1401 NE 101 St (9)■
CERTIFICATE OF OCCUPANCY
MIAMI SHORES VILLAGE, FLORIDA
BUILDING DIVISION
N° 126 Miami Shores Village, Florida, 3 4,°
14,13i ‘liA
Owner, Agent or Tenant of Building \ � "'
Lot 1 Block 3 Subdivisio
Street Address 1' 0 / . E • 10/ ,g„ 1
Approved use by occupancy 1 - 1( 6.-+- -
Remarks
This Certificate of Occupancy is issued to the above named
for building at above named location only upon the express provision that the applicant will
abide by and comply with all conditions of Ordinances Nos. 92, 93, 94 and 97, known as the
Zoning, Electrical, Plumbing and Building Ordinances of Miami Shores Village pertaining to
the erection, construction, alteration or remodeling of buildings or structures.
l iVWN BUILDING DIVISION
OWNER'S NAME
Guernsey Construction a ., Inc.
PRESENT ADDRESS
LICENSE NO.
PHONE O.
JOB LOCATION (ST. OR A VE.)
R.V. Guernsey
LOT
3
BLOCK
3
SUBDIVISION
MSBP Est,
GENERAL CONTRACTOR
1401 N.E. 101st Street
ADDRESS
PHONE NO.
LICENSE NO.
1108
BUILDING PERMIT NO. 110
d
DATE 1 -10 -55
PERMIT FEE $ 21
BUILDER'S BOND
NO. DATE
ZONE REQUIREMENTS CU. FT.
PLAN CUBE 28,47 CU. FT.
EST. COSTS 17,000
DRAWINGS. SPECIFICATIONS. RESTRICTIONS AND CUBE CHECKED BY:
DATE
NEW CONSTRUCTION
TYPE
STORIES
ROOF CONSTRUCTION
INTERIOR CONSTRUCTION
concrete tile and oak floors,
REPAIRS
DESCRIPTION plaster Walls and ceilings
3 bdrm. -32 baths - dining area - living F+voni- kitchen - garage
ALTERATION
DESCRIPTION
ADDITION
SUBMITTED TO PLANNING BOARD
APPROVED
REJECTED
REFERRED TO COUNCIL
REASONS
RE- SUBMITTED TO PLANNING BOARD
SUBMITTED TO VILLAGE COUNCIL
REMARKS
CERTIFICATE OF OCCUPANCY NO. /
[ � [+j� /
ISSUED -4- Sat BY /` a
TO -
BUILDING PERMIT AND INSPECTION RECORD -MIAMI SHORES VILLAGE
INSPECTIONS
DATE
BY
RE- INSPECT
BY
RE- INSPECT
BY
FOUNDATION
8'.0S °�I}�
`-C6
TEMPORARY SERVICE
$ i
/
SEPTIC TANK (IC.
U 4?) r,!%f.
BEAMS & LINTELS
.���
fb'
RANGE CONN.
S / !,
SOLAR HEATER
FRAMING
ry i
A ^1 '-
N
GAS
$
FIXTURES
$
$
INSPECTIONS
DATE
BY
FINAL
3 -1-Z: J-
A.
BY
ROUGHING
BY
TEMP. SERVICE
CLEAN -UP
GAS
ROUGHING
PERMIT NO. A1. :4 /
DATE � � � / . f
�` _, _ . � l
-
FEE $ J /
REPAIRS
NNN
NEW BLDG. f ALTERATION ADDITION
SPECIAL PERMITS
PERMIT NO.
DATE
FEE
TEMPORARY SERVICE
FEE
TEMPORARY SERVICE
$ i
/
SEPTIC TANK (IC.
U 4?) r,!%f.
// �l
Fn ��,` i/" L , L '
S /'' �( � r f JJ
SEWER
fb'
RANGE CONN.
S / !,
SOLAR HEATER
$
MOTORS
$
GAS
$
FIXTURES
$
$
INSPECTIONS
DATE
BY
RE- INSPECT
BY
RE- INSPECT
BY
ROUGHING
BY
TEMP. SERVICE
GAS
ROUGHING
''-"' ,, - )' ��
� -\
•
SEWER
H. W. HEATER CONN.
SEPTIC TANK
1
! � ..
� . v
SOLAR HEATER
FIXTURES
°____
'_ ,
3-2.7)--
c-',1
CONTRACTOR / -� -O o
PHONE
PERMIT NO. DATE / c5 f j - `�----.�
NEW BLDG. ALTERATION ADDITION
REPAIRS
SPECIAL PERMITS
PERMIT NO.
DATE
FEE
TEMPORARY SERVICE
$
H. W. HEATER CONN.
$
RANGE CONN.
$
MOTORS
$
FIXTURES
$
S
INSPECTIONS
DATE
BY
RE- INSPECT
BY
RE- INSPECT
BY
TEMP. SERVICE
ROUGHING
''-"' ,, - )' ��
� -\
H. W. HEATER CONN.
RANGE CONN.
•
FIXTURES & FINAL
3-2.7)--
c-',1
BUILDING INSPECTIONS (1 �� Q
PLUMBING PERMITS & INSPECTIONS
CONTRACTOR
ELECTRICAL PER ITS & INSPECTIONS
APPROVAL. TO POWER CO. FOR SERVICE DATE IN, — ". - • •' r , BY
APPLICATION FOR BUILDING PERMIT
Application is hereby made for the approval of the detailed statement of the plans and specifications herewith submitted for the build-
ing or other structure herein described. This application is made in compliance and conformity with the Building Ordinance of Miami
Shores Village, Florida, and all provisions of the Laws of the State of Florida, all ordinances of Miami Shores Village and all rules and
regulations of the Building Division of Miami Shores Village shall be complied with, whether herein specified or not. A copy of approved
plans and specifications must be ke t at building during progress of the work.
Owner's Name and Address -, c
Registered Architect and /or Engineer
Name and address of licensed contractor
Location and legal description of lot to be built on:
State work to be done and purpose of building (by floors)
To be constructed of Kind of foundation
Estimated Total cost of improvements $.___ / Z,__® mci
Zone cubage required aast:
Distance to next nearest building ./.27
Maximum live load to be borne by each floor__
I hereby su
be sent
Permit No
Disapproved
(Signed) .
MIAMI SHORES VILLAGE
BUILDING INSPECTION DEPARTMENT
Block
all the plans and sp ications for
and who, being by me first duly sworn, upon oath deposes
of the above described construction, that he has carefully
therein by him stated are i e
' D ate
A f aro ill
J
i. u ildi - spector
Date_
No. /o2-s?C
/2 /SS .
Street 44- /2
Lot 3 Subdivisio _
Street and Number where work is to be done Z4 l ( ,tr/ _ .l_ _/
;19
and for no other purpose.
New Building_ Remodeling
Addition 1
Amount
?AZ. rs No. of Stories
_ Roof if wing
1 L
of Permit $
plan Cubage �w -_l�, "1 __
Size of Building Lot id_O___._.?c
g. All notices with reference to the building and its construction may
/ a2- / /r:_ e. ell &-
The undersigned applicant for this building permit does hereby certify that he understands and accepts his obligations as an employer
of labor under the Florida Workmen's Compensation Act, being Section 5968, Compiled General Laws of Florida, Permanent Sup element,
and has complied with the provisions thereof, and will require similar compliance from -all ntractors or sub - contractors employe by him
in the work to be performed under this permit; and will post or cause to be posted for insp tion on the site of the w. k such public notice
or notices as are required by the Act. The undersigned agrees to employ only such%spbcoq actors, on work to A 'erformed under this
permit, as are licensed by Miami Shores Village.
Remarks (Sign e/ Ay/4./.44.Z.1,
STATE OF FLORIDA,
COUNTY OF DADE. j ss
Before me, the undersigned authority, a notary public, duly authorized to administer oaths and take acknowledgments, personally ap-
peared
to me well known,
says that he is the
e foregoing application, and that he did sign the same, and that all facts
Read, Sworn to and Subscribed before me.
Notary \Public, State of Florida
1
My Commission Expires
PLANNING BOARD DATE
Chairman
Member
Member Member
Member Member
Council Approved Date Disapproved Date
NOTE: A charge of $1.00 will be made for making corrections or changes to this application after approval has been obtained from
the Planning Board.
A re- inspection fee of $1.00 will be charged when such re- inspection is made necessary by improper notice for inspection or faulty
materials and /or workmanship.