Loading...
1213 NE 94 St (12)GEOTECHNICAL ENVIRONMENTAL HYDROLNEOLOGY A SBESTOS Miami, July 14, 2003 Mr. Mark A. Campbell MARK A. CAMPBELL AlA ARCHITECTS 373 NE 92 " Street Miami Shores, FL 33138 Re: Proposed Addition @ 1213 NE 94 Street Miami, FL Dear Mr. Campbell: �s�I� lisp \ \ \ \111Mt MIL • DYNATECH ENGINEERING CORP. TESTING LABORATORIES DRILLING SERVICES INSPECTION SERVICES ROOFING Pursuant to your request; DYNATECH ENGINEERING CORP., D.E.C. completed a Subsoil Investigation on July 14, 2003 at the above referenced project. The purpose of our investigation was to verify subsoil conditions relative to foundation design of the proposed addition. A total of (2) standard penetration boring tests were performed according to ASTM -D 1586 down to an average depth of 25' below existing ground surface. The following graph was developed as a general condition for the subject site: (Refer to field boring logs for exact locations and soil description): Depth From To Description 0'- 0" 0' -6" 2' -0" 2'-6" 4'-6" 0'- 6" 2'- 0" 2' -6" 4' -6" 25' -0" Topsoil & grass Brown sand Brown silty sand Tan sand Tan sandy lime rock Groundwater table elevation was measured immediately at the completion of each boring and was found at an average depth of 5'- 0" below existing ground surface. Fluctuation in water level should be anticipated due to seasonal variations and run off. 1 750 West 84 Street, Hialeah, FL 33014 -3618 Phone (305) 828 -7499 ® Fax (305) 828 -9598 Page. No. 2 1213 NE 94 Street, Miami, FL Based on our understanding of the proposed structure and our field boring logs; the following are our recommendations for foundations design. A- Strip the entire footings and building construction areas plus 5 feet outside perimeter of all topsoil and vegetation down to clean granular sand (when encountered). B- Compact all construction areas with a heavy self propelled vibratory roller to a minimum of 95% of ASHO T -180C but not less than 10 passes in each direction. C- Backfill construction areas to required elevation if needed using clean granular material placed in lifts not to exceed 12 inches in thickness and compact as indicated in items B. Excavated footings only to a 2' -6" and remove the silty sand and compact as indicated above. D- Care should be taken not use vibration in case of existing structures in the vicinity of the construction area. If vibration cannot be used for compaction, static compaction may be applied. However, in this case, the compacted layer should not exceed 6" inches in thickness. E- All construction fill material shall be clean granular soil, free of organics or other deleterious material, and shall contain no more than five percent fines passing a U.S. standard No. 200 sieve. (Classified as SW /GW). F- Verify all compaction efforts by taking an adequate number of field density tests in each layer of compacted material. G- Representative samples of the on site and proposed fill material should be collected and tested to determine the classification and compaction characteristics. H- All Geotechnical work must be performed under the supervision of our geotechnical engineer or his representative to verify compliance with our specifications and the Florida Building Code. I- In the event of existing structures, existing footings or proposed drainage lines, provisions shall be made by the structural engineer and site contractor to protect all footings from undermining and exposure. The geotechnical engineer shall be notified of these conditions to evaluate the applicability of his recommendations. The above foundation recommendations being achieved and verified, it is our opinion that the proposed structures be designed for a shallow foundation system with a permissible soil bearing pressure not to exceed 2500 P.S.F. 2 Page No. 3 1213 NE 94` Street, Miami, FL Regardless of the thoroughness of a Geotechnical exploration there is always the possibility that conditions may be different from those of the test locations; therefore, DYNATECH ENGINEERING CORP., does not guarantee any subsoil condition between the bore test holes. In accepting this report the client understands that all data from the borings are strictly for foundation analysis only and are not to be used for excavation or back filling estimates and pricing. Site contractor must familiarize himself with site conditions prior to bidding. It has been a pleasure working with you and look forward to do so in the near future. Please feel free to contact us if we may be of further service to you. Sincerely yours, Wissarr(Naamani, P.E. DYNATECH ENGINEERING CORP. Florida Reg. No. 39584 Special Inspector No. 757 WN/jg 3 APPENDIX Appendix Drilling Procedures The borings are conducted in accordance with procedures outlined for standard penetration test and split spoon sampling of soils by ASTM D -1586. A two -feet long, two -inch O.D. split spoon sampler was driven into the ground by successive blows with a 140 lbs, hammer dropping 30 inches. The soil sampler was driven (2) at a time, then extracted for visual examination and classification of the retained soil samples The nutnber of blows required for one-foot penetration of the sampler is designated as "N" (known as the Standard Penetration Resistance Value). The "N" value provides an indication of the relative density of non - cohesive soils and the consistency of cohesive soils. It is general practice that the sum of the number of blows required for the second and third six -inch penetration are added to determine the N" value. Suitable corrections are applied to this number, in order to include the effects of soil overburden pressure and other factors. A general evaluation of soils is made from the established correlation between "N" and the relative density of consistency of soils. This dynamic method of soil testing has been widely accepted by foundation engineers and architects, to conservatively evaluate the bearing capacity of soils. A continuous drilling and sampling procedure was used. Therefore the samples were taken at intervals of 2 feet or at every change in soils characteristics. Maid DiyiaioM Grow Symbols Typical Nantes CW4 /K.trOn f:111e.e Cone. Orrn•d Soils Mont Ihan 50% No on No. 200 c4..• G /MIt 50% or more of ma"t"t 1r•ct:on ',wood on No 4 c•• _ 5,3 Gw Wehisec al lairs rind 7uind matures, w' little or no fines CIwl:c•tlon on basic of percentage of I.no• Loss than 5% pr. No 200 stave GW. G1 . SW. SP More tan 17% par No 700 ua• GM. GC. SM. SC 5% to 12% pass No. 700 c.•o• 8orda.tm• ctassilication forsotrino too of dual -symbol' C.' 060 D to Greater Man 4 0,01 C, D 1o• D IA B.tw...n 1 end 3 GP Poorly 7Id.d as wets and cer/fiend mixtures. little or no fins Not messing born crrur4 for G• Attabrs limo dot t aloa. "A" ln♦ la ln 4 d psCrty .tdr• .+ Tha Afte.b..g limits plotting r in hatched ores e bo•drl.ne c1 D,f.Calier. repo.. lop ow 01 dual sympoh F t € 13 GM Silty 7fnels 7ry/1-s.nd• .i11 m xtures G C Cherry or Melt. 7sysliatd Cloy mixtures Attrbrg Irmo dot .poi. "A" line rue plan Cory ..de. 7.ata then 7 Csr D66'Dt0 Gr.... roan S I 7 C • 1 w■1 'oN ss.ts0 uo.lwl 011•03 1 %OS u•'10.011 1 P •a S 11 SW Well q/dad sands and 7r.Nly sands. Imle or no tines 75- Bm.wn and 3 r SP Poorly gr . 0.. , . sands end 7N.I ql tends, little or no linos Not I rn►flrrng poi crrl rr.e f o- SW Alt.b.rg I.n.b dot below "A" Imit a dan C.h •n,.• I.ss thane Anrberg Irn•tt 010110 99 m halch.d WOO ore bawds.1.M clot♦.I.U1 puurno use of duel tympbl. £ L SM Slips sands, Yndtilt mixtures r SC Cllyry sand., Ynd.clay ...Tatum Al ter bag I.mlt 001 ebor a 'A" IoM end p1.tl K.ry rnd.a 7 than 7 .1.1.100Z oN c•sst.d WOW 10 %05 $11 61 .046. 0 7 . .� ML Inds. c silts, yry fine 0 r rods. rock (loo ur, Idly d storey IoM Ynd/ 1 2 2 R � �••• c -.� •o a .•. • •.•.. " �� • .....................ma. 1...• • a.. • r • ...... 10' o U S C Y 8 QO 5 J M CL Ind panic cloys 01 low to m.dium plMtiCity, 7ry.ily clays. sandy Clays, silty clay., loan cirri oL Ch genic tilt. Ind o.g.nic Pity cl.yt of low plasticity 1 1 ,, �. tt i N 3g M inorganic ants, m.C.ceous d ma diatoceous Iona sands dti111..11KWp 1 • I E. L�� i ( L D F . t Q CH Inorganic clays of h' plasticity. fat clays o .0 7e a •o so u •o 00 00 .00 n� . a .„. - J • • N S OH Orgenic clays of medi 10 h■ph plasticity High y Or pin is Soils R Peet. muck, and other highly orpank soils Viwal.Manusl Identification. w ASTM Designation 02488. GEOTECHNICAL ENVIRONMENTAL HYOROGEOLOGY CHEMISTS ROCK HARDNESS DESCRIPTION DYNATECH ENGINEERING CORP. BOX 170406 FLORIDA 33017.0406 PHONE: (305) 628-4418 KEY 'ICATION AND SYMBOLS TESTING LABORATORIES DRILLING SERVICES INSPECTION SERVICES ROOFING CORRELATION OF PENETRATION RE SISTANCE WITH R4ATIVE DENSITY AND CONSISTENCY Cone Standard Penetration Penetration Relative Tests, Tests Density Kg /Cm blows /Ft. SOFT Rock core crumbles. when handled 0 -16 0 -4 Very Loose 17-40 5 -10 Loose MEDIUM Can break core with ends SANDS 41 -80 11 -20 Firm 81 -120 21 -30 Very Firm MODERATELY Thin edges of rock core can he Over 120 31 -50 Dense HARD broken .with fingers Consistency HARD Thin edges of rock core cannot be 4 -9 broken with fingers 3 -4 Soft SILTS 10 -17 5 -8 Firm VERY HARD Rock core rings when struck with AND a hammer (cherts) CLAYS 18 -31 9 -15 Stiff 32 -60 16 -30 Very Stiff Over 60 31 -50 Hard Approximate Fines Content 5% to 12% 12% to 30% 30% to 50% MODIFIERS 0 -3 0 -2 Very Soft PARTICLE SIZE Boulder > 12 in. Modifiers Cobble 3 to 12 in. Slightly Silty or Slightly clayey Gravel - 4 -76rrm to 3 in. Silty or clayey Sand 0.074rm1 to 4.76m Very Silty or Very Clayey Silt 0.005rrml to 0.074rnrn Clay < 0.005rm7