Loading...
615 NE 97 St (6)BUILDING 0 ELECTRICAL 0 PLUMBING ROOFING ; 1 0 Owner of Building Architect Contractor or Builder . Legal Lot Description Address of Building CONTRACTOR OR BUILDER MIAMI SHORES VILLAGE, FLORIDA PERMIT Bl NC' 7740 Work to be performed under this Permit " k , DATE. Contractor's License No. ■'‘ 19 Subdi- vision Value of 1 Amount of Project $ 1 Permit $ 4 This permit is granted to the contractor or builder named above to construct the building or to install the equipment or device described in the applica- tion herefor in strict compliance with all ordinances pertaining thereto and with the understanding that the work will be performed in compliance with any plans, drawings, statements or specifications that may have been submitted to and approved by the proper municipal authorities. This Permit may be revoked at any time if the work is not done in compliance with such ordinances or if the plans are changed without authorization. A further condition upon which this permit is granted is the understanding that the contractor or builder named above assumes the responsibility for a thorough knowledge of the ordinances and regulations pertaining to the work covered hereby whether shown on the plans or drawings or in the statements or specifications-and that he assumes respon- sibility for work done by his agents, servants or employees. Signed' s INSPECTOR In consideration of the issuance to me of this permit I agree to perform the work covered hereunder in compliance with all ordinances and regulations pertaining thereto and in strict conformity with the plans, drawings, statements or specifications submitted to the proper authoriifiss , of Miami Shores Village. In as cepting this permit I assume responsibility for ell work done by either, myself, my agent, servant or employee. BY AUTHORITY AS 0 T nt4E' BUILDING ELECTRICAL PLUMBING ROOFING Owner of Building ❑ DATE , ❑ PERMIT Na 7 t r a ctof ❑ Work to be performed under this Permit Architect Contractor or Builder Legal Lot Description • CONTRACTOR OR BUILDER MIAMI SHORES VILLAGE, FLORIDA BI. 0 f a-GC - .T.ra••- 19 Subdi- vision Address of Value of I Amount of r, ` Building a Project $ - I Permit $ This permit is granted to the contractor or builder named above to construct the building or to install the equipment or device described in the applica- tion herefor in strict compliance with all ordinances pertaining thereto and with the understanding that the work will be performed in compliance with any plans, drawings, statements or specifications that may have been submitted to and approved by the proper municipal authorities. This Permit may be revoked at any time if the work is not done in compliance with such ordinances or if the plans are changed without authorization. A further condition upon which this permit is granted is the understanding that the contractor or builder named above assumes the responsibility for a thorough knowledge of the ordinances and regulations pertaining to the work covered hereby whether shown on the plans or drawings or in the statements or specifications and that he assumes respon- sibility for work done by his agents, servants or employees. - r -% ' Signed. INSPECTOR In consideration of the issuance to me of this permit I agree to perform the work covered hereunder in compliance with all ordinances and regulations pertaining thereto and in strict conformity with the plans, drawings, statements or specifications submitted to the proper authorities of Miami Shores Village. In ao cepting this permit I assume responsibility for all work done by Dither, myself, my agent, servant or employee. BY AUTHORITY ABBOT c 'oNiu 62 ‘A \(Lact,u, 4Qe, -L„Q +0Let)-- v cal Cr_ cu‘&0L._ rau ice c)-e-ct �=� ( (04 Riri Yo-G JP] OWNER'S NAME i .a Elm ze "i 5 NEW CONSTRUCTION PRESENT ADDRESS 615 • E • 9 7 - N Cr. STORIES 04e LICENSE NO. PHONE NO. 615 JOB LOCATION (ST. OR AVE.) T6 ?4€. 41 - ST. J DESCRIPTION t f/nf .SGr'B O n pee•c.� 4.41 l i.4Ll .I #'• re. % 4 14.n C. e a A..�M.n ...71 Tr..... e LOT (3 .4 14 BLOCK tot M to. 04 SUBDIVISION Skeet S sac+. 4 121 71,-( GENERAL CONTRACTOR C.+ 54001 13 .s. Dee. S APPROVED ADDRESS r '7SSo t.�. - Z°'_"0 CA. 14 tale f PHONE NO. LICENSE NO. 09 45 5 BUILDING PERMIT NO. 1° DATE x'4• 413 PERMIT FEE $ / a 6 SUBMITTED TO VILLAGE COUNCIL BUILDER'S BOND NO. / 03ZL DATE '9' `a X111.4 ZONE REQUIREMENTS CU. FT. PLAN CU'BE g f'Z.1 CU. FT. EST. .. COST $ • 000 DRAWINGS. SPECIFICATIONS. RESTRICTIONS AND CUBE CHECKED BY: L.•" R• DAT= 94 -G BUILDING PERMIT AND INSPECTION RECORD -MIAMI SHORES VILLAGE NEW CONSTRUCTION TYPE .SC✓e STORIES 04e ROOF CONSTRUCTION "Z.... 14 co" INTERIOR CONSTRUCTION REPAIRS J DESCRIPTION t f/nf .SGr'B O n pee•c.� 4.41 l i.4Ll .I #'• re. % 4 14.n C. e a A..�M.n ...71 Tr..... e ALTERATION P DESCRIPTION re L sr, /ac SC./•Ge "7 - ADDITION SUBMITTED TO PLANNING BOARD APPROVED REJECTED REFERRED TO COUNCIL REASONS RE- SUBMITTED TO PLANNING BOARD SUBMITTED TO VILLAGE COUNCIL REMARKS CERTIFICATE OF OCCUPANCY NO. I ISSUED BY TO DRAWINGS. SPECIFICATIONS. RESTRICTIONS AND CUBE CHECKED BY: L.•" R• DAT= 94 -G BUILDING PERMIT AND INSPECTION RECORD -MIAMI SHORES VILLAGE INSPECTIONS DATE BY INSPECTIONS DATE BY FOUNDATION BY ROOF SEPTIC TANK FEE BEAMS & LINTELS S POOL $ TUB & TOP OUT FRAMING SOLAR HEATER $ AIR COND. S GAS FINAL MOTORS S CLEAN UP $ FIXTURES SLAB SEPTIC TANK 4 FIXTURES & FINAL SLAB SOLAR HEATER SPECIALS PERMITS PERMIT NO. DATE FEE TEMPORARY SERVICE RE- INSPECT BY S SEPTIC TANK FEE TEMPORARY SERVICE S SEWER $ TUB & TOP OUT S SOLAR HEATER $ RANGE CONN. S GAS SEWER MOTORS S $ FIXTURES A INSPECTIONS DATE BY RE- INSPECT BY RE- INSPECT BY ROUGHING DATE FEE TEMPORARY SERVICE $ TUB & TOP OUT H. W. HEATER CONN $ RANGE CONN. RANGE CONN. SEWER MOTORS $ FIXTURES SEPTIC TANK 4 FIXTURES & FINAL S SOLAR HEATER FIXTURES GAS CONTRACTOR PHONE PERMIT NO. 1 DATE FEE S NEW BLDG. 1 ALTERATION I ADDITION REPAIRS SPECIAL PERMITS PERMIT NO. DATE FEE TEMPORARY SERVICE $ H. W. HEATER CONN. H. W. HEATER CONN $ RANGE CONN. RANGE CONN. $ MOTORS $ FIXTURES 4 FIXTURES & FINAL S INSPECTIONS DATE BY RE- INSPECT BY RE- INSPECT BY TEMP. SERVICE ROUGHING H. W. HEATER CONN RANGE CONN. FIXTURES & FINAL APPROVAL TO POWER CO. FOR SERVICE DATE PERMIT NO. NEW BLDG. CONTRACTOR BUILDING INSPECTIONS PLUMBING PERMITS & INSPECTIONS DATE 1 ALTERATION 1 ADDITION PHONE FEE $ REPAIRS ELECTRICAL PERMITS & INSPECTIONS BY '� OWNER'S NAME NEW CONSTRUCTION PRESENT LO e� 4 ' 4 114 ADDRESS a---, BLO ? 10/ y� � o 6 1 ioc e. = A1 LICENSE NO. SUBDIVISION p L=61 p LA- PHONE NO. 7 ®p ..-- 1 , a � , ~ a � J BLOC ION (ST A VE. ) 6eS H- e 51 S7 _ GENERAL CONTRACTOR ra bt-t=leLe DAl 0.- -fie ,e Es era ADDRESS . PHONE NO. LICENSE NO. ''y) BUILDING PERMIT NO. . 7 7i DATE 7 —I ��' ®'m PERMIT FEE $ ZS BUILDER'S BOND NO. Co"'"-- Co"'"-- DATE S 1 , a - 0 mo MA t'. a ,, ZONE REQUIREMENTS CU. FT. PLAN CUBE CU. FT. 4 EST. COST $ 4 4 O DRAW NGS, SPECIFICATIONS, RESTRICTIONS AND CUBE CHECKED BY: (.` . M Ar e.. IL. t�'�— BUILDING PERMIT AND INSPECTION RECORD —MIAMI SHORES VILLAGE `1„,./ — Ca' C DATE NEW CONSTRUCTION TYPE STORIES ROOF CONSTRUCTION INTERIOR CONSTRUCTION REPAIRS DESCRIPTION a Q tt�t�. ,eC" - l ®� i c3 I G■O 114 b ad L e— — 4 O ALTERATION DESCRIPTION ADDITION SUBMITTED TO PLANNING BOARD APPROVED REJECTED REFERRED TO COUNCIL REASONS RE- SUBMITTED TO PLANNING BOARD , SUBMITTED TO VILLAGE COUNCIL REMARKS CERTIFICATE OF OCCUPANCY NO. I ISSUED BY TO DRAW NGS, SPECIFICATIONS, RESTRICTIONS AND CUBE CHECKED BY: (.` . M Ar e.. IL. t�'�— BUILDING PERMIT AND INSPECTION RECORD —MIAMI SHORES VILLAGE `1„,./ — Ca' C DATE , INSPECTIONS DATE BY INSPECTIONS DATE BY FOUNDATION I ROOF RE- INSPECT BY B`E 1S & LINTELS POOL FEE TEMPORARY SERVICE F AING I SEWER AIR COND. TUB & TOP OUT $ FINAL $ CLEAN UP S GAS SLAB MOTORS 5 RANGE CONN. 5 SLAB SEPTIC TANK $ SPECIALS PERMITS PERMIT NO. DATE FEE TEMPORARY SERVICE RE- INSPECT BY $ SEPTIC TANK FEE TEMPORARY SERVICE $ SEWER _ TUB & TOP OUT $ SOLAR HEATER $ RANGE CONN. S GAS SEWER MOTORS 5 RANGE CONN. 5 de INSPECTIONS DATE BY RE- INSPECT BY RE- INSPECT BY ROUGHING DATE FEE TEMPORARY SERVICE ROUGHING $ TUB & TOP OUT $ RANGE CONN. SEWER MOTORS RANGE CONN. 5 FIXTURES SEPTIC TANK $ S SOLAR HEATER FIXTURES & FINAL FIXTURES GAS CONTRACTOR PHONE PERMIT NO. I DATE FEE 5 NEW BLDG. 1 ALTFRATION 1 ADDITION REPAIRS SPECIAL PERMITS PERMIT NO. DATE FEE TEMPORARY SERVICE ROUGHING $ H. W. HEATER CONN. $ RANGE CONN. $ MOTORS RANGE CONN. 5 FIXTURES $ S INSPECTIONS DATE BY RE- INSPECT BY RE- INSPECT BY TFMP. SERVICE ROUGHING H. W. HEATER CONN RANGE CONN. FIXTURES & FINAL CONTRACTOR PERMIT NO. NEW BLDG. BUILDING INSPECTIONS PLUMBING PERMITS & INSPECTIONS • DATE ALTERATION 1 ADDITION PHONE FEE $ REPAIRS ELECTRICAL PERMITS & INSPECTIONS APPROVAL TO POWER CO. FOR SERVICE DATE BY ITEMS SUB CONTRACTORS & SUPPLIERS NA 1 & ' DDRESS 1. Architectural Fee lans ' milig FREW 2. As•halt walks drives. etc. 3. Cabinets m Bath Vanit _�1.�- _. -=ll3 ME 4o Cabinets ® Kitchen , • 10taIN= a II ! ., 5. Cabinets Medicine �/ �. 6 Cabinets Unit Closet L. 7. Cleanin: 1 - !A-- � / .- 8. Clearin: Site ' M ! ; _; 9. Concrete Foundation. Slabs . Beams 10. Concrete .� Walks , drives . etc. t P -�1�_ !_�� � W! A ,:'.,,_- .. , 11. Contractors Fee s�IM�W 12, Electric Fixtures IeaCT,, �- .KjQEMIIM /W4._ �'�t 1 010 Jam._:_., 13. Electric Wirin- 14. E.ui.ment Rental IL 15. Excavation �!�:5r41II 16. Fill for S1 ' G✓�. 17 Floors - Finish wood & kitchen 0011 18. Floors - Terrazzo 19. Gara:e Doors N , : ' i ce' 20.lass. Slidin: Doors " .' • 21 - Hardware ® Finish L, !�wtin=!! 22. Hardware ® Rough Alb. N 1 I 23. Heatin: L,.�M,. 24. nsurance Liabilit come. bond "i" Y!' +4, ,250 'Labor m Pa oll . • 1 26. Labor - Contract ``3 „ ; •} Wit,:, 27. Labor - Contract �����!1 _._ 28. Landsca•in, Fill. Gradin: � 1� �r A. 4 11IL ` 29. Lath. Plaster Stucco �-!'- __ JO 30 Lumber All lit r'!'I'�►1���l11111 blr 31. Masonr Labor 32. Masonr Materials . Block - Z "`'�` �w'�`,� ` 33. Millwork ~' !I.' 34. Miscellaneous �r�," 35. Ornamental Iron Work 11111111111111111111111111101111111111.. . 36. Oven & Plate m Built in �'g 37. Overhead 111.1M.IP, . ..° 11.1111111111111111.1111111 �� �r011&-...WM - 38. Paintin. 39, Permits. Tem.orar Power �i - '� • 40, Pilin: Foundation 41. Plumbin: Com•lete ', 1 - s ._ ll� 42. Pool - Swimmin: . 43. Roofin: & Sheet Metal Work 44. Roof Trusses - Pre -fab.. ..P t� =-° ' 1 - 45. Screen Enclosures 46. Se tic Tank or Sewera:e m' %• t_ ' 47. Shower or Tub Enclosures , 48. Steel - Reinforcin: & str1. -4‘ a 'TV 49. Su ervision 1 - 1 50, Surve s 510 Tile & Marble hl 52. Water ® Public - Milailliall.1111111111111 53. Water m Well & Pm. AN ! . 54. Windows - Glazin: & Screens `% /• ! W �' 550 Window Frames - Concrete L�1W ., .�5. ,� • ;Y Prior to a final inspecti. n this application must t'e filled out; if sub contractors have failed to take out permits the general contractor shall be responsible for the permit and fee. A final inspection must be made prior to the release to Florida Power and Light Co, and the issueance of a certificate of occupancy. '' JOB - ADDRESS CA E I v \\ 1E.. oliasam . . 1.,(c)0E) LOT 1 BLOCKY:7 BUILDER MIAMI SHORES VILLAGE APPLICATION FOR FINAL INSPECTION SUB. DAY LABOR CONTRACT DATE • TOTAL. CIE b'� �IIIFII�A�IE OIF OCCUPANCY MIAMI SHORES VILLAGE, FLORIDA BUILD II G DIVISION •N 164 Miami Shores Village, Florida, 9 — 15 = 66 John Lan: Loob Owner, Agent or Tenant of Building-- - Lot 13 & 14 _ Bloc kk 1 °— Street Address 615 N. E. 97 St, Approved use by occupancy 4 bedroom - 3 bath residence deuce 7308, 7720 -encl. 7729 -•00 Remarks - This Certificate of Occupancy is issued to the above express ress that the applicant will for building at above named location only upon abide by and comply with all conditions of Ordinances Nos. 92, 93, 94 and 97, known as he Zoning, Electrical, Plumbing and Building Ordinances of Miami Shores Village pertaining the erection, construction, alteration or remodeling of buildings or structure , Plan cube - 30191.89 _ 2 % ' Encl. cost - 500 BIDING DIVISION Pool cost -5,00 Subdivision M• S. Sect, #4 Owner 0 Interply/ Surfacing/ • Slope Bitumen Type Materials per 100 ft Interply Base Ply' 1 ply Felts 3 plies Bitumen 0-14" 11, 111 75 Ibs 1 / 2 -3" III, IV 75 Ibs 0 -3" PermaMop 75 Ibs 3 -6" IV 60 Ibs 3 -6" PermaMop 60 Ibs Surfacing Asphalt or 0'1/2" II, III 15 -20 Ibs 1/2-3" III, IV 15 -20 Ibs 3 -6" IV 15 -20 Ibs 0 -6" PermaMop 15-20 lbs Emulsion or 0 -6" Fiberated 3 gal Aluminum 0 -6" Fiberated 1.5 -2 gal Nallable Deck Red Rosin Wood Decks Y tr r1- .r 12" Nailable /Smooth Asphalt - 43 -NS PermaMop i . 43E -NS PERMAPLY-R 1 • 1 • Intermediate Fasteners te o.e. /� 2" sldNap 24" Sidelap Nails a • 10" 4 d 38 Coating Nominal Installed Weight -127 lb/100 ft Nominal weights provided for design consideration. Application of Base Ply'. 2 Apply PERMAPLY base ply with 2' (min. 1 ") side laps and end laps. Mechanically secure maximum 9" o.c. at side laps and maximum 18' o.c. on two lines 11 -13" from each edge (staggered). Mechanical securement using mechanical fasteners recommended by the deck manufacturer. Large -head Simplex nails (minimum "X." head diameter), or the Senco Fastening system may be used on wood or plywood decks only. To minimize wrinkles and buckles allow enough time for base ply to relax unrolled prior to attachment. Application of Plies Embed three plies of PERMAPLY in shingle fashion (starter sheets required), lapping 241' into uniform solid moppings of hot bitumen, using 23 -45 lb/100 ft per ply. Starter plies should be cut to dimen- sions so as to preclude coincident side laps to the base ply. Plies may be left exposed up to three months without surfacing. Application of Surface • Bitumen —coat entire surface using a uniform, solid 15 -20 lb/ 100 ft mopping of hot bitumen. • Emulsion —coat entire surface using not Tess than 3 gal /100 ft? • Aluminum Coating —coat entire surface using 1.5-2 gal /10011' appied with brush o squeegee ' Base Pty —may be specified PERMAPLY Na 28, PERMAPLY No. 80 PERMAPLY-IV, PERMAPLY -8, or PERMAPLY-R. If PERMAPLY Na 28 base sheet or PERMAPLY No. 80 not used, base ply used must be the same as the ply felts. 'Red Rosin — recommended on ea wood and plywood decks, required on wood plank decks. Not required where PERMAPLY No 28 or PERMAPLY No. 8013 used as base ply. NOTE: Recessing Is required as normal maintenance by owner. 42 -NS 42E-NS . PERMAPLY-6 41 -NS 41E -NS PERMAPLY-IV General Note All general instructions contained in the General Requirements section of current Owens- Corning Membrane Roofing Products Reference and Application Guide /Guaranty Guidelines, Pub. No. 1 -RW -18088 shall be considered part of this specification. Drainage Roof decks must be graded to drain all water freely, Drain* shell be sufficient in number and size to am" repel elirlNrlenon'4 /polo from trio remit homier , Holing Ply felts must be back nailed on inclines exceeding 2' per foot. On slopes between 2' and 3' per foot, back nailing shall not exceed 8 foot on center. On slopes greater than 3' per foot, back nailing shall not exceed 48' on center. Felts are to run parallel to the incline and must be secured 12" in from the back edge of the felt. Each nail must be covered by succeeding plies. High temperature areas may require nailing on lower slopes. ' nn,r ,,.,,r I ■•,,r 11.1/r lc tar I ',vs- I ,.. ,,. Flashings See Flashing Section of current Owens - Corning Membrane Roofing. Products Reference and Application Guide /Guaranty Guidelines, Pub. No. 1 -RW- 18088. Ply Edge To Ply (Op. PERMAPLY • P lea Back o1 Ply To Nall r.1