Loading...
1285 NE 101 St (14)CLOSETS BATH TUBS SHOWERS LAVA- TORIES SINKS SLOP SINKS LAUNDRY TUBS URINALS CATCH BASIN FLOOR DRAIN DRINKING FOUNT'HS TOTAL FIXTURES ,,,../— .s / /7 Sketch position of building and lot lines in square (which represents an entire city block) , showing on which street the building and lot faces; also show exact locations of "Y" in street and position of lateral or septic tank. Show wer and any change in direction same may make. The purpose of this plan is to have an accurate layout of all lerground pipes for future references. E"/Y 7 - .r l� 0 A -244 SM 3-38 Employing Plumber Ground Date ` f ROUGH -IN INSPECTION Rough -In _ Rain Leader . a AM P M. �E )?► Approved by C./ I ` / f � Condemned by REMARKS DIVISION OF PLUMBING INSPECTION DEPARTMENT OF PUBLIC SERVICE MIAMI, FLORIDA I herewith submit the following plan of plumbing for approval: At center of St. ❑ h 1` A • New l2( -, Old ❑ Story ❑ For a Dwelling [ Store ❑ Garage ❑ Apartment ❑ Owner or Agent `�'' � � P Address Builder or Contractor is r�'�`� a . T Address rL....jLtt L 7......., Block No. / rL� 4. Subdivision 4 Address 112� r{ � 1.1 I I 6 `0. / I 'tr.. .- P Sewer Connections At curb ❑ At property line Work executed by To septic tank Date SEWER INSPECTION A M P M. Approved by Condemned by REMARKS Sewer Permit No , 19 Addition ❑ Remodeled ❑ Hotel ❑ Existing bldg. drain Office Bldg. ❑ Existing in alley ❑ Existing bldg. sewer ❑ ❑ To dry well ❑ A charge of $1.00 will be made for correcting any inaccuracies in the foregoing information. DO NOT WRITE IN SPACE BELOW. THIS IS FOR THE USE OF THE DIVISION OF PLUMBING INSPECTION ONLY. Date FINAL INSPECTION AM P M Approved by Condemned by REMARKS THIS SPACE FOR ELEVATION SKETCH In alterations to existing work show the old work in red ink and the new in black ink. Letter each stack to correspond with the opening shown in floor plan or ground plan on opposite page. A PERSPECTIME SKETC ,E SUFFICIENT PROVIDED THEi WORK C .,,1 ! CLEARLY MWN Show location of stacks and horizontal drains inside building, lettering each opening to correspond with t e stock nections as shown on the elevation sketch on opposite page. Where ground work is concealed, draw floor an of l- ing showing location. of walls, partitions. columns, etc., and the location of all horizontal soil and waste ,ipes, i erence to same. . N THIS SPACE FOR PLAN SKETCH C W EST NORTH A SOUTH EAST Remarks: SOUTH e - Plan No / D n