1076 NE 98 St (3)OWNER'S NAME
HERMAN; 316,ING
PRESENT ADDRESS LICENSE NO.
6000 N. E. 2nd Avenue
I PHONE NO.
SOB LOCATION (ST. OR AVE.)
1076 N. E. 98th Street
LOT
17
BLOCK
180
SUBDIVISION
I Miami Shores Abet.
GENERAL CONTRACTOR
Amer
ADDRESS
6000 N. E. 2nd Avenue
PHONE NO.
LICENSE NO.
3/012 0 -6
BUILDING PERMIT NO. 894 e�
p
DATE 3.0/18/49
e�r�
PERMIT FEE 622.00
BUILDER'S BONO
NO. 894 DATE
ZONE REQUIREMENTS 20,000 CU. FT.
�6, yiy
PLAN CUBE 410111116= CU. FT.
EST. COST S 1/
,5 00
DRAWINGS, SPECIFICATIONS, RESTRICTIONS AND CUBE CHECKED BY: YWU JAVrifir7
X
NEW CONSTRUCTION
TYPE
CBS
STORIES
,1
ROOF CONSTRUCTION
( Tile
y INTERIOR CONSTRUCT!
Oak Floors - Plaster Walla
REPAIRS
Liv
Liv Bin - Din Area - Kit - Scr. Porch - 3 Bed ABB - 2 Baths -
ALTERATION
- DESCRIPTION
2 car attached garage
ADDITION
SUBMITTED TO PLANNING BOARD
APPROVED
REJECTED
REFERRED TO COUNCIL
REASONS
RE- SUBMITTED TO PLANNING BOARD
SUBMITTED TO VILLAGE COUNCIL
REMARKS
CF E OF OCCUPANCY NO. I ISSUED
BY I
TO
BUILDING PERMIT AND INSPECTION RECORD -MIAMI SHORES VILLAGE
DATE
INSPECTIONS
CATE
BY
RE- INSPECT
BY
RE- INSPECT
BY
FOUNDATION
10/21/49
A 7�
d LLB
• DATE
FEE
TEMPORARY SERVICE
10/31/49
BEAMS & LINTELS
11/2/4,
JPI
8Q 402
L
10/26/49
,.,p
$ 1,00 (Refu
SEWER
FRAMING
13/29;.5
Jpg
SOLAR HEATER
$
$
f
$
$
$
FINAL
1/255/50-
T
Ji
BY
REINSPECT
BY
RE- INSPECT
CLEAN -UP
ROUGHING
1 1/ 2 9/49
VH
CONTRACTOR S. E. Vann Plumbing Co.
PHONE
PERMIT NO. 3466
DATE 10/27/49
FEE $ 11.00
NEW BLDG. S 1 ALTERATION
ADDITION
REPAIRS
SPECIAL PERMITS
PERMIT NO.
• DATE
FEE
TEMPORARY SERVICE
10/31/49
$ 1.00
$
SEPTIC TANK A. A.
8Q 402
L
10/26/49
,.,p
$ 1,00 (Refu
SEWER
$
$
SOLAR HEATER
$
$
GAS
$
$
$
$
INSPECTIONS
DATE
BY
REINSPECT
BY
RE- INSPECT
BY
ROUGHING
1 1/ 2 9/49
VH
ROUGHING
GAS
JDH
H. W. HEATER CON
SEWER
RANGE CONN.
SEPTIC TANK
SOLAR HEATER
FIXTURES & FINAL
FIXTURES
1/ 5.0
A im
CONTRACTOR E. G. "Red" Cornelius
PHONE
NO. 521 DATE 11 2 1 9
FEE 5 14.65
NEW BLDG. S
ALTERATION 1 ADDITION
REPAIRS
SPECIAL PERMITS
PERMIT NO.
DATE
FEE
TEMPORARY SERVICE
p
8429
10/31/49
$ 1.00
H. W. HEATER CONN.
$
RANGE CONN.
$
MOTORS
$
FIXTURES
$
$
INSPECTIONS
DATE
BBY
RE- INSPECT
BY
RE- INSPECT
BY
TEMP. SERVICE
10 /3 ) 14 9
JDH
ROUGHING
11/29/49
JDH
H. W. HEATER CON
RANGE CONN.
FIXTURES & FINAL
1/25/
.TD,R
BUILDING INSPECTIONS
PLUMBING PERMITS & INSPECTIONS
ELECTRICAL PERMITS & INSPECTIONS
APPROVAL TO POWER CO. FOR SERVICE DATE
1/26/50 BY �[7
If
i;
�+ 1-26-50
ctf.occ. 5
PAID BY
Y EAR
ANNUAL TAX
PERIOD USED
AMOUNT PAID
DATE PAID
RECEIPT
NUMBER
I .cawlr: at
o
/
' ,
l 9 s i
, , .3/..s
v /a /s/
— i - /
/ 3 975 1
/ _
Ii
_�.�
.. 4 .4.
9 2.-
Q6
-
/ A - P ' ,S1."
l
ADDRESS 1076 N. E. 98th St.
LEGAL tot 17,B1k.180 MSS #8
RECORD
ARBAGE TAX
Amount �- 9
K
� No Houses
I✓ "—
r� (..4
^..4
6
,..4
4
I
r
4 n
Issued Le /.9 19�
KNOW ALL MEN BY THASE PRESENTS, that
Address L O a d • -
buildir at the follow' • as resses:
•
ea /' 7, �' P q
/07C 5'
.•.• ,r•'� �'•x �'���' „..,.. �•N.,;,1•.•.• tj ••••��`��•••••� „,. ,•�a,•�.•• , . f• x�. f• f•e� l�, si �ew{7 r _ e�.V�'VV V� �•f � �
r�[ ltc�' if��r��f�ti r�mti; �ti wo $m�r�oY��r�'a»rarao�a��i;ir�r�� y ,� r r
ami clzolres9liage
L 9 A ID A
BUILDER'S BO
IVY
D
N?.
in consideration of the issuance to me by Miami Shores Village, Florida, of a permit or permits to construct or repair a bui or
do hereby deposit with Miami Shores Village, Florida, the sum of ' , and I agree with said Village that, when such construction
been completed py me within the meaning of the ordinances of said Village, I will clear aft premises and repair any Village property damage In%
used for the deposit of material or equipment in the construction or repair and that, if I do not so clear and repair such premises immediately upea
completion of such construe ' n within the meaning of such ordinances, the Village may clear. and repair the same and pay the costs of such olearace
repairs ut of the aforesai , and return the remainder to me; and that, if I shall clear and repair said property immediately, as aforesaid,
sai shall be returned to me.
WITNESS MY HAND and Seal at Miami Shores Village, Florida, this_ ti day o
s.4
INSTRUCTIONS TO BUILDER —When above mentioned construction is completed and the premises are c1e re anY epaired take this bond
ip m
Village Building Inspector and obtain his approval, after which Miami Shores Village will refund your money in a ccordance with' the above agree'> VILLAGE BUILDING INSPECTOR'S APPROVAL
I hereby certify that the construction contemplated under this Bond, has been completed and that the builder thereof has caused
�� the surrounding premises to be cleared and repaired in as good condition as they were before commencing said construction.
WHEN CLEARED AND REPAIRED BY THE VILLA
K' P ! /
s Amount of Bond $
"" Cost of clearing and repairs done by Village $
Balance due Builder $ Cancelled \ 19 By
lags Building Iee 144Iia2u��e
!t r n � [ +t e[ !+ l lte� i�'`� !t n n ! [ t r [ ![ [ sr [t�
t e.V 1r•° it il `•°&°•' ir ir `•° i °••'9r•°e'ir`•° it :IM , .•.. IIMMi ` er`r i t '.'�r` i`•°et ii`Pe l tt
a,2 ,`01'
ild-
am
*_14 MIAMI SHORES VILLAGE
Applicatiou is hereby made for the approval of the detailed statement of the plans and specifications herewith submitte
ing or other structure herein described. This application is made in compliance and conformity with the 'Building Ord'
Sho =es Village, Florida, and all provisions of the Laws of the State of Florida, all ordinances of Miami Shores Village a
regulations of the Building Division of Miami Shores Village shall be complied with, whether herein specified or not. A
plans and specifications must be kept at building during progress of the work.
1'l �/ Dat / ' ' ,�ie
Owner's Name and Address / t 11 t / / No.___AQ_Q_LC Street__
Registered Architect and /or Engineer
Name and address of licensed contractor
Location and legal description of lot to be built on:
Lot 1 7 Block Subdivis
Street and Number when - work is to be done
State work to be done and purpose of building (by floors) __________
and who, being by m
of the above describe
therein by him stated
Permit No
Disapprove
( Signed)
BUILDING INSPECTION DEPARTMENT
APPLICATION FOR BUILDING PERMI
New Building ✓ mRdeling dition,„
To be constructed of. __- -,Kind of foundation
Estimated Total cost of improvements $ ./ ,,4.___ .6 d
Zone cubage required - 2-0 1 DQ O
STATE OF FLORIDA,
COUNTY OF DADE. ss.
y sworn, upon
tion, that he
Date..
Amo t of Permit $.
-Plan Cubage
Size of Building Lot
Repairs No. of Storie
oof *ng
_
y ad, Sworn to and Subscribed before me.
Notary Public, State of Florida
ce of
11 rule an .
py of approved
and for no other purpose.
7 ".X
Distance to next nearest building
Maximum live load to be borne by each floor
I hereby submit all the plans and specifications for said building. All notices with reference the it '' g and it nst ruction may
be sent to 1 � `'
The undersigned applicant for this building permit does hereby certify that he understands and accepts his obligations as an employer
of labor under the Florida Workmen's Compensation Act, being Section 5966, Compiled General Laws of Florida, Permanent Supplement,
and has complied with the provisions thereof, and will require similar compliance from all contractors or sub - contractors employed by him
in the work to be performed under this permit; and will post or cause to be posted for inspection on the site of the work such profblie notice
or notices as are required by the Act. The undersigned agrees to employ only such su ntraotors, on work to be performed under this
permit, as are licensed by Miami Shores Village.
Remarks (Signed)
Before me, the undersigned authority, a notary public, duly authorized to administer oaths and take acknowledgments, personally ap-
peared
to me well known,
deposes and says that he is the
of ly read the foregoing application, and that he did sign the same, and th al facts
Building Inspector My Commission Expires
PLANNING BOARD DATE
Chairman _ Member
Member Member
Member Member
Council Approved Date Disapproved Date
NOTE: A charge of $1.00 will be made for making corrections or changes to this application after approval has been obtained from
the Planning Board.
A re- inspection fee of $1.00 will be charged when such re- inspection is made necessary by improper notice for inspection or faulty
materials and /or workmanship.