1250 NE 97 St (9)Jack Ritter
BUILDING PERMIT NO.
ZONE
X
NEW CONSTRUCTION
REPAIRS
ALTERATION
ADDITION
JOB LOCATION (ST. OR AVE.)
1250 N. E. 9 7th Street
GENERAL C.ONTRACTOR
9
REQUIREMENTS 25,000
SUBMITTED TO PLANNING BOARD
gar•
RE- SUBMITTED TO PLANNING BOARD
SUBMITTED TO VILLAGE COUNCIL
TYPE
CBS
CERTIFICATE OF OCCUPANCY NO. 945
DATE 3/
APPROVED
PRESENT ADDRESS
130 N. W. 97th Street
LOT BLOCK
*16 &vi 50'1 4
ADDRESS
130 N. W. 97th Street
CU. FT.
DRAWINGS, SPECIFICATIONS, RESTRICTIONS AND CUBE CHECKED BY: J121
1. Tile
REJECTED
PERMIT FEE S 18.00
PLAN CUBE 2 79 945 CU. FT.
STORIES I ROOF CONSTRUCTION
DESCR IPTION
REFERRED TO COUNCIL
REMARKS
Earltori Shores
PHONE NO.
7 -2108
BUILDING PERMIT AND INSPECTION RECORD -MIAMI SHORES VILLAGE
UBDIVISION
PHONE NO.
LICENSE NO.
35
BUILDER'S BOND
NO. 60 9 DATE Trans.
EST. COST 5 14, 000.00
DATE
INTERIOR CONSTRUCTION
REASONS
3/24/50
Oak Strip Floors - Plaster Malls
Li® Rm - Jal. Porch w /Din Area - Kit - 3 Bed Ems - 2 Baths - 2 car att.
DESCRIPTION
ISSUED 1/2/5 BY JDH TO Jack Ritter, 1250 NE 97th St.
INSPECTIONS
DATE
BY
RE- INSPECT
BY
RE- INSPECT
BY
FOUNDATION
3/25/5
J TDH
FEE
TEMPORARY SERVICE
3/25/50
$ 1.00
BEAMS & LINTELS
4/5 5*
. .
5/4/50
$ 1.00
SEWER
FRAMING
19/50
JDH
$
$
GAS
$
$
$
$
FINAL
7/
J
REINSPECT
BY
RE- INSPECT
BY
'CLEAN -UP
3/31/50
JDH
ROUGHING
CONTRACTOR WOO OS � 'AO/'9 S'F/G a.
PHONE
PERMIT NO. /d.2 .5 51' I DATE //— / O — .SO
FEES 9• a 2
NEW BLDG. le.. I ALTERATION
ADDITION
REPAIRS
SPECIAL PERMITS
PERMIT NO.
DATE
FEE
TEMPORARY SERVICE
3/25/50
$ 1.00
$
SEPTIC TANK LeonPost
9289
5/4/50
$ 1.00
SEWER
$
$
SOLAR HEATER
$
$
GAS
$
$
$
$
INSPECTIONS
DATE
BY
REINSPECT
BY
RE- INSPECT
BY
ROUGHING
3/31/50
JDH
ROUGHING
GAS
JDH
H. W. HEATER CONN
SEWER .
RANGE CONN.
SEPTIC TANK .
5/5/50
JDH
t
SOLAR HEATER
yD qn[p��
FIXTURES & FINAL / 31 J 5
p ,
FIXTURES
7/24x/50
�7y��
JDH
CONTRACTOR
PHONE
PERMIT NO. DATE
FEE $
NEW BLDG. 1 ALTERATION 1 ADDITION
REPAIRS
SPECIAL PERMITS
PERMIT NO.
DATE
FEE
TEMPORARY SERVICE
9116
3/25/50
$ 1.00
H. W. HEATER CONN.
$ ,
RANGE CONN.
$
11 4 OTO R S
$
- RES
$
71
$
INSPECTIONS
DATE
BY
RE- INSPECT
BY
RE- INSPECT
BY
TEMP. SERVICE
ROUGHING
4/19/50
JDH
H. W. HEATER CONN
RANGE CONN.
t
yD qn[p��
FIXTURES & FINAL / 31 J 5
p ,
BUILDING INSPECTIONS
, PLUMBING PERMITS & INSPECTIONS
ELECTRICAL PERMITS & INSPECTIONS
APPROVAL TO POWER CO. FOR SERVICE DATE
BY JDH
7111fr P �s OWNER'S NAME
P, a,,
. t� » 610°
• Q i 4
PRESENT ADDRESS
I S Ra.6'0 46. iv
LICENSE NO.
PHONE NO.
JOB LOCATION (ST. OR AVE.)
ass-® ai.e:- V 7— e w.
LOT
os'
BLOCK
e
SUBDIVISION
C',;,a. 6 c=2).i�= .
GENERAL CONTRACTOR
ADDRESS
PHONE NO.
LICENSE NO.
c , 7
BUILDING PERMIT IT NO. / // .7
DATE � ' ����, 7 (
PERMIT FEE $ al. '7
BUILDER'S BOND
NO. e DATE
Y o gg I�pO Cb
ZONE REQUIREMENTS CU. FT.
PLAN CUBE 0 0 FJ 7 4.3 L CU. FT.
°O
EST. COST $ 0,a:7CD
,,��11 C� r , n
DRAWINGS. SPECIFICATIONS, RESTRICTIONS AND CUBE CHECKED BY: ... -. Q�E' ' OPL
�
I DATE
3 °a' • e Q
NEW CONSTRUCTION
TYPE
STORIES
CD6Jd.
ROOF CONSTRUCTION
6.=-D6 6- C e
INTERIOR CONSTRUCTION
p 5. G_9,_ 4'adg g�d000
REPAIRS
DESCRIPTION v
�, y qp
/ 8a
ft'�Q044' o ec,c.— ?lo�G CQc Ze e �a ' U 2S A @�S C C 9 Q e: r
§CRIPTION&'
DE
ALTERATION
p
ADDITION Wb9d �SCS 6 ' a, c ny e
SUBMITTED TO PLANNING BOARD
APPROVED
REJECTED
REFERRED TO COUNCIL
. REASONS
RE- SUBMITTED TO PLANNING BOARD
SUBMITTED TO VILLAGE COUNCIL
REMARKS
CERTIFICATE OF OCCUPANCY NO.
ISSUED
BY
TO
BUILDING PERMIT AND INSPECTION RECORD —MIAMI SHORES VILLAGE
INSPECTIONS
DATE
BY
INSPECTIONS
DATE
BY
tiUNDATION
$
SEWER
ROOF
$
BEAMS & LINTELS 1
TUB & TOP OUT
POOL
$
GAS
FRAMING
$
y
AIR COND. /3G
3-1i...-
N4ccN
2eFr:-
FINAL
$
FIXTURES
CLEAN UP
SEPTIC TANK
5
SLAB
G
PAro /3117
FAR, c a
/2131
ii 1( -7I
1'a6'�l
• Nni • a
cruz
?: Nw.dw
(x- 2
SLAB
TEMPORARY SERVICE
DATE BY
RE - INSPECT
$
SEPTIC TANK
BY
ROUGHING
$
SEWER
TEMPORARY SERVICE
$
SOLAR HEATER
TUB & TOP OUT
H. W. HEATER CONN
$
GAS
RANGE CONN.
$
'SEWER
MOTORS
a
INSPECTIONS
DATE BY
RE - INSPECT
BY
RE - INSPECT
BY
ROUGHING
DATE
FEE
TEMPORARY SERVICE
$
TUB & TOP OUT
H. W. HEATER CONN
$
RANGE CONN.
'SEWER
MOTORS
$
FIXTURES
SEPTIC TANK
5
FIXTURES & FINAL
SOLAR HEATER
FIXTURES
GAS
CONTRACTOR alad7i. .� +. an. �/��� - 4? _
PHONE
v...-7-6,-1 v...-7-6,-1
41- " C "' PERMIT NO. _, "�� I DATE ��'�°�� (
FEE $ ij S 4'b
NEW BLDG. I ALTERATION 1 ADDITION
REPAIRS
SPECIAL PERMITS PERMIT NO.
DATE
FEE
TEMPORARY SERVICE
$
H. W. HEATER CONN.
H. W. HEATER CONN
$
RANGE CONN.
$
MOTORS
$
FIXTURES
5
FIXTURES & FINAL
INSPECTIONS DATE
BY
RE- INSPECTI BY
RE- INSPECT BY
TEMP. SERVICE
I
ROUGHING
H. W. HEATER CONN
RANGE CONN.
FIXTURES & FINAL
ILs
•° a
s3
SPECIALS PERMITS
BUILDING INSPECTIONS
PLUMBING PERMITS & INSPECTIONS
CONTRACTOR MAIL t��T� M VI.N 1 Yrc- -� PHONE
PERMIT NO. �Z 1h� I DATE 2 'ZS '�I� FEE $ ,O
•s NEW BLDG. I ALTERATION 1 ADDITION
PERMIT NO.
APPROVAL TO POWER CO. FOR SERVICE DATE
DATE
ELECTRICAL PERMITS & INSPECTIONS
REPAIRS
FEE
BY
BUILDING
ELECTRICAL
PLUMBING
ROOFING
Owner of
Building
Architect
Contractor
or Builder
Legal
Description
Address of
Building
Lot
MIAMI SHORES VILLAGE.
o PERMIT N9 8226
`'CONTRACTOR OR BUILDER
Bl.
Subdi-
vision
FLORIDA
Work to be performed under this Permit
Sq. Ft
Value of
Project $
DATE _L ] 95
Contractor's
License No.
Amt. of
Permit $
This permit is granted to the contractor or builder named above to construct the building or to install the equipment or device described in the application
herefor in strict compliance with all ordinances pertaining thereto and with the understanding that the work will be performed in compliance with any plans,
drawings, statements or specifications that may have been submitted to and approved by the proper municipal authorities. This Permit may be revoked at any
time if the work is not done in compliance with such ordinances or if the plans are changed without authorization. A further condition upon which this permit is
granted is the understanding that the contractor or builder named above assumes the responsibility for a thorough knowledge of the ordinances and regulations
pertaining to the work covered hereby whether shown on the plans or drawings or in the statements or specification£, and that he assumes responsibility for work
done by his agents, servants or employees.
Signed:
BY
INSPECTOR
In consideration of the issuance to me of this permit I agree to perform the work covered hereunder in compliance with all ordinances and regulations
pertaining thereto and in strict conformity with the plans, drawings, statements or specifications submitted to the proper authorities of Miami Shores Village.
In accepting this permit I assume responsibility for all work done by either, myself, my agent, servant or employee.
BY AUTHORITY
MIAMI SHORES VILLAGE, FLORIDA
BUILDING ❑
ELECTRICAL ❑ PERMIT o
PLUMBING ❑ N e 8112
ROOFING ❑
Architect
Contractor
or Builder
Legal
Description
Address of
Building
Lot
❑ Work to be performed under this Permit_
Owner of
Building
CONTRACTOR OR BUILDER
Bl.
Subdi-
vision
Sq. Ft
Value of
Project $
DATE 195
Cont:ractor's
License No
Amt. of
Permit $
This permit is granted to the contractor or builder named above to construct the building or to install the equipment or device described in the application
herefor in strict compliance with all ordinances pertaining thereto and with the understanding that the work will be performed in compliance with any plans,
drawings, statements or specifications that may have been submitted to and approved by the proper municipal author:ties. This Permit may be revoked at any
time if the work is not done in compliance with such ordinances or if the plans are changed without authorization. A further condition upon which this permit is
granted is the understanding that the contractor or builder named above assumes the responsibility for a thorough knowledge of the ordinances and regulations
pertaining to the work covered hereby whether shown on the plans or drawings or in the statements or specifications and that he assumes responsibility for work
done by his agents, servants or employees.
Signed • BY
INSPECTOR
In consideration of the issuance to me of this permit I agree to perform the work covered hereunder in compliance with all ordinances and regulations
pertaining thereto and in strict conformity with the plans, drawings, statements or specifications submitted to the proper authorities of Miami Shores Village.
In accepting this permit I assume responsibility for all work done by either, myself, my agent, servant or employee.
BY AUTHORITY
ctf. occ. 7- 24—.5O PAID BY
YEAR
ANNUAL TAX
PERIOD USED
AMOUNT PAID
DATE PAID
RECEIPT
NUMBER
∎J.,
<(
1,
1 95/
/02 en'
/02 / - 5/
id- %
7%
gad -51
c•° d .
/67/it
(C.
/
)
/
/j ° °,
ADDRESS 1250 IL
3/it 9 • Earlton Shores
LEGAL t 1/2 16 & W 501 15 RECORD GARBAGE TAX
MIAMI SHORES VILLAGE
APPLICATION FOR FINAL INSPECTION
'Prior to a final inspection this application must be filled out; if sub contractors have
failed to take out permits the general contractor shall be responsible for the permit and
fee. A final inspection must be made prior to the release to Florida Power and Light Co.
and the issueance of a certificate of occupancy.
OWNER 6;5' "IPA? / /,� JOB ADDRESS f 67,7 /1/i s/
• LOT ' / w /j 1 /,j LOCK Q SUB, />iZ ,ei' /o ✓
BUILDER
. Architectural Fee lans
2. Asphalt walks, drives, etc.
3. Cabinets - Bath Vanit
4. Cabinets - Kitchen
5. Cabinets - Medicine -
. Cabinets - Unit Closet
7. Cleanin
8. Clearing Site
9. Concrete - Foundation. Slabs, Beams
10. Concrete - Walks drives. etc.
11. Contractors Fee
12. Electric Fixtures
13. Electric Wirin
14 Equipment Rental
15. Excavation
16. Fill for Ste;
17. Floors - Finish wood & kitchen
18, Floors - Terrazzo
e Doors
19. Gara
20. Glass. Slidin: Doors
21. Hardware - Finish
22. Hardware Rou:h
23. Heating
24. Insurance - Liabilit .com.. -bond
25. Labor - Pa oll
26. Labor - ontract
27. Labor - Contract
28. Landsca•in Fill. Gradin
29. Lath. Plaster. Stucco
.30. Lumber All
31. Masonry Labor
32. Masonr Materials, Block
33. Millwork
34. Miscellaneous
35. Ornamental Iron Work
36. Oven & Plate - Built -in
37. Overhead
38. Painting
39. Permits Temporary Power
40. Pilin: (Foundation)
41. Plumbin: Com lete
42. Pool - Swimmin
43. Roofing & Sheet Metal Work
44. Roof Trusses - Pre -fab.
45. Screen. Enclosures
46 Se tic Tank or Sewerage
47. Shower or Tub Enclosures
48. Steel - Reinforcing & strl.
49. Su ervision
50. Surveys
51. Tile & Marble
52. Water - Public
53. Water - Well & alma_
54. Windows - Glazin: & Screens
55. Window Frames - Concrete
ITEMS
CONTRACTOR
DAY LABOR CONTRACT DATE $ / 197/
SUB CONTRACTORS & SUPPLIERS
NAME & AD 'SS / e o
" ''
ff
YJIrk'4Jiv o /dN
4 _r Le/ .P/ -' o
TOTAL
m o o
O 0 o.2
• . q 0
,t/W /7
o 6
.0c7, p o