925 NE 91 Terr (6)i nspection Number: I NSP -1 5960
Inspection Date: 04/27/2006
Inspector: Grande, Claudio
Owner: PIEDRAHITA, JUAN CARLOS
Job Address: 925 91 Terrace NE
Project: <NONE>
Miami Shores Village, FL 33138-
CL
Contractor: C & F DECORATING SERVICES INC
Building Department Comments
Wednesday, April 26, 2006
Inspection Worksheet
Miami Shores Village
10050 N.E. 2nd Avenue Miami Shores, FL
Phoi: (305)795 -2204 Fax: (305)756 -8972
Block:
Permit Number. RC -12 -05 -1434
Permit Type: Residential Construction
Inspection Type: Final
Work Classification: Alteration
Phone Number (305)244 -1158
Parcel Number 1132060030060
Lot:
Page 2 of 2
q 51
Passed
Inspector Comments
I/
Failed
Correction
Needed
Re- Inspection
Fee
($75)
No Additional Inspections can be scheduled
re- inspection fee is paid.
until
i nspection Number: I NSP -1 5960
Inspection Date: 04/27/2006
Inspector: Grande, Claudio
Owner: PIEDRAHITA, JUAN CARLOS
Job Address: 925 91 Terrace NE
Project: <NONE>
Miami Shores Village, FL 33138-
CL
Contractor: C & F DECORATING SERVICES INC
Building Department Comments
Wednesday, April 26, 2006
Inspection Worksheet
Miami Shores Village
10050 N.E. 2nd Avenue Miami Shores, FL
Phoi: (305)795 -2204 Fax: (305)756 -8972
Block:
Permit Number. RC -12 -05 -1434
Permit Type: Residential Construction
Inspection Type: Final
Work Classification: Alteration
Phone Number (305)244 -1158
Parcel Number 1132060030060
Lot:
Page 2 of 2
15841 Pines Pines Blvd. #233
• Pembroke Pines, Fl 33027
Phone: 954 -435 -5302
• Fax: 954 -430 -5698
CGC# 060692
Mecias Construction Corp.
November 15, 2005 Via: email & Certified Mail
Juan Piedrahita
925 NE 91 Terrace
Miami Shores, Fl 33138
Dear Mr. Pedrahita:
I am in receipt of the e-mail you copied to me to the State of Florida. I would like to clarify several
items that we have mentioned to you numerous times, but you seem either to not understand or
unwilling to:
1. Mecias Construction is not known as Mecias Development. They are two separate
entities with two separate functions. In fact, Mecias Development has not even been
opened for business.
2. According to the contract that was signed between you and Mecias Construction
$8,000 was to be submitted upon signing of the contract to cover all the costs
associated with architect fees, plans, sketches, and all costs associated with the
preconstruction phase. As we also have mentioned to you, because of all the non
permitted work that you did before you contracted with our company, items that
would have been accepted with sketches such as kitchen cabinets and bathroom tiles,
we had to go back and add them to the ever growing list of full architectural plans.
Thereby, adding massive expenses of the difference which we have not recovered
from you. Please see attached list of costs.
3. In reference to the signed and sealed drawings, we had mentioned to you that the
drawings take anywhere from 4 -8 weeks depending on the architect and even with
the set backs of Hurricane Wilma we told you that we would have the signed and
sealed drawings ready for you by this past Friday which was 45 days from the signed
contract. So when you mention excuses, I fail to understand what you mean. We
have been clear with you from the beginning.
4. Then lastly, in yesterday's conversation with our Vice - President Juan Mecias, all he
wanted to assure was proper coordination with you because for some reason you
always seem to call someone else except for Mr. Mecias.
5. We have met with you on multiple occasions to not only help you with this problem,
but to also clear up your blatant mistakes that you had committed with Miami Shores
Inspectors. We still stand ready and able to perform this work for you. As
mentioned in the contract, we can only begin after the permits are ready and we will
not shortcut or deviate from the appropriate processes as you had mentioned to Mr.
Juan Mecias in order to reduce the contract.
6. Please be aware that providing false written statements is a criminal act. Your
decision to want to 12reacti ttie poet ;act, carne ; hprtly thereafter we suggested t11at.
November 15, 2005
Page 2
Govern Yourself Accordingly,
Annie Mecias
President
you allow the City of Miami Shores Inspectors to inspect your house before
submitting the final drawings to the city so they could clarify your red tag items. If
you recall, when we mentioned this to you, you said that you were going to meet
with the city yourself. I want to reiterate that we will not proceed without the pre -
inspection from the City of Miami - Shores. We have wasted enough time and money
on this situation.
CC: Claudio Grande, Miami Shores, State of Florida
Claudio Grande
From: meciasa @bellsouth.net
Sent: Monday, November 14, 2005 10:30 PM
To: gemglobal @bellsouth.net; info @stateofflorida.com
Cc: meciasa @bellsouth.net
Subject: Re: Contractor complaint
925 NE 91 Terrace 925ne9lterraceflori
Miami Shores... daletter.do...
Mr. Piedrahita:
Please see the attached letter and list of preconstruction costs regarding the response to
your e -mail from yesterday.
> From: "Juan Piedrahita" <gemglobal @bellsouth.net>
> Date: 2005/11/13 Sun PM 09:31:43 EST
> To: <info @stateofflorida.com>
> CC: < meciasa @bellsouth.net>
> Subject: Contractor complaint
> This general contractor Mecias Construction Crop. Also known as Mecias development
Inc.(owner Anne P Mecias wife or daughter)( #CGC060692) Received on 10/04/2005 check #298
$8,000 of my money, refuse to do the work, refuse to return my money and I would like to
lodge a complaint. I kindly asked to make arrangement to apart and had the nerve to ask
for $6 to $7,000 more to break the Contract for work that has not been preformed.
> Mr. Juan Macias mentions to me that he has architectural plan signed and sealed from a
architect for the last few weeks, I visited the Village of Miami shores and spoke to the
chief inspector Claudio he says all that he has received are sketches. Juan Macias, on our
last conversation mentions that I need to call him in the event if I what to solve my
problem on another day because he is to busy to contact me the customer on a later date.
All i get are excusese.
> Where may I submit the contracts and correspondence. To proceed
> mediation. I also Cc copy this letter to Mecias Contraction email
> address meciasa @bellsouth.net address 16277 NW 13 street Pembroke
> pines FL 33028 FEI #320154148
> Thank you
> Juan Piedrahita home owner address 925 NE 91 terrs Miami shores
> Florida, 33138 Cell #786- 553 -3137
> Here is a direct link to the city of Miami shore to contact the chief
> inspector Claudio if necessary http : / /www.miamishoresvillage.com /
1
925 NE 91 Terrace Miami Shores
Preconstruction Costs
Description Costs
1. 6 Site Visits @ $75 ea. $450
2. 5 Sketch Renderings @$400 ea $2,000
3. 3 County Meetings @ $100 ea $300
4. NOC, etc. 5 hours @$50/hr $250
5. Architectural Fees 1 St rendering $7,800
6. Architectural Fees 2 " rendering $2,000
To Date Preconstruction Costs : $12,800
Claudio Grande
From: Juan Piedrahita [gemglobal @bellsouth.net]
Sent: Monday, December 12, 2005 11:27 PM
To: 'Kristina George'
Cc: Claudio Grande; gemglobal @bellsouth.net
Subject: RE: Mecias Construction Corp.
Page 1 of 2
Dear Ms.George,
I am enclosing a portion of the complaint I submitted to Tallahassee's mediation
department so you can get a better understand what has occurred.
I read Annie Mecias response to your letter and I am still confused. Maybe you can
help me understand what she is saying and explain it to me. I wrote their lawyer
and asked him this same question but as of yet there is no response.
Mr. Mecias claims he terminated our contract (and is keeping the deposit) for three
reasons
None of these reasons make any sense to me. Do they make any sense to you?
Reason # 1
REFUSAL TO ACCEPT RESPONSIBILITY FOR PRE EXISTING AND UNKNOWN CONDITIONS.
Tell him I accept all responsibility to pre existing conditions, whatever that
means, So will he now either do the work or give back the deposit? This is too
silly to comment on
Reason # 2
REFUSAL TO COOPERATE WITH CONTRACTORS ATTEMPT TO OBTAIN PERMITS
In what way am I refusing to cooperate? I gave him $8000.00. I went to building and
zoning and they feel it is because he has no architectural drawings. I spoke to the
chief inspector, Mr. Grande, and he has no idea what Mr. Mecias is referring to. He
said whenever he submits the drawings and pulls the permits he may start the job.
What more can I do?
Reason # 3
MISREPRESENTATION ABOUT THE SCOPE OF PRIOR WORK PERFORMED BY THE HOMEOWNER
This is the most interesting reason. Only after he began to hide and not return my
phone calls did he invoice me for 6 visits at $75.00 per visit. When he wanted the
job he came around for free. He never mentioned he charges $75.00 per visit. He
only made up this invoice after Hurricane Wilma arrived and destroyed many homes
which is the time he disappeared with my deposit. But lets put $75.00 per visit x
six times aside for one minute. He is admitting he came to my house 6 times. How
can I misrepresent the scope of the work? What am I getting for 75.00 per visit?
Ms. George it is obvious Mr. mecias walked away from the job because he decided to
work for more desperate homeowners. If other people are now willing to pay more
money than canceling our contract is unethical. but to keep someone's deposit is
simply criminal.
Since neither Mecias or his lawyer refuse to answer me I have no choice but to
request a mediation in Tallahassee and to report him to the BBB. If ever you find
out what he means by his three reasons for termination I would appreciate if you
let me know.
Thanks in advance
for any help you can assist me in
12/13/2005
Juan Piedrahita
Cc Claudio Grande (Building Offical /Director)
Original Message
From: Kristina George [mailto:bbb4 @wpbbb.com]
Sent: Monday, December 12, 2005 9:24 AM
To: gemglobal @bellsouth.net
Subject: Mecias Construction Corp.
BBB SERVING SOUTHEAST FLORIDA AND THE CARIBBEAN
2924 N Australian Ave. , West Palm Beach, FL 33407
561 - 842 -1918 FAX 561 - 845 -7234 info @seflorida.bbb.org
December 12, 2005
Mr. Juan Piedrahita
925 NE 91 terrs
Miami, FL 33138
RE: #31000475 - Mecias Construction Corp.
Dear Mr. Piedrahita:
Thank you for utilizing the services of the Better Business Bureau.
We have contacted the company on your behalf in an attempt to reach
a mutually acceptable resolution. Enclosed, please find a copy the
company's response received by the Bureau in reference to your
complaint.
Through mediation, the Bureau strives to find a fair and amicable
solution to disputes that occur between a customer and a business.
However, instances do exist where the Bureau is unable to bring
about a satisfactory resolution to a dispute. Because mediation is
a voluntary procedure, the Bureau cannot compel either the business
or consumer to settle a complaint.
IF YOU ARE NOT SATISFIED WITH THE COMPANY'S RESPONSE AND /OR HAVE
ADDITIONAL INFORMATION TO BE CONSIDERED, PLEASE LET US KNOW IN WRITING.
FOR YOUR CONVENIENCE, YOU MAY SUBMIT YOUR REBUTTAL
VIA E -MAIL TO THE ADDRESS LISTED BELOW.
Sincerely
Kristina George
Dispute Resolution Specialist
bbb4 @wpbbb.com / 561 - 842 -9278 ext 161
12/13/2005
Page 2 of 2
•
;Y. P .1'5
Oirii0edtge..
6 1.tet:Busiiitss13tirea
)24N, .Au.trdJjaAve
ch; FI 33
H.e: Case / 3100425 925 NE 9i Uerrace)
Dear Ms. Georgc:
take Os wcfl as the PenuILs. We rnentjon to hizi that thc: actuaj work woujd lake two weeks
Additionallyhe SrepseiitJ about his scopc ofprior work. and was not wI1ing to accept
in th contract We havc had the signed and sealcd drawngs fbr more than two weeks flow.
Eventhougj we inurred morc costs than we were pad lbr we wcnt &ead and didn't even asic
for rnore money hopirig to fins1i ibe job, but ifMr. Piedrahjia is going to breach tlie conlract,
we have no other choice than to terzninaie Our conuact with hirn. If you b.a've ariy questioris,
fc free to COntactnic
'..•••••. • ••.:.
•••
•• .....•• ...• .
•.•.• •.•• .
•
• •
•
..... ':::::;:.::...-:::::::::::::::•:. ;:', :: 1::::::::— .: :':: ;::::':::,-.:'....
1111 ienCe
..• ,:: '',::',.:•:::•*:..........:::: tali • • • s ......... .
::::..".: .• •••• .........:.. • ::•.::•...:.1::::...;.N6. •
...: ".--::•-•:::::••••1":•:::: ::::••:-...,•• : . :•;:2••••::,1 j.--..•••••.'f -..-..'s4ilig. 'Vt ..,
se . t) .ox I. ... . .. ..:. '....••• •••-• ...* .
.. .... .. .,.. , , ........,.......: :,i.........-......:.:....-...•,:,..-........•.::::.:::.....•:.:....••
.:-....-.;...-,...::::..
••••••••:-..::.:*...-:..::•' ..• :.. : , ......:.....,.. ..• :•... At.Lessi bil■ty:.I.O:.•iiiij;•.ii.att•:ii}.:',§.ite0.7•.i.riteks..iind/ot-cicjuipiiie•itl •:::::::......
•-•-••4••::::-:;iiiiri.ieitiFi1ji,iii'etil....drict•;.,slidtiiel.-ptiot-.to..toiniii.dititiitiiiiir.::•:....::.... .
•::::••••:":•••••: • st • ...:.:Pi,61.13ii§i•iig:ari0.it...ithicIrdwil:eoriditlitrissiii:iiiiit:"Iffeitiiiiii Jii:iIii•..tcii.ipe iit.Wiirk , . :.....
• - " ••••••••••.........•........•.:..••••••.;,:.::::....:::::::„:4.•.......:•.....::•;:.:::.:;:..-..... ....'...., .. -. - .......................: . .....: ; ;.:.... - ,:,;.•.:.....ii:.: - ...: . ...,E'.:::..,..,:......: : : : •••..............: : :.:...• : .f... ,•,... .............. ... ,;.. ... .... ...; ., ..;.......
. . ; .....:....• ..... ......
••• ; .. ..:...' ...• ...•.:......H.........,.....;...1.1-;:.:::•,..:::...;[......;•:;:::::;•....:::::...:....:.::::::.::: .'•:.............,:••••••••; ..• • .-..........' 1.. ............:•••• ...........:•.--:-..:.......
..... .. .
: ••:••••
:....,. • ..-.... •-•::. •,•'.:•:.:1•.•,:::Prias:11;itfiedriitk.irt..iiteltide,-..ii•Orilitiiible:Fltrid..1itx...lin4 •lifajr:lid:.adjil•gkii:•tit sliny Time . to :refl et i t . .:• • •• • •••••••••••••:."...::-.': :....'
iti:•taices .wh lc h:rilay.:4eecitfie:lotiectiiii:•AItet:the-.-.lati:':r.if4hi$•;:pippb..sal:...:..• :.....• :...; ..• ......:..::_:........:...........:•••:,:•• -::;.•,......:„..:•:......•••:••••:.......
..-.::"fi1iiiril.61;Mtil,ii:b.aiitif6-9 ..thesiiii••.i.1ilrby iiiivtiet;Taild•••eiiiiioepil:.6f.•:•eiiiastotfsteui:tii.iti.:.:.• .;,::.•:•:..::::•:.:.•:.:........•:-....
..::::.:.• :..:..:.....::::"i.. -:- Mecias••Coristniettori.Cotrioration yestrye$ T e righr o .t lc owner on:r coo in
• .. Iiiiiii.ifii(6.-ii•iid/Oi:iiii§§i.idp.6iiiiiiiti.:Iii.".ai:•crirdati•eell:.) this.projet(:•:4:dd111ijilly; .i.perFforiiiii....i.' :-..........:..:.;'•.;;..•...:••.....:,....
••,•:
„ • .....
.,:-..C.Ciii.stniiiiroii::Li4;•:iv•iiritiiiiii::flie niiiii.fii•Li6ii-ttio-Oroiiieity:i,ii•liiiiiii:itdei.:tupti.itett:joitrstight.:to :::•1.:..:••••,:•::::;.•,:••••:::•••••••-•:..:
:•,..;:::::•:.:•......i.:::: .:....:iiiiii1i.igi'iiijiiiillk?.•••:;.:•.:::,-:::.::......:1-..:::::::::•:::.:•-.-.......*::::.-:::.•,..'1... ,•,:,".....-.;•• .:;:l-,........:.;:.:::%,•,::::;;-•••.,:'...:..:::::.....:.:':.:::•:•:,::::. -.:...".•::•';'::::.•:: •-• •••••": .-: •:‘:••••••• ... --...:.
•••••8V...:Liii6e..tif6'...,i■kli(t6';di!iliobiliii:riur; work
„.::.......7..:::: • .
tori:e.c.froir.•••••Ei4.,:riifoji4T.Oiti:•:it riayiliviii:icwiiiiheld•:[ar....-:-.:.;:::"...:::..........::•:::::i:.,....
..: - • - . 15...-(liji...tit.:iiioies:.:12:44tiobi iiiitt•::wi 'be S .titisilie's.tliy. s••••riiiii.:i!etei■i_oiiiititi: .paynieht, • and anji.....:.•..-::•.:::-.,•:...::::.........:-.;.:....:.•::::•:.:....;-.:-.........
'e.61...i....iiieiiiiedtOi-iiiiii-obili;aiiiiii - iiii1111e:the . respoiiiibi I ity• 4:if the I c Iirge
.... .. , . .. . . .,•::tOnitructiota.::::•• :•-•:•.:••••• ':;••:..;•:••••-••••••••••••••:••••••••-•::2;:•:::.:-..:•••••••:•••• ": •••" ••••••• ...•-•-••••••:•••••:'•'•.:"••••••••:::':::•:•••.'"•:::::••••-••• .... • ••.' - •:•••••• .. "*".•• ••• • :.•:' '" . ::' ''''' -
5. - iike if ii6iy:•§i te''.*titki "6 i de4iiis,;:: will:btieil•nrtneci.by:11\4....,e.:,6ia,...:'...:C'......._.‘:ictitsii•Cutporaticin.itigitic.".1:
,,,: ... .:.......•-•...,..:.:•,..,... '•:ii..i...j.i..ii.i••••i+!ii±ki...i.:.• • • .:...:::: iies.:—.-..,•No...btiek.i!.hitei; Will.:6...lietri006,:iiril.iiii;:afithOrlied in ii-g••••::: '.....:•:•••:••:..:....".....::::•:.:,.:.::,......
::::::;:.:•::::•:.:•.-..1...•::::,:-.-...-,..-;:.;.....:.:::.........::::fira:04:iilt.:ipi(of..Mee.itk1:2oti!.. ti-ti"Ci .:Ciirporation;.:1ffiti...,iluiiipilied•;:••iii■kliting•:ofcolii0let Ilaiges::••••:,:l.:•••••:•::.::::::.::,,...•,,,.:::::::::1',..
: . •::: :i5.ilas..aftei:.iiiriiiiiefi.6•0•:...61;..iiim-k•:..•.:'.....:.::"1:-.::.... ...„ ' . :
' .-.,•••..:....,:.-... ' • ••••.•,.::•:M airis••:•Coi i . str.tietitiii .. ."Ciii . p . o.iiiiiiriy1:.■:•0i not be •11:4 bit: tit diAliet••••itfikeifb,•:.Ai.••I'es:•.arcliltg:ei•.• •• ••: .•••••:::::••• ••••:•:.••••:••:::-...":•••:••••••••"•••••••• •-„
:•.1•:::::::•...,-...::-.:-... ....iiiiiiii4-,••••.•6iriitiliti=Z:iik6iiisii;;:.•:::ikA.:itlIcyti:maitylai...m■iAtiik;;:•,•1:iaNii•:::iii:.ti.•of CiNcl' .:' • ... .•-••• : ..•••••• :•:::•,. ...•••:.••:-...:::.-; •• . ...............
, .
. .
• • • • • • • .• „ • • • • • • . • • .
• " " • "••••
. .
• ••
• • . . .
. . ,
• •
•.....•.•• .• •
. • • .:••••••• • ••-•"
.... •
.. • ......
MeciiisCi.instruction;(':ii grMiion - •re %ervey'thc'ri ht:tnrbie+:tan a rceitie nt••
with :tlic icrma :nurlincd.::in•thin :proposiil. ": :':. : :;.::
Icritis and C onditions' ofpayrncni .:`50 %depoitaiefore'"iniitiili ,airnn o proj
f` : ect •and flne1:56% - iipon
.
. coinpletion.Plcra a :sec.Attachment :13 :(Paynienl Sto i.• ile): :: ::::':: . ; :::.:•'. • : " :::: "::- , . `; ° ;:
'-Arty.ehunge of dev.iaiinn.from rhi contract rniisrne apprnved.by an oltie,er of.Meciav
( sonStrniti... i ......... . ...
osetii :furnish labor: in:accordancewith: the: iibovi ::Ypecitieation;:rorthestirn
r Thotistin our: Hundred; AndFighry -Two
A ll.estirnate s .. are .giiiiruitc.Lilrn;lbesp (lu. c'r ru,iv iv /risuri?drindRoi - All w iirk10 be
- completed: in. a woi•krnanlike;ntenner:nceurding to stand ard:rractiee. Any::altcrahon and /or `';
above iitvolviiru;extra:c'ost: 'ill he executed only uptm written ordi rs and: will become an extra ;
c hiir�e over end a the es iinak .; lug prnp0sal will he accepted nd luler;ahan 3.calendar days (Oc uber ' •
A "2d65).or:it �svoid aiicrttrtlhr:; +t:nnr,Option
y ou • thave:iiiiy;iaiies(iuri,�,:y u may contact inc ityenr Cony iiieni e:
espec l3 Voiirs:
ceive d::T::i:me:De:c:;
onditlo are d :: Yuu are:'authlil l7Ct1 ro do work: cis •
o: 561 :' 845: 72 f?.
Jpon`:consulting our:;auorneys . please be aware.;that we` arc.termmating:.the ::.: :
ontrac date Scptcmbcr 3U; 2005 bctwccn iMccias Constr fiction Corp. : and Juan
'cdrar based'on theft Vowing: ;:. = >.
............
l� efusalito: "acce't "res onsibilii fer: re- existiri at d:unk
•
c onditions . .
p
a. ' Rciiasal to coo erate with contructor'C uttem,i is to obtain . erniits, ,
:;3: M isrcprescntation about:tlie scope .of prior work': pertorrned by::tlie
homeowner. : •
f: you have::any further questions; please'refer all correspondence or : .
om.rnun.icatlons tb:our attorilcy David:Reimcr
N :: • nittierce .Piirkwri
•
y
:::::Phone = 384.= 9200: Pax: 954- 3 :84�O01:7.
nnie Meciae;.
resident
audio (ri :altdellvliami:Shores:and ,Rick lvloi sl$tatc..of rlorida
15541 Pint's Dlvd. =
Pcmhmkeex',::FI:::3
Phone: .9544353
P x :.; 954 -X 3Q- 369A:;;i
ia: Certified Moil
COMPLAINT DESCRIPTION
I was removing all my cabinets from my house when a city inspector drove by and asked if I had
a permit to do any work. I said no and he suggested I call a General Contractor. I was introduced
to Mr. Macias of Macias Construction CC # 123456 through an acquaintance who said he could
do remodeling and get permits. Macias and I wrote a list of work to be performed and agreed on a
$33,000.00 price with a $8000.00 deposit which I stupidly gave him. Just as he was about to
begin work hurricane Wilma arrived and Mr. Macias disappeared and stopped taking my phone
calls. Mr. Macias claims building and zoning will not approve any of the permits. I asked Claudio
Grande (chief inspector) at building and zoning about this problem and he is also confused why
Macias just walked away. He thinks the problem is with Macias's architectural drawings, sketches
are not acceptable.
I feel Mr. macias just took my deposit and then went off to do other jobs for more desperate
customers. I do not mind him leaving since he didn't even start the job, but keeping my deposit is
unacceptable.
Could you please assist in helping me get back my deposit, Mr. Macias refuses to take my calls
Thanks in advance
Juan Piedrahita
2115 N Commerce Parkway
Weston Fl 33326
954 384 -9200 Fax 954 384 -0017
Dear David Reimer,
I received a letter from your client Mr.Macias who requests I direct all questions directly to you.
Your client "terminating our contract" and refuses to do any work or return an $8000.00
advance. He says he repeatedly told me why but no one at Building or Zoning or
myself understand what he is saying. Could you please ask your client to explain it to you and
then translate it to us. We requested a hearing /mediation with Tallahassee to get to the bottom of
this. Building and Zoning feels it is just a hurricane abuser case and he is fleecing a customers.
Could you please look into this and see if there is anything you can discover,
Thanks in Advance
Juan Piedrahita
My cell is 786 553 -3137
.J2_1.QcJ - v c 3
& 3Agers
Reviewer:
Claudio Grande C.B.O
305 - 795 -2204 Ext 430
Miami Shores Village
Building Department
10050 N.E.2nd Avenue
Miami Shores, Florida 33138
Tel: (305) 795.2204
Fax: (305) 756.8972
Permit No. O c J 1 434 -
Job Name Piee.4 464!!,A
Date /0//
BUILDING CRITIQUE SHEET
P/lD i)/fie. i x /.A) vE-P s/4ow /--
)& Goo A2-1 7o
P/Ams .-tee 70 he SP y %v.7cie A) (-5Q !d3
Ait) -rLc j - tec7 o rL AA)
_X-A/ / Gvae -P 6,43- e . /nu s7 fi e. ea2 -4)
l _ 1-:)C/ /04,10 ' '• n?.ru.PA t .
z c-Q-e ,./14) cat) AelaxIVA_ A.A24-3 6(1/A.; 4 1C4-e
_ /A,cls 6o _ciao) ( 4) t S )2x < s i .� ,4,v d A
Is 1%443 64)? 714 t JSi e a? •e-r'
Gc)Ads
P />s v SLR 2
a AJ¢J rc4et) Gur1'e
et3, s Aifr# 6444 er
i'ver/ r�c� 41-P 44l
Mecias Construction Corp.
November 17, 2005 Via: 0i. ‘\->
Juan Piedrahita
925 NE 91 Terrace
Miami Shores, Fl 33138
Dear Mr. Pedrahita:
Upon consulting our attorneys please be aware that we are terminating the
contract dated September 30, 2005 between Mecias Construction Corp. and Juan
Pedrahita based on the following:
1. Refusal to accept responsibility for pre- existing and unknown
conditions.
2. Refusal to cooperate with contractor's attempts to obtain permits.
3. Misrepresentation about the scope of prior work performed by the
homeowner.
If you have any further questions, please refer all correspondence or
communications to our attorney, David Reimer:
ecias
President
2115 N. Commerce Parkway
Weston, Fl 33326
Phone: 954-384-9200 Fax: 954-384-0017
Cc: Claudio Grande /Miami Shores and Rick Morris /State of Florida
15841 Pines Blvd. #233
Pembroke Pines, Fl 33027
Phone: 954 -435 -5302
Fax: 954 -430 -5698
CGC# 060692
Signed,
Mecias Construction Corp.
November 16, 2005 Via: email & Certified Mail
Juan Piedrahita
925 NE 91 Terrace
Miami Shores, Fl 33138
Dear Mr. Pedrahita:
ie Mecias
15841 Pines Blvd. #233
Pembroke Pines, Fl 33027
Phone: 954 -435 -5302
Fax: 954 -430 -5698
CGC# 060692
We are in receipt of your e -mail dated November 15 Honestly, I do not
know how many times I need to explain to you that we have the signed and sealed
drawings waiting for your response so that we can submit them to the city. As we
explained before, due to the work that you had done before on the house that was non
permitted which received a red tag before you signed the contract with us, we would
prefer for the city to go and inspect the house so those items could be added to the plans.
If you prefer not to do that, then we would need your response in writing that you take
responsibility for any delays and additional costs that may be incurred as a result of
these unpredictable items. We have told you that we stand ready and able to perform the
work, but if you do not make a decision and respond back we are at a stand still and we
cannot proceed.
I don't understand why you continue placing roadblocks and obstacles when all we
wanted to do was finish the work and be of assistance to you. We told you from the
beginning that we could not begin the work until the permits were ready. In spite of all
the false accusations that you have written about us, we stand ready and able to perform
the contract which we signed. We wait to hear from you.
Cc: Claudio Grande, Miami Shores, State of Florida
Mecias Consfruction Corp.
November 16, 2005 Via: email & Certified Mail
Juan Piedrahita
925 NE 91 Terrace
Miami Shores, Fl 33138
Dear Mr. Pedrahita:
15841 Pines Blvd. #233
Pembroke Pines, PI 33027
Phone: 954- 435 -5302
Fax: 954- 430 -5698
CGC# 060692
1 am in receipt of the e-mail you copied to me to the State of Florida. I would like to clarify several
items that we have mentioned to you numerous times, but you seem either to not understand or
unwilling to:
1. Mecias Construction is not known as Mecias Development. They are two separate
entities with two separate functions. In fact, Mecias Development has not even been
opened for business.
2. According to the contract that was signed between you and Mecias Construction
$8,000 was to be submitted upon signing of the contract to cover all the costs
associated with architect fees, plans, sketches, and all costs associated with the
preconstruction phase. As we also have mentioned to you, because of all the non
permitted work that you did before you contracted with our company, items that
would have been accepted with sketches such as kitchen cabinets and bathroom tiles,
we had to go back and add them to the ever growing list of full architectural plans.
Thereby, adding massive expenses of the difference which we have not recovered
from you. Please see attached list of costs.
3. In reference to the signed and sealed drawings, we had mentioned to you that the
drawings take anywhere from 4 -8 weeks depending on the architect and even with
the set backs of Hurricane Wilma we told you that we would have the signed and
sealed drawings ready for you by this past Friday which was 45 days from the signed
contract. So when you mention excuses, 1 fail to understand what you mean. We
have been clear with you from the beginning.
4. Then lastly, in yesterday's conversation with our Vice - President Juan Mecias, all he
wanted to assure was proper coordination with you because for some reason you
always seem to call someone else except for Mr. Mecias.
5. We have met with you on multiple occasions to not only help you with this problem,
but to also clear up your blatant mistakes that you had committed with Miami Shores
Inspectors. We still stand ready and able to perform this work for you. As
mentioned in the contract, we can only begin after the permits are ready and we will
not shortcut or deviate from the appropriate processes as you had mentioned to Mr.
Juan Mecias in order to reduce the contract.
6. Please be aware that providing false written statements is a criminal act. Your
decision to want to 12re ?cb the contract, ,awe shortly thereafter we suggested that,
November 16, 2005
Page 2
Govern Yourself Accordingly,
Annie Mecias
President
you allow the City of Miami Shores Inspectors to inspect your house before
submitting the final drawings to the city so they could clarify your red tag items. If
you recall, when we mentioned this to you, you said that you were going to meet
with the city yourself. I want to reiterate that we will not proceed without the pre -
inspection from the City of Miami - Shores. We have wasted enough time and money
on this situation.
CC: Claudio Grande, Miami Shores, State of Florida
Mecias Construction Corp.
Juan Piedrahita
925 NE 91 Terrace
Miami Shores, FI 33138
Dear Mr. Pedrahita:
15841 Pines Blvd. #233
Pembroke Pines, FI 33027
Phone: 954 -435 -5302
Fax: 954 -430 -5698
CGC# 060692
November 16, 2005 Via: email & Certified Mail
We are in receipt of your e -mail dated November 15` Honestly, I do not
know how many times I need to explain to you that we have the signed and sealed
drawings waiting for your response so that we can submit them to the city. As we
explained before, due to the work that you had done before on the house that was non
permitted which received a red tag before you signed the contract with us, we would
prefer for the city to go and inspect the house so those items could be added to the plans.
If you prefer not to do that, then we would need your response in writing that you take
responsibility for any delays and additional costs that may be incurred as a result of
these unpredictable items. We have told you that we stand ready and able to perform the
work, but if you do not make a decision and respond back we are at a stand still and we
cannot proceed.
I don't understand why you continue placing roadblocks and obstacles when all we
wanted to do was finish the work and be of assistance to you. We told you from the
beginning that we could not begin the work until the permits were ready. In spite of all
the false accusations that you have written about us, we stand ready and able to perform
the contract which we signed. We wait to hear from you.
Signed,
Annie Mecias
Cc: Claudio Grande, Miami Shores, State of Florida
3PM -
> Sent: Monday, November 14, 2005 7:30 PM
> Subject: Re: Contractor complaint .
> > Mr. Piedrahita:
> >
> > Please see the attached letter and list of preconstruction costs
> > regarding the response to your e -mail from yesterday.
> »
> » From: "Juan Piedrahita" <gemglobal @bellsouth.net>
> » Date: 2005/11/13 Sun PM 09:31:43 EST
> » To: <info @stateofflorida.com>
> » CC: < meciasa @bellsouth.net>
> » Subject: Contractor complaint
> »
> » This general contractor Mecias Construction Crop.'Also known as
> » Mecias development Inc.(owner Anne P Mecias wife or daughter)(
> » #CGC060692) Received on 10/04/2005 check #298 $8,000 of my money,
> » refuse to do the work, refuse to return my money and I would like
> » to lodge a complaint. I kindly asked to make arrangement to apart
> » and had the nerve to ask for $6 to $7,000 more to break the
> » contract for work that has not been preformed.
> »
> » Mr. Juan Macias mentions to me that he has architectural plan
> » signed and sealed from a architect for the last few weeks, I
> » visited the Village of Miami shores and spoke to the chief
> » inspector Claudio he says all that he has received are sketches.
> » Juan Macias, on our last conversation mentions that I need to call
> » him in the event if I what to solve my problem on another day
> » because he is to busy to contact me the customer on a later date. All i get are
excusese
> »
> » Where may I submit the contracts and correspondence. To proceed
> » mediation. I also Cc copy this letter to Mecias Contraction email
> » address meciasa @bellsouth.net address 16277 NW 13 street Pembroke
> » pines FL 33028 FEI #320154148
> »
> » Thank you
> » Juan Piedrahita home owner address 925 NE 91 terrs Miami shores
> » Florida,
> » 33138
> » Cell #786- 553 -3137
> »
> »
> »
> » Here is a direct link to the city of Miami shore to contact the
> » chief inspector Claudio if necessary
> » http : / /www.miamishoresvillage.com /
> »
> »
> »
> »
> »
> »
> >
2
Claudio Grande
From:
Sent:
To:
Cc:
Subject:
925ne9lterrace2nd
letter.doc (3...
Mr. Piedrahita:
meciasa@bellsouth.net
Wednesday, November 16, 2005 9:05 AM
gemglobal @bellsouth.net
info @seflorida.bbb; org @bellsouth.net; Claudio Grande
Re: Contractor complaint
Please find the attached letter in response to your e -mail dated November 15, 2005
Annie Mecias
President
> From: "Juan Piedrahita" <gemglobal @bellsouth.net>
> Date: 2005/11/15 Tue AM 01:26:42 EST
> To: <meciasa @bellsouth.net>
> CC: <gemglobal @bellsouth.net>
> Subject: Re: Contractor complaint
> Juan C Piedrahita
> HOMEOWENER
> 11/14/05
> Dear Sirs and /or To whom it may concern, We signed a contract on
> 10/2/05 for some remodeling with a scope of work totaling 33,000 with
> a $8000.00 good faith deposit to get started. You said you would begin
> in one week. With a Mortgage, taxes and insurance's to pay any
> reasonable person would agree I waited long enough. I only called you
> tonight as a courtesy to let you know I have lodged a complaint with
> the state of Florida. Instead of talking to me you hung up and wrote
> some kind of expense sheet as if it is supposed to mean something.
> Either honor the contract you signed. Return my money with an apology
> for wasting my time. Or explain to Tallahassee the e -mail just sent to
> me because I do not understand it. I hired you because you claimed you
> can pull a few homeowner permits and more importantly do the work. I
> am not exactly sure how a small little 2400 S/F home would require
> over $10,000 in sketches but you can explain it to us at mediation.
> FYI - I went to the city and spoke to Claudio Grande c.b.o the
> building official director who told me you only need to submit the
> architects drawings, signed, and with a seal and you can start right away.
> 6 weeks of my home expenses wasted for nothing. Something that could
> have been solved 6 weeks ago.
> By the way thank you for the e -mail.
> Respectfully
> Juan
> Homeowner
> Original Message
> From: <meciasa @bellsouth.net>
> To: <gemglobal @bellsouth.net >; <info @stateofflorida.com>
> Cc: <meciasa @bellsouth.net>
1
1
Claudio Grande
From: meciasa @bellsouth.net
Sent: Thursday, November 17, 2005 3:29 PM
To: Claudio Grande
Cc: meciasa @bellsouth.net
Subject: [Fwd: Re: Contractor complaint]
r!:]
925ne9lterraceter
minationlette...
Mr. Grande:
I have attached a copy of the termination letter that I am sending Mr. Piedrahita via
certified mail as well as a copy of his last e -mail to my company. I will be sending an
original copy to you as well. I just wanted to make sure to communicate and that it is in
file in the City of Miami Shores that we will no longer be the General Contractor for the
job and will not be responsible for anything done at the address of 925 NE 91 Terrace.
Please let me know if there is any paperwork I would need to fill out or if this notice is
sufficient.
Thank you for your time,
Annie Mecias
> From: "Juan Piedrahita" <gemglobal @bellsouth.net>
> Date: 2005/11/17 Thu AM 01:50:24 EST
> To: <meciasa @bellsouth.net>
> CC: <gemglobal @bellsouth.net>
> Subject: Re: Contractor complaint
> • "As we explained before, due to the work that you had done before on
> the house that was non permitted which received a red tag before you
> signed the contract with us, we would prefer for the city to go and
> inspect the house so those items could be added to the plans"
> 11/15/05
> Dear Sirs,
> As you know the work you are referring to is the cabinets and some
> tiles being pulled out. I only wanted to get a head start and possible
> save some money. There was no work done. The only work done was me
> doing some free manual labor for you. And you still charge me
> hurricane abusive prices and ran off with my money.
> You act as if a homeowner being red tagged is a Federal offense. I am
> a homeowner who simply wanted to remodel my house. A city inspector
> came by and said if you are planning some repairs, you must record
> them at city hall. The problem is not only the work, the problem is
> the recording of the work. Mr. Grande requested a General Contractor
> to record these repairs. I am not placing "roadblocks and obstacles"
> in your way. Mr. Grande said you can start anytime.
> So please make up your mind. Either do the work or return my money.
> Respectfully
> Juan
> cc Rick Morrison
> cc Claudio Grande
> cc State of Florida
> cc BBB
1
> Original Message
> From: <meciasa @bellsouth.net>
> To: <gemglobal @bellsouth.net>
> Cc: <info @seflorida.bbb >; <org @bellsouth.net >;
> < grandec @miamishoresvillage.com>
> Sent: Wednesday, November 16, 2005 6:05 AM
> Subject: Re: Contractor complaint
> > Mr. Piedrahita:
> >
> > Please find the attached letter in response to your e -mail dated
> > November 15, 2005
> >
> > Annie Mecias
> > President
> »
> » From: "Juan Piedrahita" <gemglobal @bellsouth.net>
> » Date: 2005/11/15 Tue AM 01:26:42 EST
> » To: <meciasa @bellsouth.net>
> » CC: <gemglobal @bellsouth.net>
> » Subject: Re: Contractor complaint
> »
> » Juan C Piedrahita
> » HOMEOWENER
> »
> »
> » 11/14/05
> »
> » Dear Sirs and /or To whom it may concern, We signed a contract on
> » 10/2/05 for some remodeling with a scope of work totaling 33,000
> » with a $8000.00 good faith deposit to get started. You said you
> » would begin in one week. With a Mortgage, taxes and insurance's to
> » pay any reasonable person would agree I waited long enough. I only
> » called you tonight as a courtesy to let you know I have lodged a
> » complaint with the state of Florida. Instead of talking to me you
> » hung up and wrote some kind of expense sheet as if it is supposed
> » to mean something. Either honor the contract you signed. Return my
> » money with an apology for wasting my time.
> » Or
> » explain to Tallahassee the e -mail just sent to me because I do not
> » understand it. I hired you because you claimed you can pull a few
> » homeowner permits and more importantly do the work. I am not
> » exactly sure how a small little 2400 S/F home would require over
> » $10,000 in sketches but you can explain it to us at mediation.
> »
> » FYI - I went to the city and spoke to Claudio Grande c.b.o the
> » building official director who told me you only need to submit the
> » architects drawings, signed, and with a seal and you can start right away.
> » 6 weeks of my home expenses wasted for nothing. Something that
> » could have been solved 6 weeks ago.
> » By the way thank you for the e -mail.
> »
> » Respectfully
> » Juan
> » Homeowner
> »
> »
> »
> » Original Message
> » From: <meciasa @bellsouth.net>
> » To: <gemglobal @bellsouth.net >; <info @stateofflorida.com>
> » Cc: <meciasa @bellsouth.net>
> » Sent: Monday, November 14, 2005 7:30 PM
> » Subject: Re: Contractor complaint
> »
> »
,(41 > » > Mr. Piedrahita:
> » >
> » > Please see the attached letter and list of preconstruction costs
> » > regarding the response to your e -mail from yesterday.
> » »
> » » From: "Juan Piedrahita" <gemglobal @bellsouth.net>
> » » Date: 2005/11/13 Sun PM 09:31:43 EST
> » » To: <info @stateofflorida.com>
> » » CC: < meciasa @bellsouth.net>
> » » Subject: Contractor complaint
> » »
> » » This general contractor Mecias Construction Crop. Also known as
> » » Mecias development Inc.(owner Anne P Mecias wife or daughter)(
> » » #CGC060692) Received on 10/04/2005 check #298 $8,000 of my
> » » money, refuse to do the work, refuse to return my money and I would like to lodge
a complaint.
> » » I
> » » kindly asked to make arrangement to apart and had the nerve to
> » » ask for
> »» $6
> » » to $7,000 more to break the contract for work that has not been
> » » preformed.
> » »
> » » Mr. Juan Macias mentions to me that he has architectural plan
> » » signed and sealed from a architect for the last few weeks, I
> » » visited the Village of Miami shores and spoke to the chief
> » » inspector Claudio he says all that he has received are sketches
> » » Juan Macias, on our last conversation mentions that I need to
> » » call him in the event if I what to solve my problem on another
> » » day because he is to busy to contact me the customer on a later
> » » date. All i get are excusese.
> » »
> » » Where may I submit the contracts and correspondence. To proceed
> » » mediation. I also Cc copy this letter to Mecias Contraction
> » » email address meciasa @bellsouth.net address 16277 NW 13 street
> » » Pembroke pines FL
> » » 33028
> » » FEI #320154148
> » »
> » » Thank you
> » » Juan Piedrahita home owner address 925 NE 91 terrs Miami shores
> » » Florida,
> » » 33138
> » » Cell #786- 553 -3137
> » »
> » »
> » »
> » » Here is a direct link to the city of Miami shore to contact the
> » » chief inspector Claudio if necessary
> » » http : / /www.miamishoresvillage.com /
> » »
> » »
> » »
> » »
> » »
> » »
> » >
> »
> »
> »
> >
3
Claudio Grande
From: Juan Piedrahita [gemglobal @bellsouth.net]
Sent: Thursday, November 17, 2005 2:11 AM
To: Claudio Grande
Subject: Juan 925 NE 91 terrs
Dear Claudio,
This is my response letter that I sent Mecias. Sorry to bother you with these silly games
that these people are playing. I'm obvious taking action against them and getting the
right contractor to take over the task. There as been to much talk and no action.
Once again thank you for your time and patients on the matter. I have an appointment this
friday with the new contractors achitect and will keep you posted on the matter.
If need to reach me you know have my email address gemglobal @bellsouth.net
sincerely
Juan Piedrahita
786 -553 3137
Original Message
From: "Juan Piedrahita" < gemglobal @bellsouth.net>
To: <meciasa @bellsouth.net>
Cc: < gemglobal @bellsouth.net>
Sent: Wednesday, November 16, 2005 10:50 PM
Subject: Re: Contractor complaint
> "As we explained before, due to the work that you had done before on the
> house that was non permitted which received a red tag before you signed
> the contract with us, we would prefer for the city to go and inspect the
> house so those items could be added to the plans"
> 11/16/05
> Dear Sirs,
> As you know the work you are referring to is the cabinets and some tiles
> being pulled out. I only wanted to get a head start and possible save some
> money. There was no work done. The only work done was me doing some free
> manual labor for you. And you still charge me hurricane abusive prices and
> ran off with my money.
> You act as if a homeowner being red tagged is a Federal offense. I am a
> homeowner who simply wanted to remodel my house. A city inspector came by
> and said "if you are planning some repairs, you must record them at city
> hall'. The problem is not only the work, the prob.Lem is the recording of
> the work. Mr. Grande requested a General Contractor to record these
> repairs. I am not placing "roadblocks and obstacles" in your way. Mr.
> Grande said you can start anytime.
> So please make up your mind. Either do the work or return my money.
> Respectfully
> Juan
> cc Rick Morrison
> cc Claudio Grande
> cc State of Florida
> cc BBB
> Original Message
> From: <meciasa @bellsouth.net>
1
> To: <gemglobal @bellsouth.net>
> Cc: <info @seflorida.bbb >; <org @bellsouth.net >;
> <grandec @miamishoresvillage.com>
> Sent: Wednesday, November 16, 2005 6:05 AM
> Subject: Re: Contractor complaint
>
>
» Mr. Piedrahita:
» Please find the attached letter in response to your e -mail dated November
» 15, 2005
» Annie Mecias
» President
»>
>>> From: "Juan Piedrahita" <gemglobal @bellsouth.net>
>>> Date: 2005/11/15 Tue AM 01:26:42 EST
»> To: <meciasa @bellsouth.net>
»> CC: <gemglobal @bellsouth.net>
>>> Subject: Re: Contractor complaint
»>
>>> Juan C Piedrahita
»> HOMEOWENER
»>
>>>
»> 11/14/05
»>
>>> Dear Sirs and /or To whom it may concern,
>>> We signed a contract on 10/2/05 for some remodeling with a scope of work
>>> totaling 33,000 with a $8000.00 good faith deposit to get started. You
»> said
>>> you would begin in one week. With a Mortgage, taxes and insurance's to
»> pay
>>> any reasonable person would agree I waited long enough. I only called
»> you
>>> tonight as a courtesy to let you know I have lodged a complaint with the
»> state of Florida. Instead of talking to me you hung up and wrote some
»> kind
>>> of expense sheet as if it is supposed to mean something. Either honor
»> the
»> contract you signed. Return my money with an apology for wasting my
»> time. Or
»> explain to Tallahassee the e -mail just sent to me because I do not
»> understand it. I hired you because you claimed you can pull a few
>>> homeowner
>>> permits and more importantly do the work. I am not exactly sure how a
»> small
>>> little 2400 S/F home would require over $10,000 in sketches but you can
»> explain it to us at mediation.
»>
>>> FYI - I went to the city and spoke to Claudio Grande c.b.o the building
>>> official director who told me you only need to submit the architects
>>> drawings, signed, and with a seal and you can start right away.
>>> 6 weeks of my home expenses wasted for nothing. Something that could
»> have
»> been solved 6 weeks ago.
»> By the way thank you for the e -mail.
»>
>» Respectfully
»> Juan
»> Homeowner
»>
»>
>»
>>> Original Message
>>> From: <meciasa @bellsouth.net>
>» To: <gemglobal @bellsouth.net >; <info @stateofflorida.com>
2
» > < meciasa @bellsouth.net>
>>> Sent: Monday, November 14, 2005 7:30 PM
>>> Subject: Re: Contractor complaint
»>
»>
>>> > Mr. Piedrahita:
»> >
>>> > Please see the attached letter and list of preconstruction costs
»> > regarding
>>> > the response to your e -mail from yesterday.
> » »
>>> » From: "Juan Piedrahita" <gemglobal @bellsouth.net>
»> » Date: 2005/11/13 Sun PM 09:31:43 EST
>» » To: <info @stateofflorida.com>
>» » CC: < meciasa @bellsouth.net>
»> » Subject: Contractor complaint
»> »
>>> » This general contractor Mecias Construction Crop. Also known as
>>> » Mecias
»> » development Inc.(owner Anne P Mecias wife or daughter)( #CGC060692)
»> » Received on 10/04/2005 check #298 $8,000 of my money, refuse to do
»> » the
>>> » work, refuse to return my money and I would like to lodge a
>>> » complaint. I
»> » kindly asked to make arrangement to apart and had the nerve to ask
»> » for $6
>>> » to $7,000 more to break the contract for work that has not been
>>> » preformed.
»> »
»> » Mr. Juan Macias mentions to me that he has architectural plan signed
»> » and
>>> » sealed from a architect for the last few weeks, I visited the Village
»> » of
»> » Miami shores and spoke to the chief inspector Claudio he says all
»> » that he
>>> » has received are sketches. Juan Macias, on our last conversation
>» » mentions
>>> » that I need to call him in the event if I what to solve my problem on
>>> » another day because he is to busy to contact me the customer on a
»> » later
»> » date. All i get are excusese.
»> »
>>> » Where may I submit the contracts and correspondence. To proceed
»> » mediation. I also Cc copy this letter to Mecias Contraction email
»> » address
>>> » meciasa @bellsouth.net address 16277 NW 13 street Pembroke pines FL
»> » 33028
>» » FEI #320154148
>» »
>>> » Thank you
>>> » Juan Piedrahita home owner address 925 NE 91 terrs Miami shores
>» » Florida,
»> » 33138
>>> » Cell #786 -553 -3137
»> »
> » »
>» »
>>> » Here is a direct link to the city of Miami shore to contact the chief
>» » inspector Claudio if necessary
>>> » http : / /www.miamishoresvillage.com /
>» »
»> »
>» »
»> »
>» »
»> »
»> >
BU1..DING
PERMIT APPLICATION
FBC 2001
Owner's Address!'
$ Value of Work For this Permit V\ ((p a
Total Fee Now Due $
(Continued on opposite side)
N 1 T •
vt iami mores age
Building Department
10050 N.E.2nd Avenue, Miami Shores, Florida 33138
Tel: (305) 795.2204 Fax: (305) 756.8972
Permit Type (circle): Building ��ll Electrical Plumbing Mechanical
Owner's Name (Fee Simple Titleholder)V1'%, r� t }kr; ? . =' -,' Phone # ?. jC 7 J
•
r
City State 'fr C Zip
Tenant/Lessee Name Phone #
Job Address (where the work is being done) �)( -', ; % ; - 1 4 `,!
City Miami Shores Village County Miami -Dade Zip
Is Building Historically Designated YES NO
Contractor's Company Name Phone #
Contractor's Address
City State Zip
Qualifier
State Certificate or Registration No. Certificate of Competency No.
Architect/Engineer's Name (if applicable) Phone #
Permit No. P •
Master Permit No.
Square Footage Of Work:
Roofing
2- ( ve_
Type of Work: iAdditi ❑Alteration ❑New El Repair/Replace El Demolition
Describe Work: eR A
* * * * * * * * * * * * * * * * * * * * * * * * * * ** F ees * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
Submittal Fee $ Permit Fee $ D CCF $ flt a CO /CC
Notary $ 5 , a c7 Training/Education Fee $ . Technology Fee $
Scanning $ Radon $ Zoning Bond $
Code Enforcement S Structural Plan Review. $
q, 3n im6)-9 lolo
Bonding Company's Name (if applicable)
Bonding Company's Address
City State Zip
Mortgage Lender's Nanie (if applicable)
Mortgage Lender's Address
City State Zip
Application is hereby made to obtain a permit to do the work and installations as indicated. I certify that no work or installation has
commenced prior to the issuance of a permit and that all work will be performed to meet the standards of all laws regulating
construction in this jurisdiction. I understand that a separate permit must be secured for ELECTRICAL WORK, PLUMBING, SIGNS,
WELLS, POOLS, FURNACES, BOILERS, HEATERS, TANKS and AIR CONDITIONERS, ETC
OWNER'S AFFIDAVIT: I certify that all the foregoing information is accurate and that all work will be done in compliance with all
applicable laws regulating construction and zoning.
"WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR
PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING,
CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF
COMMENCEMENT."
Notice to Applicant: As a condition to the issuance of a building permit with an estimated value exceeding $2500, the applicant must
promise in good faith that a copy of the notice of commencement and construction lien law brochure will be delivered to the person
whose property is subject to attachment. Also, a certified copy of the recorded notice of commencement must be posted at the job site
for the first inspection which occurs seven (7) days after the building permit is issued. In the absence of such posted notice, the
inspection will not be tipproved and a reinspection fee will be charged.
Signature / -s - Signature
/
Owner or Agent
Chc 05/13/03
a /1'4,7
My Commission Expires:
Contractor
The foregoing instrument was acknowledged before me this The foregoing instrument was acknowledged before me this
day of , 20 _, by , day of , 20 , by
who is personally known to me or who has produced who is personally known to me or who has produced
As identification and who did take an oath. as identification and who did take an oath.
NOTARY PUBLIC: NOTARY PUBLIC:
Sign: Sign:
Print: Print:
My Commission Expires:
************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** *** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
APPLICATION APPROVED BY: AJ16 2 4 2004 Plans Examiner
Engineer
Zoning
Miami Shores Village
10050 NE 2nd Avenue
Building Permit
Phone: 305 - 795 -2204 Permit Number: BP2004 -1153
Printed: 8/26/2004 Page 1 of 1
Applicant: BARBARA ABSALOM
Owner: ABSALOM BARBARA
JOB ADDRESS: 925 NE 91 TERR
Contractor
Local Phone:
Signed: (INSPECTOR)
Contractor's Address:
Parcel # 1132060030060 Legal Description: PL OF BISCAYNE RIDGE PB 39-41 W31FT LOT 7 & LOT 8 & E2FT LOT 9 LESS
Fees: Description Amount
FEE2004 -8669 Building Painting Fee $60.00
FEE2004 -8670 CCF $0.60
FEE2004 -8671 Notary Fee $5.00
FEE2004 -8672 Training and Education Fee $0.20
FEE2004 -8673 Technology Fee $1.50
Total Fees: $67.30
Permit Status: APPROVED Permit Expiration: 2/19/2005 Construction Value:
Work: EXTERIOR PAINT
$60.00
Total Fees: $67.30
Total Receipts: $67.30
In consideration of the issuance to me of this permit, I agree to perform the work covered hereunder in compliance with all ordinances and regulations pertaining thereto and in strict
conformity with the plans, drawings, statements or specifications submitted to the proper authorities of Miami Shores Village. In accepting this permit I assume responisibility for all work
done by either myself, my agent, servants or employes.
Signed: (Contractor or Builder) BY:
MIAMI SH RES''VILLAGE, FLA. ` /05
N2 26214
JOB / >JX4/
ADDRESS 7".r.04 ��'
INSPECTION 77 2 �� �'C r �a%'l'
TIME READY /'teal
REMARKS.
647;2'719 (
�) f
INSPECTOR •
8 /
AIhrrt Eltrkirn un
REALTO R
8411 BISCAYNE BOULEVARD
MIAMI, FLORIDA
Mr Simmons
Building Inapt
Miami Shores Village.
Dear Mr Simmons;
May Ibth.
I939
We intend to add six feet to the
East side of this lot to comply with your request
of ten feet from each building line.
LOTS
ACREAGE
PROPERTY
MANAGEMENT
Yours very truly,
D1. E. Bisoayne Company