD Sheathed or 2 -5 -0 on center purlin spacing,
1 -3 2 X 4 SYP No.2D except end verticals.
BOT CHORD 2 X 6 SYP No.2D BOT CHORD Rigid ceiling directly applied, or 10 -00 -00 on center bracing.
WEBS 2 X 4 SYP No.3'Except' Except: 1- 13:6 -3 -0, 12- 13:6 -3 -0, 11- 12:4 -7 -10, 10- 11:4 -7 -10,
12 -2 2 X 4 SYP No.2D, 7 -9 2 X 4 SYP No.2D 9- 10:5 -1 -11.
WEBS 1 Row at midpt 2 -12, 9 -7
REACTIONS (Ibs/size) 13= 2786/0 -8 -0, 8= 2409/0 -2 -8
Max Horz 13= 298(load case 3)
Max Uplift 13=- 1850(load case 3), 8=- 1423(load case 3)
FORCES
TOP CHORD 1 -2 =389, 2 -3= -3531, 3 -4= -3852, 4 -5= -3852, 5 -6= -3852, 6 -7= -2756, 7 -8= -2112
BOT CHORD 8 -9 =0, 9 -10 =2756, 10-11 =3258, 11 -12 =3258, 12 -13= -354, 1 -13= -354
WEBS 2 -13= -2695, 2 -12 =3693, 3 -12 =423, 3 -10 =710, 4 -10= -524, 6 -10 =1320, 6 -9= -1258, 7 -9 =3320
NOTES
1) This truss has been designed for the wind Toads generated by 110.0 m.p.h. winds at 32.4 feet above ground level, using 2.0 p.s.f. top chord dead load and 8.0 p.s.f
bottom chord dead Toad, 1.0 miles from hurricane oceanline, on a category I enclosed building, of dimensions 80.5 by 66.5 with exposure C (ASCE 7 -93). Lumber
Increase = 1.33, Plate Increase = 1.33. No end verticals are exposed.
2) Except as shown below, special connection(s) required to support concentrated load(s). Design of connection(s) is delegated to the building designer.
3) Provide adequate drainage to prevent water ponding.
4) This truss has been designed with ANSI /TPI 1 -1995 criteria.
5) For truss to truss connections refer to attached Hanger
Sheets.
LOAD CASE(S)
1) Lumber Increase =1.33, Plate Increase =1.33
Uniform Loads (Ibs per ft) r
Vert:1 -2= -90.0, 2 -3= -90.0, 3 -4= -90.0, 4 -5= -90.0, 5 -6= -90.0, 6 -7= -90.0, 8 -9 =- 102.5, 9 -10 =- 102.5, 10 -11 =- 102.5,
11 -12 =- 102.5, 12 -13= -20.0, 1 -13= -20.0 i
Concentrated Loads (Ibs) ,. j �1
Vert:12= -824.2
JAN 221997
VIAHMOUD ZOLFAGHARI, N.E.
. Job
8340
Truss
B2
Truss Type
ROOF TRUSS
Qty
1
Ply
1
BLUM RESIDENCE ( BLUM BLDR.) DWH
DECO TRUSS COMPANY INC. 3.3T s Dec 11 1996 MiTek Industries, Inc. Tue Jan 21 11:25:16 1997 Page 1
2 -10-0 I 6-11-0 { 11-0-0 I 18-10-0 26-8 -0
I
2 -10-0 4-1 -0 4-1-0 7 -10-0 7 -10-0
4x8 = 2x4 11 3x4 =
5.00 I12
4 5 6
um
4x6 s
3
u5
2x4 II
2
Y
v.
11
•
A
JD
f3
• 1 10 9 8
3x4 = 11 3x4 = 3x4 = 3x8 = 7
5x6 =
2x4 u
I 2 -6-0 2 - 11-0-0 I 18-10-0 26-8-0
I
2 -6-0 0-4-0 8-2 -0 7 -10-0 7 -10-0
Plate Offsets (X,Y) [1:0- 0- 4,0 -1- 11],[4:0- 2- 4,0 -1- 12] 0- 0,0 -3 -8]
LOADING (psf)
SPACING 2 -0 -0
CSI
DEFL (in) (loc) 1/deft
PLATES GRIP
TCLL 30.0
Plates Increase 1.33
TC 0.71
Vert(LL) 0.10 9/8 999
M20(20ga) 249/190
TCDL 15.0
Lumber Increase 1.33
BC 0.79
Vert(TL) 0.19 9/8 999
BCLL 0.0
Rep Stress Incr YES
WB 0.55
Horz(TL) 0.03 7 n/a
BCDL 10.0
Code SFBC
Min Length / LL deft = 360
Weight: 149 (Ibs)
LUMBER BRACING
TOP CHORD 2 X 4 SYP No.2D *Except* TOP CHORD Sheathed or 3 -3 -14 on center purlin spacing,
4 -6 2 X 4 SYP SS except end verticals.
BOT CHORD 2 X 4 SYP No.2D BOT CHORD Rigid ceiling directly applied, or 10 -00 -00 on center
WEBS 2 X 4 SYP No.3 bracing. Except: 1- 11:6 -3 -0, 10- 11:5 -8 -7, 9- 10:5 -9 -14,
8- 9:5 -9 -14.
WEBS 1 Row at midpt 11 -3, 4 -8, 8 -6
REACTIONS (Ibs /size) 11= 1642/0 -8 -0, 7= 1283/0 -2 -8
Max Horz 11= 366(load case 3)
Max Uplift 11=- 1072(load case 3), 7=- 682(load case 3)
FORCES
TOP CHORD 1 -2 =369, 2 -3 =361, 3 -4= -1505, 4 -5= -1376, 5 -6= -1376, 6 -7= -1206
BOT CHORD 7 -8 =0, 8 -9 =1389, 9 -10 =1389, 10 -11 =1256, 1- 11 = -333
WEBS 2 -11= -340, 3 -11= -1986, 3 -10 =168, 4- 10 =56, 4- 8 = -15, 5 -8= -697, 6 -8 =1623
NOTES
1) This truss has been designed for the wind loads generated by 110.0 m.p.h. winds at 32.4 feet above
ground level, using 2.0 p.s.f. top chord dead load and 8.0 p.s.f bottom chord dead Toad, 1.0 miles from
hurricane oceanline, on a category I enclosed building, of dimensions 80.5 by 66.5 with exposure C
(ASCE 7 -93). Lumber Increase = 1.33, Plate Increase = 1.33. No end verticals are exposed.
2) Provide adequate drainage to prevent water ponding.
3) This truss has been designed with ANSI/TPI 1 -1995 criteria. r
LOAD CASE(S) Standard %
JAN 2 2 1997
- MAHMOUD ZOLFAGHARI, P.E.
'Job
8340
Truss
B3
Truss Type
ROOF TRUSS
Qty
1
Ply
1
BLUM RESIDENCE ( BLUM BLDR.) DWH
DECO TRUSS COMPANY INC. 3.3T s Dec 11 1996 MiTek Industries, Inc. Tue Jan 21 11:25:27 1997 Page 1
I 2 -10-0 7 -10-12 13-0-0 19 26-8-0
I I I I
2 -10-0 5-0-12 5-1 -4 6-10-0 6-10-0
4x8= 2x4 I I 3x4=
4 5 6
5.00 12
0
i
9
4x6
3
M
VA
�,
2x4 11
2
7.
Ifl
B
1 17 10 9 8
3x4 = 5x6 = 3x4 = 3x8 = 2x4 11
3x4=
1 2-6-0 2 - 13-0-0 19-1130 26-8-0
I 1 I
2-6-0 0-4-0 10-2 -0 6-10-0 6-10-0
Plate Offsets (X,Y) [1:0- 0- 4,0 -1- 11],[4:0- 2- 4,0 -1- 12],[11:0- 0- 0,0 -3 -8]
LOADING (psf)
SPACING 2 - -
CSI
DEFL (in) (loc) 1/deb
PLATES GRIP
TCLL 30.0
Plates Increase 1.33
TC 0.77
Vert(LL) 0.16 9/8 999
M20(20ga) 249/190
TCDL 15.0
Lumber Increase 1.33
BC 0.70
Vert(TL) 0.29 11/10 965
BCLL 0.0
Rep Stress Incr YES
WB 0.66
Horz(TL) 0.03 7 n/a
BCDL 10.0
Code SFBC
Min Length / LL deft = 360
Weight: 158 (Ibs)
LUMBER BRACING
TOP CHORD 2 X 4 SYP No.2D TOP CHORD Sheathed or 3 -3 -3 on center purlin spacing,
BOT CHORD 2 X 4 SYP No.2D *Except* except end verticals.
1 -9 2 X 4 SYP SS BOT CHORD Rigid ceiling directly applied, or 10 -00 -00 on center
WEBS 2 X 4 SYP No.3 bracing. Except: 1- 11:6 -3 -0, 10- 11:5 -7 -11, 9- 10:6 -2 -0,
8- 9:5 -8 -3.
WEBS 1 Row at midpt 11 -3, 4 -8, 8 -6
REACTIONS (Ibs /size) 11= 1642/0 -8 -0, 7= 1283/0 -2 -8
Max Horz 11= 432(load case 3)
Max Uplift 11=- 1058(load case 3), 7=- 696(load case 3)
FORCES
TOP CHORD 1 -2 =369, 2 -3 =361, 3 -4= -1403, 4 -5= -1085, 5 -6= -1085, 6 -7= -1216
BOT CHORD 7 -8 =0, 8 -9 =1295, 9 -10 =1295, 10 -11 =1310, 1- 11 = -333
WEBS 2 -11= -384, 3 -11= -1992, 3- 10 = -18, 4 -10 =180, 4 -8= -272, 5 -8= -607, 6 -8 =1420
NOTES
1) This truss has been designed for the wind loads generated by 110.0 m.p.h. winds at 32.4 feet above
ground level, using 2.0 p.s.f. top chord dead Toad and 8.0 p.s.f bottom chord dead load, 1.0 miles from
hurricane oceanline, on a category I enclosed building, of dimensions 80.5 by 66.5 with exposure C
(ASCE 7 -93). Lumber Increase = 1.33, Plate Increase = 1.33. No end verticals are exposed.
2) Provide adequate drainage to prevent water ponding.
3) This truss has been designed with ANSI/TPI 1 -1995 criteria. r
LOAD CASE(S) Standard ZosiOPAA'.
JAN 2 2 1997
flflAHMOUD ZOLFAGHARI, P.E.
Job
8340
Truss
B4
Truss Type
ROOF TRUSS
Qty
1
Ply
1
BLUM RESIDENCE ( BLUM BLDR.) DWH
DECO TRUSS COMPANY INC. 3.3T s Dec 11 1996 MiTek Industries, Inc. Tue Jan 21 11:25:38 1997 Page 1
I 2 -10-0 I 8-11-2 I 15-0-0 20-10-0 26-8-0
I I
2 -10-0 6-1 -2 6-0-14 5-10-0 5-10-0
4x8 = 2x411 3x4 =
4 5 6
50012 6x66
3
M
cb
3x4
2
/
■
El 1
1 12 11 10 9 8 7
3x4 = 3x6 11 3x6 = 3x4 = 3x8 = 2x4 I I
3x4 =
1 2-6-0 2- 1 11-0 8-11-2 I 15-0-0 20-10-0 26-8-0
I I
2-6-0 0-4-0 6-1 -2 6-0-14 5-10-0 5-10-0
Plate Offsets (X,Y) [1:0- 0- 4,0 -1- 11],[ 4: 0- 2- 4,0- 1- 12],[12:0- 2- 8,0 -2 -12]
LOADING (psf)
SPACING 2 - -
CSI
DEFL (in) (loc) I /deft
PLATES GRIP
TCLL 30.0
Plates Increase 1.33
TC 0.54
Vert(LL) 0.06 11/10 999
M20(20ga) 249/190
TCDL 15.0
Lumber Increase 1.33
BC 0.47
Vert(TL) 0.12 11/10 999
BCLL 0.0
Rep Stress Incr YES
WB 0.69
Horz(TL) 0.02 7 n/a
BCDL 10.0
Code SFBC
Min Length / LL deft = 360
Weight: 167 (Ibs)
LUMBER BRACING
TOP CHORD 2 X 4 SYP No.2D TOP CHORD Sheathed or 3 -8 -5 on center purlin spacing,
BOT CHORD 2 X 4 SYP No.2D except end verticals.
WEBS 2 X 4 SYP No.3 BOT CHORD Rigid ceiling directly applied, or 10 -00 -00 on center
bracing. Except: 1- 12:6 -3 -0, 11- 12:6 -3 -0,
• 10- 11:5 -9 -15, 9- 10:6 -3 -0, 8- 9:6 -3 -0.
WEBS 1 Row at midpt 4 -8, 8 -6
REACTIONS (Ibs /size) 12= 1642/0 -8 -0, 7= 1283/0 -2 -8
Max Horz 12= 495(load case 3)
Max Uplift 12=- 1042(Ioad case 3), 7=- 713(load case 3)
FORCES
TOP CHORD 1 -2 =369, 2 -3= -1523, 3 -4= -1254, 4 -5= -853, 5 -6= -853, 6 -7= -1226
BOT CHORD 7 -8 =0, 8 -9 =1157, 9 -10 =1157, 10 -11 =1412, 11- 12 = -333, 1- 12 = -333
WEBS 2 -12= -1552, 2 -11 =1784, 3 -11= -276, 3 -10= -306, 4 -10 =288, 4 -8= -455, 5 -8= -518, 6 -8 =1292
NOTES
1) This truss has been designed for the wind loads generated by 110.0 m.p.h. winds at 32.4 feet above
ground level, using 2.0 p.s.f. top chord dead load and 8.0 p.s.f bottom chord dead load, 1.0 miles from
hurricane oceanline, on a category I enclosed building, of dimensions 80.5 by 66.5 with exposure C
(ASCE 7 -93). Lumber Increase = 1.33, Plate Increase = 1.33. No end verticals are exposed.
2) Provide adequate drainage to prevent water ponding.
3) This truss has been designed with ANSI/TPI 1 -1995 criteria. r
LOAD CASE(S) Standard zow*gfLi.
JAN 2 2 1997
MAHMOUD ZOLFAGHARI, P.E.
Job
8340
Truss
B5
Truss Type
ROOF TRUSS
Qty
b
Ply
1
BLUM RESIDENCE ( BLUM BLDR.) DWH
DECO TRUSS COMPANY INC. 3.3T s Dec 11 1996 MiTek Industries, Inc. Tue Jan 21 12:08:42 1997 Page 1
6-2 -4 i 12 -1.0 18 -5-12 23 -10-0 26-8-0
I I I I ,
6-2 -4 5-10-12 6-4-12 5-4-4 2 -10-0
4x6 =
5.00P
4
3x4
s
3
3x4
5
<b
3x4 5
3x4
�J,
2
6
M
12 11 10 9 :=-.11
1 7
2x4 I1 3x4 = 3x4 = 3x4 = 3x6 1 1 3x4 =
3x8 =
6-2 -4 I 12 -1 -0
18 -5-12 23-10-0 1-2 26-8-0
6-2-4 5 -10-12
I I 1
6-4-12 5-4-4 0-4 -0 2-6-0
Plate Offsets (X,Y): [7:0 -0- 4,0-1- 11],[8:0- 2- 8,0 -0 -8]
LOADING (psf)
SPACING 2 -0 -0
CSI
DEFL (in) (loc) I /deft
PLATES GRIP
TCLL 30.0
Plates Increase 1.33
TC 0.60
Vert(LL) 0.07 12/11 999
M20(20ga) 249/190
TCDL 15.0
Lumber Increase 1.33
BC 0.39
Vert(TL) 0.14 11/10 999
BCLL 0.0
Rep Stress Incr YES
WB 0.61
Horz(TL) 0.02 8 n/a
BCDL 10.0
Code SFBC
Min Length / LL dell = 360
Weight: 147 (Ibs)
LUMBER BRACING
TOP CHORD 2 X 4 SYP No.2D TOP CHORD Sheathed or 3 -7 -6 on center purlin spacing,
BOT CHORD 2 X 4 SYP No.2D except end verticals.
WEBS 2 X 4 SYP No.3 BOT CHORD Rigid ceiling directly applied, or 9- 10:6 -3 -0, 8- 9:6 -3-0, 7- 8:6 -3 -0,
1- 12:6 -3 -0, 11- 12:6 -3 -0, 10- 11:6 -3 -0 on center bracing.
REACTIONS (Ibs/size) 1= 1283/0 -2 -8, 8= 1642/0 -8 -0
Max Horz 1 =- 164(Ioad case 2)
Max Uplift 1=- 648(Ioad case 4), 8=- 1106(load case 4)
FORCES
TOP CHORD 1 -2= -1223, 2 -3= -1624, 3 -4= -1289, 4 -5= -1289, 5 -6= -1507, 6 -7 =369
BOT CHORD 7 -8= -333, 8 -9= -333, 9- 10=1391, 10 -11 =1391, 11 -12 =1499, 1 -12 = -0
WEBS 2 -12 =1534, 3 -12 =- 207, 3-11= -369, 4 -11 =438, 5 -11= -231, 5 -9= -331, 6 -9 =1781, 6 -8= -1559
NOTES
1) This truss has been designed for the wind Toads generated by 110.0 m.p.h. winds at 32.4 feet above ground level, using 2.0 p.s.f. top chord dead Toad and 8.0 p.s.f
bottom chord dead load, 1.0 miles from hurricane oceanline, on a category I enclosed building, of dimensions 80.5 by 66.5 with exposure C (ASCE 7 -93). Lumber
Increase = 1.33, Plate Increase = 1.33. No end verticals are exposed.
2) This truss has been designed with ANSI /TPI 1 -1995 criteria.
LOAD CASE(S) Standard
• 1
. ," , .�,
JAN 2 2 1997
MAHMOUD ZOLFAGHARI, P.E.
Job
8340
Truss
B6
Truss Type
ROOF TRUSS
Qty
I
Ply
1
BLUM RESIDENCE ( BLUM BLDR.) DWH
DECO TRUSS COMPANY INC. 3.3T s Dec 11 1996 MiTek Industries, Inc. Tue Jan 21 11:25:58 1997 Page 1
-2 -8-3 5-8-4 12 -1 -0 18-5-12 24 -2 -0
2 -8-3 5-8-4 6-4 -12 6-4 -12 5-8-4
4x6 =
4
5.00p
.
3x4
3x4
3
5
cb
3x4
3x4
2
6
• _ • 10 9 8
1
7
3x10 11 3x4 = 5x10 = 3x4 = 2x4 11
2 -6 -0
t10 -p
{
5-8-4 1 12-1-0 18 -5-12 24 -2 -0
+ 1
0-10-0 5-8-4 6-4 -12 6-4-12 5-8-4
Plate Offsets (X,Y): [1:0- 3- 8,0- 3- 41,[9:0- 0- 0,0 -3 -01
LOADING (psf)
SPACING 2 -0 -0
CSI
DEFL (in) (loc) I /def
PLATES GRIP
TCLL 30.0
Plates Increase 1.33
TC 0.69
Vert(LL) 0.07 10/9 999
M20(20ga) 249/190
TCDL 15.0
Lumber Increase 1.33
BC 0.43
Vert(TL) 0.13 10/9 999
BCLL 0.0
Rep Stress Incl NO
WB 0.49
Horz(TL) 0.03 7 n/a
BCDL 10.0
Code SFBC
Min Length / LL deft = 360
Weight: 149 (Ibs)
LUMBER BRACING
TOP CHORD 2 X 4 SYP No.2D TOP CHORD Sheathed or 3 -5 -2 on center purlin spacing,
BOT CHORD 2 X 4 SYP No.2D except end verticals.
WEBS 2 X 4 SYP No.3 BOT CHORD Rigid ceiling directly applied, or 10 -00 -00 on center
OTHERS 2 X 4 SYP No.3 bracing. Except: 8- 9:6 -3 -0, 1- 10:6 -3 -0, 9- 10:6 -2 -2.
REACTIONS (Ibs /size) 1= 1675/0 -8 -0, 7= 1313/0 -2 -8
Max Harz 1= 149(load case 3)
Max Uplift 1=- 1107(load case 4), 7=- 680(load case 4)
FORCES
TOP CHORD 1 -2= -1619, 2 -3= -1670, 3 -4= -1350, 4 -5= -1350, 5 -6= -1670, 6 -7= -1258
BOT CHORD 7 -8 =0, 8 -9 =1542, 9 -10 =1542, 1 -10 =0
WEBS 2 -10 =1585, 3 -10= -246, 3 -9= -340, 4 -9 =463, 5 -9= -340, 5 -8= -246, 6 -8 =1585
NOTES
1) This truss has been designed for the wind loads generated by 110.0 m.p.h. winds at 32.4 feet above
ground level, using 2.0 p.s.f. top chord dead load and 8.0 p.s.f bottom chord dead load, 1.0 miles from
hurricane oceanline, on a category I enclosed building, of dimensions 80.5 by 66.5 with exposure C
(ASCE 7 -93). Lumber Increase = 1.33, Plate Increase = 1.33. No end verticals are exposed.
2) Studs to be fastened with 2x3 M20 plates.
3) This truss has been designed with ANSI/TPI 1 -1995 criteria.
LOAD CASE(S)
1) Lumber Ib .33, Plate Increase =1.33
Uniform Loads (Ibs per ft)
U Loads (ls d%3 ? " frn
D��
Vert:2 -3= -90.0, 3 -4= -90.0, 4 -5= -90.0, 5 -6= -90.0, 7 -8= -20.0, 8 -9= -20.0, 9 -10= -20.0, 1 -10= -20.0
Concentrated Loads (Ibs)
Vert:2= -361.4 JAN 2 2 1991
MAHMOUD ZOLFAGHARI, P.E.
•
Job
8340
Truss
B7
Truss Type
ROOF TRUSS
Qty
1
Ply
1
BLUM RESIDENCE ( BLUM BLDR.) DWH ,
DECO TRUSS COMPANY INC. 3.3T s Dec 11 1996 MiTek Industries, Inc. Tue Jan 21 11:26:09 1997 Page 1
2 -10.0 F 7 -10-12 13-0-0 16-2 -0 21 -3-4 26-4-0 29-2 -0
1
2 -10-0 5-0-12 5-1 -4 3-2-0 5-1 -4 5-0-12 2-10-0
4x8 = 4x6 =
4
5
5.0012
4x6 s
4x6
3
6
r?
0
•
,h
2x4 n
2x4 0
2
7
1 t 11 10 ''—' 8
3x4 = 5x6 — 3x4 = 5x10 = S1B = 3x4 =
1 2 - 6 - 0 219-0 13-0-0 1 16 26-4 -0 291-0 29-2-0
1
2 -6-0 0-4-0 10-2 -0 3-2 -0 10-2 -0 0-4-0 2 -6-0
Plate Offsets (X,Y) [1:0- 0- 4,0 -1- 11],[4:0- 2- 4,0 -1- 12],[8:0 -0- 12,0 -1- 11],[9:0- 0- 0,0 -3- 8],[10:0- 0- 0,0 -3- 0],[12:0- 0- 0,0 -3 -8]
LOADING (psf)
SPACING 2 -0 -0
CSI
DEFL (in) (Ioc) 1 /deft
PLATES GRIP
TCLL 30.0
Plates Increase 1.33
TC 0.43
Vert(LL) 0.16 11/10 999
M20(20ga) 249/190
TCDL 15.0
Lumber Increase 1.33
BC 0.70
Vert(TL) 0.29 12/11 961
BCLL 0.0
Rep Stress Incr YES
WB 0.64
Horz(TL) 0.04 9 n/a
BCDL 10.0
Code SFBC
Min Length / LL dell = 360
Weight: 165 (Ibs)
LUMBER BRACING
TOP CHORD 2 X 4 SYP No.2D TOP CHORD Sheathed or 4 -3 -10 on center purlin spacing.
BOT CHORD 2 X 4 SYP SS BOT CHORD Rigid ceiling directly applied, or 1- 12:6 -3 -0, 11- 12:6 -3 -0,
WEBS 2 X 4 SYP No.3 10- 11:6 -3 -0, 9- 10:6 -3 -0, 8- 9:6 -3 -0 on center bracing.
WEBS 1 Row at midpt 12 -3, 6 -9
REACTIONS (Ibs /size) 12= 1612/0 -8 -0, 9= 1612/0 -8 -0
Max Horz 12= 71(Ioad case 3)
Max Uplift 12=- 1078(Ioad case 4), 9=- 1078(Ioad case 4)
FORCES
TOP CHORD 1 -2 =369, 2 -3 =361, 3 -4= -1345, 4 -5= -1241, 5 -6= -1345, 6 -7 =361, 7 -8 =369
BOT CHORD 8- 9 = -333, 9 -10 =1266, 10 -11 =1241, 11 -12 =1266, 1- 12 = -333
WEBS 2 -12= -384, 3 -12= -1939, 3- 11 = -31, 4 -11 =151, 4 -10 =0, 5 -10 =151, 6- 10 = -31, 6 -9= -1939, 7 -9= -384
NOTES
1) This truss has been designed for the wind Toads generated by 110.0 m.p.h. winds at 32.4 feet above
ground level, using 2.0 p.s.f. top chord dead Toad and 8.0 p.s.f bottom chord dead Toad, 1.0 miles from
hurricane oceanline, on a category I enclosed building, of dimensions 80.5 by 66.5 with exposure C
(ASCE 7 -93). Lumber Increase = 1.33, Plate Increase = 1.33. No end verticals are exposed.
2) Provide adequate drainage to prevent water ponding.
3) This truss has been designed with ANSUTPI 1 -1995 criteria.
LOAD CASE(S) Standard r
r yic07;
JAN 2 2 1997
MAHMOIID ZOLFAGHARI, P.E.
Job
8340
Truss
B8
Truss Type
ROOF TRUSS
Qty
1
Ply
1
BLUM RESIDENCE ( BLUM BLDR.) DWH
DECO
TRUSS COMPANY INC. 3.3T s Dec 11 1996 MiTek Industries, Inc. Tue Jan 21 11:26:20 1997 Page
-
2 -10-0 F 6-10-4 11 -0-0 18-2-0 22 -3-12 26-4 -0 29-2-0
1
1— { 1
2 -10-0 4-0-4 4-1-12 7 -2 -0 4-1 -12 4 -0-4 2-10-0
4x8 = 4x6 =
5.00 12
4
5
4x6 s
4x6
3
6
u5
2x4 n
2
2x4 �i
7
.•..
pif
1 13 12 11 10 '_' g
3x4 = 5x6 _ 3x4 = 3x4 = 3x8 = 9 3x4 =
— 5x6 =
•
I 2 -6-0 2111.0 11-0-0 1 16-2 -0
26-4 -0 211-0 29-2-0
2-6-0 0-4-0 8-2-0 7 -2 -0
1 1
8-2-0 0-4 -0 2 -6-0
Plate Offsets (X,Y) [1:0- 0- 4,0- 1- 11],[4:0- 2- 4,0 -1- 12],[8:0- 0- 4,0 -1 -1 ],[9:0- 0- 0,0 -3- 8],[13:0- 0- 0,0 -3 -8]
LOADING (psf)
SPACING 2 -0 -0
CSI
DEFL (in) (loc) I /deft
PLATES GRIP
TCLL 30.0
Plates Increase 1.33
TC 0.66
Vert(LL) 0.08 11/10 999
M20(20ga) 249/190
TCDL 15.0
Lumber Increase 1.33
BC 0.79
Vert(TL) 0.15 13/12 999
BCLL 0.0
Rep Stress Incr YES
WB 0.48
Horz(TL) 0.04 9 n/a
BCDL 10.0
Code SFBC
Min Length / LL deft = 360
Weight: 155 (Ibs) .
LUMBER BRACING
TOP CHORD 2 X 4 SYP No.2D *Except* TOP CHORD Sheathed or 3 -5 -6 on center purlin spacing.
4 -5 2 X 4 SYP SS BOT CHORD Rigid ceiling directly applied, or 1- 13:6 -3 -0, 12- 13:6 -3
-0,
BOT CHORD 2 X 4 SYP No.2D 11- 12:6 -3 -0, 10- 11:6 -3 -0, 9- 10:6 -3 -0, 8- 9:6 -3 -0 on
WEBS 2 X 4 SYP No.3 center bracing.
WEBS 1 Row at midpt 13 -3, 4 -10, 6 -9
REACTIONS (Ibs /size) 13= 1612/0 -8 -0, 9= 1612/0 -8 -0
Max Horz 13=- 61(load case 2)
Max Uplift 13=- 1078(Ioad case 4), 9=- 1078(load case 4)
FORCES
TOP CHORD 1 -2 =369, 2 -3= 361, 3 -4= -1450, 4 -5= -1338, 5 -6= -1450, 6 -7 =361, 7 -8 =369
BOT CHORD 8 -9= -333, 9 -10 =1210, 10 -11 =1338, 11 -12 =1338, 12 -13 =1210, 1- 13 = -333
WEBS 2 -13= -337, 3 -13= -1933, 3 -12 =161, 4- 12 =55, 4 -10 =0, 5- 10 =55, 6 -10 =161, 6 -9= -1933, 7 -9= -337
NOTES
1) This truss has been designed for the wind Toads generated by 110.0 m.p.h. winds at 32.4 feet above
ground level, using 2.0 p.s.f. top chord dead load and 8.0 p.s.f bottom chord dead load, 1.0 miles from
hurricane oceanline, on a category I enclosed building, of dimensions 80.5 by 66.5 with exposure C
(ASCE 7 -93). Lumber Increase = 1.33, Plate Increase = 1.33. No end verticals are exposed.
2) Provide adequate drainage to prevent water ponding.
3) This truss has been designed with ANSI/TPI 1 -1995 criteria.
r
LOAD CASE(S) Standard
6 :0 441 4. 2 ...10/40/1
.IAN 2 2 1997
MAHMOl1D ZOLFAGHARI, P.E.
Job
8340
Truss
B9
Truss Type
ROOF TRUSS
Qty
1
Ply
1
BLUM RESIDENCE ( BLUM BLDR.) DWH
DECO TRUSS COMPANY INC. 3.3T s Dec 11 1996 MiTek Industries, Inc. Tue Jan 21 11:26:28 1997 Page 1
� 2 -10-0 1 9-0-0 { 14 -7-0 20-2-0 26-4 -0 29-2 -0
1- 1 1
2 -10-0 6-2 -0 54 5-7 -0 6-2 -0 2-10-0
4x9 = 2x4 11 4x8 =
5.0012 3
4 5
3x4:
3x4
2
6
Pillib■.
1 13 12 11 10 9 8 7
3x4 = 3x6 ii 4x6 = 3x4 = 3x8 = 4x6 = 3x6 ii 3x4 =
1 2 - 2 - 9-0-0
1 14 -7-0 20-2 -0 26-4-0 291 -0 29-2-0
2 -6-0 0-4-0 6-2-0
1 1 i
5-7-0 5-7-0 6-2-0 0-4-0 2 -6-0
Plate Offsets (X,Y) [1:0- 0- 4,0 -1- 11],[3:0- 2- 4,0 -1- 12],[5:0- 2- 4,0 -1- 12],[7:0 -0- 13, 0- 1- 12],[ 8:0- 2- 8,0- 3- 0],[13:0- 2- 8,0 -3 -0]
LOADING (psf)
SPACING 2 -0 -0
CSI
DEFL (in) (loc) I /defl
PLATES GRIP
TCLL 30.0
Plates Increase 1.33
TC 0.57
Vert(LL) 0.07 10/9 999
M20(20ga) 249/190
TCDL 15.0
Lumber Increase 1.33
BC 0.48
Vert(TL) 0.13 10/9 999
BCLL 0.0
Rep Stress Incr YES
WB 0.75
Horz(TL) 0.01 8 n/a
BCDL 10.0
Code SFBC
Min Length / LL deft = 360
Weight: 154 (Ibs)
LUMBER BRACING
TOP CHORD 2 X 4 SYP No.2D TOP CHORD Sheathed or 3 -1 -13 on center purlin spacing.
BOT CHORD 2 X 4 SYP No.2D BOT CHORD Rigid ceiling directly applied, or 1- 13:6 -3 -0, 12- 13:6 -3 -0,
WEBS 2 X 4 SYP No.3 11- 12:6 -3 -0, 10- 11:6 -3 -0, 9- 10:6 -3 -0, 8- 9:6 -3 -0,
7- 8:6 -3 -0 on center bracing.
REACTIONS (Ibs /size) 13= 1612/0 -8 -0, 8= 1612/0 -8 -0
Max Horz 13=- 50(Ioad case 2)
Max Uplift 13=- 1078(Ioad case 4), 8=- 1079(load case 4)
FORCES
TOP CHORD 1 -2 =369, 2 -3= -1479, 3 -4= -1794, 4 -5= -1794, 5 -6= -1479, 6 -7 =369
BOT CHORD 7- 8 = -333, 8- 9 = -333, 9 -10 =1365, 10 -11 =1365, 11 -12 =1365, 12 -13= -333, 1- 13 = -333
WEBS 2 -13= -1521, 2 -12 =1741, 3 -12= -266, 3 -10 =527, 4 -10= -499, 5 -10 =527, 5 -9= -266, 6 -9 =1740, 6 -8= -1521
•
NOTES
1) This truss has been designed for the wind Toads generated by 110.0 m.p.h. winds at 32.4 feet above
ground level, using 2.0 p.s.f. top chord dead Toad and 8.0 p.s.f bottom chord dead load, 1.0 miles from
hurricane oceanline, on a category I enclosed building, of dimensions 80.5 by 66.5 with exposure C
(ASCE 7 -93). Lumber Increase = 1.33, Plate Increase = 1.33. No end verticals are exposed.
2) Provide adequate drainage to prevent water ponding.
3) This truss has been designed with ANSI/TPI 1 -1995 criteria.
LOAD CASE(S) Standard i
JAN 22 1997
MVIAIIM011D ZOLFAGHARI, P.E.
Job
8340
Truss
BG10
Truss Type
ROOF TRUSS
6-
PIy
1
BLUM RESIDENCE (BLUM BLDR.) DWH
DECO TRUSS COMPANY INC. 3.3T s Dec 11 1996 MiTek Industries, Inc. Tue Jan 21 17:57:34 1997 Page 1
1 2 -10-0 I 7-0-0 I 12-5-4 17-3-4 22 -2 -0 23-11-8 26-4-0 29 -0-2
I I t I 1 1
2 -10-0 4-2-0 5-5-4 4-10-0 4-10-12 1 -9-8 2 -4 -8 2 -8-2
5.0012 4x8 = 2x411 3x4 = 4x8 =
3 4 5 6 5.16112
4x =
4x8
2x4 ii
2
•, 8
IA
1 15 14 13 12 11 " 3x8
3x4 = 3x10 = 7x10 = 4x6 = 3x6 = 3x4 = 10 9
3x8 i i 7x8 = 3x4 =
2-6-0 2 - 7-0-0 12 -5-4
1
17-3-4 1 22 -2 -0 1 26-4-0 { 29-0-0 29-p-2
I 1
2 -6-0 0-4-0 4-2 -0 5-5-4
4-10-0 4-10-12 4-2 -0 2-8-0 0-0-2
Plate Offsets (X,Y): (3.0- 2 -0,0 -1 -121, (6:0- 1 -8,0 -1 -121, [10:0- 0- 0,0 -5 -4), (14:0 -1- 12,0 -5 -4j, 116:0 -2- 12,0 -0 -12j
LOADING (psf)
SPACING 2-0-0
CSI
DEFL (in) (loc) I/defl
PLATES GRIP
TCLL 30.0
Plates Increase 1.33
TC 0.92
Vert(LL) 0.18 4 999
M20(20ga) 249/190
TCDL 15.0
Lumber Increase 1.33
BC 0.55
Vert(TL) 0.34 4 835
BCLL 0.0
Rep Stress Incr NO
WB 0.81
Horz(TL) 0.04 10 n/a
BCDL 10.0
Code SFBC
Min Length / LL dell = 360
Weight: 179 (Ibs)
LUMBER BRACING
TOP CHORD 2 X 4 SYP No.2D 'Except* TOP CHORD Sheathed or 1 -10 -7 on center purlin spacing.
3-6 2 X 4 SYP SS BOT CHORD Rigid ceiling directly applied, or 1- 16:6 -3 -0, 15- 16:6 -3 -0, 14- 15:5 -6 -0,
BOT CHORD 2 X 6 SYP No.2D 13- 14:4 -9 -2, 12- 13:4 -9 -2, 11- 12:6 -3 -0, 10- 11:6 -3 -0, 9- 10:5 -11 -4 on center
WEBS 2 X 4 SYP No.3 *Except' bracing.
15 -2 2 X 4 SYP No.2D, 14 -4 2 X 6 SYP No.2D - WEBS 1 Row at midpt 3 -14, 12 -6, 7 -10
OTHERS 2 X 4 SYP No.3
WEDGE Right: 2 X 4
REACTIONS (Ibs/size) 16= 3125/0 -8 -0, 9=- 678/0 -8 -3, 10= 3098/0 -8-0
Max Horz 16= 45(load case 3)
Max Uplift 16=- 2108(load case 4), 9=- 678(load case 1), 10=- 1789(load case 4)
Max Vert 16= 3125(load case 1), 9= 442(load case 3), 10= 3098(load case 1)
FORCES
TOP CHORE) 1 -2 =389, 2 -3= -3648, 3 -4= -5643, 4 -5= -5643, 5 -6= -4241, 6 -7= -2133, 7 -8 =1702, 8 -9 =1763
BOT CHORD 9- 10= -1564, 10 -11 =1222, 11-12 12 -13 =4241, 13 -14 =4241, 14 -15 =3366, 15 -16= -354, 1- 16 = -354
WEBS 2 -16= -3054, 2 -15 =3900, 3 -15= -462, 3 -14 =2611, 4 -14= -609, 5 -14 =1659, 5 -12= -1320, 6 -12 =2679, 6 -11= -896, 7 -11 =1237, 7 -10= -3860, 8 -10= -360
NOTES
1) This truss has been checked for unbalanced loading conditions about joints 5 and 4.
2) This truss has been designed for the wind loads generated by 110.0 m.p.h. winds at 32.4 feet above ground level, using 2.0 p.s.f. top chord dead load and 8.0 p.s.• bottom chord dead
load, 1.0 miles from hurricane oceanline, on a category I enclosed building, of dimensions 80.5 by 66.5 with exposure C (ASCE 7 -93). Lumber Increase = 1.33, Plate Increase =
1.33. No end verticals are exposed.
3) Except as shown below, special connection(s) required to support concentrated load(s). Design of connection(s) is delegated to the building designer.
4) Provide adequate drainage to prevent water ponding.
5) This truss has been designed with ANSI/TPI 1 -1995 criteria.
6) For truss to truss connections refer to attached Hanger
Sheets.
LOAD CASE(S) .
1) Lumber Increase =1.33, Plate Increase =1.33
Uniform Loads (Ibs per ft)
Vert:1 -2= -90.0, 2 -3= -90.0, 3 -4 =- 146.3, 4 -5= -90.0, 5 -6= -90.0, 6 -7= -90.0, 7 -8= -90.0, 8 -9= -90.0, 9 -10= -20.0, 10 -11= -20.0, •
11 -12= -20.0, 12- 13= -20.0, 13- 14= -20.0, 14- 15= -32.5, 15 -16= -20.0, 1- 16 = -20.0
Concentrated Loads (Ibs)
Vert:14=- 1419.0,15=- 576.9f
JAN 2 2 1997
MAHMOIJD ZOLFAGHARI, P.E.
Job
8340
Truss
BG11
LOADING (psf)
TCLL 30.0
TCDL 15.0
BCLL 0.0
BCDL 10.0
Truss Type
ROOF TRUSS
DECO TRUSS COMPANY INC.
N
1
(4
1
3x4 =
1
2 -4-2
2 -4-2
2 -0-2
2-0-2
5.32 1
3x4
10
3x101
0-4-0
8-6-1
6-1-15
9-1-2
6-9-0
3.3T s Dec 11 1996 MiTek Industries, Inc. Tue Jan 21 12:48:07 1997 Page 1
1 9 -t -2
11 -7 -6
0-7 -1 2 -6-4
4x6 =
3
{
3x8
4x10 = 7x8 =
10-9 -6 1 11-7-6 1
1 -8-4 0-10-0
16-2 -2
4-6-12
5.00 12
{
16-2-2
4-6-12
3x6
6
3x10 11
1
( 4
Plate Offsets (X,Y): (7:0-0- 0,0 -5 -0)
SPACING
Plates Increase
Lumber Increase
Rep Stress Incr
Code
2 -0 -0
1.33
1.33
NO
SFBC
CSI
TC 0.82
BC 0.41
WB 0.72
(Matrix)
Qty
1
Ply
1
BLUM RESIDENCE (BLUM BLDR.) DWH
DEFL (in) (loc) I /def
Vert(LL) 0.04 8/7 999
Vert(TL) 0.07 9/8 999
Horz(TL) 0.01 6 n/a
Min Length / LL deft = 360
PLATES GRIP
M20(20ga) 249/190
Weight: 109 (Ibs)
LUMBER
TOP CHORD 2 X 4 SYP No.2D
BOT CHORD 2 X 6 SYP No.2D
WEBS 2 X 4 SYP No.3 *Except*
3-9 2 X 6 SYP No.2D, 4-7 2 X 6 SYP No.2D
REACTIONS (Ibs/size) 10=1631/0 -8 -0, 6= 1662/0 -2 -8
Max Holz 10 =131(load case 3)
Max Uplift 10=- 1152(load case 4), 6 =- 985(load case 4)
FORCES
TOP CHORD 1 -2= -170, 2 -3= -1711, 3 -4= -1690, 4 -5= -2225, 5 -6= -1605
BOT CHORD 6 -7 =0, 7 -8 =2064, 8 -9 =2064, 9 -10 =219, 1 -10 =219
WEBS 2 -10= -1446, 2 -9 =1342, 3 -9 =1021, 4 -9= -817, 4 -7 =451, 5 -7 =2143
NOTES
1) This truss has been designed for the wind Toads generated by 110.0 m.p.h. winds at 32.4 feet above ground level, using 2.0 p.s.f. top chord dead load and 8.0 p.s.f
bottom chord dead load, 1.0 miles from hurricane oceanline, on a category I enclosed building, of dimensions 80.5 by 66.5 with exposure C (ASCE 7 -93). Lumber
Increase = 1.33, Plate Increase = 1.33. No end verticals are exposed.
2) Except as shown below, special connection(s) required to support concentrated load(s). Design of connection(s) is delegated to the building designer.
3) This truss has been designed with ANSI /TPI 1 -1995 criteria.
4) For truss to truss connections refer to attached Hanger
Sheets.
LOAD CASE(S)
1) Lumber Increase =1.33, Plate Increase =1.33
Uniform Loads (Ibs per ft)
Vert:1- 2= -90.0, 2 -3= -90.0, 3 -4= -90.0, 4 -5= -90.0, 6 -7= -20.0, 7 -8= -20.0, 8 -9= -20.0, 9 -10= -20.0, 1 -10= -20.0
Concentrated Loads (Ibs)
Vert:7 =- 805.0, 8 =- 280.0, 9= -437.0
BRACING
TOP CHORD Sheathed or 2 -8 -14 on center purlin spacing,
except end verticals.
BOT CHORD Rigid ceiling directly applied, or 10 -00-00 on center bracing.
Except: 9- 10:6 -3 -0, 8- 9:5 -10 -8, 7- 8:5 -10 -8.
JAN 2 2 1997
MAHMOIID ZOLFAGHARI, P.E.
Job
8340
Truss
BG12
Truss Type
ROOF TRUSS
Qty
1
Ply
1
BLUM
RESIDENCE ( BLUM BLDR.) DWH
DECO TRUSS COMPANY INC.
3.3T s Dec 11 1996
3-1 -12 4 -6-0
MiTek Industries, Inc. Tue Jan 21 12:53:59 1997 Page 1
{
3-1 -12 1 -4-4
5.00p 2x4
1 1
4
3x4%
co
i
3x4
2
3
I
•
M
0.4 111111
I
IMP
IT
I W I
6 0
7x8 = 5
►�
2x4 11 7x8
=
3-1 -12 4-6-0
I
3-1 -12 1 -4 -4
1
Plate Offsets (X,Y): 3:0- 0- 12,0- 1 -0],(5:0- 3- 8,0 -5- 0],(6:0- 0- 0,0 -5 -4]
LOADING (psf)
SPACING 1 -0 -0
CSI
DEFL (in) (loc)
I/defl
PLATES GRIP
TCLL 30.0
Plates Increase 1.33
TC 0.13
Vert(LL) 0.01 6
999
M20(20ga) 249/190
TCDL 15.0
Lumber Increase 1.33
BC 0.09
Vert(TL) 0.01 6
999
BCLL 0.0
Rep Stress Incr NO
WB 0.32
Horz(TL) 0.00 5
n/a
BCDL 10.0
Code SFBC
Min Length / LL deft = 360
Weight: 39 (Ibs)
LUMBER BRACING
TOP CHORD 2 X 4 SYP No.2D TOP CHORD Sheathed
or 6 -0 -0 on center purlin spacing,
BOT CHORD 2 X 6 SYP No.2D except end
verticals.
WEBS 2 X 4 SYP No.3 *Except* BOT CHORD Rigid ceiling
directly applied, or 1- 6:6 -3 -0, 5- 6:6 -3 -0 on center
3 -6 2 X 6 SYP No.2D bracing.
REACTIONS (Ibs /size) 1= 806/0 -8 -0, 5= 1419/0 -1 -8
Max Horz 1= 67(load case 3)
Max Uplift 1=- 488(load case 4), 5=- 965(load case 4)
FORCES
TOP CHORD 1- 2 = -626, 2- 3 = -731, 3 -4 = -0, 4 -5 = -27
BOT CHORD 5-6 =675, 1 -6 =0
WEBS 2 -6 =729, 3 -6 =1572, 3 -5= -1541
NOTES
1) This truss has been designed for the wind loads generated by 110.0 m.p.h. winds at 32.4 feet above ground
level, using 2.0 p.s.f. top chord dead load and 8.0 p.s.f
bottom chord dead load, 1.0 miles from hurricane oceanline, on a category 1 enclosed building, of dimensions
80.5 by 66.5 with exposure C (ASCE 7 -93). Lumber
Increase = 1.33, Plate Increase = 1.33. No end verticals are exposed.
2) This truss has been designed with ANSI /TPI 1 -1995 criteria.
LOAD CASE(S)
1) Lumber Increase =1.33, Plate Increase =1.33
Uniform Loads (Ibs per ft)
Vert:2 -3= -45.0, 3- 4= -45.0, 5 -6= -10.0, 1 -6= -120.5
Concentrated Loads (Ibs)
Vert:6 =- 1662.0
r 1
r 4021
JAN 2 2 1997
MAHMOUD ZOLFAGHARI, P.E.
Job
8340
Truss
BG13
Truss Type
ROOF TRUSS
Qty
1
Ply
1
BLUM RESIDENCE ( BLUM BLDR.) DWH
DECO TRUSS COMPANY INC. 3.3T s Dec 11 1996 MiTek Industries, Inc. Tue Jan 21 12:12:36 1997 Page 1
I 2 -7 -14 I 6 -10-13 9-5-13
I
2 -7 -14 4 -2 -15 2 -7 -0
5.00p 4x6 = 2x4 11
3 4
1I i. I 1
1
5.18
MN
c?
4x6 =
2
1111
14 ?
N
1
1�
M
�
4
OL
.11110
wirolB
1
6
1
3x4 =
3x4 =
5
2x4 11 4x6 =
2 -5-11 2 -14 6-10-13 9-5-13
+ 1
2 -5-11 0-2 -3 4-2 -15 2 -7 -0
Plate Offsets (X,Y): (2:0- 1- 0,0-0- 0],13:0- 1- 0,0 -1 -12]
LOADING (psf)
SPACING 2 -0 -0
CSI
DEFL (in) (loc) 1 /deft
PLATES GRIP
TCLL 30.0
Plates Increase 1.33
TC 0.31
Vert(LL) 0.01 999
M20(20ga) 249/190
TCDL • 15.0
Lumber Increase 1.33
BC 0.16
Vert(LL) 0.02 1 999
BCLL 0.0
Rep Stress Incr NO
WB 0.25
Horz(TL) -0.00 5 n/a
BCDL 10.0
Code SFBC
Min Length / LL deft = 360
Weight: 63 (lbs)
LUMBER BRACING
TOP CHORD 2 X 4 SYP No.2D TOP CHORD Sheathed or 6 -0 -0 on center purlin spacing,
BOT CHORD 2 X 6 SYP No.2D except end verticals.
WEBS 2 X 4 SYP No.3 BOT CHORD Rigid ceiling directly applied, or 1- 7:6 -3 -0, 6- 7:6 -3 -0, 5- 6:6 -3 -0 on
center bracing.
REACTIONS (Ibs /size) 7= 966/0 -8 -0, 5= 805/0 -2 -8
Max Horz 7= 234(Ioad case 3)
Max Uplift 7=- 762(Ioad case 3), 5=- 497(load case 3)
FORCES
TOP CHORD 1 -2 =355, 2 -3= -507, 3 -4 = -0, 4- 5 = -177
BOT CHORD 5 -6 =468, 6- 7 = -321, 1- 7 = -321
WEBS 2- 7 = -896, 2 -6 =824, 3 -6 =415, 3 -5= -752
NOTES
1) This truss has been checked for unbalanced loading conditions about joint 4.
2) This truss has been designed for the wind loads generated by 110.0 m.p.h. winds at 32.4 feet above ground level, using 2.0 p.s.f. top chord dead Toad and 8.0 p.s.f
bottom chord dead Toad, 1.0 miles from hurricane oceanline, on a category I enclosed building, of dimensions 80.5 by 66.5 with exposure C (ASCE 7 -93). Lumber
Increase = 1.33, Plate Increase = 1.33. No end verticals are exposed.
3) Provide adequate drainage to prevent water ponding.
4) This truss has been designed with ANSI /TPI 1 -1995 criteria.
LOAD CASE(S)
1) Lumber Increase =1.33, Plate Increase =1.33
Uniform Loads (Ibs per ft)
Vert:1 -2= -90.0, 2 -3= -90.0, 3 -4 =- 146.3, 5 -6= -32.5, 6 -7= -20.0, 1 -7= -20.0
Concentrated Loads (lbs)
Vert:6= -568.8
r
V , , 0 , , l q i ? v ,,,fifo. d
JAN 2 2 1997
MAHMOUD ZOLFAGHARI, P.E.
•
Job
8340
Truss
B14
Truss Type
ROOF TRUSS
Qty
1
Ply
1
BLUM RESIDENCE ( BLUM BLDR.) DWH
DECO TRUSS COMPANY INC. 3.3T s Dec 11 1996 MiTek Industries, Inc. Tue Jan 21 11:25:06 1997 Page 1
4-10-10 7 -8-13 9.5-13
1
4-10-10 2-10-3 1 -9-0
4x6 = 2x4 11
3
4
5.1412 4x8
B
2
----/
N
PZ
N
-
o-
Aki o
1
6
x
3x4 =
7
3x4 = 5
2x4 % 3x4 =
� 2 -6.10 2 12 4 -10-10 9 -5-13
2-6-10 0-4-2 1-11-14 4-7-3
{
Plate Offsets (X,Y) [1:0- 0- 0,0 -1- 14],[2:0 -1- 12,0 -1 -12]
LOADING (psf)
SPACING 2 -0 -0
CSI
DEFL (in) (Ioc) I /deft
PLATES GRIP
TCLL 30.0
Plates Increase 1.33
TC 0.43
Vert(LL) 0.01 1 999
M20(20ga) 249/190
TCDL 15.0
Lumber Increase 1.33
BC 0.21
Vert(TL) 0.02 1 999
BCLL 0.0
Rep Stress Incr YES
WB 0.22
Horz(TL) 0.00 5 n/a
BCDL 10.0
Code SFBC
Min Length / LL defl = 360
Weight: 58 (Ibs)
LUMBER BRACING •
TOP CHORD 2 X 4 SYP No.2D TOP CHORD Sheathed or 6 -0 -0 on center purlin spacing,
BOT CHORD 2 X 4 SYP No.2D except end verticals.
WEBS 2 X 4 SYP No.3 BOT CHORD Rigid ceiling directly applied, or 1- 7:6 -3 -0, 6- 7:6 -3 -0,
5- 6:6 -3 -0 on center bracing.
REACTIONS (Ibs /size) 7= 755/0 -8 -4, 5= 280/0 -2 -8
Max Horz 7= 267(Ioad case 3)
Max Uplift 7=- 628(load case 3), 5=- 158(load case 3)
Max Vert 7= 755(load case 1), 5= 293(load case 5)
FORCES
TOP CHORD 1 -2 =601, 2- 3 = -73, 3 -4 = -0, 4 -5 = -72
BOT CHORD 5 -6 =75, 6 -7 =68, 1- 7 = -546
WEBS 2- 7 = -935, 2 -6 =73, 3- 6 = -12, 3- 5 = -179
NOTES
1) This truss has been checked for unbalanced loading conditions about joint 4.
2) This truss has been designed for the wind loads generated by 110.0 m.p.h. winds at 32.4 feet above
ground level, using 2.0 p.s.f. top chord dead load and 8.0 p.s.f bottom chord dead load, 1.0 miles from
hurricane oceanline, on a category I enclosed building, of dimensions 80.5 by 66.5 with exposure C
(ASCE 7 -93). Lumber Increase = 1.33, Plate Increase = 1.33. No end verticals are exposed.
3) Provide adequate drainage to prevent water ponding.
4) This truss has been designed with ANSI/TPI 1 -1995 criteria. t
LOAD CASE(S) Standard
rglowq,'"
JAN 22 1997
MAHMOUD ZOLFAGHARI, P.E.
Job
8340
DECO TRUSS COMPANY INC.
LOADING (psf)
TCLL 30.0
TCDL 15.0
BCLL 0.0
BCDL 10.0
Truss
BG15
Plate Offsets (X,Y): (3:0 -0- 12,0 -1-0]
Truss Type
LUMBER
TOP CHORD 2 X 4 SYP No.2D
BOT CHORD 2 X 6 SYP No.2D
WEBS 2 X 4 SYP No.3 "Except'
3 -6 2 X 6 SYP No.2D
ROOF TRUSS
SPACING
Plates Increase
Lumber Increase
Rep Stress Incr
Code
2 -0 -0
1.33
1.33
NO
SFBC
REACTIONS (Ibs/size) 7= 925/0 -8 -11, 5= 437/0 -2 -8
Max Horz 7= 313(Ioad case 3)
Max Uplift 7=- 716(Ioad case 3), 5=- 297(Ioad case 3)
FORCES
TOP CHORD 1 -2 =380, 2 -3= -327, 3 -4 = -0, 4- 5 = -137
BOT CHORD 5- 6=299, 6- 7 = -343, 1- 7 = -343
WEBS 2- 7 = -865, 2 -6 =709, 3 -6 =131, 3 -5= -403
2 -10-12
2-10-12
CSI
TC
BC
WB
5.10-14 4 7-7-6 8-10-0 v-P
5-10-14
0.17
0.12
0.21
LOAD CASE(S)
1) Lumber Increase =1.33, Plate Increaso =1.33
Uniform Loads (Ibs per ft)
Vert:1 -2= -90.0, 2 -3= -90.0, 3 -4= -90.0, 5 -6= -20.0, 6 -7= -20.0, 1 -7= -20.0
Concentrated Loads (Ibs)
Vert:6= -371.0
5-10-14
3-0-2
Qty
Ply
1
3.3T s Dec 11 1996 MiTek Industries, Inc. Tue Jan 21 12:40:42 1997 Page 1
BLUM RESIDENCE ( BLUM BLDR.) DWH
1-8-8
9-1 -0
3-2-2
DEFL (in) (loc) I /dell
Vert(LL) 0.01 1 999
Vert(TL) 0.01 1 999
Horz(TL) -0.00 5 n/a
Min Length / LL defl = 360
1 -2 -10 0-3-0
2x4 1
4
PLATES GRIP
M20(20ga) 249/190
Weight: 64 (Ibs)
BRACING
TOP CHORD Sheathed or 6 -0 -0 on center purlin spacing,
except end verticals.
BOT CHORD Rigid ceiling directly applied, or 1- 7:6 -3 -0, 6- 7:6 -3 -0, 5- 6:6 -3 -0 on
center bracing.
NOTES
1) This truss has been checked for unbalanced loading conditions about joint 4.
2) This truss has been designed for the wind loads generated by 110.0 m.p.h. winds at 32.4 feet above ground level, using 2.0 p.s.f. top chord dead Toad and 8.0 p.s.f
bottom chord dead Toad, 1.0 miles from hurricane oceanline, on a category I enclosed building, of dimensions 80.5 by 66.5 with exposure C (ASCE 7 -93). Lumber
Increase = 1.33, Plate Increase = 1.33. No end verticals are exposed.
3) Except as shown below, special connection(s) required to support concentrated load(s). Design of connection(s) is delegated to the building designer.
4) This truss has been designed with ANSI /TPI 1 -1995 criteria.
5) For truss to truss connections refer to attached Hanger
Sheets.
7y�hlt
JAN 2 2 1997
MAHMOUO ZOLFAGHARI, P.E.
Job
8340 •
Truss
BG16
Truss Type
ROOF TRUSS
Qty
1
Ply
1
BLUM RESIDENCE ( BLUM BLDR.) DWH
DECO TRUSS COMPANY INC.
3.3T s Dec 11 1996 MiTek Industries,
0-9-15 1-5-9 -11 -101 2 -6-7 3-0-7 3-8-2 4-6-1
Inc. Tue Jan 21 12:28:43 1997 Page 1
1 t 1 1 i i 1 1
0 M0 0-6-1 0-6-13 0-6-0 0-7 -11 0-9-15
I ' L
4x6 = 4x6 = 3x4
3x4 =
2 3
4 5
um
wr
co
(V
i
IL
ch
M
c7
Y L C
►: 1 8 7 6
►:
►9
3x4 = 3x4 =
10
2x4 I I 2x4 11
1-5-9 1 3-0-7 4-6-1
1
1 1
1-5-9 1-6-14 1-5-10
Plate Offsets (X,Y): (10:0- 2- 8,0 -0-8)
LOADING (psf)
SPACING 1-0 -0
CSI
DEFL (in) (loc) I /defl
PLATES GRIP
TCLL 30.0
Plates Increase 1.00
TC 0.09
Vert(LL) 0.00 3 999
M20(20ga) 249/190
TCDL 15.0
Lumber Increase 1.00
BC 0.09
Vert(TL) 0.00 3 999
BCLL 0.0
Rep Stress Incr NO
WB 0.10
Horz(TL) 0.00 6 n/a
BCDL 10.0
Code SFBC
(Matrix)
' Min Length / LL deft = 360
Weight: 45 (Ibs)
LUMBER BRACING
TOP CHORD 2 X 4 SYP No.2D TOP CHORD Sheathed or 6 -0 -0 on center purlin spacing,
BOT CHORD 2 X 6 SYP No.2D except end verticals.
WEBS 2 X 4 SYP No.3 BOT CHORD Rigid ceiling directly applied, or 10 -00 -00 on center bracing.
Except: 1- 9:6 -3 -0, 1- 8:6 -3 -0, 7- 8:6 -3 -0.
REACTIONS (Ibs /size) 9= 334/0 -1 -8, 6= 371/0 -1 -8
Max Horz 9= 3(load case 2)
Max Uplift 9=- 267(load case 2), 6=- 254(load case 3)
FORCES
TOP CHORD 1 -2= -340, 2 -3= -124, 3 -4= -109, 4 -5= -124, 5 -6= -340
BOT CHORD 6 -7 =0, 7 -8 =109, 1 -8 = -0, 1 -9 = -0, 6 -10 =0
WEBS 2 -8 =241, 3- 8 = -175, 4- 7 = -176, 5 -7 =240
NOTES
1) This truss has been checked for unbalanced loading conditions about joints 4 and 3.
2) This truss has been designed for the wind loads generated by 110.0 m.p.h. winds at 32.4 feet above ground level, using 2.0 p.s.f. top chord dead load and 8.0 p.s.f
bottom chord dead load, 1.0 miles from hurricane oceanline, on a category I enclosed building, of dimensions 80.5 by 66.5 with exposure C (ASCE 7 -93). Lumber
Increase = 1.33, Plate Increase = 1.33. No end verticals are exposed.
3) This truss has been designed with ANSI /TPI 1 -1995 criteria.
LOAD CASE(S)
1) Lumber Increase =1.00, Plate Increase =1.00
Uniform Loads (ibs per ft)
Vert:2 -3 =- 155.0, 3 -4 =- 155.0, 4 -5 =- 155.0, 6 -7= -25.0, 7 -8= -25.0, 1 -8= -25.0, 1 -9= -25.0
W . , i 0 „ ,, , W t ", 1 .
JAN 2 2 1997
MAHMOIIr ZOLFAGHARI, P.E.
Job
8340
Truss
CG1
Truss Type
ROOF TRUSS
Qty
1
Ply
1
BLUM RESIDENCE (BLUM BLDR.) DWH
DECO TRUSS COMPANY INC. 3.3T s Dec 11 1996 MiTek Industries, Inc. Tue Jan 21 11:47:11 1997 Page 1
2 -10-0 7 -0-0 13-7 -0
2 -10-0 4-2 -0 6-7 -0
4x8 = 2x4 II
5.00
3 4
3x4
ch
1C)
2
•
OPE
3x4
=
3x4 =
►
-I
3x10 ii 4x6=
2 -6-0 ?� -10-p 7 -0-0 13-7-0
I
2 -6-0 0-4-0 4-2 -0 6-7 -0
i
Plate Offsets (X,Y): 13:0- 2 -0,0 -1 -12]
LOADING (psf)
SPACING 2 -0 -0
CSI
DEFL (in) (loc) 1 /dell
PLATES GRIP
TCLL 30.0
Plates Increase 1.33
TC 0.71
Vert(LL) 0.02 6/5 999
M20(20ga) 249/190
TCDL 15.0
Lumber Increase 1.33
BC 0.24
Vert(TL) 0.04 6/5 999
BCLL 0.0
Rep Stress lncr NO
WB 0.48
Horz(TL) 0.00 5 n/a
BCDL 10.0
Code SFBC
Min Length / LL dell = 360
Weight: 79 (Ibs)
LUMBER BRACING
TOP CHORD 2 X 4 SYP No.2D *Except* TOP CHORD Sheathed or 5 -0 -3 on center purlin spacing,
3 -4 2 X 4 SYP SS except end verticals.
BOT CHORD 2 X 6 SYP No.2D BOT CHORD Rigid ceiling directly applied, or 1- 7:6 -3 -0, 6- 7:6 -3 -0, 5- 6:6 -3 -0 on
WEBS 2 X 4 SYP No.3 center bracing.
WEBS 1 Row at midpt 3 -5
REACTIONS (lbs/size) 7= 1431/0 -8 -0, 5= 1074/0 -2 -8
Max Horz 7= 214(Ioad case 3)
Max Uplift 7=- 950(load case 3), 5=- 565(load case 3)
FORCES
TOP CHORD 1 -2 =389, 2- 3= -1141, 3 -4 =0, 4- 5 = -471
BOT CHORD 5 -6= 1053, 6-7= -354, 1 -7= -354
WEBS 2 -7= -1360, 2 -6 =1475, 3 -6 =281, 3 -5= -1165
NOTES
1) This truss has been designed for the wind loads generated by 110.0 m.p.h. winds at 22.1 feet above ground level, using 2.0 p.s.f. top chord dead load and 8.0 p.s.f
bottom chord dead load, 1.0 miles from hurricane oceanline, on a category I enclosed building, of dimensions 80.5 by 66.5 with exposure C (ASCE 7 -93). Lumber
Increase = 1.33, Plate Increase = 1.33. No end verticals are exposed.
2) Provide adequate drainage to prevent water ponding.
3) This truss has been designed with ANSI /TPI 1 -1995 criteria.
4) For truss to truss connections refer to attached Hanger
Sheets.
LOAD CASE(S)
1) Lumber Increase =1.33, Plate Increase =1.33
Uniform Loads (Ibs per ft)
Vert:1- 2= -90.0, 2 -3= -90.0, 3 -4 =- 146.3, 5 -6= -32.5, 6 -7= -20.0, 1 -7= -20.0
Concentrated Loads (Ibs) f
Vert:6= -576.9
Z ifint‘" 1.
JAN 2 2 1997
MAHMOUD ZOLFAGHARI, P.E.
Job
8340
Truss
C2
Truss Type
ROOF TRUSS
Qty
1
Ply
1
BLUM RESIDENCE ( BLUM BLDR.) DWH
DECO TRUSS
COMPANY INC. 3.3T s Dec 11 1996 MiTek Industries, Inc. Tue Jan 21 11:26:50
2-10-0 9-0-0 13-5-0
1997 Page 1
2 -10-0 6-2 -0 4 -5-0
• 4x8 = 2x4 11
3 4
5.00
r?
M
vi-
3x4
2
id
0-
6
0
3x4 =
7
4x6 = 5
2x4 11 3x4 =
`
2-6-0 2f 10.P 9.0-0 135.0
2 -6-0 0-4 -0 6-2-0 ¢5-0
Plate Offsets (X,Y) [1:0-0-4,0-1-11], [3:0-2-4,0-1-12]
LOADING (psf)
SPACING 2 -0 -0
CSI
DEFL (in) (Ioc) 1/deft
PLATES GRIP
TCLL 30.0
Plates Increase 1.33
TC 0.48
Vert(LL) 0.02 1/7 999
M20(20ga) 249/190
TCDL 15.0
Lumber Increase 1.33
BC 0.43
Vert(TL) 0.04 7/6 999
BCLL 0.0
Rep Stress Incr YES
WB 0.29
Horz(TL) 0.00 5 n/a
BCDL 10.0
Code SFBC
Min Length / LL deft = 360
Weight: 75 (Ibs)
LUMBER BRACING
TOP CHORD 2 X 4 SYP No.2D TOP CHORD Sheathed or 6 -0 -0 on center purlin spacing,
BOT CHORD 2 X 4 SYP No.2D except end verticals.
WEBS 2 X 4 SYP No.3 BOT CHORD Rigid ceiling directly applied, or 1- 7:6 -3 -0, 6- 7:6 -3 -0,
5- 6:6 -3 -0 on center bracing.
REACTIONS (Ibs /size) 7= 938/0 -8 -0, 5= 530/0 -2 -8
Max Horz 7= 278(load case 3)
Max Uplift 7=- 634(load case 3), 5=- 263(load case 3)
FORCES
TOP CHORD 1 -2 =369, 2 -3= -344, 3 -4 = -0, 4 -5= -192
BOT CHORD 5-6 =317, 6- 7 = -333, 1- 7 = -333
WEBS 2- 7 = -847, 2 -6 =667, 3- 6 = -42, 3 -5= -433
NOTES
1) This truss has been designed for the wind loads generated by 110.0 m.p.h. winds at 22.1 feet above
ground level, using 2.0 p.s.f. top chord dead load and 8.0 p.s.f bottom chord dead Toad, 1.0 miles from
hurricane oceanline, on a category I enclosed building, of dimensions 80.5 by 66.5 with exposure C
(ASCE 7 -93). Lumber Increase = 1.33, Plate Increase = 1.33. No end verticals are exposed.
2) Provide adequate drainage to prevent water ponding.
3) This truss has been designed with ANSI/TPI 1 -1995 criteria.
LOAD CASE(S) Standard r
ZA 4 .0'frifi fr71.
JAN 2 2 1997
MAHMOUD ZOl.FAGHARI, P.E.
Job
8340
Truss
C3
Truss Type
ROOF TRUSS
Qty
1
Ply
1
BLUM RESIDENCE ( BLUM BLDR.) DWH
DECO TRUSS COMPANY
INC. 3.3T s Dec 11 1996 MiTek Industries, Inc. Tue Jan 21 11:46:54 1997 Page 1
I -2 -8-3 4-3-14 8-6.0 10-11-0
1 1 I
2 -8-3 4-3-14 4-2 -2 2 -5-0
4x8 = 2x4 11
4 5
E -LI
5.00 F-1-
all
6
4x6
3
14
2x4 11
2
El
Ei
0
�!
�c
7
1
3x4 = 6
3x4 = 3x4 =
•
l 2 -6 -0
1
I -0.10-0
8-6-0 10-11-0
1 1
0-10-0 8-6-0 2-5-0
Plate Offsets (X,Y): [4:0- 2- 4.0 -1 -12]
LOADING (psf)
SPACING 2 -0 -0
CSI
DEFL (in) (loc) 1 /dell
PLATES GRIP
TCLL 30.0
Plates Increase 1.33
TC 0.28
Vert(LL) 0.07 7/6 999
M20(20ga) 249/190
TCDL 15.0
Lumber Increase 1.33
BC 0.31
Vert(TL) 0.13 1/7 999
BCLL 0.0
Rep Stress Incr NO
WB 0.29
Horz(TL) 0.01 6 n/a
BCDL 10.0
Code SFBC
Min Length / LL dell = 360
Weight: 85 (lbs)
LUMBER BRACING
TOP CHORD 2 X 4 SYP No.2D TOP CHORD Sheathed or 6 -0-0 on center purlin spacing, •
BOT CHORD 2 X 4 SYP No.2D except end verticals.
WEBS 2 X 4 SYP No.3 BOT CHORD Rigid ceiling directly applied, or 1- 7:6 -3 -0, 6- 7:6 -3 -0 on center
OTHERS 2 X 4 SYP No.3 *Except* bracing.
B2 2 X 4 SYP No.2D
REACTIONS (lbs/size) 1= 886/0 -8 -0, 6= 584/0 -2 -8
Max Horz 1 =323(load case 3)
Max Uplift 1=- 544(load case 3), 6=- 346(load case 3)
FORCES
TOP CHORD 1 -2= -494, 2 -3 =0, 3 -4= -236, 4 -5 = -0, 5 -6= -102
BOT CHORD 6 -7 =217, 1 -7 =426
WEBS 1- 3 = -526, 3 -7= -262, 4 -7 =265, 4 -6= -508
NOTES
1) This truss has been designed for the wind loads generated by 110.0 m.p.h. winds at 22.1 feet above ground level, using 2.0 p.s.f. top chord dead load and 8.0 p.s.f
bottom chord dead Toad, 1.0 miles from hurricane oceanline, on a category I enclosed building, of dimensions 80.5 by 66.5 with exposure C (ASCE 7 -93). Lumber
Increase = 1.33, Plate Increase = 1.33. No end verticals are exposed.
2) Provide adequate drainage to prevent water ponding.
3) Studs to be fastened with 2x3 M20 plates.
4) This truss has been designed with ANSI /TPI 1 -1995 criteria.
LOAD CASE(S)
1) Lumber Increase =1.33, Plate Increase =1.33
Uniform Loads (lbs per ft)
Vert:2 -3= -90.0, 3 -4= -90.0, 4- 5= -90.0, 6- 7= -20.0, 1- 7 = -20.0
Concentrated Loads (lbs)
Vert:2= -301.4 r
JAN 2 2 1997
MAHMOUD ZOLFAGHARI, P.E.
Job
8340
Truss
C4
Truss Type
ROOF TRUSS
Qty
1
Ply
1
BLUM RESIDENCE ( BLUM BLDR.) DWH
DECO TRUSS COMPANY INC.
-2 -8-3
2-8-3
5-3-10
5-3-10
3.3T s Dec 11 1996 MiTek Industries, Inc. Tue Jan 21 11:27:08 1997 Page 1
10-6-0
5-2 -6
1¢11
0-5-0
2x4 11
4
LOADING (psf)
TCLL 30.0
TCDL 15.0
BCLL 0.0
BCDL 10.0
SPACING
Plates Increase
Lumber Increase
Rep Stress Incr
Code
2 -0 -0
1.33
1.33
NO
SFBC
CSI
TC 0.45
BC 0.20
WB 0.43
DEFL (in) (loc) I /defl
Vert(LL) 0.02 6/5 999
Vert(TL) 0.03 6/5 999
Horz(TL) -0.01 5 n/a
Min Length / LL deft = 360
PLATES GRIP
M20(20ga) 249/190
Weight: 79 (Ibs)
LUMBER
TOP CHORD 2 X 4 SYP No.2D
BOT CHORD 2 X 4 SYP No.2D
WEBS 2 X 4 SYP No.3
OTHERS 2 X 4 SYP No.3
REACTIONS (Ibs /size) 1= 886/0 -8 -0, 5= 584/0 -2 -8
Max Horz 1= 389(load case 3)
Max Uplift 1=- 511(load case 3), 5=- 379(Ioad case 3)
FORCES
TOP CHORD 1- 2 = -834, 2- 3 = -485, 3 -4 = -0, 4- 5 = -246
BOT CHORD 5 -6 =448, 1 -6 =0
WEBS 2 -6 =462, 3 -6 = -8, 3- 5 = -530
LOAD CASE(S)
1) Lumber Increase =1.33, Plate Increase =1.33
Uniform Loads (Ibs per ft)
Vert:2 -3= -90.0, 3 -4= -90.0, 5- 6= -20.0, 1- 6 = -20.0
Concentrated Loads (Ibs)
Vert:2= -301.4
BRACING
TOP CHORD
BOT CHORD
Sheathed or 6 -0 -0 on center purlin spacing,
except end verticals.
Rigid ceiling directly applied, or 1- 6:6 -3 -0, 5- 6:6 -3 -0 on
center bracing.
NOTES
1) This truss has been designed for the wind loads generated by 110.0 m.p.h. winds at 22.1 feet above ground level, using 2.0 p.s.f. top chord
dead load and 8.0 p.s.f bottom chord dead load, 1.0 miles from hurricane oceanline, on a category I enclosed building, of dimensions 80.5 by
66.5 with exposure C (ASCE 7 -93). Lumber Increase = 1.33, Plate Increase = 1.33. No end verticals are exposed.
2) Studs to be fastened with 2x3 M20 plates.
3) This truss has been designed with ANSI/TPI 1 -1995 criteria.
4 r440.‘"‘" 1.
,IAN 2 2 1997
MVIAHMOUD ZOLFAGHARI, P.E.
Job
8340
Truss
C5
Truss Type
ROOF TRUSS
Qty
3
Ply
1
BLUM RESIDENCE ( BLUM BLDR.) DWH
DECO TRUSS COMPANY INC.
3.3T s Dec 11 1996 MiTek Industries, Inc. Tue Jan 21 11:27:16 1997 Page 1
2 -10-0 7 -10-7 13-5-0
{ +
2 -10-0 5-0-7 5-6-9
2x4 11
4
5.00
4x6 ;
3
eio
co
2x4 i I
;
2
_ ug
;d;
1
3x4 = 6
3x4 =
5
3x4 =
2-6-0 2 13-5-0
1 1
2 -6-0 0-4-0 10-7-0
Plate Offsets (X,Y) [1:0- 0- 4,0 -1 -11]
LOADING (psf)
SPACING 2 -0 -0
CSI
DEFL (in) (Ioc) I/defl
PLATES GRIP
TCLL 30.0
Plates Increase 1.33
TC 0.39
Vert(LL) 0.15 1/6 830
M20(20ga) 249/190
TCDL 15.0
Lumber Increase 1.33
BC 0.66
Vert(TL) 0.28 6/5 452
BCLL 0.0
Rep Stress Incr YES
WB 0.56
Horz(TL) -0.00 5 n/a
BCDL 10.0
Code SFBC
Min Length / LL dell = 360
Weight: 73 (Ibs)
LUMBER BRACING
TOP CHORD 2 X 4 SYP No.2D TOP CHORD Sheathed or 6 -0 -0 on center purlin spacing,
BOT CHORD 2 X 4 SYP SS except end verticals.
WEBS 2 X 4 SYP No.3 BOT CHORD Rigid ceiling directly applied, or 1- 6:6 -3 -0, 5- 6:6 -3 -0 on
center bracing.
REACTIONS (Ibs /size) 6= 938/0 -8 -0, 5= 530/0 -2 -8
Max Horz 6= 403(Ioad case 3)
Max Uplift 6=- 576(load case 3), 5=- 321(load case 3)
FORCES
TOP CHORD 1 -2 =369, 2 -3 =361, 3 -4 =0, 4- 5 = -238
BOT CHORD 5 -6 =280, 1-6= -333
WEBS 2-6= -383, 3 -6= -744, 3- 5 = -337
NOTES
1) This truss has been designed for the wind Toads generated by 110.0 m.p.h. winds at 22.1 feet above
ground level, using 2.0 p.s.f. top chord dead load and 8.0 p.s.f bottom chord dead load, 1.0 miles from
hurricane oceanline, on a category I enclosed building, of dimensions 80.5 by 66.5 with exposure C
(ASCE 7 -93). Lumber Increase = 1.33, Plate Increase = 1.33. No end verticals are exposed.
2) This truss has been designed with ANSI/TPI 1- 1995'criteria.
LOAD CASE(S) Standard
r
/ow
JAN 2 2 1997
MAHMOUF ZOLFAGHNRI, P.E.
Job
8340
Truss
C6
Truss Type
ROOF TRUSS
Qty
7
Ply
1
BLUM RESIDENCE ( BLUM BLDR.) DWH
DECO
TRUSS COMPANY INC. 3.3T s Dec 11 1996 MiTek Industries, Inc. Tue Jan 21 11:27:25 1997
2 7 -10-5 { 13-8-0 19 -5-11 24-10-0 •
'
Page 1
'
2 - 5- 0-5 5-9-11 5-9-11 5-4 -5
4x6 =
4
5.0012 Irk
4x6
4x6
3
2x4 ii
5
2x4 Ii
2
6
Y' IOU
'-
NM E:
1 ' ' 8 '—'
9 7
_
3x4 = 5x6 = 6x8 = 3x4 =
1 2-6-0 2- ' 10 1 -0 13.8-0 4 24-10-0
I
2-6-0 0-4-0 10-10-0 - 11 -2 -0
Plate Offsets (X,Y): [1:0- 0- 4,0 -1- 11],[9:0- 0- 0,0 -3 -8]
LOADING (psf)
SPACING 2 -0 -0
CSI
DEFL (in) (Ioc) I /defl
PLATES GRIP
TCLL 30.0
Plates Increase 1.33
TC 0.46
Vert(LL) 0.22 8/7 999
M20(20ga) 249/190
TCDL 15.0
Lumber Increase 1.33
BC 0.71
Vert(TL) 0.40 8/7 651
BCLL 0.0
Rep Stress Incr YES
WB 0.59
Horz(TL) 0.03 7 n/a
BCDL 10.0
Code SFBC
Min Length / LL deft = 360
Weight: 134 (lbs)
LUMBER BRACING
TOP CHORD 2 X 4 SYP No.2D TOP CHORD Sheathed or 4 -5 -11 on center purlin spacing,
BOT CHORD 2 X 4 SYP No.2D *Except* except end verticals.
1 -8 2 X 4 SYP SS BOT CHORD Rigid ceiling directly applied, or 1- 9:6 -3 -0, 8- 9:6 -3 -0,
WEBS 2 X 4 SYP No.3 7- 8:5 -9 -2 on center bracing.
WEBS 1 Row at midpt 9 -3, 5 -7
REACTIONS (lbs/size) 9= 1543/0.8 -0, 7= 1181/0 -8 -0
Max Horz 9= 517(Ioad case 3)
Max Uplift 9=- 944(load case 4), 7=- 526(load case 4)
FORCES
TOP CHORD 1 -2 =369, 2 -3 =361, 3 -4= -1161, 4 -5= -1161, 5 -6 =0, 6 -7= -240
BOT CHORD 7 -8 =1252, 8 -9 =1153, 1- 9 = -333
WEBS 2 -9= -383, 3 -9= -1804, 3- 8 = -96, 4 -8 =381, 5 -8= -212, 5 -7= -1502
NOTES
1) This truss has been designed for the wind loads generated by 110.0 m.p.h. winds at 22.1 feet above
ground level, using 2.0 p.s.f. top chord dead Toad and 8.0 p.s.f bottom chord dead Toad, 1.0 miles from
hurricane oceanline, on a category I enclosed building, of dimensions 80.5 by 66.5 with exposure C
(ASCE 7 -93). Lumber Increase = 1.33, Plate Increase = 1.33. No end verticals are exposed.
2) This truss has been designed with ANSI/TPI 1 -1995 criteria.
LOAD CASE(S) Standard
JAN 2 2 1997
MAHMOUD ZOLFAGIIARI, P.B.
Job
8340
Truss
C7
Truss Type
ROOF TRUSS
Qty
1
Ply
1
BLUM RESIDENCE ( BLUM BLDR.) DWH
DECO TRUSS COMPANY INC. 3.3T s Dec 11 1996 MiTek Industries, Inc. Tue Jan 21 11:27:35 1997 Page 1
' 2 -10-0 7 -10-12 13-0-0 14 -4-0 19-5-4 24-6-0 27 -4 -0
2 -10-0 5-0-12 5-1 -4 1 -4-0 5-1-4 5-0-12 2 -10-0
4x6 = 4x6 =
•
5.00p
4 5
.�
4x6 s
4x6
3
6
(7)
2x4 II
2x4 II
2
7
FIT—
1 '3 121110 ''' 8
3x4 = 5x6 = 3x4 = 3x4 = 3x4 =
3x6 = 5x6 =
1 2 -6-0 2 - 13-0-0 -4-0 24-6-0 24114.0 27 -4-0
1 14
I
2 -6.0 0-4-0 10-2 -0 1 -4 -0 10-2 -0 0-4-0 2 -6-0
Plate Offsets (X,Y) [1:0- 0- 4,0- 1- 11],[8:0- 0- 4,0 -1- 11],[9:0- 0- 0,0 -3 -8] [13:0- 0- 0,0 -3 -8]
LOADING (psf)
SPACING 2 -0 -0
CSI
DEFL (in) (Ioc) 1 /deft
PLATES GRIP
TCLL 30.0
Plates Increase 1.33
TC 0.32
Vert(LL) 0.17 11/10 999
M20(20ga) 249/190
TCDL 15.0
Lumber Increase 1.33
BC 0.53
Vert(TL) 0.32 13/12 822
BCLL 0.0
Rep Stress Incr YES
WB 0.53
Horz(TL) 0.04 9 n/a
BCDL 10.0
Code SFBC
(Matrix)
Min Length / LL defl = 360
Weight: 150 (Ibs)
LUMBER BRACING
TOP CHORD 2 X 4 SYP No.2D TOP CHORD Sheathed or 4 -4 -0 on center purlin spacing.
BOT CHORD 2 X 4 SYP No.2D BOT CHORD Rigid ceiling directly applied, or 1- 13:6 -3 -0,
WEBS 2 X 4 SYP No.3 12- 13:5- 11 -11, 11- 12:6 -3 -0, 10- 11:6 -3 -0, 9- 10:6 -3 -0,
8- 9:6 -3 -0 on center bracing.
WEBS 1 Row at midpt 13 -3, 6 -9
REACTIONS (Ibs /size) 13= 1511/0 -8 -0, 9= 1511/0 -8 -0
Max Horz 13=- 521(load case 2)
Max Uplift 13=- 917(load case 4), 9=- 917(load case 4)
FORCES
TOP CHORD 1 -2 =179, 2 -3 =186, 3 -4= -1279, 4 -5= -1083, 5 -6= -1279, 6 -7 =186, 7 -8 =179
BOT CHORD 8- 9 = -86, 9 -10 =1226, 10 -11 =1083, 11 -12 =1083, 12 -13 =1226, 1- 13 = -86
WEBS 2 -13= -421, 3 -13= -1591, 3 -12= -175, 4 -12 =214, 5 -10 =214, 6 -10= -175, 6 -9= -1591, 7 -9= -421
NOTES
1) This truss has been checked for unbalanced loading conditions about joints 5 and 4.
2) This truss has been designed for the wind loads generated by 110.0 m.p.h. winds at 22.1 feet above
ground level, using 2.0 p.s.f. top chord dead Toad and 8.0 p.s.f bottom chord dead load, 1.0 miles from
hurricane oceanline, on a category I enclosed building, of dimensions 80.5 by 66.5 with exposure C
(ASCE 7 -93). Lumber Increase = 1.33, Plate Increase = 1.33. No end verticals are exposed.
3) Provide adequate drainage to prevent water ponding.
4) This truss has been designed with ANSI/TPI 1 -1995 criteria. r
/
LOAD CASE(S) Standard ' ,4�v,1
JAN 221997
MAHMOUD ZOLFAGHARI, P.E.
•
Job
8340
Truss
C8
Truss Type
ROOF TRUSS
Qty
1
Ply
1
BLUM RESIDENCE ( BLUM BLDR.) DWH
DECO
TRUSS COMPANY INC. 3.3T s Dec 11 1996 MiTek Industries, Inc. Tue Jan 21 11:27:43 1997 Page 1
1 2 -10-0 ' 6-11 -9 1 11 -0-0 16-4-0 20-4 -7 24 -6-0 27 -40
} {
2 -10-0 4-1-9 4.0-7 5-4-0 4-0-7 4-1 -9 2 -10-0
4x8 = 4x6 =
4
5
5.00p
4x6
4x6
3
6
2x4 n
2x4 n
2
7
3x4 = 3x4 = 3x6 = 3x4 =
5 _ 3x4 = Sx96 _
1 2-6-0 2- 11-0-0 16-4 -0
24 -6-0 24 27 -4.0 1
1 1
2 -6-0 0-4-0 8-2 -0 5-4 -0
8-2-0 0-4-0 2-6-0
Plate Offsets (X,Y) [1:0- 0- 4,0 -1- 11],[4:0- 2- 4,0 -1- 12],[8:0 -0- 12,0 -1- 11],[9:0- 0- 0,0 -3- 4],[13:0- 0- 0,0 -3 -4]
LOADING (psf)
SPACING 2 - -
CSI
DEFL (in) (loc) I/defl
PLATES GRIP
TCLL 30.0
Plates Increase 1.33
TC 0.51
Vert(LL) 0.08 11/10 999
M20(20ga) 249/190
TCDL 15.0
Lumber Increase 1.33
BC 0.71
Vert(TL) 0.14 13/12 999
BCLL 0.0
Rep Stress Incr YES
WB 0.98
Horz(TL) 0.03 9 n/a
BCDL 10.0
Code SFBC
Min Length / LL deft = 360
Weight: 148 (Ibs)
LUMBER BRACING
TOP CHORD 2 X 4 SYP No.2D TOP CHORD Sheathed or 3 -10 -11 on center purlin spacing.
BOT CHORD 2 X 4 SYP No.2D BOT CHORD Rigid ceiling directly applied, or 1- 13:6 -3 -0, 12- 13:6 -3 -0,
WEBS 2 X 4 SYP No.3 11- 12:6 -3 -0, 10- 11:6 -3 -0, 9- 10:6 -3 -0, 8- 9:6 -3 -0 on
center bracing.
REACTIONS (Ibs /size) 13= 1511/0 -8 -0, 9= 1511/0 -8 -0
Max Horz 13= 444(Ioad case 3)
Max Uplift 13=- 917(load case 4), 9=- 917(Ioad case 4)
FORCES
TOP CHORD 1 -2 =369, 2 -3 =361, 3 -4= -1264, 4 -5= -1166, 5 -6= -1264, 6 -7 =361, 7 -8 =369
BOT CHORD 8- 9 = -333, 9 -10 =1086, 10 -11 =1166, 11 -12 =1166, 12 -13 =1086, 1- 13 = -333
WEBS 2 -13= -342, 3 -13= -1770, 3 -12 =103, 4- 12 =71, 4- 10 = -0, 5- 10 =71, 6 -10 =103, 6 -9= -1770, 7 -9= -342
NOTES
1) This truss has been designed for the wind loads generated by 110.0 m.p.h. winds at 22.1 feet above
ground level, using 2.0 p.s.f. top chord dead load and 8.0 p.s.f bottom chord dead Toad, 1.0 miles from
hurricane oceanline, on a category I enclosed building, of dimensions 80.5 by 66.5 with exposure C
(ASCE 7 -93). Lumber Increase = 1.33, Plate Increase = 1.33. No end verticals are exposed.
2) Provide adequate drainage to prevent water ponding.
3) This truss has been designed with ANSI/TPI 1 -1995 criteria.
LOAD CASE(S) Standard r
Z., 0 y1(,
JAN 22 1997
MAHMOUD ZOLFAGHARI, P.E.
Job
8340
Truss
C9
Truss Type
ROOF TRUSS
Qty
1
Ply
1
BLUM RESIDENCE ( BLUM BLDR.) DWH
DECO TRUSS COMPANY INC. 3.3T s Dec 11 1996 MiTek Industries, Inc. Tue Jan 21 11:27:55 1997 Page 1
2 -10.0 9-0-0 13-8-0 18-4 -0 24 -6-0 27-4-0
{
2 -10-0 6-2 -0 4 -8-0 4 -8-0 6-2-0 2 -10-0
4x6 = 3x4 = 4x6 =
i
5.0012
3x4
2
3 4
5
3x4
6
r.
1 '_' 11 10 9 " ' 7
3x4 = 3x6 Ii 4x8 = 3x4 = 4x8 = 3x6 �� 3x4 =
1 2 - 6 - 0 2 11 - 9-0-0 1 18-4 -0 24-6-0 2411?-0 27 -4-0
I 1
2 -6-0 0-4-0 6-2 -0 9-4-0 6-2 -0 0-4-0 2-6-0
Plate Offsets (X,Y) [1:0- 0- 4,0- 1- 11],[7:0 -0- 12,0 -1- 11],[8:0 -2- 12,0 -2- 8],[12:0 -2- 12,0 -2 -8]
LOADING (psf)
SPACING 2 -0 -0
CSI
DEFL (in) (Ioc) I/defl
PLATES GRIP
TCLL 30.0
Plates Increase 1.33
TC 0.48
Vert(LL) 0.12 10/9 999
M20(20ga) 249/190
TCDL 15.0
Lumber Increase 1.33
BC 0.50
Vert(TL) 0.22 10/9 999
BCLL 0.0
Rep Stress Incr YES
WB 0.61
Horz(TL) 0.01 8 n/a
BCDL • 10.0
Code SFBC
Min Length / LL deft = 360
Weight: 139 (Ibs)
LUMBER BRACING
TOP CHORD 2 X 4 SYP No.2D TOP CHORD Sheathed or 4 -2 -7 on center purlin spacing.
BOT CHORD 2 X 4 SYP No.2D BOT CHORD Rigid ceiling directly applied, or 1- 12:6 -3 -0, 11- 12:6 -3 -0,
WEBS 2 X 4 SYP No.3 10- 11:6 -3 -0, 9- 10:6 -3 -0, 8- 9:6 -3 -0, 7- 8:6 -3 -0 on center
bracing.
REACTIONS (Ibs /size) 12= 1511/0 -8 -0, 8= 1511/0 -8 -0
Max Horz 12=- 367(Ioad case 2)
Max Uplift 12=- 917(Ioad case 4), 8=- 917(load case 4)
FORCES
TOP CHORD 1 -2 =369, 2 -3= -1309, 3 -4= -1208, 4 -5= -1208, 5 -6= -1309, 6 -7 =369
BOT CHORD 7 -8= -333, 8- 9 = -333, 9 -10 =1453, 10 -11 =1453, 11- 12 = -333, 1- 12 = -333
WEBS 2 -12= -1420, 2 -11 =1580, 3- 11 =15, 4 -11= -321, 4 -9= -321, 5 -9 =15, 6 -9 =1580, 6 -8= -1420
NOTES
1) This truss has been designed for the wind Toads generated by 110.0 m.p.h. winds at 22.1 feet above
ground level, using 2.0 p.s.f. top chord dead load and 8.0 p.s.f bottom chord dead load, 1.0 miles from
hurricane oceanline, on a category I enclosed building, of dimensions 80.5 by 66.5 with exposure C
(ASCE 7 -93). Lumber Increase = 1.33, Plate Increase = 1.33. No end verticals are exposed.
2) Provide adequate drainage to prevent water ponding.
3) This truss has been designed with ANSI/TPI 1 -1995 criteria.
LOAD CASE(S) Standard r
, / / 1' H7
JAN 2 2 1997
MAHMOUD ZOLFAGHARI, P.E.
Job
8340
Truss
CG10
Truss Type
ROOF TRUSS
Qty
1
Ply
1
BLUM RESIDENCE
(BLUM BLDR.) DWH
DECO TRUSS COMPANY INC. 3.3T s Dec 11 1996 MiTek
Industries, Inc. Tue Jan 21 11:47:27 1997 Page 1
1 2 -10-0 1 7 -0-0 1 10-5-12 1 16-10-4 20-4 -0
24-6-0 27 -4 -0
I
2- 10-0 4-2 -0 3-5-12 6-4-8 3-5-12
1 4
4-2 -0 2 -10-0
5.00P 4x6 = 3x4 = , 3x4 = 4x6
=
3 4 5
6
3x8
3x8
r?
2
_iii :..4irx
1111-17
1 ►� 12 11
10 ►� 8
3x4 = 13 3x12 = 6x6 = 3x12
= 9 3x4 =
3x811
3x8 0
I 2 - 2- I 19-0 7-0-0 i 13-8-0
20-4 -0
24-6-0 24 -0 27 -4 -0
2 -6-0 0-4-0 4-2-0 6-8-0
i
6-8-0
1 1
4-2 -0 0-4 -0 2 -6-0
Plate Offsets (X,Y): [9:0 -2- 12,0 -2- 8],[10:0- 1- 8,0 -1- 8],[11:0- 0- 0,0 -4- 8],[12:0 -5 0,0-1-8], (13:0-2-12,0-2-8]
LOADING (psf)
SPACING 2 -0 -0
CSI
DEFL (in) (loc) I /defl
PLATES GRIP
TCLL 30.0
Plates Increase 1.33
TC 0.83
Vert(LL) 0.11 11 999
M20(20ga) 249/190
TCDL 15.0
Lumber Increase 1.33
BC 0.56
Vert(TL) 0.20 11 999
BCLL 0.0
Rep Stress Incr NO
WB 0.93
Horz(TL) 0.04 9 n/a
BCDL 10.0
Code SFBC
Min Length / LL dell = 360
Weight: 159 (lbs)
LUMBER BRACING
TOP CHORD 2 X 4 SYP No.2D *Except* TOP CHORD Sheathed or 2 -2
-3 on center purlin spacing.
3-6 2 X 4 SYP SS BOT CHORD Rigid ceiling directly
applied, or 1- 13:6 -3 -0, 12- 13:6 -3 -0, 11- 12:5 -4 -5,
BOT CHORD 2 X 6 SYP No.2D 10- 11:5 -5 -12, 9-
10:6 -3 -0, 8- 9:6 -3 -0 on center bracing.
WEBS 2 X 4 SYP No.3
REACTIONS (lbs/size) 13= 2546/0 -8 -0, 9= 2546/0 -8 -0
Max Horz 13= 282(loac' case 3)
Max Uplift 13=- 1536(Ioad case 4), 9=- 1536(load case 4)
FORCES
TOP CHORD 1 -2 =389, 2 -3= -2792, 3 -4= -2576, 4 -5= -3627, 5 -6= -2576, 6 -7= -2792, 7 -8 =389
BOT CHORD 8- 9 = -354, 9 -10= -354, 10 -11 =3514, 11 -12 =3514, 12- 13 = -354, 1- 13 = -354
WEBS 2 -13= -2476, 2 -12 =3072, 3 -12 =631, 4 -12= -1249, 4 -11 =157, 5 -11 =157, 5 -10= -1249, 6 -10 =631, 7 -10 =3072,
7 -9= -2476
NOTES
1) This truss has been designed for the wind Toads generated by 110.0 m.p.h. winds at 22.1 feet above ground level,
using 2.0 p.s.f. top chord dead load and 8.0 p.s.f
bottom chord dead Toad, 1.0 miles from hurricane oceanline, on a category I enclosed building, of dimensions 80.5
by 66.5 with exposure C (ASCE 7 -93). Lumber
Increase = 1.33, Plate Increase = 1.33. No end verticals are exposed.
2) Except as shown below, special connection(s) required to support concentrated load(s). Design of connection(s) is
delegated to the building designer. •
3) Provide adequate drainage to prevent water ponding.
4) This truss has been designed with ANSI /TPI 1 -1995 criteria.
5) For truss to truss connections refer to attached Hanger
Sheets.
LOAD CASE(S)
1) Lumber Increase =1.33, Plate Increase =1.33
Uniform Loads (lbs per ft)
Vert:1 -2= -90.0, 2 -3= -90.0, 3 -4 =- 146.3, 4 -5 =- 146.3, 5 -6 =- 146.3, 6 -7= -90.0, 7 -8= -90.0, 8 -9= -20.0, 9 -10= -20.0,
10- 11= -32.5, 11- 12= -32.5, 12- 13= -20.0, 1- 13 = -20.0
f
Concentrated Loads (lbs)
Vert:10=- 576.9, 12= -576.9
/ irrt
.JAN 2 2 1997
MAHMOUD ZOLFAGHARI, P.E.
Job
8340
Truss
D1
LOADING (psf)
TCLL 30.0
TCDL 15.0
BCLL 0.0
BCDL 10.0
Truss Type
ROOF TRUSS
SPACING 2 -0 -0
Plates Increase 1.33
Lumber Increase 1.33
Rep Stress Incr YES
Code SFBC
CSI
TC 0.59
BC 0.27
WB 0.86
Qty
Ply
1
BLUM RESIDENCE ( BLUM BLDR.) DWH .
DECO TRUSS COMPANY INC.
(0
-9-3
0-3-0
-0r3
0-3-0
6-8-6
6-8-6
5.00
3.3T s Dec 11 1996 MiTek Industries, Inc. Tue Jan 21 11:29:02 1997 Page 1
6-8-6
6-8-6
13-6 -0
6-9-10
13-6-0
6-9-10
2x4 11
3
► —� 5 :.
1 4
3x6 I l 2x4 I I 3x4 =
DEFL (in) (Ioc) I/defl
Vert(LL) 0.04 5/4 999
Vert(TL) 0.07 5/4 999
Horz(TL) 0.01 4 n/a
Min Length / LL defl = 360
PLATES GRIP
M20(20ga) 249/190
Weight: 69 (Ibs)
LUMBER
TOP CHORD 2 X 4 SYP No.2D
BOT CHORD 2 X 4 SYP No.2D
WEBS 2 X 4 SYP No.3
SLIDER Left 2 X 4 No.3 SYP 1 -11 -12
REACTIONS (Ibs /size) 1= 718/0 -8 -0, 4= 718/0 -2 -8
Max Horz 1= 412(load case 3)
Max Uplift 1=- 235(Ioad case 3), 4=- 420(load case 3)
FORCES
TOP CHORD 1- 2 = -839, 2 -3 = -0, 3- 4 = -299
BOT CHORD 4 -5 =755, 1 -5 =755
WEBS 2 -5 =131, 2- 4 = -833
BRACING
TOP CHORD Sheathed or 4 -9 -7 on center purlin spacing,
except end verticals.
BOT CHORD Rigid ceiling directly applied, or 1- 5:6 -3 -0, 4- 5:6 -3 -0 on
center bracing.
NOTES
1) This truss has been designed for the wind Toads generated by 110.0 m.p.h. winds at 22.1 feet above ground level, using 2.0 p.s.f. top chord
dead Toad and 8.0 p.s.f bottom chord dead load, 1.0 miles from hurricane oceanline, on a category I enclosed building, of dimensions 80.5 by
66.5 with exposure C (ASCE 7 -93). Lumber Increase = 1.33, Plate Increase = 1.33. No end verticals are exposed.
2) This truss has been designed with ANSIITPI 1 -1995 criteria.
LOAD CASE(S) Standard
JAN 2 2 1997
MAHMOIJD ZOLFAGHARI, P.E.
Job
8340
Truss
D2
Truss Type
ROOF TRUSS
Qty
5
Ply
1
BLUM RESIDENCE ( BLUM BLDR.) DWH
DECO TRUSS COMPANY INC.
6-11 -6
6-11-6
3.3T s Dec 11 1996 MiTek Industries, Inc. Tue Jan 21 11:29:09 1997 Page 1
13-9 -0
6-9-10
2x4 11
3
0
0-3-0
6-11 -6
6-8-6
13-9-0
6-9-10
Plate Offsets (X,Y) [1:0- 0- 4,0 -1 -11]
LOADING (psf)
TCLL 30.0
TCDL 15.0
BCLL 0.0
BCDL 10.0
LUMBER
TOP CHORD 2 X 4 SYP No.2D
BOT CHORD 2 X 4 SYP No.2D
WEBS 2 X 4 SYP No.3
OTHERS 2 X 8 SYP SS
WEDGE Left: 2 X 8
SPACING 2 -0 -0
Plates Increase 1.33
Lumber Increase 1.33
Rep Stress Incr YES
Code SFBC
FORCES
TOP CHORD 1- 2 = -873, 2 -3 = -0, 3- 4 = -299
BOT CHORD 4 -5 =793, 1 -5 =793
WEBS 2 -5 =134, 2- 4 = -875
CSI
TC 0.59
BC 0.28
WB 0.91
REACTIONS (Ibs /size) 1= 736/0 -8 -0, 4= 736/0 -2 -8
Max Horz 1= 412(Ioad case 3)
Max Uplift 1=- 245(Ioad case 3), 4=- 426(Ioad case 3)
DEFL (in) (loc) I /deft
Vert(LL) 0.04 5/4 999
Vert(TL) 0.07 1/5 999
Horz(TL) 0.01 4 nla
Min Length / LL deft = 360
NOTES
1) This truss has been designed for the wind loads generated by 110.0 m.p.h. winds at 22.1 feet above
ground level, using 2.0 p.s.f. top chord dead load and 8.0 p.s.f bottom chord dead Toad, 1.0 miles from
hurricane oceanline, on a category I enclosed building, of dimensions 80.5 by 66.5 with exposure C
(ASCE 7 -93). Lumber Increase = 1.33, Plate Increase = 1.33. No end verticals are exposed.
2) This truss has been designed with ANSI/TPI 1 -1995 criteria.
LOAD CASE(S) Standard
PLATES GRIP
M20(20ga) 249/190
Weight: 72 (lbs)
BRACING
TOP CHORD Sheathed or 4 -8 -4 on center purlin spacing,
except end verticals.
BOT CHORD Rigid ceiling directly applied, or 1- 5:6 -3 -0, 4- 5:6 -3 -0 on
center bracing.
JAN 2 2 1997
MAHMOUG ZOLFAGHARI, P.E.
Job
8340
Truss
EG1
Truss Type
ROOF TRUSS
Qty
2
Ply
1
BLUM RESIDENCE ( BLUM BLDR.) DWH
DECO TRUSS COMPANY INC. 3.3T s Dec 11 1996 MiTek Industries, Inc. Tue Jan 21 11:51:04 1997 Page 1
I 2 -10.0 7 -0-0 10-2 -12 16-1 -4 19-4 -0 23-10-0 26-6 -3
I
2- 10.0 4-2-0 3-2 -12 5- 10-8 3-2 -12 4 -6-0 2 -8-3
5.00 [ 4x6 = 3x4 = 3x4 = 4x6 =
4 5
c4
3x6'
3x6
.
/
1 ►: 12 11 10 9
3x4= 13 3x12 = 3x4 = 3x12 = 8
3x8 n 4x6 = 3x8 11
•
I 2 -6-0 2 - -0 7 -0-0 I 13-2-0 19-4 -0 23-10-0 ?48-(1
I I
2-6-0 0-4-0 4-2 -0 6-2 -0 6-2-0 4-6-0 0-10-0
Plate Offsets (X,Y): [8:0 -2- 12,0 -3- 4],[9:0- 3- 0,0 -1- 8],[12:0- 5- 0,0 -1- 8],[13:0 -2- 12,0 -2 -8]
LOADING (psf)
SPACING 2 -0 -0
CSI
DEFL (in) (loc) Udell
PLATES GRIP
TCLL 30.0
Plates Increase 1.33
TC 0.63
Vert(LL) 0.09 11 999
M20(20ga) 249/190
TCDL 15.0
Lumber Increase 1.33
BC 0.51
Vert(TL) 0.17 11 999
BCLL 0.0
Rep Stress Incr NO
WB 0.88
Horz(TL) 0.03 8 n/a
BCDL 10.0
Code SFBC
Min Length / LL deft = 360
Weight: 149 (Ibs)
LUMBER BRACING
TOP CHORD 2 X 4 SYP No.2D 'Except* TOP CHORD Sheathed or 2 -5 -6 on center purlin spacing,
3 -6 2 X 4 SYP SS except end verticals.
BOT CHORD 2 X 6 SYP No.2D BOT CHORD Rigid ceiling directly applied, or 10 -00 -00 on center bracing.
WEBS 2 X 4 SYP No.3 Except: 1- 13:6 -3 -0, 12- 13:6 -3 -0, 11- 12:5 -8 -3, 10- 11:5 -10 -5,
OTHERS 2 X 4 SYP No.3 9- 10:5 -10 -5.
REACTIONS (lbs/size) 13= 2446/0 -8-0, 8= 2219/0 -8 -0
Max Horz 13= 280(load case 3)
Max Uplift 13=- 1497(load case 4), 8=- 1327(load case 4)
FORCES
TOP CHORD 1 -2 =389, 2 -3= -2644, 3 -4= -2439, 4 -5= -3317, 5 -6= -2395, 6 -7= -2595, 7 -8= -2175
BOT CHORD 8 -9 =0, 9-10 =3210, 10 -11 =3210, 11 -12 =3232, 12 -13= -354, 1 -13= -354
WEBS 2 -13= -2375, 2 -12 =2928, 3 -12 =592, 4 -12= -1091, 4 -11 =124, 5 -11 =154, 5 -9= -1124, 6 -9 =564, 7 -9 =2488
NOTES
1) This truss has been designed for the wind loads generated by 110.0 m.p.h. winds at 22.1 feet above ground level, using 2.0 p.s.f. top chord dead toad and 8.0 p.s.f
bottom chord dead load, 1.0 miles from hurricane oceanline, on a category I enclosed building, of dimensions 80.5 by 66.5 with exposure C (ASCE 7 -93). Lumber
Increase = 1.33, Plate Increase = 1.33. No end verticals are exposed.
2) Except as shown below, special connection(s) required to support concentrated load(s). Design of connection(s) is delegated to the building designer.
3) Provide adequate drainage to prevent water ponding.
4) Studs to be fastened with 2x3 M20 plates.
5) This truss has been designed with ANSI /TPI 1 -1995 criteria.
6) For truss to truss connections refer to attached Hanger
Sheets.
LOAD CASE(S)
1) Lumber Increase =1.33, Plate Increase =1.33
Uniform Loads (Ibs per ft) r
Vert:1 -2= -90.0, 2 -3= -90.0, 3 -4 =- 146.3, 4 -5 =- 146.3, 5 -6 =- 146.3, 6 -7= -90.0, 8 -9= -20.0, 9 -10= -32.5, 10- 11= -32.5,
11- 12= -32.5, 12 -13= -20.0, 1- 13 = -20.0 .
4
Concentrated Loads (Ibs) , • / i off 091
Vert:7 =- 301.4, 9 =- 325.2, 12= -576.9
JAN 2 2 1997
MAHMODU ZOLFAGHARI, P.E.
Job
8340
Truss
E2
Truss Type
ROOF TRUSS
Qty
1
Ply
1
BLUM RESIDENCE ( BLUM BLDR.) DWH
DECO TRUSS COMPANY INC. 3.3T s Dec 11 1996 MiTek Industries, Inc. Tue Jan 21 11:29:27 1997 Page 1
2 -10.0 9-0-0 13-2 -0 17 -4 -0 23-6-0 26-4-0
{ {
2-10-0 6-2 -0 4 -2 -0 4-2 -0 6-2 -0 2 -10-0
4x6 = 3x4 = 4x6 =
5.00p
3 4 5
3x4 %
3x4
2
6
1 '3 11 10 9 ► =� 7
3x4 = 3x 11 4x8 = 3x4 = 4x8 = 3x611 3x4 =
I 2 -6-0 2-19 -0 9-0-0 I 17 -40 23 23 -0 26 -
i
2 -6-0 0-4-0 6-2 -0 8-4-0 6-2 -0 0-4-0 2 -6-0
Plate Offsets (X,Y) [1:0- 0- 4,0 -1- 11],[7:0 -0- 12,0 -1- 11],[8:0 -2- 12,0 -2- 8],[12:0 -2- 12,0 -2 -8] •
LOADING (psf)
SPACING 2 -0 -0
CSI
DEFL (in) (loc) I /defl
PLATES GRIP
TCLL 30.0
Plates Increase 1.33
TC 0.48
Vert(LL) 0.09 10/9 999
M20(20ga) 249/190
TCDL 15.0
Lumber Increase 1.33
BC 0.43
Vert(TL) 0.16 10/9 999
BCLL 0.0
Rep Stress Incr YES
WB 0.58
Horz(TL) 0.01 8 n/a
BCDL 10.0
Code SFBC
Min Length / LL deft = 360
Weight: 138 (Ibs)
LUMBER BRACING
TOP CHORD 2 X 4 SYP No.2D TOP CHORD Sheathed or 4 -4 -5 on center purlin spacing.
BOT CHORD 2 X 4 SYP No.2D BOT CHORD Rigid ceiling directly applied, or 1- 12:6 -3 -0, 11- 12:6 -3 -0,
WEBS 2 X 4 SYP No.3 10- 11:6 -3 -0, 9- 10:6 -3 -0, 8- 9:6 -3 -0, 7- 8:6 -3 -0 on center
bracing.
REACTIONS (Ibs/size) 12= 1456/0 -8 -0, 8= 1456/0 -8 -0
Max Horz 12= 367(Ioad case 3)
Max Uplift 12=- 892(load case 4), 8=- 892(load case 4)
FORCES
TOP CHORD 1 -2 =369, 2 -3= -1216, 3 -4= -1123, 4 -5= -1123, 5 -6= -1216, 6 -7 =369
BOT CHORD 7- 8 = -333, 8 -9= -333, 9 -10 =1317, 10 -11 =1317, 11- 12 = -333, 1- 12 = -333
WEBS 2 -12= -1365, 2 -11 =1492, 3 -11 =2, 4 -11= -269, 4 -9= -269, 5 -9 =2, 6 -9 =1492, 6 -8= -1365
NOTES
1) This truss has been designed for the wind Toads generated by 110.0 m.p.h. winds at 22.1 feet above
ground level, using 2.0 p.s.f. top chord dead load and 8.0 p.s.f bottom chord dead load, 1.0 miles from
hurricane oceanline, on a category I enclosed building, of dimensions 80.5 by 66.5 with exposure C
(ASCE 7 -93). Lumber Increase = 1.33, Plate Increase = 1.33. No end verticals are exposed.
2) Provide adequate drainage to prevent water ponding.
3) This truss has been designed with ANSI/TPI 1 -1995 criteria.
LOAD CASE(S) Standard r
JAN 2 2 1997
MAHMOUD ZOLFAGHARI, P.E.
•
Job
8340
Truss
E3
Truss Type
ROOF TRUSS
Qty
1
Ply
1
BLUM RESIDENCE ( BLUM BLDR.) DWH
DECO TRUSS COMPANY INC. 3.3T s Dec 11 1996 MiTek Industries, Inc. Tue Jan 21 11:29:35 1997 Page 1
2 -10-0 6-11 -9 11-0-0 15-4-0 19-4-7 23 26
`
2 -10-0 4-1-9 4-0-7 4-4-0 4-0-7 4-1 -9 2 -10-0
4x8 = 4x6 =
4
5
-
5.00p
r-
4x6 c
4x6 a
3
6
2x4 it
2x4 n
2
7
is
1 ►'' 12 11 10 ►'' 8
3x4 = 5 _ 3x4 = 3x4 = 3x8 = 5:6= 3x4 =
2-6-0 2 - 11 -0-0 I 15-4-0 I 23-6-0 23 26-4-0 1
I
2 -6-0 0-4-0 8-2-0 4-4-0 8-2-0 0-4-0 2 -6-0
Plate Offsets (X,Y): [1:0- 0- 4,0 -1- 11],[4:0- 2- 4,0 -1- 12],[8:0 -0- 12,0 -1- 11],[9:0- 0- 0,0 -3- 4],[13:0- 0- 0,0 -3 -4]
LOADING (psf)
SPACING 2 -0 -0
CSI
DEFL (in) (loc) Udefl
PLATES GRIP
TCLL 30.0.
Plates Increase 1.33
TC 0.32
Vert(LL) 0.08 11/10 999
M20(20ga) 249/190
TCDL 15.0
Lumber Increase 1.33
BC 0.71
Vert(TL) 0.14 13/12 999
BCLL • 0.0
Rep Stress Incr YES
WB 0.93
Horz(TL) 0.03 9 n/a
BCDL 10.0
Code SFBC
Min Length / LL defl = 360
Weight: 145 (Ibs)
LUMBER BRACING
TOP CHORD 2 X 4 SYP No.2D TOP CHORD Sheathed or 4 -7 -11 on center purlin spacing.
BOT CHORD 2 X 4 SYP No.2D BOT CHORD Rigid ceiling directly applied, or 1- 13:6 -3 -0, 12- 13:6 -3 -0,
WEBS 2 X 4 SYP No.3 11- 12:6 -3 -0, 10- 11:6 -3 -0, 9- 10:6 -3 -0, 8- 9:6 -3 -0 on
center bracing.
REACTIONS (Ibs /size) 13= 1456/0 -8 -0, 9= 1456/0 -8 -0
Max Horz 13= 444(load case 3)
Max Uplift 13=- 892(load case 4), 9=- 892(load case 4) .
FORCES
TOP CHORD 1 -2 =369, 2 -3 =361, 3 -4= -1163, 4 -5= -1073, 5 -6= -1163, 6 -7 =361, 7 -8 =369
BOT CHORD 8 -9= -333, 9 -10 =1012, 10 -11 =1073, 11 -12 =1073, 12 -13 =1012, 1- 13 = -333
WEBS 2 -13= -342, 3 -13= -1678, 3- 12 =77, 4- 12 =77, 4 -10 =0, 5- 10 =77, 6- 10 =77, 6 -9= -1678, 7 -9= -342
NOTES
1) This truss has been designed for the wind Toads generated by 110.0 m.p.h. winds at 22.1 feet above
ground level, using 2.0 p.s.f. top chord dead load and 8.0 p.s.f bottom chord dead load, 1.0 miles from
hurricane oceanline, on a category I enclosed building, of dimensions 80.5 by 66.5 with exposure C
(ASCE 7 -93). Lumber Increase = 1.33, Plate Increase = 1.33. No end verticals are exposed.
2) Provide adequate drainage to prevent water ponding.
3) This truss has been designed with ANSI/TPI 1 -1995 criteria.
LOAD CASE(S) Standard r
%,
JAN 2 2 1997
MAHMOIJD ZOLFAGHARI, P.E.
Job
8340
Truss
E4
Truss Type
ROOF TRUSS
Qty
1
Ply
1
BLUM RESIDENCE ( BLUM BLDR.) DWH
DECO
TRUSS COMPANY INC. 3.3T
2 -10-0 7-11-8 13-0-0
s Dec 11 1996 MiTek Industries, Inc. Tue Jan 21 11:29:45 1997 Page 1
1 .4�0 18-4-8 23-10-0
0-4-0 5-0-8 5-5-8
2 -10-0 5-1-8 5-0-8
4x6 =
4
5.0012
4x6
4x6
3
5
Y
,.
*
t
2x4 i l
2x4 ii
2
6
r.
1 �� g
3x4 = 5x = 6x8 = 3x4 =
I 2 -6-0 2110/.0 13-2 -0 23-10-0
1 1
2-6-0 0-4-0 10-4-0 10-8-0
Plate Offsets (X,Y) [1:0- 0- 4,0 -1- 11],[9:0- 0- 0,0 -3 -4]
LOADING (psf)
SPACING 2 -0 -0
CSI
DEFL (in) (loc) I /defl
PLATES GRIP
TCLL 30.0
Plates Increase 1.33
TC 0.43
Vert(LL) 0.18 8/7 999
M20(20ga) 249/190
TCDL 15.0
Lumber Increase 1.33
BC 0.65
Vert(TL) 0.34 8/7 741
BCLL 0.0
Rep Stress Incr YES
WB 0.58
Horz(TL) 0.03 7 n/a
BCDL 10.0
Code SFBC
Min Length / LL defl = 360
Weight: 130 (Ibs)
LUMBER BRACING
TOP CHORD 2 X 4 SYP No.2D TOP CHORD Sheathed or 4 -8 -9 on center purlin spacing,
BOT CHORD 2 X 4 SYP No.2D *Except* except end verticals.
1 -8 2 X 4 SYP SS BOT CHORD Rigid ceiling directly applied, or 1- 9:6 -3 -0, 8- 9:6 -3 -0,
WEBS . 2 X 4 SYP No.3 7- 8:6 -1 -10 on center bracing.
WEBS 1 Row at midpt 9 -3, 5 -7
REACTIONS (Ibs /size) 9= 1489/0 -8 -0, 7= 1125/0 -8 -0
Max Horz 9= 498(load case 3)
Max Uplift 9=- 920(load case 4), 7=- 500(load case 4)
FORCES
TOP CHORD 1 -2 =369, 2 -3 =361, 3 -4= -1092, 4 -5= -1092, 5 -6 = -0, 6 -7= -244
BOT CHORD 7 -8 =1176, 8 -9 =1086, 1- 9 = -333
WEBS 2 -9= -387, 3 -9= -1718, 3- 8 = -95, 4 -8 =381, 5 -8= -206, 5 -7= -1409
NOTES '
1) This truss has been designed for the wind loads generated by 110.0 m.p.h. winds at 22.1 feet above
ground level, using 2.0 p.s.f. top chord dead load and 8.0 p.s.f bottom chord dead load, 1.0 miles from
hurricane oceanline, on a category I enclosed building, of dimensions 80.5 by 66.5 with exposure C
(ASCE 7 -93). Lumber Increase = 1.33, Plate Increase = 1.33. No end verticals are exposed.
2) This truss has been designed with ANSIITPI 1 -1995 criteria.
LOAD CASE(S) Standard r
JAN 2 2 1997
MAHMOt10 ZOLFAGHARI, P.E.
Job
8340
Truss
E5
Truss Type
ROOF TRUSS
Qty
3
Ply
1
BLUM RESIDENCE ( BLUM BLDR.) DWH
DECO TRUSS COMPANY INC. 3.3T s Dec 11 1996 MiTek Industries, Inc. Tue Jan 21 11:29:54 1997 Page 1
1 2 -10-0 1 7-11-8 1 13-2 -0 18-4 -8 23-10-0
1 1 I
2 -10-0 5-1 -8 5.2.8 5-2 -8 5-5-8
4x6 =
4
5.00p
^�
4x6s
4x6
cb
3
I•
2x411
5
:
2x411
2
6
I.
1 9 8=
3x4 = 6x8 = 7
5x6 = 3x4 =
1 2-6-0 2 - 13-2-0 23-10-0
1 1
2-6-0 0-4-0 10-4 -0 10-8-0
Plate Offsets (X,Y) [1:0- 0- 4,0 -1- 11],[9:0- 0- 0,0 -3 -4]
LOADING (psi)
SPACING 2 -0 -0
CSI
DEFL (in) (loc) I/defl
PLATES GRIP
TCLL 30.0
Plates Increase 1.33
TC 0.43
Vert(LL) 0.18 an 999
M20(20ga) 249/190
TCDL 15.0
Lumber Increase 1.33
BC 0.65
Vert(TL) 0.34 8/7 741
BCLL 0.0
Rep Stress Incr YES
WB 0.58
Horz(TL) 0.03 7 n/a
BCDL 10.0
Code SFBC
Min Length / LL defl = 360
Weight: 130 (Ibs)
LUMBER BRACING
TOP CHORD 2 X 4 SYP No.2D TOP CHORD Sheathed or 4 -8 -9 on center purlin spacing,
BOT CHORD 2 X 4 SYP No.2D *Except* except end verticals.
1 -8 2 X 4 SYP SS BOT CHORD Rigid ceiling directly applied, or 1- 9:6 -3 -0, 8- 9:6 -3 -0,
WEBS 2 X 4 SYP No.3 7- 8:6 -1 -10 on center bracing.
WEBS 1 Row at midpt 9 -3, 5 -7
REACTIONS (Ibs/size) 9= 1489/0 -8 -0, 7= 1125/0 -8 -0
Max Horz 9= 498(Ioad case 3)
Max Uplift 9=- 920(Ioad case 4), 7=- 500(load case 4)
FORCES
TOP CHORD 1 -2 =369, 2 -3 =361, 3 -4= -1092, 4 -5= -1092, 5 -6 =0, 6 -7= -244
BOT CHORD 7 -8 =1176, 8 -9 =1086, 1- 9 = -333
WEBS 2 -9= -387, 3 -9= -1718, 3- 8 = -95, 4 -8 =381, 5 -8= -206, 5 -7= -1409
NOTES
1) This truss has been designed for the wind loads generated by 110.0 m.p.h. winds at 22.1 feet above
ground level, using 2.0 p.s.f. top chord dead load and 8.0 p.s.f bottom chord dead Toad, 1.0 miles from
hurricane oceanline, on a category I enclosed building, of dimensions 80.5 by 66.5 with exposure C
(ASCE 7 -93). Lumber Increase = 1.33, Plate Increase = 1.33. No end verticals are exposed.
2) This truss has been designed with ANSI/TPI 1 -1995 criteria.
LOAD CASE(S) Standard I
L
JAN 2 2 1997
MAHMOUD ZOLFAGHARI, P.E.
•
Job
8340
Truss
E6
Truss Type
ROOF TRUSS
Qty
4
Ply
1
BLUM RESIDENCE ( BLUM BLDR.) DWH
DECO TRUSS COMPANY INC. 3.3T s Dec 11 1996 MiTek Industries, Inc. Tue Jan 21 11:30:04 1997 Page 1
-2 -8-3 5.5-8 1 10-8 -0 15-10-8 20-5-0
1 1
2-8-3 5-5-8 5-2 -8 5-2 -8 4-6-8
4x6 =
4 •
5.00 r
4x6 ;
4x6
3
5
6
2x4 11
2x4 11
r
r
2
6
E In
,-- .
L]
1 8
5x6 = 6x8 =
3x4 =
1 0 -101 10-8 -0 20-5-0
1 1
0-10 -0 10-8-0 9-9-0
Plate Offsets (X,Y) [1:0- 0- 0,0 -3 -8]
LOADING (psf)
SPACING 2 - -
CSI
DEFL (in) (loc) I /defl
PLATES GRIP
TCLL 30.0
Plates Increase 1.33
TC 0.48
Vert(LL) 0.18 8/7 999
M20(20ga) 249/190
TCDL 15.0
Lumber Increase 1.33
BC 0.63
Vert(TL) 0.33 1/8 726
BCLL 0.0
Rep Stress Incr NO
WB 0.84
Horz(TL) 0.03 7 n/a
BCDL 10.0
Code SFBC
Min Length / LL defl = 360
Weight: 127 (Ibs)
LUMBER BRACING
TOP CHORD 2 X 4 SYP No.2D TOP CHORD Sheathed or 4 -7 -13 on center purlin spacing,
BOT CHORD 2 X 4 SYP No.2D except end verticals.
WEBS 2 X 4 SYP No.3 BOT CHORD Rigid ceiling directly applied, or 1- 8:5 -9 -11, 7- 8:6 -3 -0 on
OTHERS 2 X 4 SYP No.3 center bracing.
WEBS 1 Row at midpt 1 -3
REACTIONS (Ibs/size) 1= 1408/0 -8 -0, 7= 1107/0 -2 -8
Max Horz 1= 475(load case 3)
Max Uplift 1 =- 855(load case 4), 7=- 512(load case 4)
FORCES
TOP CHORD 1 -2= -545, 2 -3 =0, 3 -4= -1056, 4 -5= -1056, 5 -6 =0, 6 -7= -203
BOT CHORD 7 -8 =1018, 1 -8 =1149
WEBS 1 -3= -1376, 3 -8= -213, 4 -8 =353, 5- 8 = -52, 5 -7= -1300
NOTES
1) This truss has been designed for the wind loads generated by 110.0 m.p.h. winds at 22.1 feet above
ground level, using 2.0 p.s.f. top chord dead load and 8.0 p.s.f bottom chord dead load, 1.0 miles from
hurricane oceanline, on a category I enclosed building, of dimensions 80.5 by 66.5 with exposure C
(ASCE 7 -93). Lumber Increase = 1.33, Plate Increase = 1.33. No end verticals are exposed.
2) Studs to be fastened with 2x3 M20 plates.
3) This truss has been designed with ANSI/TPI 1 -1995 criteria.
LOAD CASE(S) r
•
1) Lumber Increase =1.33, Plate Increase =1.33 / y
$0-4
Uniform Loads (Ibs per ft)
Vert:2 -3= -90.0, 3 -4= -90.0, 4 -5= -90.0, 5 -6= -90.0, 7 -8= -20.0, 1 -8= -20.0
Concentrated Loads (Ibs) JAN 2 2 1997
` Vert:2= -301.4
MAHMOUO ZOLFAGHARI, P.E.
Job
8340
Truss
E7
Truss Type
ROOF TRUSS
Qty
13
Ply
1
BLUM RESIDENCE ( BLUM BLDR.) DWH
DECO
TRUSS COMPANY INC. 3.3T s Dec 11 1996 MiTek Industries, Inc. Tue Jan 21 11:30:13 1997 Page
2 -10-0 7 -11 -8 13.2.0 18-4 -8 22 -11 -0
1
2 -10-0 5-1 -8 5-2-8 5-2-8 4.6.8
4x6 =
4
5.0012
4x6
4x6
3
5
«cddd
2x4 I
2x4 11
2
6
i
r
y
1 8
3x4 = 9 7
__
5x6 = 6x8 3x4 =
I 240 2 13-2-0 22 -11-0
1 1
2-6-0 0-4-0 10-4-0 9-9-0
Plate Offsets (X,Y) [1:0-0-4,0-1-11], [9:0-0-0,0-3-4]
LOADING (psf)
SPACING 2 -0 -0
CSI
DEFL (in) (loc) I/defl
PLATES GRIP
TCLL 30.0
Plates Increase 1.33
TC 0.39
Vert(LL) 0.16 8/7 999
M20(20ga) 249/190
TCDL 15.0
Lumber Increase 1.33
BC 0.65
Vert(TL) 0.29 9/8 812
BCLL 0.0
Rep Stress Incr YES
WB 0.81
Horz(TL) 0.03 7 n/a
BCDL 10.0
Code SFBC
Min Length / LL deft = 360
Weight: 126 (Ibs)
LUMBER BRACING
TOP CHORD 2 X 4 SYP No.2D TOP CHORD Sheathed or 4 -11 -11 on center purlin spacing,
BOT CHORD 2 X 4 SYP No.2D 'Except* except end verticals.
1 -8 2 X 4 SYP SS BOT CHORD Rigid ceiling directly applied, or 1- 9:6 -3 -0, 8- 9:6 -3 -0,
WEBS 2 X 4 SYP No.3 7- 8:6 -3 -0 on center bracing.
WEBS 1 Row at midpt 9 -3
REACTIONS (Ibs /size) 9= 1439/0 -8 -0, 7= 1073/0 -2 -8
Max Horz 9= 489(load case 3)
Max Uplift 9=- 896(Ioad case 4), 7=- 478(load case 4)
FORCES
TOP CHORD 1 -2 =369, 2 -3 =361, 3 -4= -995, 4 -5= -995, 5 -6 =0, 6 -7= -203
BOT CHORD 7 -8 =975, 8 -9 =1013, 1- 9 = -333
WEBS 2 -9= -387, 3 -9= -1631, 3 -8= -116, 4 -8 =306, 5- 8 = -70, 5 -7= -1246
NOTES
1) This truss has been designed for the wind loads generated by 110.0 m.p.h. winds at 22.1 feet above
ground level, using 2.0 p.s.f. top chord dead load and 8.0 p.s.f bottom chord dead load, 1.0 miles from
hurricane oceanline, on a category I enclosed building, of dimensions 80.5 by 66.5 with exposure C
(ASCE 7 -93). Lumber Increase = 1.33, Plate Increase = 1.33. No end verticals are exposed.
2) This truss has been designed with ANSI/TPI 1 -1995 criteria.
LOAD CASE(S) Standard
j '
JAN 2 2 1997
MAHMOUD ZOLFAGIIARI, P.E.
Job ■
8340
Truss
E8
Truss Type
ROOF TRUSS
Qty
1
Ply
1
BLUM RESIDENCE ( BLUM BLDR.) DWH
DECO TRUSS COMPANY INC. 3.3T s Dec 11 1996 MiTek Industries, Inc. Tue Jan 21 11:30:22 1997 Page 1
4-6-8 9-7 -0 9 14 -11 -8 20-5-0 23-1-3
1
4-6-8 5-0-8 0-4-0 5-0-8 5-5-8 2-8-3
4x6 =
5.00p 4
►�
4x6
4x6
M
3
1.1
5
k•
2x4ii
6
2
2x4 II
6
_`
- —
e NI
-
1
6x8 =
3x4 = 5x6
i
=
9-9-0
20 -5-0 1 -30
9-9-0
10-8-0 0-10-0
Plate Offsets (X,Y): [7:0-0-0,0-3-8]
LOADING (psf)
SPACING 2 -0 -0
CSI
DEFL (in) (loc) I /deft
PLATES GRIP
TCLL 30.0
Plates Increase 1.33
TC 0.53
Vert(LL) 0.18 8/7 999
M20(20ga) 249/190
TCDL 15.0
Lumber Increase 1.33
BC 0.63
Vert(TL) 0.33 8/7 726
BCLL 0.0
Rep Stress Incr NO
WB 0.84
Horz(TL) 0.03 7 n/a
BCDL 10.0
Code SFBC
Min Length / LL deft = 360
Weight: 127 (Ibs)
LUMBER BRACING
TOP CHORD 2 X 4 SYP No.2D TOP CHORD Sheathed or 4 -7 -13 on center purlin spacing,
BOT CHORD 2 X 4 SYP No.2D except end verticals.
WEBS 2 X 4 SYP No.3 BOT CHORD Rigid ceiling directly applied, or 1- 8:6 -3 -0, 7- 8:6 -0 -2 on
OTHERS 2 X 4 SYP No.3 "Except* center bracing.
B3 2 X 4 SYP No.2D WEBS 1 Row at midpt 5 -7
REACTIONS (Ibs /size) 1= 1107/0 -2 -8, 7= 1408/0 -8 -0
Max Horz 1=- 165(load case 2)
Max Uplift 1=- 577(load case 4), 7=- 958(load case 4)
FORCES
TOP CHORD 1 -2= -203, 2 -3 = -0, 3 -4= -1057, 4 -5= -1057, 5 -6 = -0, 6 -7= -545
BOT CHORD 7 -8 =1150, 1 -8 =1013
WEBS 1 -3= -1300, 3- 8 = -52, 4 -8 =353, 5 -8= -213, 5 -7= -1377
NOTES
1) This truss has been designed for the wind loads generated by 110.0 m.p.h. winds at 32.4 feet above
ground level, using 2.0 p.s.f. top chord dead load and 8.0 p.s.f bottom chord dead load, 1.0 miles from
hurricane oceanline, on a category I enclosed building, of dimensions 80.5 by 66.5 with exposure C
(ASCE 7 -93). Lumber Increase = 1.33, Plate Increase = 1.33. No end verticals are exposed.
2) Studs to be fastened with 2x3 M20 plates.
3) This truss has been designed with ANSI/TPI 1 -1995 criteria.
r
LOAD CASE(S)
1) Lumber Increase =1.33, Plate Increase =1.33 Vi>401/47.1.
Uniform Loads (Ibs per ft)
Vert:2 -3= -90.0, 3 -4 =- 90.0, 4 -5= -90.0, 5 -6= -90.0, 7 -8= -20.0, 1 -8= -20.0
Concentrated Loads (Ibs) JAN 2 2 1997
Vert:6= -301.4
MAHMOUR ZOLFAGHARI, P.E.
Job
8340
Truss
E9
Truss Type
ROOF TRUSS
Qty
1
Ply
1
BLUM RESIDENCE (BLUM BLDR.) DWH
DECO TRUSS COMPANY INC. 3.3T s Dec 11 1996 MiTek Industries, Inc. Tue Jan 21 11:48:02 1997 Page 1
7-7-0 11 -11 -0 16-1 -2 20-5 -0 23-1-3
F i I
7-7-0 4 -4 -0 4-2-2 4-3-14 2-8-3
5.00 1 4x8 = 4x6 =
3 4
E
4x6
5
3x4 s
'
2
2x4 n
6
9 87 3x4 = 6x8 =
2x4 11 5x6 =
I 7 -7 -0 I 11 -11 -0 20-5-0 p1-3-0
i
7 - - 4-4 -0 s-6-0 0-10-0
Plate Offsets (X,Y): ]3:0 -2- 4,0-1- 12],17:0- 0- 0,0 -3 -8]
LOADING (psf)
SPACING 2 -0 -0
CSI
DEFL (in) (loc) I/defl
PLATES GRIP
TCLL 30.0
Plates Increase 1.33
TC 0.72
Vert(LL) 0.08 9/8 999
M20(20ga) 249/190
TCDL 15.0
Lumber Increase 1.33
BC 0.43
Vert(TL) 0.15 8/7 999
BCLL 0.0
Rep Stress Incr NO
WB 0.79
Horz(TL) 0.02 7 n/a
BCDL 10.0
Code SFBC
Min Length / LL def = 360
Weight: 129 (Ibs)
LUMBER BRACING
TOP CHORD 2 X 4 SYP No.2D *Except' TOP CHORD Sheathed or 3 -6 -8 on center purlin spacing,
2 -3 2 X 4 SYP SS except end verticals.
BOT CHORD 2 X 4 SYP No.2D BOT CHORD Rigid ceiling directly applied, or 10 -00 -00 on center bracing.
WEBS 2 X 4 SYP No.3 Except: 8- 9:6 -3 -0, 7- 8:6 -3 -0.
OTHERS 2 X 4 SYP No.3 *Except*
B3 2 X 4 SYP No.2D
REACTIONS (Ibs/size) 1= 1107/0 -2 -8, 7= 1408/0 -8 -0
Max Horz 1=- 154(load case 2)
Max Uplift 1=- 577(Ioad case 4), 7 =- 958(load case 4)
FORCES
TOP CHORD 1 -2= -1033, 2 -3= -1171, 3 -4= -1126, 4 -5= -1221, 5 -6 =0, 6 -7= -494
BOT CHORD 7 -8 =1148, 8 -9 =1081, 1 -9 =0
WEBS 2 -9 =1109, 3 -9= -129, 3 -8 =68, 4 -8 =93, 5- 8 = -27, 5 -7= -1417
NOTES
1) This truss has been designed for the wind loads generated by 110.0 m.p.h. winds at 32.4 feet above ground level, using 2.0 p.s.f. top chord dead load and 8.0 p.s.f
bottom chord dead load, 1.0 miles from hurricane oceanline, on a category I enclosed building, of dimensions 80.5 by 66.5 with exposure C (ASCE 7 -93). Lumber
Increase = 1.33, Plate Increase = 1.33. No end verticals are exposed.
2) Provide adequate drainage to prevent water ponding.
3) Studs to be fastened with 2x3 M20 plates.
4) This truss has been designed with ANSI /TPI 1 -1995 criteria.
LOAD CASE(S)
1) Lumber Increase =1.33, Plate Increase =1.33
Uniform Loads (Ibs per ft)
Vert:2 -3= -90.0, 3 -4= -90.0, 4 -5= -90.0, 5 -6= -90.0, 7 -8= -20.0, 8 -9= -20.0, 1 -9= -20.0
Concentrated Loads (Ibs)
Vert:6= -301.4
Z,,,,,4*,.."Zpiefrn*
JAN 2 2 1997
MAHMODU ZOLFAGHARI, P.E.
Job
8340
Truss
E10
Truss Type
ROOF TRUSS
Qty
1
Ply
1
BLUM RESIDENCE ( BLUM BLDR.) DWH
DECO TRUSS COMPANY INC. 3.3T s Dec 11 1996 MiTek Industries, Inc. Tue Jan 21 16:51:10 1997 Page 1
I
6-6-0 I 10-8-0 14-10-0 21 -4-0 24-0-3
I I I I
6-6-0 4 -2 -0 4-2-0 6-6-0 2-8-3
5.00p 4x6 = 3x4 = 4x6 =
3
4 5
3x4:
3x4
2
6
i f
Zr
I
Y gg
Y
1 �'1
Y
i 10 9 8 i =i
1 3x4 = 4x8 = 7
2 x 4 11 4x8 = 3x8 11
6-6-0 I 14-10-0 21 -4 -0 ?2 -2-9
I
I
6-6-0 8-4-0 6-6-0 0-10-0
Plate Offsets (X,Y): (7:0- 3- 8,0 -3 -4)
LOADING (psf)
SPACING 2 -0 -0
CSI
DEFL (in) (Ioc) 1/dell
PLATES GRIP
TCLL 30.0
Plates Increase 1.33
TC 0.85
Vert(LL) 0.09 10/9 999
M20(20ga) 249/190
TCDL 15.0
Lumber Increase 1.33
BC 0.49
Vert(TL) 0.17 10/9 999
BCLL 0.0
Rep Stress Incr NO
WB 0.51
Horz(TL) 0.02 7 n/a
BCDL 10.0
Code SFBC
Min Length / LL dell = 360
Weight: 130 (Ibs)
LUMBER BRACING
TOP CHORD 2 X 4 SYP No.2D TOP CHORD Sheathed or 2 -10 -5 on center purlin spacing,
BOT CHORD 2 X 4 SYP No.2D except end verticals.
WEBS 2 X 4 SYP No.3 BOT CHORD Rigid ceiling directly applied, or 10 -00-00 on center bracing.
OTHERS 2 X 4 SYP No.3 *Except' Except: 8- 9:6 -2 -15, 9- 10:6 -2 -15.
B2 2 X 4 SYP No.2D
REACTIONS (Ibs/size) 1= 1157/0 -8 -0, 7= 1459/0 -8 -0
Max Horz 1=- 119(load case 2)
Max Uplift 1 =- 601(load case 4), 7 =- 987(Ioad case 4)
FORCES
TOP CHORD 1 -2= -1094, 2 -3= -1402, 3 -4= -1294, 4 -5= -1294, 5 -6= -1402, 6 -7= -1395
BOT CHORD 7 -8 =0, 8 -9 =1488, 9 -10 =1488, 1 -10 =0
WEBS 2- 10=1321, 3- 10=65, 4 -10= -269, 4 -8= -269, 5 -8 =65, 6 -8 =1321
NOTES
1) This truss has been designed for the wind Toads generated by 110.0 m.p.h. winds at 32.4 feet above ground level, using 2.0 p.s.f. top chord dead Toad and 8.0 p.s.f
bottom chord dead Toad, 1.0 miles from hurricane oceanline, on a category I enclosed building, of dimensions 80.5 by 66.5 with exposure C (ASCE 7 -93). Lumber
Increase = 1.33, Plate Increase = 1.33. No end verticals are exposed.
2) Provide adequate drainage to prevent water ponding.
3) Studs to be fastened with 2x3 M20 plates.
4) This truss has been designed with ANSI /TPI 1 -1995 criteria.
LOAD CASE(S)
1) Lumber Increase =1.33, Plate Increase =1.33
Uniform Loads (Ibs per ft)
• Vert:2 -3= -90.0, 3 -4= -90.0, 4 -5= -90.0, 5 -6= -90.0, 7 -8= -20.0, 8 -9= -20.0, 9 -10= -20.0, 1 -10= -20.0
Concentrated Loads (Ibs)
Vert:6= -301.4 f
i
'1' •
JAN 22 1
MAHMOUD ZOLFAGHARI, P.E.
Job
8340
Truss
K1
Truss Type
ROOF TRUSS
Qty
15
Ply
1
BLUM RESIDENCE ( BLUM BLDR.) DWH
DECO TRUSS COMPANY INC. 3.3T s Dec 11 1996 MiTek Industries, Inc. Tue Jan 21 11:33:03 1997 Page 1
3-1 -0 6-2-0
{
3-1 -0
5.01 r12 4x6
2
3 -1 -0
=
c il
0L-64
�cx1011 3x101
2x411
1 3
3x4 = 3x4 =
1 0 - 3-1 -0 i 5-11.0
1 62.0
0 - 3 - 0 2-10-0 2 -10-0 0-3-0
Plate Offsets (X,Y) [1:0- 0- 0,0 -2- 1],[3:0- 0- 8,0 -2 -1]
—
LOADING (psf)
TCLL 30.0
TCDL 15.0
BCLL 0.0
BCDL 10.0
SPACING 2 -0 -0
Plates Increase 1.33
Lumber Increase 1.33
Rep Stress Incr YES
Code SFBC
CSI
TC 0.12
BC 0.07
WB 0.02
DEFL (in) (loc) I /defl
Vert(LL) 0.00 4 999
Vert(TL) 0.01 4 999
Horz(TL) 0.00 3 n/a
Min Length / LL defl = 360
PLATES GRIP
M20(20ga) 249/190
Weight: 36 (Ibs)
LUMBER BRACING
TOP CHORD 2 X 4 SYP No.2D TOP CHORD Sheathed or 6 -0 -0 on center purlin spacing.
BOT CHORD 2 X 4 SYP No.2D BOT CHORD Rigid ceiling directly applied, or 1- 4:6 -3 -0, 3- 4:6 -3 -0 on
WEBS 2 X 4 SYP No.3 center bracing.
OTHERS 2 X 8 SYP SS
WEDGE . Left: 2 X 8, Right: 2 X 8
REACTIONS (Ibs /size) 1= 315/0 -8 -0, 3= 315/0 -8 -0
Max Horz 1=- 19(Ioad case 2)
Max Uplift 1=- 162(load case 4), 3=- 162(load case 4)
FORCES
TOP CHORD 1- 2 = -340, 2- 3 = -340
BOT CHORD 3 -4 =301, 1 -4 =301
WEBS 2 -4 =57
NOTES
1) This truss has been designed for the wind Toads generated by 110.0 m.p.h. winds at 32.4 feet above '
ground level, using 2.0 p.s.f. top chord dead load and 8.0 p.s.f bottom chord dead load, 1.0 miles from
hurricane oceanline, on a category I enclosed building, of dimensions 80.5 by 66.5 with exposure C
(ASCE 7 -93). Lumber Increase = 1.33, Plate Increase = 1.33. No end verticals are exposed.
2) This truss has been designed with ANSI/TPI 1 -1995 criteria.
LOAD CASE(S) Standard r
Z
JAN 2 2 1997
MAHMOLID ZOLFAGHARI, P.E.
Job
8340
Truss
K2
Truss Type
ROOF TRUSS
Qty
3
Ply
1
BLUM RESIDENCE ( BLUM BLDR.) DWH
DECO
TRUSS COMPANY INC. 3.3T s Dec 11 1996 MiTek Industries, Inc. Tue Jan 21 11:33:09 1997
5-0-0 10-0-0
Page 1
5-0-0 5-0-0
4x6 =
5.00 12
2
L - Z
I , • Al
3x4 %
x4
4
4x6 II
_ .
C
3.00 �12
3x6 l%
3
3x6 /1
` 5-0-0
5-0-0 5-0-0
Plate Offsets (X,Y) [1:0- 3- 8,0 -1 -3], [3:0- 4- 6,0 -1 -3]
LOADING (psi)
SPACING 2 -0 -0
CSI
DEFL (in) (loc) I/defl
PLATES GRIP
TCLL 30.0
Plates Increase 1.33
TC 0.39
Vert(LL) 0.03 4 999
M20(20ga) 249/190
TCDL 15.0
Lumber Increase 1.33
BC 0.22
Vert(TL) 0.06 4 999
BCLL 0.0
Rep Stress Incr YES
WB 0.17
Horz(TL) 0.04 3 n/a
BCDL 10.0
Code SFBC
Min Length / LL defl = 360
Weight: 42 (Ibs)
LUMBER BRACING
TOP CHORD 2 X 4 SYP No.2D TOP CHORD Sheathed or 4 -7 -6 on center purlin spacing.
BOT CHORD 2 X 4 SYP No.2D BOT CHORD Rigid ceiling directly applied, or 1- 4:6 -3 -0, 3- 4:6 -3 -0 on
WEBS 2 X 4 SYP No.3 center bracing.
SLIDER Left 2 X 4 No.2D SYP 1- 11 -12, Right 2 X 4 No.2D SYP 1 -11 -12
REACTIONS (Ibs /size) 1= 518/0 -8 -0, 3= 518/0 -8 -0
Max Horz 1= 32(Ioad case 3)
Max Uplift 1=- 26€(load case 4), 3=- 266(load case 4)
FORCES
TOP CHORD 1- 2= -1052, 2- 3 = -1052
BOT CHORD 3 -4 =958, 1 -4 =958
WEBS 2 -4 =559
NOTES
1) This truss has been designed for the wind Toads generated by 110.0 m.p.h. winds at 32.4 feet above
ground level, using 2.0 p.s.f. top chord dead Toad and 8.0 p.s.f bottom chord dead Toad, 1.0 miles from
hurricane oceanline, on a category I enclosed building, of dimensions 80.5 by 66.5 with exposure C
(ASCE 7 -93). Lumber Increase = 1.33, Plate Increase = 1.33. No end verticals are exposed.
2) This truss has been designed with ANSI/TPI 1 -1995 criteria.
LOAD CASE(S) Standard
r
, "0.71*
,IAN 2 2 1997
MAHNIOUD ZOLFAGHARI, P.E.
Job
8340
ti
0
N
Truss
K3
DECO TRUSS COMPANY INC.
LOADING (psf)
TCLL 30.0
TCDL 15.0
BCLL 0.0
BCDL 10.0
1 -38-0
0-8-0
Truss Type
ROOF TRUSS
-3-11 -0
3-11.0
-3.0 -0
3-0-0
Plate Offsets (X,Y) [1:0- 3- 0,0- 2- 0],[3:0 -5- 11.0 -1 -13]
SPACING 2 -0 -0
Plates Increase 1.33
Lumber Increase 1.33
Rep Stress Incr YES
Code SFBC
CSI
TC 0.97
BC 0.41
WB 0.31
(Matrix)
5-3-0
5-3-0
5-3-0
5-3-0
Qty
2
Ply
1
3.000
BLUM RESIDENCE ( BLUM BLDR.) DWH
3.3T s Dec 11 1996 MiTek Industries, Inc. Tue Jan 21 11:33:18 1997 Page 1
5x6 =
2
9-4 -0
4-1 -0
3
5.00 12 111
�
gC � 4
'W 5x6 = �•
1 ►5
4x6
9.4-0
4 -1 -0
4x6
DEFL (in) (loc) l/defl
Vert(LL) 0.31 1 494
Vert(TL) 0.56 1 269
Horz(TL) 0.22 3 n/a
Min Length / LL deft = 360
PLATES GRIP
M20(20ga) 249/190
Weight: 64 (Ibs)
LUMBER
TOP CHORD 2 X 6 SYP No.2D
BOT CHORD 2 X 4 SYP No.2D
WEBS 2 X 4 SYP No.3
OTHERS 2 X 4 SYP No.3 *Except*
W52X8SYPSS
LBR SCAB 2 -5 2 X 6 SYP X No.2D one side
WEDGE Left: 2 X 4
SLIDER Right 2 X 4 No.2D SYP 2 -5 -5
REACTIONS (Ibs /size) 5= 950/0 -8 -0, 3= 784/0 -2 -8
Max Horz 5= 132(load case 3)
Max Uplift 5=- 388(load case 4), 3=- 367(Ioad case 4)
FORCES
TOP CHORD 1- 2= -1937, 2- 3= -2197, 1 -5= -284
BOT CHORD 3 -4 =1909, 1 -4 =1912
WEBS 2 -4 =1014
NOTES
1) This truss has been checked for unbalanced loading conditions about joint 2.
2) This truss has been designed for the wind loads generated by 110.0 m.p.h. winds at 32.4 feet above
ground level, using 2.0 p.s.f. top chord dead Toad and 8.0 p.s.f bottom chord dead Toad, 1.0 miles from
hurricane oceanline, on a category I enclosed building, of dimensions 80.5 by 66.5 with exposure C
(ASCE 7 -93). Lumber Increase = 1.33, Plate Increase = 1.33. No end verticals are exposed.
3) Except as shown below, special connection(s) required to support concentrated load(s). Design of
connection(s) is delegated to the building designer.
4) Studs to be fastened with 2x3 M20 plates.
5) This truss has been designed with ANSI/TPI 1 -1995 criteria.
LOAD CASE(S) Standard
BRACING
TOP CHORD Sheathed or 1 -7 -9 on center purlin spacing.
BOT CHORD Rigid ceiling directly applied, or 1- 4:6 -3 -0, 3- 4:6 -3 -0 on
center bracing.
�, vt
JAN 2 2 1997
MAHMOUD ZOLFAGHARI, P.E.
Job
8340
Truss
P1
Truss Type
PIGGYBACK
Qty
1
Ply
1
BLUM RESIDENCE ( BLUM BLDR.) DWH
DECO TRUSS COMPANY INC. 3.3T s Dec 11 1996 MiTek Industries, Inc. Tue Jan 21 11:33:25 1997 Page 1
2 -5-8 4 -11 -0
9
2 -5-8
5.01 i12 3x4
2 -5-8
NOTE: FOR CONNECTION, REFER TO
= PIOGY —BACK DETAIL SHEEP ATTACHED.
•
W
Ic3
d
1 3
2x4 = 2x4 =
1-1-4 3-9-12 4.11 -0
1 -1 -4 2-8-8 1 -1 -4
Plate Offsets (X,Y) [2:0- 0- 0,0 -0 -14]
LOADING (psf)
TCLL 30.0
TCDL 15.0
BCLL 0.0
BCDL 10.0
SPACING 2 -0 -0
Plates Increase 1.33
Lumber Increase 1.33
Rep Stress lncr YES
Code SFBC
CSI
TC 0.03
BC 0.04
WB 0.00
DEFL (in) (loc) I/defl
Vert(LL) 0.00 1/3 999
Vert(TL) 0.00 1/3 999
Horz(TL) 0.00 3 n/a
Min Length / LL deft = 360
PLATES GRIP
M20(20ga) 249/190
Weight: 13 (Ibs)
LUMBER BRACING
TOP CHORD 2 X 4 SYP No.2D TOP CHORD Sheathed or 6 -0 -0 on center purlin spacing.
BOT CHORD 2 X 4 SYP No.2D BOT CHORD Rigid ceiling directly applied, or 1- 3:6 -3 -0 on center
bracing.
REACTIONS (lbs/size) 1= 143/0 -2 -8, 3= 143/0 -2 -8
Max Horz 1=- 14(load case 2)
Max Uplift 1=- 154(load case 4), 3=- 154(load case 4)
FORCES
TOP CHORD 1- 2 = -140, 2- 3 = -140
BOT CHORD 1 -3 =127
NOTES
1) This truss has been designed for the wind loads generated by 110.0 m.p.h. winds at 32.4 feet above ground level, using 2.0 p.s.f. top chord
dead Toad and 8.0 p.s.f bottom chord dead load, 1.0 miles from hurricane oceanline, on a category I enclosed building, of dimensions 80.5 by
66.5 with exposure C (ASCE 7 -93). Lumber Increase = 1.33, Plate Increase = 1.33. No end verticals are exposed.
2) This truss has been designed with ANSI/TPI 1 -1995 criteria.
LOAD CASE(S) Standard
r
i
JAN 2 2 1997
MAHMOUD ZOLFAGHARI, P.E.
Job
8340
Truss
CJ12
Truss Type
ROOF TRUSS
Qty
1
Ply
1
BLUM RESIDENCE ( BLUM BLDR.) DWH
DECO TRUSS COMPANY
INC. 3.3T s Dec 11 1996 MiTek Industries, Inc. Tue Jan 21 11:28:27
4 -0-1 9-2-5 12 -8-12
1997 Page 1
4-0-1 5-2-4 3-6-7
2x4 11
3.54 p 4
3x4
3
2
3x4
v
2
•
1
501
3x4 =
7
6
3x4 =
3x6 1 1 3x4 =
3-6-7 14 -0-1 1
9-2 -5 12-8-12
3 &7 0-5-11
5-2 -4 3-6-7
Plate Offsets (X,Y) [1:0- 0- 4,0- 2- 0],[7:0 -2- 12,0 -2 -8]
LOADING (psf)
SPACING 2 -0 -0
CSI
DEFL (in) (loc) I/defl
PLATES GRIP
TCLL 30.0
Plates Increase 1.33
TC 0.85
Vert(LL) 0.04 1 999
M20(20ga) 249/190
TCDL 15.0
Lumber Increase 1.33
BC 0.49
Vert(TL) 0.07 1 999
BCLL 0.0
Rep Stress Incr NO
WB 0.35
Horz(TL) -0.01 5 n/a
BCDL 10.0
Code SFBC
Min Length / LL defl = 360
Weight: 68 (Ibs)
LUMBER BRACING
TOP CHORD 2 X 4 SYP No.2D TOP CHORD Sheathed or 5 -0 -13 on center purlin spacing,
BOT CHORD 2 X 4 SYP No.2D except end verticals.
WEBS 2 X 4 SYP No.3 BOT CHORD Rigid ceiling directly applied, or 1- 7:6 -3 -0, 6- 7:6 -3 -0,
5- 6:6 -3 -0 on center bracing.
REACTIONS (Ibs /size) 7= 1089/0 -11 -5, 5= 426/0 -2 -8, 6= 900/0 -11 -5
Max Horz 7= 347(load case 2)
Max Uplift 7=- 1047(load case 2), 5=- 320(load case 2), 6=- 567(load case 2)
FORCES
TOP CHORD 1 -2 =774, 2 -3 =187, 3- 4 = -114, 4 -5= -402
BOT CHORD 5- 6 = -72, 6- 7 = -674, 1- 7 = -674
WEBS 2- 7 = -959, 2 -6 =623, 3- 6 = -885, 3 -5 =97
NOTES
1) This truss has been checked for unbalanced loading conditions about joint 4.
2) This truss has been designed for the wind loads generated by 110.0 m.p.h. winds at 32.4 feet above
ground level, using 2.0 p.s.f. top chord dead load and 8.0 p.s.f bottom chord dead load, 1.0 miles from
hurricane oceanline, on a category I enclosed building, of dimensions 80.5 by 66.5 with exposure C
(ASCE 7 -93). Lumber Increase = 1.33, Plate Increase = 1.33. No end verticals are exposed.
3) This truss has been designed with ANSI/TPI 1 -1995 criteria.
LOAD CASE(S) r
1) Lumber Increase =1.33, Plate Increase =1.33
�
Trapezoidal Loads (lbs per ft) j � �
Vert:1= 0.0- to -2 =- 186.6, 2 =- 93.3- to -3 =- 212.4, 3 =- 212.4- to -4 =- 286.4, 5 =- 63.6 -to -6= -47.2,
6 =- 47.2 -to -7= -20.7, 1= 0.0 -to -7= -41.4
JAN 2 2 1997
MAHMOLID 7 -OLFAGHARI, P.E.
Job
8340
Truss
CJ12A
Truss Type
ROOF TRUSS
Qty
2
Ply
1
BLUM RESIDENCE ( BLUM BLOR.) DWH
DECO TRUSS COMPANY
INC. 3.3T s Dec 11 1996 MiTek Industries, Inc. Tue Jan 21 11:56:58 1997 Page 1
` 3-2 -12 6-1 -9 12 -8-12
{
3-2 -12 2- 10-13 6-7-3
2x4 11
3.54 1 2
4
p
3x8
M
c?
v
3x4
2
3
9 .
O —
1 7
5
0
3x4 = 2x4
11 6
3x8 =
5x6 =
I 3-2 -12 5-7-14 -1 -9 12-8-12
I I
3-2 -12 2 -5-3 0-5-11 6-7-3
Plate Offsets (X,Y): 1:0- 0- 8,0- 2- 0J,(5:0- 2- 4,0 -1- 8],[6:0- 2- 0,0 -3 -8]
LOADING (psf)
SPACING 2 -0 -0
CSI
DEFL (in) (Ioc) 1/dell
PLATES GRIP
TCLL 30.0
Plates Increase 1.33
TC 0.92
Vert(LL) 0.16 1 471
M20(20ga) 249/190
TCDL 15.0
Lumber Increase 1.33
BC 0.89
Vert(TL) 0.29 1 257
BCLL 0.0
Rep Stress Incr NO
WB 0.92
Horz(TL) -0.02 5 n/a
BCDL 10.0
Code SFBC
Min Length / LL dell = 360
Weight: 65 (Ibs)
LUMBER BRACING
TOP CHORD 2 X 4 SYP SS TOP CHORD Sheathed or 2 -6 -10 on center purlin spacing,
BOT CHORD 2 X 4 SYP No.2D except end verticals.
WEBS 2 X 4 SYP No.3 BOT CHORD Rigid ceiling directly applied, or 1- 7:4 -4 -11, 6- 7:3 -4 -12, 5- 6:2 -9 -1 on
center bracing.
WEBS 1 Row at midpt 3 -5
REACTIONS (Ibs/size) 6= 3285/0 -11 -5, 5 =- 65/0 -2 -8
Max Horz 6= 347(load case 2)
Max Uplift 6=- 2886(load case 2), 5=- 65(load case 1)
Max Vert 6= 3285(load case 1), 5= 215(load case 3)
FORCES
TOP CHORD 1 -2 =1985, 2 -3 =2968, 3- 4 = -190, 4- 5 = -674
BOT CHORD 5 -6=- 2761, 6-7= -1831, 1- 7 = -1831
WEBS 2 -7 =98, 2 -6= -1003, 3 -6= -2691, 3 -5 =2901
NOTES
1) This truss has been checked for unbalanced loading conditions about joint 4.
2) This truss has been designed for the wind Toads generated by 110.0 m.p.h. winds at 32.4 feet above ground level, using 2.0 p.s.f. top chord dead Toad and 8.0 p.s.f
bottom chord dead load, 1.0 miles from hurricane oceanline, on a category I enclosed building, of dimensions 80.5 by 66.5 with exposure C (ASCE 7 -93). Lumber
Increase = 1.33, Plate Increase = 1.33. No end verticals are exposed.
3) Except as shown below, special connection(s) required to support concentrated load(s). Design of connection(s) is delegated to the building designer.
4) This truss has been designed with ANSI/7P! 1 -1995 criteria.
LOAD CASE(S)
1) Lumber Increase =1.33, Plate Increase =1.33
Concentrated Loads (Ibs)
Vert:1= -500.0
Trapezoidal Loads (Ibs per ft) r
Vert:1= 0.0- to -2 =- 150.8, 2 =- 150.8- to -3 =- 284.0, 3=- 142.0- to -4 =- 286.4, 5 =- 63.6 -to -6= -31.6, 6 =- 63.2 -to -7= -33.5,
1 =0.0 -to-7= -33.5 • .' ,/ ,
JAN 2 2 1997
MAHMOIJD ZOLFAGHARI, P.E.
•
Job
8340
Truss
CJ9
Truss Type
ROOF TRUSS
Qty
7
Ply
1
BLUM RESIDENCE ( BLUM BLDR.) DWH
DECO TRUSS COMPANY
INC. 3.3T s Dec 11 1996 MiTek Industries, Inc. Tue Jan 21 11:28:46 1997 Page 1
` 4 -0-1 9-10-13
{
4- 0-1 9-10-12
2x4 I I
3.54112
3
3x4
M
2
N
OL
_
•
r
3x4 =
5
4
3x6 11 3x4 =
I 36-7 4 -0.1 9-9-13 9-1 &13 •
I
36-7 0-5-11 5-9-12 0-1-0
Plate Offsets (X,Y): [1:0-0-4,0-2-0], [4:0-2-8,0-2-8]
LOADING (psf)
SPACING 2 -0 -0
CSI
DEFL (in) (Ioc) Udefl
PLATES GRIP
TCLL 30.0
Plates Increase 1.33
TC 0.72
Vert(LL) 0.04 1 999
M20(20ga) 249/190
TCDL 15.0
Lumber Increase 1.33
BC 0.55
Vert(TL) 0.07 1 908
BCLL 0.0
Rep Stress Incr NO
WB 0.48
Horz(TL) 0.01 5 n/a
BCDL 10.0
Code SFBC
Min Length / LL deft = 360
Weight: 47 (Ibs)
LUMBER BRACING
TOP CHORD 2 X 4 SYP No.2D TOP CHORD Sheathed or 5 -0 -7 on center purlin spacing,
BOT CHORD 2 X 4 SYP No.2D except end verticals.
WEBS 2 X 4 SYP No.3 BOT CHORD Rigid ceiling directly applied, or 1- 4:6 -3 -0, 4- 5:6 -3 -0 on
center bracing.
REACTIONS (Ibs /size) 4= 1176/0 -11 -5, 5= 370/0 -2 -8
Max Horz 4= 274(load case 2)
Max Uplift 4=- 1144(Ioad case 2), 5=- 211(load case 2)
FORCES
TOP CHORD 1 -2 =779, 2 -3 =125, 3- 5 = -442
BOT CHORD 1 -4 =-678, 4 -5= -678
WEBS 2 -5 =699, 2- 4 = -1036
NOTES
1) This truss has been checked for unbalanced loading conditions about joint 3.
2) This truss has been designed for the wind Toads generated by 110.0 m.p.h. winds at 32.4 feet above
ground level, using 2.0 p.s.f. top chord dead load and 8.0 p.s.f bottom chord dead Toad, 1.0 miles from •
hurricane oceanline, on a category I enclosed building, of dimensions 80.5 by 66.5 with exposure C
. (ASCE 7 -93). Lumber Increase = 1.33, Plate Increase = 1.33. No end verticals are exposed.
3) This truss has been designed with ANSI/TPI 1 -1995 criteria.
LOAD CASE(S)
1) Lumber Increase =1.33, Plate Increase =1.33
Trapezoidal Loads (Ibs per ft)
Z
Vert:1= 0.0- to -2 =- 187.8, 2 =- 93.9- to -3 =- 222.8, 1= 0.0 -to -4= -41.8, 4 =- 20.9 -to -5= -49.5
JAN 2 2 1997
MAHMOUD ZOLFAGIIAHI, P.E.
Job
8340
Truss
CJ9A
Truss Type
ROOF TRUSS
Qty
2
Ply
1
BLUM RESIDENCE ( BLUM BLDR.) DWH
DECO TRUSS COMPANY
INC. 3.3T s Dec 11 1996 MiTek Industries, Inc. Tue Jan 21 11:28:55 1997 Page 1
4-0-1 6-7 -3 9-10-13
E 1
4-0-1 2 -7 -2 3-3-10
2x4 11
_ 3.54 4
3x4
3
M
t1')
3x4
2
=
or
Y
I
��
•
Y
1
III
54
3x4 =
3x4 -
6
3x6 11 3x4 =
3-6-7 -1 6-7 -3 9-10-13
F 4-0
i I I
3-6-7 0-5-11 2-7-2 3-3-10
Plate Offsets (X,Y) [1:0-0-4,0-2-0], [7:0-2-12,0-2-8]
LOADING (psf)
SPACING 2 -0 -0
CSI
DEFL (in) (loc) Udefl
PLATES GRIP
TCLL 30.0
Plates Increase 1.33
TC 0.29
Vert(LL) 0.03 1 999
M20(20ga) 249/190
TCDL 15.0
Lumber Increase 1.33
BC 0.37
Vert(TL) 0.06 1 999
BCLL 0.0
Rep Stress Incr NO
WB 0.26
Horz(TL) 0.00 5 n/a
BCDL 10.0
Code SFBC
Min Length / LL defl = 360
Weight: 52 (Ibs)
LUMBER BRACING
TOP CHORD 2 X 4 SYP No.2D TOP CHORD Sheathed or 5 -6 -0 on center purlin spacing,
BOT CHORD 2 X 4 SYP No.2D except end verticals.
WEBS 2 X 4 SYP No.3 BOT CHORD Rigid ceiling directly applied, or 1- 7:6 -3 -0, 6- 7:6 -3 -0,
5- 6:6 -3 -0 on center bracing.
REACTIONS (Ibs /size) 7= 899/0 -11 -5, 5= 232/0 -2 -8, 6= 416/0 -11 -5
Max Horz 7= 274(load case 2)
Max Uplift 7=- 987(load case 2), 5=- 146(Ioad case 2), 6=- 226(load case 2)
FORCES
TOP CHORD 1 -2 =779, 2 -3 =207, 3- 4 = -79, 4- 5 = -281
BOT CHORD 5-6= -155, 6- 7 = -678, 1- 7 = -678
WEBS ' 2- 7 = -821, 2-6 =594, 3- 6 = -599, 3 -5 =191
NOTES
1) This truss has been checked for unbalanced loading conditions about joint 4.
2) This truss has been designed for the wind Toads generated by 110.0 m.p.h. winds at 32.4 feet above
ground level, using 2.0 p.s.f. top chord dead load and 8.0 p.s.f bottom chord dead load, 1.0 miles from
hurricane oceanline, on a category I enclosed building, of dimensions 80.5 by 66.5 with exposure C
(ASCE 7 -93). Lumber Increase = 1.33, Plate Increase = 1.33. No end verticals are exposed.
3) This truss has been designed with ANSI/TPI 1 -1995 criteria.
LOAD CASE(S) r
1) Lumber Increase =1.33, Plate Increase =1.33
Trapezoidal Loads (Ibs per ft) •' , .
Vert:1= 0.0- to -2 =- 187.7, 2 =- 93.8- to -3 =- 153.7, 3 =- 153.7- to -4 =- 222.7, 5 =- 49.5 -to -6= -34.2, j /'
6 =- 34.2 -to -7= -20.9, 1= 0.0 -to -7= -41.8
JAN 2 2 1997
MANMOUD ZOLFAGHARI, P.E.
Job
8340
Truss
JG9
Truss Type
ROOF TRUSS
Qty
1
Ply
1
BLUM RESIDENCE (BLUM BLDR.) DWH
DECO TRUSS COMPANY INC.
3.3T s Dec 11 1996 MiTek Industries, Inc. Tue Jan 21 16:59:39 1997 Page 1
4-4 -0 9-0-0
4 -4 -0 4 -8-0
2 x 4 11
3
5.001
•
3x6
M
2
M
iii40000.-111
■
CT'
••
1
„
4
=;
3x4 =
5
3x4 =
3x6 11
4-0-0 g-4 -9 9-0-0
1 1
4-0-0 0-4 -0 4 -8-0
Plate Offsets (X,Y): [1:0 -0- 4,0-1- 11],[5:0- 2- 8,0 -0 -8]
LOADING (psf)
SPACING 2 -0 -0
CSI
DEFL (in) (loc) I /deg
PLATES GRIP
TCLL 30.0
Plates Increase 1.33
TC 0.57
Vert(LL) 0.06 1 828
M20(20ga) 249/190
TCDL 15.0
Lumber Increase 1.33
BC 0.53
Vert(TL) 0.12 1 452
BCLL 0.0
Rep Stress Incr NO
WB 0.61
Horz(TL) -0.01 4 n/a
BCDL 10.0
Code SFBC
Min Length / LL dell = 360
Weight: 45 (Ibs)
LUMBER BRACING
TOP CHORD 2 X 4 SYP No.2D TOP CHORD Sheathed or 4 -4 -5 on center purlin spacing,
BOT CHORD 2 X 4 SYP No.2D except end verticals.
WEBS 2 X 4 SYP No.3 BOT CHORD Rigid ceiling directly applied, or 1- 5:4 -5 -6, 4- 5:4 -5 -6 on center
bracing.
REACTIONS (Ibs/size) 5 =1975/0 -8 -0, 4=- 511/0 -2 -8
Max Herz 5= 299(Ioad case 3)
Max Uplift 5=- 1607(load case 3), 4=- 511(load case 1)
Max Vert 5= 1975(load case 1), 4= 413(Ioad case 2)
FORCES
TOP CHORD 1 -2 =1782, 2 -3 =0, 3- 4 = -196
BOT CHORD 4 -5= -1620, 1 -5= -1620
WEBS 2 -5= -1887, 2 -4 =1786
NOTES
1) This truss has been checked for unbalanced loading conditions about joint 3.
2) This truss has been designed for the wind Toads generated by 110.0 m.p.h. winds at 32.4 feet above ground level, using 2.0 p.s.f. top chord dead load and 8.0 p.s.f
bottom chord dead Toad, 1.0 miles from hurricane oceanline, on a category I enclosed building, of dimensions 80.5 by 66.5 with exposure C (ASCE 7 -93). Lumber
Increase = 1.33, Plate Increase = 1.33. No end verticals are exposed.
3) Except as shown below, special connection(s) required to support concentrated load(s). Design of connection(s) is delegated to the building designer.
4) This truss has been designed with ANSI /TPI 1 -1995 criteria.
LOAD CASE(S)
1) Lumber Increase =1.33, Plate Increase =1.33
Uniform Loads (lbs per ft)
Vert:1 -2= -90.0, 2- 3= -90.0, 4- 5= -20.0, 1 -5= -20.0
Concentrated Loads (Ibs)
Vert:1= -500.0 I
4 Z,40.1 4 7 1.
JAN 2 2 1997
MAHMOUD TOLFAGNARI, P.5.
Job
8340
Truss
J9
Truss Type
ROOF TRUSS
Qty
8
Ply
1
BLUM RESIDENCE ( BLUM BLDR.) DWH
DECO TRUSS COMPANY
•
INC. 3.3T s Dec 11 1996 MiTek Industries, Inc. Tue Jan 21 11:32:50 1997 Page 1
4-4-0 9-0-0
4-4-0 4-8-0
2x4 II
5.00 171 3
3x4
co
2
1111111111111111111II■
1:
in
1
40
ISZall
3x4 =
5
3x4 =
3x6 I
I 4-0-0 1-4 -9 9-0-0
I
4-0-0 0-4-0 4 8-0
Plate Offsets (X,Y): [1:0-0-0,0-2-1], [5:0-2-12,0-2-8]
LOADING (psf)
SPACING 2 -0 -0
CSI
DEFL (in) (loc) 1/dell
PLATES GRIP
TCLL 30.0
Plates Increase 1.33
TC 0.34
Vert(LL) 0.03 1/5 999
M20(20ga) 249/190
TCDL 15.0
Lumber Increase 1.33
BC 0.38
Vert(TL) 0.05 1/5 973
BCLL 0.0
Rep Stress Incr YES
WB 0.25
Horz(TL) -0.00 4 n/a
BCDL 10.0
Code SFBC
Min Length / LL deft = 360
Weight: 44 (Ibs)
LUMBER BRACING
TOP CHORD 2 X 4 SYP No.2D TOP CHORD Sheathed or 6 -0 -0 on center purlin spacing,
BOT CHORD 2 X 4 SYP No.2D except end verticals.
WEBS 2 X 4 SYP No.3 BOT CHORD Rigid ceiling directly applied, or 1- 5:6 -3 -0, 4- 5:6 -3 -0 on
center bracing.
REACTIONS (Ibs/size) 5= 969/0 -8 -0, 4=- 6/0 -2 -8
Max Horz 5= 299(load case 3)
Max Uplift 5=- 934(load case 3), 4=- 6(load case 1)
Max Vert 5= 969(load case 1), 4= 74(load case 2)
FORCES
TOP CHORD 1 -2 =582, 2 -3 = -0, 3- 4 = -196
BOT CHORD 4 -5= -529, 1- 5 = -529
WEBS 2 -5= -881, 2 -4 =583
NOTES
1) This truss has been checked for unbalanced loading conditions about joint 3.
2) This truss has been designed for the wind Toads generated by 110.0 m.p.h. winds at 32.4 feet above
ground level, using 2.0 p.s.f. top chord dead load and 8.0 p.s.f bottom chord dead Toad, 1.0 miles from
hurricane oceanline, on a category I enclosed building, of dimensions 80.5 by 66.5 with exposure C
(ASCE 7 -93). Lumber Increase = 1.33, Plate Increase = 1.33. No end verticals are exposed.
3) This truss has been designed with ANSI/TPI 1 -1995 criteria.
r
LOAD CASE(S) Standard
"'Al
JAN 2 1997
(MAIIMOUD ZOLFAGHARI, P.E.
•
Job
8340
Truss
J9A
Truss Type
ROOF TRUSS
Qty
8
Ply
1
BLUM RESIDENCE ( BLUM BLDR.) DWH
DECO TRUSS COMPANY
INC. 3.3T s Dec 11 1996 MiTek Industries, Inc. Tue Jan 21 11:32:57 1997 Page 1
2 -10-0 9-0-0
2 -10-0 6-2 -0
2x4 11
5.00p
3
c?
co
c?—
3x4
2
No-MI
Ei
3x4 =
5
4
2x4 11 3x4 =
2 -6-0 2 8-11 -0 9-ft0
I
2 -6-0 0-4-0 6-1 -0 0-1 -0
Plate Offsets (X,Y) [1:0- 0- 0,0 -2 -1]
LOADING (psf)
SPACING 2 -0 -0
CSI
DEFL (in) (loc) Udell
PLATES GRIP
TCLL 30.0
Plates Increase 1.33
TC 0.44
Vert(LL) 0.02 1/4 999
M20(20ga) 249/190
TCDL 15.0
Lumber Increase 1.33
BC 0.44
Vert(TL) 0.03 4/5 999
BCLL 0.0
Rep Stress Incr YES
WB 0.16
Horz(TL) -0.00 5 n/a
BCDL 10.0
Code SFBC
Min Length / LL deft = 360
Weight: 46 (Ibs)
LUMBER BRACING
TOP CHORD 2 X 4 SYP No.2D TOP CHORD Sheathed or 6 -0 -0 on center purlin spacing,
BOT CHORD 2 X 4 SYP No.2D except end verticals.
WEBS 2 X 4 SYP No.3 BOT CHORD Rigid ceiling directly applied, or 1- 4:6 -3 -0, 4- 5:6 -3 -0 on
center bracing.
REACTIONS (Ibs /size) 4= 721/0 -8 -0, 5= 243/0 -2 -8
Max Horz 4= 299(Ioad case 3)
Max Uplift 4=- 582(load case 3), 5=- 172(Ioad case 3)
Max Vert 4= 721(load case 1), 5= 265(load case 5)
FORCES
TOP CHORD 1 -2 =369, 2 -3 =0, 3- 5 = -263
BOT CHORD 1- 4 = -333, 4 -5= -333
WEBS 2 -5 =342, 2- 4 = -633
NOTES
1) This truss has been checked for unbalanced loading conditions about joint 3.
2) This truss has been designed for the wind loads generated by 110.0 m.p.h. winds at 32.4 feet above
ground level, using 2.0 p.s.f. top chord dead Toad and 8.0 p.s.f bottom chord dead Toad, 1.0 miles from
hurricane oceanline, on a category I enclosed building, of dimensions 80.5 by 66.5 with exposure C '
(ASCE 7 -93). Lumber Increase = 1.33, Plate Increase = 1.33. No end verticals are exposed.
3) This truss has been designed with ANSIITPI 1 -1995 criteria.
r
LOAD CASE(S) Standard
r,,,,,„„ei„.00/0.71*
JAN 2 2 1997
MAHMOIJD ZOLFAGHARI, P.E.
Job
8340
Truss
J7
Truss Type
ROOF TRUSS
Qty
23
Ply
1
BLUM RESIDENCE ( BLUM BLDR.) DWH
DECO TRUSS COMPANY INC. 3.3T s Dec 11 1996 MiTek Industries, Inc. Tue Jan 21 11:32:11 1997 Page 1
� 2 -10-0 7 -0-0
� --I
2-10-0 4-2 -0
5.00 1
i
:1
co
2x4 II
2
V7
M
ii
R
1
3x4 =
r1
',
pm.
5
2x4 11
� 2-6-0 3 -10.? 7 -0-0
I
2 -6-0 0-4 -0 4 -2 -0
Plate Offsets (X,Y): [1:0- 0- 0,0 -2 -1]
LOADING (pst)
SPACING 2 -0 -0
CSI
DEFL (in) (loc) l/defl
PLATES GRIP
TCLL 30.0
Plates Increase 1.33
TC 0.20
Vert(LL) 0.01 1/5 999
M20(20ga) 249/190
TCDL 15.0
Lumber Increase 1.33
BC 0.16
Vert(TL) 0.02 1/5 999
BCLL 0.0
Rep Stress Incr YES
WB 0.12
Horz(TL) -0.00 4 n/a
BCDL 10.0
Code SFBC
(Matrix)
Min Length / LL defl = 360
Weight: 26 (lbs)
LUMBER BRACING •
TOP CHORD 2 X 4 SYP No.2D TOP CHORD Sheathed or 6 -0 -0 on center purlin spacing.
BOT CHORD 2 X 4 SYP No.2D BOT CHORD Rigid ceiling directly applied, or 10 -00 -00 on center
WEBS 2 X 4 SYP No.3 bracing. Except: 1- 5:6 -3 -0.
REACTIONS (Ibs /size) 5= 511/0 -8 -0, 4= 32/0 -1 -8, 3= 229/0 -1 -8
Max Horz 5= 364(Ioad case 3), 3= 195(load case 1)
Max Uplift 5=- 491(Ioad case 3), 3=- 192(load case 3)
Max Vert 5= 511(load case 1), 4= 37(load case 3), 3= 229(Ioad case 1)
FORCES
TOP CHORD 1 -2 =296, 2 -3 =268
BOT CHORD 4 -5 =0, 1- 5 = -195
WEBS 2 -5= -418
NOTES
1) This truss has been checked for unbalanced loading conditions about joint 3.
2) This truss has been designed for the wind loads generated by 110.0 m.p.h. winds at 32.4 feet above
ground level, using 2.0 p.s.f. top chord dead Toad and 8.0 p.s.f bottom chord dead Toad, 1.0 miles from
hurricane oceanline, on a category I enclosed building, of dimensions 80.5 by 66.5 with exposure C
(ASCE 7 -93). Lumber Increase = 1.33, Plate Increase = 1.33. No end verticals are exposed.
3) Non Standard bearing condition. Review required.
4) This truss has been designed with ANSI/TPI 1 -1995 criteria.
r
LOAD CASE(S) Standard
JAN.2. 2 1997
MAHMOUD ZOLFAGHARI, P. E,
Job
8340
Truss
J7A
Truss Type
ROOF TRUSS
Qty
8
Ply
1
BLUM RESIDENCE ( BLUM BLDR.) DWH
DECO TRUSS COMPANY INC. 3.3T s Dec 11 1996 MiTek Industries, Inc. Tue Jan 21 11:32:19 1997 Page 1
2 -10-0 48-0 7-0-0
`
2-10-0 1-10-0 2 -4-0
_
5.00x12 4
-
2x4 II :,
3 6
3x4
M
2
M
14
3x4=
6
1.-
110M11
7
6
2x4 I I 3x4 =
2 -fro 3 -lap 4 -8-0 7 -0-0
� I I
2 -6-0 0-4-0 1-10-0 2 -4-0
Plate Offsets (X,Y) [1:0- 0- 0,0 -2 -1)
LOADING (psf)
SPACING 2 -0 -0
CSI
DEFL (in) (loc) I/defl
PLATES GRIP
TCLL 30.0
Plates Increase 1.33
TC 0.14
Vert(LL) 0.01 1/7 999
M20(20ga) 249/190
TCDL 15.0
Lumber Increase 1.33
BC 0.14
Vert(TL) 0.01 1/7 999
BCLL 0.0
Rep Stress Incr YES
WB 0.10
Horz(TL) -0.00 6 n/a
BCDL 10.0
Code SFBC
(Matrix)
Min Length / LL defl = 360
Weight: 31 (Ibs)
LUMBER BRACING
TOP CHORD 2 X 4 SYP No.2D TOP CHORD Sheathed or 6 -0 -0 on center purlin spacing.
BOT CHORD 2 X 4 SYP No.2D BOT CHORD Rigid ceiling directly applied, or 10 -00 -00 on center
WEBS 2 X 4 SYP No.3 bracing. Except: 1- 7:6 -3 -0, 6- 7:6 -3 -0.
REACTIONS (Ibs/size) 7= 411/0 -8 -0, 5= 20/0 -1 -8, 6= 165/0 -8 -0, 4= 174/0 -1 -8
Max Horz 7= 350(load case 3), 4= 206(Ioad case 1)
Max Uplift 7=- 475(Ioad case 3), 6=- 48(load case 3), 4=- 131(load case 3)
FORCES
TOP CHORD 1 -2 =358, 2 -3 =246, 3 -4 =257
BOT CHORD 5 -6 =0, 6- 7 = -57, 1- 7 = -262
WEBS 2- 7 = -345, 2 -6 =71, 3- 6 = -175
NOTES
1) This truss has been checked for unbalanced loading conditions about joint 4.
2) This truss has been designed for the wind loads generated by 110.0 m.p.h. winds at 32.4 feet above
ground level, using 2.0 p.s.f. top chord dead load and 8.0 p.s.f bottom chord dead Toad, 1.0 miles from .
hurricane oceanline, on a category I enclosed building, of dimensions 80.5 by 66.5 with exposure C
(ASCE 7 -93). Lumber Increase = 1.33, Plate Increase = 1.33. No end verticals are exposed.
3) Non Standard bearing condition. Review required.
4) This truss has been designed with ANSI/TPI 1 -1995 criteria.
LOAD CASE(S) Standard r
;,
JAN 22 1997
MAHMOIID ZOLFAGHARI, P.E.
Job
8340
J7B
DECO TRUSS COMPANY INC.
LOADING (psf)
TCLL 30.0
TCDL 15.0
BCLL 0.0
BCDL 10.0
Truss
SPACING
Plates Increase
Lumber Increase
Rep Stress Incr
Code
LUMBER
TOP CHORD 2 X 4 SYP No.2D
BOT CHORD 2 X 4 SYP No.2D
WEBS 2 X 4 SYP No.3
FORCES
TOP CHORD 1- 2 = -182, 2 -3 =90
BOT CHORD 4 -5 =0, 1 -5 =15
WEBS 2 -5 = -15
LOAD CASE(S) Standard
Truss Type
ROOF TRUSS
co
U
c%)
2x4 I 1
5.00P
2 -0 -0 CSI
1.33 TC 0.31
1.33 BC 0.06
YES WB 0.01
SFBC (Matrix)
REACTIONS (lbs/size) 1= 221/0 -2 -8, 3= 199/0 -1 -8, 5= 54/0 -1 -8
Max Horz 1= 38(load case 3), 3= 99(Ioad case 3)
Max Uplift 1=- 125(load case 3), 3=- 143(load case 3)
4-6.0
4-6.0
4 -6-0
4 -6-0
Qty
2
Ply
1
BLUM RESIDENCE ( BLUM BLDR.) DWH
3.3T s Dec 11 1996 MiTek Industries, Inc. Tue Jan 21 12:52:48 1997 Page 1
DEFL (in) (loc) 1 /deft
Vert(LL) 0.01 5/4 999
Vert(TL) 0.01 1/5 999
Horz(TL) -0.00 5 n/a
Min Length / LL deft = 360
PLATES GRIP
M20(20ga) 249/190
Weight: 24 (lbs)
BRACING
TOP CHORD Sheathed or 6 -0 -0 on center purlin spacing,
except end verticals.
BOT CHORD Rigid ceiling directly applied, or 10 -00 -00 on center
bracing. Except: 1- 5:6 -3 -0.
NOTES
1) This truss has been checked for unbalanced loading conditions about joint 3.
2) This truss has been designed for the wind loads generated by 110.0 m.p.h. winds at 32.4 feet above ground level, using 2.0 p.s.f. top chord
dead Toad and 8.0 p.s.f bottom chord dead Toad, 1.0 miles from hurricane oceanline, on a category I enclosed building, of dimensions 80.5 by
66.5 with exposure C (ASCE 7 -93). Lumber Increase = 1.33, Plate Increase = 1.33. No end verticals are exposed.
3) Non Standard bearing condition. Review required.
4) This truss has been designed with ANSI/TPI 1 -1995 criteria.
JAN 2 2 1997
MAHMOUD ZOLFAGHARI, P.E.
Job
8340
Truss
J7C
Truss Type
ROOF TRUSS
Qty
2
Ply
1
BLUM RESIDENCE ( BLUM BLDR.) DWH
DECO TRUSS COMPANY INC. 3.3T s Dec 11 1996
MiTek Industries, Inc. Tue Jan 21 11:32:35 1997 Page 1
4 -4-0 7 -0-0
` '
4-4 -0 2 -8-0
5.00 T 3
2x4 11
P'
2
71
u3
i
Y
11
1
111110-
I
1
5
3x4 = 2x4 11
4-0-0 11-40 7-0-0
`
4-0-0 0-4-0 2 -8-0
Plate Offsets (X,Y) [1:0- 0- 0,0 -2 -1]
LOADING (psf)
SPACING 2 -0 -0
CSI
DEFL (in) (Ioc) I/defl
PLATES GRIP
TCLL 30.0
Plates Increase 1.33
TC 0.22
Vert(LL) 0.01 5/4 999
M20(20ga) 249/190
TCDL 15.0
Lumber Increase 1.33
BC 0.05
Vert(TL) 0.01 1/5 999
BCLL 0.0
Rep Stress Incr YES
WB 0.12
Horz(TL) -0.00 1 n/a
BCDL 10.0
Code SFBC
(Matrix)
Min Length / LL deft = 360
Weight: 26 (Ibs)
LUMBER BRACING
TOP CHORD 2 X 4 SYP No.2D TOP CHORD Sheathed or 6 -0 -0 on center purlin spacing.
BOT CHORD 2 X 4 SYP No.2D BOT CHORD Rigid ceiling directly applied, or 10 -00 -00 on center
WEBS 2 X 4 SYP No.3 bracing.
REACTIONS (Ibs /size) 1= 197/0 -1 -0, 3= 54/0 -1 -8, 5= 504/0 -8 -0, 4= 12/0 -2 -8
Max Horz 3= 160(load case 3), 5= 77(Ioad case 3)
Max Uplift 1=- 94(Ioad case 3), 5=- 326(load case 3)
FORCES
TOP CHORD 1 -2 =93, 2 -3 = -73
BOT CHORD 4 -5 =0, 1 -5 =4
WEBS 2- 5 = -412
NOTES
1) This truss has been checked for unbalanced loading conditions about joint 3.
2) This truss has been designed for the wind Toads generated by 110.0 m.p.h. winds at 32.4 feet above
ground level, using 2.0 p.s.f. top chord dead load and 8.0 p.s.f bottom chord dead load, 1.0 miles from
hurricane oceanline, on a category I enclosed building, of dimensions 80.5 by 66.5 with exposure C
(ASCE 7 -93). Lumber Increase = 1.33, Plate Increase = 1.33. No end verticals are exposed.
3) Non Standard bearing condition. Review required.
4) This truss has been designed with ANSI/TPI 1 -1995 criteria.
LOAD CASE(S) Standard r
Z,424*1
JAN 22 1997
MAHM01J0 20LFAGIIARI, P.E.
•
Job
8340
Truss
J7D
Truss Type
ROOF TRUSS
Qty
4
Ply
1
BLUM RESIDENCE (BLUM BLDR.) DWH
DECO TRUSS COMPANY INC.
-2 -8-3
2-8-3
-0-10-0
0-10 -0
3.3T s Dec 11 1996 MiTek Industries, Inc. Tue Jan 21 17:02:49 1997 Page 1
4-6-0
4-6-0
4-6-0
4 -6-0
LOADING (psf)
TCLL 30.0
TCDL 15.0
BCLL 0.0
BCDL 10.0
SPACING
Plates Increase
Lumber Increase
Rep Stress Incr
Code
2 -0-0
1.33
1.33
NO
SFBC
CSI
TC 0.37
BC 0.08
WB 0.03
(Matrix)
DEFL (in) (Ioc) I/defl
Vert(LL) 0.01 5/4 999
Vert(TL) 0.01 1/5 999
Horz(TL) -0.00 5 n/a
Min Length / LL deft = 360
PLATES GRIP
M20(20ga) 249/190
Weight: 33 (Ibs)
LUMBER
TOP CHORD 2 X 4 SYP No.2D
BOT CHORD 2 X 4 SYP No.2D
WEBS 2 X 4 SYP No.3
OTHERS 2 X 4 SYP No.3 *Except*
B2 2 X 4 SYP No.2D
REACTIONS (Ibs/size) 1 =505/0 -8 -0, 5=61/0-1-8, 3= 209/0 -1 -8
Max Horz 1 =100(Ioad case 3), 3= 123(Ioad case 3)
Max Uplift 1 =- 508(Ioad case 3), 5=- 36(Ioad case 3), 3=- 133(load case 3)
Max Vert 1 =505(load case 1), 5= 72(load case 5), 3= 209(load case 1)
FORCES
TOP CHORD 1- 2 = -466, 2 -3=115
BOT CHORD 4 -5=0, 1 -5=38
WEBS 2 -5= -40
BRACING
TOP CHORD Sheathed or 6 -0-0 on center purlin spacing,
except end verticals.
BOT CHORD Rigid ceiling directly applied, or 10 -00 -00 on center bracing.
Except: 1- 5:6 -3 -0.
NOTES
1) This truss has been checked for unbalanced loading conditions about joint 3.
2) This truss has been designed for the wind loads generated by 110.0 m.p.h. winds at 32.4 feet above ground level, using 2.0 p.s.f. top chord dead Toad and 8.0 p.s.f
bottom chord dead Toad, 1.0 miles from hurricane oceanline, on a category I enclosed building, of dimensions 80.5 by 66.5 with exposure C (ASCE 7 -93). Lumber
Increase = 1.33, Plate Increase = 1.33. No end verticals are exposed.
3) Non Standard bearing condition. Review required.
4) Studs to be fastened with 2x3 M20 plates.
5) This truss has been designed with ANSI/TPI 1 -1995 criteria.
LOAD CASE(S)
1) Lumber Increase =1.33, Plate Increase =1.33
Uniform Loads (Ibs per ft)
Vert:2 -3= -90.0, 4 -5= -20.0, 1 -5= -20.0
Concentrated Loads (Ibs)
Vert:2= -301.4
yam
JAN 2 2 1997
MAHMOUD ZOLFAGHARI, P.E.
•
Job
8340
Truss
J6
Truss Type
ROOF TRUSS
Qty
2
Ply
1
BLUM RESIDENCE (BLUM BLDR.) DWH
DECO TRUSS COMPANY INC.
2 -10 -0
2-10-0
2 -6-0 2 -1-3
2 -6-0 0-0-3
3.3T s Dec 11 1996 MiTek Industries, Inc. Tue Jan 21 12:29:39 1997 Page 1
5-11-5
3-1-5
5-11 -5
3-5-2
Plate Offsets (X,Y): [1:0- 0- 0,0 -1 -15)
LOADING (psf)
TCLL 30.0
TCDL 15.0
BCLL 0.0
BCDL 10.0
SPACING
Plates Increase
Lumber Increase
Rep Stress Incr
Code
2 -0 -0
1.33
1.33
YES
SFBC
CSI
TC 0.12
BC 0.12
WB 0.11
(Matrix)
DEFL (in) (loc) I /deft
Vert(LL) 0.01 1/6 641
Vert(TL) 0.01 1/6 350
Horz(TL) -0.00 5 n/a
Min Length / LL deb = 360
PLATES GRIP •
M20(20ga) 249/190
Weight: 28 (lbs)
LUMBER
TOP CHORD 2 X 4 SYP No.2D
BOT CHORD 2 X 4 SYP No.2D
WEBS 2 X 4 SYP No.3
REACTIONS (Ibs/size) 3= 199/0 -1 -8, 5= 18/0 -1 -8, 6= 439/0 -8 -0
Max Holz 3= 207(load case 1), 6= 338(load case 3)
Max Uplift 3=- 154(Ioad case 3), 5=- 97(Ioad case 3), 6=- 602(Ioad case 3)
Max Vert 3= 199(load case 1), 5= 20(load case 6), 6= 439(load case 1)
FORCES
TOP CHORD 1 -2 =326, 2 -3=271
BOT CHORD 4 -5 =0, 5- 6 = -14, 1 -6= -220
WEBS 2 -6= -364, 2 -5=15
BRACING
TOP CHORD Sheathed or 6 -0 -0 on center purlin spacing.
BOT CHORD Rigid ceiling directly applied, or 10 -00 -00 on center bracing.
Except: 1- 6:6 -3 -0, 5- 6:6 -3 -0.
NOTES
1) This truss has been checked for unbalanced loading conditions about joint 3.
2) This truss has been designed for the wind loads generated by 110.0 m.p.h. winds at 32.4 feet above ground level, using 2.0 p.s.f. top chord dead Toad and 8.0 p.s.f
bottom chord dead Toad, 1.0 miles from hurricane oceanline, on a category 1 enclosed building, of dimensions 80.5 by 66.5 with exposure C (ASCE 7 -93). Lumber
Increase = 1.33, Plate Increase = 1.33. No end verticals are exposed.
3) Non Standard bearing condition. Review required.
4) This truss has been designed with ANSI/TPI 1 -1995 criteria.
LOAD CASE(S) Standard
JAN 2 2 1997
IUAHMIOUD ZOLFAGHARI, P.E.
Job
8340
Truss
J6A
Truss Type
ROOF TRUSS
Qty
2
Ply
1
BLUM RESIDENCE ( BLUM BLDR.) DWH
DECO TRUSS COMPANY INC. 3.3T s Dec 11 1996 MiTek Industries, Inc. Tue Jan 21 11:31:56 1997 Page 1
2-9-15 5-10-15
2-9-15 3-1 -0
-
5.771 3
il
2x4 11 I�1
in
2
7
.1
E
IPA/ All
N
1
MI
►'
1
3x4 =
S
5
2x4 11
2 -6-0 -31 5 -10.15
2 -6-0 0-3-15 3-1-0
Plate Offsets (X,Y) [1:0- 0- 0,0 -1 -14] ,
LOADING (psf)
SPACING 2 -0 -0
CSI
DEFL (in) (Ioc) I/defl
PLATES GRIP
TCLL 30.0
Plates Increase 1.33
TC 0.12
Vert(LL) 0.01 1/5 999
M20(20ga) 249/190
TCDL 15.0
Lumber Increase 1.33
BC 0.14
Vert(TL) 0.01 1/5 999
BCLL 0.0
Rep Stress Incr YES
WB 0.11
Horz(TL) -0.00 4 n/a
BCDL 10.0
Code SFBC
(Matrix)
Min Length / LL defl = 360
Weight: 21 (Ibs)
LUMBER BRACING
TOP CHORD 2 X 4 SYP No.2D TOP CHORD Sheathed or 6 -0 -0 on center purlin spacing.
BOT CHORD 2 X 4 SYP No.2D BOT CHORD Rigid ceiling directly applied, or 10 -00 -00 on center
WEBS 2 X 4 SYP No.3 bracing. Except: 1- 5:6 -3 -0.
REACTIONS (Ibs /size) 5= 426/0 -8 -0, 3= 204/0 -1 -8, 4= 21/0 -1 -8
Max Horz 5= 353(Ioad case 3), 3= 213(load case 1)
Max Uplift 5=- 460(load case 3), 3=- 160(load case 3)
Max Vert 5= 426(load case 1), 3= 204(load case 1), 4= 35(load case 3)
FORCES
TOP CHORD 1 -2 =321, 2 -3 =280
BOT CHORD 4 -5 =0, 1 -5= -213
WEBS 2 -5= -348
NOTES
1) This truss has been checked for unbalanced loading conditions about joint 3.
2) This truss has been designed for the wind Toads generated by 110.0 m.p.h. winds at 32.4 feet above
ground level, using 2.0 p.s.f. top chord dead load and 8.0 p.s.f bottom chord dead load, 1.0 miles from
hurricane oceanline, on a category I enclosed building, of dimensions 80.5 by 66.5 with exposure C .
(ASCE 7 -93). Lumber Increase = 1.33, Plate Increase = 1.33. No end verticals are exposed.
3) Non Standard bearing condition. Review required.
4) This truss has been designed with ANSI/TPI 1 -1995 criteria.
r
LOAD CASE(S) Standard
r 4, 40 ,:',/i-sr .
JAN 22 1997
MAHMOUD ZOLFAGHARI, P.E.
Job
8340
Truss
J6B
Truss Type
ROOF TRUSS
Qty
2
Ply
1
BLUM RESIDENCE ( BLUM BLDR.) DWH
DECO TRUSS COMPANY INC. 3.3T s Dec 11 1996 MiTek Industries, Inc. Tue Jan 21 11:32:04 1997 Page 1
2 -9-11 5 -10-5
1
2 -9-11 3-0-10
5.90p
3x4
cv
2
M
�,
3x4 =
0
4
► ■ t
6
2x4 11 2x4
2-6-0 3 -9-1 5-10-5
I
2-6-0 0-3-11 3-0-10
Plate Offsets (X,Y): [1:0- 0- 0,0 -1- 14],[5:0 -0- 15,0 -0 -6]
LOADING (psf)
SPACING 2 -0 -0
CSI
DEFL (in) (loc) Udefl
PLATES GRIP
TCLL 30.0
Plates Increase 1.33
TC 0.12
Vert(LL) 0.01 1/6 999
M20(20ga) 249/190
TCDL 15.0
Lumber Increase 1.33
BC 0.13
Vert(TL) 0.02 1/6 999
BCLL 0.0
Rep Stress Incr YES
WB 0.22
Horz(TL) -0.01 6 n/a
BCDL 10.0
Code SFBC
(Matrix)
Min Length / LL defl = 360
Weight: 27 (lbs)
LUMBER BRACING
TOP CHORD 2 X 4 SYP No.2D TOP CHORD Sheathed or 6 -0 -0 on center purlin spacing.
BOT CHORD 2 X 4 SYP No.2D BOT CHORD Rigid ceiling directly applied, or 10 -00 -00 on center
WEBS 2 X 4 SYP No.3 bracing. Except: 1- 6:6 -3 -0, 5- 6:6 -3 -0.
REACTIONS (lbs/size) 6= 643/0 -8 -0, 5 =- 96/0 -1 -8, 3= 100/0 -1 -8
Max Horz 3= 234(Ioad case 3)
Max Uplift 6=- 833(Ioad case 3), 5=- 96(Ioad case 1)
Max Vert 6= 643(load case 1), 5= 210(load case 3), 3= 100(Ioad case 1)
FORCES
TOP CHORD 1 -2 =313, 2 -3 = -75
BOT CHORD 4 -5 =0, 5-6= -205, 1-6= -205
WEBS 2 -6= -567, 2 -5 =237
NOTES
1) This truss has been checked for unbalanced loading conditions about joint 3.
2) This truss has been designed for the wind loads generated by 110.0 m.p.h. winds at 32.4 feet above
ground level, using 2.0 p.s.f. top chord dead Toad and 8.0 p.s.f bottom chord dead Toad, 1.0 miles from
hurricane oceanline, on a category I enclosed building, of dimensions 80.5 by 66.5 with exposure C
(ASCE 7 -93). Lumber Increase = 1.33, Plate Increase = 1.33. No end verticals are exposed.
3) This truss has been designed with ANSI/TPI 1 -1995 criteria.
LOAD CASE(S) Standard
Z „,„.,,,i -- -,..,ifis-4*
JAN 2 2 1997
MAHMOUD ZOLFAGHARI, P.E.
•
Job
8340
Truss
J5
Truss Type
ROOF TRUSS
Qty
19
Ply
1
BLUM RESIDENCE ( BLUM BLDR.) DWH
DECO TRUSS COMPANY INC.
3.3T s Dec 11 1996 MiTek Industries, Inc.
2 -10-0 Sao
Tue Jan 21 11:31:16 1997 Page 1
1
2 -10-0 2 -2 -0
_
5.00 F12
2x4 a
:
2
;1
N.-
IN
N
M
4
C
3x4 =
i
5
4
2x4 1 1
� 2 -6-0 ? -10.9 5-0-0
2-6-0 0-4-0 2 -2-0
Plate Offsets (X,Y) [1:0- 0- 0,0 -2 -1)
LOADING (psf)
SPACING 2 -0 -0
CSI
DEFL (in) (Ioc) I /defl
PLATES GRIP
TCLL 30.0
Plates Increase 1.33
TC 0.13
Vert(LL) 0.01 1/5 999
M20(20ga) 249/190
TCDL 15.0
Lumber Increase 1.33
BC 0.14
Vert(TL) 0.01 1/5 999
BCLL 0.0
Rep Stress Incr YES
WB 0.09
Horz(TL) -0.00 4 n/a
BCDL 10.0
Code SFBC
(Matrix)
Min Length / LL defl = 360
Weight: 20 (Ibs)
LUMBER BRACING
TOP CHORD 2 X 4 SYP No.2D TOP CHORD Sheathed or 6 -0 -0 on center purlin spacing.
BOT CHORD 2 X 4 SYP No.2D BOT CHORD Rigid ceiling directly applied, or 10 -00 -00 on center
WEBS 2 X 4 SYP No.3 bracing. Except: 1- 5:6 -3 -0.
REACTIONS (Ibs/size) 5= 378/0 -8 -0, 4= 9/0 -1 -8, 3= 163/0 -1 -8
Max Horz 5= 391(Ioad case 3), 3= 257(load case 1)
Max Uplift 5=- 431(load case 3), 3=- 142(load case 3)
Max Vert 5= 378(load case 1), 4= 40(load case 3), 3= 163(load case 1)
FORCES
TOP CHORD 1 -2 =354, 2 -3 =300
BOT CHORD 4 -5 =0, 1- 5 = -257
WEBS 2- 5 = -308
NOTES
1) This truss has been checked for unbalanced loading conditions about joint 3.
2) This truss has been designed fo the wind loads generated by 110.0 m.p.h. winds at 32.4 feet above .
ground level, using 2.0 p.s.f. top chord dead load and 8.0 p.s.f bottom chord dead Toad, 1.0 miles from
hurricane oceanline, on a category I enclosed building, of dimensions 80.5 by 66.5 with exposure C
(ASCE 7 -93). Lumber Increase = 1.33, Plate Increase = 1.33. No end verticals are exposed.
3) Non Standard bearing condition. Review required.
4) This truss has been designed with ANSI/TPI 1 -1995 criteria.
r
LOAD CASE(S) Standard
,, ,y 3ovi
JAN 2 2 1997
BAAHMODU ZOLFAGHARI, P.E.
Job
8340
Truss
J5A
Truss Type
ROOF TRUSS
Qty
2
Ply
1
BLUM RESIDENCE ( BLUM BLDR.) DWH
DECO TRUSS COMPANY INC.
3.3T s Dec 11 1996 MiTek Industries, Inc.
4-4-0 5-0-0
Tue Jan 21 11:31:23 1997 Page 1
4-4-0 0-8.0
M hr N
5.00 1 2 2x
2
II
1 1
l'I
r
1
0
/
5
3x4 = 2x4 11
4-0-0 5.0.0
1
4-0-0 1-0-0
Plate Offsets (X,Y): [1:0- 0- 0,0 -2 -1]
LOADING (psf)
SPACING 2 -0 -0
CSI
DEFL (in) (Ioc) I /deft
PLATES GRIP
TCLL 30.0
Plates Increase 1.33
TC 0.30
Vert(LL) 0.00 5/4 999
M20(20ga) 249/190
TCDL 15.0
Lumber Increase 1.33
BC 0.06
Vert(TL) 0.01 1/5 999
BCLL 0.0
Rep Stress Incr YES
WB 0.17
Horz(TL) -0.00 1 n/a
BCDL 10.0
Code SFBC
(Matrix)
Min Length / LL deft = 360
Weight: 20 (Ibs)
LUMBER BRACING
TOP CHORD 2 X 4 SYP No.2D TOP CHORD Sheathed or 6 -0 -0 on center purlin spacing.
BOT CHORD 2 X 4 SYP No.2D BOT CHORD Rigid ceiling directly applied, or 10 -00 -00 on center
WEBS 2 X 4 SYP No.3 bracing.
REACTIONS (Ibs /size) 1= 192/0 -1 -0, 4 =- 63/0 -1 -8, 5= 689/0 -8 -0, 3 =- 271/0 -1 -8
Max Horz 5= 46(load case 3), 3= 128(Ioad case 3)
Max Uplift case 3), 4=- 63(load case 1), 5=- 445(load case 3), 3=- 271(load case 1)
Max Vert 1= 192(Ioad case 1), 5= 689(Ioad case 1), 3= 320(load case 3)
FORCES
TOP CHORD 1 -2 =92, 2- 3 = -131
BOT CHORD 4 -5 =0, 1 -5 =7
WEBS 2 -5= -560
NOTES
1) This truss has been checked for unbalanced loading conditions about joint 3.
2) This truss has been designed for the wind loads generated by 110.0 m.p.h. winds at 32.4 feet above
ground level, using 2.0 p.s.f. top chord dead load and 8.0 p.s.f bottom chord dead Toad, 1.0 miles from
hurricane oceanline, on a category I enclosed building, of dimensions 80.5 by 66.5 with exposure C
(ASCE 7 -93). Lumber Increase = 1.33, Plate Increase = 1.33. No end verticals are exposed.
3) Non Standard bearing condition. Review required.
4) This truss has been designed with ANSI/TPI 1 -1995 criteria.
LOAD CASE(S) Standard
JAN 2 2 1997
MAHMOUD ZOLFAGFIARI, P.E.
Job
8340
Truss
J5B
Truss Type
ROOF TRUSS
Qty
1
Ply
1
BLUM RESIDENCE ( BLUM BLDR.) DWH
DECO TRUSS COMPANY INC.
3.3T s Dec 11 1996 MiTek Industries, Inc.
2 -6-0
Tue Jan 21 11:31:32 1997 Page 1
1
5.00112 2 6.0
3x4 %
1
2
11
r
r
t 4'
M
r•
N
too
�
'
5
11
2x4
1
4
2x4 11
2 -6-0
1
2-6-0
Plate Offsets (X,Y) [5:0- 1- 3,0 -0 -6]
LOADING (psf)
SPACING 2 -0 -0
CSI
DEFL (in) (loc) I /defl
PLATES GRIP
TCLL 30.0
Plates Increase 1.33
TC 0.09
Vert(LL) 0.00 5/4 999
M20(20ga) 249/190
TCDL 15.0
Lumber Increase 1.33
BC 0.02
Vert(TL) 0.00 1/5 999
BCLL 0.0
Rep Stress Incr YES
WB 0.01
Horz(TL) -0.00 5 n/a
BCDL 10.0
Code SFBC
(Matrix)
Min Length / LL defl = 360
Weight: 15 (Ibs)
LUMBER BRACING
TOP CHORD 2 X 4 SYP No.2D TOP CHORD Sheathed or 6 -0 -0 on center purlin spacing,
BOT CHORD 2 X 4 SYP No.2D except end verticals.
WEBS 2 X 4 SYP No.3 BOT CHORD Rigid ceiling directly applied, or 10 -00 -00 on center
bracing. Except: 1- 5:6 -3 -0.
REACTIONS (Ibs /size) 1= 106/0 -8 -0, 5= 38/0 -1 -8, 3= 110/0 -1 -8
Max Horz 1= 25(Ioad case 3), 3= 48(Ioad case 3)
Max Uplift 1=- 54(Ioad case 3), 5=- 24(load case 3), 3=- 78(load case 3)
Max Vert 1= 119(Ioad case 5), 5= 38(load case 1), 3= 110(load case 1)
FORCES
TOP CHORD 1- 2 = -86, 2 -3 =57
BOT CHORD 4 -5 =0, 1 -5 =16
WEBS 2 -5 = -19
NOTES
1) This truss has been checked for unbalanced loading conditions about joint 3.
2) This truss has been designed for the wind Toads generated by 110.0 m.p.h. winds at 32.4 feet above
ground level, using 2.0 p.s.f. top chord dead Toad and 8.0 p.s.f bottom chord dead load, 1.0 miles from
hurricane oceanline, on a category I enclosed building, of dimensions 80.5 by 66.5 with exposure C
(ASCE 7 -93). Lumber Increase = 1.33, Plate Increase = 1.33. No end verticals are exposed.
3) Non Standard bearing condition. Review required.
4) This truss has been designed with ANSI/TPI 1 -1995 criteria. r
LOAD CASE(S) Standard / / y ��.
JAN 22 1 1
MAHMOUD ZOLFADHARI, P.E.
Job
8340
Truss
J5C
Truss Type
ROOF TRUSS
Qty
2
Ply
1
BLUM RESIDENCE (BLUM BLDR.) DWH
DECO TRUSS COMPANY INC. 3.3T s Dec 11 1996 MiTek Industries, Inc. Tue Jan 21 11:51:23 1997 Page 1
•
-2-8-3 2 -6-0
2.6-3 2 -6-0
_
5.000
3x4 .=
2
��
M
N
Oil
M
ti)
STil NI
r
O
5
11
2x4
FA
1
2x4 11
-0.10-0 l 2 -6-0
0-10-0 2 -6-0
Plate Offsets (X,Y): [5:0.1- 3.0 -0-6]
LOADING (psf)
SPACING 2 -0-0
CSI
DEFL (in) (loc) 1 /dell
PLATES GRIP
TCLL 30.0
Plates Increase 1.33
TC 0.12
Vert(LL) 0.00 2 999
M20(20ga) 249/190
TCDL 15.0
Lumber Increase 1.33
BC 0.03
Vert(TL) 0.00 2 999
BCLL 0.0
Rep Stress Incr NO
WB 0.04
Horz(TL) -0.00 5 n/a
BCDL 10.0
Code SFBC
(Matrix)
Min Length / LL dell = 360
Weight: 24 (Ibs)
LUMBER BRACING
TOP CHORD 2 X 4 SYP No.2D TOP CHORD Sheathed or 6-0 -0 on center purlin spacing,
BOT CHORD 2 X 4 SYP No.2D except end verticals.
WEBS 2 X 4 SYP No.3 BOT CHORD Rigid ceiling directly applied, or 10-00 -00 on center bracing.
OTHERS 2 X 4 SYP No.3 Except: 1- 5:6 -3 -0.
REACTIONS (Ibs/size) 1= 357/0 -8 -0, 5= 68/0 -1 -8, 3= 129/0 -1 -8
Max Horz 1= 115(load case 3), 3= 63(load case 1)
Max Uplift 1=- 390(load case 3), 5=- 83(load case 3), 3=- 80(load case 3)
Max Vert 1= 357(load case 1), 5= 84(load case 5), 3= 129(load case 1)
FORCES
TOP CHORD 1- 2 = -338, 2 -3 =108
BOT CHORD 4 -5=0, 1 -5 =63
WEBS 2 -5= -75
NOTES
1) This truss has been checked for unbalanced loading conditions about joint 3.
2) This truss has been designed for the wind loads generated by 110.0 m.p.h. winds at 32.4 feet above ground level, using 2.0 p.s.f. top chord dead load and 8.0 p.s.f
bottom chord dead load, 1.0 miles from hurricane oceanline, on a category I enclosed building, of dimensions 80.5 by 66.5 with exposure C (ASCE 7 -93). Lumber
Increase = 1.33, Plate Increase = 1.33. No end verticals are exposed.
3) Non Standard bearing condition. Review required.
4) Studs to be fastened with 24 M20 plates.
5) This truss has been designed with ANSI /TPI 1 -1995 criteria.
LOAD CASE(S)
1) Lumber Increase =1.33, Plate Increase =1.33
Uniform Loads (Ibs per ft)
Vert:2 -3= -90.0, 4- 5= -20.0, 1- 5 = -20.0
Concentrated Loads (Ibs) f
Vert:2= -301.4
JAN 2 2 1997
MAHMOUD ZOLFAGHARI, P.E.
Job
8340
Truss
J3
Truss Type
ROOF TRUSS
Qty
20
Ply
1
BLUM RESIDENCE ( BLUM BLDR.) DWH
DECO TRUSS COMPANY INC.
3.3T s Dec 11 1996 MiTek Industries,
3-0-0
Inc. Tue Jan 21 11:31:01 1997 Page 1
3-0.0
5.00 [ 3x6 11
5
FA
l
cf
III
NIN■1111111111111111111
o
a
3x4 =
*Al
3
4
2x4 11
2 -6-0 3-0-0
2 -6-0 0-6-0
+
Plate Offsets (X,Y) [1:0-0-0,0-2-1]
LOADING (psf)
SPACING 2 - -
CSI
DEFL (in) (loc) I /def
PLATES GRIP
TCLL 30.0
Plates Increase 1.33
TC 0.17
Vert(LL) 0.01 1/3 999
M20(20ga) 249/190
TCDL 15.0
Lumber Increase 1.33
BC 0.17
Vert(TL) 0.01 1/3 999
BCLL 0.0
Rep Stress Incr YES
WB 0.00
Horz(TL) 0.00 n/a
BCDL 10.0
Code SFBC
(Matrix)
Min Length / LL deft = 360
Weight: 14 (Ibs)
LUMBER BRACING
TOP CHORD 2 X 4 SYP No.2D TOP CHORD Sheathed or 6 -0 -0 on center purlin spacing,
BOT CHORD 2 X 4 SYP No.2D except end verticals.
WEBS 2 X 4 SYP No.3 BOT CHORD Rigid ceiling directly applied, or 10 -00 -00 on center
bracing. Except: 1- 3:6 -3 -0.
REACTIONS (Ibs /size) 3= 28/0 -6 -0, 2= 276/0 -1 -8
Max Horz 3= 453(load case 3), 2=- 343(load case 3)
Max Uplift 3=- 119(load case 2), 2=- 313(load case 3)
Max Vert 3= 34(Inad case 6), 2= 298(load case 5)
FORCES
TOP CHORD 1 -2 =403, 2 -5 =0, 2 -3 =0
BOT CHORD 1- 3 = -314, 3 -4 =0
NOTES
1) This truss has been checked for unbalanced loading conditions about joint 5.
2) This truss has been designed for the wind loads generated by 110.0 m.p.h. winds at 32.4 feet above
ground level, using 2.0 p.s.f. top chord dead Toad and 8.0 p.s.f bottom chord dead load, 1.0 miles from
hurricane oceanline, on a category I enclosed building, of dimensions 80.5 by 66.5 with exposure C
(ASCE 7 -93). Lumber Increase = 1.33, Plate Increase = 1.33. No end verticals are exposed.
3) Non Standard bearing condition. Review required.
4) This truss has been designed with ANSI/TPI 1 -1995 criteria.
r
LOAD CASE(S) Standard
Z-44
JAN 2 2 1997
MAHMOUD ZOLFAGHARI, P.E.
Job
8340
Truss
J3A
Truss Type
ROOF TRUSS
Qty
4
Ply
1
BLUM RESIDENCE ( BLUM BLDR.) DWH
DECO TRUSS COMPANY INC.
3.3T s Dec 11 1996 MiTek Industries, Inc.
3-0-0
Tue Jan 21 11:31:08 1997 Page 1
1
3-0-0
5.00
M
FA
1
VI
•
1
'' ,
3x4 =
3-0-0
1
3-0-0
Plate Offsets (X,Y) [1:0- 0- 0,0 -2 -1]
LOADING (psf)
SPACING 2 -0 -0
CSI
DEFL (in) (Ioc) I/defl
PLATES GRIP
TCLL 30.0
Plates Increase 1.33
TC 0.14
Vert(LL) 0.00 / 999
M20(20ga) 249/190
TCDL 15.0
Lumber Increase 1.33
BC 0.03
Vert(TL) 0.00 1/3 999
BCLL 0.0
Rep Stress Incr YES
WB 0.00
Horz(TL) 0.00 3 n/a
BCDL 10.0
Code SFBC
(Matrix)
Min Length / LL deft = 360
Weight: 11 (Ibs)
LUMBER BRACING
TOP CHORD 2 X 4 SYP No.2D TOP CHORD Sheathed or 6 -0 -0 on center purlin spacing.
BOT CHORD 2 X 4 SYP No.2D BOT CHORD Rigid ceiling directly applied, or 10 -00 -00 on center
bracing.
REACTIONS (Ibs /size) 1= 163/0 -1 -0, 3= 30/0 -1 -8, 2= 134/0 -1 -8
Max Horz 1= 55(load case 3), 2= 55(load case 3)
Max Uplift 1=- 84(Ioad case 3), 2=- 108(load case 3)
FORCES
TOP CHORD 1 -2 = -58
BOT CHORD 1 -3 =0
NOTES
1) This truss has been checked for unbalanced loading conditions about joint 2.
2) This truss has been designed for the wind loads generated by 110.0 m.p.h. winds at 32.4 feet above ground level, using 2.0 p.s.f. top chord
dead Toad and 8.0 p.s.f bottom chord dead Toad, 1.0 miles from hurricane oceanline, on a category I enclosed building, of dimensions 80.5 by
66.5 with exposure C (ASCE 7 -93). Lumber Increase = 1.33, Plate Increase = 1.33. No end verticals are exposed.
3) Non Standard bearing condition Review required.
4) This truss has been designed with ANSI/TPI 1 -1995 criteria.
LOAD CASE(S) Standard
r
j
JAN 2 2 1997
MAHMON ZOLFAGHARI, P.E.
Job .
8340
Truss
J1
Truss Type
ROOF TRUSS
Qty
24
Ply
1
BLUM RESIDENCE ( BLUM BLDR.) DWH
DECO TRUSS COMPANY INC.
3.3T s Dec 11 1996 MiTek
1-0-0
Industries, Inc. Tue Jan 21 11:30:53 1997 Page 1
1-ao
Cr)
M
i
r
O
5.00p
4
O
1111141111111
1
3x4 =
1
F'
f 1-0-0
1-ao
Plate Offsets (X,Y) [1:0- 0- 0,0 -2 -1]
LOADING (psf)
SPACING 2 -0 -0
CSI
DEFL (in) (loc) Udefl
PLATES GRIP
TCLL 30.0
Plates Increase 1.33
TC 0.03
Vert(LL) 0.00 1 999
M20(20ga) 249/190
TCDL 15.0
Lumber Increase 1.33
BC 0.04
Vert(TL) 0.00 1 999
BCLL ' 0.0
Rep Stress Incr YES
WB 0.00
Horz(TL) 0.00 n/a
BCDL 10.0
Code SFBC
(Matrix)
Min Length / LL defl = 360
Weight: 5 (Ibs)
LUMBER BRACING
TOP CHORD 2 X 4 SYP No.2D TOP CHORD Sheathed or 6 -0 -0 on center purlin spacing.
BOT CHORD 2 X 4 SYP No.2D BOT CHORD Rigid ceiling directly applied, or 1- 3:6 -3 -0 on center
bracing.
REACTIONS (Ibs/size) 3= 10/0 -1 -8, 2= 101/0 -1 -8
Max Horz 3= 143(Ioad case 3), 2=- 97(load case 3)
Max Uplift 3=- 35(load case 2), 2=- 108(load case 3) '
FORCES
TOP CHORD 1 -2 =131
BOT CHORD 1 -3 = -93
NOTES
1) This truss has been checked for unbalanced loading conditions about joint 2.
2) This truss has been designed for the wind loads generated by 110.0 m.p.h. winds at 32.4 feet above ground level, using 2.0 p.s.f. top chord
dead Toad and 8.0 p.s.f bottom chord dead load, 1.0 miles from hurricane oceanline, on a category I enclosed building, of dimensions 80.5 by
66.5 with exposure C (ASCE 7 -93). Lumber Increase= 1.33, Plate Increase = 1.33. No end verticals are exposed.
3) Non Standard bearing condition. Review required.
4) This truss has been designed with ANSUTPI 1 -1995 criteria.
LOAD CASE(S) Standard
r
,,
JAN 2 2 1997
MAHMOUD ZOLFAGHARI, P.E.
MINIMUM GQADE OP LUM13FI?
TOP C► -10RP . 'e.)(#. Ka 2 67.0UT-1EQN PINE
ao T TOM c-1-1 Zx ND. 2 �oUTrIERN Pi*1 E
WE / 2x Uo..?., k)5ourl -icN PINE
�� IA ‘",:"5:. C:- 7 - %L1- -t T2 S
li _}
m il �_ C . uJ i - 1 a. I l,11 O1 ✓ G� i�
Loading (PSF)
Top Chord • Live 30.0
Top Chord • Dead I S.O
bottorrr Chord • 10.
Total 55.0
4
4
Connector plates ' ts.X 20 • .,a. mcnufacruree
from ASTM A446 ; 1 Golvani::ed steei
(except as shown ) --
Plates are to be Insto.I on both faces of joints .
symmetrically (unless otherwise specified by
dimensions) avoiding knots and distorted grain.
Joints to be held firmly together until teeth
are embedded In the wood.
Design specifications conform
specifications, and TP I 78.
\/A Rt
�TY
Pi GAL)
3x5
VaQTIGAL L FJ,/ o ' - Off;
MAXIMUM 6vE R 2/-1
SPACING -.o c. C.
POSTAP2 DSGtJ. �?R.
_ALLowAgL STRES5
1 NC: =ASE F-OR -SNORT TIME
LOADING c NIP. 33
12
with NOS design
2 x3
2x3
Zo -o $. ovEz
Handling and erection are not the Iponslbliity of
the designer or the plate =nut .. firer. •
Trusses are to be handled with
during banding and /or bundling;
Installation to avoid damage.
Camber as shown on this drawing Is that recom-
mended for normal conditions of Ibading and
fabrication. Camber may be revised at the option
of the fabricator or architect.
Icular c
ivory and _
TQU55 SYMMETRICAL
x 4 A6otT CENTER LINE
EXGE PT AS Si- IOH/1J
?X: OPT. SPL. 2xj
6n WEDGc NAILED i0 T ✓IIJAS T�`OS5
(2U_5 ES
OR, SEVP_L CUT aG. ON VALLE`! „ USSES
vALL E { C Ct∎iNEC T I ON D T7 ;
�ID&E Li hi=
! i 5 ; I •<: I I I 11;
1
.7 .I i :
VALLEY SE s F
Q TRUSS ; T
r
1‘ �� l:
GAEN LE END TRUSS
% •'RSIFI tpoOF LA 'oLT •
; •
tJ �. r STATE OF i!
VALLEY DETAILS 9.-p
� 1 my- . ..... ••
t l: % ct;E —
( S o , 7
Designed by
. Chedied by
Oat.e7/. v/11
Drawing N 0001
1 t I
STANDARD PIGGY - BACK CONNECTION DETAIL
MINIMUM GRADE OF LUMBER
T.C• ?X1 No. 211D 19 SP
B.C, 2X1 No. 210 19 SP
WC(,;, 2)(i 11.,. 0 19 91
LOADING L (PSF)
10P 30
TTOM 0 10
ACING: 21 Inch O.C.
CONTINUOUS LATERAL
BRACE (TYP)
SUPPORTING
TP.U6o —?
TP1 Crll,
SSBC ■DI
SIR. INCR. , 33
DRAWN BY t P.G.
CHECKED BY , J.A.I.
REP. STREtS YES
PLYWOOD GUSSETS OR
WAIL ON (Tyr)
(SEE NOTES BELOW)
NOTES:
(1), Refer to nrperelo piggyback and base trusc onglncoring for truss configuratiun,
plating, lumber grades, bracing, eic.
(2). Use 2x1 Continuous bracing at 2' -0' o.c. connected to top chord of supporting truss
w /2 -16d nails and to bolt. chord of piggyback w /2 -16d nags. Bracing to be
tied to fixed point at each and.
(3). Use 3x8, 20 gage nail -on- plates w/6 -1 1/2' long, 11 gage nails, 3 nails In each chord, or
1 /2•x(rxFi' aYt, type plywood gussets on cacti face, of 1' 0' o.e., nailed w /8 -8d nails,
on each face (1 nails In each chord), •
(I). 'This drawitry vpplies to irusses spaced at 21' o.c,
MITek 1nduslrles Inc.
PIGGYBACK
" - TRUSS
PRErArko et vi am oa IcE.
' / ),►
F pl(tFF ��•`• t'r,I
No. 13658 . e
Approve l�tiCtrles Inc.
STANDARD LATERAL WEB BRACING
P REPARED 0Y WMH OfflcE,
TRUSSES ® 24" O.C. TYP.
END OF BRACING MEM.
SHALL BE CONNECTED TO A FIXED
RIGID POINT OR X— BRACED AS NOTED
ON THIS DETAIL.
ALT. LATERAL BRACING DETAIL
MINIMUM GRADE OF LUMBER
T.C. REFER TO SEPERATE
B.C. ENGINEERING DWG,
Webs
•
LOADING (PSF)
L D
TOP
BOTTOM
■SPACING:24 In O.C.
TRUSSES 0 24"
O.C. TYP.
- T — BRACE OJI11 {
10d NAILS 0 6"
0.C. IYP.
STR. INCR.:
DRAWN BY: C.L.H.
CHECKED BY: J.A.I.
REP. STR
LATERAL BRACING DETAIL
NOTE:
BRACE MUST BE 80% HIE LENGTH
OF THE WEB.
1HIS DETAIL IS TO BE USED AS AN
ALTERNATE FOR CONTINUOUS LATERAL
BRACING.
TPI -92 Crit.
Revised:
7/7/94
--WEB (2x6 MAX.)
S- UT -8.0Z\
1x4 or 2x3 LATERAL, BRACE
PER TRUSS DESIGN WITH 2--10d
NAILS PER WEB FOR FORCES
UP TO 4600 Ibs. FORCES IN
EXCESS OF 4600 Ibs. REQUIRES
2x6 #3 OR BETTER.
NOTE:
PROVIDE X-- BRACI■G AT 20' -0"
INTERVALS FOR WEB FORCES UP
To 2509 Ibs. AND AT 10' -0" FOR
FORCE GREATER THAN 2.509 Ibs.
10d 0 6"
AV-. � O.C. TYP.
T —BRACE SAME SIZE
AND GRADE AS WEB.
WEB IEC _lION DETAIL
Approved fora Pek slries Inc. j
Nom;? ='-?$
„ •
PRODUCT p �
' CO •
•
} 1
t
S; ; ; :
/ .
GAUGE
,�A.. ^,fif., s.
I.y
::.I i'
DIMENSIONS
FASTENER SCHEDULE
ALLOWABLE LOADS •
PER
CTN
W
H
BS
HEADER
JOIST
FLOOR DESIGN
LOAD 100%
ROOF DESIGN
LOAD 125%
1 . WIND /
EARTHQUAKE
NAILS
BOLTS
NAILS
BOLTS
NAILS
BOLTS
UPLIFT
133%
UPLIFT
160%
2X6 (2)
GHP26HD
14
31/8
5 1/4
3 1/4
30 -16d
3-1/2'
8 -16d
4410
930
5515
1165
1365
1365
4
: 2X8 (2).:•
GHP28HD !
',s 14 .1
31/8
7
31/4
30 -16d
3 -1/2'
8 -16d
4410
930
5515
1165
•• 1365
1365
4 .
2X10 (2)
GHP210HD
, 14
3 1/8
9
3 1/4
30 -16d
3-1/2'
8 -16d
4410
930
5515
1165
1365
1365
4
k ri
Z d
ti t
f X
; r .
1 :
<` iFl a 1 t iti
. ODUC
P , , ,.
. f C O
; 4
1 •!
: + i,
r 1 rr ' +'
/ }
h .,
G
; 4p
1
.a r + !:
DIMENSIONS
f i
FASTENER •
SCHEDULE
ALLOWABLE LOADS
.
PER
CTN
y '
i-
t
t
W
�
; ;
H ;
, ;
BS
::-
1 t
HEADER
I
JOIST
i !
FLOOR
D
LOAD •
',100%
,..,
ROOF
DESIGN
LOAD
125% `•
• : WIND /. •
EARTHQUAKE '
�1PLIFT
133%
U PLIFT
160%
2X6 (2)
GHP26D
14
31/8
5 1/4
3 1/4
20-16d
8-16d
2940
3225
1365
1365
4
1 ;06 . i)
l'.GN1:28DA +,
014 r
.3 1/8
. 7
31/4
30 -16d
12 -16d
: 4410
5515
2045
2045
4
2X10 (2)
GIIP210D
14
31/8
9
3 1/4
38 -16d
16 -16d
5585
6585
2950
2950
4
Fmrn
Southeastern Metals Manufacturing Company, Inc.
TM
FOR TECHNICAL INFORMATION:
1 800 SE SPECS
1- 800 - 737 -7327
•
GIRDER HANGER
Design Features: • Rugged support design allows for maximum Toad values where added strength is primary requirement.
14 gauge galvanized steel
Materials:
NSTALLATION: Use all specified fasteners In schedule to achieve values Indicated.
SEE GENERAL NOTES: 1, 2, 3, 4, 5, 6
CODE COMPLIANCE: S.B.C.C.I. #9166, METRO DADE COUNTY REPORT #92- 0830.3, Submitted 1/93 for a National
Evaluation Report (NER# Pending).
HEAVY DUTY GIRDER HANGER
Design Features: • Rugged support design allows for maximum Toad values where added strength Is primary requirement.
Materia s: 14 gauge galvanized steel
NSTALLATION: Use all specified fasteners in schedule to achieve values indicated.
SEE GENERAL NOTES: 1, 2, 3, 4, 5, 6
CODE COMPLIANCE: S.B.C.C.I. #9166, METRO DADE COUNTY REPORT #92- 0830.3, Submitted 1/93
for a National Evaluation Report (NER# Pending).
GENERAL NOTES
1. Allowable Load Capacities are based on the National Design
Specifications for Wood Construction 1991 Edition Including
1993 Errata.
2. Design loads are based on Southern Yellow Pine wood species
with a specific gravity of 0.55. Allowable loads for other species
or conditions must be adjusted according to the applicable code.
3. Fasteners are either common wire nails or threaded hardened
steel nails for single shear Two Member Connections) with
ASTM A653 Structural Grade 33 Steel Side Plates.
4. Floor Design loads given in the tables are not adjusted for
various durations of loading and are in accordance with ASTM.
D 1761.
5. Maximum downward load capacity has already been increased
for a duration of load, when permitted by National Design
Specifications for Wood Construction not exceeding 25 %.
6. Allowable uplift load has already been increased by a duration of
Toad factor when permitted. by the National Design Specifications
for Wood Construction not exceeding 60 %.
7. Engineer's sealed approval available upon request.
8. These products are manufactured by United Steel Products
Company Inc. under the Trade mark designation of Kant -
Sag.
9. At the time of this catalog printing, all 5F "'
and Kant -Sag products listed In this full line catalog have
GHPHD
been or are In the submittal process for the following
code authorities: ICBO - International Conference of
Building Officials, BOCA - Building Officiate and Code
Administrators International Inc., S.B.C.C.I. - Southern
Building Code Congress International, Inc. and METRO
- Dade County, Florida. For a current listing of accept-
ance reports on any Metal Connector Product contact
Southeastern Metals Manulacturing Co. Inc.
10. Most structural metal connectors listed In this full Ilne
catalog manufactured by Southeastern Metals are listed
under the following SBCCI cornpliance reports: 0166, #9320
for Southeastern Metals.
11. Duration of load adjustments for mechanical fasteners are as
follows: FLOOR /DESIGN LOADS: No increase for duration
of load. 100 %. UPLIFT: 133% and 160% of Design Load for
wind. ROOF SNOW: 115% of Design Load for 2 month
duration of load. ROOF NON -SNOW: 125% of Design Load
for 7 day duration of load.
12. The allowable load uplift percentages shown, 133% and
160 %. reflect duration factors appropriate for different build-
ing codes as defined in the National Design Specification
for Wood Construction. You should select the uplift % that Is
applicable to your building area under your governing
building code.
r 2 3/4'
•
H
}
'
81
tF
1 .11'.1
� t i
E
t
f 3
• ?li: }. ,:;,'
� ; jl4
, 41 i ', i
UC
PROD T
"} l D "'
Cf�� i! + � '`�'i "
� !;; 1 ;
;1;'' j
" � �� ,
�"
I I rj P li
� �
GAUGE
I �f r�
( (11
r ii: a ).
I]IMENSIONS '
... -
FASTENER
t P : !
SCHEDULE :..
'!.' " ALLOWABLE LOADS '
. � °.t. �
,. .� ■ � c
v .. •, t'. � . . i
! ' •
i t
1:1
PER
C
i
! ' ''
= 3 -: = --
1 � �� ?_
H `
I +:il.
" '
BS
!r,::'
,.I '��,:f.3;,
'!'.
''
HEADER
:,
1 f. q�;
"',,: %.'•:
"
JOIST
(!!
PLOOR",
DESIGN
• LOAD
";10096 ,
J'
, ROO
DES1
LOA N
! 125%\
., 1
. , WINO % ! 1. • :
EARTHQUAKE
133%
160°
2X
SHP29
18
19/16
91/2
21/2
26 -16d
6.10d
2715
2715
755
755
50
Eiiia
,!,MS11S29 ii
/18) ^ti
,15/8
: 9 .
' 2 .
14- 16d'.:
10 -104
' 204
• 2555
; 1375;
. :1650
'•.50
2X
MSHS213
18
15/8
13
2.
..14- 16d... -,
10 -104
,__20451- .....25,55
. 1 75
1650
25
1,2X.1
i.Msi 218;:
4ig19:1.'•i
:1 5/8
'
2'
k 16,16d$' '
161Od
'tt,':.2335 / !r..'."2920.`
4 1375;,'.
'!1650 ".
r 25, r•
2X
MSHS222
18
1.5/8
. -22-
2 -
- 22- 164`-.
10.104
3
. 3$0Q
1375
1650
25
i1 U.+ry�.N�o.ai•I.s
40
�r.ulu
MSt� t3;2,
4'0140
`5.118.131/4
'1.2: ?.
�
it. : :14-16dti!
10.104
A
045
;li?2 g���
!ii2555i
,;
�' '','1625ii
,.
� r'�1750s;
;I
: 25:,':
2X(2)
MSHS218 -2
16
31/8
181/4
2
16 -16d
10 -10d
2335
2920
1625
1750
25
2X(2)
::Mikiiia.
S t E i l 4
3118.
22 114
5' 2 is
22-16d+i:(
10-104
3 2 1 0 ' 1
. ; : , :3500
•'.1625:1
75
'i. 25 )i'
4X
MS118413
. 16
3 5/8
13
2
14 -16d
10 -10d
2045
2555
1625
1750
25
4X
M.. SO4
d
n'�F."l
/8
If18
.2 ,
,;16•16d4:
10
.,2335
::292
. 1625
:1750 ,.
;25.
4X
MSHS422
18
3 5/8
22
2
22 -16d
10.10d
3210
3500
1625
1750
25
STRAP TRUSS HANGER
Design Features: • This multi- purpose truss hanger design bends to fit a variety of
configurations including overhang or face mount installations.
18 - 16 gauge galvanized steel
Materials:
SHP
TNOTE:
Loads values are based on tusses.
INSTALLATION: Use all specified fasteners In schedule to achieve values Indicated.
Strap may be field- formed over the header a minimum of 11/2', for top mount.
Alternate fastening schedule available upon request.
SEE GENERAL NOTES: 1, 2, 3, 4, 5, 8, 10
CODE COMPLIANCE: S.B.C.C.I. 49166, 49320, METRO DADE COUNTY REPORT 492. 0830.4, Submitted
1/93 for a National Evatuatlo Report (NERN Pending).
FACE
MOUNT
1 \44111 1 f
Ntw
Produc
TOP =
MOUNT
n
TRUSS COMPANY, INC.
25475 S.W. 142nd Avenue
Princeton, Florida 33032
Phone: 257 -1910
Fax: 257 -1911
HANGER DETAIL SHEETS
FOR HIP CORNER JACKS 7' -0 ", 9' -0" AND 11' -0" SET
BACK, USE SEMCO SKEWED TRUSS HANGER OR EQUAL.
2) FOR 9' -0" TO 1' -0" SIDE JACKS, NAIL TOP & BOTTOM
CHORD WITH THREE (3)— 16D NAILS AND USE SEMCO
HURRICANE CLIP # HCPL & HCPR OR EQUAL.
3) FOR 7' -0 ", 9' -0" AND 11' -0" COMMON JACKS, USE SEMCO
BUTTERFLY HANGER # CLPBF OR EQUAL ON BOTTOM CHORD
AND NAIL TOP CHORD WITH THREE (3)— 16D NAILS AND
USE HURRICANE CLIP # HCPL & HCPR OR EQUAL.
SEMCO A K A SOUTHEASTERN METAL
SKEWED TRUSS HANGER (45 Degrees)
Design Features: • These skewed hangers were developed for the use with most common standard
lumber, engineered lumber and plated truss applications.
Materials: 16 gauge galvanized steel
2X4 -6
2X8.10 -12
2X10.12.14
PRODUCT:
CODE %i!
SKH24
S KH20.';t
SKH28
SKH210
2X10-12 (2) SKH210 -
GAUGE
16
i 18
DIMENSIONS
1 9/16
1 9/16
31/4
5 7/32
BS
1 7/8
1 7]3
FASTENER
SCHEDULE
HEADER
4 -16d
• 6 -16d
4 -10dX1 1/2
6 -10dX1 1/2
16 1 9/16 71/4 1 7/8 10 -16d 8 -10dX 1 1/2
FLOOR
DESIGN
LOAD,
100 %
510
810
1350
16 1 9116 9114 1 7/8 14 -16d 10 -10dX1 112 1790
16
ALLOWABLE LOADS
SNOW
DESIGN
LOAD,
115 %
510
890
1465
1790
ROOF
DESIGN
LOAD
125 %
510
890
14g5
1790
WIND UPLIFT
133%
505
760
1015
160%
PER
CTN
565
910
25
25
1215 25
1265 1520 25
1565
FOOTNOTE:
SEE GENERAL NOTES: 8
CODE COMPLIANCE: NER 478
SFMCFT
Southeastern Metals Manufacturing Company, Inc.
BUTTERFLY HANGER
6 1/6"
w .,,
(2x4)
7 1/8" (3x4)
BS
3 1 /16 8 1/2 1 3/8 14.16d 10 -10d 1890 2175 2365 1505
*Miter cut required on end of foist to achieve design loads. Loads may exceed shear capacity
of wood I -Joist or beam. Other sizes a so available.
To order product with hot- dipped galvanized finish, add I-IDG to product code number, as in
SKH24 1OG. •
FOR TECHNICAL INFORMATION:
1 800 SE SPECS
1- 800 - 737 -7327
25
Design Features: • Engineered for economical Installation and maximum Toad values.
Materials: 18 gauge galvanized steel
SKEWED
• - ANOIE
90' Right
SKH
Right Skew Shown
To order Right skew, add "R ",
to order Left skew, add "L ".
2X4
2X4
3X4
+; r` Ira;
PRODUCT
{ CODE /,.
CLPBF
• CLPBF3
18
IN
NOLI
bIMENsiio
VP
:.l §r.`sVn �1' {l. ?,jl�tiljE
1 9/16
2 518
3
21/2
21/2
2112
12
12
,12
3
6
41i rSi!krill atiOliditit19
900
900
950
950
900
950
950
950
950
950
950
950
edfc
600 710 720 855 100
300 380 360 460 100
800 71d' 101 300:
INSTALLATION: Use al specified fasteners In schedule to achieve values Indicated.
Values based on 1 1 2" header thickness.
SEE GENERAL NOTES: 1, 2, 3, 4, 5, 8, 10
CODE COMPLIANCE: S.B.C.C.I. 119186, 119320, METRO DADE COUNTY REPORT 1191-0702.7R, Submitted 1/93 for e
National Evaluation Report (NEW/ Pending).
GENERAL NOTES
1. Allowable Load Capacities are based on the National Design
Specifications for Wood Construction 1991 Edition Including
1993 Errata.
2. Design loads are based on Southern Yellow Pine wood species
with a specific gravity of 0.55. Allowable loads for other species
or conditions must be adjusted according to the applicable code.
3. Fasteners are either common wire nails or threaded hardened
steel nabs for single shear (Two Member Connections) with
ASTM A653 Structural Grade 33 Steel Side Plates.
4. Floor Design loads given In the tables are not adjusted for
various durations of loading and are in accordance with ASTM.
D 1761.
5. Maximum downward load capacity has already been Increased
for a duration of load, when permitted by National Design
Specifications for Wood Conslruction not exceeding 25 %.
8. Allowable uplift load has already been Increased by a duration of
load factor when permitted, by the National Design Specifications
for Wood Construction not exceeding 60 %.
7. Engineer's sealed approval available upon request.
8. These products are manufactured by United Steel Products
Company Inc. under the trade mark designation of Kant -
Sag.
9. At the time of thls catalog printing, all F mt.-7n
and Kant -Sag products listed In this full Ilne catalog have
been or are In the submittal process for the following
code authorities: ICBO - International Conference of
Building Officials, BOCA - Building Officials and Code
Administrators International Inc., S.B.C.C.I. - Southern
Building Code Congress International, Inc. and METRO
- Dade County, Florida. For current listing of accept-
ance reports on any Metal Connector Product contact
Southeastern Metals Manufacturing Co. Inc.
10. Most structural metal connectors listed in this full Ilne
catalog manufactured by Southeastern Metals are listed
under the following SBCCI compliance reports: 119168,119320
for Southeastern Metals.
11. Duration of load adjustments for mechanical fasteners are as
follows: FLOOR/DESIGN LOADS: No increase for duration
of load. 100 %. UPLIFT: 133% and 160% of Design Load for
wind. ROOF SNOW: 115% of Design Load for 2 month
duration of load. ROOF NON -SNOW: 125% of Design Load
for 7 day duration of load.
12.The allowable load uplift percentages shown. 133% and
160 %, reflect duration factors appropr!ate for different build-
ing codes as defined In the National Design Specification
for Wood Construction. You should select the uplift % that Is
applicable to your building area under your governing
building code.
n TM
Southeastern Metals Manufacturing Company, Inc.
FOR TECHNICAL INFORMATION:
1 800 SE SPECS
1- 800 - 737 -7327
HURRICANE ANCHOR
Design Features: • These ties add increased resistance to wind uplift.
• Eliminates toe nailing utilizing correctly located nail holes for fast, easy
and strong attachment of rafters and trusses to plates and studs.
20 -18 gauge galvanized stee
Materials:
Regular
Dbl. Long Tie
Truss Tie
HCPR & HCPL
:1.1c1 fj $ FICPLL
RT10
HCPTA
20
20 ' + `.
1 1/2
11/2
20
18
DIMENSIONSS
1 1/2
11/2
2 1/2
5
1 6 '.
101/2
4 5/8 '
20
FASTENER SCHEDULE
RAFTER
4
5 1/2'
4
8
PLATE
4
4
8
STUD
4"
4"
5 x 1 1/2'
4'
8
- ALLOWABLE LOADS
'.! LATERAL'!;'ij
(Seb Installation)
145
145
115
100
95
95
?'130
'ii1itia
.EARTHQU KE
UPLIFT' ;
.6d
400
400
480
480
500
380;
800
u:
510
510 `'
555
380'
990
555
380
960
. ed q
520
520
555
380•
990
PER
cpi
500
.100
100
100
50
FOOTNOTE:
May be installed on each side of rafter for twice the Toads when the rafter thickness is a minimum of 2 1/2" or diagonally when rafter Is 1 1/2 ".
Regular and Longtie hurricane anchors also available in 18 gauge.
*Alternate stud plate application.
Use all specified fasteners In schedule to achieve values indicated.
2 -16d toe nails from truss to top plate equals 300 lbs. additive to
listed lateral loads parallel and perpendicular.
SEE GENERAL NOTES: 1, 2, 3, 5, 6, 10
CODE COMPUANCE: S.B.C.C.I. #9166, #9320 METRO DADE COUNTY REPORT 1192- 0830.6,
Submitted 1/93 for a National Evaluation Report (NER# Pending).
INSTALLATION:
A2
REGULAR
HCPR /L
Al
Rafter application
HCPR /L
(Available In left or right)
H LONGTIE
HCPLR /LL
Rafter application
HCPLR /LL
(Available in left or right)
37
REVERSIBLE
RT12
RT12
11
Rafter application
TRUSS
TIE
HCPTA
Al
A2
May be installed on each side of rafter for
twice the loads when the rafter thickness is
a miminum of 2 1/2" or diagonally when
rafter is 1 1/2 ".
1 1/2"
L-
011
�-1
DOUBLE
LONGTIE
RT10
r
\ TOP
PLATE
H
ties insta led diagonally aoi:
from each other
2 1/2"
(MIN)
F
TOP
— PLATE
lisiinstailed back -to -back
Date
PE2MIT APPLICATION FOR MIAMI SHORES VILLAGE
L f'- f 9Job Address /4-30 101 S/. Tax Folio
Legal Description ) ,y Historically Designated: Yes 4/791
No
Owner/Lessee / Tenant Al / �� r / f fi Master Permit # ? 8
Owner's Address /4-5 6 I•J A /01 S f
Contracting Co. b t d,L (/r J ` /sue Address
Qualifier 0J t (LC- /-fit (91/ it. 7 SS#
State # 1L , Municipal # Competency # cc( 61.4z Co.
Architect/Engineer Address
Bonding Company Address
Mortgagor Address
Permit Type (circle one): BUILDING ELECTRICAL PLUMBING MECHANICAL ROOFING PAVING / F I ENCE � SIGN
WORK DESCRIPTION C 7 sr/ I wr r .. ( 117 A IY- 1 "-�' ,
01).A I /'-�Pr � �(• :> 1.) ��'L S i �� 2 2
,s> bo Estimated Cost (value) 35d o- v 0
Square Ft.
WARNING TO OWNER: YOU MUST RECORD A NOTICE OF COMMENCEMENT AND YOUR FAILURE TO DO SO MAY
RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY (IF YOU INTEND TO OBTAIN FINANCING,
CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT.)
Application is hereby made to obtain a permit to do work and installation as indicated above, and on the attached addendum (if applicable). I
certify that all work will be performed to meet the standards of all laws regulating construction in this jurisdiction. I understand that separate
permits are required for ELECTRICAL, PLUMBING, SIGNS, POOLS, ROOFING and MECHANICAL WORK.
OWNER'S AFFIDAVIT: I certify that all the foregoing information is accurate and that all work will be done in compliance with all applicable
laws regulating construction and zoning. Furthermore, I authorize the ab ee -named contractor to a work state
Signature• of owner and/or Condo President Date
Notary as to Owner and/or Condo President Date
My Commission Expires:
APPROVED:
Zoning
Mechanical
Building
Signature of Contractor or Owner -But der
Notary as to Contractor or Owner - Builder= =-,i
My Commission Expires. ` rt V
i ,,
0
Phone 15(- 9 32 I
Date
Date
y / —moo —t7
FEES: PERMIT � • RADON C.C.F. NOTARY 1 TOTAL DUE
/ 70
Electrical
Plumbing Engineering
.Appendix
UNIFORM ROOFING PFRMITAPPLICATI0N, : •
PROCESS No.
.ntractor's Name: b U �k J 6 1 1 Job Address:
r•
436 Okr 1o0
ROOF CATEGORY
(Low Slope Application) 0 (Nail-On Tile) Elf Tile) *
(Asphalt/Fiberglass Shingles) 0 ( Metal Roofs•Wood Shingles & Shakes) O (Other)
ROOF TYPE
0 New Roof 0 Re- roofing 0 Recovering 0 Repair 0 Maintenance
'at Roof Area (8 Sloped Roof Area ($2) SSa °. _ Total (8 5 J lj Master Permit No.
rposure category (per ASCE 7-88): Bulid'mg Classification category (per ASCE 7-88 table 1):
"Includes Mortar and Adhesive Set Tile
ROOF HEIGHT AND SYSTEM DETAILS (Draw details as needed)
Deck type:
ATTACHMENT
Fastener Type:
SPACING
Field: Perimeter. Corner.
DETAIL 1 & 2
Page -1
5 r
t i r
r
t t r
r �
ROOF PLAN
-1.
--------------------------------------- -
r„
-
UNIFORMROOFING PERMIT APPLICATION ,
PROCESS No.
DETAIL 3.
£,LOPED SYS
TILE CALCULATIONS
(Pmaxl: X 7l. ( Aerodynamic Muttiplict): ) - M = Md: PCA:
(Pmax2: x X (Aerodynamic Multiplier) ) - Mr = Md: PCA:
(Pmax3: x (Aerodynamic Multiplier): ) - M = M PCA:
Page-2
ATTAC MENZS REQUIRED
1) Fire Directory Listing Page
2) Dade County Product Control
Notice of Acceptance -Cover Sheet
a) Specific System Description
b) Specific System Limitation
c) General Limitations
d) APFLcable Detail Drawings
3) Municipal Permit Appiicaden
4) Other Component Approvals
METRO-DADE
Artesanos, Ltda.
Avenida 0 No. SA -22
El Salado, Colombia
PRODUCT CONTROL NOTICE OF ACCEPTANCE
Your application for Product Approval of Artesanos. Ltda.. Mortar Set. Clay "2 Piece Handmade Tapered
Mission Barrel Tile" Roofine Tile under Chapter S of the Metropolitan Dade County Code governing the use of
Altemate Materials and Types of Construction, and completely described in the plans, specifications and calculations
as submitted by Testwell Craig Laboratories & Consultants, Inc. has been recommended for acceptance by the
Building Code Compliance Department to be used in Dade County, Florida under the specific and standard conditions
set forth herein.
The approval shall be valid for a period of three years. The Building Code Compliance Department reserves the right to
secure a product or material at any time for a jobsite or manufacturer plant for quality control testing. If product or
material fail to perform in the approved manner, the Code Compliance Department may revoke, modify or suspend the
use of such product or material immediately. The Building Code Compliance Department reserves the right to require
testing of this product or material should any amendments to the South Florida Building Code be enacted affecting this
product or material.
The expense of such testing will be incurred by the Manufacturer.
PRODUCT NO. :
ACCEPTANCE NO.: 95- 0317.11
EXPIRES:
This application for Product Approval has been reviewed by the Metropolitan Dade County Building Code Compliance
Department and approved by the Building Code Committee to be used in Dade County, Florida under the conditions
set forth above.
APPROVED:
IYIAY 1 8 19 9 8
- PLEASE NOTE -
THIS IS THE COVERSHEET. SEE ADDITIONAL PAGES FOR SPECIFIC AND GENERAL
CONDITIONS.
BUILDING CODE COMB ITTEE
MAY 1 8 1995
METROPOLITAN DADE COUNTY, FLORIDA
METRO -DADE FLAGLER BUILDING
Rodrigu
BUILDING CODE COMPLIANCE OFFICE
SUITE 1603
METRO -DADE FLAGLER BUILDING
140 WEST FLAGLER STREET
MIAMI, FLORIDA 33130-1563
(305) 375 -2901
FAX (305) 375 -2908
oduct Control Division
Supervisor
PRODUCT CONTROL SECTION
(305) 375 -2902
FAX (305) 372 -6339
Arles Danger, '.E., Director
Building Code Compliance Department
Metropolitan Dade County
Applicant:
Artesanos, Ltda.
Avenida 0 No. 8A -22
El Salado, Colombia
Category: Prepared Roofing
Sub - Category: Tile
Type: Mortar Set
Sub -Type: Clay
PRODUCT CONTROL NOTICE OF ACCEPTANCE
ROOFING SYSTEM APPROVAL
System Description
Product Control No.: 95- 0317.11
Approval Date: MAY 1 8 1995
Expiration Date: MAY 1 8 1998
Artesanos, Ltda., located in El Salado. Colombia, is a manufacturer of clay roof tile for mortar set
applications. All clay roof tile is manufactured in plants located in Colombia from El Salado clays and is
distributed through Artezanos, Inc. in the South Florida jurisdiction. Artesanos. Ltda., produces one clay
tile profile for use in the South Florida jurisdiction which is a two -piece barrel tile (high profile). This
Product Control Approval relates to Artesanos' "2 Piece Handmade Tapered Mission Barrel Tile" tile
profile.
The profile has matching trim pieces used for rake hip, ridge hip, and valley terminations.
Artesanos" clay tile has been tested in compliance with the South Florida Building Code
requirements for clay, mortar set tile applications. The minimum roof slope for Artesanos mortar set clay
tiles shall be 2 ":12 ". See the "Profile Drawing" section in this Approval for the "2 Piece Handmade
Tapered NIission Barrel" profile drawing. The "2 Piece Tapered Mission Barrel" tile profile has been
tested for static uplift performance only, therefore, any consideration for installation shall be done as an
'Uplift Based System'. Data for attachment calculations is noted in Tables 1 and 2 of this Approval.
Artezanos, Inc. is an Approved local distributor of Artesanos, Ltda. clay tiles. Manufacturer .'
Distributor Agreement is on file at the Metro -Dade Building Code Compliance Office.
Contact:
Daniel Arguelles
Artezanos, Inc.
9455 S.V. 78th Street
Miami, Florida 33176
(305) 595 -4577
1
Product
2 Piece Handmade
Tapered Mission
Barrel Tile
Trim Pieces
TRADE NAMES OF PRODUCTS MANUFACTURED OR
LABELED BY APPLICANT
Dimensions
1= 17"
w = 7"
%2" thick
1= varies
w = varies
varying thickness
Test
Specifications
ASTM C 1 167
ASTM C 1 167
2
Raul odriguez
Product Control No.: 95- 0317.11
Product
Description
High profile, two- piece, barrel, clay
roof tile. For direct deck mortar set
applications.
Accessory trim, clay roof piece for use
at hips, rakes, ridges and valley
terminations.
Product
#30 Felt
#43 Coated Base
Sheet
Mineral Surface Cap
Sheet
Mopping Asphalt
Flashing Cement
Asphalt Primer
Roofing Nails
Tin Caps
TRADE NAMES OF PRODUCTS MANUFACTURED OTHERS
Dimensions
N/A
N/A
N/A
N/A
N/A
N/A
min. 12 ga. with
3 /," head
min. 32 ga.
min. I /," o.d.
max. 2" o.d.
Test
Specifications
ASTM D 226
type II
ASTM D 2626
ASTM D 249
ASTM D 312
type 111 or IV
ASTM D 4586
ASTM D 41
PA 114
Appendix E
PA 114
Appendix E
3
Raul odriguez
Product Control No.: 95-0317.11
Product
Description Manufacturer
Saturated organic felt generic
to be used as a nailed
anchor sheet.
Saturated and coated
organic base sheet for
single or double ply
underlayment.
Mineral surfaced
asphalt roll roofing
for use as a top ply in
a double ply
underlayment system.
Asphalt for bonding a
mineral surface cap to
a mech. attached base
sheet in a double ply
underlayment system.
Cut back, asphalt
based, asbestos free,
fiber reinforced,
trowel grade cement
for repair and flashing
applications.
Cut back, asphalt
based coating used to
facilitate bonding of
dissimilar materials.
Annular ring shank,
hot dipped, electro or
mechanically galv.
roofing nails for use
in underlayment
attachment.
Corrosion resistant
circular disc for use in
underlayment
attachment
generic
generic
generic
generic
generic
generic
generic
Product
Roof Tile Mortar
( "TileTiteTM ")
Valley Flashing
Drip Edge
Dimensions
N/A
min. 26 ga.
min. 16" width
min. 26 ga.
min. 2" face flange
min. 2" deck flange
Test
Specifications
PA 123
ASTM A 525
PA 111
4
Galvanized steel
valley flashing
Product Control No.: 95-0317.11
Product
Description
Prepared mortar mix
designed for mortar
set roof tile
applications.
Galvanized steel drip
edge
Manufacturer
Bermuda Roof
Company, Inc.
PCA #94- 0614.01
generic
generic
Test Agency
Testwell Craig Laboratories
& Consultants, Inc.
Testwell Craig Laboratories
& Consultants, Inc.
TEST REPORTS
Product Control No.: 95- 0317.11
Test Identifier Test Namc /Report Date
Lab #: ABM -4 Static Uplift Testing Jan. 1995
PA 101
(Mortar Set)
Lab #: ABM -1 Physical Properties Nov. 1994
ASTM C 1 167
5 7/
Raul odriguez
SYSTEMS
Deck Type: Wood, Non - insulated
Deck Description: New construction 19 /,," or greater plywood or wood plank.
SYSTEM D: Mortar Set Application
Slope Range: 2 ":12" to 7 ":12"
Note: System D is only acceptable in this slope range.
Underlayment:
Roofing Tile:
Product Control No.: 95- 0317.1 1
Install choice of Approved underlayment system, noted on Page 1 of Dade
County Protocol PA 120, in compliance with Section 3.02 of PA 120. See
System Limitation #6.
Install tile in compliance with PA 120 using one of the Approved mortars
noted in this Approval. Mortar shall be applied in compliance with the mortar
manufacturer's Roofing Component Product Control Approval. The mortar
attachment shall provide sufficient attachment resistance expressed as a
moment to meet or exceed the required moment of resistance determined in
compliance with PA 115 or PA 127. The mortar attachment data is noted in
Table 2, attached.
Comments: 1. For re -roof applications, 15 / 3 ," plywood is an acceptable substrate.
2. For mortar set applications, the first three courses of tile shall be nailed with
not less than one nail per tile. As an alternate, the first three courses of tile
shall be applied in mortar over a single layer of minimum 12 ga. wire mesh
with square openings of not Tess than 3 /," which is mechanically attached to the
deck with not less than one roofing nail every I ft'. For roof pitches from
6 ":12" to 7 ":12 ", every third tile of every fifth course, beginning at the eighth
course, shall be nailed with not less than one nail per tile.
6
Raul l 6driguez
1 D f
SYSTEM LIMITATIONS
7
Raul o driguez
Product Control No.: 95- 0317.11
1. The standard minimum roof pitch for Artesanos, Ltda. clay, mortar set tile applications is 2" rise in
12" run (2 ":12 "). The maximum roof pitch for mortar or adhesive set tile applications is 7" rise in
12" run (7 ":12 ").
The Artesanos, Ltda. "2 Piece Handmade Tapered Mission Barrel Tile" tile profile has not been
tested for nail -on applications, therefore, System A (Counter - Batten Application), System B
(Direct Deck Nail On) and System C (Horizontal Batten Application) do not form part of this
Approval.
3. System installation shall be in compliance with the system specifications outlined in this Product
Control Approval. Mortar set tile shall be attached using an Approved mortar noted in this
Approval, the data of which is noted in Table 2 of this Approval. The method of attachment utilized
shall provide sufficient attachment resistance expressed as a moment to meet or exceed the required
moment of resistance determined in compliance with Dade County Protocol PA 115 or PA 127.
4. For mortar set applications, the first three courses of tile shall be nailed with not less than one nail
per tile. As an alternate, the first three courses of tile shall be applied in mortar over a single layer
of minimum 12 ga. wire mesh with square openings of not less than 3 / 8 " which is mechanically
attached to the deck with not less than one roofing nail every 1 ft'. For roof pitches from 6 ":12" to
7 ":12 ", every third tile of every fifth course, beginning at the eighth course, shall be nailed with not
less than one nail per tile.
5. For mortar set tile applications, a field static uplift test by a Dade County accredited testing
agency, in compliance with Dade County Protocol PA 106, shall be required not Tess than 30 days
after application to confirm tile adhesion. The results of this testing shall be reported to the
Building Official and the installer stating that the application has passed or failed PA 106 testing. If
the application fails PA 106 testing, the report shall state which portion of the test was failed;
Category 1 (examination for loose tile) or Category 2 (uplift testing of tile). Subsequent to testing,
the installer may repair not more than 5% of field area tiles and 10% of perimeter area (i.e.
ridge /rake) tile with Approved tile adhesive. The installer shall place an identifiable marking on
each repaired tile for future reference. Any PA 106 re -test shall not include any marked tile.
6. For mortar set tile applications, 30/90 hot mopped underlayment applications may be installed
perpendicular to the roof pitch prior to June 1, 1995 unless stated otherwise by the material
manufacturer. Thereafter, 30/90 underlayment systems shall be installed parallel to the roof pitch in
compliance with Appendix 'A' of Dade County Protocol PA 120.
7. All tiles shall bear the imprint or identifiable marking of the manufacturer's name or logo for
identification in the field.
8. The Artesanos, Ltda. "2 Piece Handmade Tapered Mission Barrel Tile" tile profile has been tested
for static uplift performance only, therefore, attachment calculations for installation in compliance
with Dade County Protocol PA 115 or PA 127 shall be done as an 'Uplift Based System'
SYSTEM LIMITATIONS
(CONTINUED)
8
Raul Jfodriguez
Product Control No.: 95
9. Applications for roofing permits shall include a completed Section II of the Uniform Building
Permit, a copy of Artesanos' current specifications and details, a copy of this Product Control
Approval and a copy of the Product Control Approval of any Roofing Component used in the
proposed tile application. Reference shall be made to appropriate data for the required fi re rating.
10. The applicant shall retain the services of a Dade County certified testing laboratory to maintain
quality control in compliance with the South Florida Building Code and related protocols.
11. Any amendments to these provisions shall be in compliance with Sections 203 and 204 of the South
Florida Building Bode.
Table 2: Minimum Characteristic Resistance Load - F' (Ibf)
from PA 101 Testing
Tile
Profile
Tile
Application
Attachment
Resistance
2 Piece Handmade Tapered
Mission Barrel Tile
Mortar Set
78.90
Table 1: Average Weight (W) and Dimensions (I x w)
from PA 102 Testing
Tile Profile
Weight -W (Ibf)
Length -1(feet)
Width -w (feet)
2 Piece Handmade
Tapered Mission
Barrel Tile
4.90
1.42
0.58
DATA FOR ATTACHMENT
CALCULATIONS
9
Raul l driguez
Product Control No.: 95-0317.11
(7
PROFILE DRAWINGS
Product Control No.: 95-0317.11
N OM1
*� Z4 �,
* cr N *
*
*
* & �
C� °`
3"
18"
The Tiles Shall be Identified by This Stamp
ARTEZANO'S WORLD CLASS
ARTEZANO'S INC.
(305)595 -9352
Made in EI Salado, Colombia.
7"
ARTEZANOS, LTDA. "2 PIECE HANDNIADE TAPERED MISSION B A R R E L TILE"
METRODADE
METROPOLITAN DADE COUNTY, FLORIDA
METRO -DADE FLAGLER BUILDING
NOTICE OF ACCEPTANCE; STANDARD CONDITIONS
BUILDING CODE COMPLIANCE DEPARTMENT
SUITE 1603
METRO -DADE FLAGLER BUILDING
140 WEST FLAGLER STREET
MIAMI, FLORIDA 33130 -1563
(305) 375 -2901
FAX (305) 376-2908
1. Extensions of Acceptance may be considered after a new application has been filed and the supporting
data, test reports no older than ten (10) years, have been re- evaluated.
Any revision or change in the materials, use, or manufacture of the product or process shall automatically
be cause for termination, unless prior approval is granted for revisions or change.
3. Any unsatisfactory performance of this product or process or a change in Code provisions shall be grounds
for re- evaluation.
All reports of re- testing shall bear the seal, signature and date of an engineer registered in the State of
Florida.
4. This acceptance shall not be used as an endorsement of any product for sales or advertising purposes.
5. The Notice of Acceptance number preceded by the words Dade County, Florida, and followed by the
expiration date may be displayed in advertising literature. If any portion of the Notice of Acceptance is
displayed, then it shall be done in its entirety.
6. Product approval drawings, where required for permit applications, shall be provided to the applicant by
the manufacturer or his distributors unless otherwise noted in the Notice of Acceptance. The prints need
not be re- sealed by an engineer.
7. Failure to comply with the Standard Conditions shall be cause for termination of the Approval.
This Approval supersedes all previous Approvals.
Rau Rodriguez
Product Control Division
Supervisor
E
Tile Description
Test Procedure
Client: Arguelles & Arguelles
9455 S. W. 78th Street
Miami, Florida 33173
Att. Mr. Daniel Arguelles
Project Description
L E TESTWELL CRAIG LABORATORIES & CONSULTANTS, INC.
3731 S.W. 47th Ave. #401, Davie, Florida 33314
Phone: (954) 584 -4475 - Fax: (954) 584 -3887
CERTIFICATE OF TEST AND ANALYSIS
Date: 8/4/97
Lab #: ABM -50
Project: 1430 N.E. 101st Street Tech. R. Binns
Miami Shores, Florida
Permit #: 41228
Tile /Manufacturer: Artezanos, clay, barrel
Test Required: South Florida Building Code Protocol PA 106 -95
The structure tested is located at the above listed address. The roof
had been set with approximately 55 squares of roof tile.
The tiles were a mortar set, clay, Barrel, roof tile manufactured by
Artezanos, product control approval # 95- 0317.11.
The roof was first examined for loose tile by lifting one hundred eighty
six (186) field tiles and one hundred seventy eight (178) corner and
perimeter tiles. Fifty four (54) single tiles, were randomly selected
and tested. Thirty (30) tests were conducted in the field area, twelve
(12) in the perimeter area, and twelve (12) in the corner areas. The
single tiles were subjected to a concentrated uplift force measured with
a manually operated, Chatillon mechanical dial push /pull gauge, series
DPPH. The gauge was connected to a steel "L" shaped angle that was
inserted under the nose of the tile and gradually pulled upward until
reaching the required test pressure of 35 lbs. +/- 5 lbs.
As the load was applied, observations for failure of the component and
the attachment, if any, were recorded. Tests were performed in
respective order as illustrated on the attached sketch.
.o TESTWELL CRAIG LABORATORIES & CONSULTANTS, INC.
Client: Arguelles & Arguelles
Project: 1430 N.E. 101st Street
Miami Shores, Florida
Permit #: 41228
Completion Date: > 30 days as per client
Required Testing Force: 35.0 + 5 lbf.
Comments: The above listed test meets the South Florida Building Code,
Protocol PA 106 -95 static uplift test criteria. The Protocol PA 106 -95
test reported in report No. ABM -50 has been performed in full accordance
to the requirements of Dade County, with no deviations.
Anthony t. Porcello
President
Date: 8/4/97
Tech. R. Binns
Lab #: ABM -50
igakid,
8•D5.
S e• Rahman, P.E.
Reg. State of Florida # 50640
Field
Field
Perimeter
Corner
1.
pass
19.
pass
1.
pass
1.
pass
2.
pass
20.
pass
2.
pass
2.
pass
3.
pass
21.
pass
3.
pass
3.
pass
4.
pass
22.
pass
4.
pass
4.
pass
5.
pass
22.
pass
5.
pass
5.
pass
6.
pass
23.
pass
6.
pass
6.
pass
7.
pass
24.
pass
7.
pass
7.
pass
8.
pass
25.
pass
8.
pass
8.
pass
9.
pass
26.
pass
9.
pass
9.
pass
10.
pass
27.
pass
10.
pass
10.
pass
11.
pass
28.
pass
11.
pass
11.
pass
12.
pass
29.
pass
12.
pass
12.
pass
13.
pass
30.
pass
14.
pass
15.
pass
16.
pass
17.
pass
18.
pass
.o TESTWELL CRAIG LABORATORIES & CONSULTANTS, INC.
Client: Arguelles & Arguelles
Project: 1430 N.E. 101st Street
Miami Shores, Florida
Permit #: 41228
Completion Date: > 30 days as per client
Required Testing Force: 35.0 + 5 lbf.
Comments: The above listed test meets the South Florida Building Code,
Protocol PA 106 -95 static uplift test criteria. The Protocol PA 106 -95
test reported in report No. ABM -50 has been performed in full accordance
to the requirements of Dade County, with no deviations.
Anthony t. Porcello
President
Date: 8/4/97
Tech. R. Binns
Lab #: ABM -50
igakid,
8•D5.
S e• Rahman, P.E.
Reg. State of Florida # 50640
•'TESTNELL CRAIG LABORATORIES & CONSULTANTS, INC.
Client: Arguelles & Arguelles
Project: 1430 N.E. 101st Street
Miami Shores, Florida
Permit #: 41228
30
Date: 8/4/97
Tech. R. Binns
Lab #: ABM -50
tions.
New Building
To be constructed of
Estimated Total cost of improvements
Zone cubage required
Distance to next nearest building
Maximum live load to be borne by each floor
I hereby submit all the plans and specifications for said building
be sent to Pie]r'c e. 2701 - ...5. ?':�-- .69.th...Ct. -, --
MIAMI SHORES VILLAGE
APPLICATION FOR BUILDING PERMIT
Application is hereby wade for the approval of the detailed statement of the plans and specifications herewith submitted for the build-
ing or other structure herein described. This application is made in compliance and conformity with the Building Ordinance of Miami
Shores Village, Florida, and all provisions of the Laws of the State of Florida, all ordinances of Miami Shores Village and all rules and
regulations of the iuilding Division of Miami Shores Village shall be complied with, whether herein specified or not. A copy of approved
plans and specifications must be kept at building during progress of the work.
,19.22.
Owner's Name and Address Charles Krebbs No. � s ass_.. Street... .E.
Registered Architect and /or Engineer ,..... ,, :,.,:.- .....
Name and address of licensed contactor Pierce 771c e » „ cc# 10228 2701 S.W. 69th Ct -, Iiiami o Fl
Location and legal description of lot to be built on:
Lot Block Subdivision —
Street and Number where work is to be done
State work to be done and purpose of building (by floors)._ Replace entire shingle t..I.Q...r.Q.Cd
white coated cement shingle tile roofing .iTh talled...Ac.co .ding...: g...bud,,ain ...G_Q.de..SxLegj,f,i.ca—
Single family reajdence • _. bL- ..6i1uar. s and for no other purpose.
Remodeling Addition Repairs No. of Stories. ...I
Kind of foundation Roof Covering white cement sh]_o tile
$ 57140.,00 11 At 13t l ea- la•,P
The undersigned applicant for this building permit does hereby certify that he understands and accepts his obligations as an employer
of labor under the 'Florida Workmen's Compensation Act, being Section 5966, Compiled General Laws of Florida, Permanent Supplement,
and has complied with the provisions thereof, and will require similar compliance from all contractors or sub - contractors employed by him
in the work to be performed under this permit; and will post or cause to be posted for inspection on the site of th work such public notice
or notices as arc required by the Act. The undersigned agrees to employ only such subcon c rs, 9P work performed under this
pennit, as are licensed by Miami Shores Village.
Remarks (Signed).
STATE OF FLORIDA,
COUNTY OF DADE. j ss.
Before me, the undersigned authority, a notary public, duly authorized to administer oaths and take acknowledgments, personally ap-
peared - •-
and who, being by me first duly sworn, upon oath deposes and says that he is the.
of the above described construction, that he has carefully read the foregoing application, and that he did sign the same, and that all facts
therein by him stated are tru 2- v' 7
Permit No.. L._ 14 d Date Read, Sworn to and Subscribed before me.
Disapproved
(Signed)
Building Inspector
BUILDING INSPECTION DEPARTMENT.
11430 N.Eo101St.
Amount of Permit $
plan Cubage
Size of Building Lot
71.y
. All notices with reference to the building and its construction may
Miami F1 331
Notary Public, State of Florida
My Commission Expires
to me well known,
PL NING BOARD _.._......DATE
Chairman Membcr
Member _ Member ...._ ............. ....._..._ ............ _
Member sass.. _....._..._._..--- _sass._ Member
Council Approved _ Date Disapproved Date
NOTE: A charge of $1.00 will be made for making corrections or changes to this application nfter approval has been obtained from
the Planning Board.
A re-inspection fee of 31.00 will be charged when such re- inspection is made necessary by improper notice for inspection oe faulty
materials and /or workmanship.
Application is hereby made for the approval of the detailed statement of the plans and specifications herewith submitted for the build-
ing or other structure herein described. This application is made in compliance and conformity with the Building Ordinance of Miami
Shores Village, Florida, and all provisions of the Laws of the State of Florida, all ordinances of Miami Shores Village and all rules and
regulations of the Building Division of Miami Shores Village shall be complied with, whether herein specified or not. A copy of approved
plans and specifications must be kept at building during progress of the work.
Owner's Name and Address..
Registered Architect and /or Engineer
MIAMI SHORES VILLAGE
BUILDING INSPECTION DEPARTMENT
APPLICATION FOR BUILDING PERMIT
r 7? - - Q Date l �J�C No / `f 3 Sti / /4l
Name and address of licensed contractor..
Location and legal description of lot to be built on:
Lot Block Subdivision
State work to be done and purpose of building (by floors) etZ -mil /
Street and Number where work is to be done
STATE OF FLORIDA,
COUNTY OF DADE. J ss
Disapproved
(Signed)
Build' g Inspector
Chairman
Member
Member ...
Council Approved Date
NOTE: A charge of $1.00 will be made for making corrections
the Planning Board.
A re- inspection fee of $1.00 will be charged
materials and /or workmanship.
and for no other purpose.
New Building Remodeling Addition Repairs No. of Stories
To be constructed of Kind of foun iatio 2�O Roof Covering
Estimated Total cost of improvements $ �/ Amount of Permit $
Zone cubage required _Plan Cubage
Distance to next nearest building. Size of Building Lot
Maximum live load to be borne by each floor
I hereby submit all the plans and specifications for said building. All notices with reference to the .building and its construction may
be sent to
The undersigned applicant for this building pennit does hereby certify that he understands and accepts his obligations as an employer
of labor under the Florida Workmen's Compensation Act, being Section 5986, Compiled General Laws of Florida, Permanent Supplement,
and has complied with the provisions thereof, and will require similar compliance from all contractors or sub - contractors employed by him
in the work to be performed under this permit; and will post or cause to be posted for inspection on the site of the work such public notice
or notices as are required by the Act. The undersigned agrees to employ only such s , tractors, on work to be performed under this
permit, as are licensed by Miami Shores Village.
Remarks (Signed)
Before me, the undersigned authority, a notary public, duly authorized to administer oaths and take acknowledgments, personally ap-
peared
to me well known,
and who, being by me first duly sworn, upon oath deposes and says that he is the
of the above described construction, that he has carefully read the foregoing application, and that he did sign the same, and that all facts
therein by him . s d are true. tt
Permit No
634 3 Date ,Z` '- JT7
Read, Sworn to and Subscribed before me.
Notary Public, State of Florida
My Commission Expires
PLANNING BOARD DATE
Member
Member
Member
Disapproved Date
or changes to this application after approval has been obtained from
when such re- inspection is made necessary by improper notice for inspection or faulty
BUILDING
ELECTRICAL
PLUMBING
ROOFING
Owner of
Building
MIAMI SHORES VILLAGE, FLORIDA
❑ PERMIT N? 15713
a, Work to be performed under this Permit
Architect
Contractor
or Builder
Legal Lot II BI.
Description
Address of
Building ._ .
This permit is granted to the contractor or builder named above to construct the building or to install the equipment or device described in the application
herefor in strict compliance with all ordinances pertaining thereto and with the understanding that the work will be performed in compliance with any plans,
drawings, statements or specifications that may have been submitted to and approved by the proper municipal authorities. This Permit may be revoked at any
time if the work is not done in compliance with such ordinances or if the plans are changed without authorization. A further condition upon which this permit is
granted is the understanding that the contractor or builder named above assumes the responsibility for a thorough knowledge of the ordinances and regulations
pertaining to the work covered hereby whether shown on the plans or drawings or in the statements or specifications and that he assumes responsibility for work
done by his agents, servants or employees.
Signed: 4 3" f.. .. BY
--. INSPECTOR
In consideration of the issuance to me of this permit I agree to perform the work covered hereunder in compliance with all ordinances and regulations
pertaining thereto and in strict conformity with the plans, drawings, statements or specifications submitted to the proper authorities of Miami Shores Village.
In accepting this permit I assume responsibility for all work done by either, myself, my agent, servant or employee.
CONTRACTOR OR BUILDER
Subdi-
vision
Value of
Project $ / t`
DATE
195
Contractor's
License No
Amt. of
Permit $
BY AUTHORITY
.�y —�
Owner's Name and Address Guernsey Construct ion Co.
MIAMI SHORES VILLAGE
BUILDING INSPECTION DEPARTMENT
APPLICATION FOR BUILDING PERMIT
Application is hereby made for the approval of the detailed statement of the plans and specifications herewith submitted for the build-
ing or other structure herein described. This application is made in compliance and conformity with the Building Ordinance of Miami
Shores Village, Florida, and all provisions of the Laws of the State of Florida, all ordinances of Miami Shores Village and all rules and
regulations of the Building Division of Miami Shores Village shall be complied with, whether herein specified or not. A copy of approved
plans and specifications must be kept at building during progress of the work.
Date /anuary 27,
Registered Architect and /or Engineer
Name and address of licensed contractor ehSe t e t a 1 ape is 1 t y Cm
Location and legal description of lot to be built on:
Lot 6 Block 1 Subdivision Miami Shores Bay Park
,19
No._ Street N . E. 13th Avenue
Street and Number where work is to be done 1430 N. E. 101st Street
State work to be done and purpose of building (by floors)
Roofing on new residence
ny
— – -- - - - - -- and for no other purpose.
New Building X Remodeling Addition Repairs No. of Stories one
To be constructed of Kind of foundation Roof Covering t ile
Estimated Total cost of improvements $ 1200.00 Amount of Permit $ 7.00
Zone cubage required _ —Plan Cubage
Distance to next nearest building —Size of Building Lot
Maximum live load to be borne by each floor__
I hereby submit all the plans and specifications for said building. All notices with reference to the building and its construction may
be sent to
The undersigned applicant for this building permit does hereby certify that he understands and accepts his obligations as an employer
of labor under the Florida Workmen's Compensation Act, being Section 5966, Compiled General Laws of Florida, Permanent Supplement,
and has complied with the provisions thereof, and will require similar compliance from all contractors or sub - contractors employed by him
in the work to be performed under this permit; and will post or cause to be posted for inspection on the site of the work such public notice
or notices as are required by the Act. The undersigned agrees to employ only such subcontractors, on work to be performed under this
permit, as are licensed by Miami Shores Village.
Remarks (Signed) SIaet___Nt_e°_tA . Spe_ciaLty__ Company
STATE OF FLORIDA,
COUNTY OF DADE. ss.
Before me, the undersigned authority, a notary public, duly authorized to administer oaths and take acknowledgments, personally ap-
peared
and who, being by me first duly sworn, upon oath deposes and says that he is the
of the above described construction, that he has carefully read the foregoing application, and that he did sign the same, and that all facts
therein by him stated are true.
Permit No 13 Date vS ' '1 "' �'�' Read, Sworn to and Subscribed before me.
Disapproved _ Date
( Signed)
Notary Public, State of Florida
Building Inspector My Commission Expires
to me well known,
PLANNING BOARD DATE
Chairman Member
Member Member
Member — Member
Council Approved Date Disapproved Date
NOTE:,A charge of $1.00 will be made for making corrections or changes to this application after approval has been obtained from
the Planni g Board.
A inspection fee of $1.00 will be charged when such re- inspection is made necessary by improper notice for inspection or faulty