Loading...
1250 NE 97 St (9)Jack Ritter BUILDING PERMIT NO. ZONE X NEW CONSTRUCTION REPAIRS ALTERATION ADDITION JOB LOCATION (ST. OR AVE.) 1250 N. E. 9 7th Street GENERAL C.ONTRACTOR 9 REQUIREMENTS 25,000 SUBMITTED TO PLANNING BOARD gar• RE- SUBMITTED TO PLANNING BOARD SUBMITTED TO VILLAGE COUNCIL TYPE CBS CERTIFICATE OF OCCUPANCY NO. 945 DATE 3/ APPROVED PRESENT ADDRESS 130 N. W. 97th Street LOT BLOCK *16 &vi 50'1 4 ADDRESS 130 N. W. 97th Street CU. FT. DRAWINGS, SPECIFICATIONS, RESTRICTIONS AND CUBE CHECKED BY: J121 1. Tile REJECTED PERMIT FEE S 18.00 PLAN CUBE 2 79 945 CU. FT. STORIES I ROOF CONSTRUCTION DESCR IPTION REFERRED TO COUNCIL REMARKS Earltori Shores PHONE NO. 7 -2108 BUILDING PERMIT AND INSPECTION RECORD -MIAMI SHORES VILLAGE UBDIVISION PHONE NO. LICENSE NO. 35 BUILDER'S BOND NO. 60 9 DATE Trans. EST. COST 5 14, 000.00 DATE INTERIOR CONSTRUCTION REASONS 3/24/50 Oak Strip Floors - Plaster Malls Li® Rm - Jal. Porch w /Din Area - Kit - 3 Bed Ems - 2 Baths - 2 car att. DESCRIPTION ISSUED 1/2/5 BY JDH TO Jack Ritter, 1250 NE 97th St. INSPECTIONS DATE BY RE- INSPECT BY RE- INSPECT BY FOUNDATION 3/25/5 J TDH FEE TEMPORARY SERVICE 3/25/50 $ 1.00 BEAMS & LINTELS 4/5 5* . . 5/4/50 $ 1.00 SEWER FRAMING 19/50 JDH $ $ GAS $ $ $ $ FINAL 7/ J REINSPECT BY RE- INSPECT BY 'CLEAN -UP 3/31/50 JDH ROUGHING CONTRACTOR WOO OS � 'AO/'9 S'F/G a. PHONE PERMIT NO. /d.2 .5 51' I DATE //— / O — .SO FEES 9• a 2 NEW BLDG. le.. I ALTERATION ADDITION REPAIRS SPECIAL PERMITS PERMIT NO. DATE FEE TEMPORARY SERVICE 3/25/50 $ 1.00 $ SEPTIC TANK LeonPost 9289 5/4/50 $ 1.00 SEWER $ $ SOLAR HEATER $ $ GAS $ $ $ $ INSPECTIONS DATE BY REINSPECT BY RE- INSPECT BY ROUGHING 3/31/50 JDH ROUGHING GAS JDH H. W. HEATER CONN SEWER . RANGE CONN. SEPTIC TANK . 5/5/50 JDH t SOLAR HEATER yD qn[p�� FIXTURES & FINAL / 31 J 5 p , FIXTURES 7/24x/50 �7y�� JDH CONTRACTOR PHONE PERMIT NO. DATE FEE $ NEW BLDG. 1 ALTERATION 1 ADDITION REPAIRS SPECIAL PERMITS PERMIT NO. DATE FEE TEMPORARY SERVICE 9116 3/25/50 $ 1.00 H. W. HEATER CONN. $ , RANGE CONN. $ 11 4 OTO R S $ - RES $ 71 $ INSPECTIONS DATE BY RE- INSPECT BY RE- INSPECT BY TEMP. SERVICE ROUGHING 4/19/50 JDH H. W. HEATER CONN RANGE CONN. t yD qn[p�� FIXTURES & FINAL / 31 J 5 p , BUILDING INSPECTIONS , PLUMBING PERMITS & INSPECTIONS ELECTRICAL PERMITS & INSPECTIONS APPROVAL TO POWER CO. FOR SERVICE DATE BY JDH 7111fr P �s OWNER'S NAME P, a,, . t� » 610° • Q i 4 PRESENT ADDRESS I S Ra.6'0 46. iv LICENSE NO. PHONE NO. JOB LOCATION (ST. OR AVE.) ass-® ai.e:- V 7— e w. LOT os' BLOCK e SUBDIVISION C',;,a. 6 c=2).i�= . GENERAL CONTRACTOR ADDRESS PHONE NO. LICENSE NO. c , 7 BUILDING PERMIT IT NO. / // .7 DATE � ' ����, 7 ( PERMIT FEE $ al. '7 BUILDER'S BOND NO. e DATE Y o gg I�pO Cb ZONE REQUIREMENTS CU. FT. PLAN CUBE 0 0 FJ 7 4.3 L CU. FT. °O EST. COST $ 0,a:7CD ,,��11 C� r , n DRAWINGS. SPECIFICATIONS, RESTRICTIONS AND CUBE CHECKED BY: ... -. Q�E' ' OPL � I DATE 3 °a' • e Q NEW CONSTRUCTION TYPE STORIES CD6Jd. ROOF CONSTRUCTION 6.=-D6 6- C e INTERIOR CONSTRUCTION p 5. G_9,_ 4'adg g�d000 REPAIRS DESCRIPTION v �, y qp / 8a ft'�Q044' o ec,c.— ?lo�G CQc Ze e �a ' U 2S A @�S C C 9 Q e: r §CRIPTION&' DE ALTERATION p ADDITION Wb9d �SCS 6 ' a, c ny e SUBMITTED TO PLANNING BOARD APPROVED REJECTED REFERRED TO COUNCIL . REASONS RE- SUBMITTED TO PLANNING BOARD SUBMITTED TO VILLAGE COUNCIL REMARKS CERTIFICATE OF OCCUPANCY NO. ISSUED BY TO BUILDING PERMIT AND INSPECTION RECORD —MIAMI SHORES VILLAGE INSPECTIONS DATE BY INSPECTIONS DATE BY tiUNDATION $ SEWER ROOF $ BEAMS & LINTELS 1 TUB & TOP OUT POOL $ GAS FRAMING $ y AIR COND. /3G 3-1i...- N4ccN 2eFr:- FINAL $ FIXTURES CLEAN UP SEPTIC TANK 5 SLAB G PAro /3117 FAR, c a /2131 ii 1( -7I 1'a6'�l • Nni • a cruz ?: Nw.dw (x- 2 SLAB TEMPORARY SERVICE DATE BY RE - INSPECT $ SEPTIC TANK BY ROUGHING $ SEWER TEMPORARY SERVICE $ SOLAR HEATER TUB & TOP OUT H. W. HEATER CONN $ GAS RANGE CONN. $ 'SEWER MOTORS a INSPECTIONS DATE BY RE - INSPECT BY RE - INSPECT BY ROUGHING DATE FEE TEMPORARY SERVICE $ TUB & TOP OUT H. W. HEATER CONN $ RANGE CONN. 'SEWER MOTORS $ FIXTURES SEPTIC TANK 5 FIXTURES & FINAL SOLAR HEATER FIXTURES GAS CONTRACTOR alad7i. .� +. an. �/��� - 4? _ PHONE v...-7-6,-1 v...-7-6,-1 41- " C "' PERMIT NO. _, "�� I DATE ��'�°�� ( FEE $ ij S 4'b NEW BLDG. I ALTERATION 1 ADDITION REPAIRS SPECIAL PERMITS PERMIT NO. DATE FEE TEMPORARY SERVICE $ H. W. HEATER CONN. H. W. HEATER CONN $ RANGE CONN. $ MOTORS $ FIXTURES 5 FIXTURES & FINAL INSPECTIONS DATE BY RE- INSPECTI BY RE- INSPECT BY TEMP. SERVICE I ROUGHING H. W. HEATER CONN RANGE CONN. FIXTURES & FINAL ILs •° a s3 SPECIALS PERMITS BUILDING INSPECTIONS PLUMBING PERMITS & INSPECTIONS CONTRACTOR MAIL t��T� M VI.N 1 Yrc- -� PHONE PERMIT NO. �Z 1h� I DATE 2 'ZS '�I� FEE $ ,O •s NEW BLDG. I ALTERATION 1 ADDITION PERMIT NO. APPROVAL TO POWER CO. FOR SERVICE DATE DATE ELECTRICAL PERMITS & INSPECTIONS REPAIRS FEE BY BUILDING ELECTRICAL PLUMBING ROOFING Owner of Building Architect Contractor or Builder Legal Description Address of Building Lot MIAMI SHORES VILLAGE. o PERMIT N9 8226 `'CONTRACTOR OR BUILDER Bl. Subdi- vision FLORIDA Work to be performed under this Permit Sq. Ft Value of Project $ DATE _L ] 95 Contractor's License No. Amt. of Permit $ This permit is granted to the contractor or builder named above to construct the building or to install the equipment or device described in the application herefor in strict compliance with all ordinances pertaining thereto and with the understanding that the work will be performed in compliance with any plans, drawings, statements or specifications that may have been submitted to and approved by the proper municipal authorities. This Permit may be revoked at any time if the work is not done in compliance with such ordinances or if the plans are changed without authorization. A further condition upon which this permit is granted is the understanding that the contractor or builder named above assumes the responsibility for a thorough knowledge of the ordinances and regulations pertaining to the work covered hereby whether shown on the plans or drawings or in the statements or specification£, and that he assumes responsibility for work done by his agents, servants or employees. Signed: BY INSPECTOR In consideration of the issuance to me of this permit I agree to perform the work covered hereunder in compliance with all ordinances and regulations pertaining thereto and in strict conformity with the plans, drawings, statements or specifications submitted to the proper authorities of Miami Shores Village. In accepting this permit I assume responsibility for all work done by either, myself, my agent, servant or employee. BY AUTHORITY MIAMI SHORES VILLAGE, FLORIDA BUILDING ❑ ELECTRICAL ❑ PERMIT o PLUMBING ❑ N e 8112 ROOFING ❑ Architect Contractor or Builder Legal Description Address of Building Lot ❑ Work to be performed under this Permit_ Owner of Building CONTRACTOR OR BUILDER Bl. Subdi- vision Sq. Ft Value of Project $ DATE 195 Cont:ractor's License No Amt. of Permit $ This permit is granted to the contractor or builder named above to construct the building or to install the equipment or device described in the application herefor in strict compliance with all ordinances pertaining thereto and with the understanding that the work will be performed in compliance with any plans, drawings, statements or specifications that may have been submitted to and approved by the proper municipal author:ties. This Permit may be revoked at any time if the work is not done in compliance with such ordinances or if the plans are changed without authorization. A further condition upon which this permit is granted is the understanding that the contractor or builder named above assumes the responsibility for a thorough knowledge of the ordinances and regulations pertaining to the work covered hereby whether shown on the plans or drawings or in the statements or specifications and that he assumes responsibility for work done by his agents, servants or employees. Signed • BY INSPECTOR In consideration of the issuance to me of this permit I agree to perform the work covered hereunder in compliance with all ordinances and regulations pertaining thereto and in strict conformity with the plans, drawings, statements or specifications submitted to the proper authorities of Miami Shores Village. In accepting this permit I assume responsibility for all work done by either, myself, my agent, servant or employee. BY AUTHORITY ctf. occ. 7- 24—.5O PAID BY YEAR ANNUAL TAX PERIOD USED AMOUNT PAID DATE PAID RECEIPT NUMBER ∎J., <( 1, 1 95/ /02 en' /02 / - 5/ id- % 7% gad -51 c•° d . /67/it (C. / ) / /j ° °, ADDRESS 1250 IL 3/it 9 • Earlton Shores LEGAL t 1/2 16 & W 501 15 RECORD GARBAGE TAX MIAMI SHORES VILLAGE APPLICATION FOR FINAL INSPECTION 'Prior to a final inspection this application must be filled out; if sub contractors have failed to take out permits the general contractor shall be responsible for the permit and fee. A final inspection must be made prior to the release to Florida Power and Light Co. and the issueance of a certificate of occupancy. OWNER 6;5' "IPA? / /,� JOB ADDRESS f 67,7 /1/i s/ • LOT ' / w /j 1 /,j LOCK Q SUB, />iZ ,ei' /o ✓ BUILDER . Architectural Fee lans 2. Asphalt walks, drives, etc. 3. Cabinets - Bath Vanit 4. Cabinets - Kitchen 5. Cabinets - Medicine - . Cabinets - Unit Closet 7. Cleanin 8. Clearing Site 9. Concrete - Foundation. Slabs, Beams 10. Concrete - Walks drives. etc. 11. Contractors Fee 12. Electric Fixtures 13. Electric Wirin 14 Equipment Rental 15. Excavation 16. Fill for Ste; 17. Floors - Finish wood & kitchen 18, Floors - Terrazzo e Doors 19. Gara 20. Glass. Slidin: Doors 21. Hardware - Finish 22. Hardware Rou:h 23. Heating 24. Insurance - Liabilit .com.. -bond 25. Labor - Pa oll 26. Labor - ontract 27. Labor - Contract 28. Landsca•in Fill. Gradin 29. Lath. Plaster. Stucco .30. Lumber All 31. Masonry Labor 32. Masonr Materials, Block 33. Millwork 34. Miscellaneous 35. Ornamental Iron Work 36. Oven & Plate - Built -in 37. Overhead 38. Painting 39. Permits Temporary Power 40. Pilin: (Foundation) 41. Plumbin: Com lete 42. Pool - Swimmin 43. Roofing & Sheet Metal Work 44. Roof Trusses - Pre -fab. 45. Screen. Enclosures 46 Se tic Tank or Sewerage 47. Shower or Tub Enclosures 48. Steel - Reinforcing & strl. 49. Su ervision 50. Surveys 51. Tile & Marble 52. Water - Public 53. Water - Well & alma_ 54. Windows - Glazin: & Screens 55. Window Frames - Concrete ITEMS CONTRACTOR DAY LABOR CONTRACT DATE $ / 197/ SUB CONTRACTORS & SUPPLIERS NAME & AD 'SS / e o " '' ff YJIrk'4Jiv o /dN 4 _r Le/ .P/ -' o TOTAL m o o O 0 o.2 • . q 0 ,t/W /7 o 6 .0c7, p o