Loading...
901 NE 91 Terr (5)DATE: PI -LONE #: ADDRESS OF FILE REQUESTED: INFORMATION REQUESTED: Acknowledged by: FILE RETURNED TO: INITIAL Miami Shores Village Building Department 10050 NE 2 Ave, Miami Shores, Fl 33138 Tel: (305)795 -2204 - Fax; (305)756 -8972 PLEASE PRINT NAME OF PERSON REQUESTING FILE: 6 553 - )157YOUR ADDRESS: TIME: r J Ate" Llor ( � 2 �� tne I understand that all documents in this file are property of Miami Shores Village and that NO documents may be removed from this file. You may get 4 complementary copies (8x1 1) size, additional copies will be furnished at 0.15 cents per page, not including any blue prints. If blue prints are order please be aware that we are not responsible for the quality of the printed documents. DATE: - / f / TIME: NAME OF PERSON REQUESTING FILE: IA PI - ZONE # #: 3 YOUR ADDRESS: X 72 C ADDRESS OF FILE REQUESTED: �O ( Gv� ( INFORMATION REQUESTED: I understand that all documents in this file are of Miami that NO documents may be removed from this file. You property may get 4 complementary and copies (8x1 1) size, additional copies will be furnished at 0.15 cents Shores per page Village , not including any blue prints. If blue prints are order please be aware that we are not responsible for the quality of the printed documents. Acknowledged by: FILE RETURNED TO: INITIAL Miami Shores Village Building Department 10050 NE 2 Ave, Miami Shores, Fl 33138 Tel: (305)795 -2204 • Fax; (305)756 -8972 PLEASE PRINT i GENERAL It ir3 the intent of these plane and specifications to provide all labor and material to completely finish the eork, and they shall be considered at all times as a part of the construction contract. The General Contrac- tor and the various auh- oontractora shah each ae held responsible for their various phases of the pork. They shall carry workman's liability, and fire and vandalism ineuranoe as their interests shall appear in the work. They shall obtain and ray for ail permits and licenses, comply with all lees and • ordinances, and shall hold the other blameless of all loss, All bidders are advised to visit the site and become familiar .vith the conditions. Upon completion of the job it shall be left 'broom clean' and ready in every way for 'use and occupancy. EXCAVATION AND BACKFILL The contractor shall clear the site of all unddrorueh.. All tress and stur.Fa ei t<eie tthe buildine area shall be removed, Grass. and weeds wall be removed from the area to be coo piece by the ouii ding. Excavation shall be carried to firrn,hard, virgin soil was not less than six inches aelo a natural grade. Footing trenche:i shall be cut over eidth as forme shall ee used in all foatii?i trenches. All sand pockets ur soft shots shall be Oo piately due =ad €pedal fectine a shall Os) diei ;Tied oy the En7ineor to be satisfactzre to the 73uilaine Ie;aeeetor. ell f'uuti.r;; ,kiia other trenohee shall be 'sackfilled, .:el? puidled and taaeed ae BOOn C.0 t,Fiey have served their ; ueposeo . C.)NCRETE TORK All concrete shall be at least a 017 mix with a maxiaute aater con - tent of eie gallons per sack of osnlont. O,11y doelee`t is Portland C„., ont shall be uaed,and all aggregate shall be clean r341 .Nell waeaed. i „ -ia- foroin ; steel shall bo nog, etrai; ht, and free of . 1ooeo XitOt rlakee and dirt. It eha11 be scourely wired in places is the forme and shall be covered Ate at les.et i" of ormorete. All eplious chal1 oe ae l ;wet 40 die.i:ietere. All areas to have a caxnent iinieh shall have an additional 1 ", torpteig to be not leco than 1:2 mia.of ceme,at and clean, sharp Band. "OARPEITTRY All lee eer uuleee othereise epee .fi :d, shall, Yello.i Pi ie as foliate: Joist Platen - interior B "xG" Lo°i Joist Pratee - o: terior 2"a4" ti':t7" Lon i Floor Joisto "e10 "Long Bridging - Oro: sod 1 "x4" 5uo- floori no-; 1"x8" Solo Plates 2"x4" St uus 2"x4" & P "xo" Furring 1"x2" Cypreoc Firestops 2"x4" Ceiling Joist Plates 2 "x4'i Roof Rafter Plat e 2"x6" Ceiline Jcat$le Z "x3" & u ":Ls" floc; f Rafters N'i.ata "' Rec.,f Sheathing esee't Yr. & dire . R. A. Keape Loam. Leaf Leaf Coe on Seuehera eoistinueu eOtiui auO 15 16" c -o. :very 8' r clia - dea orial r:iugle 1C3" 0 -0. c -c. - vertical oz o bet.floor & c:1lin coo? clod - etas eeed points " bolts 4' c -0. 16" o -c. lb" 0-0. tie. - hovezoi:t, l - ucli . A� iwr Only aeeo nre unite; a: rryir.; .e ;troy ,1 . oi', tho UncL rwr°iter' a Labora- toriee, eh .l1 ee used *recut the builain . ell s°oetar rhs.11 prepared and of sod 1:s with clean sand. Page One Millwork shalt be ae follows* Exterior door frames Exterior doors (11 11 1 Or Cyp.fir rabbeted 3 8/4" oyp•ftr stook 15 light 1 3 /4" olrp*►flr stook 1" lt. F'rench 3/4" cyp or fir 1 It and 1 panel Interior door frames VA" cm planted stops Interior doors 1 3/8" oyp.fir stook single panel Windows 1 3/4" "Waterttk" Casements screen doors 1 1/8" cyp•ftr stook patterns All cabinet work in Kitoben, Dining Poem and Diving room shall be as detailed in the plans. Bedroom Closets shall be completely cedar lined and shall then have a 1 "x12" ebelf supported on a 1 "s4" book strip wbioh shall also support a 1" d.I. pipe the full length of the oloset. A shoe rack shall also be included in each of these closets. Linen Closet in Hell ebail hale six shelves the full area of the of Deist. Closet in Bath shall have a clothes hamper below with three shelves above. Trim thruoat the building shall be of the narrow stook type applied before plastering, Aluminum interlocking thresholds *hull be provided for all exterior doors. Front, Rear and Garage Boors shall be squippt with cylinder loots with matched keys. All other doors shall have tumbler locks. ROCFI �, A11 roof surfaces shall be covered with ' ;bite Cement idle with lap and exposure as recommended by the manufacturer. Tower cooeres of pan tiles shall be securely nailed and all tiles shall be set in white cement mortar witb'ail edges pointed up as laying advanoee. This roof shall be laid on a 94 56 S. Roll Roofing which has been nailed at 6" centers along upper edges before mopping tbs entire surface into place on a 3n' felt which has been nailed (all nailing thru tin oapsl on 12" centers in all directions to the solid sheath,. veep bales shall be provided under each lower Dover tile. Galvanised Termite 3bis16 e s 'prov ed under all floor joist plates, and over piers. it shall extend 3 " beyond the edge of the foundation under the house and to within 3" of the outer edge of the .masonry. All joints shall be soldered, all perforations in the metal shall be well filled with an asphaltic mastic before timbers are placed. The matsri*l shall be not lees than 26 gauge. Copper Rave Strips shall be applied at all eaves. These shall be not less than 4" wide and extending 3" under the lower cadge of the 2. S. Base. Valleys *ball be of copper not lees than 16" in width 8" on each aide of the Valley. The material shah, not be lead than 16 es. goofing quality. Flashing shall be of coppers VrreTIAN B' w x 4U .. Venetian Blind Guides to finish f0 ple$ter shell be installed tbrzout the building. Mr. b Yrs s . A. Kisape Page Two nava AAT .4r; P �T�= + �. dC Plaster bans obeli be 3 gypeeum pangs . x • - .bail be nailed on approximately 6 Inch centers along edges with 3d 1 1/8" 13 ga• 3/8" beads, blued lathing nails, with a a .ntr"w bearing of 5/8" on each stud and all joints staggered. Vertical joints on opposite , sides of partitions Shall be staggered and net 60enr on o pesite sides of name studs. All interior corners shall have metal. lath extending at least 3" on each side of the corieer. All plastering shall be two•ooat wont, ,The acrato1. goat shall beaf gypsum plaster applied with sufficient preseure to obtain a full key and shall be brought eat to the grounds and straightened to a trite surface with rod and derby* The finish coat shall be cranaposed of one pa$ gauges plaster and three parts lire putt; and shall. bed applied otter .a ley bass coat, so atohed in thor*ly and laid on tali, end then doubled beak and fill- ea out to an even surface. This shall be allowed to draw for a few minutes and then shall be well troweled to a smooth surface, Texture as 40141004 by the owner obeli. then be applied• Color •hall be added to added finish coat as .selected. by..tbe owner. All stump shell be applied in two coate• Thu first coat shall be oom. posed of one pest kortlane Cement and three parts sand with the addition of 9 part of lime putty. This 041 be well nodded and brought to a true and even surface ready tor the finish coalt• The final vest stall be mused with an integral waterproofing. This eshall..be brought to a tr ao and even turrets and floated with a ooxk float. Clare shall be taken to float out all shrinkage creeks, blisters, and, other imperfections. p STOOP C STEES This shall a 5 7W - flame tested ted quarry tile in 4 l color grange • This ebe33 be of 6 "x6" flame' tinted quarry tile of medium colors. The drain and splash surfaces shall be of 6 "z4" semis. sous a in pastel sbades• The floors ahalll be of 5" hexagon e•z¢i vitreous floor tile with .sing. ? ;ails shall. be of 6 "z4" glased semi- vitrceNaa wall tiles with bank cove base and napping. Vainecote shall be g' high exempt around tub mere it is 6' high, and 7' around stow partment. All tile shell be set in a 1 / wer 2" tatting bed oa a thorol; cleaned 2" concrete slab. EI tt or; no= 4. All window stoat. shall be . of 6 "x0" bull nosed semi. Vitreous t�l•s• A '" Stucco shall have 1 Goat of sta►ndar sat wash with waterproofing and color added. Eterior woodwork .ball have 3 ousts of standard house paint. Kitchen and Bathe plastered surfaces shell. have 3 coats finishing with Semi,•ranter• Otherr walls shall have 3 coats. plus 1 coat of glazing. Interior woodwork shall have 3 coats finishig frith an 8nameloid• Hxoept for the lime wash, all paint mast be delivered to the job in original unopened packages and handled according to the manufacturer's directions. Mr. a Urn. R, A W V. Page Three Kr. Yes. its As Kemp* kage Your All surfaces shall be thusly dry and clean before the prime coat is applied and elh detects and nail boles shall be puttied after the prime coat and before the *econd coat as applied* PAS rr P ,� i th s0 Thin shall include a heaver syseei meter wa storage system, to be installed on the Oaraga roof, with hot water sUppli pipe to the house to be insulated and run concealed ° in the upper art of the arch oonneoting the garage and bowies The heater shall be an ell metal unit of not less than 24 gauge galvanised in built on a etruotural frame to prevent sag, Cell tubes shall be not less than 3/4" inside diameter annealed copper and shall be soldered continuously to the copper banking. Cover shall be opt DS glass secured in place to preclude any leaks of rain water from entering the coil bou. :storage system shall include a heavy duty; eleotrio welded, galvanised both inside and out tank tested to 115n pounds hydrostatic pressure, This shall be enclosed in a cabinet of sufficient else to allow at least Off of Insulation of re• granulated cork or equal material an all sides and top of tank* The entire system shall parry s guarantee against defects in reatette2 and workinenebip for a pettod of one year, 10T tICAI All materials and fixtures shall be approved by the Underwriter's Lsbeve. tortes, Ines, end the entire ,deb obeli be guaranteed All defeote to material and Rorkmansbip for a period of one year. All regular convenience outlets shall be of the duplex types All cover plates shell be of Bakelite or similar material.. The system shall include a bell ayetem with button at front donee and busses where directed by the owner, All water pipe shall be 3/4" gaive n se rr eel or 1/ +2" (Z.3 . i annealed oopper tubing to eaoIL fixtures ia02i pipe Shall be a4tra heavy wt : oast iron. ''fixture' shall be not less than those shown on Fixture schedule on Page Five. plovANasp These shall be as tollowe& 1,i Medicine Cabinets (21 W Finish Hardwares 25.00 Lighting Fixtures 8040 For the purpose of eetab2 a , .qu i y o en doe, The following list of manufuoturera le approveds Cement i'larida t'ort3.and O o y Cement .. «� .► •. I1pria a anry • • rr w • • • • • • a e oof +iw! i� ♦ � • 411' • pew ay • e • „w Gamma ge Qualm: Tile a ...� .� ....� .. ;ate. sum !lard «r «. M .� w , + D VINO 40•0•0 l se r e• • • �wlis►r one I ar Ian rods 40'4■411 so+. WAter HettOV0.00 •• 0,. BO Woe. Bash • - ” ..... + aterti T ile Root . ....� • Rrad7 svelte Fr• eettiom • • . » Colours WM VP 3HQM • 6$ o 6968 C $3581. O 4962•B 41vv o .8600 0 C 68660 0 33980 c 11004 0 15026 0 14484 O 14610 SH0 3.� 0 4868.8 Q 4963•3 C 6608 0 5E186 C 62620 0 33678 © 33666 C 63980 0 11004 0 19660 0 32761448 0 19770 C 33980 MI. & lire. R. A. Es SCRAMS 0'0 " Caronora linamiled Iron Reaves Bath c* p* ;flath sad sharer . Fixture Cwa`. A0oese0 Wain' C.P. " it 62" Curtain Rod Only 17" x 19" Neuday nmelod Iron La'ratD 7 G.P. Supply and waste Fixture C lent suppl ie0 O.P. 2 ` 17 Oa. F Trap Banav(lx Close COap.e6 :lain Rim :closet site 'Sprayed Seat and Corer Floor pangs Mains ' Bolt caps C *V. Shower Fixture 0.p. :Mast Drain c 1" a 68" Curtain lied Only 18" z i',�4" A.R• Pleat 'Aim Sink ca. Siring Spout Pauset C.1?. U1;ility yraete C. ?. 1 " 17 Gag Trap 18" x 24" Neuday 14,nemelnd Iron Lavatory 04. Supply and taste Fixture C.2.. Bent Supplies C.. Hexagonal lege 0.2* 3quars Towel Bare 04. 10 17 Oa* P Trap Hanover Closet an S Bathroom No. 1 fry N.f r Page Fire ��c opv #5 C , B . S . R E S I D E N C E ' FOR MR . & MRS . R. A. K E M P E T O B E E R E C T E D O N L O T 11 & W E S T 24' L O T 10, I N B L O C K 1 , O F B I S C A Y N E R I D G E M I A M I S H O R E S , P L O P I D A / ,..../..-e.0 Lot • ,.. ti175 ,:---- 1 / • ^I :.7-_ - 1 m --- • - 1 y • • ' ‘'."7/1 ... 121..Z._ (j enera1 Contractor Zone Req. Cu. Ft../66 Plat Restriction Chkd. -- -- - ,- : ---- i - To Planning Boa-rd Re-Submitted to P. Ed, Plan & Spec. Checked By ToOdunell Bldg. Permit:,-No. Typo New 11111 64 - c Li No . Address • i I Date/ Cub. Cont.14, By Fee • / - JJ)7 Adcrress or Pbcite Approved-/.,kRej • Approved Reje:ctecl --4 I / Datei_/7"/Y -- .Approved ; _" - Rejected Fe Cost • -e-} Roof ICiferaf:ions epairs Plumbing Permit No. Septic Tank Sewer • 9? 9? S 1-1TR. New Const. Alteration ttepairs hloctrical Permit No. Fixturos Boater Motors Nov Const. .iIllg. insp. llama By Foundation, Beams & LinTEh Final , ,0• Final C) :: anUp • • Altorati P1u:t'iin insp. w Dace 1t ttou Mixtures Sowor I Septic Tanx 'Rough Fixtures • Final 4 e fav,..) _/6_ 1: o Solar Heater,/ • _ _i_7.]i1l_r��►'t� Electrical Insp. Da e ji3y Re-Insp. By Re -Insp, • By). gorvice - U. K. toTowerTo. z=._ f9 Repairs he -insp. Ly eihsp. By By Re-Insp.