Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
711 NE 94 St (2)
Application is hereby made for the npproval of the detailed statement of the plans and specifications herewith submitted for the build- ing or other structure herein described This application is made in compliance and conformity with the Building Ordinance of Miami Shores Village, Florida, and all provisions of the Laws of the State of Florida, all ordinances of Miami Shores Village and all rules and regulations of the Building Division of Miami Shores Village shall be complied with, whether herein specified or not. A copy of approved plans and specifications must be kept at building during progress of the work. Owner's NAM@ and Addre Registered Atehite t and/or Engineer-- - -- 1312 .-- - - - -�- ,216/?C04 iv 7 - - Location and legal description of lot to be built on: Lot Block Subdivision Name and address of licensed contractor.. Street and Number where work is to be done STATE OF FLORIDA, COUNTY OF DADE. ss • MIAMI SHORES VILLAGE BU ::.DING INSPECTION DEPARTMENT APPLIr,,e TION FOR BUILDING PERMIT Building Inspector R e 8804/V State work to be done and purpose of building (by floors) and for no other purpose. New Building Remodeling Addition Repairs No. of Stories To be constructed of Kind of foundation R ,:-... rit{g Estimated Total cost of improvements $ ` f' ' Amount of Permit $ plan Cubage .Size of Building Lot peared NOTE: A charge of $1.00 will be made for the Planning Board. A re- inspection fee of $1.00 will be charged materials and /or workinanship. Date // t,1� Chairman Member Member Council Approved Zone cubage required Distance to next nearest building Maximum live load to be borne by each floor.__ I hereby submit all the plans and specifications for said building. All notices with reference to the building and its construction may be sent to The undersigned applicant for this building permit does hereby certify that he understands and accepts his obligations as an employer of labor under the Florida Workmen's Compensation Act, being Section 5966, Compiled General Laws of Florida, Pennanent Supplement, and has complied with the provisions thereof, and will require similar compliance from all contractors or sub- contractors employed by him in the work to be performed under this permit; and will post or cause to be posted for inspection on the site of the work such public notice or notices as are required by the Act. The undersigned agrees to employ only such subcontractors, on work to be performed under this permit, as are licensed by Miami Shores Village. Remarks -- ........ — - ( Signed) ._... _ Date Date.. ( 7 ._.. .19_. Street —04. :3:131. : _ 11--22 _- _.._.. .:=,: n1:,:::M:::_::..:u:,:.::.:,:, ::,.13::13::::,:.., PLAN C BOARD DATE Notary Public, State of Florida My Commission Expires Before me, the undersigned authority, a notary public, duly authorized to administer oaths and take acknowledgments, personally;ap- to me well known, and who, being by me first duly sworn, upon oath deposes and says that he is the. of the above described construction, that he has carefully read the foregoing application, and that he did sign the same, and that all facts therein by him s ted are true. .— Permit No.___ Date // -z, Read, Sworn to and Subscribed before me. Disapproved (Signed) Member _....__ ......... ..........._...... ................ Member Member 3333_ Disapproved Date making corrections or changes to this application after nppmval has been obtained from when such re- inspection is made necessary by improper notice for inspection or faulty MIA'FAI SHORES VILLAGE, FLA. JOB 10> ADDRESS 7'/ » - G �` INSPECTION IC "/ ( . �,� e ' J TIME READY REMARKS N9 5107 INSPECTOR DATE /e ` ` r", Village of Miami Shores N° 4865 JOB cc 41 ADDRESS 7/1 CS 9 d INSPECTION ��? . �.� ;� �` " 1'j TIME READY RM . REMARKS tab INSPECTOR DATE (4- 2 7 /L, w.1 � 'Village of Miami Shores JOB ". / • --la ADDRESS INSPECTION d °`') o a TIME READY 0/1 REMARKS INSPECTOR • N? 4386 DATE yr= 'Village of Miami Shores N° 4'707 JOB ADDRESS 71/ AL - 74 . INSPECTION s g eel TIME READY REMARKS INSPECTOR DATE )— 2 2 cf/ village of Miami Shores N® 4620 JOB ADDRESS 7/‘_ er , re INSPECTION TIME READY ,l G d 3 0 r-/ — q REMARKS 4- 'r: : INSPECTOR DATE Vil ge of Miami Shores JOB 1 n ADDRESS �� • ,41# N? 4427 INSPECTION n TIME READY REMARKS �lC ;13J4a '4 1 /% INSPECTOR DATE 6-1 e: 4? . .... v .... , ,� , , f ,.... ,,� , ar• .. ,. ....aiar....,�r, .. •,� .. ,, , r ,,...., r ,....,,� r ,,...,. al . . - - of ►ice�mlice' Mice$ 4Rds;r �;�a$m�r mcaa�tir m:r ;r tir sWa;; A ArcoafA 14;ilkeu�{rc sews i � 19 � z.K (1. Issued_ _Oar) � , ....„... C iartti �hores�illage N? 1961 0 K•~^ � -_ FL O R 1 D A Amount A . No. Houses BUILDER'S BOND 7 . 3. K NOW ALL MEN BY THESE PRESENTS that I, (4(fr� , % r, r� ! ' �'% 4 Address AV ` L ' , _- - r,� P tip: Q ": G in consideration of the issuance to me by Miami Shores Village, Florida, of a permit or permits to construct or repair a building or • buildin s at the following address: r � � `� �`1�, // //v . .„... r F.' ? „,-, , ,,,, ..,- //' r', „/-,), (4 n 1 l 4 l*-1, 1 1 /10/, -) ri 5- FT i _ : tc:. L� 3. do hereby deposit with Miami Shores Village, Florida, the sum of - and I agree with said Village that, when such construction shall have been completed by me within the meaning of the ordinances of said Village, ge I will clear all , premises and repair a n Village ge Pr ope r damaged g ed b Y me, 4 used for the deposit of material or equipment in the construction or repair and that, if I do not so clear and repair such premises immediately upon the completion of such construction withii meaning of such ordinances, the Village may clear and repair the same and pay the costs of such clearance and repairs out he aforesaid , and return the remainder to me; and that, if I shall clear said shall be returned to me and repair said property immediately, as aforesaid, then ` WITNESS MY HAND and Seal at Miami Shores Village, Florida, this day of G lI ?' I lot: � / ' i.,, r (Seal) - INSTRUCTIONS TO BUILDER —When above mentioned construction is completed and the premises are cleared and zepaired take this bond to the Village Building Inspector and obtain his approval, after which Miami Shores Village will refund your money in accordance with the above agreement. // O VILLAGE BUILDING INSPECTOR'S APPROVAL l // -• , � I hereby certify that the construction contemplated under this Bond, has been completed and that the builder thereof has caused the ' surrounding premises to be cleared and repaired in ”, g o d conditions as they were before commencing said constructs n. ,, ta WHEN CLEARED AND REPAIRED BY THE V �� Amount of Bond $ .'�6 - �1�������� i �� �� r T V illage Building Insp� or, Miami Shores Village 4 Cost of clearing and repairs done by Village Balance due Builder ,•.. Cancelled 19 By zr. BUILDING ELECTRICAL PLUMBING ROOFING Owner of Building f = Architect Contractor or Builder Legal Description Address of Building Lot MIAMI SHORES VILLAGE. FLORIDA DATE t , . 195 ❑ PERMIT N° `712 t -..-,,,!„:1 r , condor: ` rt ❑ Work to be performed under this Permit Bl Value of 11 Amount of Project $ II Permit $ Subdi- vision This permit is granted to the contractor or builder named above to construc the building or to install the equipment or device described in the application herefor in strict compliance with all ordinances pertaining thereto and with the understanding that the work will be performed in compliance with any plans, drawings, statements or specifications that may have been submitted to and approved by the proper municipal authorities. This Permit may be revoked at any time if the work is not done in compliance with such ordinances or if the plans are changed without authorization. A further condition upon which this permit is granted is the understanding that the contractor or builder named above assumes the responsibility for a thorough knowledge of the ordinances and regulations pertaining to the work covered hereby whether shown on the plans or drawings cr in the statements or specifications and that he assumes responsibility for work done by his agents, servants or employees. Signed BY /' t. x INSPECTOR In consideration of the issuance to me of this permit I agree to perform the work covered hereunder in compliance with all ordinances and regulations pertaining thereto and in strict conformity with the plans, drawings, statements or specifications submitted to the proper authorities of Miami Shores Village. In ac- cepting this permit I assume responsibility for all work done by either, myself, my agent, servant or employee. CONTRACTOR OR BUILDER BY AUTHORITY e�fl F oL ( .7/ We are in receipt of Test Reports from Laboratory which indicate a ( ) failure ( ) possible failure to meet code requirements for compressive strength for con- crete which you placed in located at on Date DADE COUNTY PLANNING, ZONING & BUILDING DEPARTP!IENT C . ' fi , . We call your attention to the following paragraph, from Building Officials Committee of South Florida on Handling and Testing Concrete.. NO N -C OMPLYIN G CONCRETE- Procedure Where Poured Where 7 day concrete test reports under any of the foregoing proce- dures indicate possibility of 28 -day failure of concrete, the BUILDER shall immediately be notified of such failure in writing by the Build- ing Department concerned. Criteria for determination of failure shall be as designated in A.S.T.M. Designation c - 94. If the BUILDER elects not to remove such concrete, but to continue construction, and the 28 -day concrete test reports show failure, the builder is responsible and can core -test, re- design to compensate for non - complying concrete, repour, strengthen or remove any part of the structure in question. Whatever alternative is chosen, it must meet with the approval of the Building Department of the jurisdiction concerned. Unless and until arrangements satisfactory to this Department are made, no further inspection on the structure concern will be made. Please contact the Building Division. Phone 3 -2889. cc: G oF� c -sec 1 4; Jr • VII 7 location of structure S CO/ < iJ r- -s i2€.- (.s2.-4 MARK SAMPLE PROJECT LOCATION OF POUR CLASS OF CONCRETE SLUMP OF CONCRETE CONTRACTOR ADMIXTURE SUPPLIER coe 3 Client 90th PITTSBURGH TEeT1NG LABORATORY 3281 N.W. 7th STREET MIAMI 35, FLORIDA SECTIONAL AREA SQ. INCH AS A MUTUAL PROTECTION TO CLIENTS, THE PUBLIC AND OURSELVES, ALL REPORTS ARE SUBMITTED AS THE CONFIDENTIAL PROPERTY OF CLIENTS. AND AUTHORIZATION FOR PUBLICATION OF STATEMENTS, CONCLUSIONS OR EXTRACTS FROM OR REGARDING OUR REPORTS 1S RESERVED PENDING OUR WRITTEN APPROVAL. REPORT OF TEST OF 6" x 12" CONCRETE CYLINDERS FOR M. G. (Meal .L.LLUU bV o ud o i. ;1 kiii a� mi CRUSHING LOAD CRUSHING STRENGTH LBS. LBS. PER SQ. INCH 47 28027 33 1170 7 47 28027 34,000 1200 7 47 28027 34,000 1200 1120 7 47 28.27 28 47 28.27 28 47 28.27 28 Concrete cylinders cast on 6/8/56 by PTL Repo. G Jobs it. @ 100 p.m. Residence 711 N.E. 94th Street, Miami Shores Vill ge, :Florida Footing through center of house 2000 Lbs. /Sq. In. @ 28 days : 6 Inches : W. A. Jone Not Given M. Go 0 °Neal via Renuart Above cylinders were made without prior notice t•, Note: Above 7 day results give indication of possible compressive strength failure of concrete at 28 days for 'ti�As 9 It G LABORATORY 3. klar lles LABORATORY NO. JOB NO. FILE NO. CUSTOMER'S DATE p �36435 OR D'I�'R''Q 51050 AVER. QUANTITY TRUCK NO. yy yds TICKET NO. Q MIXING TIME 2 ana 6291 BLDG. PERMIT NO. 0 min. mo DISTRICT MANAGER FORM 1221 -MA June 15, 1956 3712 Cylsacast by m 0°ann©11 ned1 AGE DAYS on Dato cc: DADE COUNTY PLANNING, ZONING & BUILDING DEPARTMENT We are in receipt of Test Reports from Laboratory which indicate a ( ) failure ( ) possible failure to meet code requirements for compressive strength for con- crete which you placed in located at location of structure • WORM We call your attention to the following paragraph, from Building Officials Committee of South Florida on Handling and Testing Concrete. VII NO N- COMPLYIN G CONCRETE- Procedure Where Poured Where 7 day concrete test reports under any of the foregoing proce- dures indicate possibility of 28 -day failure of concrete, the BUILDER shall immediately be notified of such failure in writing by the Build- ing Department concerned. Criteria for determination of failure shall be as designated in A.S.T.M. Designation c - 94. If the BUILDER elects not to remove such concrete, but to continue construction, and the 28 -day concrete test reports show failure, the builder is responsible and can core -test, re- design to compensate for non - complying concrete, repour, strengthen or remove any part of the structure in question. Whatever alternative is chosen, it must meet with the approval of the Building Department of the jurisdiction concerned. Unless and until arrangeme satisfactory to this Department are made, no further inspection c structure concerned will be made. Please contact.- - Building Division. Phone 3 -2889. Signed We are forwarding the enclosed for your in- formation. As this concrete is within 10", of the specified strength, e! +art ,en ; will take no further action '• ° 'v 9 D_� MARK 26.7 47 28 027 Art 47 28.27 47 28.27 47 28,2 SAMPLE PROJECT LOCATION OF POUR CLASS OF CONCRETE SLUMP OF CONCRETE CONTRACTOR ADMIXTURE SUPPLIER PITTSBURGH TESTING LABORATORY SECTIONAL AREA SQ. INCH 3281 N.W. .7th STREET MIAMI 35, FLORIDA AS A MUTUAL PROTECTION TO CLIENTS, THE PUBLIC AND OURSELVES, ALL REPORTS ARE SUBMITTED AS THE CONFIDENTIAL PROPERTY OF CLIENTS. AND AUTHORIZATION FOR PUBLICATION OF STATEMENTS, CONCLUSIONS OR EXTRACTS FROM OR REGARDING OUR REPORTS 1S RESERVED PENDING OUR WRITTEN APPROVAL. 111th REPORT OF TEST OF 6" x 12" CONCRETE CYLINDERS FOR M. `` rrtt .1 1.06 wi4 c, COMPRESSION TEST CRUSHING LOAD CRUSHING STRENGTH LBS. PER SQ. INCH LBS. 33 i :$ o (( :34 1wO0 7 ', 0 000 : s'00 1100 7 5 8 000 1950 S8 5 000 1910 28 570 000 2020 1960 28 TSBURGH TESTING LABORATORY J. N0 harllee LABORATORY NO. JOB NO. r�I� FILE NO. CUSTOMER'S ORDER OATS July 6p 1956 AVER. FORM 1221 -MA AG E DAYS Concrete cylinders cast on 6/8/56 by PTL R pra Jobsite �. 1 O0 p.m. Residence 711 N.E. 94th Street Md mi Shores 11 .11agop Florida Footing through center of house 2000 Los, /Sgo In. @ 28 days QUANTITY : 7 yds. 6 Inches TRUCK NO. : 2 D VIR Vii. TICKET NO. 6291 ii. do ones MIXING TIME 40 wino BLDG. PERMIT NO. 5712 Not Giver d .Cylst,cast by m OTonnoll Mm G. O Neal via Renuart Above cylinders were made without prior notice to Botcher or Plant concemedQ Note: Above reported strength of concrete @ 28 days c� tColt the requirements as set forth by the pi Building Officials Committee of South Florida, Policy on Handling & Testing Concrete. DISTRICT MANAGER Owner's Name and Address.. Application is hereby made for the approval of the detailed statement of the plans and specifications herewith submitted for the build- ing or other structure herein described. This application is made in compliance and conformity with the Building Ordinance of Miami Shores Village, Florida, and all provisions of the Laws of the State of Florida, all ordinances of Miami Shores Village and all rules and regulations of the Building Division of Miami Shores Village shall be complied with whether herein specified or not. A ropy of approved plans and specifications must be kept at building during progress of the work. APPLICATION FOR BUILDING PERMIT Distance to next nearest building_ _......__._e j MIAMI SHORES VILLAGEr:., , BUILDING INSPECTION DEPARTMENT .. A. Registered Architect and /or Engineer Name and address of licensed contractor .e.. • welt. :S.. _ eR fa / . We - A 7 6 Location and legal description of lot to be built on: 0 Loti? 1 , - Block... .. . � Su u bdivision. _._.il .1. .,i i2 S .�° _, Street and Number where work is to be done_... f 4_li G ' E 1. (- A, State work to be done and purpose of building (by floors) 1.,e-far Z E J 4 (4 / 6 ,� Date .� ® , d1 , 19%0 No. Or ? Street l/� ° c�� �f C7 and for no other purpose. New Building Remodeling Addition Repairs No. of Stories To be constructed of C 8 , 5 .... Kind of foundation f� z)-, Roof Covering 1 62 4 Cab v i ,61 L Estimated Total cost of improvements $ /' d d `� Amount of Permit $ Zone cubage required 2 ® ® Plan Cubage 2 d d Size of Building Lot /_-. Maximum live load to be borne by each floor I hereby submit all the plan and specifications for said building. All notices with reference to the building and its construction may be sent to Q_ �.._ '� t ` . --,- li% 0_,.4Z, 7 (` ; The undersigned applicant for this building permit does hereby certify that he understands and accepts his obligations as an employer of labor under the Florida Workmen's Compensation Act, being Section 5966, Compiled General Laws of Florida, Permanent Supplement, and has complied with the provisions thereof, and will require similar compliance from all contractors or sub - contractors employed by him in the work to be performed under this permit; and will post or cause to be posted for inspection on the site of the work uch public notice or notices as are required by the Act. The undersigned agrees to employ only such subcontractors, on work to be' permed under this permit, as are licensed by Miami Shores Village. Remarks (Signed).- y _. STATE OF FLORIDA, COUNTY OF DADE. ss Before me, the undersigned authority, a notary public, duly authorized to administer oaths and take acknowledgments, personally ap- peared to me well known, and who, being by me first duly sworn, upon oath deposes and says that t is the of the above described construction, that he has carefully read the fcreggitig application, and that he did sign the same, and that all facts therein by him stated are true. Permit No ' ' / Date � Z m ead, Sworn to and Subscribed before me. Disapproved Date Notary Public, State of Florida (Signed) Building Inspector My Commission Expires PLANNING BOARD DATE Chairman Member Member Member Member Member Council Approved Date Disapproved Date NOTE: A charge of $1.00 will be made for making corrections or changes to this application after approval has been obtained from the Planning Board. A re- inspection fee of $1.00 will be charged when such re- inspection is made necessary by improper notice for inspection or faulty materials and /or workmanship. eNTr d/ • 4__: / // . _ / C. (0 l enIZA c7 / - 1= - 4 — '. • ?tg? 4721 e ( (,-"?` ,5,5 7 # 8; /6 g --- / /::" ( ,, , ,i: .: c--, ■-', , (3 / ) '.,-'- 7j.? i v ! ■ 4 (1' ( / 2 / olt 4 ----Ag5 f-)- 1?" 7 ° / 6 •". 0 • ' Sec. 6 e 53 - .42 Order # 1294 F.B. # 13 - 34 to 37 Dec. 28, 1955. 69. dJ 0 Li 65e /184' Si 3 '3 N Jo /s /2 // � E rE,2 i N 75' ' 1 75 -s ' • siu.c'. .?YALE.• / . • /9!z` P'NM'r• Nf 2 i2/ J (-2 22 Pw r4' !✓ /RE P /PF a. /o4 . 5 .J- .trrLE� / l /$:7 4 .�. L 2J 2¢ as 2,‘ - 5P EUGENE DENES • Land Surveyors 288 N.W. 71st St., Miami,50,F1a., Phone : g9 -P007 SKETCH P SURVEY Lot /7 & the 1os/ 1/2 of Lot /6 dock 67, MIAMI SHORES SECTION No. 3, according to the Plat thereof, recorded in Plat Book 10, on Page 37, of the Public Records of Dade County, Florida. Scales as 'shown I HEREBY CERTIFY: That this SKETCH OF SURVEY of the above described property is true and correct, to the best of my knowledge and . belief, as recently surveyed and platted under my direction. Eugene Denes Registered Land Surveyor #'105 State of Florida - OWNER'S NAME Iferren A. Jonee 71_. N. E. 94t1' St. i arren i o .Tons BUILDING PERMIT NO. ZONE NEW CONSTRUCTION REPAIRS JOB LOCATION (ST. OR AVE.) ALTERATION ADDITION GENERAL CONTRACTOR 3712 REQUIREMENTS SUBMITTED TO PLANNING BOARD RE- SUBMITTED TO PLANNING BOARD SUBMITTED TO VILLAGE COUNCIL 17, 502 5 °2.. R56 DATE CU. FT. OBS 1 Tile 1:ocd Base, Tile sills APPROVED REJECTED PRF$ENT ADDRESS 90 , 10 I"le Ea 2nd Ave. LOT 17 H. r o 1;- 16 PLAN CUBE Read ADDRESS PERMIT FEE $ BLOCK 67 r�A 7 � Ave. j 0 IT. E. 2nd 22 900 9 DRAWINGS, SPECIFICATIONS, RESTRICTIONS AND CUBE CHECKED BY TYPE STORIES ROOF CONSTRUCTION .25.00 DESCR IPTION CU. FT. Trnl-ra?r'.o Tloors Plastered .'rails F. (M- 1 it DESCRIPTION REFERRED TO COUNCIL REMARKS • o icl c -e CERTIFICATE OF OCCUPANCY NO. 54/7 ISSUED BY TO BUILDING PERMIT AND INSPECTION RECORD -MIAMI SHORES VILLAGE LICENSE NO. EST. COST $ SUBDIVISION Sec J 3 F'HONE NO. NO. DATE INTERIOR CONSTRUCTION 3 Br. 8. 2 Baths BUILDER'S BOND ?HONE R'p. LICENSE NO. 1115 rre. • REASONS 21 DATE 5 -21 -56 INSPECTIONS DATE BY RE- INSPECT BY RE- INSPECT BY FOUNDATION PERMIT NO. DATE FEE TEMPORARY SERVICE �``r�, (e • 6 • �. // 1 $ '\ SEPTIC TANK J ' k-- ?to p+.,S3, BEAMS & LINTELS l - �' SEWER =? $ SOLAR HEATER FRAMING - . • `4 ' O � ^JG 4 X46 `/2 / 4 $ $ INSPECTIONS DATE BY RE- INSPECT BY RE- INSPECT BY ROUGHING FINAL 2' -i S'•-P.. w '- •••;" . , ..- 4 0 3, >sC': GAS -J i.'-i t / ,pLEAN -UP rJ y r SEWER - 0JNC Od - 7 -1 - ."� ....J £/5 q(4., b CONTRACTOR «/i U n r. ,..., 0 GJ7Pj, PHONE PERMIT NO. DATE FEE $ NEW BLDG. 1 ALTERATION ADDITION REPAIRS SPECIAL PERMITS PERMIT NO. DATE FEE TEMPORARY SERVICE �``r�, (e • 6 • �. // 1 $ '\ SEPTIC TANK J ' k-- ?to p+.,S3, p fac -' Y' v o (gyJ 6 $ $ SEWER $ $ SOLAR HEATER $ $ GAS $ $ $ $ INSPECTIONS DATE BY RE- INSPECT BY RE- INSPECT BY ROUGHING 7iv• ,`:: - �` . '- •••;" . , ..- 7 p/3y 7a-' /7 7 - Z 7 3, >sC': GAS -J i.'-i t / rJ y r SEWER - 0JNC Od - 7 -1 - ."� ....J £/5 q(4., b P RANGE CONN. ( SEPTIC TANK z 2 - 41 (.. /J C RIS i r - /J4 ✓ c I . . A- L SOLAR HEATER v FIXTURES to - / -,5,7, J.4/1 t' A -,,1 CONTRACTOR / 4.- ..c = 52.4 , F :'s7 (z ^G* . P PHONE PERMIT NO. � I DATE 7 "- L' ✓ ,- I. ^ -, F FEE $ l O p NEW BLDG. IL 1 ALTERATION I ADDITION R REPAIRS SPECIAL PERMITS P PERMIT NO. D DATE F FEE TEMPORARY SERVICE .5,,,,,,,,r-/- , , z. %1 °Sr,•: - -- 6- a .c.--, s s / Po) H. W. HEATER CONN. $ $ RANGE CONN. $ $ MOTORS $ $ FIXTURES $ $ $ INSPECTIONS D DATE B BY R RE- INSPECT B BY R RE- INSPECT B BY TEMP. SERVICE / - ROUGHING 3 3 rr�� - Y S7 - -J i.'-i t / H. W. HEATER CONN. RANGE CONN. ( (• _,-(- . 1 1SrZ' z zt- 4 / Z - / /`f ✓s - - /J4 ✓ c I . . A- L v N I� c C / ct F bUILOING INSPE ' � PLUMBING PERMITS & INSPECTIONS ELECTRICAL PERMITS & INSPECTIONS BY t.J d/s' APPROVAL TO POWER CO. FOR SERVICE DATE 10- )07