381 NE 98 St (8)41 MIAMI SHORES VILLAGE
73i r S' / A-MS BUILDING INSPECTION DEPARTMENT
S ) I S APPLICATION FOR BUILDING PERMIT
Application is hereby made for the approval of the detailed statement ut the plans and specifications herewith submitted for the build •
ing or other structure herein described. This application is made in compliance and conformity with the Building Ordinance of Miami
Shores Village, Florida. and all provisions of the Laws of the State of Florida, all ordinances of Miami Shores Village and all rules and
regulations of the iuilding Division of Miami Shores Village shall be complied with, whether herein specified or not. A copy of approved
plans and specifications must be kept at building during progress of the work.
Date..._..._... —_...
Os.-ncr's Name and Address . J i I 1 40 0 fp4N.S.g.►- __.......... _ _ No.3 Street. ..1..P `f
Registered Architect and /or Engineer ,,n. rn rrnnerw +• •+srvn. r >e :..
Name and address of licensed contractor... . .. etc it.LX:.._... bF ) �° ° L�.� f _ ILJ(.—) 2 7 "c- 114
Location and legal description of lot to be built on: 6 2- K- 6 J' 4 G ``t `x( &) CF — z
Lot Block Subdivision
Street and Number where work is to be done 3 g N ST
State work to be done and purpose of building (by floors) X91.90 (_ _ t_ (At Gay
a o �I / ` ' Cp .... l 3 ° 41 - / x.490 2 - / r d
3 7< 3 6- ,s-t- z " pve- MI? .and for no other purpose.
New Building Remodeling Addition Repairs No. of Stories —
To be constructed of Kind of foundation Roof Covering
C6
Estimates Total cost of improvements $ D,,..0 t1 <) Amount of Permit S.
Zone cubage required .Plan Cubage
Distance .to next nearest building. Size of Building Lot
Mfaxitnum live load to be borne by each floor
I hereby submit all the plans and specifications for said building. All notices with reference to the building and its construction may
be sent to.. ..
The undersigned appliennt for this building permit does hereby certify that he understands and accepts his obligations as an employer
of labor under the 'Florida Workmen's Compensation Act, being Section 5966, Compiled General Laws of Florida, Permanent Sup )Iement,
anti has complied s‘ith the provisions thereof, and will require similar compliance from all contractors or sub - contractors employed by him
in the. work to be performed under this permit; and will post or cruse to be posted for inspection on the site of the work such public notice
or notices as arc required by the Act. The undersigned agrees to employ only such subcontractors, on work to be performed under this
pcnnit, as are licensed by Miami Shores Village.
Rem.uks (Signed)..
Building Inspector
STATE OF FLORIDA,
COUNTY OF DADE. } Ss.
Before me, the undersigned authority, a notary public, duly authorized to administer oaths and take acknowledgments, personally ap-
peared
and who, being by me first duly sworn, upon oath deposes and says that he is the.
of the above described construction, that he has carefully read the foregoing application, and that he did sign the same, and that all facts
therein by him s to
�
r
Permit No.__..___.........�
te
¢_.. Date - . 1 Read, Sworn to and Subscribed before me.
Disapproved .... � L /.._..... Date
Notary Public, State of Florida
(Signed)
My Commission Expires
to me well known,
PLANNING BOARD DATE
Chairman Member
\fcrr,ber Member
Member .. .. Member ...._ �_._.....
Council Approved Date Disapproved Date
NOTE: A charge of $1.00 will be made for making corrections or changes to this application after approval has been obtained from
the Hamill...! hoard.
A re.wsl)cction fce of 31.00 will be charged when such re- inspection is made necessary by improper notice for inspection or faulty
materials and /or workmanship.
Date 144 9 I Job Address 3%1 i -tE c/ % ST
Legal Description
Owner / Lessee / Tenant �Ly ' 1 &VV
Owner's Address 38\ 0, .F- °‘±=' ST Phone � �� - ` 3 "�c
t
Contracting Co. L.t1To� Address I I -A •F , 1'T
Qualifier --t \ - R c ‘ � SS4i -
Phone
Master Permit # 7/l1
Gaa -c:
Contractor or Owner- Builder
'OFFICIAL SEAL"
Anton Kolovrat
Date; ?f
= IA : •
.° . ' °mini -1� •. 1 1 4!9
% . �
.
NotaYny ' ,,�a'?s to Contractor or Owner-Builder
My Commission Expires:
Other
PERMIT NO. TAX FOLIO NO.
STATE OF FLORIDA:
COUNTY OF DADE:
NOTICE OF COMMENCEMENT
A RECORDED COPY MUST BE POSTED ON THE JOB SITE AT TIME OF FIRST INSPECTION
961E ":50 y26 1996 DEC 04 12:12
THE UNDERSIGNED hereby gives notice that improvements will be made to certain real property, and in accordance with
Chapter 713, Florida Statutes, the following information is provided in this Notice of Commencement.
38 t N . ga -T
t I to t "FL
1. Legal description of property and street address:
2. Description of improvement:
3. Owner(s) name and address:
Interest in property:
Name and address of fee simple titleholder:
6. Lender's name and address:
I It
5r• of Owner
Prin .wners Nau
Notary P
-a:
Print Notary's Name = �.'� d'
My Commission Expires:
-
\A `I h: T
E t4 s+
4. Contractor's name and address: b.‘.\
\SIo I� -
5. Surety:(Payment bond required by owner f om contractor, if any)
Name and address:
Amount of bond $
7. Persons within the State of Florida designated by Owner u on whom notices or other documents may be served as provided
by Section 713.13(1)(a)7., Florida Statutes,
Name and address: U��
Commission #CC
1<
``' 41 T
Sworn to and subscribed before me this `k day of , 194 .
"OFFICIAL SEAL"
ton Kolovrat
e 81409
Ai E OF FLORIDA, COUNTY OF DADE
0 HEREBY CERTIFY that this is a Prue •- • y of tho
originaf'( in this office on
,A. D. 19
WTNESS my hand and Official Seal.
of
HAR VIN FRK of Circuit and CountyCourtu
o. .1 ' $ / I. f' ; ®,c.
cot¢p
vs rz:.�•�:°
Ve
\COtjNf�C�
8. In addition to himself, Owner designates the fol wing person(s) to receive a copy of the Lienor's Notice as provided in
Section 713.13(1)(b), Florida Statutes.
Name and address:
9. Expiration date of this Notice of Commenment: (the expiration date is 1 year from the date of recording unless a
diff - date is specified)
Prepared by: 1:..L—"c 1, <_LS
Address: \ \V g sT
.t \ FL —, 3 \ P
12301 -52 2/93
DLL"— — t; T UE 12 '9 12 ci cif- 1 N t_.— 1_. t"o f K..
Contractor's Nance: Ta.1LT�i °c�1;1
Ft.
t29O( -7s aas
Deck type:
■
Fastener Type_
— 1
DETAIL 1 & 2
Appendix "E"
UNIFORM ROOFING PERMIT APPLICATION
PROCESS N.
ROOF CATEGORY
LJ (Low Slope Application) ❑ (Nail -On Tile,)
❑ (Asphalt/Fiberglass Shingles) ❑ ( Metal Roofs\Wood Shingles & Shakes) ❑ (Other)
/' ROOF TYPE
I f cw Roof ❑ Re- roofing ❑ Recovering ❑ Repair ❑ Maintenance
Flat Roof Area (it') Sloped Roof Area (ft') Total (tt Master Permit No.
Exposure category (per ASCE 7-S8): building Classification category (per ASCE 7 -S8 table 1):
ROOF HEIGHT AND SYSTEM DETAILS
(D raw details as needed)
ATTAtv1M
SPACING
s i a R
Field: t — Perimeter: Corner:
Job Address:
Page -1
12/03/96 13:19
El (Mortar - Adhesive Set Tile)
TX /RX NO.8516 P.001
GS Rio lin; Products Company, Inc.
5525 MacArthur Blvd., Suite 900
Irving, TX 7=035
Your application for Product Approval of GS Roofino !Modified Bitumen Roof Systems under Chapter S of the
Metropolitan Dade County Code governing the use of Alternate Nlaterials and types of Construction, and completely
described in the plans, specifications and calculations as submitted by Applied Research Laboratories, Factory
Mutual Research Corporation, Underwriters Laboratories and United States Testing Company, Inc. has been
recommended for acceptance by the Building, Code Compliance Department to be used in Dade County, Horida
under the specific and standard conditions set forth herein.
The approval shall be valid for a period of three years. The Building Code Compliance Department reserves the
right to secure a product or material -at any time for a jobsite or manufacturer plant for quality control testing.: If
product or material fail to perform to the approved manner, the Code Compliance Department may revoke rnodi
or suspend the use of such product or material .tmmediatelyAThe Building Code Compliance'Deparunent ' reserves» =.
the ri to require testing ofthis product.or material should any amendments zto the South Florida Building'Code be= '
enacted affecting this product or material
{
The expense of such testing will be incurred by the Manufacturer.
PRODUCT NO. :
.ACCEPTANCE NO.:
EXPIRES:
APPROVED: 06/i3/95
ODuC
I'IZ(1DLKTT CO N - F P OL i�(� " I I CF: I .A( C[PTA NC1
95-0501.04 (Revises No.: 94 -0= •31.01)
09/12/97.`
Raul Rodriguez
Product Control Division
Supervisor:1 - •
- PLEASE NOTE
THIS IS THE COVERSHEET. SEE ADDITIONAL PAGES FOR SPECIFIC AND GENERAL
CONDITIONS.
BUILDING CODE COMMITTEE
This application for Product Approval has been reviewed by the Metropolitan Dade County Buildine Code
Compliance Department and approved by the Building Code Committee to be u d in Dade Coin) Florida under
the conditions set forth above.
Charles Danger, RE, Director v
Building Code Compliance Department
!Metropolitan Dade County
o■n 'ruc ("1:01:1[,:1 v, f (■111)
5,25
Smitc 900
rx
C;ireqorY: Membrane Roofinc! SystJn
Suh-Cateanry: Built-up Roofing
Type: Modified Bitumen
Sub-Type: SBS/APP
1 (: ().\ (1 11 ,
1■0t11:1,N.C,
System Description
GS Roofing. Products Company, Inc. manfuactures and markets nationally a complete line of residential
and commercial BUR and modified bitumen products. GS Roofing Products Company, Inc. markets
• .. these'prodUCts through-local distribiition in the South!Florida jurisdiction..;:
. • . .
GS ..:ROOfing4products•,:and Systerrsare::the2resUICof years -of , manufacturing experience and product -- :.i"•''....
‘devel8prnent and have beeii/Proven bY-yearS'ofexperience'in'the construction field: 'r'z''''':''--
Contact:
. • •.
GS offers a .variety of approved insulated and non-insulated roolimz systems_ For detailed system
constructions, refer to the following publications: "Commercial Roof System Specification Manual" and
"Flintlastic Roof System Catalog."
GS, products and systems have been tested in compliance with all provisions of the South Florida
Building. Code as well as Underwriters Laboratories, Inc., and Factory Mutual Research Corporation for
fire and wind - uplift resistance.
GS provides technical service and warranty information through regional offices. For the South Florida
Nletro-Dade area, call 1-800-777-2563.
Pat Neuhaus
Commercial District Mana
2900 Bird St.
Charleston Hei2hts, SC 29
(S03) 744-7451
Raul Rodri
jUN i 3
r),)/17/07
i`Ic:: -I Glas " Base
Flee;- I- GlasT-` FR Base
Sheet
Flinttzlas® Pl■ Sheet
Type IV or VI
Flintlastic STA
Flintlastic GTA'
Flintlastic GTS
i„
39.: /, ;x'33 3 .;
Roll :weight: I
(1 square)
39 3/1" x 24'9 ";
Roll weight: 92
lbs.
(% square)
Flintlastic GMS /GMS 39'/, " :r 34' 2"
Premium Roll weight :'.
100/105 lbs.
(I square)
Flintlastic FR/FR -P
Premium
v Il : :A�.ti:� �,i� l i
39 ";
Roll weight: 105
lbs.
(I square)
:\I 1.A(:11:1:111) Of:
7:'•; Roil
wei,ht: Sc "> I
(11 squares)
36•' .. 10S'; Roll UL Type G' \iodiried Bitumen, Coate;' lime; Ltlass
v..:ieht: 90 lbs. base sit;._..
(3 squares)
39'.i," x 50'; Roll UL Tvp° G2 Modified Bitumen, coated fiber, lass
weight: 90 lbs. base sheet.
(1.5 squares)
36" x 180'; Roll AST■v1 D 2178 Fiberglass, asphalt impreenated ply
weight: 40/55 lbs. Type IV or VI sheet_
(5 squares) UL Type G1
o.uca oc: :�r�:c b::ie sheet.
Ui. _ i tic: i
39'/," x 33'; Roll ASTM D 5147 Smooth surfaced, APP Modified
weight: 90 lbs. Bitumen membrane with non -woven
(I square) polyester mat reinforcement for torch
application._
3
- ASTM D- D 147 Granule APP; Moditie
Bitumen membrane :vtth non woven
polyester'mat reinforcement for toch
application.'
ASTM D 5147 Granule surfaced. SBS Modified
Bitumen membrane with non-woven
polyester mat reinforcement for torch
application.
Raul Rodriguez
ASTMM D 5147 Granule surfaced SBS Modified
Bitumen membrane with non -woven
polyester mat reinforcement for mop ".
application..
ASTM D 5147 Fire resistant, granule surfaced SBS
tvfodified Bitumen Membrane with
non -woven polyester that reinforcement.
for mop application_
GiasBaseT`' Shee: 36 x 10S Roll .AS I) 4601 Asphalt con[:;1.11):2:
weioht: 69 lbs. UL Type C'
(3 squares)
Poly SN'IS Base Sheet 39 x 64 4 ASTM D 5147 Modified Bitumen, coatc.,:l polyeste7
Roll ‘veight: 90 base sheer.
Ibs.
(2 squares)
Yosemite® Mineral 36" x 36'; Roll ASTM D 249 Mineral Surfaced organic cap and buffer
Surfaced Cap Sheet weight: 90 Ibs. UL Type 30 sheet.
(1 square)
Stormshield 36" x 75'; Roll PA 103s
weight 76 lbs.
(2 squares)
f) ;
4
Slag surfaced SBS Modified Bitumen
sheet with fiberglass reinforcement for
pee! and stick application.
Raul Rodriguez
ThC;;I:1 y.1".1OUS
P On -) -)
Sunbright 400
MBA
ACFoam 11 various
Anchorbond
Fastener
Anchorbond LCW
Concrete fasteners
. •
Hig_h Density various - PA 100
Fiberboard •
Dekfast Fasteners
,114
Dekfast Hex Plate
;-0):.0
TIZ.11)1. NA.% Il• CH' 1 i\ \ 1-• ( 1:1•11) 1;1 O rn
1 .)1T 31: • ';i0;
Dekfast Lock Plate 3" x 3 1/4" PA 114
PA 110
110 Polv1socvam,r Coarn
insul:Hon
PA
1? i Aluminum root
PA 121 Roof coatin2 APOC, Subsidiary of
Gardner
ASTM 3019 Asphalt based cold applied APOC, Subsidiary of
Type III adhesive. Gardner
PA 110 .* Polyisocyanurate foam Atlas Energy
insulation Products
PA .110 ):::F„c-. ; ,insUlatin ET, conCretefi:'Celcore,
. • ; . ; : •
, .
Apache Products Co.
APOC, Subsidiary of
Gardner
PA 114 Insulation fastener and-. ' , • :- Celotex Corp.
metal or plastic plate
PA . 114 Base ply fastening systems • Celotex Corp.
,. , , ..-..., .... __ . ..
or tigntweig,nt concrete-•..4i" ,,T •-..,.. , ••":
. . .
„ .
. .. . _
decks •• ,. , . , ,. _
- . ,.,, ;'' ' J' : -',.' "•'- ?•:/•:•i• .:-• -••
. . • Wood fiber Insulation Y '.. Celotex Corp.
,..• :-,,• .,.. .. ... • , „ .
Polypropylene locking Construction
plate. Fasteners Inc.
Raul Rodricuez
PA 114 Insulation fastener for steel Construction
1
and concrete decks . Fasteners Ind.
•
2 7/8” x PA 114
Galvalume hex stress plate. Construction
3 1/4" Fasteners Inc.
F_Iastizell
FM-30, FM-45,
F'1 -60, FM -90
Fasteners
Nail -Tice Type 'A'
Nail -Tice Type'
GAFTITE
Asphalt Emulsion
Gardner Cold 1
Process
Roof Cement
Asphalt
Asphalt Primer
various
TPR PA 1 I•.
P.-\. 1 I -; III;: I:ii l,)n t:?5: e:le` For Sigel
PA 110 Cellular insulating concrete Elastizcll Corp.
system
PA 114 Base ply fastening systems ES Products, Inc.
for lightweight concrete
decks
PA 114 Galvanized steel base ply: ES Products, Inc.
fastener for lightweight
concrete decks :;s
PA 114 Galvanized steel base ply.. ES Products, Inc.
fastener for Iig_htweight
concrete decks
PA 114
PA 121
:'.I'. s.
: <
A.Iurninurn fastener for Creative
gypsum and Cons:ructiorl
tecrurn decks Components
Base sheet fastening
system.
Asphalt emulsion
:.s;_.,...., Inc.
GAF
Gardner
l;'5, 55. ASTM D 3019 Fibered asphaltic general-, Gardner •
gallons Type 1I1 purpose lap and ply cement_
High Density Wood various PA 110
Fiberboard board
ASTM D 312 'Type 11I or (V hot asphalt generic
bitumen adhesive
ASTM D 41 Asphalt Primer
6
Raul Rodriguez
generic
Wood fiber insulation generic
I.L. . !t
1 .,
al MB aluminum
roof
Karnak 81 AF
Modified Bitumen
Adhesive (Bru
Grade)
Grade)
Karnak 97 AF
Karnak 97 =
Monsev NIBA Gold- 1, 55
Membrane gallons
Adhesive_ •
Prograde Fibered
Aluminum
ENERGY PSI-25 V3110LIS
E'NRG'Y- I various
Min. 32 ga. x
5, 55 gallons
\1 )in II 171 PA 114
12
PA 121
PA 110
PA 110
1.1vc on 1.\, dccs
Corrosion resistant annular mjc
rim shank nails
Corrosion resistant circular erlz
discs.
PA 121 Aluminum roof coatina Grundy Industries
ASTM D 3019 Cold applied SBS modified Karnak
type 111, ASTM adhesive for application of
D 3409 SBS modified bitumen
-systems. -
S\ stems.
Roof coating
Polvisocvanurate foam
insulation
Polvisocvanurate foam
insulation
Rau! Rocirinutz
:
Karnak
PA I Roof coating " ; Karnak
- • ' ' . • .`
ASTM D 3019 -Fibrated, nibberized cement fvfonsey Products
. t - ype 111 for bondinE rriodified.
bitumen membranes.;'1
PA 121 Fibrated aluminum roof tvlonsey Products
coating. Co
NRG Barriers, Inc.
NRG Barriers, Inc.
/
"N.
H.:
- anOUS ! 110 Polvisocvanur:r: fo Harriers, Inc
insulation
(.13. rNiaLIn P:■ I 14 Glass reinforced nv1on Olvrlpic
fastener for use in `:psum Manufacturing
and cerncntitious wood Grouts, Inc.
fiber decks.
N.T.Q. Spin
\Veld Plate
N.T.B. Plastic Plate 3" round
Olympic Fastener
=12
2" round
PA 114 2" round amorphorus nylon Olympic
locking plate for use with Manufacturing
N.T.B. fasteners with 1" Group, Inc.
head
PA 114
PA 114
3" round polypropylene Olympic
stress plate for use with Manufacturing
B. fasteners Group, Inc.
Insulation fastener.
Olympic CR Base
Felt Fastener and
Base Sheet Disc
Olympic Fastener
PA 114 Insulation fastener
s
Rau! Rodriguez
ympic
anufacturin_
Group, Inc.
Olympic
Manufacturing
Group, Inc.
Olympic
Manufacturing
Group, Inc.
4 .
PA 1 14';y t 'Insulation fastener Olympic
assembly for Base Sheet f'vlanufacturing
fastening only Group, Inc. •
Olympic
Manufacturing
Group, Inc.
Raw lite 37. Plate
Aluma-Brite No.
120
2 2:Y flu 4
Rawl 2" Plate 2" round
3" round
PA 114
9
insulation
PA 121 Fibrated aluminum roof
coatin2.
Raul Rodriguez
(1r,.. u.
DO oiDic round I 14 3 round !_:-.11v:duinc Olympic
.\755 stci pi:n(2 Nlanur,lcturimz
Group. Inc.
FiberHas various PA 110 Fiber Mass roof insulation Okycils-Cornin2,
Fibe: Corp.
Paroc Cap Board various PA 110 Rockwool insulation Partek, Inc.
UltraGard Gold various PA 110 Polyisocyanurate foam Schuller
International Inc.
2" round galvalume AZ55 The Rawlplug
-membrane plate ' :Company
• .
Ra‘v13":. Plate 3 round PA 114 -37 round galva1umeZ55 51-he'Ra‘v1pItig
s teel platei‘4:A. Inc
411t-Itt'
•
Rawlite
PA 114 Insulation fasterfo The RakvIplug.
cementitious and 42ypsum Company Inc.
decks
. ..„
;:-.; 2100 - Modified I, 5, 55 :. ASTM D 3019 -Rubberized all-Weather Tropical Asphalt • -
All Weather canons, also (Type 111) and flash inQ cement : trowel Products Corporation
Flashin2 Cement available in D 3409 erade, modified adhesive.'
10.5 ounce
caulking
tubes.
Tropical Asphalt
Products Corp.
PA 114 3" round 2a1ValuMe AZD The Rawlplug
steel plate for u with Company Inc
Rawlite fasteners ..- y .
Pro;)ct
i;eseai Current Insulation
Con:oration Fastenimt 1:e(tuirements
,
Fire Classification
Laboratories Compliance
United States Testing ASTM D 5147
Company, Inc.
ASTM D 5147
C:••• 1
1 0
Fi\.1R'S 199:-
R 1190
97457-4
97-457-2R
•
• • '
0 ! /0 I /01
07/13/S7
06/03/88
12/02/87
7 /)
Raul Rodriguez
-60 psf
S c -60 psf
Concrete -133 psf
i i17ht Concrete -45 psi
Cementitious Wood Fiber -52 psf
Poured Gypsum -52 psf
Maximum Fire Classification
Material Classification
Wood Class A
Steel Class A
Concrete = Class A
Li_Iu■yeiRht Concrete Class
Poured Gypsum , Class
Note: Fire classifications and maximum .design pressures do not reference all assemblies over
deck types. Review system listings . for design pressures and the Underwriters Laboratories
Roofing Materials Directory or . other . approved testing agency listing directory Fire
Classifications.
Raul Rodriguez
1,.' 111rr:rn
Il�ii. 1)l'j.� I!1I11)tl. I` ..1o,`,. ,)r ..i of ..:lr.
11c f :(i
:II (7,encr:11 and S‘stetn I_,irnitali ini :r11I l
13ase
!-asteninL,:
PIy Sheet:
Membrane:
Maximum Design
Pressure: = = -45 psf.
Maximum Fire
Classification:
Maximum Slope:
One or snore plies of GS Glas Base, GS Ilex -1 Glas Base, F \ -! <;1 :: FR 13as.: or
GS Poly S:`IS base Inecilanic: iIY i^a sicned :o the dec.: de :a 1e,. i)::IC\' ;.
Base sheet shall be lapped 4" and fastened with anpro\ ed rooflm n ::ik and tin caps
9" o.c. in the lap and two rows staggered in the center of the sheet 12" o.c..
(Optional) See products listed under 'Base Sheet' above, or one or more plies of
GS Flintlastic Ply IV or Ply VI adhered to the base sheet in a full mopping of
approved asphalt applied within the EVT range and at a rate of 20 -40 lbs. /sq..
One ply of Flintlastic FR -P, Flintlastic FR Cap, Flintlastic GMS, Flintlastic
Premium GMS adhered to the base sheet with approved mopping asphalt applied
within the EVT ranee and at a razz of 20 -40 lbs. /sq.; or Flintlastic GTS Torch
adhered to the base sheet.
1 400 Ib. /sq: gravel'' or :300 ^Iblsq " ''::'in ° "a flood coat of approved mopping
asphalt at an application rate of 60 lb. /sq.:
2. Karnak 97 or APOC 212 Fibrated Aluminum at an application rate of 1
gal.lsq --
Class 'A'; see General Limitation g2..
1:12; see General Limitation #3.
Specification No.: GMS 2 -3, FRP 2 -3, GTS 2 -3, FRBC 2 -3
Rau! Rodriguez
iI
I 7, ∎l 2.l) -
:I :0
IM
i::.•
:Nk
. .
c..: rosin I!
■,VII A1I Wc3zher Enipirc b,],se is insr:111:1 an interply of Piy IV or Pk .
musr bc instailed pior ro ins1:1112[ion or rnbranz.
33
Raul Rodriciuez.
xo 0;4)502.0:
C.! 'II S;l2
1.!; . 11.HIC; (
Hpi
:.=30 base sheet shall b use,', oi. oser:lte Sae
All Weather/Fmpire Base Slice: may be use %viih all ton ply menlbranes.
•Application or GS FlintEdas. Mineral Surface Cap Sheet, Flintlastic GN1S or
Flintlastic GTA shall be in compliance wirh manufacturer's published
application instruclions.
5. installation shall comply %vial South Florida Building Code Section 3404
and applicable Dade County Application Standards and Test Protocols.
101
‘)5-
(,c'fi :0 1_liilct:1ti )IIS:
4.
;)rC os i;�f'it ilr���:;1�'�r' li!1K: i... a! . C:. '\ :he ap
Fir rat „11_s are determined fi :1 cone: inatic:t c'I s10:` C: �1'•' and aL ;se:,ibi'
keter [0 current Uilderwriters Labora r!
toes Root-i; _ 1 \1;.� (
�ais Dir._:ar or oth
e, Iir
[:):in data Iisied b_, an approved hsiln ! or :iro 2 > .. i l
. .�.r : .
,� .' ". it ia:lh• "� steal. Ve I.1
compliance ll Sections 3401 and 3401.6 o::5: South Florida Bu;ldm" Code.
Ma.\imuln slope range shall vary for each sys :em: consult current Under wr!ters
Laboratories Roofing Materials Directory and manufacturer's specifications for
compliance with design criteria for each project.
An overlay /recovery board insulation panel is required on all applications over
closed cell foam insulations when the base sheet is fully mopped. If no recovery
board is used the base sheet may be applied using spot mopping with approved
asphalt, 12" diameter circles, 24" o.c.; or strip mopped 8" ribbons in three rows, one
at each sidelap and one down the center of the sheet allowing a continuous area of
ventilation. Encircling of the strips is not acceptable. A 6" break shall be placed
every 12' in each ribbon to allow cross ventilation. Asphalt application of either
system shall be at a minimum rate oE 12 lbs.sq. Note maximum design velocity
pressure restrictions on spot systems °'
Any amendments to these_ provisionsshall be in compliance with'Setions "203 '
.204 bf the-South Florida.Buildin2 Code:
6. All work shall be performed by -a Dade County licensed roofing contractor.
Contractor shall be familiar with the details and specifications published bt- the
manufacturer. -
In re- roofing applications,. moisture content in an existing built -up roof must be in
compliance with Section 3401.9(c) of the South Florida Building Code.
8. Prior to application, all existing roof surfaces used as a bonding substrate shall be
tested for uplift resistance in compliance with Dade County Protocol PA 124 to the
calculated design pressure of the roof deck.
9. If required, any Factory Mutual Approved vapor barrier in conjunction with
proprietary or approved adhesives may be used prior to the application of the
insulation laver.
10. Perimeter and corner areas shall have an increase in fastener density for both
insulation and base sheet in compliance with Dade County Protocol PA 117 of the
South Florida Building Code.
I I. All attachment and sizing, of perirneter naiiers and metal profiie designs shall
conform with Dade County Protocol PA 1 1 1 of the South pridav8u nk Code.
1 0 2
Raul Rodri_uez
2 1.
as.,. shall t Iii Sr.!Il .._ i� .., - .... .... teHk
i
pp;i :Ir);1 �Si .�` ..i.
f _.. ..,..� • � ... . il or I;.
?pprove:i ,r): �:1 ,) - 'ii.C� i„• �:i! Ear yen I:1�
. :)n: '), :!ic m..:1::i..•.,�, ,H.11l ..:�:.�.,: 1I ;1 iHe .*• Ho II
;iii�atlili 1.
1.
oil COod materials si1:11I be s iJl! ::'. �: atilt on a cie;l: ?, tTht and dry s;Ir; ?._�.
Consul: current Underwriters 1_3fiorar.orles Direct 1 a
Or'.' tJr tilt' " pprOpriate COailno ■0f
each roofimz assembly to obtain the required tlrC rarin'L. The assembly shall be
installed in strict compliance with Chapter 3401.5 and 3401.6 of the South Florid::
Building Code for maximum fire classification.
15. Asphalt mopoin,s shall be with applied with asphalt approved by the applicant and
shall be approved in compliance with equiviscous temperature (EVT) methods of
asphalt determination. Asphalt containers or bulk tickets shall indicate an EVT,
finished blowing temperature (FBT) and flash point. Asphalt ropes and temperature
ranges shall be in compliance with Subsection 3403.4(a)(3) of the South Florida
Building Code.
16. Insulation may be installed in multiple layers. The first layer shall be attached in
compliance with Product Control Approval guidelines. All other layers shall be
adhered with approved mopping asphalt applied within the EVT range and at a rate
of 20 -40 lbs./sq.,, or mechanically attached using the fastening pattern of the top
layer.' ' Refer: to r..manufacturer's literature and /or, the • NRCA Roofing and
.Waterproofing Manual correct application procedures .•: of insulation panels in
approved asphalt or adhesive., _
17 Pre- assembl nailsmay'only be used for termination of fully bonded surfaces
such as mechanical termination at wood blocking: head and side laps, and base
flashing terminations. Cap nails shall not be used for the mechanical attachment of a
base sheet. Tin caps are required by the South Florida Building Code.
18. The submission of system specifications and details shall accompany the Section 11
Building Code Permit., This information is available in the publications listed in the
'System Description' of this Product Control Approval. The submission of these
documents, as well as the proper application and installation of all materials shall be
the sole responsibility of the contractor.
19. All standard panel sizes are acceptable for mechanical artachment. When applied in
approved asphalt, panel size shall be 4' x 4' maximum.
20. Fastener spacing for base sheet attachment is based on a minimum withdra«al
resistance value of 250 lbf as tested in compliance with Dade County Protocol P:■
105. If the fastener values as tested are below 2 50 lbf a professional engineer may°
submit a revised fastener spacing utilizing the withdrawal resistance value taken
from Dade County Protocol PA 105. Calculations shall be based en a rupture value
(the fastener stress plate pulling over the base ply) of not more than 90
Fastener spacing for insulation attachment is based on a minimum withdrawal
resistance value of 300 Ibf. as tested in compliance with PA 105. If the fastener
value, as field tested, are below 300 Ibf. insulation/'ttac- 'n shay not he
acceptable. L ✓� '�
103
Raul Rodri,'_l::z
Ex :e:Isiora or Acceptance may be considc:ed a:-ie: a ne•.k. application Hs been riled and the supporic d
:es: rears ro olde than ten (10) ve3rs, have been re- _valuated .
Ali re7o':s of rt..-te :;tin° shall bear the seal, siwnarurc and date of an engine:'; reg in t!le Siate of
Florida:
Anv revision or change in the materials, use, or manufacture of the product or process shall automatically be
cause for termination, unless prior approval is granted for revisions or change.
3. Anv unsatisfactory performance of this product or process or a change in Code provisions shall be grounds
for re- evaluation.
4. Tnis acceptance shall not be used as an endorsement of any product for sales or advertising purposes. -
5. The Notice of Acceptance number preceded by the , words Dade County, Florida, and followed by the
expiration date may be. displayed in advertising - literature.;;: If any portion of the Notice of Acceptance is
displayed, then it shall be done in its entirety...,
Product approval drawings where required for permit applications shall. be pro to' the applicant by the e-
lti manufacturer or his distributors unless otherwise noted intheNoiiceof Acceptance .The prints need not be!f-A
re- sealed by an engineer : a� jr Y � y� °` rn ' H .'.tx` ? 5 a r .'„ e� .... .
7. Failure to comply with the Standard Conditions shall be for termination of the Approval.
This Product Control Approval supersedes No. 94- 0531.04
Raul Rodriguez
Product Control Division
Supervisor
:1,
w;'
/.� • ..`
" .���
E.
�
���T
i.o/ oeSCmpD0m
A. Related mmm specified elsewhere. Ack.c:`:,*c, m V./x'`/
1.02 PRODUCT HANDLING, STORAGE AND oEuvEnv
A. Products. Materials shall x /hcCSbrands delivered origii u|o:ckv0eshz'xoymnnvhcxvuirhbg;
B. Storage of Materias. Store all roofing ma/v'in/s. coatings v//0 accessories off the ground completely
protected against eeaU
1.03 WARRANTY
A. Roof M b Warranty. GS will issue the a |icoN Roof Ivienun/'oVVa'onty upon receipt o( the wn,'
m«ybz,eheoaUpoWishedcond/tionsu,enmt.To be eligible requires i ion by a GS Authorized RooUog
Contractor or a member of the GS Golden Star Applicator Program. Prior to commencing work, the Roofing
Contractor shall sub it t necessary application form to GS for approval. Roofing Contractor shall notify GS three working days prior to
commencing work 10 arrange for required inspections.
PART 2 - PRODUCTS
2.01 ROOFING SYSTEM
A. Modified Bi Roof S Nailable Decks. On areas indicated on drawings to receive modified bitumen,.apply FRP-2-3 Roof
System, with the appropriate GS Approved Base Flashing and Metal Counterflashing or Wall Covering, as specified i the current GS
Specification Manual Roof shall be installed by a Roofing Contractor authorized by GS to install the specified Roof Membrane Warranty
System.
B. Insulation. (See 07240 or pages 23 - 24 of this catalog.)
C. Summary of Materials per 100 Square Feet -
*GLASBASE Base Sheet (1 ply)
. Type III Asphalt Solid Mopping • •
^, ` •
*Alternate approved GS Base Sheets includef-Ultra,.Premium, and All VVaathe Sheets. GS approved SBS':Cad:
process adhesives may be used in lieu of asphalt Contact GS for .• • •
D. Asphalt Apply asphalt at a temperature between 400°F and 450°F. . . • • • '•
E. Cants. In angles of roof deck and vertical surfaces, the Roofing Contractor shall furnishand install a solid wood, wood fiber or insulation''
type Cant Strip with a minimum 3" face. •
PART u'EXECUTION
3.01 INSPECTION OF SURFACES
A. Roof Deck. Roof deck shall be smooth, dry, clean and securely nailed. Cover large cracks with metal. Properly grade surfaces to outlets.
Roof accessories shall be available before Roofing Contractor be i work.
B. Outlets. Drainage odntx shall be installed below roof deck surface to permit free flow of water and to prevent forming water dams at rims.
3.02 PREPARATION ` .
A. Sheet Metal Work. All metal flashings shall be factory primed or lightly primed with asphalt primer and allowed to before roofing mate-
rials are applied.
B. Cants. NaiI cants on top and bottom 16" o.c. Cants shall fit flush at ends and 10 vertical surfaces. Where scuppers occur, apply cant 2"
back from flange and bevel cant 8" from ends.
3.03 APPLICATION ' `
A. Outlets. Set base sheet at d in in flashing com d 9" ide aro nd ring and flange FolIow with an approximate 40" x 40" collar of •
FLINTLASTIC FR-P applied in hot asphalt, extending into drain. GS recommends the use of a minimum 30" square, 4 lb. lead or 16 oz. soft
• copper flashing set in flashing compound over the flashing collar and requires its use on all Roof Membrane Warranty Systems. Solid mop
base ply, flashing collar and primed lead or copper flashing with asphalt, and while hot, embed FLINTLASTIC FR-P membrane. Install clamp
ring and tighten while membrane is hot.
B. Valleys. Apply one ply of FLINTLASTIC FR-P solid mopped to the base ply, centered in the valley, lapping 6" on ends. Field membrane
courses shall overlap the valley sheet a minimum of 6". Valleys shall have positive drainage.
C. Pipe Flashing. Where projections extend through the roof surface, install a collar of FLINTLASTIC FR-P over the base ply to extend a
minimum of 4" beyond flanges. Install metal flashing with a minimum 4" wide continuous flange on top of the FLINTLASTIC FR-P collar.
(For nailable surfaces, flange must be nailed 3" o.c. 3/4" from perimeter.) Field membrane shall be applied in hot asphalt over the FLINT-
LASTIC FR-P collar and metal flange. After the membrane is applied, form a cant of flashing compound around the base. (Not suitable for
hot pipe projections.)
D. Roofing Membrane. Apply one ply of GLASBASE Base Sheet lapping 2" on sides and 4" on ends. Attach base ply 9" c.c. at side laps and
18" o.c. staggered in two' rows 12" from each edge with Approved Fasteners. Install base ply to provide and maintain a 6" minimum offset
between side and end laps of ;he base ply and FLINTLASTIC FR-P. Solid mop base ply with asphalt and embed one ply of FLINTI_ASTIC
FR-P, lapping 4-1/4" on sides and 6" on ends. All end laps shall be diagonally staggered and not less than 3' apart. Roofing System shall be
applied in a continuous application.
E. Base Flashing and Curbs. Over the completed membrane at vertical surfaces, install Base Flashing consisting of one ply of FLINTLASTIC
FR-P/fl. set in asphalt to primed concrete or masonry surfaces. Base flashing shall extend a minimum of 8" up vertical surfaces and out onto
tield membrane. Wood surfaces shall receive one ply of base sheet extending from top ol cant strip to top edge of Base Flashing prior to
application of FLINTLASTIC FR-P/fl. Nail top edge of Base Flashing 9" o.c. through tin-discs.
Re!el E0 General Requirements Section for definitions. These shall be considered part of and used in conjunction with Roof System Specs.
^==. �" "
_
W.1,487 F. DECK
23 lbs.
25 lbs.
105 lbs.
19
0 0
•
COVERING MATERIALS (TENT)
ROOF COntfnllBd
262 SYSTEMS ROOFING SYS S (TGFU)—
linnt Coating" at 1 -2 t +l /sv
Inc. "al MB Aluminum Incline: 1 /'t rte. mechanically fa,. in fine" or per
Surfacing: (i ra cya nurate , Sl in deck
C -15/ Any thickness PoNso' from lomts
Ply Dock: tionall: offset 6 n . fastened or but mopped.
ae S l: Type insulation must be r hot tmoppe
shoat, mechanically tally f, +, ;toned o Diamond",
toned, looms G2 base/ply base/ply TA Black Di'+
/ A sheet. m echanica ll y Diamond- or ' G
Me Sheet: G2 base ! , •GTA White Diamo at 1 to 2 l ack D .
Su Shang: Type TA ". .
Membrane: "Flintlastio SMR Aluminum fiord Coating- Incline: 1 / 2 any combination, any
hbet. perlite. wand fiber.
Insulation Grunions +d or ad.
glass lastam
11. Dock: NC (Optional): Polyp �� mec hanically •
Insulation t fastened FR " or " Flntlasuc FR Base , or •Flmtla slit F8
thickness, mechanically "Flex-Glas _.
Sheet: Type G2, -alt. Premium FR -P "Flimlastic -FR /PG
Base roofing asp` � �
hared with hot FR-P", " Flintlastc P re ,•
"Flimlast asphalt.
Incline: 1 /2
Membrane: with hot roofing thickness
Cap adhe any combination, any , •`
15/ with 2x4'5. lass fiber, perlite, 12. Deck: C- rata, 9 asphalt.
•All joints in deck blocked isocV a dhered wit! Q
Insulation (Optional): Poly or adhered with hot rootinfl
R /PG'
tastene mechanically fastened or "Flintlast+c-
mechanically ..Flintlasuc Premium FR -P' • 1t,
Base Shoot Type G-2. . FR -p ", wood tibar,�aa 11
Membrane: "Flintlasu Incline: 1 /tin perlite or
asphalt. with 1/2 in ' m "
hot roofing thickness, covered hal f "7�
13. Deck: NC EPS, any with hot roofing asp adhered,wd.�1J
Insulation (Optional): hered •hot hot asphalt.
fastened. ' fastened or adhered or ''<
Membrane: t Type G2, m echanical l y P remium FR- .t
Base Sheet: FR -P ". "Flimlastic thicken,'}
Membrane: "Flintlasu 1/2 combination, a ^Y ;+
asphalt. wood fiber. 'I' '
hot roofing Incline: fiber, perlite. , tc;ike
1 q Deck: NC isocYanurate, glass asphalt.
,
Poly hot roofing
Insulation ••, adhered with fin0 asp (`, �99 '
fastened. „ Flex- i-glas with hot roofing asphalt. 1 ,
Ply Shies t" "Poly ye M B or heet ", adhered halt. Asphalt Roof ;G
Base Shea arr Karnak C Base S Aluminum ky,
Ply Sheet „GMS", adhered with 50* roofing No. 97 Fibrated A •a '
Membrane: Inclina: t/q cofribi
Surfacing: Karnak Chemical Corp. wow fiber, any ..
at 2 -1/2 gal /sq- lass fiber, Derck, halt
anurate 9 fin wood
with hot
e,
15. Deck: es (Optional): P t85 b fastened or adhered •.9 .
Base She pe mechanically 2 fastened o844hmechanicallyt fastened
Base Shaer Type G2 or "Flex-i fastened or ad��
G2 or "'Flex- i-9las mechanically
phalt. "GMS Black Diamond or.'GMS�
Ply Sheet halt. (Optional): Type , ; :y:
halt. "GMS Premium al /sq
roofing asp halt. ••.
Membrane: Pllntlastic GMS' . APOC 400 Sunbrite', 3 9
mond", adhered with hot roofing asp Incline: 1/4
Surfacing: Asphalt Products Oil Corp.
must be offset 6 ih!
insulation m ' �
C-15/ perlite, 1 in. min, joints in hared wit ,
16 peck: Glass fiber, p fa or ad ,a iy-, !, •
Insulation fastened. •• mechanically fa aelretsd
deck, mechanically or ••Flex i
I' Base Sheet: TyPe G2 mechanically a r
or "'Flex- i.�las' , fastened or
phalt. 2 Black Diamorid(oei
Ply Sheet : "Fl ionall: TYPe �' ••GMS SBS
ha M S•• "GMS Premium .. 3 gal /sq.
roofing asp roofing asphalt
Membrane: "Flimlast G with hot 400 Sunbrite -i >fi •
Diamond adhered it Corp. ..APOC- Incline: 1/2 fiber: am/,`.?hlbt ; ' ■
White A Products 0 lass fiber or wood • �.•yfuri�� ,._��
Insulation isocYanurate perlite, 9 Cfest?r!r` "
17. Deck: NC Optional): Poly lace. mechanically., _ 4 S
insulation 1 P mopped in P G2 or "Flex- i -glas' . ; „ ).,
fastened or mote layers of Type
chanically G1, G2 or "Flex- i- glas " ::!n. - ,,'.
+' r
Base Sheet: One or Types '2.4.7!-''''..•
> - • e!
mopped in place. or more layers ••GTA White Diamond'i,
One
Pl Sheet (Optional): In place. ••GTA Black Diamond
lanai or hot mopped GTA a :• :4i', ,
Membrane: "Flimlastic lied at 1 -1/2 gal/sq. .,.;.
97.,. a p p Incline: 1/4
fused.
,,ii i
. ' ihiilrta�`j .
Karnak Chemical Co. "N °' or hot ?'
mechanically fastened G jll
insulation lass fiber, ' ,
18. Deck: NC Partite. 9 mec hanicallY , l t e > A -` „
max thickness.
Insulation 1 : Ptional): 2 "Flex- i -9las' .
taxers of Type G Iasi; do :P,�.
or more G1, G2, "Flex -i-g - = ihe?II
8850 Sheet: One la ers of Types
mopped i^ place. 0r more y +n lace. "STA "'
One or hot mopped White Diamond' or
Ply Sheet (Optional): fastened Diamond' • applied White
at 1-1/2 9aVsq•"'� �•�°
Sheet', ng: APOC 5 A i
Black Coating •'GTA ". � 212 Aluminum incline: 1/2 f a ste ,of ! . -
Membrane C No. nad .e.-,,::•....;„.,,, , '
c hanically
Insulation APO perlite, min 1 in. thick, me
19. Deck: C -15j32 fiber or P Base mechantcally:,fi.,0
Glass ^Flex -1 -Gies FR . all
Insulation: ••Flex- I -Glas" or
place. •
G2, FR -P" or "FlintlastioFfi/;:.
Mee Sheet: Type -_`
mopped in place. °Flimlastic Premium henal=
Membrane: "Flimlastic FR -P "'. Incline: 2 •
olyurethane. isocYanurate, P ..,• ..
lass fiber, P 'n'
20. Deck: NC place.
Partite, 9
Insulation (Optional):
ON PRODUCT
LOOK FOR MARK �. 6
o