Loading...
RC-09-1590Scheduled Inspection Date: April 19, 2011 Inspector: Bruhn, Norman Owner: , BARRY UNIVERSITY Job Address: 11300 NE 2 Avenue Pool House Miami Shores, FL 33138 -0000 Project: BARRY UNIVERSITY Building Department Comments April 18, 2011 Inspection Worksheet Miami Shores Village 10050 N.E. 2nd Avenue Miami Shores, FL Phone: (305)795 -2204 Fax: (305)756 -8972 Inspection Number: INSP - 158360 Permit Number: CC -9 -09 -1590 Contractor: JULIANA ENTERPRISE, INC DBA POWER PRO For Inspections please call: (305)762 -4949 Permit Type: Commercial Construction Inspection Type: Final Work Classification: Alteration Phone Number Parcel Number 1121360010160 -36 Phone: (305)687 -7080 replace existing concrete floor slab and timber floor with 4 inch slab as per approval from NB, ok to extend permit until 9/30/10. 6/4/10 Failed Correction Needed Re- Inspection Fee No Additional Inspections can be scheduled until re- inspection fee is paid. Inspector Comments CREATED AS REINSPECTION FOR INSP- 157520. CREATED AS REINSPECTION FOR INSP- 155809. CREATED AS REINSPECTION FOR INSP- 125655. NOt Ready NB No Access. NB cL Page 9 of 17 BUILDING PERMIT APPLICATION FBC 20 Miami Shores Village Building Department 10050 N.E.2nd Avenue, Miami Shores, Florida 33138 Tel: (305) 795.2204 Fax: (305) 756.8972 INSPECTION'S PHONE NUMBER: (30) 762.4949 Permit No. C" "1 r O — 1 I Sq o Master Permit No. Permit Type: BUILDING ROOFING Owner's Name (Fee Simple Titleholder) is (1, -( °'1 \, Q \' C 1 `j' lv )Z 1} phone :# 73 E ,� r �' t 7-3T 5 .� Owner's Address 1 1 73 ( C. IM E "" J VE_ City al t( 1Lt c { 1 c Ti F State L_ Zip Tenant/Lessee Name b cc-c-- L) v3 ?AA_ L 6 t '� Phone# iw Email Job Address where the work is being done City Miami Shores Village County Miami -Dade Zip y S(.1,11 m le t FOLIO / PARCEL # State Certificate or Registration No. (. (' ;— Certi icate of Competency No. Is Building Historically Designated YES NO Flood Zone Contractor's Company Name 4 ) ;A_ WI q.\ -- - - ) 41 Q Phone 13 C- S) 6s-) -4 T C Contractor's Address 1 2. k; i h. (A-' ‘j- s 1? 1 te =-- == 1 City f it 1 s C _l , _ C S State . ( Zip -3 3 (, T Qualifier k ame P ,t, - . \. Ci 1, L Phone # — i k- 6 ° 1 A " 3 L( c . 33 * * * * * * * * ** 'Contact Phone - 3'-( 9 . 3 E -mail ineers Name if applicable) y g� ( pp ) l�.r -�� �� Architect/Engineer's "(i F )c, Phone # Value of Work For this Permit $ 3C, . Square / Linear Footage Of Work: Lj d Type of Work: ❑Addition Alteration i ❑New ❑ Re ir/Replace p Demolition Describe Work: tk C E E)( (S41 t ) C' ) C_ !`1 , ? a)) a j ifq Ai 4 * * * * * ** * * ** * * * *ic. * ** Training /Education Fee $__6;.— Violation date: CCF$ * * * * * * * * * * * * * * * * ** Submittal Fee $ U , v Permit Fee $ Notary $ Scanning $ ? f7° Radon $ / 75 DPBR $ Aar Double Fee $ 0 =' Structural Review. $ Total Fee Now Due $ la i----5.' $ Technology Fee $ Bond $ See Reverse side -* 7 hL // i�rf Bonding Company's Name (if applicable) Bonding Company's Address City State Zip Mortgage Lender's Name (if applicable) Mortgage Lender's Address City State Zip Application is hereby made to obtain a permit to do the work and installations as indicated. I certify that no work or installation has commenced prior to the issuance of a permit and that all work will be performed to meet the standards of all laws regulating construction in this jurisdiction. I understand that a separate permit must be secured for ELECTRICAL WORK, PLUMBING, SIGNS, WELLS, POOLS, FURNACES, BOILERS, HEATERS, TANKS and AIR CONDITIONERS, ETC OWNER'S AFFIDAVIT: I certify that all the foregoing information is accurate and that all work will be done in compliance with all applicable laws regulating construction and zoning. "WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT." Notice to Applicant: As a condition to the issuance of a building permit with an estimated value exceeding $2500, the applicant must promise in good faith that a copy of the notice of commencement and construction lien law brochure will be delivered to the person whose property is subject to attachment. Also, a certified copy of the recorded notice of commencement must be posted at the job site for the first inspection which occurs seven (7) days after the building permit is issued. In the absence of such posted notice, the inspection will no e approved and a reinspection fee will be charged. Print: Signat 1 6(.CIJ.J4'lC.vrra. � l ii'elie'+' Signattf"e Contractor Owner or Agent The foregoing instrument was acknowledged before me this The foregoing instrument was acknowledged before me this 3 r_f day of r ; 20 , by r4 . i , .. r. . day of , '. } N. , 20,:. '1 b / who is personally known, to me or who has produced who is personally known to me or who has produced /> r as identification and who did take an oath. NOTARY PUBLIC: As identification and who did take an oath. NOTARY PUBLIC: 1 LINDA S. MITTS J "Y P ��h � u s Notary Public - State of Florida . • � My c Lxpires .gun 16, 2013 My Commission Expires: oY, Commission # a0 863031 � ;; Bonded Through National Notary Assn. APPROVED BY (Revised 07 /10 /07)(Revised 06/10/2009) ***************************************************************************** * * ** * * * * * * * * * * * * * * * * * * * * * * * * * ** 10/C Plans Examiner Engineer Sign: Print: My Com Zoning Clerk checked UNIVERSITY September 8, 2009 To Whom It May Concern: This letter is to authorize Juliana Enterprises to apply for permits on behalf of Barry University to do work on the campus and university owned sites. If you have any questions please call our office at 305-899-3052. a you, Alex MacNamara Director of Facilities Of Business and Finance BARRY UNIVERSITY 11300 Northeast Second Avenue Miami Shores, Florida 33161 SWIMMING POOL MECHANICAL ROOM REPAIR June 18, 2009 Prepared by: Edward F. Cannon, AIA AR 0013273 Miami Beach, Florida 305.345.1844 Project Location: Barry University Swimming Pool Mechanical Room Repair Barry University Miami Shores, Florida - Campus Map Site Preparation: 1. The swimming pool will be in continuous operation and use throughout the repair period. 2. There shall be no contact of any kind between the contractor nor his representatives and employees with any University faculty or students throughout this repair period. Any violation of this requirement shall constitute forfeiture of the contract and any monies owed to the contractor at the time of occurrence. 3. Barry University will have removed all University property from the first floor of the Pool Facility at the time the contract for repair is executed. 4. All partitioning, finishes, equipment and devices remaining at the time of execution of the contract shall become the responsibility of the contractor to remove and dispose of in a legal manner or protect as needed or required to accomplish the intended results at completion of this work. 5. The pool mechanical, electrical and control equipment in the lower mechanical room and at grade level shall remain in operation throughout this contract period. University maintenance personnel shall have access to this equipment at all times for purposes of maintaining health, safety and operation of the pool. The contractor shall cooperate in all matters pertaining to this requirement. 6. Provide a scaffold structure in the pool mechanical room in such a manner to prevent any demolition or removal of building materials form dropping onto the equipment and floor of the pool equipment room below. This scaffold structure shall provide for maintenance work required in paragraph 5. Removals: 7. The scope of work includes the removal of all deteriorated concrete associated with the first floor of the Pool Mechanical Room as identified on the First Floor 2 F Barry University Swimming Pool Mechanical Room Repair Framing Plan below. All material shall be removed from the site and disposed of as part of the contractors responsibility. 8. The scope also includes the removal of specific timber flooring that makes up portions of the first floor of the facility. L First Floor Framing Plan - NQ No Scale 9. All existing partitions affected by the work will be removed by this contractor and replaced with new partitions, in the current locations of the partitions that are being removed. See First Floor Partition Plan below. First Floor Partition Plan - Nit No Scale Remove existing first floor concrete slab. Maintain existing reinforcing steel within 1' of east wall. Remove existing first floor timber floor inlays. Remove existing first floor beam. Maintain existing reinforcing steel within 3' of east and west walls. Remove existing first floor walls as required to accomplish the work. Contractor to verify exact locations in field. Replace as noted in item 9 above. Opening in first floor concrete slab to Mechanical Room below. Note: Replacement partitions shall be of heavy gage, galvanized metal stud @i6" O.C. and continuous top and bottom plates of similar material. Wall board shall be 3 Barry University Swimming Pool Mechanical Room Repair Moisture, Mold and Mildew resistant a minimum of 5/8" thick and be finished to receive University applied final finishes. 10. Mechanical and electrical devices that are required to be removed shall be replaced with new devices to provide the same performance as the existing. Replace existing light fixtures on ceiling of Mechanical Room in these locations. Provide energy efficient, vapor proof fixtures Provide new weather proof aluminum exhaust louver (200 sq." free area) in existing opening. Secure to adjacent construction to meet NOA requirements. Connect new exhaust fan directly to louver. See existing fan installation photo M1 3 First Floo Plan - Nil No Scale Photo M1 — Exhaust fan Provide new weather proof aluminum intake louver (400 sq." free area) in existing opening. Secure to adjacent construction to meet NOA requirements. Connect louver to new supply fan on suspended platform above first floor door. Ductwork to be 12"x16" galv. metal. See existing photo M2 From fan supply, provide new suspended galv. metal ductwork, below first floor structure duct to be 16"x12" first bay, 12"x12" second bay and 10"x12" third bay. with 2-8"x12"aluminum diffusers per bay (6 total). Note: Maintain all existing pipes and conduit through slab throughout. 4 Photo M2 — Supply fan BEAM SCHEDULE MARK ELEV SIZE BOTT. TOP STIRRUPS SIZE SPACING B1 FFF - 2 5/8" 10" X 16" 3 #6 2 #5 #3 @ 6 "O.C. Thru. B2 FFF - 2 5/8" 10" X 16" 3 #7 2 #6 #3 @ 6 "O.C. Thru. Barry University Swimming Pool Mechanical Room Repair 11. Remove existing angle support frame. Remove existing Cast Iron pipe to first hub below floor of mechanical room. Plug CI pipe at hub. Replace existing guard rail around floor pit with new galv. metal pipe rail meeting the following requirements: Height 42 ", Open guards shall have balusters such that a 4 -inch- diameter sphere cannot pass through any opening up to a height of 34 inches. From 34 inches to 42 inches above the walking surfaces, a sphere 8 inches in diameter shall not pass. Guard rail shall be designed to resist a load of 50 plf applied in any direction at the top and to transfer this load through the supports to the structure. Guard rails shall be able to resist a single concentrated load of 200 pounds, applied in any direction at any point along the top, and have attachment devices and supporting structure to transfer this loading to appropriate structural elements of the building. This load need not be assumed to act concurrently with the loads specified above. Intermediate rails, balusters and panel fillers shall be designed to withstand a horizontally applied normal load of 50 pounds on an area equal to 1 square foot, including openings and space between rails. Reactions due to this loading are not required to be superimposed with those above Photo G1 — SW Corner Angle frame CI Pipe Guard rail Photo G2 — SW Corner Replacement Work: 12. The scope of work includes the replacement of certain selected areas of deterioration as identified on the following plan: Note: Concrete to be 4000psi. Note: FFF = existing finished first floor 5 Barry University Swimming Pool Mechanical Room Repair First Floor Framing Plan - NIT No Scale Note: All slab reinforcing to be drilled 4" into existing conc. walls and set in epoxy. 6 42" x 42" + Frame, Bilco Floor Door, Model #K5 or equal. Ships Ladder w/ Platform Model 521 by O'Keeffe's, Inc. or equal. Hand rail and guard rail by same Mfgr. See Paragraph 11 for guard rail requirements. Barry University Swimming Pool Mechanical Room Repair 7 Repair Work: 13. The scope of work includes the repair of certain selected areas of deterioration as identified on the following plan. 14. All repair work shall be done in accordance with repair system manufacturer's requirements. Products of a single manufacturer shall used and be by Mapei System or approved equal. Barry University Swimming Pool Mechanical Room Repair See Photo R1 Reflected Ceiling Plan - WO No Scale Photo R1 See Photo R6 Note: This crack should be repaired at time of work on Beam B2 Exist. See Detail A under paragraph 12. 8 Photo R2 Photo R5 Photo R3 Barry University Swimming Pool Mechanical Room Repair 9 Photo R4 Photo R6 Project Completion & Warranty 15. Upon completion of all work above, completely paint the Pool Mechanical equipment room with a white latex based paint designed for exterior application. 16. The contractor shall provide a labor and material warranty for a period of one year from final acceptance of the required work on this facility. PERMIT #: 0Y - /J/ Miami Shores Villaga APPROVED BY DATE ZONING DEPT BLDG DEPT afj /we, SUBJECT TO COMPLIANCE WITH ALL FEDERAL STATE AND COUNTY RULES AND REGULATIONS 0 // 3 , 0 .v*v 11 of JulCCAA.9.0— ac Irkc . cress kS 1* AM-44CM i4A4 c\ck cry— Ilding / 'occupational License Dept. 5 North Perviz Avenue a-Iocka, FL 33054 tKE ALL CHECKS PAYABLE T Y OF OPA-LOCKA, FLORIDA o LERK ASH1ER WHITE - Customer Copy YELLOW & PINK - Flnance Copy GREEN & GOL NR D - 13Idg./LIcense Copy HECK PEN E Fl NOF P PP CO MECH XER TOTAL PAID $ 6 co MONEY ORDER # CUSTO E E El T 25766 Go 00 ,00 Inspection Number: INSP- 125682 Permit Number: ELC -9 -09 -1591 Scheduled Inspection Date: September 07, 2010 Inspector: Devaney, Michael Owner: , BARRY UNIVERSITY Job Address: 11300 NE 2 Avenue Pool House Project: <NONE> September 03, 2010 Miami Shores, FL 33138 -0000 Building Department Comments Inspection Worksheet Miami Shores Village 10050 N.E. 2nd Avenue Miami Shores, FL Phone: (305)795 -2204 Fax: (305)756 -8972 Contractor: JULIANA ENTERPRISE, INC DBA POWER PRO For Inspections please call: (305)762 -494 Permit Type: Electrical - Commercial Inspection Type: Final Work Classification: Addition /Alteration Phone Number Parcel Number 1121360010160 -36 Phone: (305)687 -7080 Replace two existing Tight fixtures on ceilings of mechanical room. as per approval from NB, ok to extend permit until 9/30/10. 6/4/10 Passed Failed Correction Needed Re- Inspection Fee No Additional Inspections can be scheduled until re- inspection fee is paid. Inspector Comments -°/ Page 2 of 35 BUILDING PERMIT APPLICATION FBC 20 Permit Type: ELECTRICAL Owner's Name (Fee Simple Titleholder) Owner's Address City Tenant/Lessee Name Email Miami Shores Village Building Department 10050 N.E.2nd Avenue, Miami Shores, Florida 33138 Tel: (305) 795.2204 Fax: (305) 756.8972 INSPECTION'S PHONE NUMBER: (305) 762.4949 1,-( r - Ven.il y r) Job Address (where the work is being done) ®sQ9t�- r1�'1') C 1 bc■ m ■ rij )0 e 6 ( - City Miami Shores Village County Miami -Dade Zip' FOLIO / PARCEL # Is Building Historically Designated YES NO, X Contractor's Company Name Value of Work For this Permit $ Zip Contractor's Address 12, t a (A) 4 S / V Q, ) City C (S' CL State L Qualifier Igam t?) 11. 41 Q 1 I th to Master Permit No. Phone # (-q ) 1 - r3 ins- Phone # Phone Permit No. LL C- I -o q - 15q 1 Square / Linear Footage O Work: ONew Flood Zone 30S) 6fl -io �v Phone #--r Q C 149 s2- c3 ef- 7 _j State Certificate or Registration No. £ C — ( 9 - 0 0 I q 0 3 Certificate of Competency No. Contact Phone Tj 6 - ° 3 (f-- d E -mail Architect/Engineer's Name (if applicable) Ack Ca_ title e }l Phone # scri a ¢ rIc: to ces** *t * * ** * * * ** Submittal Fee $ Notary $ Technology Fee $ 17 Scanning $ v Radon $ DPBR $ ( Bond $ U Double Fee $ Structural Review. $ Alteration * * * * * * * * * * * * * * * * * * * * * * * * * * * ** * * * * * * ** U v * * * * * * * * * * * * ** Permit Fee $ CCF $ • .C-6ttC'$ Training/Education Fee $ Violation date: 6 6 Total Fee Now Due $ See Reverse side --> n Demoliti V Bonding Company's Name (if applicable) Bonding Company's Address City State Zip Mortgage Lender's Name (if applicable) Mortgage Lender's Address City State Zip Application is hereby made to obtain a permit to do the work and installations as indicated. I certify that no work or installation has commenced prior to the issuance of a permit and that all work will be performed to meet the standards of all laws regulating construction in this jurisdiction. I understand that a separate permit must be secured for ELECTRICAL WORK, PLUMBING, SIGNS, WELLS, POOLS, FURNACES, BOILERS, HEATERS, TANKS and AIR CONDITIONERS, ETC OWNER'S AFFIDAVIT: I certify that all the foregoing information is accurate and that all work will be done in compliance with all applicable laws regulating construction and zoning. "WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT." Notice to Applicant: As a condition to the issuance of a building permit with an estimated value exceeding $2500, the applicant must promise in good faith that a copy of the notice of commencement and construction lien law brochure will be delivered to the person whose property is subject to attachment. Also, a certified copy of the recorded notice of commencement must be posted at the job site for the first inspection which occurs seven (7) days after the building permit is issued. In the absence of such posted notice, the inspection wicot be and a re- inspection fee will be charged. Signature/ /� . / / ' Alex. At'c' Art J Sign VVV 1 c: et Ito Contractor The foregoing instrument was acknowledged before me this 3 The foregoing instrument was acknowledged before me this day of Se rfi� h b r , 20 GP , by A'Le fit, r 1� � �, , day of , 20 b9 , by who ispersonally known to me or who has produced who is personally known to me or who has produced F Lr As identification and who did take an oath. / as identification and who did take an oath. NOTARY PUBLIC: NOTARY PUBLIC: Sign: .0■CM Print: L: u ri •• •unn. a , LINDA S. MITTS d aPpr a , W, Notary Public ate of Florida ' My Comm. Expires J.:n 16, 2013 Commission # DD 863031 ***IL* t••`• • • ;, Vie+ u National Notary Assn. s My Commission Expires: * * * * * * * * * * * * * * * * * * * * * * * * APPROVED BY Owner or Agent (Revised 07 /10 /07)(Revised 06/10/2009) Engineer Sign: Print: My Commissi ***************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** �® S' Plans Examiner Zoning Clerk checked