1285 NE 101 St (14)CLOSETS
BATH
TUBS
SHOWERS
LAVA-
TORIES
SINKS
SLOP
SINKS
LAUNDRY
TUBS
URINALS
CATCH
BASIN
FLOOR
DRAIN
DRINKING
FOUNT'HS
TOTAL
FIXTURES
,,,../—
.s
/
/7
Sketch position of building and lot lines in square (which represents an entire city block) , showing on which street
the building and lot faces; also show exact locations of "Y" in street and position of lateral or septic tank. Show
wer and any change in direction same may make. The purpose of this plan is to have an accurate layout of all
lerground pipes for future references.
E"/Y 7 -
.r
l�
0
A -244 SM 3-38
Employing Plumber
Ground
Date ` f
ROUGH -IN INSPECTION
Rough -In _ Rain Leader
. a
AM P M.
�E )?►
Approved by C./ I ` / f �
Condemned by
REMARKS
DIVISION OF PLUMBING INSPECTION
DEPARTMENT OF PUBLIC SERVICE
MIAMI, FLORIDA
I herewith submit the following plan of plumbing for approval:
At center of St. ❑
h 1` A •
New l2( -, Old ❑ Story ❑
For a
Dwelling [ Store ❑ Garage ❑ Apartment ❑
Owner or Agent `�'' � � P Address
Builder or Contractor is r�'�`� a . T Address
rL....jLtt
L 7......., Block No. / rL� 4. Subdivision
4 Address 112� r{ � 1.1 I I 6 `0. / I 'tr.. .- P
Sewer Connections
At curb ❑ At property line
Work executed by
To septic tank
Date
SEWER INSPECTION
A M P M.
Approved by
Condemned by
REMARKS
Sewer Permit No
, 19
Addition ❑ Remodeled ❑
Hotel ❑
Existing bldg. drain
Office Bldg. ❑
Existing in alley ❑ Existing bldg. sewer ❑
❑ To dry well
❑
A charge of $1.00 will be made for correcting any inaccuracies in the foregoing information.
DO NOT WRITE IN SPACE BELOW. THIS IS FOR THE USE OF THE DIVISION OF PLUMBING INSPECTION ONLY.
Date
FINAL INSPECTION
AM P M
Approved by
Condemned by
REMARKS
THIS SPACE FOR ELEVATION SKETCH
In alterations to existing work show the old work in red ink and the new in black ink. Letter each stack to correspond
with the opening shown in floor plan or ground plan on opposite page.
A PERSPECTIME SKETC ,E SUFFICIENT
PROVIDED THEi WORK C .,,1 ! CLEARLY MWN
Show location of stacks and horizontal drains inside building, lettering each opening to correspond with t e stock
nections as shown on the elevation sketch on opposite page. Where ground work is concealed, draw floor an of l-
ing showing location. of walls, partitions. columns, etc., and the location of all horizontal soil and waste ,ipes, i
erence to same.
. N
THIS SPACE FOR PLAN SKETCH
C
W EST
NORTH
A
SOUTH
EAST
Remarks:
SOUTH
e -
Plan No / D n