Loading...
Limerock Density Testing201 ALHAMBRA CIRCLE SUITE 800 CORAL GABLES, FLORIDA 33134 • 5108 T: 305.476.1102 800.218.5080 F: 305.476.0073 www.harperpartners.com AA0002442 July 22, 2002 Mr. Charles Esher, Building Official Village of Miami Shores 11050 NE 2 " Avenue Miami Shores, FL 33138 Re: Barry University Parking Lot Limerock Density Testing Dear Mr. Esher: HARPER PARTNERS, INC. It is our understanding that the Village is requiring a letter from the Engineer -of- Record verifying that the limerock based used in the construction of the subject parking lot was compacted in accordance with the Village approved permit drawings. This letter is being issued in response. Random testing for the required compaction was conducted by Eastcoast Testing & Engineering, Inc. on April 26, 2002. The report issued by Eastcoast is attached herewith (including an enlarged copy of the actual test results that is clearer than the original fax). The permitted construction documents required a minimum of 98% compaction based on a Modified Proctor. All six tests conducted by Eastcoast exceeded 100% of the compaction achieved under laboratory methods for a Modified Proctor. These test results provide substantial evidence that the compaction of the limerock base is in accordance with permitted construction documents and, based on these results, this Engineer has determined that the compaction is acceptable under the permitted construction documents. We hope that this letter satisfactorily addresses the request of the Village's Building Department. Please feel free to call me directly should you have any remaining concerns or comments. C: Chris Tucker, Beauchamp Construction Ed Cannon, Harper Partners Sincerely, HARPER PART N R8 INC. Albert R. Dettbarn, P PE 18966 Vice President E:'PROJECTS HPI\BARRY\Miami Shores\BARRY Univ Village 072202 Compaction.wpd ORIGINAL ARCHITECTURE ENGINEERING INTERIORS P L A N N I N G TEST # LJFT 6 TEST LOCATIONS PROBE wclIES MOISTURE PERCENT oar coed'/ PCF %R ?.O cowocroo PERCEy WOW 1 BC BETWEEN CATCN 9 72 & 73 PARKING 6 49 7,2 6 2 BC 140' W OF CATCH BASW 12 6 3.2 133.7 I r 2 BC 230' W OF Carr -waASW 72 6 3.7 132.4 8C 20' $ OF &II CH BASIN 2 Qp RowY 6 4.4 732.1 5 BC 740'WOaCA TCKBASIN 2 6 4 13Z7 6 BC 280' W QF CA7CH6ASW 2 8 12 133.9 7 _ 8 9 10 I, 11 72 13 - 144 1 CDCeletrzi YIAAIC 1INr FCV w1Ar0.r1 J ww•...I 1 M A ... "PAIL. • oA.,! reeor !Ill.,. T! /.A "I'Ll /111 V uurrad Linn ir,'T J01 17 -2002 15:23 FROM: EASTCOAST TESTING & ENGINEERING, INC. 4100 North PowOWae Rd. • UN* G-1 Pompano Bead, Rork,. 32013 Oreva d (95d) 972.7145 (sop. Dade (3115)04T-47101 P000knflo No (2S4)271-41171 PERFORMED BY: REPORTED TO: LABORATORY NUMBER: CLIENT FAX NUMBER: CLIENT: PROJECT: CONTRACTOR: SOIL DESCRIPTION: PROCTOR VALUE. PCF: RO TOR VALUE 02 • PCF: $ALL NOTE: rA/VDARDS FOR METHOD OF ASTM D2922 RESPECTFULLY SUBMITTED, EASTCOA$T TESTING' & ENGINEERING, INC., CRA/ PRES /DEN' E$TABLJSHED 1981 FIELD DENSITY TEST 222583 CUSTOMER #: PO NUMBER: 732 B: SUBGR4OE C SASE COURSE OPTIMUM MOISTURE % OPTIMUM MOISTURE % T d WdZT:Z0 2002 9t In!' ZL89tL617S6: '0N NUJ TO:305 4760073 4361 Okamoto. alvd. - SaltoA-S West Palm Bead., Itorfda 33409 (400)324-744513011,1 • (311) 471.6220 BEAUCHAMP 11500 NW 1ST AVE BARRY UNIVERSITY. MIAMI BZAUCHAMP PALE BROWN LIMEHOCK, SOME FINE MEDIUM GRAINED SAND PROPOSED PARKING LOT, BASE COURSE COREY 2- CLIENT 0: PAD FILL E: OTHER ___ 7FS . _ .. 3 /NA1C47F THE TOTAL D�E9�T7t SELOW Exts7we c&aDE Ar MORE wpm ONLraY0l00ESAo7 R0MCr 7NS 4017sl A uN° CAPIare FOR FOU NaanaN 9E4ivlcE+11 CAnar+ I AS SFA,tmaoO NINE71t47OO 1 rirrooAINCS MAO OLITEIMAS 4- ON: 04/26/2002 ON :: 05/02/2002 RK LEBLANC, V.P., P.E. TATE OF FLORIDA #35683 91 # LAB! P.002/002 !2225 i I '° .7UL =18 -2002 09:49 FROM: $45 (SOIL) -Dade (306) 947.6768 Foes Imffo No (954) 977-8872 ESTABLISNIED 1 481 I �( FIELD DENSITY TEST 4,4- c 411111 f` ER: 222583 CUSTO/YIER #: BEAUCHAMP 17500 NW 7ST AVE. BARRY UNIVERSITY, MIAMI BEAUCHAMP PALE BRO wN LIMEROCK. SOME FINE MEDIUM GRAINED SAND PROPOSED PARKING LOT, BASE COURSE COREY 732 "CF. f0' W OF CATCH 6ASIN 12 410" W OA CATCH BASIN 2 30' W OF CATCH BASIN 2 OPTIMUM MOISTURE OPTIMUM MOISTURE % MOISTURE PERCENT 1324 ;33.7 7327 ;TS: 2' S 'SIOENT 2- CLIENT TEST LOCATIONS 30• W OF CATCH BASIN Ili IlrD, & ENGINEERING, INC., PROBE INCHES TO:305 4760073 West Patin 8baek Fto, da 33409 (800.329-7645 (SOIL). fay 471.8220 PO NUMBER.• ON: 04/26/2002 ON: 05102/2002 LA3 # 222583E LAB # rE TESTRESULTS DO COMPLY w1TH PROJECT SPECIFICATIONS UNLESS NOTED : SUBGR4DE C: BASE COURSE 0: PAp PILL, E: OTHER R METHOD OF TEST: ASTM D2922 rsrRFSutTS INDIUM THE roTAL cFVn OVS WC PERCENT* REQUIRED P.001/001 93 98 93 CKAOE Ar was DSPTf, ONLY AND DOES NOT RERECY THE SOILS BEARING = MQTY FOR FOUND477ON DESIGNICER77RCa7TON AS STANoaAy) Rf1VETRAT7ON TES7'8O01NGS wouu, OETERARNE RK LEBLANC, V.P., P.F. TATE OF FLORIDA #35683