Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
557 NE 92 St (6)
-cAo-LQ, J c=kj JJ > yJ �5� c f r'- RICHARD L. LAPIDUS ROBERT P. FRANKEL KEITH D. DIAMOND Frank Lubien Director of Code Enforcement Building and Zoning Department Miami Shores Village 10050 N.E. 2nd Avenue Miami Shores, FL Dear Mr. Lubien: RPF /sea Enclosure LAPIDUS & FRANKEL, P.A. SUITE 1600 MUSEUM TOWER 150 WEST FLAGLER STREET MIAMI, FLORIDA 33130 January 7, 1993 Re: McPhail Construction Corp. /Dr. Joseph Pierre Permit No. 32636 I represent McPhail Construction Corp. whose name appears on Permit No. 32636 dated May 19, 1992. For your easy reference, I am enclosing a copy of the permit. My client is engaged in a dispute with the owners of the property, Dr. and Mrs. Joseph Pierre. My client has not performed any services at the job for the past three weeks. My client has been advised that the owners have hired other workmen or contractors. My client hereby notifies you that it does not consent to any other laborer, material man, supplier or contractor working under the permit. My client will be happy to meet with you to discuss the matter. Please note my client's position in connection with the pending permit. Cc: Steven McPhail McPhail Construction Corp. Sincerely, LAPIDUS & FRANKEL. By T P. FRANKEL • AREA CODE 305 TELEPHONE 358 -5690 FACSIMILE 358 -2306 BUILDING Er ELECTRICAL ❑ PLUMBING ❑ ROOFING ❑ Owner of Building �• Architect Contractor or Builder Legal Description Address of � Building ltl �? � C2 1444-P6L I do4n c1tP , Lot / 11 BI Signed• CONTRACTO or BU DER MIAMI SHORES VILLAGE, FLORIDA PERMIT N932636 Work to be performed under this Permit 1 Date Contractor's �S: C/ License No. tc/ 1l IWG5t, ✓ ` / �a Subdi- vision //!! Sq Ft. Value of 4 / co Amount of Project / CJJ �� Permit $ BY AUTHORITY 44ea -e- (/ --tit mot, /G eo 19 .____. '3 ,t°. c�rr/ e This permit is granted to the contractor or builder named above to construct the building or to install the equipment or device described inthe 5p tion herefor in strict compliance with all ordinances pertaining thereto and with the understanding that the work will be performed in compliance with an plans, drawings, statements or specifications that may have been submitted to and approved by the proper municipal authorities. This Permit may be revoke at any time if the work is not done in compliance with such ordinances or if the plans are changed without authorization. A further condition upon which this permit is granted is the understanding that the contractor or builder named above assumes the responsibility for a thorough knowledge of the ordinances and regulations pertaining to the work covered hereby whether shown on the plans or drawings or in the statements or specifications and that he assumes respon- sibility for work done by his agents, servants or employ (INSPECTOR) BY In consideration of the issua o me of this permit I agree to perform the work covered hereunder in compliance with all ordinances and regulation, pertainin• thereto and in strict con rmit Tith the s, drawings, statements or specifications submitted to the proper authorities of Miami Shores Village. I opting is permit i sume r cpons bility urk done by either, myself, my agent, servant or employee. 7844A200 05/19/92TOTL 168.63 STATE OF FLORIDA DEPARTMENT OFSTArE Division of Archives, History and Records Management DS•HSP•3AAA Rev. 3.79 Site No. Site Name 830= = Survey Date 8505 820= = Address of Site: 557 NE 92 St., Miami Shores, F1 33138 905= = Instruction for locating on N side of NE 92 St. between NE 5 Ave., & NF h AVP_ 813= _ Location Miami :whores Sec. 2 57 16 & 17 868= = subdivision name block no. lot no. County. Dade 808= = Owner of Site: Name: Thomas, Arthur W. Address: 557 NE 92 St., Miami Shores, F1 33138 Type of Ownership private . 848= = Recorder: Name & Title: Stofik, Marty Address: 4SHPB Condition of Site: Integrity of Site: Check One Check One or More ❑ Excellent 863= = 0 Altered . g Good 863= = ❑ Unaltered ❑ Fair ^ 863 = = Original Site ❑ Deteriorated ❑ Moved( NR Classification Category: Threats to Site: none Check One or More ❑ Zoning ( )( ❑ Development( )( ❑ Deterioration( )( ❑ Borrowing ( )( ❑ Other (See Remarks Below): FLORIDA MASTER SITE FILE Site Inventory Form FDAHRM 802= = 1009= = 858 = = 858= = 858 = = 863 = = ❑ Restored( ) (Date: )( ) 858 = = ) (Date: )( ) 858 = = Building )( )878= = )( ) 878 = = )( ) 878 = = )( ) 878 = = Recording Date ❑ Transportation( )( ❑ Fill( )( ❑ Dredge( )( • 902= = 832= = 818 = = Original Use private residB38= = Present Use private resid850= = Dates: Beginning -i-1939 844= = Culture /Phase Ame rican 840= = Period 20th Century 845= = 916= = )( ) 878 = = )( )878= = )( ) 878 = = 878= = Areas of Significance Architecture 910= = Significance: Structure is a fine example of a late 1930s adaptation of Mediterranean Revival style to blend with the predominant style of the community. Noteworthy features include its large lateral massing and use of hollow clay tile grillwork. It is in scale and character with the neighborhood to the W. 911 = = Township Range , Section 812 53S 42E 6 ARCHITECT' _ 872 = = BUILDER 874 = _ . STYLE AND /OR PERIOD Masonry Vernacular 964 = = • PLAN TYPE irregular; irregular 966= = EXTERIOR FABRIC(S) smooth textured stucco 854 = = STRUCTURAL SYSTEM(S) concrete block 856= = PORCHES enclosed 942 = = FOUNDATION:. concrete block 942 = = ROOF TYPE: gy:ble 942 = = SECONDARY ROOF STRUCTURE(S):5$Eag 1 r e ile #former •942:. ;_ CHIMNEY LOCATION: end, front slope, interior 942 = = WINDOW TYPE: 4 light casein ,ent 942 = = CHIMNEY: CBS 882 = _ ROOF SURFACING: barrel tile, exposed brackets 882 = _ ORNAMENT EXTERIOR: hallow clay tile 882= = NO. OF CHIMNEYS 1 952= = NO. OF STORIES 2 950 = = 954 = = NO. OF DORMERS none Map Reference (incl. scale & date) Latitude and Longitude: .O Site Size (Approx. Acreage of Property): LT1 LOCATION SKETCH OR MAP r d J7 1 1 ;I nut Miami Shores Village Plat 1980 0 N UTM Coordinates: Tone — Easing Norlfiing 809 = = 800 = = 833 = = 890 = 6 ii.c• 92 Photographic Records Numbers 85N104HG30/85N104HG31 860= = Contact Print STATE OF FLORIDA DEPARTMENT OF STATE Division of Archives, History and Records Management DS HSP -3E 9.74 Physical Description: CONTINUATION SHEET Site No. • Site Name 557 NE 92nd Street Miami Shores, FL Structure is masonry vernacular with significant Mediterranean Revival influence. A front screened porch (S) now is enclosed with a variety of materials including aluminum casement windows. 2nd story front (S) facade has polygonal window in center. Ends of gables have horizontal weatherboard siding. The roof eaves have exposed brackets. Decorative hollow clay tile walls extend from E and W front corners, exaggerating the already significant lateral massing. Attached garage. Area to the immediate west is single -story professional offices, not threatening or impacting the residential neighborhood. za EMI /o /9 '8 2 Ee N 1, J .,L MIME NOIONOOli mm®mmm®m=m01 : - oa® 1 ./ 1 r !r it 7: /J U /! te� )^ 11 Inc Emma 011091111 NW JINN ROL din 9 I■.y.) 105 5 rL 5 15 75 nue pm amm a© ®m mation driliaddig —I.-l: W. min a ��eoAmeea� N �eooe�goeoee .11111 11111 ■ w. — 1- 03' 5T eg naliril Filop gar rapniat IMMO " Ni OOM R ease ria = ID N.w 9 9 N. 1 N- — Nw, 0 98 Eig RBI d 9 7 , monveaamm ®,. N . W. 9 mm eg i 1 in mum mmmeoevmmo ammame�mmms:- mmmeevv000am wed= mom 5 ro /• L ° T r. 107 o0ap ll t ° MI rrf`_ 1 0 4 *'.e. T mmmm O memm���mm T N• 5 .5 T. 9 4T ... 5T. 93 RD. 5 T. 5. ST. 5 T: d 'Urn emeo: fin Q 3.T. mum AMR 37. mmmme an Imo 41151 ill mmmm 5 T. 0 sopmed x. ; AIME mmm1mm®O 18 4 Q k N.1 E. 8 9 / / 7 4 1,4 N E. IOW =Am 5 • /J " •t // N,N _7 J�lu E • s�^ 7 L • ° /e 1/.0 i 7 e l , gaid , WHIN ,° L L B /J It !, :�i:, 09 O 5r < /J z ., u ' rt 107• mad INN ga AE 17, 11111 ese�me a as : 'r .mom uvula mnka au MIA IsIN MAIN aovaoamm Wi MEN 111111!1 mm deaavaam . 11'01111 m r iu / r N NJ. E • r�E N E r -J.E r 5T. ll * ;L1 1' 1 ST. 8 mlnmo m:momaam mmP� mmmmommm MOP HMO lid' toed 7 .. Ism ammoao NEIL 9o' a'' 111111 6 , :. am °0 11111' �- Onomimmm OHM MEd mmmmoa Mai tmmmmmg �mcmma rJ 1V•E r-. 11111 mankillo �momm . J. Mina 18 IV 1V. E. T O r ro �mme lb • , NEI raja �� 00 N P rr For r 5 o ®: 8 to e0o4 O I eao as • • 0 4 '"'• im anr�naee 10 1 0 z 101 a I 0 0 Je D• $ 5'. 5 moan p�nnn�� RPM kid egged ;mMm7r.'; 9 9 m a-e reel r a ohm 9 5 5 aepv n MA: A oil mu 9 6 95 9 4 92 dam 91 dept IQ�� mA / • r 7J ;t40 - ti MI I Alm i mmodmmen oo •vvntn� �m�oov�Jmn� nomanill cm • OR; MN MIN aniattlg ammeo�9'�a� illObAM1gg neD madam .9 T mmeeee�oa1i3 �gn�9A ®9►1�l� 181 r � , � �Epq s . fi e , 7, 1] 93 5 5 T. �3' J 5 T. T. 5T. 5 T s •• S T. TRACT q • OQ •r•e sr ROM OF 1 /54 MN000 f CNURCN ce B 5 SO • M1 e110 5. 1. 0 0 0 1. 11 so �mmnmo�mneaa zti:m �:0Z4 T. T le timaja Z�Zg ang= m0EDD9009c�� WI i► v'" RA ° 0 50 item eellig, �� � g 'l . ' ;' J . ; `� ,� _ mantigring re :04 moo MIND MOVER OMNI Paimi and • AHD • ell4MI SHORES SCHOOL moral tit" el ev OW • 9 NE Angle • mop Ikii NE • OWN 4 11 ralwiTia Absent: Cliff Walters MIAMI SHORES VILLAGE PLANNING & ZONING BOARD REGULAR MEETING AUGUST 26, 1993 Larry McClure Charles smith Les Forney Tom Laubenthal 3. Request for approval of plans for store front removations. Mr. George H. Bennett 9531 NE 2 Avenue 4. Request for final approval of waiver of plat. Mr. Joseph Pierre 557 NE 92 Street 1 The regular meeting of the Miami Shores Planning & Zoning Board was held on August 28, 1993. The meeting was called to order at 7:34 P.M. by Chairman McClure with the following members present: Also Present: Mr. Frank LuBIen,Director of Building & Zoning 1. Minutes - August 12, 1993 Mr. Forney made a motion to approve the minutes as submitted. Mr. Laubenthal seconded the motion and it passed unanimously. 2. Request for approval of flat roof addition. Javier Valera 9230 NE 2 Avenue After a discussion, Mr. Laubenthal moved to approve the plans as submitted by Mr. Valera. Mr. Forney seconded the motion and It passed unanimously. Mr. LuBten explained that the store front will be enclosed with a gunite wall and that It meets all the requirements of the Village code. After a discussion, Mr. Laubenthal moved to approve the plans for the store front renovation with the provision that the glass block panels be Increased In size to five horizontal courses of 8" glass blocks. Mr. Smith seconded the motion and It passed unanimously. Mr. LuBlen stated that Mr. Pierre has compiled with the re- quirements of the City for the waiver of plat. After further discussion, Mr. Forney moved to approve the waiver of plat. Mr. Laubenthal seconded the motion and It passed unanimously. Present Zoning Area of Present Building Variances /Zoning Change /y0 Council Action Required cJI Liami cJ hhorrs I llla L O R 1 0 A PLANNING BOARD AGENDA OF ,06a oZ6 /"? ITEM NO. Name of Owner /Applicant .SQ(6RJI ir46e,Q'E Phone No. )W—� j' Address of Property, and /or Legal Description .51,57//A Nature of Request /24/i44 i55 ,4eJoW Di" i4444 4 iDZ•gT Area with Proposed Addition Parking Spaces Provided Parking Spaces Required with Addition Setbacks as per Code Setbacks Provided y Es Date of Applicant Notification AP PR, Board Action " PR. Council Action Director of Building and Zoning Mr. Frank Lubian Village of Miami Shores Building and / Zoning Department 10050 N.B. Avenue Miami Shores, Florida 33138 , \ «" / c2s ,t... , / i I / Re: _Waiver -rof\ Plat / - - - Dr. Joseph -Px N, .-, •,, o 1 Dear Mr. Lubian: - eloiiinent Consultant Ford, Armenteros & Manucy, Inc. August 12, 1993 1. 6 \ _ • • 7`, Thank you for your usual consideration and courtesy. 8000 N.W. 31st Street, Suite 7, Miami, Florida 33122 Telephone (305) 477-6659 • Fax (305) 470-2805 A- / • • Pursuant to your instructions, enclosed please find five (5) copies of the revision to the above-referenced matter. Should you have any questions or require additional information, do not hesitate to contact us. .75.00' 52.80' 7 r Fb Ly _ OfrN fibwe 7biefihone L int ' roPone /a• , //z' °do' /19n Clet7f, P /7 I Par vv c .: :..c,•'. 4 . .. ti s;e "sg ;: 4 g :: O ! .�., t i� T ri ?O'V/ r i . ✓' N r MUM SHORES VILLAGE PLANNING & ZONING BOARD REGULAR MEETING January 23, 1992 A regular meeting of the Miami Shores Village Planning S Zoning Board was held on January 23, 1992. The meeting was called to order at 7 :30 P.M. by Chairman, Mr, Fernandez, with the following members present: Richard M. Fernandez, Chairman Les Forney Thomas Laubenthal Larry T, McClure Cliff Walters Also present: Frank LuBien, Director of Building & Zoning The agenda was amended to add item number 5A -Minutes of the meeting of Wednesday, January 22, 1992 by a motion by Mr. Laubenthal, seconded by Mr. McClure, and passed rn+animnusly. 1. MINUTES - JANUARY 9, 1992 The minutes of the meeting of January 9, 1992 were approved, as corrected, by a motion made by Mr, Laubenthal, seconded by Mr. McClure, and Passed by a unanimous vote, 2. REQUEST FOR APPROVAL OF PLANS FOR ALTERATION AND ADDITION JOSEPH PIERRE, 557 N. E. 92nd STREET Mr. LuBien introduced the case, stating that all pertinent information is in Members packet. At the previous meeting the waiver of plat was discussed & Members expressed the desire to see something in a drawing of exactly what is planned. He showed and explained a composit hoto and rendering of how the house will look when the work is complete. Tae house is not designated a Historic Landmark. Mr. Scott Jay, Attorney was present to represent Dr, Joseph Pierre. He stated they have complied with the required setbacks, The garage on the exist- ing house was added later. Mr. Fernandez in addressing Dr. Pierre, the owner, asked if he planned to stay in the house. This information will aid the Members to ascertain if they are addressing Dr. Pierre's request or a potential buyer. Dr. Pierre stated he does plan to stay in the house. The house is very small and he wants to add a pool and bath and closet space. The new garage will not occupy the den area. Discussion continued. Mr. Smith, architect replied to Mr. McClure that the water holding tank will be removed. He also clarified for Mr. McClure where the proposed demolishion will be. There was much continued discussion concerning the cost, rear wall, the new 75' lot to be built'on and the existing garden wall on the west side of the house. This 9' wall could be reduced to 5'. Members raised concerns seeing a beautiful home cut up and set a precedent of subdivision, but cannot deny the request. The Board wants to maintain harmony and the architectural integrity, Mr. Forney moved to approve the request with the removal of the wall, seconded by Mr. Laubenthal for discussion. Mr. McClure commented Members must consider the changes being made to the house as being in harmony with the house and the community or the request can be denied. •His major concern is in removing the wall which belongs there, he would PLANNING & ZONING BD REG NIG -2- 1/23/92 'however; be willing to have the wall reduced in height, He does not like. the term modify. vall. Mr, LuBien 'would have no problem enforcing the code•if the motion states the southwest garden wall will be reduced to 5' or less, This was made a part of the motion, the question was called and the motion passed unanimously, 3, REQUEST FFOR.APPBOVAL OF PLANS FOR WAIVER OF PLAT JOSEPH PIERRE, 557 N. E, 92nd STREET 4, REQUEST FOR APPROVAL OF PLANS FOR'GABAGE ENCLOSURE GLADSTONE PHILLIPS, 1248 N. E.-98t. STREET The previous request and discussion was for the alteration and addition to the existing house. No discussion was forthcoming for the waiver of plat. Mr. Forney moved the request be approved, the motion was seconded by Mr. Laubenthal and carried unanimously, It was clarified this is a prelimin waiver, also that it must go to Council. Besides the information in Members packet, Mr. LuBien gave Members a complete copy of sealed plans for their review, Mr. & Mrs. Phillips indicated he wants to use the garage for storage and laundry, The door needs to be replaced and enclosure seemed better than replac- ing the door, It is not being finished as living quarters, Mr, Fernandez explained the reason for scrutinizing the enclosure, the guidelines and plumbing in the garage. Discussed also were the awning type windows installed to match the other windows, the basketball post and the desire that it not look like a garage when finished and the driveway cutback, A five minute break was taken, The meeting reconvened at 8 :25 P.M, Mr. Laubenthal made a motion to approve the request provided the driveway is cut back a minimum of 5', The motion was seconded by Mr, McClure and carried unanimously. Mr, Phillips commented he does understand the intent, 5, APPEAL OF BUILDING OFFICIAL'S CODE INTERPERTATION" ROBERT COOK, 74 N. E. 111th .STREET _ Mr, LuBien indicated letters regarding the situation are in Members packet, Mr. LuBien stated that as far back as he can recall, when he began to work for Miami Shores Village, white tile was grey tile painted white. This has always been the policy of accepting this as a white roof. It is Mr..Cook's contention that white roof should be white cement tile and the color white be impregnated throughout, He noted the narrow issue of appeal appears on pg 1569, Sec 225, 1 -4, Mr, Cook disagreed with the item as it appears on the agenda. He noted he is requesting Members interpertation of the code, He produced tile. samples from roofing manufacturers, and stated he feels as noted in (31 his roof should be white impregnated throughout the tile and not painted as was done, MIAMI SHORES VILLAGE REGULAR COUNCIL MEE10 MARCH 3, 1992 Mayor Johnson Herb Spahn Henry T. Courtney Stephen Loffredo Robert Cook Also present: Gall Macdonald William F. Fann ITEM *2 PLANNING AND ZONING ITEMS: Recreation Advisory Board 1/13/92 Planning and Zoning Board 1/23/92, 2/13/92 The regular meeting of the Miami Shores Village Council was held on March 3, 1992, at the Miaml Shores Village Hall commencing at 7:31 p.m. with the following members present: Mayor Johnson and Lela Jacobson presented Mobile Patrol awards. Mayor Johnson presented the National Certificate For Excellence In Financial Reporting to Village Finance Director, Patricia Varney. ITEM *1 MINUTES Mr. Spahn moved approval of the minutes from the 2/18/92 Regular Council meeting. Mr. Courtney seconded the motion and the vote was unanimous In favor. Mr. Spahn moved approval of the minutes from the Cable TV Public Hearing of 2/25/92. Mr. Courtney seconded the motion and the vote was unanimous In favor. Mayor Johnson acknowledged receipt of the minutes from the following meetings: a. Request for approval of variance to permit room addition. Mr. LuBien introduced the Item and stated that the home was built before the Village was Incorporated and Is non - conforming to the Code. Mr. Cook moved to accept P &Z's recommendation for approval. Mr. Spahn seconded the motion and the vote was unanimous In favor. b. Request for approval of waiver of plate Mr. LuBien Introduced the item and stated that P &Z has approved the application. Mr. Fann stated that the applicant Is not entitled to a waiver of plat until some conditions are met. He stated that the request Is premature. Mr. Spahn moved to table the request for approval of the waiver of plat until conditions are corrected. Mr. Courtney seconded the motion and the vote was unanimous In favor. Mr. Fann stated that when the conditions are corrected the waiver of plat will be automatic. He stated that If It were not for the existing conditions at this time the applicant would be entitled to the waiver. c. Report from the Planning and Zoning Board on the definition of gasoline station. Mayor Johnson stated that In the report the definition Is not TO: .:y Ar i'Iii A %Cdi /1 ion. x . 1 0. E. � a/u•Q. - -- Ai 0J hI ' X32 REFERENCE: Permit No. ‘ 9,0&?)?-- : 1 4,43 3 " p (k ca' CS 7/7/_ 9& S7 ATTENTION: Please cancel the above referenced permit as the customer cancelled and same was never installed. Thank you, ADT SECURITY SYSTEMS MID - SOUTH, INC. Permit Department Security Systems 1052 South Powerline Road Deerfield Beach Florida 33442 305.481.3733 Broward 305.624.7770 Dade 407.655.4557 West Palm Beach Fax 305.428.2987 State N EF 0000100 ATTEST: Scott W. Davis Village Clerk APPROVED AS TO FORM: William F: Fann, Jr. Village Attorney RESOLUTION NO. 912 - RESOLUTION OF MIAMI SHORES VILLAGE COUNCIL APPROVING DIVISION OF LAND WITHOUT PLAT AS SAME AS SET FORTH IN SKETCH OF SURVEY PREPARED BY FORD ARMENTEROS & MANUCY, INC., PREPARED FOR DR. JOSEPH PIERRE UNDER CERTIFICATE DATED OCTOBER 14, 1991, REVISED JULY 13, 1993; SAID LAND BEING SITUATED IN MIAMI SHORES VILLAGE, FLORIDA, AND LEGALLY KNOWN AND DESCRIBED AS LOTS 15, 16 AND 17, BLOCK 57, MIAMI SHORES SECTION NUMBER 2, ACCORDING TO PLAT THEREOF AS RECORDED IN PLAT BOOK 10 AT PAGE 37 OF THE PUBLIC RECORDS OF DADE COUNTY, FLORIDA. WHEREAS, Joseph Pierre, as the owner of certain land situated within Miami Shores Village, Florida, Petitioned for the approval of a division of said land without Plat, and WHEREAS, the Miami Shores Village Planning and Zoning Board has heretofore reviewed and approved said Petition, and WHEREAS, said Petition appears to be in appropriate form and entitled to the approval of this Council, BE IT RESOLVED BY THE COUNCIL OF MIAMI SHORES VILLAGE FLORIDA, that the Petition for the division of land without Plat as same is set forth in sketch of survey prepared by Ford, Armenteros & Manucy,1 Inc. for Dr. Joseph Pierre under Certificate dated October 14, 1991, and revised under date of July 13, 1993, be and the same is hereby approved. 1 PASSED AND ADOPTED this 21 • day of September, 1993. MIAMI SHORES VILLAGE 4/11 William J. eff Will ern , Mayor BUILDING - PERMIT RECORD ' iriIAMI SHORES VILLAGE FLORIDA :APPLICATION ti • DATE Febr'uar'y 1N l Application is hereby made for the approval of the plans and specifications herewith submitted for the building or other structure herein described. This application is made in com- pliance and conformation with the Building Ordinance of the Miami Shores Village, Florida, and all provisions of the Laws of the State of. Florida, all Ordinances of - Miami Shores Village, .and ...all . rules and regulations of the building Department of Miami Shores Village, shall be complied with, whether.specified or not. OWNER a1 a'e W, ernwenra ARCHITECTCarlos Schoeppl CONTRACTOR John H. Arnold LOT 16 - BLK_57 SUBDIVISION M. a STREET# a NEVI X ADDITION REPAIRS 2 NUMBER OF STORI C ROOF pill; COST (excluding Architect's fee, landscaping & garage)$15,000 Building to be used for residence and no other use. I hereby submit all the plans and specifications for said building. STATE OF FLORIDA) COUNTY OF DADE ) Signed el Before me, the undersigned authority, a notary public, duly authorized to administer oaths and take acknowledgment, personally appeared____ _ p�p Id to me well known, and who, being by me first duly sworn, upon oath deposes and says that he is the builder of the above described construction, that he has read the foregoing application, and that he did sign the same, and that facts stated by him are true. Read, Sworn and Subscribed before me • ©, No ary Public My Commission expire‘, / Cubic Feet 3-2. Cubic feet required in this Block PLANNING BOARD Chairman, Membeql Member Secretary Building Inspector gam' N. �e Issued to Permit No. R.' Painting Plastering Lathing Electrical Glazing Tile Miscellaneous Mason & Concrete Plumbing Roofing LIST OF SUB-CONTRACTORS Lob cr; 1 7 10 11 12 1 L 3 1 1 C A 'I, 1 for ,ienerai L.:arthvioric ■,:onoret(. fr tee Oar 0 ai Lath 1 Luter Tile a .etrork G1as .1u r ) r ilY ...LOUSE ... 17, ..lock ;liore a "., se 2 'Aiorec 'v1.11ate UBJI.ZT .,)na Itaonry LLi lwork Iron, :rorae and Steel and. Stuctoo llovenber 16, 12.38 �i 1 4 4 5 6 a a 9 1 lc? 11 12 14 18 r � Teaohers SECTION 1 - GENERAL CO1D)ITIOdS )SOl SPECIAL NOT81t The "geners1 Conditions of the Contract ", fourth edition issued by the ric n Institute of Arohiteots, shall form a part of this speoifioation and shall govrrn All my work exoept where modified herein. Copies of "General. Conditions of the Contract" are male and may be referred to at the office of the Architect. '142 GRADAAL INTERTs It is the declared and aoknoxv edged intention and meaning to provide And immure a two story Dement blook atu000ed dwelling house, Complete as shown on drawings and as spsaitied heroin. The building shall be et on location noted on title page* .1+48 DRAWING AIaD Si ECIFICATIuN8 In erpre ions a Arohiteot'a interpretation of the drawings and specifioations shell be finals In case of difference between small and large scale drawings, the large scale 'drawings shall take preoedenoe and in oese of difference between drawings and apeoifioations, the Contractor shall procure proper. inatruotions from the Arahiteot before proceeding with the .worst:. R. Drawings furnisheds The Architect shall furnish to the Contractor, six oompplete sets of plans and specifications and three oopiea of each detail drawings. Should additional oopies of plans or details be required, the oontraotor shall bed charged with them. C. Ownerships All drawings and speoif :oations are the property of the Arohiteot and shall be returned promptly at the completion of the building. � p The Owner or his A o iteot reserves the right to rejeot any or all bids, and to suooessful bidder as he sees fit, regardless of whether or not he is the low bidder. BM also rsssrvesrthe right to substitute in any subwtrade, price to be adjusted a000rdingly x•08 =A! ISA'j'ION OF SITES The Contractor shall visit the site of the proposed work and tii the looation and Conditions affecting the progress of the proposed wnr. No additional allosanoes will be granted because of laok of knowledge of suoh oonditions. 4006 OL.DINANCES AND ii G TLATIONSs All requirements of looal and atate ordinanoes and iegtslations relating to building and the preservation of public) health and safety shall be observed by all Contractors. 1.07 PERMIT'S The General Contractor shall procure and pay for general building permits. ` 'peolal permits shall be taken ut and paid for by the vontraotor for suoh work. PROTECTION OF PiiOFERTYs The Contractor shall erect necessary boxing for trees, sohaubbety, etc. erect fences, and walks and maintain yarning lights where necessary at night. Be shall maintain adequate protection for adjaoent propertios as provided by law. -09 TBMPOARY FtkILDIA. The Contractor shall provid . a temporary office, storage shed, 0o ''' a o. as necessary to maintain job office and store materials and equipment out of the weather. 1::20 DOCUMENTARY STAMP TAX ACTS Each Contractor shall Co in his estimate and properly 5 s discharge any obligation due the State of Florida under the provisions of uhaj,.ter ,787, L Lsws of Florida, Aote of 1931, known as the Jooumentary Stamp lax Act. Tax is 1/'10 of one percent and is on all written obligations to pay money. 141 FEDERAL SOCIAL SECURITY ACTT Each Contractor shall oompute in his estimate and h pay and discharge any obligation due the United States of Aaerioa or the State of Florida under the previsions of the Federal Social Security Aot (H.P.7260) enacted by the 74th Centres.. Eaoh Contractor shall also inolude in addition to the above,. a tax for "Old , Age Benefit" vhioh is deduoted from all wages. Tax is 1% on wages of all persona employed. 1013 RENTAIL SALES ACT! Eaoh Contractor or sub - oontraotor or supply dialer ahal1 oompute T their oost and properly pay and discharge any obligation due the State of Florida under the provisions of Chapter 16,848, Laws of Florida, Acts of 1938, known as the "Retail Sales Act", or, "Chain Store ..Act ". 1413 CONTRACTOR'S LIABILITY INSURANCE t The Owner will sign withthe General Contractor the 1IiialF1 of the A.I.A. • °Contract: between owner and Contraotor", which will stipulate that the Outer will maintain and pay for fire and tornado insurance in proportionate amounts as the work progresses. The Contractor must maintain and pay for workman's oompensation iinsuranos a000rding to workman's compensation act effective July 1, 1936, inoluding liability and Contingent Liability Insuranoe which shall thoroughly proteot the Owner and Contraotor 'from any claims for damages or personal injury, inoluding death to anyone whioh may arise from operations under this ooantraot. Certificates of such insuranoe shall be filed with the Owner, with a Disuse in suoh osrtitioate requiring at least ten (10) days written notioe in the event of oanoellation, and shall be subject to his approval for adequacy of protection. 144 SANITARY CON IrWLS: The Contraotor shall ereot temporary earth oloset for the iesiiin an the job, and maintain it in a clean, orderly oondition at all times. At the completion of the work, he shall remove sane and its oontente. 13 WATERS As soon as praotioable, the General Contraotor shall arrange with the }mater for a tap to the water main and the installation of a 1" water meter. The General Contractor shall have the water meter installed and pay for tap and all water oharges, inoluding meter Deposit, for oonstruotion purposes. Meter and deposit shall be changed to Owner's name at the oompletion o this contract. The Contraotor shall not be reimbursed for meter deposit. 1416 �� UIPb?s All equipment necessary to properly expediate the work shall be furnished y th oontraotor. 1+17 yATElTALS* All materials th.t are to be furnished h rounder shall be the beat of their respsotive kind as apeoified, eubjeot to the approval of the Arohiteot. 148 LATING OUT OF WORK, The prinoipal lines and necessary grades for the oonstruotion of the building are shown on the a000mpanying drawings and shall be followed aoourately by the Contraotor. The Jontraotor shall oheek carefully and verify all lines and measurements and cheek suoh additional points of lines as may be required, as the Contraoto* shall be held entirely .responsible for the proper laying out and construction of the work included in this specification. The Contractor shall check the layout of the looation with the Arohiteot betere prooeeding with the work. All levels and grades shall oonfons to those shown on the drawings. Eaoh Contraotor shall cooperate with all other oontraotors engaged in work on the building to the end that unity of action wii1 facilitate the orderly progress of the work, '14.19 CUTT1L0 AND PATCii7NG3 The Contractor shall do all neoessary outting and patching to 'make the severil pants of the work fit oorreotly and shall leave the building oomplete as one unit. 2 .. Teachers rri Teachers 120 CLEANING' Eaoh oontmaotor shall remove from time to time all rubbish left by himself or his subweontraotors, and keep the premises •lean and tidy at all times. :el GUSRANTEEI Unless specified otherwise, all material and workmanship shall be guaranteed againit defects for a period of one year from date of aooeptanoe of the building. 1412 CASE ALLOWAU0ESs Where oash allowances re made, they do not include Contractor's ,profit. Contractor to inolude such materials, work and installation costs, as are required for a 'omelet* job ix every respect, unless otherwise specified. In oonneotion with such work* the General Contractor is to construct or set all adjoining work as that work under these items can be set just as if same mere inoluded in the Geuural Contraot. The full amount of sash allowances shall be construed as being oredita to the Owner in their full value as set up in this oontraot„ a nd do not include oontrsotor's fees Should the final cost of the work included in those al lowan oe s be lose than the amount of the iallowanosr, then the Owner shall be oredited *hd differenoe. However, should the final cost of the allowaneee exoesd said allowanoes, the Owner will pay, net, the differenoe in exoses without adding a Contractor's fee. All work covered by allowanoes will be oontraoted for dirsot through the .rrohiteot's offioe. A. 1L►rdwrtre 250 00 Bs Llegtrio Fixtures .. 250.00 0. Wrout Iron . . • • • . 50.00 D. Medicine Cabinets • • • • 35.00 E. Shower Joore • • • • 37.'00 - 3 is SECTION 2 • EARTHWORK • 4 • Teachers " 2-01 EXTENT OF WORK. This work inoludes all neoessary earth and rook exoavation, filling an ,, r ough and finished grading necessary for footings, foundation walls, t erraoes, eta., shown on the plans. The Plumber shall do all excavating and baok- filling neoeasary for his work. 2•03. CLEARING OF SITE The General Contractor shall clean the entire building side of all 'r rubbish and all other ob3eotionable matter. Do not out damn any trees without first consulting the Architect. All trees within area of building walls shall be transplanted, on plot where directed iy the Arohiteot. 2-03 EXG The Contraotor shall do all earth and rook excavation for all footings tad under parts of the building and wherever required for the oonetruotion of the building to depths as ,sheen or speoified. 2.04 FILL ARID BACK•FILLs All earth used for filling and baola- filling shall be clean and free frost rthbish, vegetable or other objectionable matter. All filling or boob filling who planed shall be puddled and tamped. Fill and back -fill to proper levels for all the tile and oeaent floors, sidewalks and runways. $.05 GRADING: This Contractor shall Sill or excavate as necessary o bring the finished Trade to levels shown on the drawings at the building line. Frain thew lines the finished grade shall be worked to meet the natural grade at a point ten feet from the building in all directions surplus fill any be left on the lot for grading by the landscaper, if so directed by the arohiteot. SECTION 3 • CONCRETE AND LIASCiiRY 3•01 EXTENT OF WORE. This part of the oontraot shall include all materials, labor, equip- Tent and scaffolding for plain and reinforoed oonorete work, osment block work, brick work, dement floors, file vents, and all other miscellaneous masonry necessary for the oompletion of the building as shown on the drawings. 348 I(ATERI LS t A. S at • Shall be Florida Portland Cement conforming to the ourreot standard spoof• fieations of the r:m,rioan "yooiety of Testing :: aterials. Bs Sand • Shall be Glean, sharp and free from any foreign or deleterious matter, and shall be well graded from ooarse to fine. C. Broke' Rook • Shall be Glean and hard of sizes shown on the drawings. n Concrete Bloeks • Shall be of approved mixtuxe and texture, cured at least eight days in the shade and kept well dampened. No cracked block shall be allowed. Blocks shall comply with the requirements of the local building, code and shall be 8 "*8"z16", bearing the tnarsriter's label. E. Ce :.ens Brick • Shall be sound, thoroughly hard burned, of standard size, free from defects and shall be whole and news F. Fibs Brick Shall be made sound, hard burned, fire alai bricks. Go Cement Brink • Shall be well cured, hard and of standard oases. H. Flue Lining Shall be standard terra ootta flue lining of sire shorn. 1 • latter Shall be from the City ;wins. J. 11Xposed Brierk - Shall be old red brink, sound and thoroughly hard burned. 5•05 STRUCTURAL CMCR Et Grade beams, wail columns, tie beams,, etos shall be of reinforoed onorete as shown on the drawings. Concrete shall be mixed in proportions of 1 cement, 3-1/1 sand sad 3 •I rook or according to city node. Aggregate shall be °lean and graded and free fro from all mater that, in the opinion of the Engineers, is deleterious to oonorete. Water to be from City Mains. CO 5 • Teachers ' ,norete and Laustry Contwd) .44 REINFOR lNG STEIL. All steel for oonorete shall be new, intermediate grade, corruptly flbrieated, plaoed and held rigid in place. ti 5 SUB•i.LOOH$s All sub floors shall be as called for on the ctruotural drawings or noted the arohiteetural plans. The finish of all subs- floors 'halite suffioiently low to provide proper setting for finish floor called for in plans or this speoifioation. Provide waterproof paper under all concrete slabs on fill. r FINISH CELINT FLOORSs All floors or surfaoes marked "Cement" shall be trowled snooth th proper pitch as called for on the drawings. All oement floors shall have oolorsd oement inish• All oolors shall be integrally mixed • colors to be seleoted. CLIENT MORTAR* idortar for all masonry work is to be oomposed of 1/2 oaok Florida f Orland, 'i saok Florida Masonry oement and 44 ou. ft. of sand or 28 shovels. MASONRY fiAtis All cement blocks shall be laid up true and plumb in a substantial nc� Qnan manner, using cement briok for filling where necessary. Before setting and 5 lding any masonry material into walls, it is to be oarefully wet down in order to prevent tee rapid suotion of the moisture from the oement mortar. All the above worst shall be d up in full oement beds, oarefully filling the vertioal joints. All exposed block shall have joints wiped with gwmy sack. V CHASES AND WALL SLOTS: All soil water or oth(.r pipe and radiator reoesses to be ied in tile or concrete blook walla, most be built in by the I.`.ason as t.e work progresses end not be out out later. Lawn shall build in these slots where direoted b the P umber. i•1O NTSCSLLA1EOUS IRONS This Contractor to furnish and install all miscellaneous iron to Way .delete the work such as angle lintels, joist anchors, hangers, etc. where ems are squired. 4hll FIREP'I.ACES AND CHD NETS The Living Room fireplaoe sha. l be as shown, oonstruoted in the best approved manner using fire briok under bed and linings and terra cotta flue lining Of sip indicated on the plans. Fire brio* shall be laid flat in straight lines using olay toter. Entire ohimeury shall be oonstruoted of common clay bricks exoept where oonorete beams odour. DRIVEWAY; Driveways where shown shall be built of first grade rolled rook. 8" rolled to , finished with oil and gravel, pitohed to street, all as indicated on the plot plan. -use plot for ourb to street. Use 2" s 6" strips treated with o eloursol for curbing. SECTION 4 • STEIL ILWWCYi8s '4.01 ()MEAL REQUIMMENTS s All windows throughout shall be bonderised, steel windows as meaufsotursd by the Detroit Steel Products C.:sapany, Fenestra Fenwrrought Type„ as noted an elevation's er plans. All ventilators shall be equipped with X18 mesh bronse sore= wire guy set in stainless steel frames, Hardware shall be bronse finish with die oast adjuster housing and type "D" operating and looking handle. Adjuster housing shall be mounted an steel plate securely welded to window frame. All windows shall be set in wood bucks furnished by ethers. No fins required, See details of jamb conditions. 02 EREC I0N s This Contractor shall erect all sash and shall at nascns haw to poor w ' prepare the rough openings and be responsible for sands. sash shall be true and lore , , to heights as shown on all four sides of each • Undid* outside. Coach:ors SECTION 5* CARPENTRY J1Ni) MILLhORK 1001 EXTENT OF ZDRKs The work under this oontraot inoludot all rough oarpentry and from nu iu shed carpentry, anterior and exterior millwork, and all euoh other woek as oan reasonably be implied to As belonging to oarpsatry as shown on drawings and as herein called for. 1.06 V LIT! OF WORKMALii3Ps All work that is to be done wader these specifications shall bs love b mechanios and az'lsians skilled in their reapeotive trades.. in order to rroduoe first ola*rs oonatruotion and installation of the worti Medioore workmanship will not be aooeptable to the Arohiteot. 5-05 TILTERs The whole of the tizcer used throughout the house for floor, joists, roof ra!l ere, ate. Mall be long leaf yellow pule, to be the best of its respeotive kind, new lumber* thoroughly dried, full and mare to dimensions noted an plans, well seasoned and free Prom large knots, shakes, sapwood or other defeots. Creosote all of the under floor timbers and ends in masonry as direoted with Creosote heavy enough to oover the grain of the wood. 5-010 ROUGH HARDWARE: This Contraotor shall furnish all rough :ardware in oonneotion with Es work, euoh as nails, sorrow, bolts, anchors, straps, ties, gate h:rdwaro and garage door hardware sliding door and shutter hardware, as distinot from finished hardware. All nails for exterior work to be galvanised and sorewrs of brass. The carpenter is to work with the Mason in oonneotion with placing and netting of bolts, anchors and straps, ties, etc. 6.05 FINI81iED : ARDWAhEi All finished hardwares *hail be furnished under a oash allowance s aaaurn e y and neatly set by this Coitraotor. Before pai.ter starts his work, all hardwire shall be oompletely set, then removed, marked, stored away until after the 01660.6 painting is oompleted, then carefully, a•.urately and seoorely reset after painting is entirely finished. ¢06 OUTTTiIG AND FITTING: `Phis Contractor shall do all cutting; and fittin ; of timbers to t special oond3tions required for installation of equi :msnt, eta. OF 547 PROTECTION INN ''A}ik; Cover and protuot with boards sills, steps, ornamental work, door and window abs an sills and all work from damage of any oharaoter. Cover with heavy building paper and proteot and keep olean, all finished floors, until the oompletion of the building, Proteot all trees with nheathj.ng scoured to trunk where they are in da ger of d, nags. h 08 n al AND CENTERS: Build and set wood forms and centers for all plain and re - nforoed oonarete work and brick, stone and plaster arches required in uocoxdanoe with plans and detail* and neosasazy for the eonstruotion of the building or wherever else required for any part of the work. All oonorete shall be oompletely formed and none poured in oontaot with earth and sand* Art wood forms shall be reneged. 6■9 kAIG: Studding throughout shall be #2 short leaf yellow pine properly sired and apaesa6" o.o. Place single plate at top and bottom of non - bearing fracas partitions and double at top of those oarrying joists. Bathroom partitions at %ends of tubs not to. be eseoted until tuba are in plane. Furr all exterior masonry walls not shoti:n otherwise with 1 "see" furring strips on 1 "x" blocks, furring strips and blocks to be pressure treated impregnated with Celouresol. t•laoe roofing felt under all studs on first floor slab. See dreoings for furred ceilings and finished oeiling heights. All studs shall be doubled at all openings. Leads to be doubled for small openings and for age openings have beams at all openings. Leads to be doubled for small openings and for lib openings have beams for lintils, or sufficient size to properly carry the loads impeee000 Floor and oeiling joists and roof rafters shall be 4 yellow long leaf pine* 2gampoists under all partitions shall be doubled. Beam ends in masonry wails to r oeilmfailellik.eet of Celouresol penetrating pressrvatile. A - 1 coiling ,)oists i roof oonstruotiou 1 length and to be securely spiked to rafters and set to ties, and where ceiling Y 'slre below plate heights, they are 'tabs hung from these oross ties. Cross bridge all 3oitt``ttth 1 "x2" strips using one row between bearing 12 feet or under and two rows for spans of over 12 feet. 6* Tcaoheg a 640 SHLATH1 Gs All roof surfaoet and floor joist are to be solidly sheathed with 7/8" x 6" G# 2 yellow pine sheathing, solidly double :sailed at bearings. All exposed sheathing shall be ul Common pine , groove random wi4the. 0.11 .I XTEFIOR t;)CDc Oi K: All exterior woodwork shown or dotailtL., to be of ; 1 common pine as ea led for. 642 BUCKS, Furnish and install 14/4 "x; •1/2" oypress buoke c s detailed for all sash. Use 2 "x4w timbers cut diagonally in half, each timber making two busks. • 5-15 CAUI,KIiii Gs Tho exposed perimeter of all exterior openings to be baulked with ,un type oaulk'ing compound. This includes around all edges of timber agtinst stucco 'walls throughout. 5414 DOOR F RAI. ' S; All door frames shall be of oloar oypr. ss as detailed. 5-15 fl TEriIO . OGD All interior woodwork shall be °leer white pine. spoor trim shall v. one piooe, moulded. All finiahe:i millwork shall be sanded at the mill. 5-16 JOQ:.0 : All exterior doors shall be of clear oypr Interior doors shall be olear ''w" ite pine of fir, as indicated. All doors shall be mortised and tennoned, detailed ae shown on door schedule. Glared doors shall be fitted with wood steps, 5*17 CABINETS1 Provide kitohen, pantry and all other cabinets as detailed of blear white lane* Slab door made up with waterproofed glue. All shelves shall be supported on moulded shelf seats. See details and plans for notes. 5-18 CLOSET FITTINGS* All closets, not show otherwise, &all be fitted with two shelves, clothes pole and sloe rack, where indicated. :;helves shall be supported .,n moulded shelf seats. Clothes poles shall be 3/4" galvanised water pipe with alvenized seats at wall. 5-19 SC` EL iS1 :greens of exterior doors shall be 1 -3/8" think of al©er cypress with 18 uesh Gronse wire sareeining. All nails shall be bronze or ooppers irovide felt but strip at 'bottoms of all soresn doors* See &tails for window softens. 5-20 LTDICIhE CABINETS* See Dash allowanoe. Cabinets to be set by Contractor. 5-21 rlEATBERWOODs U. S. Gypsum 16 "xlG" weatherwbod tile, or equal, shall be installed on o Sngs who oan or called for. 5-23 LINOS Floors where called for shall be ooverod with medium gauge linoleum where balled 'fir. a or and pattern as directed by Architect. 5423 WOOD FLcOiSs Cale strip flooring Where called shall be select ax1 cam on red oak nailed to evb- iloors• Provide heavy building paper between all sub -floors and finish wood floors. All wood floors shall be sanded until smooth, treated with one ooat of "Lignophol" as mfg. by A.L. Sonneborn e Sons, Inc. and applied according to manufactures directions. All oolors as seleoted. All wood floors shall receive two coats of wax. 6034 SHOWER DOORSs Provide and install two model "L" shower doors, size 24 "x72" oomplete as manufactured by J. M. Ketohem :.'anufaaturing CompanY.vr equal see oash allovlanoe3. • ? - SECTION IV. ROOFING AND U T ;>;ETAL LORE 241 EXTENT Or ,•ORK, This part of the oontraot inolud.s material, labor and equipment for all rile roofs, sheet metal work, and flashing, of all description for the house. All work shall be watertight at completion. 6-02 :FLT= The ,:ntirc roof shall be covered with a X90 slate surfaoe enasoo Roofing felt as immufactured by Beebe Asphalt Co., being careful to stagger all joints. alt shall be applied to have at least 3" lap horizontally and vertically, upper edge well nailea with large head copper rotfing nails. Felt on hips and ridges shall lap 12" both w aye. swab in all felt with piteh. Provide . 3 ply felt membrane waterproofing on deck. 64i TTLEs The entire roof shall be oovered with Old Cuban Tile Cape and rens or Domestio Pans set in solid mortar bed, 9Onoape per square, double caps at eaves. :o badly broken tile will be allowed and the entire roof must be swept down and left olean. All cement shall b e out off flesh at ends of tile i a neat workmanlike manner. 1444 NAILS, All nails used in connection with roofing shall be galvanised nails. 645 FL68lINGs All if terseotions of roof with vertioal surfaoos, of every nature, uhall be ias W7 counter- flashed with 16 os. roofing; copper• Flashing shall be full length pieces looked and soldered joints. All pipes pae ing through roof shall be caulked it the hubs or **Nodded in elsstio oement and held with brass olamps. Rosin shall be used for soldering flue. 6 - GUARANTEE' The Contractor shall J.ve a written guarantee against all defeats of material ` an4 ,o p in the roof for a period of 5 ;ears after date of aoceptanoe. 3:„CITTON 7 - L:13C.L.J.L- °hiC II, ION, B1 3n EL 7.01 (MZRlL 11..L tUI .,;.. :,ITTO: The Contractor shall furni:;h all wrought iron, anohora, pot hangers, ape ta, ties, clips and other wrought iron requirements for the entire building operations. 7.0$ TBRE$ROLWS AND oeaA• -rs p adjusted for Welt Al 743 WROUGHT IRONS cif: Coe Cash allc wanoe for wrought iron ellioh includes wrought iron stair hand „ THERaTRIPPINGs This Contraotor shall eupply and install spring bronze rouse e •o • on all doors so marked on schedule. Thresholds shall be to all doom to pass over rugs. 7 • VENETIAN NUL) UID --Ss All window openings, and where oa led for, shall have solid brass atvsimel guides, same to be reoeosed in plaster and set before plastering is started. Guides shall be set true and plumb, and variations in the sotAug of the steel sash shal.. be oorrooted before guides are set. 4 Teaohers SECTION 8 • LATH PLASTER AND STUCCO • 9 Toaohers 8.01 EXTENT OF LORE: The work under this heading shall inolude material, labor and equip+ Sint and scaffolding for all lathing and rlaterin7 of all inside faces and of all exterior masonry walls. and interior walls. partitions and oeilinga, throughout the building, together with all other similar work not especially mentioned, but shown or implied b the drawings and speoifioations, to make a oamplete first -olase job in every respect. 86.02 LLTEflIGs All walla and all oeilin;s, except where shown otherwise, shall be lathed ;writ 5/t6" Sheetrock, seourely nailed a000rding to floating wall system with galvanised iron nails and metal at and set with „oints staggered* Use metal lath strips, 8" wide, continuous !around the *robed openings where shown on plans and all bull -nosed corners. Also, all inside and outside oorners of all walls and ceilings. the lath to be 2/4 lb. galvanised expanded metal lath, or 20 gauge galvanised Clinton wire mesh. Behind all tile wainscots and neon Cement, !lath shall be galvanised expanded metal. ,8-03 PLASTERING: All interior walls and ceilings, except where otherwise specified shall be plastere_ ooate, using Gypsum plaster as manufactured by Certin•Teed .'rod. Corr. gauged and finished with amooth putty finish in kitchen and baths. All ether rooms to have hard smooth white sand or texture finish, as directed. Submit samples. All plaster shall be arced according to the direotione of the manufacturer. All plastering shall be brought out 'flush with grounds and all oorners at windows and doors where no wood trim is oalled for, together with all exterior angles, shall ran flush with trim mould. All corners round. All planter in bathrooms and k tohen shall b e flush with Idle wainsoot as directed. .file oap shall project 1/16" beyond finish plaster and tile xaiesoot. 8.04 1OR!MM BID: ilaetering shall be done in such a manner as to leave a p rfeot job, free from all defeats, "Spidering" and other imperfeotions, to make a perfeet job of plastering and lathing. On all exterior and interior walla, whioh are speoified to have a tile base or wainsoot, the finish coat of plaster is not to be rut on until after the the work has been finished. No cutting or patohing of plaster in conjunction with tile work will be allcwsd. 8.08 STUCCO: Exterior malls where shown shall receive 2 coats of :eortland Bement stu000 oompoeef 1 part clement and 2 parts sand. All window jambs, heads and sills to have stu000 finish. Stu000 shall be waterproofed with "See" or "Fluresit" tinder the direotion of the representative of the :ranufeoturer. 6.06 CUTTING AND PATCHING: Do all neoessary nutting and patohing of plaster work as required 'alter other trades. All patohing must be done in neat, workmanlike manner, leaving neither otwoks, Barka or stains. 107 HUN STUCCO: All exterior mouldings shall be run stu000 to approved profiles as shown on the drawings and subsequent details. Portland Cement stu000 composed of 1 pa t Dement and 2 parts sand. All stucco shall be waterproofed with "Fluresit" or "Seo" under the direction of the representative of the manufacturer. 8-08 FINALLY: It is hereby definitely . peoified, understood and agreed that this Contractor Ti not to plaster over any eleotrio outlets, and that should he do same, anytime spent by other trades in locating the plastered -in outlets will be oharged back against this Gontraotor. Yale suoh oarelessness is general in the plastering trade, it will not be tolerated on this job. r Teaehers t X SJ TION 9 • TILE AND 3TeNEtiORH An of the the to be paid on a full oement' grout and to bc level and plumb. All 'ainsoot tile to be set in oement grout on a metal lath. The General Contraotor will install metal lath. 41]. floors to be set in waterproofed cement grout. All tile waiescots ;hall be set flus with finished plaster. Tile asp or wainsoot shall protect 1/16" beyond finish plaster or as dirootedw x-01 TILE: All tile in baths and kitchen *sere oallee or shall be standard grade matt tile, ,go or and pattern as seleoted. 9-02 BATBB 1 e 2: Shall have tile floor and wainsoot 4 +0" and 06" at tub or dioeers. Tile ISM le 4"x4" with 3/4" decorated liner strip below top tile. .9.06 BATH 5 Shall have oeranio tile floor and 4" base. 9-04 IC TCI : Shall have tile backs, ends and oounters as detailed or selected of 4-s" x4; ' tilso uee details 9••06 ACCESSCRIIES= Baths 1, 2, shall have oolored china accessories. Bath ; ;3 shall have white �►�na aooessorrors. All baths shall be equipped with 2 soap dishes (ono with Grab rail) 2 -24" towel bars, tumbler and tooth brush holder, 1 paper holder (reoess typo), 1 hook, 1 razor strop hook, 1 douche bag hook. All bathrooms shall have marbly: thresholds. 9.06 WINDOW SILLS: All windows shall have matt tile sills as selected, with bull nose edge. plans for other notes and include as called for. 9•07 LIVING RUOMs Shall have quarry tile floor, color and pattern as selected, 'white oenent joint 1 PATIO & SITTING TEENAGE: Shall have semi filled quarry keystone laid on sand with oolored os snt joints. 948 PATIO POOL Provide 6 "x6" decorated tile across front edge and on tap of pool and bin wi►11s. All as seleoted. 340 FINALLY: At the oompletion of all tile work, this Contraotor shall clean and polish �l of his work. k loora shall be machine weaved, two coats. Lleotrioity shall bc furnished by the Owner. SECTION 1 0 • GLAS:i A D GLAZING 10 EXTENT OF WORK: This Contractor shall furnish and install all ela.; neoessary for Toor4, otbinets, sash or wherever else called for, or required, by the drawinga. 10-02 GA438: Glass for all doors and windows not apeoified othervrioe shall be double strength vs. . glass 10-02 PUTTY: Shall be durable, easy working putty all glazed openings, shall adhere rudily to glass and dry promptly with a non - greasy surface. Any putty that cracks, wrinkled, sags or breaks away shall be replaced. details 10-06 L`IItItORS: All mirrors on walls and doors shall be 114" plate class. topper backed, See 10■6 GLAZING: All glass shall be properly set, well sprigged, puttied and baolo - puttied and Tef� eaaa asad whole upon ooapletion of the work. Glass in doors shall .. a sat in putty. 10-06 CLEANING: At the ooasapistion of all plastering and pal tang, the glans shailbe °leaned Waj s s, patty stsins,►paint, plaster, eto., and lashed thorou ly. .10 Teaoherd SECTION 11 • PAINTING 11.1 ECTLT OF WORK: This part of the oontraot inoludee all material, labor, a quips nt and Scaffolding for the painting of all exterior and interior woodwork, exterior etu000 malls and (tailings, interior plastered walls and oeilings, wrought iron work, pipes, hinges, switch and outlet plates, eto. 1«02 MLTLRIALS: All paints, varnishes, lac -quars and oils shall be ZerWin -V illiams, Dupont, ija $n Moore w Co., or ittsburgh Plate Glass Coo All paint shall be deliverer: on the job in Voir original packages and they ahall be used in atriot a.:oordanoe with the manufacturer's directions and must not be thinned =loss directed to do so by the Arohiteot. A11 colors to be seleoted by the Arehiteot. •11 WORKMANSHIP* All dust, dirt, etc., ahall be removed before aiplying paint. Puttying s _ a be done after the priUng coat has been applied. All fi ishe:' suriaoes shall be smooth, even and free from defects. and paperin shall be done where naoessary. CLsets shall be the same as seoified for the adjoining room. See that the woodwork is properly prepared and in perfoot condition before any painting is starter:. Failing to do so, the painting Contractor shall be responsible for any defeotive paint. 11•0t PRIMING LID CK., i iai G: All woodwork to be painted shall be :rimed with lead and oil Taint. exterior door frars z�nd window buoks shall be back - painted with a heavy ooat of oreosote before erection. All trim shall be primed before plastering. The backs of all cabinets shall be given a heavy coat of shellac after fitting. 4.06 EXTLRIOR .0oD4,ORKa All exterior woodwork shall receive, in addition to printing, two coats of lead sino paint. 1106 INTLMIOR FINISH* All i:: erior wood finish in bathroom and kitchen shall be primed, with one ooat primer sealer, one ooat half and half flat wall paai.it and enamel and two ooat dull dlus enamel, or as direoted. All other woodwork shall receive one coat primer sealer, oolor added, three coats flat wall paint, where direoted. Woodwork shall rooea ve one ooat oil ,stain, one coat shellac and one ooat rotton stone and wax rubbed off as directed. 11.07 PLASTLN WALLS OLILI Plaster work in bathrooms, and kitchen shall reoeive one coat ,rimer sealer, one coat half and half flat paint and enamel and two coat delux enaaal or as directed. All other spaoes shall receive use coat primer sealer with oolor added, and two ooats flat wall paint. 11-08 STUCCO I'AINTILG: All exterior walls and inside garage walls to reoeive two ooats of paint, Tn colors, and for effect, as directed by the :.rchiteot, Paint shall ,e as manufaotured b the "See" Mfg. Cam. 1148 1. 11.'AL SASH & IRONWORKC: All motel work shall reoeive one ooat of aluminum paint as soon ;I is d .livered to the job. After setting, all ::total work shall reoeive two ooats of automobile enamel, oolor as seloted. 1.14•1Q CL.r,AN)NG AL) .t i:OTECTIC "►a: This Contraotor shall provide drop cloths, ate., for the iiiigii3on of floors, hardiiire, fixtures and other parts of the building tram paint droppings. He shall olean paint from any part of the work which may be defaoed by his workmen, leaving the 'job Olean and oomplete. SECTION 12 • PLUMBING Teaohers; it iii - 7 - 67aitions 1 SPECIAL irk .t'Et ahe "General Conditions o3' the ,entrant" ienued by the A.I.A. and the of these speoifieatiens shall Derr.: a art of this cpeei ieation for plumbing. 1;_.°2 EXTeNT t „u� The ti+ork inoluded by these speoifioations oameri3e tho noce3aary labor and materials to install oomplete in every detail the plumbing system of unitary Brains, hot tad Cold Water supply system. The installation shall be made so that the several component parts Will funotion together as a workable system oomplete with all aooe ..aories neoessary for its operation, and final left with all equipment properly adjuoted and in w rkinz order. '�12 -03 PEReiTe AL GeRTIFICATE8. This Contractor shall promptly obtain and pas for all permits zieoessary to carry on and oomplete the plumbing, unless otherwise herein specified. The Arohiteot reserves the right to withhold final settlement until this Contractor has delivered to him all pertificates from all souroes necessary to c seeorm with all c .istiz cis, rules and regulations in effect at the plane of building. •CEArACTL& &; - :: ;;; K: The entire plumbing system must be ::o installed and perfected as to amply with the • lorida State Board of Lealtll and all governine bodies t ct have Juris.• Motion at the plaoe o1 building;, earefuily comply with their requireeeees, eed netwithetanding anything to the contrary LA these spocifioations. . owever, +•.•here the workmanahip, eise dim,enm- tibns, grade, quality, or olass of materials epeoified herein is better than otherwise the above tamed requirements, this speoifioation moat be strictly adhered to. 05 CUTTING d ALT::.ii:._.t UEK O: : l.,,it;z immediately upon cieeiee the eontractef eor this ' =ork s Contractor shall insteot the plans and apeoi. ioatiuns to assure that the eeoe isaiy provi• *ions for the proper installation of this work have been aside. This eoetraotor shall furnish to the other trades Contrt otore suoh intonation as is necessary to provide chases, pockets and Openings in the struoture as it is built, avoiding as muoh cutting as po*sible in the rough etruoture. 2..06 XiATER SLEVICe eereeeTION: This Contractor shall arrange with tho water oo. ,pant' for a tap o t e water rain and the installation of a 1" water ratter with a full by-pass acid a stop and masts nook on the house side and oast iron box for an approved tatter oonneotion into the property. The General Contractor shall pay for tap, meter and all water charges. EARTHWORK. All e- .oavation and bao3e'filling required in the oonstruotion of t: is work 1 be done by this Contractor, who shall furnish such bracing, sheathing, e to., as may be 8equired to properly protect foundations or walls of the buildin. as directed. lame- filling Shall , e done in a r anner to prevent undue settlement, and surplus earth removed as directed. LY,..08 1iATE ?IALSt All materials furnished must be new and free from def Dots and be the best of *soh grade apeoified or required for first olass work. The Are itect reserves the right to rejeot any materials or fixtures that do not oonform to these r quirements, alsc to rejeot any wor3kQan• ship that is not first class. All waterpipe and fittings from meter throughout, of aisee shown Shall be Moeller streamline Type "M" copper tubing, or equal, as approved. ,':11 sell pipe shall + be oast iron, extra heavy weight. 9 SIZE Oz eATEe eleE: This Contractor shall make an approved 1 ca...ectiaon to the 1" slater meter for the first 35 feet of gale. steel pipe 60-4ke and bring tc the inside building, graduating the size of all b S of n g g �ahes therefrom as they oonneot into more than one riser to a rise aggregating the total area of all risers so oonneoted. Drench pipes ooi nccting to a Single riser shall be at least as large as the riser and never less than 3/4" pipe. • 12 w 13 e. Teachers 12-#0 SPECIAL JIRE<�ITS: All water piping passing through concrete shall be wrapped with ads paper. All pipe izl oont/aot with the straoture in the livin portio.a shall be wrapped with � deadening felt. Jontrol valves for all baths and sinks shall be looated in oonoealed but accessible places. Users to each soup of fixtures shall be provided with verti,dal air chambers at least 24" high, one pipe size larger than riser.. All hot and cold water pipe shall he sufficiently large to furnish a full supply of eater to all fixtures oonncoted thereto and shall be at least 3/4" i p pe. Approved oleanout plugs shall be installed wherever required* All vent stacks shall extend through the roof, and where possible, on the side of the roof away from the street. ,here not more than 10 feet apart, stacks shall be connected _nto a single vent. All pipes passing through roof shall have lead co,lar of a'4 load turned into top of pipes and 21.. need 12" on roof around pipe. 12.11 3EBTIC TAW X4 Provide and install ooraplete one 600 gallon Griffith concrete septio ;ink with 150 feet of drain tile. Drain tile shall be laid on s. bed of C" crushed rook and ooversa with 4" crashed rook. lop of rock to be 6" below finish grade. See plot plan dnd location. Sams shall be inste led according to Lanufaotureras direotions. 1242 GAS i 1.PL,G: This uoitrao4 shall provide and install 3/4" galvanized as piping o &1I outlets shown on the Mans. All joints ]made up with shellac or as required for bottled as. 12 SILL COCKS: Install where shoo= on plaaa or 'where instruoted by the brohiteot, 3/4" .l1 cooks. 11 02LA E TRAP: Provide a grease trap for kitchen sink, whore shown, oonstructed of 18" ter o to tiwT` vrith an unvented ooriorete of oast iron access oover. Cover of trap to ..e at &east 4" below finished grade. IP. - S: Before any of the roughing -in work is covers , and prier to the setting of xtures and equipment, all router pipes shall be subjeet to tLsts for tightness of joints tinder pressure to which they may be subjected. eater pressure to be maintained in pipes during the entire oonstruetion thereafter. Tests for tightness of s it waste vents lines shall be made in accordance with local regulations. 31 GVARANTER. This .:ontraotor shail be responsible for the proper operation of the p.C i eg ays e m for a period of one year tram date of completion and shall, at his own expense, make good any defect of ranufaoturing in material, also, defeats through the use of poor quality material or imperfeot workmanship or through the use of materiald other than those specified herein. This guarantee shall be ; ivrin in writin : upon demand of the Architect. iMC /use «Joe w WsS Basaf a,rd 48-1? SOLAR SY3TEV: This Contractor shall,�follaw instr�,ations given by the Solar heater Jo. and s red pipe where directed and make all connections between booster heater, water system and storage tank. 1 R ALICE W. CRAWFORD ,TOB - CARLOS B. SCHOEPPL, ARCHITECT 11/17/38 PLUMBING: BATH A - COLOR Sh ow r: 24.170 L.P. two valve shower fitted with 2" Midget strainer. Note: Shower door allowance will be shown elsewhere in specifications. Lavatory: 7-115-622x18" Colored Companion lavatory complete w/ #45 C.P. legs and 1 -1/4" C.P. 17 gauge P trap. Closet: Colored Compact closet complete w/ C -214 plain color seat and cover, C.P. angle stop and braes floor flange package. HA - COLOR TO and Shower: P- 2215 -14 5 -1/2' Colored Master Pembroke tub fitted with B -75 C.P. tub and shower fitting, B -438 C.P. 1 -1/2" Pop-up Waste and B-293 5-1/2' C.P. rod and pins, less curtain. Lav to : 7-iI! 24x20" Colored Roxbury lavatory w/ #45 C.P. legs and fitted w/ B-709 C.P. supply and waste fitting, 3/8" C.P. angle supplies w/ stops and 1 -1/4" C.P. 17 ga. P trap. Closet: T= "colored Compact closet combination complete as in Bath #1. BATS #3 - WHITS Shower: IPTITT.2, two valve shower fitted with 2" C.P. Universal strainer and 38" C.P. rod and pins. Lavatory: 7- 3905 -4 . ]9x17" White B.I. Shelvon lavatory oomplete w/ 1 -1/4" C.P. 17 gauge P trap. Closet: 7:1155 white closet complete w/ #600 white seat & cover, C.P. angle stop and brass floor flange w/ B.S. & W. and china bolt caps. lITC Sic (COLOR) P-7021 84x20" Colored A/R flat rim sink w/ B -906 -S C.P. faucet with soap dish, B -989 C.P. duo strainer and 1 -1 /2" C.P. 17 ga. 2 trap. LAUNDRY TRAY: 84z4e" 2 part cement laundry tray w/ steel stand, B -929 rough faucet and 1 -1 /2 lead P trap. amain SHOWER: 1 /1" U.P. straight shower valve, 1/2" C.P. bent arm and 8.268 C.P. shower head and 2" C.P. Universal shower strainer. WAFER HEATER: 4500 Watt Westinghouse side -arm electric water heater. SECTION 13 - ELEOTRICAL 13.01 GEoLOALS The articles of the "C:eneral Carditions of the Contract ", standard form of the A.T.A. fourth edition, copyright 1925, together 'with the General Cordit:rs of the Specifications for the entire work as hereinbefore set forth, are to be ocr.sidered as an internal pert of these speoifioations for Eleotrioal Bork• By submittinn a bid an these speoifioati ns and the accompanying plans, Contractor will be held to have familiarised themselves with all of the aforementioned articles, end as rsuo ^essful Contractor to exeoute the oentraot acooraingly. 13 SCQP:J GI i ORK: The work under ti!is oontraot oomprises furnishing of a 1 labor and ateria s necessary for the oomplete installation of eleotrio wiring and li.htinv, power and heating devioes, publio and private telephone service, sicnal system, radio torvioe distributed to the vari ass outlets as indicated on the plans in all details from the scarce of supply for eaoh system. Each system is to be oomplete it itself for the servioe intended. The Co,,tractcr Will be held to have carefully compared the drawio gs and speoifioations, checked oonditions fat the site under whioh this installation is to be made, the installation ocnforolin,; to the requirements of tho slam, and specifications, irrespecti'.e of whether each inaividual item ie dpeoifioally mentioned or not. 13 REGULLTI InO, I ,-ITC 1.'do CLRTT '_CAT Ss A11 of the work ocher: d in t :.ese specifications Zinn to the ''ati.onal ;..lcctrioal Jode In effect at the tine, the rul. s and regulations of local and state bodies, the respeotive servioe companies supplying the services, and the En ineerinG Standards as reooamendod b the Assooiati n of nleotroli vista. .workman ^hip and materials which exceed the requirements of tho above rientioned authorities and herein s „eoified shall take preoodenoe over such ordinanoes• The cost of obtaining the neoessary permits and of seourin,._; certificates of inspection and approval for all work installed under this contract shall be bone by the °leotrioal Contractor. Final oertifioates of approval shall a000r the final request for payment of this work, as no final settlement will be ::ode by the .Arohiteot unless this provision is adhered to be the Contraotor. 13 MAT.” RIAL3 .OND , ,o , ,,iC: K :HIP: All materials used throunhout the installation shall be new and the best of their respective kind, installed in a neat wormlike manner, and to the entire satisfaotlon of tho A.rohiteot and all 3:overnir, bodies. The Contraotor shall, upon request of the Architect, furnish samples of the .:atcrials whioh he proposes to furnish and install, and obtain written approval of their use before prooeeding with the work. 13 L TiTOD 0 :1 IR21Gs mess otherwise specified, all wires are to be run oonoealed in trmaraG7 servioe to the last outlet, providioE. a continuous and eleotrieally bonded raoeuay for the mires. 3-08 tLAiISs The plane indioate the outlets and sc•. tohes it their respective looati:_ns by n r� symbols, loosti cn of all spacial outlets shall U•e oheoked with the Arohiteot before installaing same. Any outlets not located properly shall be moved where directed at this Contractor's expense. 5 BUTTING L:ll FITTING* c cnarally, all noto .ie ; and nutting inoidental to the installation e eotrioa work w 1 be done by the General Sontrz otor at tho direction of this Jontr, otor, rovided the outting is ordered prior to the oo:npletion of suoh oonstruotion wor3c, whioh may tail alterations in the finished 'work to a000mplish acme. This Contraotor's failure to hdviee 'of speoial req iraunents, prior to oompleted oonstruotion parte afteoted, will necessitate an order by the Aror.iteot to effeot same at tho expense of the jacotrioal Contractor. He mast obtain permission from the Lrohiteot. • 14 — Teachers T 1C.neoi • 4.3.08 SERVICE Al YLT :iiIN s eleotrio service will be supplied by the power oo:n any at a pot and in a manner ae indicated upon the plans. i rovid and install the :aeoessary oonneotiona for overhead service into the building :here shown iu strict o . ormity with the requirements of the 'comer ooepany and tt:eir reoomeendatieos for this iestailation. Terminate the service liees in a .rain switch supplied by this Contractor, and nctcriii block furnished to thin Contraotor b;, the power oox pony for instollation. The necessary meter hoardand meter loops are to be provided as require a. ',hen the :,umi;er and rise of the service wiresare not shown on the plans this eontraotor will be required to insta -1 them of ample oapaoity for the requirements. 13 -09 DISTItIBUTIoN: iron the main switch or sub -toed r panel, supply the respective feed..rs, righting panels, special outlets and lighting outlets and controls required, furuishi.io the j necessary wire, conduit and accessories for their ocmpleto service. , >eparate circuits shall be provided aocording to their in.:ividual ooraoit y for elootrio refrigerators, ironiro board. reoeptacles, ;rentilct :r. :ants, dater hewers, electric range, eleotrio roo -: 'eaters, eto. • 13 C A:+GTMG there it becomes ncoes'sary to change the iuoations of cutlets to ?Item" oentcr with panels or panelled wa l s this Contraotor shall, at his own expense, Dove the outlets .s require_.. and 13.11 SYSTole G. UI D: i`urnish and install system and equipment ground oi a size /in a ner as ::resoribe._ by the juriddictional regulations. :,arse shall be eeetly and aeosaaibly installed in a manner and locations acoeptable by the Arcf .tent. - there necessary, make oonneotIon to a water pipe an..i leave sane exposed, this Contractor making arrang.imenta with the rlumbine contractor to :ra a short extension of : is f:iping to accomodatse the connection in the location desired, the oost al same bcin ; borne by tee :.leotrioal Gootraotor. 13 INSTALLATION ReCi II L!. 1 TS s Lighting Outlets: All oeiling, wall. or switch outlets shall • rc provided with a oressa .galvanised outlet box fitted with a plaster rint- to finish flush with the finished plaster. Cutlets meant for :w.unti..g fixtures shall be provided with a 31p" fixture stud rigidly fastened to the outlet box. cutlet boxes shall be rigidly mounted with an approved outlet box support of metal, accurately as the center lines or other dimensions green• This Qooi.ractor shall ascertain from the . _rohitcot the Jr::sired :.ountin : hcieht of all ! weal outlets and switches before prooeeding with his work, unless suoh c:ccial notations are oarried upon the plans. 13 FIXTURES lelo. LAPS: Unless oteerwise specified, all lightin° fixtures and lamps will be furnished and hung by others. ' 13.14 0 CI t L ITS: The number of oirouits to be ccntainod in brunch lighting panelboards shall be such as to provide for one circuit for each 600 square feet of floor area. Allow at leads one additional circuit in each panel for a spare and when required for balanoe of panels, there being no unequal number of active circuits, tw_, or more oirouits stall b e allowed. there • power circuits are ta: :en from lighting panels, or whore power panels are provided, furnish an added 30 amp. cutlet as a spare power d tai 1, Light and power f cede rs shall be provided to properly serve the above requires nts without overload or the future neoessity of increasing the respective feeders to serve same. 13■15 BRANCH eANI Le0A. nU s Same shall be solid neutral employing moulder units mounted on s e ..coke, as manuiaotured by Hull -Dog rroduots Co., Oostinghouse,; _ rank Adams Co., Square "D" Co., or Cleveland Switchboard Company. 1p-la SAFETY SiiITCbES: Shall be externally opea+ated "o "2, snick make and break switches mouant- . Ted in a steel oabinet and provided with an interlock which prohibits opening; until the switch is in the "o5£" position. Same shall be as nwnufacturec by mull -Dog , square li, ..estinghouse or trwnbull • - 15 • w � Teachers i 21±11, CONNECTION TO Ar FLIAiCESs Shall be made by ,his :;ontraotor from a heavy duty receptacle ib and installed by this Contractor in a wall adjacent to the applianoe, with whin in flexible conduit oo_::;eoted to a plu-; furnished with suitable means for fastonin` the conduit and -rith provisions for a ' ;round oonuootion. : eeepte.oles and plu;;s shall be ;= �'; .' flrrant, or G. ::. for medium capacity, while for .eavier capacity, same shall be nanufcoture d b ii H . Pubbell or :talco. 13 CC',:)UIT: Used throughout the installation* shall be thin, wall steel tube ;galvanized or shrsardised, as ma ufacturod by G. L•, National nlootrio :rod. ')o., or :ontral -ube 13-19 i'iI'ti,t Shall be of •ational ...,lcotrio ,ode requiro _.eras as nanufacturcd by A,:_er can steel ;iTrss Co., National lectrio i'rod. Co., or S. n. :ompany, ..fires ,;8 and larger shall be the standard oo ,duotor. 1340 MALL ALC..- TA(;i,i,J s ',;hall be flush type duplex o:. like manufacture - .i ; ,1530, l'ryant 748$2, or u• n. ; ;2679, all sin lar to ..espard line, or equal as approved. 13.21 ,ALL S- TC _.'.;: For li7 ;hitnt; control, shall be tumbler tyres, sl_.:ilar to nespard line ac nanuiactnred by t . ;; 1815 series, Bryant ; 6951 aeries, or A. .,. + 1303 se: es, or equal as approved. 1542 S :.TICK Ai !J ,... _ T 1t L : I L1 TLS: .xcept -, nere tAose requir :d i i;at;_roo:;y, pantry and Molten, shall be Pakolito or similar oomposition, pattern to bc; a by the Architect. Plates in bathrooms, per eey r,nd kitchen shall be ahrone plated. 13 3 ;ITC: ILJ:) !tgCL I TALL : :... ' ; :fill; .� _ :,lu �1',) s ©1 e u1iy, stir.:tchcs shall -..c, '.:ountod ':t 4 feet, ;file reoeptaoles shall be 18 inohes above finished floor. , rior to starting the work, this Contractor shall ascertain if these dimensions gold ti.rounhout and be ' ovorned by the Arehiteott reoormiendations unless of .rF;ise shown en the nlans. This : ;ontraotcr shall i'iclu ::e relocating a proxir.,ately six out eta as directed by the Lrehitoct. 13 -24 vU ;In i . C i:S I-LUT:;: All shall be *terprooi pla s as manufactarod by ' .. S J .3155i and switohos astrtanu aetured b; Arrow , 7331, or equal, as aarovei. 'crews holdin plates shall be brass. • 13 P'L*:e.?. _.:; L?TACLL,S: Shall be furnished, aonsistiag vaterw.tight floor outlet boxes and WaTTiolea complete with finished brass adjustable covers, as nanui actured by t1Lman, Frank Adam Company, or G: E. 13 PLUG r s ;h.11 be Dugs, Clcarsite, or i'yrox. 13-27 Shall be L iii, Leonnmy, or . -, non - rentable t; pe. 13 DROP :there noted, shall .:e equipped with pull o'_ain sockets, supported from ribber sheathed type "JJ" cord, and terminated In z: brush cover elate. aookets shall be fluted, bases shell type. ' 1.3.29 PUBLIC T2LEI'IIONL STAEI I 3ervioe cDnduits and fittings shall b c orovid..d and installed V iris Contractor to the protector cabinet as a oan on the plans. Run the 1/2" conduit to sash outlet, or as indioated, on the floor plane, furnishi< :; a pressed steel outlet box with plaster Dover, and bush Bakelite plate at each outlets, exoept as may be otherwise indioated on the plans. All :pork shall be installed in etriot oorforr_;+.ty to the requirements of the Telephone Co., and unless of :erwise noted, the point of service and the size of the service c. nJuita shall be verified by this Contractor before proeee ' +.r:,, with the work. Outlets, in general, ' shall be plaoed 18" above the floor unless otherwise noted or provided for on the plans. All wires, cables, instruments and equipment will be furnished and installed by: the Telephone Company. Furnish a ground wire to each protector cabinet for the use of the Telephone Co., r elied in an approved manner and co_ :.voted to a water pipe in an exposed location. Provide .. 13 -29 Public : crvice Telephone ( 'J onttd) pull nire in aondu .t between protector cabinet and phone outlet for ju11 See plans for notes. I3 -30 CALL , :.I.L'.:: This Co; tractor ;',,all . urnisr. and install all electric call sisals as note on the plans, operating from a bell rirrginc transformer, and supplying serv-ioe from eaoh floor or wall button to a bell, buzzer, or aununcia or, as indioatod. :L11 wiriro shall be run in conduit. ,.ire shall be ,;13 gauge rubber covered code wire. Annunciators shall b o flush mounted with tho required number of drops, allowing one drop for future Ise, with push button reset. 5e11 and buzzers shall o each as m...y be uoonted in a switch box, similar to icing Call, . elo Call, %call, or :3usaoall, as manufactured by odaards a Co. rush buttons for the entrance doors, and :s here directed, shall be stone escutcheon type with oast body, ;.ddare 260. All other wall call bells shall be provid, d with a 6 foot silk cord extension to :;nkelite blook ; ,145, oonneoted to a receptacle plug. floor treads shall be combination push and receptacle similar to Edwards ; co plate wit:, silk oord extention to awards 290 r loor Tread. The e power transformer shall be ci' suC iei©nt oenaoity for the service intended, suitably located or as direoted by the Architect. The equipment above r;,enti,ned shall be as ranw actured by :Awards Jo., noltzer Jabot oleotrio 3o., or Auth .uleotrie 0o. All call bell stations indicato on the plans exoo)tirr the Inane entra:oe call bell station snail indicate on the annunoiater and :loo an extension chi:ac si g al. the chine si.lial shall Le a `i'eleohi2ne "L ode122 Chimettes as nsfgd. by the general inotrolar .o., Inc. The .:win entrance call , ell otation shall ring twO alternate tones on the o signal, whereas, the balanoe of the call bell etrtions shall ring only a single chine tone. Locate chinas where direotod. 15-3L itADIO here shown on the plans, furnish and install radio outlets consisting of a duplex receptacle and a Ground zJid serial co:: eo$on, both services counted under 040 con en plate. Aerial connection shall lonsi st o. ` approximately 50 foot of stranded and tinned hopper aerial wire, nounted on porcelain insulators, The aerial shall not be run in a manes that will parallel any Lind of pipes in tLe building unless they are kept at least 5 feet apart. alder no oonditions i11 crossing pipes with the aerial at right angles be ;:permitted within the :.forene:^ti o.:,ed .'istance. Care shall be exercised in the installation o.. the aerial wires so that no vibrating noises wall odour !s they ar. strung in :.ha construction. ?he ground conduoto= shall he ;,14 strande : and rubber covered wire, extended on porcelain insulators to appdnt where e'; accessible gro ad co ieotion c&i be ;wade to a cold water pipe. mires entering outlet boxes small be rubber covered and further insulated from the last s ;pport to the box in oirouL- lar loom. The reoe_tocle furnished for the aerial and ground shall be readily identified to be used for tie ::urpose only, with .markings on the receptacle or plate, the plus• or plugs furnisT with sane being not of a type which will formit insertion into a reooptaole used for power service. i oeeptacies and plates shall he of the same rake as those furnished for other services In the building*. 13 T»ST : All wiring installed under this contract, prior to the turnioo of the work over as a oon,Jcte unit, ohail . e test ©d for proper oo nootions, short circuits or Grounds. The torts shall be conducted with tLe aid of a ii veto testing set and in the presence of the Architect or his duly appointed representative. The final result shall indioate that a;1 'wiring shall test free and be clear from any .i aults coo :on to such installations. 13 ;MACE ILIATai t, ' rovide and install one 1GOOti Ternado electric heater in the baths where ehovm, with chrome plated front. 4:11 other heaters w ere shown shall be Therr.,ador fan type. •ee plans for sizes. All shalt have primo finish front. - uture phone wires. • {: Te chers A • 1344 SOLAR BEATER BOOSTER: This .:ontraotor shall include outlet switch and pilot light ;ire shown and made the necessary oonneotions to the 4500 '.:. electric booster furnished by others for the Solar System. 13-3* Gii&1tAPJTEE: All materials installed wider this oontraot shall be guaranteed in writing 177 the Arahiteot for a period of twelve (12) months after final aooeptanoe of the work. Under this guarantee, the Contractor shall repair or replace at his own expense any pests which may become defeetive or due to pour workmanship within that tine. The guarantee shall aeoompany the request for final payment. SECTION 14 - '0LE i ELATEIW 1401 SOLAR SYSTEM: i.- rovide and install complete Solar Vater :.gating consisting of one no gallon heavy galvanised iron storage tank (30 "x40 ") and two trays approximately 102 "x40" as manufactured by Fan - American Solar Water fleeter i4orks or equal. 14.02 Ii.SUT TIA: Tank shall be enoloaed in Box 36"x50" and i..sulated with glass wool on a.1 Mass A11 o0nneotiong to pipes between tanks, house and booster shall be heavy soft copper as manufactured by : uellor. 14•.03 HkI TI-G =Ms Shall be of sizes shown, 3" deop, the exterior of each tray being 1324d with galvanised iron not less than 4r22 gauge and reinforced with 1/3" flat iron bars. All lapping edges of this galvanised tray shall be crimped and spot soldered. The iL.terior Of this box shall be lined with 1/$" thick Armstrong i_-sulution board and oovered with 15 lb. insulating paper. These entire heating uxiits shall be oovered with double strength glass using all natal skylight rib oonstruetion, ell joints caulked and made water and air tight. Provide oopper lap flashing around all trays, or as manufactured b Pan Arnerioan, or equal as approved. 14.04 O th R TRAD S: This Contractor shall 000perate with the ; lumber and leotr oian so } is all oonneotions and reu;h work till be properly set. 14 GUARD- ITEEe This Contractor shall give written guarantee agai._Ist all fAfects of material a d workmanship for each olar System for a period of one year sftc r date of final te3oeptance by the Owner. -18. • , e/_m -de y • S5 ti6 / DATE r 9/r s Real Estate Inspection Service; Inc, NI 002133 9507 S.W. 160 Street, Suite 260 Miami, FL 33157 252 -0230 / /vn d„( cg-* s IL PLEASE PAY LAST FIGURE IN THIS COLUMN PLEASE RETURN YELLOW COPY WITH PAYMENT DATE: l''"'" AMOUNT Subtotal 0 2 0,_,S Tax Deposit TOTAL. G2 L i/1SO 4 TELEPHONED PLEASE CALL CALLED TO SEE YOU WILL CALL AGAIN WANTS TO SEE YOU URGENT 1 RETURNED YOUR CALL 1 1 To /,;," Date ' � L Time ,,f 224x WH E YOU WERE OUT of Phone Area Code Number Extension / C-/"L Operator Campbell 09301 4. .,..' �•. •i�. i •!�/F �"< is ,A � !! ��I w /•� �� 1 ,M. !I. • y l +!IMPS!!!, ?1 S!'�!. PIP95 !' �A '4' omr it • /rf Ll .yr 1 CAL D I 1 H, 0.44 , 41( . 1 J � 9 Q eel E i iriepection Service, Inc. an Assot'10n of Licensed Trade Professionals STRUCTURAL INSPECTION REPORT Date Of f nape ctJ. ont Property Inepeoted Seller: NEEDS ATTENTION �C OF CONSTRUCTION LAB C RAWL , BS CONST.Ponr t RAI4E CONST. FOUNDATION, RIOR FINISHES STUCCO t 1, WOOD .. SON$ BRI `OTHER O STRUCTURE RUSSES oNVENTIONAL M •V 3 9lIA E , CO Q lOn "' itAN' CHANDLER CONSTRUCTION CORP. Buye PATIO RO () CON () W (( D ST - COLUMN PATIO FLOOR CONCRETE () WOOD ' () TOPPING TYPE FL9OR STRUCTURE (tGWOOD JOIST # - r (y' CONCRETE () OTHER EXTERIOR () DOORS O WINDOWS 11 STAIRS (] BALCONY RAILS INTERIOR (ti' AIRS ( RAILINGS N°_ 1158 NEEDS ATTENTION fl (] fl [l (] (] Pr- 4a4-1, Dan Chandler l CGC 021659 -0%-cizit;".e•H ?tam_ e -A..01 att_& LA-J-el Q n GENERAL LIIMIATATIONSR pp lleAt I F O f THE ONLYTWHATT15 REPORTED r 11 rs! n P TEC 'SERVI T A N " HEILOI6, THER II OUR ATTEMPT f A6LE T R V E i 1HE TIME F THE INSPECTION. THE 1 7 $ IC AND I 'S NS PECTOR DAN CHANDLER L D NI�R p 1 .10: i � M C PT 1 HIL 41111R ITYFOR DEE N g / AAppQ IT SI C 0Aj CONSTR�jC CORP. IS LIM�TED $T H T M ME B Y R PURCHAS LIMIER WARRANTY NC I A ND DOS 0 lc P NCLUD H OSMETC, AE 1S C, ORTE P MAIN T NANCE I ITEN AESTHETIC, OwommlimminsummoMMMOUNIMMIONMEMMOIMMOMMMEMEMOMMEMEMMINIMMINIMOMIMMEMMOM imm,■ wn aaaaaa■■■■ wUw■■■ WeaM MIMw■■ w■■■ ■■ww ■ww■■wwE■■■ww ■wM■■■■MM•UUU■ ■®i: ommummixa■w■wwwwwwowMw inmemowo■mo■■ommo m■mummummemmum ■ rtK: xtlwwwwwSiitf aala■ lawwfwwMit■ i■ Mww■■■ iMOs■■ E■i■E11■E■■■ ■OMO■MEME■■E■ ■■■M■■ ■ : MOIMMOOOMEMMOM ■wwIOwMww■MIIMww■ IMMIMM■MOMMI MEMMI ■M■OM■ ■ or vita■ mommaawwalla■ wwwOwwww■ alEMEM ■■■■EMIONEMMEMMEMO■MI■OM■■ IMOMME■■ ■ irramlnw mwwmw■ u■■ wwww■■■ w■ w■■■■■■ ww ■ ■■w■■w■ ■■ ■ ■wwww■uEMMOMMu■ ■u■■ mmt!w■millm tii4w ■inumlaw■iaa■Aw■■■w■■■■lIM■■www IMMOMME■IUw■wMME■■■■ME■■ ■ la' asl# IIFI!■l 1tIOMMOIMONNIMMOMMMEAMEMEMMEMMI IMMOM■INIMMI INIMMOMMO■MOMME■ ■!'olRtlm ennammu■■■■■ ao■■■■■■■■■■■■ ww■ ■■www■w■w■N■■■E■M■■■i•■w■O■■■E■ ■m dal~9ommIIINOMMMOMMEMMi•Iwwi NIMMOMMEMMO■MEMMO MEMMM■E■MOMMEM■■MIMME ■ramtm3e inaNNIMMU/ 1wOAwEMOMM OM MMO MO MMM INIMME■OMMEMMOMME■■MO■MM■■MOMM■ wrtimwignmmo l■ oIww■ w■■■■■ nmul■■■■■■■ w■■■■■■■■■n■■■■■■■■■m■■■■wwm■ mariMmENNOWNIIMMIIMMOOMMONNONOMMINIMMEMMEMEMMOMMEMEMEMOMMIMIMMOOM ■ IRIS' IMIn■ alalttammum iia ■ ■■■■■■■w■■■w■ww■■■■INIMMEM♦■■EMM■■E■wU■M■MMOMM■M■ Ai r?xl tllwl lnf 4ti al iseAwaawaamumwaamaaaaaaaam■ IImmemom miwommommom■o■■■u■mim■■ NPRIYINIONSWINN IA■■ www■ ww■ wn■■■ w■■■■■E■MEMEMINIMM■U■■Ew■INIMMI IMME■ME■ ■ ■! mmioeta'RmmI ommeUUUAUI um mummUUU■ UU •■■■IU ■■U ■I■■■Ua1I■I000U■■UUU■ ■lash llllumumP. mmumw■wwM!"a■aa■#IMw■wa INIMMI IMMEMEMMUMMI IMMMEMEMINNIMMOM■ ■w ! gall■ mumem■ wlwwwwwAMEMMEMMOM■w■ MwwUMMOMMw■■MINIM■IMMIMMw■MwMM■ ■!!It'lIlll UNNIMial UwwMAwww IOMaaEMOMME■■■ MEMM ■I■MIIMM■M■■MOMMO■MEMINIMINIM■ ■IVIsi 6aI1a ■a:ata8l MOMI IMMOMME MMUMMOM■ OMME ■EMOMMO■MENMEM■OMMOM■II■MEMM■■ npvmmonnwmmensommummemosensommilimmommommummommommommummummm a4wo' !aiAllliBF'! !?1mummolAmmensommin uaaummiumm■lummo mommmommis■ossom o woLtlimplimmmmelmemennommeminmemommumummosimmommommommommosommommomm wr Airm m we alimmEMOIllwaawwwwala EMMINIaa■OM■EMMOMMEMMI■ OMMOMMEMMOMMI■■■ low ili * =r li]'S9illislF6t3 mmm lei /IMMICOMAUaaU.0 . wI■UUUUII■U•UU ■■UMMOMMI IMMIMMUUI■■ a '. D Buyer Oaf.' ixposed ceiling ear `Estate Inspection Service ervice, Inc. ii ASSociatlon of Licensed Trade Professionals ROOF` INSPECTION REPORT • $ . r Assumption DAN`' HANDLrR CONSTRUCTION CORP, Good -- Good .-- Good Good Good Good Good Good / NOT A GUARANTEE iS S •A'ROOF INSPECTION REPORT — thi date stpection y ��. ability on the editing conditions of the roof. coverings. As all areas of the roof and attic are not accessible or "''' t1li� itieibledueio coverings such as tile, gravel, and other coatings, the contractor can not guarantee against any *airs No inspection has been made for such structural defects as would require engineering skill and practices F.H A. " Gravel-_ " Shingle 90 Ib. Slate Fiberglass *rk .1 2 t�4< IIeMIftlak 1� 1 ttirpeetency " Fair Poor _1r Needs Repairs Fair Poor / Needs Repairs Fair Poor ✓ Needs Repairs Fair Poor / Needs Repairs Fair Poor _Z. Needs Repairs Fair / Poor Needs Repairs Fair Poor Needs Repairs Fair Poor Needs Repairs ie J /L. /n1 1JE1.43c PATIO reir0 The words chanted above Indicate the condition. also see comments. OS 00 V A. Other Needs Replacement ✓ Needs Replacement Needs Replacement Needs Replacement Needs Replacement ✓ Needs Replacement Needs Replacement Needs Replacement — Good Fair Poor Needs Repairs Needs Replacement Good Fair " Poor Needs Repairs . Needs Replacement pm4 ,/uG /Ec.a'io J 1 leor ,v or tidAri e 77G E{ r a;, 4 e 4 f 0 " 4 1 Q Oc,b AND C / L • t - c , 44F0 ' - 0 .25.6 • r, s Lop .06-dsos de i°c.4c.6-0 , 4r IF; Dan Chander CGC 021659 (2) *ood.d.stroyki ' organlama observed: �,.. (3) ;y ^ demat observed: No CI Yes g A E (4) iblo (evkfsnoe of previous treatment was observed: No IS Yes ❑ Waverly' =hat trsmtsd Its structure(*) at Imo of Inspection: No El Yes ❑ f_ copy of pta ? bontract Is attached. (6) 1f1111t, has boated SIC itucttare(s): No 11 Yes ❑ If YES: Date of treatment: :: 'rn' • •Ticji n,, . c 4 is c cc o WHTIIM Is by (COMMON NAME OF ORGANISMS CAUSING DAMAGE) (ORGANISMS TREATER • (PESTICIDE USED) HR3 each year for PROFESSIONAL "P)EST"CONTROL SERVICE, INC. 15931 S.W. 284 Street Homestead, Florida Phone: 246-2108 Beeper:. 353 -8510 at oost of , " Ir Amount due . Additional Charges $ Total Amount Due Buyer: Ke j WOOD - DESTROYING ORGANISMS INSPECTION REPORT Section 482.226, Florida Statutes Professional Pest Control Service,Inc. U cense Number 4618 H omestead, Florida 33033 , 5 �3�1 �.W. 284 St.. al. a rz a inspection Date •r Identification Card No. ' S� r� l ftl-S SCOPE OF INSPECTION arthrtIlad or plant life which MI a s ucbre, ne noIy termites, powder -poet beetles, wood - boring beetles, • `y ' _ OF WH MSTBI� ,E MID ACCESSIBLE AT THE TIME OF THE INSPECTION and is not an opinion covering b,' ICON* Chet Mb - enclosed or Inaccessible, were concealed by wall coverings, floor coverings, furniture, equipment, et/velure in *Bich klep&Von would necessitate removing or defacing any pal of the structure. REPORr, A wooO organisms inspector is not ordinarily a oonstr icbon or building trade expert end therefore _•,.. _•,.._. • ,._ ,. � _ Ika which ' enable him b attest to fie structural soundness of the property. IF VISIBLE DAMAGE OR 0 „1 r ' i. }• I " � : : ,x. ' TN1S REPORT (ITEM NUMBER_ p((3)) OF THIS REPORT), FURTHER INVESTIGATION BY QUALIFIED EXPERTS OF THE al,, DE DETERMINE THE STRUCTURAL SOUNDNESS OF THE PROPERTY. �' 'aF -- ' e �' r TO CONSTITUTE A GUARANTEE OF THE ABSENCE OF WOOD - DESTROYING ORGANISMS OR DAMAGE OR • SPECIFICALLY STATES HEREIN THE EXTENT OF SUCH GUARANTEE. . REPORT OF FINDINGS d r° dd � W d e organisms observed: No 0 Yes ® 43 (a/016AfIE OF ORGANISMS) AWE (Addles) per year. . $ (COMMON NAME OF ORGANISMS) for has any financial Interest In the property Inspected or Is abeociated In any way In ,i other than for Inspectbn purposes. ON WF 6 ` THIS INSPECTION AND TO: Date i " a -3-9a. The cost of which is $ ' 7 S after which the warranty may be renewed • l SWIM geed LMnO Roe Nat . • 'le rid • il - - -.11- .:.• :... ...%:�C g a Atiztlimmomsmawslii umnitz . • 'fi _ ,, , ,, ,MhilaINIIII11 1 51111111111111 . A a v�yr / r Y '. Y • 7:3! NI 111 �� • ".'w=111111 1111 111 11111 III 111111 • C •7 • a•J 1111 III 1111 W /R /; G % A J 0 .�,!� z % i Point AtANNO 311 r.• `TED ti, 1 * tT0,1 Ml 0AYM r 1. 1'1t'APtt 4 '�RWS J w/ rC/l Phone: 2 S7OR OOrfrner'clel Aluminum Re BUILT 1939 A IRAN Sh vC,L I�t 1354 W /TC,'/ boas 0.v rr o L 4/411/7.- LI 4 to . Vaal- QP6wj e �✓/•tvi GN REPAIRS ($) ,vor 7 CODE 4� r `° • G . 7 (11/4._ Dooms /SGT" �Rll /Ai ' _a P6�v AN,e A 1" ,Ca-QO. LC'c-rr#4 /GAL- s* '' -6 /s Ah Q V.v r cc 4 b £ / S G. 4 j fr. # C C00,4 ODAr& A bev r 6,1M L.o4k C4/4*G <4 STORE4a /N 6/144 --c v Ietwttlrt Otter ( OeW BMW t h I ft,Spection Service, Inc. oci `of`iiicensec Trade,Professlonais ICILINsPECTION REPORT THE I!'1 • • -•• •• ••• • e AVISUAL rarrAn roN (. .. - �■ r•Y HAS BEM MADE TO IDENTIFY AS MANY DEFECTS AS POSSIBLE DURING OUR INSPECTION. WE DO N . AT MAY OCCUR IN THE FUTURE. MAXIMUM LIABILITY INCURRED BY PDO REAL ESTATE • SERVICE, INC. IS UMTLED TO THE COST OF THIS INSPECTION. , A4' t Nor' CaoR k /Na TOTAL: ems .var- c A)Tgcz- L/ From : HOOLIGANS<BUSINESS <OFFICE'S Jacks ofall Trades John Kenney 2777 Shipping Avenue Coconut Grove, Florida 22 January 1992 FAX 665 -4822 PHONE No. : 305 667 1005 Jan.29 1992 10:33AM P01 RR: House 7nspeetion done on 1/18/92 LOCATION: 5S7 N.E. 92nd Street, Miami Shorco, Florida DESCRIPTION; As per agreement a complete "general" house inspection was provided e a preliminary procedure for the above named homebuyer. `PERMS: $40.00 per hour 3 hours'. TOTAL CHARGE $120.00 ANALYSIS: It is my opinion that there may be deeper problems within this home as there are many cosmetically covered patches, and you should have this home completely inspected by qualified personell, especially a roofer, plumber, electrician and termite /structure. 251 -6686 , o. ItUx 561517, MIAMI, 11 33256.1514 • CC* 12828 1.!( J N.'jKIj INSURED -- =-= --- " Bidet Valve S_ U_ Drain Pipes S__ U__ Supplies S_ U_ Drains S_ U_ Cos satt: ' 77f ASilowtit //W is c WOG 4fi ,3 Cased if 410 o iu ita ?b' 7C Pao k. tsT . t t: is TO- - fcooN /A/4 . TN-'- 4 4.$ 1 5 ifig" . 1 A 4E41C. o,9 ' 'c 4 ok.ve Lit $1 j Bath: / Toilet : Flush S Spud S ✓U Supply S tub ;: Valve S__ U,e/ Shover Head Si/t1 4besar. Valve S_ 11„ Cosasiat$: : :• 1- t,04KS ARoit MI. 771W S?E/S 1 Ssiitate Inspection 16rvice, Inc. Seller :Unknown Buyer:Kenney, Bath: / / Toilet : Flush S Spud S ✓U ' Supply S � I( Grout S Ballcock Sy( Leh: Valve S.. U.„ Shover Head S__ U_ , Drains S_ U_ Waste & Overflow S_ U_ Shover _: Valve S_. L 7 Shower Head S 1__ Drains Siel Pan Leak YQ'lr LaV _OK.: Faucet S, Drain Pipes S./Ir Supplies S vU! Drains S Lav Faucet S_ U_„ Drain Pipes S_ U_ Supplies S_ U_ Drains S_ U_ Pan Leak Y_ N_ Lav : Faucet S_,, U_, Drain Pipes S_ U_ Supplies S_ U_ Drains S_ U_ iw -•: Faucet S_ U_ Drain Pipes S_ U_ Supplies S_ U_ Drains S_ U_ Drains S_ U_ 1lds�C` A V Valve S_. U„, 4,60144 7we rrifcov xmle s "Avows a s c ,4 0 i ors s w a*r 4 C ieC0 a Total estimated coat. of plumbing repairs: $ /7 013 . 211° • rF u411 Drain Pipes S__ U_ •l0 Drains S 0 Inspection #: PL Gros ✓U Ballcock S Waste & Overflow Sk Shower Head S_ U_ Drains S U_ Supplies S_ U_ op a le p 1N AEA-K Thia repport is based on a visual inspection of the plumbing system. This inspection is a diligent effort to identify any defects or deficiencies in the system at the time of the inspection. We do not represent to have found all of the defects in the system and no liability is accepted for any defe�.is or problems not found in this inspection, or any which may occur in the future. Absolutely no warranty is expressed or implied. Inspeecteed By: A ► er y uEFing T.:1 ervices, Tnc. CFC Uic;ru5 CoaUsnt*: Se 1 1er : JaDSlVI1L. Ad4rois$ :, 55 N, E. 92 Street Miami Shores Outside: Water Service Yaw L L sire ..wr Ot her : tenedoy,^ ..,, faucet L yaabins Machies Q,�'S: trains .,,,.,,,Watar HOW ? : Gate Valve .+,..- Water Heater ....: Bata Valve Bath: 'Coillt Flush SU _ _ Real. Estate In sp Service, Inc. cep Asaociatioa of Licensed Trade Professionals Ste- -0230 to Buyer : Kenney Date: 01/21 /92 Time: 10;00 AM Inspection #: PL Valve S,, U_ Le61M: S_ • Sat • PLUMS/NO INSPECTION REPORT ........tea Bibb S,., U_ Hose Bibb S_ U_ _,,,,,,,,,+Note Bibb S_„ U,,,, Hose Bibb S. U_ Hose Bibb S_ U_ Hose Bibb S_ U_ 4�MrrrrMYArrrbi .lY1►�r�'IrWrerri.Vr - r - _�r _ - i�.��r Kitchen /Bar Area: Garbage Disposal S,_ _ S_ U / S u S u Woke Sink 4: faucet S_„ U ains S Drain Pipes S_ U✓tiater Supply S_ U_ D/W & UN Lines S_ U. Sink : Paucat SL U Drains S, U Drain Pipes S_ U_ Water Supply S U S U i% c N .SMJ& F ifi j S e,.e.r.)6G-ea9 Z re∎vbt (t. 73f L Fe9 uct7 Drains S_ U_ S � 8,_ u_. U,. M :. itcor fo% ce s +6 LE Drain Pipes S_ U Water Supply S_ U_ Drain Pipes S, 11' Hose Faucet S!'T P & T Valve /Line S_ U_ Tank S_ U_ Heats S_ U_ P & T Valve /Line S_ U_ Tank S_ U_ Heats S_ U. ' 4thd Cot cv Per Ac O/eci(EI • Supply S W Grout S_ U ✓ Ballcock S c- U_ Drains S U Waste & Overflow S_ U_ Spud S_a'U_ Shower Head S Ames. : Valve S_ U„_ Shover Head S_ U_ Drains S_ U_ Lay A.,: faucet S„„ U Drain Pipes S_ U Supplies S_ U_ U_ iMw Faucet S„_ U.„ Drain Pipes S__ U_ Supplies S_ U_ U_ 110&%. ,,, Valve S_ U„_ grain Pipes S_ U_ Supplies S_ U_ Drains S_ U _ Conents; nit . Alt e7'" *4,- 4E . G,,e 6. c PW it Vt R 3t rZ ("4 Cao ) /77fe -441) a c 4 , SliEsots er- 1 • tam) A"vc. ACS 4E0-te/A4 A/7 1C 7 egexweto rex. 40 a" rh MO-LIP. Pan Leak Y_ Drains S_ Drains S_ r Unsatisfactory X 2 problea with fixture OK = fixture working properly N_