Loading...
ROOFINGLegal Description Owner / Lessee / Tenant Square Ft. 25 sq. Notary as t•'Owner and /or My Commission Expires: ** * * . * FEES: PERMIT 9'. APPROVED: PERMIT APPLICATION FOR MIAMI SHORES VILLAGE Date Jan. 4, 192eb Address 680 N.E. 93 Street Frank (kristen Owner's Address 680 N.E. 93 Street Contracting Co. OLIO l 71 ige 1 (n4 /7Gi , .l,c/C', Address Qualifier CAf /D S ArocAO SS# 2Phone Signature of owner and /or Condo President Date: / -5-9 ondo Pre dent , a MARYLOU HERNANDEZ .. ; .g MY COMMISSION # CC 324212 WIRES: October 10, 1997 , Bonticdhre No*ry P Undemir*ra RADON Fire Tax Folio / / "-/ /-./ 2, 7-S State . fie 005 h r2 4unicipal # a 117 a 61 Competency # i 7 fy 9 Ins . Co . Architect /Engineer Address Bonding Company 4 Address Mortgagor Address Permit Type(circle one): BUILDING ELECTRICAL PLUMBING MECHANICAL _ROOFING WORK DESCRIPTION Tear off roof to wood deck, tin cap base sheet as per building 'ode will mop on with hot asphalt 2 layers of fiberglass and embed in hot asphalt one (1) laver of gravel Estimated Cost(value) $ 5,000.00 WARNING TO OWNER: .YOU MUST RECORD A NOTICE OF COMMENCEMENT AND YOUR FAILURE TO IN SO MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY (IF YOU INTENT TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUI NOTICE OF COMMENCEMENT). Application is hereby made to obtain a permit to do work and installation as indicated above, an on the attached addendum (if applicable). I certify that all work will be performed to meet th standards of all laws regulating construction in this jurisdiction. I understand that separat permits are required for ELECTRICAL, PLUMBING, SIGNS, POOLS, ROOFING and MECHANICAL WORK. OWNER'S AFFIDAVIT: I certify that all the foregoing information is accurate and that all work wil be done in compliance with all applicable laws regulating construction and zoning. Furthermore, authorize the above -named contractor to do the work stated. Signature of Contractor or Owner- Builder Date: , —s Notary as to 'ontr My Commission Exp C.C.F. 1 NOTARY Zoning Building C l / Mechanical Plumbing Master Permit it 45 Phone 751 -5379 a5/NW99 75 /- 23 g PAVING PENCE SIGt MARYLOU HERNANDEZ MY COMMISSION b CC 324212 WIRES: October 10, 1997 TOTAL DUE f g/1 " Other Electrical Engineering VI MESS my h r / HARVEf / /" PERMIT NO. TAX FOLIO NO. STATE OF FLORIDA: COUNTY OF DADE: THE UNDERSIGNED hereby gives notice that improvements will be made to certain real property, and in accordance with Chapter 713, Florida Statutes, the following information is provided in this Notice of Commencement. 1. Legal description of property and street address: 680 N. E. 93 Street 2. Description of improvement: Install new Gravel Roof. 3. Owner(s) name and address: Frank (Vitristen 680 N.E. 93 Street Miami Shores, FLorida 33138 Interest in property: at )(l e r Name and address of fee simple titleholder: k) I A 4. Contractor's name and address: L A t(' I p rC) C ;I(\C ' Q c .t Ck i? + y Ron c? 'n Com*-rr, C: -or T n c , . a ∎ i- l?Ate °,c(A nn 5. Surety:(Payment bond required by owner from contractor, if any) Name and address: N/A Amount of bond $ 6. Lender's name and address: N/A 7. Persons within the State of Florida designated by Owner upon whom notices or other documents may be served as provided by Section 713.13(1)(a)7., Florida Statutes, Name and address: IV 1 A 8. In addition to himself, Owner designates the following person(s) to receive a copy of the Lienor's Notice as provided in Section 713.13(1)(b), Florida Statutes. A Name and address: lV / ,\ 9. Expiration date of this Notice of Commencement: (the expiration date is 1 year from the date of recording unless a different date is specified) Jan. 30, 1994 4 f/ea' 44 P/ fr Signature of Owner Print Owners Name r ret Y1 k M / r I s Sworn to and subscribed before me this S day of Notary Public Print Notary's Name My Commission Expires: .,; C• ur•igCcv Ps s.1.C. NOTICE OF COMMENCEMENT <s: Miami Shores, Florida 33138 94R0 184.5 1 1994 JAM 12 11 :57 <a V\ Prepared by: Carlos Arocho a.,14 , 1 9 9 q . Quality Roofing Contractor, It Address: 251 N.W. 99th Street Miami, FLorida 33150 Volume 2.1 METRO - DADE BUILDING & ZONING ROOFING APPROVED APPLICATIONS JULY, 1993 BUILT -UP ROOF REQUIREMENTS: 1) Moisture test mandatory on any recovery. 2) Uplift test on any recovery. 3) No hot mopping of felts directly to Iso- Board. 4) System must meet 1 -90 requirements. You may refer to Factory Mutual or provide a lab tested system that will meet or exceed this requirement. (not required for wood deck) 5) In - .tall nn unproved brim sheet. SHINGLES Up to this date, only Malarkey SBS shingles have been approved to be Installed In Dade County. Obtain Notice of Acceptance prior to the Installation of thls shingle. More Information will be made available as it is obtained from the Code Compliance Dept. Two (2) plies of #30 ASTM 0 -226 are required at this time. Also tin caps 6" o.c. on laps and 12" o.c. on field. Any of this information is subject to change without notice. These are only GUIDELINES. TILES Manufacturers specifications and Notice of Acceptance sheet must be placed et )obslte. Also no "Improving" Is allowed. Work must be done as per Notice of Acceptance. Ceram Ica de Esparta (Nail -On System) Clay: Spanish "S" Tile Prodek, Inc. (Nail -On & Mortar Set Systems) Vulcan Clay: Spanish "S" Tile La Mancha Tiles: (Nail -On & Mortar Set Systems) Clay: Spanish 'V' Tile Metro Roof Tile: (Nall -On System) Spanish 'S' Cement Flat (Mortar Set) Best Clay Tiie Corp.: (Mortar Set Systems) Spanish "S" 'Venezuela, S.A.' Clay: 'S' "Salvador, S.A.' Lifetile (Nall -On Systems) Cement: Colonial Slate Flat Espana 'V' Style Capri Almar (USA), Inc.: (Nail -On & Mortar Set Systems) Clay: Altusa "S' Tile Altuse Barrel F.R. Bor)a . Pioneer Concrete Tile: (Nail -On Systems) 2:12 pitch Cement: Hadenda' Shake/Slate Rustic Shake Spanish "S Flat 9" Classic 100 Entegra Roof Tile: (Nall -On System) 2:12 pitch Cement: Estate Skandia Bender Roof Tile Ind.,tnc. (Nall -On System) 2:12 pitch Cement : Palerma Corrugated Nordic Flat Etema Roof TI10 Manufacturing (Nail -On Systems) Cement: Estate Barrel Skandia Flat Marley Roof Tile: (Nall -On Systems) Cement: Barcelona Castilla Monier Roof 1110: (Nail -On Systems) 2:12 pitch Cement: Mission "S" Cement Villa Flat Shake & Slate Vanguard II Roll Spanish 'S" . Vanguard II Fiat Classic "100" The tile shall be Installed on a solid nallable dock of 5/8' thick plywood for all new construction or to 1/2' plywood deck on re- roofing. , The nailable deck shall be covered with a #30 Type II (ASTM 226) anchor sheet Maintaining a 4" overlap and tin -capped 12" o.c. except 6" o.c. at the laps. Over this, a #90 mineral surface roll roofing shall be fully hot- mopped with nominal 2' laps with the concealed edge of lap lin- capped 12" o.c. except at the valley flashing. The galvanized steel strip shall be nailed over the #30 anchor sheet ® 4' o.c. and over lapped for 5 ". When required, and prior to the Installation of tho tile, a formed 0.019 thick sleet bird slop shall be Installed at the cave, which shall be bedded in mastic to the membrane and hand nailed to the roof 11" o.c. and near each end. The tile, maintaining a 3' head lap, shall be attached with two 10d plated steel gun nails per the over a bed of roofing mastic applied to the #90 roll roofing, at nail penetrations. The eave tile, in addition to the 2 - 10d nails, shall be attached with formed steel grip clips (refer to Mok'i(QCatalog page ) centered 4 3/4" from the nose of each tile. The dips shall be 0.043' thick by 1/2' wide. galvanized steel, attached with ono 10d galvanized steel hand driven nail located 1" from the 90 degree bend In the dip. The clip shall be Inbedded In mastic applied to the roofing, at tho nail location. STRONG RECOMMENDATIONS: On commercial applications a continuous cleat Is strongly recommended both by manufacturers and the Building and Zoning Department. This detail is found on almost every manufacturer specification and the FM guidelines for perimeter flashing. - --- - - - - -- - -- - - -- - - -- Type I Min. Max. Type II Min. Max. Type III Min. Max Type IV Min. Max. Test Methods Softening Point ( °F) 135 151 158 176 185 205 210 225 ASTM D36 Flash Point ( ° F) 475 — 475 — 475 — 475 — ASTM D92 Penetration, Units: ASTM D5 at 32°F 3 — 6 — 6 — 6 — at 77 18 60 18 40 15 35 12 25 at 115 90 180 — 100 — 90 — 75 Ductility at 77 °F, cm 10.0 — • 3.0 — 2.5 — 1.5 — ASTM 0113 Solubility in Trichloroethylene, % 99 — 99 — 99 — 99 — ASTM D2042 Asphalt For Built -Up Roofing Features EVT shown on each carton All products meet ASTM D312 Printed cartons Specification Benefits The best temperature and viscosity at point of application to assure the proper adhesion, waterproofing and application rate Assurance each shipment meets or exceeds the physical requirements of the specified roofing grade asphalt Clearly identifies manufacturer, type, flash point, EVT, Cartons are color coded for easy distinction between types Descriptio :: >: << < > >;;;<.:< > > > >< >> <> Asphalt us ed 1n built p I;pofir classified in fou types Type 'I Dead Level Type e Type P . Type :IV Special Steep The product is availa in eith cartons or bulk Ali f our types i their specific re quirements fors D312. Mid States built p roof exceeds AS TM D312 sl State does not spedfic the : type of as phalt to bi particular roof The do type :as phalt muss be made ificat rc st acked If pa llets stac o all asphalt::containers (fiber ons and steel drums) from prolonged ) sur e to direct sunbght, Pro vide sufficient ventilation to avoid cesslve heat build -up in closed storage pheltcon must be stored l y isphalt co. ntainers that tip over 11 # low. This is true of Type IV as well as ead level Ttte hotter the weather, the er the asphalt' will;flow. Asphalts shall be homogenous and free of water and shall conform to these physical properties. gums may be double are used to separate the Manville Built -Up • Roofing Systems • Prior to application, cut the cap sheet into manageable lengths (12' - 18') and allow to flatten. When nailers are required, cut the cap sheet into lengths which conform to the nailer spacing. Using Manville GlasKap and starting at the low edge of the roof, apply the cap sheet, being sure to maintain 2" side laps and 6" end laps over the preceding sheets. Position the cap sheet upside -down over the preceding coarse. Apply a full width mopping of asphalt to the substrate (30 - 40 lbs. per square) and flop the cap sheet into it. The temperature of the asphalt when applied must be such that, when the cap sheet is set into it, its temperature is approximately 20 °F above the EVT. This will assure proper fluxing of the back coating on the cap sheet and result in maximum bonding. The cap sheet must be firmly and uni- formly set into the hot asphalt with all edges well sealed. Built -Up Roofing Over Naitable Decks: These specifications are for use over any type of structural deck (without insulation) which can receive and adequately retain nails or other types of mechanical fasteners recommended by the deck manufacturer. Examples of such decks are wood and plywood. Select specifications are eligible for use over lightweight insulating concrete decks or over fill made of lightweight insulating concrete. Contact the Manville Roofing Systems District Technical Services Specialist for approval of the lightweight fill to be used. Over wood decks one ply of sheathing paper must be used under the base felt next to the deck. The specifications in this section require the use of a nailable base felt. Use nails or fasteners appropriate to the type of deck. Smooth and Gravel- Surfaced Systems, Four -Ply Roof Membranes: Using Manville GlasBase or Ventsulation and starting at the low edge of the roof, start with an 18" width. The following felts are to be applied full width, lapping each felt 2" over the preceding one. Nail the laps 9" o.c. and, down the longitudinal BUR Membrane Specifications 07500 /MAN BuyLine 5318 center of each felt, place two rows of nails with the rows spaced approximately 11" apart and the nails, staggered with those in the adjacent row, on approximately 18" centers. Over the in -place base felt, using Manville GlasPly Premier or GlasPly IV and starting at the low edge of the roof, apply one 12" wide sheet, then over that, one 24" wide sheet, then over both, a full 36" wide sheet. The following felts are to be applied full width, overlapping the preceding felt by 24 so that at least 3 plies of felt cover the base felt at all locations. Three -Ply Roof Membranes: Using Manville GlasBase or Ventsulation and starting at the low edge of the roof, start with a 12" width. The following felts are to be applied full width, lapping each felt 2" over the preceding one. Nail the laps at 9" centers and down the longitudinal center of each felt, place 2 rows of nails with the rows spaced approximately 11" apart and the nails, staggered with those in the adjacent row, on approximately 18" centers. Over the in -place base felt, using Manville GlasPly Premier or GlasPly IV and starting at the low edge of the roof, apply one 18" wide sheet, then over that, a full 36" wide sheet. The following felts are to be applied full width, overlapping the preceding felt by 19" so that at least 2 plies of felt cover the base felt at all locations. Install each ply felt so that it will be firmly and uniformly set, without voids, into the hot asphalt, within 25 °F of the asphalt's EVT, applied just before the felt at a nominal uniform rate of 23 lbs. per square over the entire surface. Finish the entire surface with a uniform coating of the selected surfacing or flood the surface with the appropriate asphalt, at an approximate rate of 60 lbs. per square, and while it is still hot embed therein an acceptable gravel at the rate of approximately 400 lbs. per square or an acceptable slag at a rate of 300 lbs. per square. Mineral - Surfaced Cap Sheet Systems Four -Ply Roof Membranes: Using Manville GlasBase or Ventsula- tion and starting at the low edge of the roof, start with a 12" width. The following felts are to be applied full width, lapping each felt 2" over the preceding one. Nail the laps 9" o.c., and down the longi- tudinal center of each felt place two rows of nails with the rows spaced approximately 11" apart and the nails staggered with those in the adjacent row, on approximately 18" centers. Over the in place base felt, using Manville GlasPly Premier or GlasPly IV and starting at the low edge of the roof, apply one 18" wide sheet, then over that, a full 36" wide sheet. The following felts are to be applied full width, overlapping the preceding felt by 19" so that at least 2 plies of felt cover the base felt at all locations. Finish the surface with GlasKap fiber glass mineral surfaced cap sheet. Three -Ply Roof Membranes: Using Manville GlasBase or Ventsulation and starting at the low edge of the roof, start with a 24" width. The following felts are to be applied full width, lapping each felt 2" over the preceding one. Nail the laps 9" o.c. and down the longitudinal center of each felt place two rows of nails with the rows spaced approximately 11" apart and the nails staggered with those in the adjacent row, on approximately 18" centers. Over the in -place base felt, using Manville GlasPly Premier or GlasPly IV and starting at the low edge of the roof, apply one 18" wide sheet, then a full 36" wide sheet, overlapping the preceding felt by 2 ". All following felts are to be applied full width overlapping the 13 Volume 2.1 METRO - DADE BUILDING & ZONING ROOFING APPROVED APPLICATIONS 9/04 is t ,.� "1)F Nlorstg!e- , 9 2) [fplitttsto 17 .0 1 = +t`= . - 43 .�`�` = ard. 4 Sys JZ J . ...... a s ic ma cete r , . orp a lab '.tes ed s r3 thatwlfl meet' ,exxeeed this o ` re ` ` wed deck) requirement. {�Ot roQn rea?�(ar S) Inclnfl an :inproaid�bo-md.'ifieeL ' TILES JULY, 1993 SHINGLES Up to this date, only Malarkey SBS shingles have been approved to be Installed In Dade County. Obtain Notice of Acceptance prior to the Installation of this shingle. More Information will be made available as It is obtained from the Code Compliance Dept. Two (2) plies of #30 ASTM D -226 are required at this time. Also tin caps 6" o.c. on Zaps and 12" o.c. on field. Any of this information Is subject to change without notice. These are only GUIDELINES. Manufacturers specifications and Notice of Acceptance sheet must be placed at Jobslte. Also no "Improving" is allowed. Work must be done as per Notice of Acceptance. Ceramlca de Esparta (Nail -On System) Clay: Spanish - S" Tile Prodek. Inc. (Nail -On & Mortar Set Systems) Vulcan Clay: Spanish 'S"Tile La Mancha Tiles: (Nail -On & Mortar Set Systems) Clay: Spanish - S' Tile Metro Roof Tile: (Nail-On System) Spanish "S° Cement Flat (Mortar Set) Best Clay Tile Corp.: (Mortar Set Systems) Spanish "S' 'Venezuela. SA" Clay: "S' 'Salvador. S.A.° !Motile (Nall -On Systems) • Cement: Colonial Slate Flat Espana "5 Style Capri Almar (USA), Inc.: (Nall -On & Mortar Set Systems) Clay: Altusa'S Tile Aituse Barrel F.R. Borja Pioneer Concrete Tile: (Nall -On Systems) 2:12 pitch Cement: Hacienda' Shake/Slate Rustic Shake Spanish "S Flat 9' Classic 100 Entegra Roof Tile: (Nail - System) 2:12 pitch Cement Estate Skandla Bender Roof Tile Ind.,Inc. (Nall -On System) 2:12 pitch Cement : Palermo Corrugated Nordic Flat Etema Roof Tilo Manufacturing (Nall -On Systems) Cement Estate Barrel Skandla Flat Marley Roof Tile: (Nall -On Systems) Cement: Barcelona Castilla Monier Roof Tllo: (Nail -On Systems) 2:12 pitch Cement Mission "5 Cement Villa • Flat Shake & Slate Vanguard II Roll Spanish "S' . Vanguard II Flat Classic °100" The tile shall be installed on a solid nalable dock of 5/8" thick plywood for all new construction or 10 1/2° plywood deck on re- roofing. , • The nailable deck shall be covered with a #30 Type II (ASTM 226) anchor sheet rilaintaining a 4' overlap and lin- capped 12" o.c. except 6" o.c. at the laps. Over this, a #90 mineral surface roll roofing shall be fully hot- mopped with nominal 2 laps with the concealed edge of lap tin- capped 12" o.c. except at the valley flashing. The galvanized steel strip shall be nailed over the #30 anchor sheet ® 4' o.c. and over lapped for 5". When required. and prior to the installation of No tile, a formed 0.019 thick steel bird stop shall be Installed at the cave, which shall be bedded in mastic to the membrane and hand nailed to the roof 11' o.c. and near each end. The tile, maintaining a 3" head lap, shall be attached with two 100 plated steel gun nails per the over a bed of roofing mastic applied to the #90 roll roofing, at nail penetrations. The eave tile, in addition to the 2 -10d nails, shall bo attached with formed steel grip dips (refer to Mos (Catalog page r-.) centered 4 3/4' from the noso of each tile. The clips shall be 0.043' thick by 12" wide, galvanized steel, attached with one t Od galvanized steel hand driven nail located 1" from the 90 degree bend In the dip. The clip shall be Inbcdded In mastic applied to the roofing, at tho nail location. $TRONG RECOMMENDATIONS: On commercial applications a continuous cleat Is strongly recommended both by manufacturers and the Building and Zoning Department. This detail is found on almost every manufacturer specification and the FM guidelines for perimeter flashing. Asphalt For Built -Up Roofing Features EVT shown on each carton All products meet ASTM D312 Printed cartons Specificatio Mid States:: built exceeds: AS State does the type type as Physical Requirements —ASTM 0312 Benefits The best temperature and viscosity at point of application to assure the proper adhesion, waterproofing and application rate Assurance each shipment meets or exceeds the physical requirements of the specified roofing grade asphalt Clearly identifies manufacturer, type, flash point, EVT, Cartons are color coded for easy distinction between types �' recDtf mei halt containers containers (fiber steel drums): from prolonged s ect sunlight. fe suffi cient ventilation to avoid cessive heat build -up in closed storage Asphalts shall be homogenous and free of water and shall conform to these physical properties. x�nt alners :must be stored asphalt containers that tip over Isis'true: Type IV as well as hotter the weather, the Kali wall; flow; s #eet drums may be double lists are used to separate the Type I Min. Max. Type 11 Min. Max. Type III Min. Max Type IV Min. Max. Test Methods Softening Point ( °F) 135 151 158 176 185 205 210 225 ASTM D36 Flash Point (°F) 475 — 475 — 475 — 475 — ASTM D92 Penetration, Units: ASTM D5 at 32°F 3 — 6 — 6 — 6 — at 77°F 18 60 18 40 15 35 12 25 at 115°F 90 180 — 100 — 90 — 75 Ductility at 77 °F, cm 10.0 — • 3.0 — 2.5 — 1.5 — ASTM D113 Solubility in Trichloroethylene. % 99 — 99 — 99 — 99 — ASTM D2042 Asphalt For Built -Up Roofing Features EVT shown on each carton All products meet ASTM D312 Printed cartons Specificatio Mid States:: built exceeds: AS State does the type type as Physical Requirements —ASTM 0312 Benefits The best temperature and viscosity at point of application to assure the proper adhesion, waterproofing and application rate Assurance each shipment meets or exceeds the physical requirements of the specified roofing grade asphalt Clearly identifies manufacturer, type, flash point, EVT, Cartons are color coded for easy distinction between types �' recDtf mei halt containers containers (fiber steel drums): from prolonged s ect sunlight. fe suffi cient ventilation to avoid cessive heat build -up in closed storage Asphalts shall be homogenous and free of water and shall conform to these physical properties. x�nt alners :must be stored asphalt containers that tip over Isis'true: Type IV as well as hotter the weather, the Kali wall; flow; s #eet drums may be double lists are used to separate the Manville Built -Up • Roofing Systems • Prior to application, cut the cap sheet into manageable lengths (12' - 18') and allow to flatten. When nailers are required, cut the cap sheet into lengths which conform to the nailer spacing. Using Manville GlasKap and starting at the low edge of the roof, apply the cap sheet, being sure to maintain 2" side laps and 6" end laps over the preceding sheets. Position the cap sheet upside -down over the preceding coarse. Apply a full width mopping of asphalt to the substrate (30 - 40 lbs. per square) and flop the cap sheet into it. The temperature of the asphalt when applied must be such that, when the cap sheet is set into it, its temperature is approximately 20' F above the EVT. This will assure proper fluxing of the back coating on the cap sheet and result in maximum bonding. The cap sheet must be firmly and uni- formly set into the hot asphalt with all edges well sealed. Buift -Up Roofing Over Naifable Decks: These specifications are for use over any type of structural deck (without insulation) which can receive and adequately retain nails or other types of mechanical fasteners recommended by the deck manufacturer. Examples of such decks are wood and plywood. Select specifications are eligible for use over Lightweight insulating concrete decks or over fill made of lightweight insulating concrete. Contact the Manville Roofing Systems District Technical Services Specialist for approval of the lightweight fill to be used. Over wood decks one ply of sheathing paper must be used under the base felt next to the deck. The specifications in this section require the use of a nailable base felt. Use nails or fasteners appropriate to the type of deck. Smooth and Gravel- Surfaced Systems, Four -Pty Roof Membranes: Using Manville GlasBase or Ventsulation and starting at the low edge of the roof, start with an 18" width. The following felts are to be applied full width, lapping each felt 2" over the preceding one. Nail the laps 9" o.c. and, down the longitudinal BUR Membrane Specifications 07500/MAN BuyLine 5318 center of each felt, place two rows of nails with the rows spaced approximately 11" apart and the nails, staggered with those in the adjacent row, on approximately 18" centers. Over the in -place base felt, using Manville GlasPly Premier or GIasPIy IV and starting at the low edge of the roof, apply one 12" wide sheet, then over that, one 24" wide sheet, then over both, a full 36" wide sheet. The following fetts are to be applied full width, overlapping the preceding felt by 24 so that at least 3 plies of felt cover the base felt at all locations. Three -Ply Roof Membranes: Using Manville GlasBase or Ventsulation and starting at the low edge of the roof, start with a 12" width. The following felts are to be applied full width, lapping each felt 2" over the preceding one. Nail the laps at 9" centers and down the longitudinal center of each felt, place 2 rows of nails with the rows spaced approximately 11" apart and the nails, staggered with those in the adjacent row, on approximately 18" centers. Over the in -place base felt, using Manville GlasPly Premier or GlasPly IV and starting at the low edge of the roof, apply one 18" wide sheet, then over that, a full 36" wide sheet. The following fetts are to be applied full width, overlapping the preceding felt by 19" so that at least 2 plies of felt cover the base felt at all locations. Install each ply felt so that it will be firmly and uniformly set, without voids, into the hot asphalt, within 25 °F of the asphalt's EVT, applied just before the felt at a nominal uniform rate of 23 lbs. per square over the entire surface. Finish the entire surface with a uniform coating of the selected surfacing or flood the surface with the appropriate asphalt, at an approximate rate of 60 lbs. per square, and while it is still hot embed therein an acceptable gravel at the rate of approximately 400 lbs. per square or an acceptable slag at a rate of 300 lbs. per square. Mineral- Surfaced Cap Sheet Systems Four -Pty Roof Membranes: Using Manville GlasBase or Ventsula- tion and starting at the low edge of the roof, start with a 12" width. The following felts are to be applied full width, lapping each felt 2" over the preceding one. Nail the laps 9" o.c., and down the longi- tudinal center of each felt place two rows of nails with the rows spaced approximately 11" apart and the nails staggered with those in the adjacent row, on approximately 18" centers. Over the in place base felt, using Manville GlasPly Premier or GlasPly IV and starting at the low edge of the roof, apply one 18" wide sheet, then over that, a full 36" wide sheet. The following felts are to be applied full width, overlapping the preceding felt by 19" so that at least 2 plies of felt cover the base felt at all locations. Finish the surface with GlasKap fiber glass mineral surfaced cap sheet. Three -Ply Roof Membranes: Using Manville GlasBase or Ventsulation and starting at the low edge of the roof, start with a 24" width. The following felts are to be applied full width, lapping each felt 2" over the preceding one. Nail the laps 9" o.c. and down the longitudinal center of each felt place two rows of nails with the rows spaced approximately 11" apart and the nails staggered with those in the adjacent row, on approximately 18" centers. Over the in -place base felt, using Manville GlasPly Premier or GlasPly IV and starting at the low edge of the roof, apply one 18" wide sheet, then a full 36" wide sheet, overlapping the preceding felt by 2 ". All following felts are to be applied full width overlapping the 13