1154 NE 91 Terr (6)MIAMI SHORES VILLAGE
BUILDING DEPARTMENT
305 -745 -2204
Building Inspection Request
Date q I (D Time
Type Insp'n Final (1 0071 nq
Permit No. Sp a003 - 1 011
Name V9 Rdri WU. Can - I - We I
Address 115H N E g l Ter r
Company M Cl1 hl OM Cnn6+r0 Ofion
Phone # ,305. 9@ 5. 557
For Inspector: q I 1 1 Name & Date
Approved
Correction
Re- Insp'n Fee
3811
MIAMI SHORES VILLAGE
BUILDING DEPARTMENT ( 10
305- 795 -2204
Building Inspection Request
Date 240 Time r,
Type Insp'n �� nC4I aoOF
Permit No. 1' 2O& — 12N-
Approved
Correction
Re- Insp'n Fee
Name
Address 1t5(4 t_ q 1 to '
Company r CE " .
Phone # 3OS -- 22S-9 - 5 - 1 -
c-CS 9 1
For Inspector: be 061 Name & Date
MIAMI SHORES VILLAGE
BUILDING DEPARTMENT
305- 795 -2204
Building Inspection Request
Date q le Time
Type Insp'n �l r Crap.
Permit No. 1 P 2-00 2 ( a 1 `f
Name tauct _
Address MLA
Compan .Ia l(1 Id 00 4
Phone# 3US-225— 55 1
For Inspector: 6P 4 119 Name & Date
Approved
Correction
Re- Insp'n Fee
5i at
MIAMI SHORES VILLAGE
BUILDING DEPARTMENT
305- 795 -2204
Building Inspection Request
Date Q ICI Time
Type Insp'n R I irl ' a P
Permit No. 1 )PcwIO3 .
Name Andre u )
Address 1154 N E q l )err.
Company
Phone# 305•aa5 •557)
For Inspector: q I Jo Name & Date
Approved
Correction
Re- Insp'n Fee
)•(
0
37►f)
MIAMI SHORES VILLAGE
BUILDING DEPARTMENT
305- 795 -2204
Building Inspection Request
Date Q I to Time
Type Insp'n (i C( ^ II,,
Permit No. BPoo3 ' Ia1 ttT
Name OQ,b(
Address 1154 NE 49 ler r
Company Ma land Conotruciion
Phone # a 95' 55
For Inspector: gill Name & Date
Approved
Correction
Re- Insp'n Fee
o
o
ENGINEER Tel: (305)649 -6454
Fax: (305) 541 -3298
Brick and Stone Inc.
2312 North Miami Avenue
Miami, Florida 33127
Project:
Dear Sirs;
LG ENGINEERING SERVICES, INC.
Consulting Engineers
2020 Northwest 7th Street
Miami, Florida 33125
TILE UPLIFT TEST
Residential home
330 Northeast 104 Street
Miami, Florida
Information provided by client:
Permit Number: Not Provided
Date Completion: September 10, 2003
Roofing Contractor: Brick and Stone Inc.
LG Engineering Services, inc. Project Number: LGO3 -1388
(Testing Laboratory Certificate #00- 0224.07)
September 16, 2003
In accordance with your request and authorization, a representative o fLG Engineering Services, Inc.
completed the RoofTile Uplift Test at the above referenced project. This testing was performed in general
accordance with Roofing Application Standard RAS No.106 -- Standard procedure for field verification
of the bonding ofmortar or adhesive set tile system and mechanically attached, rigid, discontinuous roof
systems.
The total of the tested roof surface area was 1es ; than 10000 square feet, and the mean height of the roof
is less than 30 feet above ground surface. The type of tile used for this project was reported to be Spanish.
"S" Roof Tile. This tile was reported to have been foamed in place.
At the time of this testing, one test for every corner, one test for every 100 square feet ofroof tile in the
perimeter area and one test for every 200 square feet of roof tile in the field area were tested. Initially the
entire area of the roof was examine for loose tile. More than 10% of the roof tile located in the field area
and more than 20% of the roof tile at the roof perimeter and corner were physically examined.
Based on our test results; all of the tested roof tiles were able to resist the appl cd 35pounds:fo' - ceLpiIft
load as per the test requirement outlined in the above mentioned protocol Upward inovemi en , ppri,
%2 ") were observed at the time ofloadingin some. of the tested roof tiles. However, theb. 1 i % .';,�. - -en
the roof tile and the polyfoam did not fail. Attached please find a copy of our test re a f ,•�� i ev✓
LG Engineering Services, Inc. appreciates the opportunity of assisting you in this project. If you have
any questions or if we may be of further assistance, please do not hesitate to contact the undersigned.
Respectfully submitted;
LG Engineering Services, Inc.
TILE UPLIFT TEST
Residential Home
330 Northeast 104 Street
Miami, Florida
‘mad Sonny Salieh, P.E.
Project Manager
Test Number
Test Load (lbf)
Test Status
1
35
Pass
2
35
Pass
3
35
Pass
4
35
Pass
5
35
Pass
6
35
Pass
7
35
Pass
8
35
Pass
9
35
Pass
10
35
Pass
11
35
Pass
12
35
Pass
13
35
Pass
14
35
Pass
15
35
Pass
16
35
Pass
17
35
Pass
18
35
Pass
19
35
Pass
20
35
Pass
21
35
Pass
22
35
Pass
Report of
TILE UPLIFT TEST
for
Residential Home
330 Northeast 104 Street
Miami, Florida
Project Number: LG03 -1388
LG Engineering Services, Inc. -- Tile Uplift Test Result -- Project Number: LG03 -1388, Page 1
Test Number
Test Load (lbf)
Test Status
23
35
Pass
24
35
Pass
25
35
Pass
26
35
Pass
27
35
Pass
28
35
Pass
29
35
Pass
30
35
Pass
31
35
Pass
32
35
Pass
33
35
Pass
34
35
Pass
35
35
Pass
36
35
Pass
37
35
Pass
38
35
Pass
39
35
Pass
40
35
Pass
41
35
Pass
42
35
Pass
43
35
Pass
44
35
Pass
45
35
Pass
46
35
Pass
47
35
Pass
48
35
Pass
49
35
Pass
50
35
Pass
. •
LG Engineering Services, Inc. -- Tile Uplift Test Result -- Project Number: LGO3 -1388, Page 2
Test Number
Test Load (lbf)
Test Status
51
35
Pass
52
35
Pass
53
35
Pass
54
35
Pass
55
35
Pass
56
35
Pass
57
35
Pass
58
35
Pass
59
35
Pass
60
35
Pass
61
35
Pass
62
35
Pass
63
35
Pass
64
35
Pass
65
35
Pass
66
35
Pass
LGEngineering Services, Inc. -- Tile Uplift Test Result -- Project Number: LGO3 -1388, Page 3
NORTH
+ + ++
+ +
+
+ ++
+
+
+
+
+
60'
+
+
+
+
+
+
+
+
+
+
+
+
+ +
+
+
+
+ +
+
+
+
f
+
+
+
+
+
+
1
1
+
+
50'
APPPDXIMATh TE5T ILOCA11ON
PERMIT APPLICATION FOR MIAMI SHORES VILLAGE
Date . 1_—__Zd a WJob Address t \ 1 9 T GLTax Folio
Legal Description Historically Designated: Yes 1 No
Owner/Lessee / Tenant (� 0.1. M (� iJ t� P \ —2 �) M A Master Permit # \ L i {oO 33
Owner's Address Phone ' SOS ' S' —
Contracting CO el Ate4) Address
Qualifier SS# Phone
State # Municipal # Competency # Ins. Co.
Architect/Engineer Address
Bonding Company Address
Mortgagor Address
Permit Type (circle one : BUILDING /ELECTRICAL PLUMBING MECHANICAL ROOFING PAVING FENCE SIGN
WORK DESCRIPTION r O LT jZL) C, �� \l L �' N E- Lc� U Z.
t Lo ;J C, 1 0N1.
Square Ft. Estimated Cost (value) X 4i a 0 0
WARNING TO OWNER: YOU MUST RECORD A NOTICE OF COMMENCEMENT AND YOUR FAILURE TO DO SO MAY RESULT IN YOUR
PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY (IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER
OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT.)
Application is hereby made to obtain a permit to do work and installation as indicated above, and on the attached addendum (if applicable). I certify that all work
will be performed to meet the standards of all laws regulating construction in this jurisdiction. I understand that separate permits are required for ELECTRICAL
PLUMBING, SIGNS, POOLS, ROOFING and MECHANICAL WORK.
OWNER'S AFFIDAVIT: I certify that all the foregoing information is accurate and that all work will be done in compliance with all applicable laws regulating
construction and zoning. Furthermore, I authorize the above -named contractor to do the work stated.
Signature of owner and/or Condo President Date
Notary as to Owner and/or Condo President Date Notary as to Con
My Commission Expires:
FEES: PERMIT .0 ' RADON
APPROVED:
Zoning Buil
Mechanical
isnature of C
or ' • er- Builder
tor or Owner - Builder
fires -
EAL
OFFICIAL NOTARY S
P P U 6 S MARGARITA MONT1EL
Z 1Q COMMISSION NUMBER
. ? J�(1
co qr Q CC797277
�O MY COMMISSION EXPIRES
r`c OF F� DEC. 17,2002
BOND
My Commission E
C.C.F. 6 a NOTARY
Electrical
Date
7
7 - �
TOTAL DUE
Date
Plumbing Structural Engineer
. .
Borrower /Client
MANNAPPERUMA, RANJITH
Property Address
1154 NE 91 TERRACE
City
MIAMI SHORES
County
DADE
State
FLORIDA
Zip Code
33138
Lender
SAVINGS OF AMERICA
4.
SKETCH /AREA TABLE ADDENDUM
File No: MANNAP - R
V :
BATH
21'
POOL
SCREENED
PATIO
eEDRC01A I BATH
H
DINING
123
UV1NG
BATH
BEDRCCM
L J UnuT,
FAMLY ROOM
KITCHEN
BATH
BEDROOM
eB
SCALE: 1 Inch = 20 feet
R
E
A
A
T
AREA CALCULATIONS SUMMARY
Area Name of Area
Size Totals
G1.A1 First Floor
POR Patio
2530.50
TOTAL LIVABLE (rounded)
1917.50
2530.50
1917.50
2531
LIVING AREA CALCULATIONS
Breakdown Subtotals
22.50 X 66.00
32.50 X 27.00
21.00 x 8.00
1485.00
877.50
168.00
2531
APEX SOFTWARE, INC. 1 (210)699.8668
APEX II Form 2739
“ t■ G1 ^4 1 - c:)‘` 4 ”
%t54.
At-4 t Nvt:,
r.
et-f
"--
.0
• I:
• f ;
e••
1 1 •••••—•
t
v
1
4 ,1
".0, "4 Y •
4.04
•
- r
19 2 14 .
-4v/A efele
2 "
1-10_ sie,
et
r
r
T •
.111.•••■
/
7- 1
0
7.?
r r7
.1%
•)
/ig 73J
2 2[L )7"
2 3
if .a.""
e
)
479
a-7"
OWNER'S NAME
/ /t. ed.c2.7 ///.4 - , A/ o
PRESENT ADDRESS
//4 At a 9/e i
LICENSE NO.
PHONE'NO.
JOB LOCATION (ST. OR AVE.)
/4$ A a 5 -72--(-• .
LOT
/ 4 4) 14/ OF 2,j
BLOCK
`Z
SUBDIVISION
I G✓ 7t -S r'
GENERAL CONTRACTOR
Ea w , ,j sue. CiLa-�.✓ i,c- .
ADDRESS /7
774 . c.)• 21 cf___
PHONE NO.
LICENSE NO.
,.wy
�j
BUILDING PERMIT NO. / L3 Z
DATE 9.---2 ' �
PERMIT FEE $
BUILDER'S BOND
_ f / yr� x
NO. 2 r0 7 DATE ` �
AIDS Tt o 6 —
ZONE REQUIREMENTS CU. FT.
r (/+4c_...
PLAN CUBE 2/ o a CU. FT.
1
° A
EST. COST S 4 ac
DRAWINGS. SPECIFICATIONS. RESTRICTIONS AND CUBE CHECKED BY: C. I iffine./'C. --
DATE
I /_ 2 "S"
NEW CONSTRUCTION
TYPE
STORIES
ROOF CONSTRUCTION
INTERIOR CONSTRUCTION
REPAIRS
DESCRIPTION
• —b7• /20i
.. .. e'i A j /// / —
DESCRIPTION
T ..7,7,..,
ALTERATION
. a � Z,
/ /[� � �
ADDITION p5 .c/V EA;Q -� s 9.2 ae /�/¢' ���;-re-A f4,'e 5 //v Q_
APPROVED
SUBMITTED TO PLANNING BOARD
REJECTED
REFERRED TO COUNCIL
REASONS
RE- SUBMITTED TO PLANNING BOARD
SUBMITTFD TO VILLAGE COUNCIL
REMARKS
CERTIFICATE OF OCCUPANCY NO.
ISSUED
BY
TO
BUILDING PERMIT AND INSPECTION RECORD —MIAMI SHORES VILLAGE
INSPECTIONS
DATE
BY
INSPECTIONS
DATE
BY
FOUNDATION
$
SEPTIC TANK
ROOF
TEMPORARY SERVICE
$
BEAMS & LINTELS
$
TUB & TOP OUT
POOL
SOLAR HEATER
$
FRAMING
$
GAS
AIR COND.
MOTORS
$
FINAL
$
FIXTURES
CLEAN UP
SEPTIC TANK
$
SLAB
FIXTIIRFS & FINAL
$
SOLAR HEATER
SLAB
SPECIALS PERMITS
PERMIT NO.
DATE
FEE
TEMPORARY SERVICE
RE- INSPECT
BY
$
SEPTIC TANK
FEE
TEMPORARY SERVICE
$
SEWER
$
TUB & TOP OUT
$
SOLAR HEATER
$
RANGE CONN.
$
GAS
SEWER
MOTORS
$
$
FIXTURES
e
INSPECTIONS
DATE
BY
RE- INSPECT
BY
RE- INSPECT
BY
ROUGH ING
DATE
FEE
TEMPORARY SERVICE
$
TUB & TOP OUT
H. W. HEATER CONN
$
RANGE CONN.
RANGE CONN.
SEWER
MOTORS
$
FIXTURES
SEPTIC TANK
$
FIXTIIRFS & FINAL
$
SOLAR HEATER
FIXTURES
GAS
CONTRACTOR$ e9 i_ 14 S 4Ae E2 I 41c ..
PHONE
PERMIT NO. 3 I O %A-ri-S - Z S
FEE $
NEW BLDG. 1 ALTERATION 1 ADDI
REPAIRS
SPECIAL PERMITS
PERMIT NO.
DATE
FEE
TEMPORARY SERVICE
$
H. W. HEATER CONN.
H. W. HEATER CONN
$
RANGE CONN.
RANGE CONN.
$
MOTORS
$
FIXTURES
$
FIXTIIRFS & FINAL
$
INSPECTIONS
DATE
BY
RE- INSPECT BY
RE- INSPECT' BY
TEMP. SERVICE
ROUGHING
H. W. HEATER CONN
RANGE CONN.
FIXTIIRFS & FINAL
CONTRACTOR
PERMIT NO.
NEW BLDG.
BUILDING INSPECTIONS
PLUMBING PERMITS & INSPECTIONS
I DATE
1 ALTERATION 1 ADDITION
PHONE
FEE $
REPAIRS
ELECTRICAL PERMITS & INSPECTIONS
APPROVAL TO POWER CO. FOR SERVICE DATE
BY
CERTIFICATE OF OCCUPANCY
MIAMI SHORES VILLAGE, FLORIDA
BUILDING DIVISION
N° 1026
Miami Shores Village, Florida, 11 -27 -59
Owner, Agent or Tenant of Building .ALBERT MANCINO
Lot 19 & W 208 Oftlock 2 Subdivision WATERS EDGE
Street Address 1154 N.E. 91st Terr
Approved use by occupancy POOL ENCL. AND POOL
Remarks # 9232 & 9228
This Certificate of Occupancy is issued to the above named Owner
for building at above named location only upon the express provision that the applicant will
abide by and comply with all conditions of Ordinances Nos. 92, 93, 94 and 97, known as the
Zoning, Electrical, Plumbing and Building Ordinances of Miami Shores Village pertaining to
the erection, construction, alteration or remodeling of buildings or structures.
Pool T. V. 2100
Encl T. V. 600
j BUILDING DIVISION
Owner of
Building
Architect
Contractor
or Builder
Legal
Description
Address of
Building
L.) r
Lot
I ;
CONTRACTOR OR BUILDER
MIAMI SHORES VILLAGE. FLORIDA
BUILDING
ELECTRICAL ❑ PERMIT N9 9228
PLUMBING ❑
ROOFING ❑
Bl.
DATE I 2 .
Contractor's
License No = 1
1954_
Work to be performed under this Permit
Subdi-
vision C
Sq. Ft
Value of
Project $ /) (. ;
Amt. of
Permit $ / (,
This permit is granted to the contractor or builder named above to construct the building or to install the equipment or device described in the application
herefor in strict compliance with all ordinances pertaining thereto and with the understanding that the work will be performed in compliance with any plans,
drawings, statements or specifications that may have been submitted to and approved by the proper municipal authorities. This Permit may be revoked at any
time if the work is not done in compliance with such ordinances or if the plans are changed without authorization. A further condition upon which this permit is
granted is the understanding that the contractor or builder named above assumes the responsibility for a thorough knowledge of the ordinances and regulations
pertaining to the work covered hereby whether shown on the plans or drawings or in the statements or specifications and that he assumes responsibility for work
done by his agents, servants or employees.
Signed: t/' _ .,. - A3Y, '
INSPECTOR
In consideration of the issuance to me of this permit I agree to perform the work covered hereunder in compliance with all ordinances and regulations
pertaining thereto and in strict conformity with the plans, drawings, statements or specifications submitted to the proper authorities of Miami Shores Village.
In accepting this permit I assume responsibility for all work done by either, myself, my agent, servant or employee.
BY AUTHORITY
7
BUILDING K]
ELECTRICAL ❑ PERMIT N? PLUMBING ❑ N. 9 2 3 2
ROOFING ❑
❑ Work to be perfo de
Owner of
Building /.` ;? i "� / C,`• , 4 q %` d
Architect
Contractor
or Builder
Legal
Description
Address of
Building
Lot
CONTRACTOR OR BUILDER
MIAMI SHORES VILLAGE. FLORIDA''
Bl.
es
T� r2
Signed
st
Subdi-
vision . r
Sq. Ft
Value of
Project $
This permit is granted to the contractor or builder named above to construct the building or to install the equipment or device described in the application
herefor in strict compliance with all ordinances pertaining thereto and with the understanding that the work will be performed in compliance with any plans,
drawings, statements or specifications that may have been submitted to and approved by the proper municipal authorities. This Permit may be revoked at any
time if the work is not done in compliance with such ordinances or if the plans are changed without authorization. A further con tion upon which this permit is
granted is the understanding that the contractor or builder named above assumes the responsibility for a thorough knowledge of the ordinances and regulations
pertaining to the work covered hereby whether shown on the plans or drawings or in the stateyiknts or specificationorand that he ssumes responsibility for work
done by his agents, servants or employees.
INSPECTOR
In consideration of the issuance to me of this permit I agree to perform the work covered hgt"eunder in compliance with all ordinances and regulations
pertaining thereto and in strict conformity with the plans, drawings, statements or specifications submitted to the proper authorities of Miami Shores Village.
In accepting this permit I assume responsibility for all work done by either, myself, my gent, dry' ant or employee.
r r
BY
DATE 2 .
Contract g '
t)
Y
4 L
ert
•
Amt. of
Permit $
AUTHORITY
Owner's Name and Address
Name and address of licensed contractor
New Building
To be constructed of
MIAMI SHORES VILLAGE
BUILDING INSPECTION DEPARTMENT
APPLICATION FOR BUILDING PERMIT
Application is hereby made for the approval of the detailed statement co Inc plans and specifications herewith submitted for the build •
in or other structure herein described. This application is made in compliance and conformity with the Building Ordinance of Miami
Shores Village, Florida. and all provisions of the Laws of the State of Florida, all ordinances of Miami Shores Village and all rules and
regulations of the Building Division of Miami Shores Village shall be complied with, whether herein specified or not. A copy of approved
plans and specifications must be kept at building during progress of the work.
Registered Architect and /or Engineer .,.,. . ..••....• .... .........•. - . <.
T 4 Na =!rYt
Sc cvl P 2 Lifo GIUF('kx/ 2.0 F7: c4- vP, Fc.,
Location and legal description of lot to be built on:
Lot Block
Street and Number where work is to be done
State work to be done and purpose of building (by floors)
and for no other purpose.
Remodeling Addition Repairs No. of Stories
Kind of foundation n . Roof Covering
Estimate Total cost of improvements $ W,. Amount of Permit S . r
Zone cubage required Plan Cubage
Distance .to next nearest building. Size of Building Lot
Maximum live load to be borne by each floor
I hereby submit all the plans and specifications for said building. All notices with reference to the building and its construction may
be sent to.
The undersigned applicant for this building permit does hereby certify that he understands and accepts his obligations as an employer
of labor under the Florida ‘Vorknien's Compensation Act, being Section 5966, Compiled General Laws of Florida, Permanent Supplement,
and has complied %%nth the provisions thereof, and will require similar compliance from all contractors or sub - contractors employed by him
in the work to be performed under this permit; and will post or cause to be posted for inspection on t e site of the work such public notice
or notices as arc required by the Act. The undersigned agrees to employ only suc subcontr o,•, 9 woj to % performed under this
permit, as are licensed by Miami Shores Village. 1 /
Rern.uks .__._.__ (Signed)..
STATE OF FLORIDA,
COUNTY OF DADE. j ss.
Before me, the undersigned authority, a notary public, duly authorized to administer oaths and take acknowledgments, personally ap-
peared
and who, being by me first duly sworn, upon oath deposes and says that he is the.
of the above described construction, that he has carefully read the foregoing application, and that he did sign the same, and that all facts
therein by him stated are true..
Permit No.. —a• .L L c• Date �v 2-- Read, Sworn to and Subscribed before me.
Disapproved
(Signed)
Building Inspector
-TV
Subdivision
Subdivision
J Date... —.. ._...__.....�.._._......_
,.► e s _ No...._... .....__.._... Street_—
l?t!S v2 rgivice"r 12E4 ' v 6 f [ c [. _._.._.._
Notary Public, State of Florida
My Commiuion Expires
CCU, o 0 k 3/
to me well known,
PLANNING BOARD DATE
Cihainnrn Mcmbcr
MIcrnber Member _
Member Member
Council Approved Date Disapproved Date
NOTE: A charge of S1.00 will be made for making corrections or cltnnges to this application after approval has been obtained from
the Planning hoard.
A re- inspection fce of $1.00 will be charged when such re- inspection is made necessary by improper notice for inspection or faulty
materials anti /or workmanship.
11 3 <5
V V () / 2
7Y
Seibels Bruce & Co.
P. 0. Box 3810
Miami, Fla. 33169
Attn: George Letchford
Building permits
PREPATORY WORK:
BEDROOM: 17 x 21 x 8
Handle contents
Remove carpet &'pad.: 40 sq. yds.
Remove & discard closet partitions,
doors & shelving
Tear out decorative wall paneling -
(Wood & mirrors)
Cut back ceiling plaster approx. 2'
at perimeter of damaged area for
access to hurricane straps &
beams.
Tear out plaster, strapping &
related trim from damaged area
UTILITY ROOM: 6 x 8 x 8
(1) Remove refrigerator
(2) Disconnect utility sink & remove
(3) Disconnect & remove washing machine
(4).,Disconnect sprinkler system master
control panel & remove
(5) Disconnect & remove A/C condensing
unit at side of house.
Con't. on page #2
First
General
Services
Corp.
insurance Repair Specialists
VEHICLE DAMAGE
2450 Griffin Road, Ft. Lauderdale, Florida 33312
Broward 966-9564
Palm Beach 734 -4778
Dade 620 -0823
August 4, 1982
Re: Mr. Fusco
1154 NE 91st. Terr.
Miami Shores, Fla.
Phone #756 -1781
TEMPORARY ENCLOSURE & JACKING
(1) Jaek roof
(2)• Build temporary partition (Approx.
38 lin. ft.) using 2 x 4 studs with i
Z" plywood sheathing & visqueen poly.;
covering
(3) Remove existing temporary shoring
from exterior side
CONCRETE DEMOLITION:
(1) Remove side entrance door unit &
discard
(2) Rental of demolition equipment
(3) Jackhammer & discard block walls
south wall 12' x 8', west wall
22' x 8' total of 272 sq. ft.
(4) Remove portions of fascia, frieze,
soffitt boards & gutters
(5) Remove concrete tie beams - approx.
34 lin. ft.
(6) Rubbish removal for entire job
JOB NOTES: Concrete . demolition price is based on terminating walls
& tie beams at the left side of front window and at the left
side of side door at small jog.
: The roof at the southwest corner has been raised as a
result of the *impact. We will also be raising this area to
gain access to perform our work. All this movement may result
in roof dmaage and leaks, we will contact you if this problem
occurs.
RECONSTRUCTION - EXTERIOR:
(1) Build new cement block walls: 272
sq. ft.
(2) Electrical conduit removal & replace-
ment for .(3) outlets,(1) exterior
light & check out of electrical
system. •
(3) Install new exterior door unit -
2'6" x 6'8" x 1 3/4 "; steel entrance
door complete with threshold lockset
& deadbolt
NOTE: Door unit to be raised 6" above existing grade, at owners
request, to eliminate a water problem. There will be no cost
difference.
(4) Install new hurricane straps. r
I
(5). Drill & install steel tie rods at
areas where existing meets new work
Con't. on page #3
LL
L 1. VV .L LCCCLVC L[CGC)LAL.LVC , WVVL1 _. ..
& mirror panels 6 man hrs. @ 15.00
NOTE: Plywood from temporary partition will be reused for backing
(9) Apply decorative wood panels with
mirror inserts - diagonal & random
widths. Total footage: 196 sq. ft.
Con't. on page #4
90.00
Page, if.) - -vir. l'usco
RECONSTRUCTION - EXTERIOR: Con't.
(5) Con't. .
(6) Set forms, install new steel re -rod
& pour new tie beam :,34.lin. ft.
(7) Strip forms.
(8) Apply smooth stucco finish over new
block work: 272 sq. ft.
(9).: Install new fascia, freize, & soffil
material where removed for access
(10) Reinstall A/C condensing. unit &
recharge
RECONSTRUCTION - INTERIOR
UTILITY ROOM: 6 x 18 'x 8
(1) Install new strapping on block
(2) Apply drywall to walls & ceiling
as needed, tape ready for
paint. Total 80 sq. ft.
(3) Paint entire room - 2 coats: 272 . 11
sq. ft.
(4) Paint new door interior & exterior
including trim - 2 coats
BEDROOM: 17 x 21 x 8
(1) Remove temporary partition
(2) Install wall strapping on new block
walls: 350 sq. ft. ,
(3) Build new closet partition: 9 lin. 0
ft. of wall: 72 sq. ft.
(4) Drywall, tape &'bed - 2 wall areas,
ceiling & c loset: 388 sq. ft.
(5) Repair popcorn ceiling
(6) Install new 4' sliding door unit at
• closet L
1'
i
(7) Reinstall shelving unit - 1!
(8) Install plywood backing on walls
that will receive decorative wood
& mirror panels 6 man hrs. @ 15.00
NOTE: Plywood from temporary partition will be reused for backing
(9) Apply decorative wood panels with
mirror inserts - diagonal & random
widths. Total footage: 196 sq. ft. @
Con't. on page #4
90.00
. r'
RECONSTRUCTION - INTERIOR
BEDROOM: C o n ' t .
(10) Interior painting of south wall &
closet area: 312 sq. ft.
(11) Paint entire ceiling: 17 x 21 =
357 sq. ft.
(12) Paint special contemproary design
on south wall
(13) Reinstall carpeting: 40 sq. yds.
(14) Clean carpet: 357 sq. ft.
RP:js
Richard Puopolo
THESE PLANS ARE APPROVED FOR ISSUANCE OF A BUILDING PERMIT
❑ WITH NO VARIANCES ❑ WITH VARIANCE(S) LISTED IN "REMARKS"
NO OTHER DEVIATIO "S FROM THE MIAMI SHORES BUILDING AND ZONING
ORDINANCES WILL BE PERMITTED, UNLESS SPECIFICALLY LISTED BELOW.
ALL OTHER APPLCABI.E STATE AND COUNTY LAWS MUST BE COMPLIED
WITH BY ALL PARTIES.
FIRE DEPARTMENT
PUBLIC 'NOR:CS
POLICE 'IEPARTMENT
BUILDING DIRECTOR
PLANi!ING & ZO rI::G .20
VILLAGE COUNCIL
REMARKS:
Autho•i7ed S;Cn ?cure Date
APPROVAL
PRELIMINARY: FINAL:
COMP LIAi;CE WITH THE SOUTH F! i)RID + BUR DI:.G CODE AS ADOPTED
BY MIAMI S:;O:iES VILLAGE Is ;EQU :RED. T.1 ARCHITECT, BUILDER II &D
SUB CO�:TRAC('J. ?'
,0' ' , :. .. IT
ING REGULATIONS WHETHER OR NOT SPECIFICALLY INDICATED HEREIN.