Loading...
187 NE 100 St (5)DATE: 3 3 Gi'1 `? Miami Shores Village Building Department NAME OF PERSON REQUESTING FILE: 10050 NE 2 Ave, Miami Shores, Fl 33138 Tel: (305)795 -2204 • Fax; (305)756 -8972 PLEASE PRINT TIME: 3 2- PHONE #: 3da� — 833 CYOUR ADDRESS: I g 14 ( (9 O S ADDRESS OF FILE REQUESTED: / 2 ( tO 0 S7' INFORMATION REQUESTED: )c.— I understand that all documents in this file are property of Miami Shores Village and that NO documents may be removed from this file. You may get 4 complementary copies (8x11) size, additional copies will be furnished at 0.15 cents per page, not including any blue prints. If blue prints are order please be aware that we are not responsible for the quality of the printed documents. Acknowledged by: (/v FILE RETURNED TO: INITIAL PERMIT APPLICATION FOR MIAMI SHORES VILLAGE Date itclaroilq Job Address 8 i46: 1 o O ST Tax Folio Legal Description Historically Designated: Yes No Ownedizes9° nt- tE LLe4 Owner's A d d r e s s 1 87 N E 1 0 0 S T 1.1 I LLi5 Master Permit # Phone /3 0S) 15t— g '3'3 s Contracting Co. -/`)AR� Coo . Address Qualifier SS# Phone State # Municipal # Competency # Ins. Co. Architect/Engineer Address Bonding Company Address Mortgagor Address Permit Type (circle one): BUILDING ELECTRICAL PLUMBING MECHANICAL ROOFING PAVING FENCE SIGN WORK DESCRIPTION /1-01-4( N C - tt i-E 1 ,J S t b tS Square Ft. Estimated Cost (value) / 600- WARNING TO OWNER: YOU MUST RECORD A NOTICE OF COMMENCEMENT AND YOUR FAILURE TO DO SO MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY (IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT.) Application is hereby made to obtain a permit to do work and installation as indicated above, and on the attached addendum (if applicable). I certify that all work will be performed to meet the standards of all laws regulating construction in this jurisdiction. I understand that separate permits are required for ELECTRICAL PLUMBING, SIGNS, POOLS, ROOFING and MECHANICAL WORK. OWNER'S AFFIDAVIT: I certify that all the foregoing information is accurate and that all work will be done in compliance with all applicable laws regulating construction and zoning. Furthermore, I authorize the above -named contractor to do the work stated. Signature of owner and/or Condo President Notary as to Owner and/or Condo President My Commission Expires: FEES: PERMIT .50 . RADON Date Date C.C.F. • C NOTARY Signature of Contractor or Owner- Builder Date Notary as to Contractor or Owner - Builder Date My Commission Expires. CATHERINE ESTES Notary Public -State of Florida My Commission Expires Aug 3, 2001 Commission .,` CC668812 BOND APPROVED: i TOTAL DUE ( - 5 - 0 ,4 Zoning Building 1d g dmg [ � Electrical Mechanical Plumbing Structural Engineer Location dlegal t flot tob built New Building To be constructed of Disapproved k (Signed) MIAMI SHORES VILLAGE BUILDING INSPECTION DEPARTMENT APPLICATION FOR BUILDING PERMIT Application is hereby wade for the approval of the detailed statement of the plans and specifications herewith submitted for the build - ing or other structure herein described. This application is made in compliance and conformity with the Building Ordinance of Miami Shores Village, Florida, and all provisions of the Laws of the State of Florida, all ordinances of Miami Shores Village and all rules and regulations of the Building Division of Miami Shores Village shall be complied with, whether her in specified or not. A copy of approved plans and specifications must be kept at building during progress of the work. Date..—. L.2____, _____.... ,19.?7 Owner's Name and Address ... ... No./ Streetll ..�� Registered Architect and /or ngint: r Name artd address of licensed contractor ..,. QM J� j R'i 4� Leo ST oca ion an ega description o c ui on: 3950 S.W 6 Street Lot Block Subdivision Ft. �.au erflalf3,.E1 �1 r Street and A'umber where work is to be done . � , • ,! �` � G .---» State work to be done and purpose of building (by floors) and for no other purpose. Remodeling Addition Repairs No. of Stories Kind of foundation . Roof Covering — o Estimated Total cost of improvements $ Amount of Permit $. 1 Zone cubage required Plan Cubage Distance to next nearest building. Size of Building Lot Maximum live load to be borne by each floor I hereby submit all the plans and specifications for said building. All notices with reference to the building and its construction may be sent to The undersigned applicant for this building pennit does hereby certify that he understands and accepts his obligations as an employer of labor under the Florida Workmen's Compensation Act, being Section 5966, Compiled General Laws of Florida, Permanent Supplement, and has complied with the provisions thereof, and will require similar compliance from all contractors or sub - contractors employed by him in the work to be performed under this permit; and will post or cause to be posted for inspectoo, on the site of the work such public notice or notices as arc required by the Act. The undersigned agrees to employ only suc ors, on work to be performed under this permit, as are licensed by Miami Shores Village. Remarks ( S STATE OF FLORIDA, COUNTY OF DADE. ss Before me, the undersigned authority, a notary public, duly authorize • to administer oaths and take acknowledgments, personally ap- peared __._ . ^_._..-_ - -.•- and who, being by me first duly sworn, upon oath deposes and says that he is the. of the above described construction, that he has carefully read the foregoing application, and that he did sign the same, and that all facts therein by him stated are true. Permit No. _ »_. X.) _� *I Date 9 1 4 Read, Sworn to and Subscribed before me. Date Building Inspector PLANNING BOARD Notary Public, State of Florida My Commission Expires DATE to me well known, Chairman Member Member Member Member - ....._. _ Member Council Approved Date Disapproved Date NOTE: A charge of $1.00 will be made for making corrections or changes to this application after approval has been obtained from the Planning Board. A re inspection fee of $1.00 will be charged when such re- inspection is made necessary by improper notice for inspection or faulty materials and /or workmanship. Date Bill to Address Job Address Lot 47 Signed by Purdy Soil Compaction Service 1 Remarks + P. O: BOX `357 MIAMI, FLORIDA 33166 TELEPHONE 947-6677 WORK COMPLETION RECEIPT r) re' / 7 , / 0,0 777 . 2 Block /5 Subdivision Job No. Purchase Order No Heavy Compactor Medium Compactor Light Compactor Time Arrive Job Time Leave Job Amount $ Hour: Worked Operator of Machine /0 (no initials accepted) SERVICE IS OUR BUSINESS ITEMS SUB CONTRACTORS & SUPPLIERS NAME & ADDRESS 1. Architectural Fee lans 2, Asphalt walks drives. etc. 3, Cabinets - Bath Vanity ,I _/_" k v�•, 41 . e 4 Cabinets - Kitchen .;/ r , 5. Cabinets- Medicine 6. Cabinets - Unit Closet 7. Cleanin C a s/ 74-.n e. to PEI 8. Clearin: Site 9. Concrete - Foundation. Slabs Beams o,/.,, c/o si, ., g. 1.-e 10, Concrete - Walks drives: etc. 11, Contractors Fee 12. Electric Fixtures 13.• Electric Wirin: S'• ./ 4,..A... r A e e, , /2.-e 14. E quip ment Rental ,D G, / • 1e - > 15. Excavation .11, air,/ n- (s c•- f\ e !q vm iv it) 16. Fill for S1 (a 1 rc n L t) rt. 17. Floors - Finish wood & kitchen 18. Floors - Terrazzo . - • 19. Gara:e Doors ' e/, ai •- 'Doo 2 20. Glass. Slidin• Doors 21. Hardware - Finish Co't /X,,c /o `c, -, . /.- /4101 22. Hardware - Rou_h e, - ciev /., i e„,..... . 23. Heatin: 24. Insurance - Liability,comp. -bond , 25. Labor - Payroll • • 26. Labor - Contract _ c7 /.e -' c d4N 27. Labor - Contract 28. Landsca.in.. Fill. Gradin: .e0 sr.- iz 41 C /o W. ,. 29. Lath Plaster, Stucco 1/a re r.) 5 Cale 19. 1 30. Lumber (A11) 31. Masonry• Labor C o Ai 1 n r► e I v vt 32. Masonry Materials, B1oek , 33. Millwork 34. Miscellaneous 35. Ornamental Iron Work -- •• 36. Oven & Plate - Built -in • 37. Overhead 38. Painting -- e o ,- • , s71 C /o .z. • r 39, Permits. Tem.orar Power 40. Pilin: Foundation ACINIMIMMIMMIIIMMEIMI 41. Plumbin: Com.lete 42. Pool - Swimming . 43. Roofing & Sheet Metal Work •. 44. Roof Trusses Pre -fab.. • F , rz.c 0.0 . T/f a xi 1� . -• 45. Screen Enclosures - 46. Se.tic Tank or Sewera:e S� , o 1'•.p r 5 7■9r? -14 . 47. Shower or Tub Enclosures 48.• Steel - Reinforcin: & str1. 'as - 1".q,, /o av .a a z • 49. Supervision • . re • .I !% t WAa 50. Surve s 51. Tile & Marble C 7>e' S .. ,.,d 77/ e 52. Water - Public 53. Water - Well & Pump 54. Windows - Glazing & Screens ` r - . -e r.. a • rA- ,:,. s - V / 55. Window Frames - Concrete Ca sz.vi rra e /' /z, Prior to a final inspectin this application must be filled out; if sub contractors have failed to take out permits the general contractor shall be responsible for the permit and fee. A final inspection, must be made prior to the release to Florida .Power and Light Co, and the issueance of a certificate of occupancy. OWNER T, JOB ADDRESS /� �g /D& 2/ LOT ; BLOCK MIAMI SHORES VILLAGE APPLICATION FOR FINAL INSPECTION SUB, //i9/l /. SI,, . r J e. . - - -7D DAY LABOR `' CONTRACT ` DATE 56 . Builders Bond Must Accompany This Application for Final Inspection •1 ;'77 // Y19 72 TOTAL