Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
1115 NE 97 St (13)
UILDING LECTRICAL LUMBING MIAMI SHORES VILLAGE, FLORIDA DATE 194 PERMIT N? 8460 Work to be performed under this Permit 'caner of uilding rchitect - : ontractor Builder egal Lot Bl. •escription ddress of uild ng This permit is granted to the contractor or builder named above to construct the building or to install the equipment or device described in the appli- _tion herefor in strict compliance with all ordinances pertaining thereto and with the understanding that the work will be performed in compliance with any ans, drawings, statements or specifications that may have been submitted to and approved by the proper municipal authorities. This Permit may be revoked any time if the work is not done in compliance with such ordinances or if the plans are changed without authorization. A further condition upon which this xmit is granted is the understanding that the contractor or builder named above assmmes the responsibility for a thorough knowledge of the ordinances and gulations pertaining to the work covered hereby whether shown on the plans or drawings or in the statements or specifications and that he assumes respon- ,ility for work done by his agents, servants or employees. Subdi- vision Value of Project Contractor's License No. Amt. of Permit Signed: •" By INSPECTOR In consideration of the issuance to me of this pernlit I agree to perform the work covered hereunder in compliance with all ordinances and regulations Ttaining thereto and in strict conformity with the plans, drawings, statements or specifications submitted to the proper authorities of Miami Shores Village. accepting this permit I assume responsibility for all work done by either myself, my agent, servant or employee. CONTRACTOR OR BUILDER BY AUTHORITY N9 905 CERTIFICATE OF OCCUPANCY MIAMI SHORES VILLAGE, FLORIDA BUILDING DIVISION Owner, Agent or Tenant of Building Lot_ __ Block______ _______ Subdivision Street Address Approved use by occupancy Remarks: Miami Shores Village, Fla., This Certificate of Occupancy is issued to the above named_ for building at above named location only upon the express provision that the applicant will abide by and comply with all conditions of Ordinances Nos. 92, 93, 94 and 97, known as the Zoning, Electrical, Plumhing and Building Ordinances of Miami Shores Village pertaining to the erection, construction, alteration or remodeling of buildings or structures. BUTILI)ING DIVISIO f f tai t fall f i' i i W ' tf fl IMIO;; '' '''i '''tc ' ktuiMiirco i iMaria$Migi r 0 �•6 r., Issued _19__ Amount. No. Houses WHEN CLEARED AND REPAIRED BY THE VILLAGE Amount of Bond Cost of clearing and repairs done by Village Balance due Builder $ aiami c. Jzores d illage g L O R ID A BUILDER'S BOND __ day of– __- KNOW ALL MEN BY THESE PRESENTS, that I,_ Address in consideration of the issuance to me by Miami Shores Village, Florida, of a permit or permits to construct or repair a building or buildings at the following addresses: said shall be returned to me. .:� WITNESS MY HAND and Seal at Miami Shores Village, Florida, this__ Cancelled 19 By N© 906 Village Building Inspector, Miami Shores Village ' 7r ` • i •... fi-. �..•'l ................. it• r• •i • Ii 1C t • I C 1C iY ir• ° • ' • ' r • • ' i t•.'�...• ' � ` • ° '� °' ; t ' i :::....„ • do hereby deposit with Miami Shores Village, Florida, the sum of , and I agree with said Village that, when such construction shall have b•= • been completed by me within the meaning of the ordinances of said Village, I will clear all premises and repair any Village property damaged by me, S used for the deposit of material or equipment in the construction or repair and that, if I do not so clear and repair such premises immediately upon the 19' completion of such construction within the meaning of such ordinances, the Village may clear and repair the same and pay the costs of such clearance and -,. 4 z repairs out of the aforesaid — — , and return the remainder to me; and that, if I shall clear and repair said property immediately, as aforesaid, then O • �. AA V1 s4 1 (Seal) G) INSTRUCTIONS TO BUILDER —When above mentioned construction is completed and the premises are cleared and repaired take this bond to the Village Building Inspector and obtain his approval, after which Miami Shores Village will refund your money in accordance with the above agreement. I := VILLAGE BUILDING INSPECTOR'S APPROVAL tii.) I h ereby certify that the construction contemplated under this Bond, has been completed and that the builder thereof has caused n= the surrounding premises to be cleared and repaired in as good condition as they were before commencing said construction.