ROOFINGLegal Description
Owner / Lessee / Tenant
Square Ft. 25 sq.
Notary as t•'Owner and /or
My Commission Expires:
** * * . *
FEES: PERMIT 9'.
APPROVED:
PERMIT APPLICATION FOR MIAMI SHORES VILLAGE
Date Jan. 4, 192eb Address 680 N.E. 93 Street
Frank (kristen
Owner's Address 680 N.E. 93 Street
Contracting Co. OLIO l 71 ige 1 (n4 /7Gi , .l,c/C', Address
Qualifier CAf /D S ArocAO SS# 2Phone
Signature of owner and /or Condo President
Date: / -5-9
ondo Pre
dent
, a MARYLOU HERNANDEZ
.. ; .g MY COMMISSION # CC 324212
WIRES: October 10, 1997
, Bonticdhre No*ry P Undemir*ra
RADON
Fire
Tax Folio / / "-/ /-./ 2, 7-S
State . fie 005 h r2 4unicipal # a 117 a 61 Competency # i 7 fy 9 Ins . Co .
Architect /Engineer Address
Bonding Company 4 Address
Mortgagor Address
Permit Type(circle one): BUILDING ELECTRICAL PLUMBING MECHANICAL _ROOFING
WORK DESCRIPTION Tear off roof to wood deck, tin cap base sheet as per building 'ode
will mop on with hot asphalt 2 layers of fiberglass and embed in hot
asphalt one (1) laver of gravel
Estimated Cost(value) $ 5,000.00
WARNING TO OWNER: .YOU MUST RECORD A NOTICE OF COMMENCEMENT AND YOUR FAILURE TO IN
SO MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY (IF YOU INTENT
TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUI
NOTICE OF COMMENCEMENT).
Application is hereby made to obtain a permit to do work and installation as indicated above, an
on the attached addendum (if applicable). I certify that all work will be performed to meet th
standards of all laws regulating construction in this jurisdiction. I understand that separat
permits are required for ELECTRICAL, PLUMBING, SIGNS, POOLS, ROOFING and MECHANICAL WORK.
OWNER'S AFFIDAVIT: I certify that all the foregoing information is accurate and that all work wil
be done in compliance with all applicable laws regulating construction and zoning. Furthermore,
authorize the above -named contractor to do the work stated.
Signature of Contractor or Owner- Builder
Date: , —s
Notary as to 'ontr
My Commission Exp
C.C.F. 1 NOTARY
Zoning Building C l /
Mechanical Plumbing
Master Permit it 45
Phone 751 -5379
a5/NW99
75 /- 23 g
PAVING PENCE SIGt
MARYLOU HERNANDEZ
MY COMMISSION b CC 324212
WIRES: October 10, 1997
TOTAL DUE f g/1 "
Other
Electrical
Engineering
VI MESS my h r /
HARVEf / /"
PERMIT NO. TAX FOLIO NO.
STATE OF FLORIDA:
COUNTY OF DADE:
THE UNDERSIGNED hereby gives notice that improvements will be made to certain real property, and in accordance with
Chapter 713, Florida Statutes, the following information is provided in this Notice of Commencement.
1. Legal description of property and street address: 680 N. E. 93 Street
2. Description of improvement: Install new Gravel Roof.
3. Owner(s) name and address: Frank (Vitristen
680 N.E. 93 Street Miami Shores, FLorida 33138
Interest in property: at )(l e r
Name and address of fee simple titleholder: k) I A
4. Contractor's name and address: L A t(' I p rC) C ;I(\C ' Q c .t Ck i? + y Ron c? 'n
Com*-rr, C: -or T n c , . a ∎ i- l?Ate °,c(A nn
5. Surety:(Payment bond required by owner from contractor, if any)
Name and address: N/A
Amount of bond $
6. Lender's name and address: N/A
7. Persons within the State of Florida designated by Owner upon whom notices or other documents may be served as provided
by Section 713.13(1)(a)7., Florida Statutes,
Name and address: IV 1 A
8. In addition to himself, Owner designates the following person(s) to receive a copy of the Lienor's Notice as provided in
Section 713.13(1)(b), Florida Statutes. A
Name and address: lV / ,\
9. Expiration date of this Notice of Commencement: (the expiration date is 1 year from the date of recording unless a
different date is specified) Jan. 30, 1994
4 f/ea' 44 P/ fr
Signature of Owner
Print Owners Name r ret Y1 k M / r I s
Sworn to and subscribed before me this S day of
Notary Public
Print Notary's Name
My Commission Expires:
.,; C• ur•igCcv Ps
s.1.C.
NOTICE OF COMMENCEMENT
<s:
Miami Shores, Florida 33138
94R0 184.5 1 1994 JAM 12 11 :57
<a V\ Prepared by: Carlos Arocho
a.,14 , 1 9 9 q . Quality Roofing Contractor, It
Address: 251 N.W. 99th Street
Miami, FLorida 33150
Volume 2.1
METRO - DADE BUILDING & ZONING
ROOFING APPROVED APPLICATIONS
JULY, 1993
BUILT -UP ROOF REQUIREMENTS:
1) Moisture test mandatory on any recovery.
2) Uplift test on any recovery.
3) No hot mopping of felts directly to Iso- Board.
4) System must meet 1 -90 requirements. You
may refer to Factory Mutual or provide a lab
tested system that will meet or exceed this
requirement. (not required for wood deck)
5) In - .tall nn unproved brim sheet.
SHINGLES
Up to this date, only Malarkey SBS shingles have been approved to be Installed In Dade County. Obtain
Notice of Acceptance prior to the Installation of thls shingle. More Information will be made available as it is
obtained from the Code Compliance Dept. Two (2) plies of #30 ASTM 0 -226 are required at this time. Also
tin caps 6" o.c. on laps and 12" o.c. on field. Any of this information is subject to change without notice.
These are only GUIDELINES.
TILES
Manufacturers specifications and Notice of Acceptance sheet must be placed et )obslte. Also no "Improving" Is allowed.
Work must be done as per Notice of Acceptance.
Ceram Ica de Esparta
(Nail -On System)
Clay: Spanish "S" Tile
Prodek, Inc.
(Nail -On & Mortar Set Systems)
Vulcan
Clay: Spanish "S" Tile
La Mancha Tiles:
(Nail -On & Mortar Set Systems)
Clay: Spanish 'V' Tile
Metro Roof Tile:
(Nall -On System)
Spanish 'S'
Cement Flat (Mortar Set)
Best Clay Tiie Corp.:
(Mortar Set Systems)
Spanish "S" 'Venezuela, S.A.'
Clay: 'S' "Salvador, S.A.'
Lifetile
(Nall -On Systems)
Cement: Colonial Slate
Flat
Espana 'V' Style
Capri
Almar (USA), Inc.:
(Nail -On & Mortar Set Systems)
Clay: Altusa "S' Tile
Altuse Barrel
F.R. Bor)a .
Pioneer Concrete Tile:
(Nail -On Systems) 2:12 pitch
Cement: Hadenda'
Shake/Slate
Rustic Shake
Spanish "S
Flat 9"
Classic 100
Entegra Roof Tile:
(Nall -On System) 2:12 pitch
Cement: Estate
Skandia
Bender Roof Tile Ind.,tnc.
(Nall -On System) 2:12 pitch
Cement : Palerma Corrugated
Nordic Flat
Etema Roof TI10 Manufacturing
(Nail -On Systems)
Cement: Estate Barrel
Skandia Flat
Marley Roof Tile:
(Nall -On Systems)
Cement: Barcelona
Castilla
Monier Roof 1110:
(Nail -On Systems) 2:12 pitch
Cement: Mission "S"
Cement
Villa
Flat Shake & Slate
Vanguard II Roll
Spanish 'S"
. Vanguard II Fiat
Classic "100"
The tile shall be Installed on a solid nallable dock of 5/8' thick plywood for all new construction or to 1/2' plywood deck on
re- roofing. ,
The nailable deck shall be covered with a #30 Type II (ASTM 226) anchor sheet Maintaining a 4" overlap and tin -capped
12" o.c. except 6" o.c. at the laps. Over this, a #90 mineral surface roll roofing shall be fully hot- mopped with nominal 2'
laps with the concealed edge of lap lin- capped 12" o.c. except at the valley flashing.
The galvanized steel strip shall be nailed over the #30 anchor sheet ® 4' o.c. and over lapped for 5 ". When required, and
prior to the Installation of tho tile, a formed 0.019 thick sleet bird slop shall be Installed at the cave, which shall be
bedded in mastic to the membrane and hand nailed to the roof 11" o.c. and near each end.
The tile, maintaining a 3' head lap, shall be attached with two 10d plated steel gun nails per the over a bed of roofing mastic
applied to the #90 roll roofing, at nail penetrations.
The eave tile, in addition to the 2 - 10d nails, shall be attached with formed steel grip clips (refer to Mok'i(QCatalog page )
centered 4 3/4" from the nose of each tile. The dips shall be 0.043' thick by 1/2' wide. galvanized steel, attached with
ono 10d galvanized steel hand driven nail located 1" from the 90 degree bend In the dip. The clip shall be Inbedded In
mastic applied to the roofing, at tho nail location.
STRONG RECOMMENDATIONS:
On commercial applications a continuous
cleat Is strongly recommended both by
manufacturers and the Building and Zoning
Department. This detail is found on almost
every manufacturer specification and the FM
guidelines for perimeter flashing.
- --- - - - - -- - -- - - -- -
- --
Type I
Min. Max.
Type II
Min. Max.
Type III
Min. Max
Type IV
Min. Max.
Test
Methods
Softening Point ( °F)
135
151
158
176
185
205
210
225
ASTM D36
Flash Point ( ° F)
475
—
475
—
475
—
475
—
ASTM D92
Penetration, Units:
ASTM D5
at 32°F
3
—
6
—
6
—
6
—
at 77
18
60
18
40
15
35
12
25
at 115
90
180
—
100
—
90
—
75
Ductility at 77 °F, cm
10.0
—
• 3.0
—
2.5
—
1.5
—
ASTM 0113
Solubility in Trichloroethylene, %
99
—
99
—
99
—
99
—
ASTM D2042
Asphalt For
Built -Up Roofing
Features
EVT shown on each carton
All products meet ASTM D312
Printed cartons
Specification
Benefits
The best temperature and viscosity at point of application to
assure the proper adhesion, waterproofing and application
rate
Assurance each shipment meets or exceeds the physical
requirements of the specified roofing grade asphalt
Clearly identifies manufacturer, type, flash point, EVT,
Cartons are color coded for easy distinction between types
Descriptio :: >: << < > >;;;<.:< > > > >< >> <>
Asphalt us ed 1n built p I;pofir
classified in fou types
Type 'I Dead Level
Type
e
Type P .
Type :IV Special Steep
The product is availa in eith
cartons or bulk Ali f our types i
their specific re quirements fors
D312.
Mid States built p roof
exceeds AS TM D312 sl
State does not spedfic
the : type of as phalt to bi
particular roof The do
type :as phalt muss be made
ificat
rc
st acked If pa llets
stac
o all asphalt::containers (fiber
ons and steel drums) from prolonged
) sur e to direct sunbght,
Pro vide sufficient ventilation to avoid
cesslve heat build -up in closed storage
pheltcon must be stored
l y isphalt co. ntainers that tip over
11 # low. This is true of Type IV as well as
ead level Ttte hotter the weather, the
er the asphalt' will;flow.
Asphalts shall be homogenous and free of water and shall conform to these physical properties.
gums may be double
are used to separate the
Manville Built -Up
• Roofing
Systems
•
Prior to application, cut the cap sheet into manageable lengths (12' -
18') and allow to flatten. When nailers are required, cut the cap
sheet into lengths which conform to the nailer spacing.
Using Manville GlasKap and starting at the low edge of the roof, apply
the cap sheet, being sure to maintain 2" side laps and 6" end laps over
the preceding sheets. Position the cap sheet upside -down over the
preceding coarse. Apply a full width mopping of asphalt to the substrate
(30 - 40 lbs. per square) and flop the cap sheet into it. The temperature
of the asphalt when applied must be such that, when the cap sheet is
set into it, its temperature is approximately 20 °F above the EVT. This
will assure proper fluxing of the back coating on the cap sheet and
result in maximum bonding. The cap sheet must be firmly and uni-
formly set into the hot asphalt with all edges well sealed.
Built -Up Roofing Over Naitable Decks: These specifications are for
use over any type of structural deck (without insulation) which can
receive and adequately retain nails or other types of mechanical
fasteners recommended by the deck manufacturer. Examples of
such decks are wood and plywood. Select specifications are eligible
for use over lightweight insulating concrete decks or over fill made of
lightweight insulating concrete. Contact the Manville Roofing Systems
District Technical Services Specialist for approval of the lightweight fill
to be used.
Over wood decks one ply of sheathing paper must be used under
the base felt next to the deck.
The specifications in this section require the use of a nailable base
felt. Use nails or fasteners appropriate to the type of deck.
Smooth and Gravel- Surfaced Systems, Four -Ply Roof
Membranes: Using Manville GlasBase or Ventsulation and
starting at the low edge of the roof, start with an 18" width. The
following felts are to be applied full width, lapping each felt 2" over
the preceding one. Nail the laps 9" o.c. and, down the longitudinal
BUR
Membrane
Specifications
07500 /MAN
BuyLine 5318
center of each felt, place two rows of nails with the rows spaced
approximately 11" apart and the nails, staggered with those in the
adjacent row, on approximately 18" centers.
Over the in -place base felt, using Manville GlasPly Premier or
GlasPly IV and starting at the low edge of the roof, apply one 12"
wide sheet, then over that, one 24" wide sheet, then over both, a full
36" wide sheet. The following felts are to be applied full width,
overlapping the preceding felt by 24 so that at least 3 plies of felt
cover the base felt at all locations.
Three -Ply Roof Membranes: Using Manville GlasBase or
Ventsulation and starting at the low edge of the roof, start with a 12"
width. The following felts are to be applied full width, lapping each
felt 2" over the preceding one. Nail the laps at 9" centers and down
the longitudinal center of each felt, place 2 rows of nails with the
rows spaced approximately 11" apart and the nails, staggered with
those in the adjacent row, on approximately 18" centers.
Over the in -place base felt, using Manville GlasPly Premier or
GlasPly IV and starting at the low edge of the roof, apply one 18"
wide sheet, then over that, a full 36" wide sheet. The following felts
are to be applied full width, overlapping the preceding felt by 19" so
that at least 2 plies of felt cover the base felt at all locations.
Install each ply felt so that it will be firmly and uniformly set, without
voids, into the hot asphalt, within 25 °F of the asphalt's EVT, applied
just before the felt at a nominal uniform rate of 23 lbs. per square
over the entire surface. Finish the entire surface with a uniform
coating of the selected surfacing or flood the surface with the
appropriate asphalt, at an approximate rate of 60 lbs. per square,
and while it is still hot embed therein an acceptable gravel at the
rate of approximately 400 lbs. per square or an acceptable slag at a
rate of 300 lbs. per square.
Mineral - Surfaced Cap Sheet Systems
Four -Ply Roof Membranes: Using Manville GlasBase or Ventsula-
tion and starting at the low edge of the roof, start with a 12" width.
The following felts are to be applied full width, lapping each felt 2"
over the preceding one. Nail the laps 9" o.c., and down the longi-
tudinal center of each felt place two rows of nails with the rows
spaced approximately 11" apart and the nails staggered with those
in the adjacent row, on approximately 18" centers.
Over the in place base felt, using Manville GlasPly Premier or
GlasPly IV and starting at the low edge of the roof, apply one 18"
wide sheet, then over that, a full 36" wide sheet. The following felts
are to be applied full width, overlapping the preceding felt by 19" so
that at least 2 plies of felt cover the base felt at all locations. Finish
the surface with GlasKap fiber glass mineral surfaced cap sheet.
Three -Ply Roof Membranes: Using Manville GlasBase or
Ventsulation and starting at the low edge of the roof, start with a 24"
width. The following felts are to be applied full width, lapping each
felt 2" over the preceding one. Nail the laps 9" o.c. and down the
longitudinal center of each felt place two rows of nails with the rows
spaced approximately 11" apart and the nails staggered with those
in the adjacent row, on approximately 18" centers.
Over the in -place base felt, using Manville GlasPly Premier or
GlasPly IV and starting at the low edge of the roof, apply one 18"
wide sheet, then a full 36" wide sheet, overlapping the preceding felt
by 2 ". All following felts are to be applied full width overlapping the
13
Volume 2.1
METRO - DADE BUILDING & ZONING
ROOFING APPROVED APPLICATIONS
9/04 is t ,.�
"1)F Nlorstg!e- , 9
2) [fplitttsto 17 .0 1 = +t`= . -
43 .�`�` = ard.
4 Sys JZ J . ...... a s ic
ma cete r , . orp a lab
'.tes ed s r3 thatwlfl meet' ,exxeeed this
o ` re ` ` wed deck)
requirement. {�Ot roQn rea?�(ar
S) Inclnfl an :inproaid�bo-md.'ifieeL '
TILES
JULY, 1993
SHINGLES
Up to this date, only Malarkey SBS shingles have been approved to be Installed In Dade County. Obtain
Notice of Acceptance prior to the Installation of this shingle. More Information will be made available as It is
obtained from the Code Compliance Dept. Two (2) plies of #30 ASTM D -226 are required at this time. Also
tin caps 6" o.c. on Zaps and 12" o.c. on field. Any of this information Is subject to change without notice.
These are only GUIDELINES.
Manufacturers specifications and Notice of Acceptance sheet must be placed at Jobslte. Also no "Improving" is allowed.
Work must be done as per Notice of Acceptance.
Ceramlca de Esparta
(Nail -On System)
Clay: Spanish - S" Tile
Prodek. Inc.
(Nail -On & Mortar Set Systems)
Vulcan
Clay: Spanish 'S"Tile
La Mancha Tiles:
(Nail -On & Mortar Set Systems)
Clay: Spanish - S' Tile
Metro Roof Tile:
(Nail-On System)
Spanish "S°
Cement Flat
(Mortar Set)
Best Clay Tile Corp.:
(Mortar Set Systems)
Spanish "S' 'Venezuela. SA"
Clay: "S' 'Salvador. S.A.°
!Motile
(Nall -On Systems) •
Cement: Colonial Slate
Flat
Espana "5 Style
Capri
Almar (USA), Inc.:
(Nall -On & Mortar Set Systems)
Clay: Altusa'S Tile
Aituse Barrel
F.R. Borja
Pioneer Concrete Tile:
(Nall -On Systems) 2:12 pitch
Cement: Hacienda'
Shake/Slate
Rustic Shake
Spanish "S
Flat 9'
Classic 100
Entegra Roof Tile:
(Nail - System) 2:12 pitch
Cement Estate
Skandla
Bender Roof Tile Ind.,Inc.
(Nall -On System) 2:12 pitch
Cement : Palermo Corrugated
Nordic Flat
Etema Roof Tilo Manufacturing
(Nall -On Systems)
Cement Estate Barrel
Skandla Flat
Marley Roof Tile:
(Nall -On Systems)
Cement: Barcelona
Castilla
Monier Roof Tllo:
(Nail -On Systems) 2:12 pitch
Cement Mission "5
Cement
Villa •
Flat Shake & Slate
Vanguard II Roll
Spanish "S'
. Vanguard II Flat
Classic °100"
The tile shall be installed on a solid nalable dock of 5/8" thick plywood for all new construction or 10 1/2° plywood deck on
re- roofing. ,
•
The nailable deck shall be covered with a #30 Type II (ASTM 226) anchor sheet rilaintaining a 4' overlap and lin- capped
12" o.c. except 6" o.c. at the laps. Over this, a #90 mineral surface roll roofing shall be fully hot- mopped with nominal 2
laps with the concealed edge of lap tin- capped 12" o.c. except at the valley flashing.
The galvanized steel strip shall be nailed over the #30 anchor sheet ® 4' o.c. and over lapped for 5". When required. and
prior to the installation of No tile, a formed 0.019 thick steel bird stop shall be Installed at the cave, which shall be
bedded in mastic to the membrane and hand nailed to the roof 11' o.c. and near each end.
The tile, maintaining a 3" head lap, shall be attached with two 100 plated steel gun nails per the over a bed of roofing mastic
applied to the #90 roll roofing, at nail penetrations.
The eave tile, in addition to the 2 -10d nails, shall bo attached with formed steel grip dips (refer to Mos (Catalog page r-.)
centered 4 3/4' from the noso of each tile. The clips shall be 0.043' thick by 12" wide, galvanized steel, attached with
one t Od galvanized steel hand driven nail located 1" from the 90 degree bend In the dip. The clip shall be Inbcdded In
mastic applied to the roofing, at tho nail location.
$TRONG RECOMMENDATIONS:
On commercial applications a continuous
cleat Is strongly recommended both by
manufacturers and the Building and Zoning
Department. This detail is found on almost
every manufacturer specification and the FM
guidelines for perimeter flashing.
Asphalt For
Built -Up Roofing
Features
EVT shown on each carton
All products meet ASTM D312
Printed cartons
Specificatio
Mid States:: built
exceeds: AS
State does
the type
type as
Physical Requirements —ASTM 0312
Benefits
The best temperature and viscosity at point of application to
assure the proper adhesion, waterproofing and application
rate
Assurance each shipment meets or exceeds the physical
requirements of the specified roofing grade asphalt
Clearly identifies manufacturer, type, flash point, EVT,
Cartons are color coded for easy distinction between types
�' recDtf mei
halt containers containers (fiber
steel drums): from prolonged
s ect sunlight.
fe suffi cient ventilation to avoid
cessive heat build -up in closed storage
Asphalts shall be homogenous and free of water and shall conform to these physical properties.
x�nt alners :must be stored
asphalt containers that tip over
Isis'true: Type IV as well as
hotter the weather, the
Kali wall; flow;
s #eet drums may be double
lists are used to separate the
Type I
Min. Max.
Type 11
Min. Max.
Type III
Min. Max
Type IV
Min. Max.
Test
Methods
Softening Point ( °F)
135
151
158
176
185
205
210
225
ASTM D36
Flash Point (°F)
475
—
475
—
475
—
475
—
ASTM D92
Penetration, Units:
ASTM D5
at 32°F
3
—
6
—
6
—
6
—
at 77°F
18
60
18
40
15
35
12
25
at 115°F
90
180
—
100
—
90
—
75
Ductility at 77 °F, cm
10.0
—
• 3.0
—
2.5
—
1.5
—
ASTM D113
Solubility in Trichloroethylene. %
99
—
99
—
99
—
99
—
ASTM D2042
Asphalt For
Built -Up Roofing
Features
EVT shown on each carton
All products meet ASTM D312
Printed cartons
Specificatio
Mid States:: built
exceeds: AS
State does
the type
type as
Physical Requirements —ASTM 0312
Benefits
The best temperature and viscosity at point of application to
assure the proper adhesion, waterproofing and application
rate
Assurance each shipment meets or exceeds the physical
requirements of the specified roofing grade asphalt
Clearly identifies manufacturer, type, flash point, EVT,
Cartons are color coded for easy distinction between types
�' recDtf mei
halt containers containers (fiber
steel drums): from prolonged
s ect sunlight.
fe suffi cient ventilation to avoid
cessive heat build -up in closed storage
Asphalts shall be homogenous and free of water and shall conform to these physical properties.
x�nt alners :must be stored
asphalt containers that tip over
Isis'true: Type IV as well as
hotter the weather, the
Kali wall; flow;
s #eet drums may be double
lists are used to separate the
Manville Built -Up
• Roofing
Systems
•
Prior to application, cut the cap sheet into manageable lengths (12' -
18') and allow to flatten. When nailers are required, cut the cap
sheet into lengths which conform to the nailer spacing.
Using Manville GlasKap and starting at the low edge of the roof, apply
the cap sheet, being sure to maintain 2" side laps and 6" end laps over
the preceding sheets. Position the cap sheet upside -down over the
preceding coarse. Apply a full width mopping of asphalt to the substrate
(30 - 40 lbs. per square) and flop the cap sheet into it. The temperature
of the asphalt when applied must be such that, when the cap sheet is
set into it, its temperature is approximately 20' F above the EVT. This
will assure proper fluxing of the back coating on the cap sheet and
result in maximum bonding. The cap sheet must be firmly and uni-
formly set into the hot asphalt with all edges well sealed.
Buift -Up Roofing Over Naifable Decks: These specifications are for
use over any type of structural deck (without insulation) which can
receive and adequately retain nails or other types of mechanical
fasteners recommended by the deck manufacturer. Examples of
such decks are wood and plywood. Select specifications are eligible
for use over Lightweight insulating concrete decks or over fill made of
lightweight insulating concrete. Contact the Manville Roofing Systems
District Technical Services Specialist for approval of the lightweight fill
to be used.
Over wood decks one ply of sheathing paper must be used under
the base felt next to the deck.
The specifications in this section require the use of a nailable base
felt. Use nails or fasteners appropriate to the type of deck.
Smooth and Gravel- Surfaced Systems, Four -Pty Roof
Membranes: Using Manville GlasBase or Ventsulation and
starting at the low edge of the roof, start with an 18" width. The
following felts are to be applied full width, lapping each felt 2" over
the preceding one. Nail the laps 9" o.c. and, down the longitudinal
BUR
Membrane
Specifications
07500/MAN
BuyLine 5318
center of each felt, place two rows of nails with the rows spaced
approximately 11" apart and the nails, staggered with those in the
adjacent row, on approximately 18" centers.
Over the in -place base felt, using Manville GlasPly Premier or
GIasPIy IV and starting at the low edge of the roof, apply one 12"
wide sheet, then over that, one 24" wide sheet, then over both, a full
36" wide sheet. The following fetts are to be applied full width,
overlapping the preceding felt by 24 so that at least 3 plies of felt
cover the base felt at all locations.
Three -Ply Roof Membranes: Using Manville GlasBase or
Ventsulation and starting at the low edge of the roof, start with a 12"
width. The following felts are to be applied full width, lapping each
felt 2" over the preceding one. Nail the laps at 9" centers and down
the longitudinal center of each felt, place 2 rows of nails with the
rows spaced approximately 11" apart and the nails, staggered with
those in the adjacent row, on approximately 18" centers.
Over the in -place base felt, using Manville GlasPly Premier or
GlasPly IV and starting at the low edge of the roof, apply one 18"
wide sheet, then over that, a full 36" wide sheet. The following fetts
are to be applied full width, overlapping the preceding felt by 19" so
that at least 2 plies of felt cover the base felt at all locations.
Install each ply felt so that it will be firmly and uniformly set, without
voids, into the hot asphalt, within 25 °F of the asphalt's EVT, applied
just before the felt at a nominal uniform rate of 23 lbs. per square
over the entire surface. Finish the entire surface with a uniform
coating of the selected surfacing or flood the surface with the
appropriate asphalt, at an approximate rate of 60 lbs. per square,
and while it is still hot embed therein an acceptable gravel at the
rate of approximately 400 lbs. per square or an acceptable slag at a
rate of 300 lbs. per square.
Mineral- Surfaced Cap Sheet Systems
Four -Pty Roof Membranes: Using Manville GlasBase or Ventsula-
tion and starting at the low edge of the roof, start with a 12" width.
The following felts are to be applied full width, lapping each felt 2"
over the preceding one. Nail the laps 9" o.c., and down the longi-
tudinal center of each felt place two rows of nails with the rows
spaced approximately 11" apart and the nails staggered with those
in the adjacent row, on approximately 18" centers.
Over the in place base felt, using Manville GlasPly Premier or
GlasPly IV and starting at the low edge of the roof, apply one 18"
wide sheet, then over that, a full 36" wide sheet. The following felts
are to be applied full width, overlapping the preceding felt by 19" so
that at least 2 plies of felt cover the base felt at all locations. Finish
the surface with GlasKap fiber glass mineral surfaced cap sheet.
Three -Ply Roof Membranes: Using Manville GlasBase or
Ventsulation and starting at the low edge of the roof, start with a 24"
width. The following felts are to be applied full width, lapping each
felt 2" over the preceding one. Nail the laps 9" o.c. and down the
longitudinal center of each felt place two rows of nails with the rows
spaced approximately 11" apart and the nails staggered with those
in the adjacent row, on approximately 18" centers.
Over the in -place base felt, using Manville GlasPly Premier or
GlasPly IV and starting at the low edge of the roof, apply one 18"
wide sheet, then a full 36" wide sheet, overlapping the preceding felt
by 2 ". All following felts are to be applied full width overlapping the
13