Loading...
326 NE 92 St (13)Owner's Name and Address # i��1) MIAMI SHORES VILLAGE BUILDING INSPECTION DEPARTMENT APPLICATION FOR BUILDING . PERMIT Application is hereby made for the approval of the detailed statement of the plans and specifications herewith submitted for the build- ing or other structure herein described. This application is made in compliance and conformity with the Building Ordinance of Miami Shores Village, Florida, and all provisions of the Laws of the State of Florida, all ordinances of Miami Shores Village and all rules and regulations of the Building Division of Miami Shores Village shall be complied with, whether herein specified or not. A copy of approved plans and specifications must be kept at building during progress of the work. Date __.?_ f - -- ,19_ -- 4 , r No , � Street —_ __! / i' 1`Pi %^,. , . Registered Architect and /or Engineer _ _l� Name and address of licensed contractor . _2 • Lot__ � ihti tion of lot to be built oa: f y / Location eg description Block � 1 L4 Subdivision________,__ � � Street and Number where work is to be done 'Z.-, ' _ 1_2 ti r State work to be done and purpose of building (by floors) and for no other purpose. New Building Rf '4' ii :% ' ' ,e }n , deling Addition Repairs No. of Stories To be constructed of .,„,f,. Kind of foundation Roof Covering__ Estimated Total cost of improvements $ / ra ' A t ! % Amount of Permit $ e Zone cubage equired__________________ / ' _Plan Cubage_ +- Distance to next nearest building Size of Building Lot Maximum live load to be borne by each floor I hereby submit all the plans and specifications for said building. All notices with reference to the building and its construction may, be sent to The undersigned applicant for this building permit does hereby certify that he understands and accepts his obligations as an employer of labor under the Florida Workmen's Compensation Act, being Section 5966, Compiled General Laws of Florida, Permanent Supplement, and has complied with the provisions thereof, and will require similar compliance from all contractors or sub - contractors employed by him in the work to be performed under this permit; and will post or cause to be posted for inspection on the site of the work such public notice or notices as are required by the Act. The undersigned agrees to employ only such subcontractors, on work to be performed under this permit, as are licensed by Miami Shores Village. / a Remarks (Signed) ! e_ k "s o ; - ' % �' e c _ "s STATE OF FLORIDA, COUNTY OF DADE. ss. Before me, the undersigned authority, a notary public, authorized to adm' is s and take acknowledgments, personally ap- peared and who, being by me first duly sworn, upon oath deposes and says that he is the of the above described construction, that he has carefully read the foregoing application, and that he did sign the -same, and that all facts therein by him stated e true. , �� / / a G, i — Permit No / /4 l Date ` ` f Read, s Swprn to and bscribed before me." �j Disapproved Date __ ■ Notary Public, Si Florida (Signed) ,e Building Inspecto{ My Commission Expires / 7V ir ._ PLANNING BOARD DATE Chairman Member Member Member Member Member Council Approved Date Disapproved Date NOTE: A charge of $1.00 will be made for making corrections or changes to this application after approval has been obtained from the Planning Board. A re- inspection fee of $1.00 will be charged when such re- inspection is made necessary by improper notice for inspection or faulty materials and /or workmanship. to nie well known, • • 1 Owner + s Name jic,.No. ,, , Add. or Phone General Contractor Lic.No. Add. or Phone Zone Req.Cu.Ft. U r ( r+ Cu. Cont . By Plat Restriction Checked by To Planning Board 9/,I Re- Submitted to P.B. Approved Rejected Plans & Spec. Checked by To Council Approved Rejected ), Bldg. Permit No. ' �1" //Date i ` Fee Cost Type Stories Roof New Construction Alterations _ Repairs Plumbing Permit No Date Septic Tank ++ Sewer Misc'l New Const. 'Electrical Permit Fixtures Heater Motors Misc rl New Construction Building Inspection pato By Foundation � Beams & Lintels Final Final Clean -Up ' / Block Plumbing inspection Roughing F.� x Lure a Sewer Septic Tank . Solar Heater . Final Certificate E.ecbrical Inspection a + Pcugaing r Fixtures Final _i% //(9 ,/ Tem , O.K, . ery ce O.KG to Power Co. t ration Repairs No. � Dato�rFee Ir 11 Subdivision No. Street 11 11 1, If t Alteration MINIM ' v Approved Rejected Re' -insp Fee 11 11 11 11 11 Ropairs By Re -Insp By Re -'insp By R e -Insp By Re:Eisp By Re -Insp By Cert /q