Cylinder TestsNAME
Signature O.LC.
125.01 -86
e
METROPOLITAN DADE COUNTY PERMIT DATE CS - 76 7 2-4
FIRE INSPECTION REPORT FOR C.O.
ADDRESS ' J 13 . 0 0 iv t 0 o A/f-
i
SPRINKLERS - HYDRANTS ON -SITE STANDPIPE
Flow Tests
HYDRANT S R F
S R F
STANDPIPE S R F
ON -SITE S R F
- v E v e, 7 INSPECTOR r n
Ar‘ p
, 5 p xci,t O 1-'
BUILDING MEETS PRESS FIRE SAFETY AND FIRE FLOW REQUIREMENTS
Date G' `l
airy University
Vice President for Business Affairs
M E M O R A N D U M
TO: Frank Lubien, Code Enforcement Officer,
Village of Miami Shores
FROM: Timothy H. Czerniec, Vice President for Business Affairs
DATE: September 15, 1987
SUBJECT: Affidavit
AFFIDAVIT
This is to certify that Barry. University recognizes that certain
details on the West Hall I Project are incomplete. Barry University
certifies that all matters will be brought into compliance with the
approved drawings.
Lei
Timothy 1Rharrniec
Vice President for Business Affairs
A CatF.oTie T:-tu Un.iNersity
11300 NORTHEAST SECOND AVI_NUE
MIAMI SHORES, FLORIDA 33161
PHONE (305) 758 -3392
�{�' //f7
September 16, 1987
Village of Miami Shores
10050 N.E. 2nd Avenue
Miami Shores, Florida 33138
Att.: Mr. Frank Lubien
Ref.: Barry University / West Hall Phase I
F &F /Project No. 8630.00
Subject: Certificate of Compliance
Dear Sir:
Pursuant to the South Florida Building Code, Article 305.3,
this letter shall serve as certification by F &F /FRAGA AND
FEITO /architects - planners, Inc., as the Architect -of- Record,
that the work performed by L. Milton Construction Corp. to
the best of our knowledge or belief and professional
judgement meets with the intent of the South Florida Building
Code and is in substantial compliance with the approved
Contract Documents (Permit Set).
Said certification is subject to the completion of corrective
work and outstanding items to be completed by L. Milton
Construction Corp., as the General Contractor for this
Project, as enumerated by the Architect's List of Defficiencies
and Incomplete Items dated September 10, 1987. For your
record a copy of same is attached. In addition, pursuant to
your request, attached please find copies of the Structural
Engineer -of- Record's Field Reports as well as F &F's previously
issued Field Reports.
Respectfully Submitted,
F& AAND FEITO /architects - planners, Inc.
Jose Feito, FAIA
Encl .
cc.: T. Czerniec /Barry University
A. Perez /L. Milton Construction Corp.
File 8630.00.3A
0
N
L
0
co
C
O
Q.
N
C LO
cr'
T
Q�
• c0
0 O
UE
�
O o
R,
Z
Q o
(0
0
LL roi
September 10; 1987
L.MILTON CTRUCTION CORP.
2700 S.W. 23rd Terrace
Miami, Florida 33145
Attention: Mr. Armando Perez
Reference:
Subject:
Dear Armando:
Sr. Betty McFadyen
Mr. Ed Turner
Mr. Jim Killmeyer
Mr. J.A. Rodriguez
West Hall Phase I
F&F Project No. 8630.00
Preliminary List of Defficiencies and /or
Uncompleted Items.
.Given the status of the Project at this point in time and
the reality that the date of substantial completion has not
been met - precluding the use of this facility as the Owner
had intended i.e. housing for the University's Students - a
preliminary list of defficiencies and /or imcompleted items
has been prepared to assit you in the completion of this
project. By this action it is hereby understood that your
responsibilities outlined in Article 9.8.1. of the General
Conditions and Section 01705 are still subject to your
compliance and have neither been assumed by the Owner nor
deleted from your Contract. Corrective action or completion
of the work is this not limited to the items herein listed.
This report was compiled September 9, 1987.
Barry University
n n
n
11
F &F Architects
Those present:
oa
N
co
vt
L0
0
M
0
c
0
a
0
`1 F
C �
O.r)
P-
o /5
IRE
U E
L
C
0
0
Cli
Z
0
w
BUILDING EXTERIOR
01 RAILINGS: SPECS CALL FOR BUTT JOINT;
APPLIED SEALANT NOT ACCEPTABLE.
E.02 OVERSPRAY FROM DOORS AT CONC SURFACES & WALLS NOT
ACCEPTABLE.
E.03 OVERSPRAY ON EXTERIOR RAILINGS NOT ACCEPTABLE.
E.04 2 LT. FIXT. MISSING IN FRONT OF RM 33; 1 LENS
MISSING AS WELL.
E.05 DOORS MARK 01 — SILENCERS MISSING; HARDWARE
INSTALLATION IN COMPLETE; APPLIED WEATHERSTRIPPING
IN PROPERLY INSTALLED — SCREWS, AS SET, ROUGH — NOT
ACCEPTABLE — PRESENTS HAZARD; CLOSURE PLATES NOT
INSTALLED AT HEAD & SILL CONDITION AS PER 08100,
2.03 (D), DRAWINGS AND APPROVED FIRE DOOR SUBMITTAL
08100.3 PG 6. DOOR NOT IN COMPLIANCE WITH SPECS.
DOOR EDGE PLATE JOINTS OPEN, AT HINGE SIDE OPEN
JOINTS VISIBLE (DUE TO REVERSIBLE FEATURE PER
FABRICATOR) WHICH WILL RESULT IN INTRODUCTION OF
MOISTURE AND RESULTANT RUST SEE 08100/2.03 (A)
"FABRICATE STEEL DOOR ... TO BE RIGID. SEAMLESS ..."
SEE 08100/2.03 (A)1. "CONNECT WORK. BY WELDED SEAMS.
JOINTS, INCLUDING REINFORCEMENT.... WELDED JOINTS
SHALL BE NEATLY MADE, PRESSED CLEAN. SMOOTH AND
FLUSH WITH SURFACE OF BASE METAL. MAKE EXPOSED FACE
JOINTING OF WORK AS INVISIBLE AS POSSIBLE." PAINT
APPARENTLY IMPROPERLY APPLIED AS PEELING /POPPING OFF
AT VARIOUS LOCATIONS EVIDENT.
E.06 SEAL AROUND FIRE ALARM DEVICE; OPEN J.BOX VISIBLE.
E.07 REPAINT EXTERIOR WALLS OVERSPRAYED WITH CORAL COLOR
PAINT.
E.08 GREEN COLOR WALSS NOT PAINTED AS PER APPROVED SHOP
DRAWINGS; RETURN GREEN COLOR ON WALL OF DOOR 14 AT
STORAGE UNITS 17A, B AND 18 A, B LOCATIONS. PATCH
AND FILL INCORRECT STUCCO JOINTS AT SAME LOCATION.
E.09 AT ENTRANCE TO 22A. UPPER LEFT CORNER OF STUCCO
DAMAGED. PATCH AND REPAINT.
E.10 EXTERIOR RAILINGS AT STAIRS: AS SET /FABRICATED
INCORRECT. SEE PREVIOUSLY APPROVED SHOP DRAWINGS.
AT TOP OF STAIR — RAILING SHALL EXTEND 1' -10" FROM
NOSING. AT BOTTOM 1' -10" FROM NOSING. RAILING HT.
IS SET AT 2' -8 ". CORRECT INSTALLATION. AS
COMPLETED, IN VIOLATION OF SFBC.
E.11 SCORED JOINTS AT SIDEWALK ABUTTING BUILDING ON FIRST
FLOOR NOT CUT. SEE Al, FOR TYP. NOTE.
E.12 UNIT NO.'S AS INSTALLED NOT IN COMPLIANCE WITH
GENERAL NOTE #2 ON Al. SEE 10440. TYPE SHOULD HAVE
BEEN HELVETICAL COLOR SUBMITTAL NEVER RECEIVED.
ARCHITECT DESIRED WHITE. SEQUENCE NOTED ON PLANS;
INSTALLATION NOT IN COMPLIANCE. NOTE: DISREGARD
REMARK AS OWNER'S STAFF HAD ISSUED CURRENT
INSTRUCTIONS.
E.13 ALLL EXTERIOR THRESHOLDS CALLED FOR BEING SET IN A j,
FULL BED OF SEALANT. SEE 9 /A8 AND 10/A8. NOT IN-
FRAGA AND FElTO / architects . planner
COMPLIANCE. -
E.14 WHERE SIDEWALK ABUTTS DOS MAX. DIFFERENCE BETWEEN ,
TOP OF SIDEWALK AND FIN. GRADE IS SET AT A MAXIMUM 't
OF 1°. SEE DETAIL 10/A5 SECTION A-A. NOT IN
COMPLIANCE. ALSO SEE SECTION 1/A6 AT JUNCTURE OF
SIDEWALK AND FINISH GRADE NOTE, DRAWING CALLS FOR
1" MAX. DIFFERENCE.
E.15 TOOLED JOINT NOT ACCOMPLISHED AT DECORATIVE "GRID"
(PAINTED GREEN) AS PER SECTION 1/A6 AND ELEVATIONS
ON A3. FOR THE RECORD ONLY. DO NOT ATTEMPT TO CUT
STUCCO.
E.16 A/C CONDENSING UNIT SLAB AS NOTED ON DETAIL 1/A3
SCORED JOINT NOT ACCOMPLISHED.
E.17 PARKING LOT INCOMPLETE; NOT READY FOR PUNCH LIST.
E.18 LANDSCAPING /SOD/IRRIGATION INCOMPLETE; NOT READY
FOR PUNCH LIST.
E.19 EXTRUDED CURB NOT INSTALLED AS PER SR3 AND DTL 6/A5.
E.20 COMPLY WITH 01705 AND INDIVIDUAL TECHNICAL SECTIONS
AS TO FINAL CLEAN UP REQUIREMENTS AND SUBMITTALS.
E.21 CLEAN ALL WINDOW TRACKS; INSTALL SCREENS.
E.22 CRACKED STUCCO ON EAST STAIRS
E.23 EAST STAIRWAY HAS TWO SHADES OF GREEN; APLLY SECOND
COAT
E.24 REF UNIT #10A - CONCRETE HAS CRACK IN IT
E.25 REF UNIT #7A - CONCRETE HAS CRACK IN IT
E.26 REF UNIT #3A - LIGHT LENS COVER MISSING
E.27 REF UNIT #30A - STUCCO CHIPPED ABOVE DDOR
E.28 REF UNIT #29A - RAILING BENT
E.29 REF UNIT #26A - WINDOW MEEDS TO BE CAULKED
E.30 REF UNIT #26A - THREE (3) HOLES IN STUCCO
E.31 REF UNIT #26A - FLOOR HAS HOLE WHERE IT MEETS WALL
E.32 REF STORAGE ROOM #33 - LIGHT LENS MISSING AND
ENTIRE LIGHT UNITS MISSING
E.33 REF UNIT #22A - STUCCO SHIPPED AT WINDOW AND DOOR
E.34 REF UNIT #21A - STUCCO CHIPPED AT DOOR
E.35 REF UNIT #20A - STUCCO CHIPPED AT DOOR
E.36 REF UNIT #21B - HOLES AT TOP OF DDOR JAMB
E.37 REF UNIT #22B - ELECTRIC BOX COVER MISSING
E.38 REF UNIT #32 - PULL BOX AND FIRE ALARM MISSING
E.39 REF UNIT #23B - JUNCTION BOX COVER MISSING
E.40 REF UNIT #23B - OVERSPRAY FROM DOORS ON WALLS
E.41 REF UNIT #26B - AREA UNDER WINDOWS NEEDS TO BE
PAINTED
E.42 REF UNIT #27B - WINDOW CAULKING HAS HOLES AND CRACKS
01.00 GENERAL COMMENTS. THE FOLLOWING ITEMS PERTAIN TO
INTERIOR SPACES. REFERENCE IS MADE TO ROOM NUMBERS
AS INDICATED ON FLOOR PLANS (KEY PLANS ATTACHED) AND
TO TYPICAL UNIT SPACES AND/OR DOOR NUMBERS (KEY
PLANS AnirouniED).
01.01 TOP SHELF UNIT, VERTICAL CLOSURE EDGE NOt)00t
2 L2 ON SLEEPING AREA SIDE..1
G4, AND FEITO / architects •
3t
01.02 UNIT *'S MISSING — SEE DRAWINGS AND DIVISION 10440.
01.03 NO PULL STRING VISIBLE a) BOX FOR TEL & CCTV.
01.04 CLOSERS AT EXTERIOR DOORS REQUIRE ADJUSTMENT; NOT
CLOSING.
01.05 CLEAN VCT FLOORS; REMOVE STAINS, CLEAN AND POLISH AS
PER 09650; DELIVER EXTRA STUCK AS PER 09650/8.08.
01.06 LT. FIXT. NOT INSTALLED AT STUDENTS DESK. DRAWING
E4 CALLS FOR TWO LT. FIXT. MARK 'D' AT STUDENTS
DESK. ONLY ONE INSTALLED.
01.07 COVE LT. NOT INSTALLED AT VANITY.
01.08 SMOKE DETECTORS INSTALLATION, EMERGENCY ETC. FIRE
HORNS, FIRE STATIONS INCCOMPLETE — SEE ELECT. REPORT
TO FOLLOW.
01.09 BATHROOM CEILINGS NOT INSTALLED; NOT READY FOR
INSPECTION.
01.10 CLOSET FOLDING DOORS INSTALLATION INCOMPLETE; NOT
READY FOR PUNCH LIST
01.11 CLOTHES SHELF AND ROD AT CLOSETS NOT INSTALLED
01.12 VINYL BASES LOOSE AT DOOR MARK 01 CONDITION AT
RETURN
01.13 HARDWARE COMPONENTS MISSING; SEE E05
01.14 TYP. STUDENT DESK; PAINT UNDERSIDE OF DESK SEE 3/A5;
CLEAN
01.15 LIGHT THROUGH AT BATHROOMS INCOMPLETE SEE 2/A5
01.16 CABINET ABOVE DRESSER UNIT. SEE ELEVATION 14 AND
SECTION 2/A4. CABINET SHALL BE DIVIDED INTO TWO
COMPARTMENTS (SEE SECTION 2/A4 NOTE" 3/4" COMP.BD.
DIVIDER PANEL). HASP FOR STUDENTS LOCKERS NOT
FURNISHED. TRIM AT EDGE (VERT) NOT INSTALLED AS PER
SHOP DRAWING SUBMITTALS. ALIGN DOORS
01.17 ROBE HOOKS (MARK 7) AT TYP. BATHROOM UNITS NOT
INSTALLED. INSTALL ON BATHROOM SIDE OF DOOR 06
01.18 BATHROOM VANITY — PAINT UNDERSIDE; MTL BRACKET
MISSING SEE DETAIL 3/A5 INSTALL.
01.19 SMOKE DETECTORS NOT INSTALLED
01.20 FLOOR MTD DOOR STOP AT DOOR 06 (TO HOLD AT 90
DEGREES) NOT INSTALLED. PROVIDE SHIM PLATES
(CONTACT HARDWARE SUPPLIER) FOR INSTALLATION
01.21 CLEAN CT. FLOORS AND WALLS (GOOD TILE INSTALLATION)
01.22 INSTALL WINDOW SCREENS
01.23 PIPE AT EXPOSED BRANCHES AT SINKS SCHEDULED TO BE
BRASS PIPE OR TUBE. CHROME PLATED. PVC IN PLACE.
NOT IN COMPLIANCE SUBMIT CREDIT
01.24 PATCH DRYWALL AT ELECT. CONNECTION UNDER STUDENT
DESKS (FOR LT. FIXT.)
01.25 PATCH DRYWALL AT PLUMBING DRAINAGE PIPE UNDER SINKS.
POOR PLUMBING ESCUTCHEON COVERAGE.
01.26 CHECK ALL DOORS MARK 06 MAKE SURE 1" UNDERCUT IS
PROVIDED AT CLOSED POSITION IN ALL CASES. MOST DO
NOT HAVE 1" UNDERCUT WHICH WILL IMPAIR POPER A/C
OPERATION. THIS ITEM MUST BE CORRECTED IMMEDIATELY
01.27 ALL UNITS MEED TO BE THOROUGHLY CLEANED
01.28 ELECTRICAL AND /OR TELEPHONE COVER PLATES MISSING
01.29 ALL DRYWALL HAS ROUGH TEXTURE AND APPEARANCE NOT
FRAGA AND FEITO / architects - planners
B
2
FINISHED WHERE WALL MEETS CEILING PLANE. NEED TO BE
SANDED AND REPAINTED
01.30 MANY JOINTS SHOW LACK OF SANDING PRIOR TO PAINTING
01.31 FINISH BACKSPLASH INSTALLATION ON ALL STUDENT DESK
AND SHELF UNITS WORK INCOMPLETE.
THE FOLLOWING SERIES OF COMMENTS PERTAIN TO SPECIFIC ROOMS
IN ADDITION TO THE GENERAL COMMENTS ABOVE LISTED WHERE
REFERENCE IS MADE TO "1AB.0..." COMMENT APPLIES TO BOTH
SIDES OF UNITS "1A.0..." OR "18.0..." SPECIFICALLY REFERS TO
RESPECTIVE HAFES.
1AB.00 UNITS 1A AND 1B
1A.01 EXTERIOR DOOR HAS FOREIGN SUBSTANCE ON IT - PAINT
WILL NOT ADHERE
1A.02 EXTERIOR DOOR INSIDE DOOR KNOB DAMAGED
1A.03 WINDOW MOLDING NOT ATTACHED
1AB.04 SHOWER HEAD MISSING
1AB.05 PAPER TOWEL HOLDER LOOSE
10.06 VINYL BASE BY EXTERIOR DOOR LOOSE
10.07 EXTERIOR DOOR '1' STICKING
2AB.00 UNITS 2A AND 2B
2B.01 EXTERIOR DOOR JAMB HAS FOREIGN SUBSTANCE ON IT
2B.02 EXTERIOR DOOR '1' TIGHT AT BOTTOM
2AB.03 TOILET DOOR STOP MISSING
2AB.04 LOCK BROKEN DOOR #7
2AB.05 PATCH HOLE NEXT TO PAPER TOWEL HOLDER
3AB.00 UNITS 3A AND 3B
F &F
2A.06 MARBLE THRESHOLD BROKEN DOOR #6
2A.07 BATHROOM DOOR #6 DOES NOT CLOSE - NEEDS TO BE
PLANNED
2A.08 BROKEN BED LIGHT COVER LENS
2A.09 WINDOW MOLDING OFF #1
2A.10 EXTERIOR DOOR WILL NOT CLOSE
2A.11 EXTERIOR DOOR #'1' HAS FOREIGN SUBSTANCE ON IT-
PAINT WILL NOT ADHERE
3A.01 EXTERIOR DOOR DOES NOT CATCH DR SEAT
3A.02 COVER PLATE MISSING SCREW
3A.03 BEDROOM CEILING LIGHT MISSING
3A.04 BATHROOM THRESHOLD NEEDS TO BE SEALED DOOR MARK '6'
3AB.05 PLUMBING DRYWALL EXPOSED UNDER SINK
3AB.06 TOILET DOOR *7 STOP NOT WORKING PROPERLY - DOOR
BEING STOPPED BY DOORKNOB
3AB.01 BATHROOM DOOR *6 NOT PLUMB; SHOWS LESS THAN 1/2°
FRAGA AND FEITO / architects - planners
UNDERCUT - 1" SPECIFIED
3AB.02 BED LIGHT MISSING LENS AND BULBS
39.03 WINDOW WEATHERSTRIPPING OUT
3B.04 EXTERIOR DOOR #1 AND JAMB HAS FOREIGN SUBSTANCE AND
PAINT WILL NOT ADHERE
12AB.00 UNITS 12A AND 12B
12A.01 CABINET SHELF BRACKET BROKEN
12A.02 BATHROOM DOOR #6 JAMB NOT CAULKED
12A.03 BATHROOM DOOR #6 KNOB NOT WORKING - WILL NOT PULL
TONGUE BACK
12A.04 TOILET DOOR 07 MISSING DOOR STOP
12B.05 BATHROOM DOOR STOP NOT OUT FAR ENOUGH
12B.06 BED LIGHT LENS AND BULB MISSING
13.00 UNIT 13
13.01 DRYWALL ABOVE FRONT DOOR #1 CRACKED
13.02 WINDOW SEAL, LIVING ROOM NEEDS TO BE CAULKED
13.03 BATHROOM CEILING LIGHTS MISSING - HOLES CUT, NO
FIXTURES INSTALLED
13.04 PLUMBING ESCUTCHEON NOT COVERING HOLES
13.05 NO DOOR STOP ON BATHROOM DOOR
13.06 MEDICINE CABINET NEEDS TO BE CAULKED TO WALL;
MISSING ONE DOOR PULL
13.07 FLOOR TILE BROKEN AT CLOSET CO3
13.08 NO DOOR STOP OR CLOSET DOOR #11
13.09 INSTALL MIRROR
14.00 LAUNDRY ROOM
14.01 UNDER CONSTRUCTION; INSTALL VCT, PNT, INSTALL
GLAZING, NOT READY FOR INSPECTION
15.00 BOILER ROOM
15.01 DOOR NEEDS TO BE PAINTED
15.02 PAINT ROOM; NOT READY FOR INSPECTION
16.00 ELECTRICAL ROOM
16.01 DOOR NEEDS TO BE PAINTED
16.02 INSTALL DOOR #3 LOUVER
4AB.00 UNIT 4A AND 4B
4A.01 EXTERIOR DOOR #1 HAS FOREIGN SUBSTANCE AND PAINT
WILL NOT ADHERE
4A.02 WEST WALL, DRYWALL TAPE COMING OFF WALL
4A.03 EXTERIOR DOOR #1 DEAD BOLT NOT WORKING
4A.04 BATHROOM DOOR #6 WILL NOT CLOSE
F &F
FRAGA AND FEITO / architects - planners
4AB.05 TOILET DOOR #7 STOP NOT WORKING - DOOR KNOB HITTING
WALL
4B.06 BATHROOM DOOR #6, INSIDE TOP, CRACKED
48.07 EXTERIOR DOOR *1 STICKING, MIDDLE HINGE SPRUNG
4B.08 VINYL BASE LOOSE AT FRONT DOOR #1
4B.09 FRONT DOOR THRESHOLD NOT SEALED
48.10 LEFT OF DESK, SHEETROCK TORN
5AB.00 UNIT 5A AND 58
5B.01 VINLY BASE AT FRONT DOOR #1 LOOSE
5B.02 DEADBOLT TONGUE NOT SECURING
5B.03 WINDOW NOT ALIGNED
5B.04 LIGHT SWITCH NEEDS FINISH ON SHEETROCK
5B.05 BATHROOM DOOR #6 STICKS AND VENEER PULLED AWAY; ONLY
1/2" UNDERCUT EVIDENT
5B.06 DOOR #1 WILL NOT CLOSE WITH LATCHSET
5B.07 TOILET DOOR #7 STOP BROKEN
5AB.08 HOLE IN PORTION LEFT SIDE OF TOILET
5AB.09 PAINT TOILET ROOM A06
5A.10 BED LIGHT LENS COVER MISSING
5A.11 FRONT DOOR #1 DENTED
5A.12 REPAINT FULL HT. 2' -4" W. SOUTH WALL FACING CLOSET
(ABUTTING STUDENT DESK) POOR PAINT /PATCH CONDITION
6AB.00 UNITS 6A AND 6B
6A.01 FRONT DOOR #1 NEEDS TO BE PAINTED; INSIDE FACE SHOWS
ONLY ON COAT
6A.02 DEADBOLT LOCK STICKS
6A.03 VINYL BASE MISSING SOUTH WALL; NO SEALANT EVIDENT AT
BASE OF DRYWALL- REQUIRED FOR ACOUSTICAL PARTITION.
6A.04 BATHROOM DOOR #6 WILL NOT CLOSE
6AB.05 LIGHT SWITCH COVERPLAT NEEDS TO BE CAULKED
68.06 LEFT CLOSET FOLDING DOOR BROKEN
68.07 LIGHT CABINET DOOR WILL NOT CLOSE
68.08 FRONT DOOR DEAD BOLT AND LOCK PLATE MISSING SCREWS
6B.09 VENEER ON DESK LOOSE
6B.10 SECOND SHELF DESK AREA FORMICA CHIPPED
6B.11 WINDOW WEATHERSTRIPPING MISSING
7AB.00 UNITS 7A AND 78
78.01 DESK PULLED AWAY FROM DRYWALL
7B.02 CEILING LIGH FIXTURE MISSING
78.03 LIGHT SWITCH COVER PLATE LOOSE AND NEEDS TO BE
STRAIGHTENED
7B.04 NAIL PROTRUDING FROM BATHROOM DOOR JAMB
78.05 DOOR *6 LESS THAN 1/8" UNDERCUT
F &F
FRAGA AND FEITO / architects - planners
7AB.06 TOILET DOOR HAS NO DOOR STOP
7A.07 FRONT DOOR #1 DENTED
7A.08 FRONT DOOR #1 DOES NOT CATCH
BAB.00 UNITS BA AND GB
9AB.00 UNITS 9A AND 9B
8A.01 FRONT DOOR #1 DOES NOT CLOSE
BA.02 DEADBOLT DOOR #1 DOESN'T WORK
8A.03 BATHROOM DOOR #6 STICKS AND LOCK BROKEN. DOOR
DAMAGED ON EDGE AND 52" AFF
8B.04 LEFT CLOSET, VINYL BASE PULLED AWAY IN RIGHT HAND
CORNER.
8B.05 SECOND DESK SHELF, FORMICA CRACKED
88.06 EXTERIOR DOOR #1 HAS FOREIGN SUBSTANCE AND DOOR JAMB
- PAINT WILL NOT ADHERE
9B.01 FRONT DOOR #1 STICKING AT BOTTOM
98.02 LEFT CLOSET FOLDING PORTION BROKEN
9B.03 BATHROOM DOOR WILL NOT CLOSE
9B.04 STUDENT DESK FRONT PANEL WARPED; REPLACE
948.05 TOILET DOOR #8 MISSING DOOR STOP
9AB.06 TOILET DOOR #8 WILL NOT CLOSE
948.07 AT TOILET DOOR #8 JAMB FINISH GROUT AT SHOWER SIDE
94.08 FRONT DOOR #1 STICKING
94.09 FRONT DOOR #1 HAS FOREIGN SUBSTANCE ON IT AND PAINT
WILL NOT ADHERE
94.10 ALIGN CABINET DOORS
1OAB.00 UNITS 10A AND 10B
10A.01 FRONT DOOR #1 HAS FOREIGN SUBSTANCE ON IT AND PAINT
WILL NOT ADHER -
104.02 FRONT DOOR #1 DEADBOLT DOES NOT LINE UP
1OAB.03 BATHROOM DOOR DRYWALL NOT FINISHED TO DOOR JAMB
1048.04 DOOR #8 NEEDS TO BE PAINTED
10AB.05 TOILET DOOR #8 MISSING DOOR STOP
108.06 LEFT CLOSET PORTION DOOR COMING OFF WALL
108.07 FRONT DOOR #1 AND DOOR JAMB HAS FOREIGN SUBSTANCE
AND PAINT WILL NOT ADHERE
108.08 AT STEEL COLUMN LOCATION. EAST WALL OF SLEEPING
AREA. CORRECT VINYL BASE INSTALLATION, POOR.
11AB.00 UNIT 11A AND 11B
118.01 FRONT DOOR #1 HAS FOREIGN SUBSTANCE ON IT AND PAINT
WILL NOT ADHERE
F &F
FRAGA AND FEITO / architects - planners
118.02 FRONT DOOR #1 HANDLE BROKEN; REINSTALL
WEATHERSTRIPPING - POOR EXECUTION
118.03 RIGHT CLOSET PORTION DOOR DOES NOT WORK PROPERLY
118.04 BED LIGHT LENS MISSING
118.05 CEILING LIGHT MISSING
11B.06 BATHROOM DOOR #6 WILL NOT CLOSE
11B.07 BATHROOM DOOR #6 CRACKED AT TOP HINGE
118.08 CABINET DOORS WILL NOT CLOSE
11AB.09 TOILET DOOR #6 MISSING DOOR STOP
11AB.10 TOILET PAPER HOLDER LOOSE
11A.11 FRONT DOOR #1 LATCH BARELY HOLDING - GAP TOO WIDE
17AB.00 STORAGE
17AB.01 PAINT ALL WALLS
1BAB.00 STORAGE
18A.01 DOOR #14 STICKS
1BA.02 NO LIGHT SWITCH COVER PLATE
1BA.03 FOREIGN SUBSTANCE ON DOOR JAMB - PAINT WILL NOT
ADHERE
1BAB.04 PAINT ALL WALLS
SECOND FLOOR
20AB.00 UNITS 20A AND 20B
20A.01 WINDOW MOLDING OUT
20A.02 DESK NEEDS TO BE CAULKED
20A.03 BOTTOM SHELF OF DESK MISSING BOTH SIDE BOARDS
20A.04 A/C VENT HOLE CUT BATHROOM NEEDS TO BE SEALED
20AB.06 TOILET DOOR #6 WARPED
20AB.07 JUNCTION BOX EXPOSED IN CEILING
20AB.08 DRYWALL NOT FINISHED BEHIND TOILET
20B.09 BATHROOM DOOR #6 NEEDS TO HAVE SECOND COAT OF PAINT
20B.10 THRESHOLD NOT SEALED; ALL WITH GROUT AND SEALANT AS
SPECIFIED
20B.11 BOTTOM SHELF OF DESK NEEDS SIDE BOARDS
20B.12 REST OF DESK NEEDS TO BE CAULKED
208.13 TILE AT FRONT DOOR BROKEN. LOOSE
208.14 FRONT DOOR #1 NEEDS TO BE PAINTED
21AB.00 UNITS 21A AND 21B
21B.01 FRONT DOOR #1 STICKS, WILL NOT CLOSE PROPERLY
21B.02 WINDOW OUT OF ALIGMENT
21B.03 FINISH CAULING AROUND WINDOW
218.04 SECOND DESK SHELF POORLY DONE
218.05 DESK NEEDS TO BE CAULKED
F &F
FRAGA AND FEITO / architects - planners
21A0.06 TOILET DOOR #6 DOES NOT CLOSE
21AB.07 TOILET DOOR #7 MISSING DOOR STOP
21AB.09 JUNCTION BOX EXPOSED IN CEILING
21AB.09 TOILET PAPER HOLDER BROKEN
21AB.10 SHOWER NOZZLE LEAKS
21A.11 DESK MEEDS CAULKING
21A.12 WINDOW WEATHERSTRIPPING OUT
22AB.00 UNITS 22A AND 228
22A.01 FRONT DOOR #1 NEEDS TO BE PAINTED
22A.02 WINDOW WEATHERSTRIPPING OUT
22A.03 DESK NEEDS TO BE CAULKED
22A.04 THRESHOLD TO BATHROOM NEEDS TO BE SEALED
22A.05 BASEBOARD UNDER CABINET AWAY FROM WALL
22AB.06 JUNCTION BOX EXPOSED IN CEILING
22AB.07 TOILET DOOR #7 MISSING DOOR STOP
22AB.08 TOILET DOOR #7 DOES NOT CLOSE
22AB.09 TOILET DOOR #7 JAMB NEEDS WHITE PAINT REMOVED
22B.10 THRESHOLD TO BATHROOM NEEDS TO SEALED
225.11 WINDOW NOT HUNG STRAIGHT
225.12 NUMEROUS FLOOR TILES LOOSE AND COMING UP
22B.13 TILE INSTALLED OVER THRESHOLD TO FRONT DOOR
22B 14 DESK NEEDS TO BE CAULKED
31AB.00 UNITS ,31A AND 31B
31A.01 FRONT DOOR MISSING DOOR KNOB
31A.02 DEADBOLT NOT LINED UP
31A.03 FRONT DOOR THRESHOLD #1 NEEDS TO BE SEALED
31A.04 DESK NEEDS TO BE CAULKED
31A.05 CLOSET VINYL BASE LOOSE
31A.06 BOTH BATHROOM DOOR JAMBS TO BE REPLACED; OUT OF
PLUMB - UNACCEPTABLE; DOOR #6 CANNOT CLOSE
31AB.07 TOILET DOOR #7 WILL NOT CLOSE
31AB.08 JUNCTION BOX EXPOSED IN CEILING
31AB.09 SHEETROCK NEEDS TO BE FINISHED TO JAMB
31B.10 RED LIGHT LENS COVER MISSING
31B.11 DESK NEEDS TO BE CAULKED
32.00 UNIT 32
32.01 FRONT DOOR #1 NEEDS TO BE PAINTED
32.02 DOOR JAMB TO BEDROOM, RIGHT SIDE, WALL NEEDS TO BE
FINISHED. (SAME ON INSIDE BEDROOM)
32.03 BATHROOM NO LIGHTS INSTALLED
32.04 BATHROOM INSIDE TOP DOOR JAMB NEEDS CAULKING
32.05 SHOWER TILE NEEDS GROUTING
32.06 DOOR #10 MISSING DOOR STOP
F &F
FRAGA AND FEITO / architects - planners
32.07 TRAP DOOR IN CLOSET NEEDS TO BE PAINTED
32.08 FLOOR TILE AT KITCHEN DOOR NEEDS TO BE FINISHED
23AB.00 UNITS 23A AND 23B
23A.01 FRONT DOOR #1 NEEDS PAINTING
23A.02 WINDOW MOLDING AND WEATHERSTRIPPING LOOSE
23A.03 DESK NEEDS TO BE CAULKED
23A.04 JUNCTION BOX, WEST WALL OPEN
23A.05 CABINET SHELVING BRACKETS MISSING
23AB.06 TOILET DOOR #7 STOP MISSING
23AB.07 JUNCTION BOX EXPOSED IN CEILING
23A8.08 DOOR JAMB LEADING TO 23B NEEDS TO BE PAINTED
23B.09 TRAP DOOR NEEDS TO BE PAINTED
23B.10 FLOOR TILE LOOSE IN CLOSET
23B.11 SECOND SHELF OF DESK - FORMICA CHIPPED
23B.12 FOREIGN SUBSTANCE ON FRONT DOOR #1 AND JAMB - PAINT
WILL NOT ADHERE
23B.13 BASEBOARD BY FRONT DOOR MISSING
278.14 TILE AT FRONT DOOR THRESHOLD MISSING
24AB.00 UNITS 24A AND 248
248.01 FRONT DOOR #1 THRESHOLD FLOOR TILES MISSING
248.02 CABINET SHELF MISSING AND HOLE IN BACK RIGHT
248.03 BATHROOM DOOR HAS 6 GOUGES IN IT
248.04 VINYL BASE NEEDS TO BE FINISHED AT BATHROOM DOOR
248.05 BATHROOM THRESHOLD NEEDS TO BE SEALED
248.06 HOLE TOO LARGE FOR A/C GRILL
24A8.07 AT BATHROOM JUNCTION BOX EXPOSED IN CEILING
24A.08 FRONT DOOR #1 NEEDS TO BE PAINTED
25A8.00 UNITS 25A AND 258
254.01 WINDOW WEATHERSTRIPPING MISSING
25A.02 DESK NEEDS CAULKING
25A.03 BATHROOM THRESHOLD NEEDS CAULKING
25A8.04 AT BATHROOM JUNCTION BOX EXPOSED IN CEILING
258.05 BATHROOM THRESHOLD NEEDS TO BE SEALED
258.06 DESK NEEDS TO BE CAULKED
25B.07 FRONT DOOR #1 THRESHOLD NEEDS TO BE CAULKED
25B.08 DEADBOLT DOES NOT WORK
26AB.00 UNITS 26A AND 26B
268.01 FRONT DOOR #1 THRESHOLD TILE MISSING
26B.02 WINDOW MOLDING OUT
F &F
FRAGA AND FEITO / architects - planners
26B.03 DESK NEEDS TO BE CAULKED
268.04 BATHROOM THRESHOLD NEEDS TO BE SEALED
26148.05 DOOR KNOB MISSING ON TOILET DOOR #7
26AB.06 TOILET DOOR #7 MISSING DOOR STOP
26A8.07 JUNCTION BOX EXPOSED IN CEILING AT BATHROOM
26A.08 WINDOW WEATHERSTRIPPING OUT
26A.09 DOOR #1 NEEDS TO BE PAINTED
27AB.00 UNITS 27A AND 27B
27A.01 WINDOW MOLDING LOOSE
27A.02 DEADBOLT DOES NOT WORK
27A.03 BOTTOM SHELF OF DESK BROKEN
27A.04 BATHROOM THRESHOLD NEEDS TO BE SEALED
27AB.05 TOILET DOOR #7 MISSING DOOR STOP
27AB.06 ORANGE PAINT ON WALLS IN A05 & A06
27AB.07 JUNCTION BOX EXPOSED IN CEILING IN A05
27AB.08 HOLE AROUND LIGHT SWITCH COVER PLATE IN A05
27AB.09 LIGHT FIXTURE INSTALLED OVER SHOWER ROD (SAFETY ?)
27B.10 BATHROOM THRESHOLD DOOR #6 NEEDS TO BE SEALED
27B.11 DESK NEEDS TO BE CAULKED
29AB.00 UNITS 29A AND 29B
29A.01 FRONT DOOR #1 DENTED
29A.02 DEAD BOLT STICKING
29A.03 THRESHOLD TO BATHROOM NEEDS TO BE SEALED
29A.04 THRESHOLD TO BATHROOM FLOOR TILES LOOSE
29AB.05 JUNCTION BOX EXPOSED IN CEILING
29AB.06 TOILET DOOR #7 MISSING DOOR STOP
29AB.07 TOILET PAPER HOLDER BROKEN
29B.08 BATHROOM THRESHOLD NEEDS TO BE SEALED
29B.09 CHIPPED TILE AT FRONT DOOR
29B.10 WINDOW NEEDS TO BE SEALED
29B.11 DESK NEEDS TO BE CAULKED
30AB.00 UNITS 30A AND 30B
30B.01 BATHROOM THRESHOLD DOOR #6 NEEDS TO BE SEALED
30B.02 FRONT DOOR #1 THRESHOLD NEEDS TO BE SEALED
30B.03 WINDOW MOLDING OUT
308.04 DESK NEEDS TO BE CAULKED
308.05 FLOOR NOT FINISHED IN CLOSET
30B.06 BOTH BED LIGHTS MISSING
30A8.07 DOOR JAMB #7 NEEDS TO BE PAINTED
30AB.08 JUNCTION BOX EXPOSED IN CEILING
30AB.09 TOILET DOOR #7 MISSING DOOR STOP
F &F
FRAGA AND FEITO / architects - planners
30AB.1O HOLE IN WALL NEXT TO DOOR JAMB TO 30B
3OAB.11 TOILET ROOM LIGHT FIXTURE NEEDS TO BE CAULKED
30A.12 BATHROOM THRESHOLD NEEDS TO BE SEALED
30A.13 BOTH BED LIGHTS MISSING
30A.14 WINDOW WEATHERSTRIPPING OUT
30A.15 DENTS IN FRONT DOOR #1
FRAGA AND FEITO / architects - planners
0004 Z
to
11 11111P , s16111111111•11
i rp— —1
131 ro ril 1 1 I 1
o 1
t. ::.1 ti._ act471.:)
r-0•10 1 t.1.4p4Eft 4 1 / — -
"IA usA 1
rirt ---t-ti
r
ocAP' C1.44-
rl '70 fir
s
MS.e dT� 3 ":
841
..Sept /1/87.2
4 �a o`�ti: Y .,
PROJECT
West Hall Phase . I .
LOCATION •
Miami Shores, Fl.
CONTRACTOR •
LMCC
OWNER
Barry University
WEATHER
CL
TEMP. ° at
°at
AM
PM
PRESENT AT SITE
J.A. RODRIGUEZ, AIA
TO
L. MILTON CONST.CORP.
A. PEREZ
THE FOLLOWING WAS NOTED
01.00 General
01.01 FIre Line Excavation, Installation & Backfill operations related to 12" Dip in
process: Fire line installed & covered up to grounds bldg./ Elbow at tel.feeds at
property line uncovered w /(1) 45° elbow missing /stub out for meter in place, water
meter not installed.
01.02 Trees in place: some along South side not in exact location, especially towards east
end. Some Mahoganies not in place correctly, Royal Palms out of triangulation as per
plan. Some relocations due to FPL easement.
01.03 50% of Railings in place
01.04 Exterior painting complete w/ exception of touch - up;could not determine if second
coat completed.
01.05 Sealant in place at window units
21.06 Ext. doors do not have closure plates @ top & bottom as per specs & section 08100 and
approved fire door submittal 08100.3 PG 6.
01.07 Check thersholds @ typ. unit "B" against approved submittal for hardware Div.8
Requires sweep strip none evident. Perimeter weatherstripping @ head & jamb conditions
not in place; silencers missing see hardware submittal 08700.25
01.08 Touch up paint on most interiors of units incomplete.
COPIES TO T.Czerniec, J.Rillmeyer
F..Lubien
FORM 241-2 Available from �� Inc. Groton. Mail. 01450
HE FOLLOWING WAS NOTED
01.09 Top shelf unit, vertical closure edge not finished
01.10 Unit #'s missing see drwgs & div. 10440
01.11 No pull string visible @ J. Box for tel & CCTV.
01.12 Closers at exterior doors require adjustment; not closing
01.13 Clean V.C.T. floors, vinyl base in place
01.14 LT. FIXT. not installed at students desk
imcomplete.
=OPIES TO
ORM 241.3 Ma.$5* hoot ;VWAT NC. Gram% was 01150
01.15 Cove LT. not installed at vanity
01.16 Smoke detectors not installed, emergency_ etc. fire horns fire stations in place-
see elect. report to follow.
01.17 Bathroom ceilings to be installed.
01.18 Closet folding doors not installed
01.19 Clothes shelf & rod missing at closets
01.20 Vinyl bases loose at entry door condition at return.
01.21 Door hardware in place (locking devices) first floor only. Other hardware
components missing
01.22 VCT installation in progress second floor. -
01.23 Storage 33, fire rated shaft assembly at exhaust pipes not installed see plans
01.24 CCTV stub out pipes terminated second floor to ground floor electrical room
01.25 Exhaust louvers at south & west elevators not installed see section 10200
TIDE
L
REP
CEllr
SJGNED
A,
LOCATION
•
CONTRACTOR •
OWNER
.,
WEATHER
T E MP •
o at
° at
,
AM
PM
PRESENT AT SITE
J.A. RODRIGUEZ
•
HE FOLLOWING WAS NOTED
01.09 Top shelf unit, vertical closure edge not finished
01.10 Unit #'s missing see drwgs & div. 10440
01.11 No pull string visible @ J. Box for tel & CCTV.
01.12 Closers at exterior doors require adjustment; not closing
01.13 Clean V.C.T. floors, vinyl base in place
01.14 LT. FIXT. not installed at students desk
imcomplete.
=OPIES TO
ORM 241.3 Ma.$5* hoot ;VWAT NC. Gram% was 01150
01.15 Cove LT. not installed at vanity
01.16 Smoke detectors not installed, emergency_ etc. fire horns fire stations in place-
see elect. report to follow.
01.17 Bathroom ceilings to be installed.
01.18 Closet folding doors not installed
01.19 Clothes shelf & rod missing at closets
01.20 Vinyl bases loose at entry door condition at return.
01.21 Door hardware in place (locking devices) first floor only. Other hardware
components missing
01.22 VCT installation in progress second floor. -
01.23 Storage 33, fire rated shaft assembly at exhaust pipes not installed see plans
01.24 CCTV stub out pipes terminated second floor to ground floor electrical room
01.25 Exhaust louvers at south & west elevators not installed see section 10200
TIDE
L
REP
CEllr
SJGNED
HE FOLLOWING WAS NOTED
02.00 Unit IA /IB
02.01 Align dresser overhead cab.
02.02 Students desk not installed on 1B
03.00 Unit 2A /2B
03.01 Bathroom w/c door jambed
03.02 Door jamb to 2A w /silencers, 2B w /out
03.03 Student desk missing on 2B
04.00 Laundry
04.01 IIM Frame installed, glazing incomplete; installatio r e l nrata� as p arrh_ingt,
04.02 Painting not done
05.00 Unit 13
05.01 Kitchen LT. fixt. at bath & Closet missing
05.02 Bifold door @ a/c not installed
06.00 Unit 4A /4B
06.01 Entrance door to 4B sticks @ head, PNT is scraped with door rusting.
07.00 Other units not inspected
As typical notes & above notation apply.
;OPIES TO
LD
REPO
RT
tOCATIOK
CONTRACTOR
OWNER
WEATHER
MAP.
° at
° at
AM
PM
PRESENT AT SITE
HE FOLLOWING WAS NOTED
02.00 Unit IA /IB
02.01 Align dresser overhead cab.
02.02 Students desk not installed on 1B
03.00 Unit 2A /2B
03.01 Bathroom w/c door jambed
03.02 Door jamb to 2A w /silencers, 2B w /out
03.03 Student desk missing on 2B
04.00 Laundry
04.01 IIM Frame installed, glazing incomplete; installatio r e l nrata� as p arrh_ingt,
04.02 Painting not done
05.00 Unit 13
05.01 Kitchen LT. fixt. at bath & Closet missing
05.02 Bifold door @ a/c not installed
06.00 Unit 4A /4B
06.01 Entrance door to 4B sticks @ head, PNT is scraped with door rusting.
07.00 Other units not inspected
As typical notes & above notation apply.
;OPIES TO
LD
REPO
RT
FRAGA AND FEITO / architects • ' !antlers
TO
3663 SW 8th Street Suite 200
MIAMI, FLORIDA 33135
Phone 444 -6248
L. MILTON CONSTRUCTION
ATTN.: ARMANDO PEREZ
HE FOLLOWING 1:.S N TL:
1.0 NOTIFIED CONSTRUCTION PERSONNEL DRYWALL STUD WORK AT LIVING AREA FOR ALL UNITS
WAS INCORRECT AS INSTALLED AT GROUND FLOOR. STUDS AT BACK OF PARTITION SEPARATING
SLEEPING AREA FROM LIVING AREA WAS EXTENDED TO UNDERSIDE OF SLAB. AS INDICATED ON
SECTION #3/A4 AND ELEVATION #9/A4, TOP OF SHELF UNIT IS 6' -0" ABOVE FINISH FLOOR.
SEE DETAILS 1/A5 AND #3/A5 FOR FRAMING DETAILS. NOTIFIED ARMANDO PEREZ SAME DATE
OF PROBLEMS ENCOUNTERED. WORK MUST BE CORRECTED TO CONDITION AS INDICATED ON
CONTRACT DOCUMENTS.
2.0 STUD PARTITION CONTRACTOR WAS IN PROCESS OF INSTALLING A HEAD CHANNEL IN FORNT
OF STUDENT DESK MISTAKENLY ASSUMING LOCATION WAS INTENDED FOR FOLDING PARTITIONS.
INSTRUCTIONS WERE ISSUED AT JOB SITE WORK WAS INCORRECT AS IT WAS LAID OUT.
3.0 OWNER REPORTS CONDUIT SERVING PERIMETER PARKING LIGHTS AT CLASSROOM BUILDING WERE
SEVERED BY PAVING CONTRACTOR. SAID ELECTRICAL FEED MUST BE PROMPTLY RESTORED AS
IT APPEARS CUT HAS DISCONNECTED THE ENTIRE NORTHEAST CORNER OF THE CAMPUS'
PARKING LIGHTS. THE CONTRACTOR'S PROMPT RESPONSE TO THIS ITEM IS REQUESTED.
4.0. WORK PROGRESSING ON INTERIOR LAYOUT OF GROUND FLOOR: METAL STUD PARTITIONS IN PLACE
(SUBJECT TO CORRECTION OF ITEMS 01 AND 02); A/C UNITS INSTALLED, CHILLER LINES UP
TO UNIT (NOT CONNECTED); CONDENSATE LINES IN:PLACE (NOT CONNECTED TO UNITS) ; DUCTWORK
__._ • NOT IN PLACE; EXTERIOR METAL INSTALLED GROUND FLOOR, APPROX. 50% ON SECOND
FLOQR.._;_WQQD TRUSSES HAVE NOT ARRIVED, NO OTHER PROGRESS ON SECOND FLOOR DUE TO
APPARENT DELAY IN DELIVERY OF SAME. CLASSROOM BUILDING REPORT: FILL AND COMPACTION
COMPLETEDL MASONRY UP TO UNDERSIDE OF PERIMETER TIE BEAM
COPIES TO T. CZERNIEC; C. CURRIER 8 ASSOC.
F. LUBIEN
I'_w1 7B••i AV.l'.p:! • ••P 1t 0 • • ^K. ;pr Mev. C'4 ,
DATE
JULY 16, 1987
.10/ r w y . 'P 3T- ^el
8616. co': -' ,'-
PROJECT - . ..: •
WEST HALL PHASE 1 •
LOCATION
MIAMI SHORES, FL.
CONTRACTOR
LMCC
OWNER
BARRY UNIVERSITY •
WEATHER
CLDY.
TEMP. 0 e
o
AM
PM
PRESENT AT SITE
J. A. RODRIGUEZ, AIA
J. KILLMEYER
FRAGA AND FEITO / architects • ' !antlers
TO
3663 SW 8th Street Suite 200
MIAMI, FLORIDA 33135
Phone 444 -6248
L. MILTON CONSTRUCTION
ATTN.: ARMANDO PEREZ
HE FOLLOWING 1:.S N TL:
1.0 NOTIFIED CONSTRUCTION PERSONNEL DRYWALL STUD WORK AT LIVING AREA FOR ALL UNITS
WAS INCORRECT AS INSTALLED AT GROUND FLOOR. STUDS AT BACK OF PARTITION SEPARATING
SLEEPING AREA FROM LIVING AREA WAS EXTENDED TO UNDERSIDE OF SLAB. AS INDICATED ON
SECTION #3/A4 AND ELEVATION #9/A4, TOP OF SHELF UNIT IS 6' -0" ABOVE FINISH FLOOR.
SEE DETAILS 1/A5 AND #3/A5 FOR FRAMING DETAILS. NOTIFIED ARMANDO PEREZ SAME DATE
OF PROBLEMS ENCOUNTERED. WORK MUST BE CORRECTED TO CONDITION AS INDICATED ON
CONTRACT DOCUMENTS.
2.0 STUD PARTITION CONTRACTOR WAS IN PROCESS OF INSTALLING A HEAD CHANNEL IN FORNT
OF STUDENT DESK MISTAKENLY ASSUMING LOCATION WAS INTENDED FOR FOLDING PARTITIONS.
INSTRUCTIONS WERE ISSUED AT JOB SITE WORK WAS INCORRECT AS IT WAS LAID OUT.
3.0 OWNER REPORTS CONDUIT SERVING PERIMETER PARKING LIGHTS AT CLASSROOM BUILDING WERE
SEVERED BY PAVING CONTRACTOR. SAID ELECTRICAL FEED MUST BE PROMPTLY RESTORED AS
IT APPEARS CUT HAS DISCONNECTED THE ENTIRE NORTHEAST CORNER OF THE CAMPUS'
PARKING LIGHTS. THE CONTRACTOR'S PROMPT RESPONSE TO THIS ITEM IS REQUESTED.
4.0. WORK PROGRESSING ON INTERIOR LAYOUT OF GROUND FLOOR: METAL STUD PARTITIONS IN PLACE
(SUBJECT TO CORRECTION OF ITEMS 01 AND 02); A/C UNITS INSTALLED, CHILLER LINES UP
TO UNIT (NOT CONNECTED); CONDENSATE LINES IN:PLACE (NOT CONNECTED TO UNITS) ; DUCTWORK
__._ • NOT IN PLACE; EXTERIOR METAL INSTALLED GROUND FLOOR, APPROX. 50% ON SECOND
FLOQR.._;_WQQD TRUSSES HAVE NOT ARRIVED, NO OTHER PROGRESS ON SECOND FLOOR DUE TO
APPARENT DELAY IN DELIVERY OF SAME. CLASSROOM BUILDING REPORT: FILL AND COMPACTION
COMPLETEDL MASONRY UP TO UNDERSIDE OF PERIMETER TIE BEAM
COPIES TO T. CZERNIEC; C. CURRIER 8 ASSOC.
F. LUBIEN
I'_w1 7B••i AV.l'.p:! • ••P 1t 0 • • ^K. ;pr Mev. C'4 ,
- 6W o.dO 5 i. !; *
DATE
JULY 16, 194111
JOQi
8630.00
PROJECT -
WEST HALL PHASE I
LOCATION
MIAMI SHORES, FL.
CONTRACTOR •
LMCC
OWNER
BARRY UNIVERSITY
'
WEATHER
CLDY.
TEMP. Oat
oatl :
AM
PM
PRESENT AT SITE
J. A. RODRIGUEZ, AIA
•
J. KILLMEYER
F. LUBIEN
SIGNED
�e.
TO
(pap FRAGA AND FEITO / architects - tanners
; CRtM 24t -2
3663 SW 8th Street Suite 200
MIAMI, FLORIDA 33135
Phone 444 -6248
L. MILTON CONSTRUCTION
ATTN.: ARMANDO PEREZ
1.0 NOTIFIED CONSTRUCTION PERSONNEL DRYWALL STUD WORK AT LIVING AREA FOR ALL UNITS
WAS INCORRECT AS INSTALLED AT GROUND FLOOR. STUDS AT BACK OF PARTITION SEPARATING
SLEEPING AREA FROM LIVING AREA WAS EXTENDED TO UNDERSIDE OF SLAB. AS INDICATED ON
SECTION #3/A4 AND ELEVATION #9/A4, TOP OF SHELF UNIT IS 6' -0" ABOVE FINISH FLOOR.
SEE DETAILS 1/A5 AND #3/A5 FOR FRAMING DETAILS. NOTIFIED ARMANDO PEREZ SAME DATE
OF PROBLEMS ENCOUNTERED. WORK MUST BE CORRECTED TO CONDITION AS INDICATED ON
CONTRACT DOCUMENTS.
2.0 STUD PARTITION CONTRACTOR WAS IN PROCESS OF !INSTALLING A HEAD CHANNEL IN FORNT
OF STUDENT DESK MISTAKENLY ASSUMING LOCATION WAS INTENDED FOR FOLDING PARTITIONS.
INSTRUCTIONS WERE ISSUED AT JOB SITE WORK WAS INCORRECT AS IT WAS LAID OUT.
3.0 OWNER REPORTS CONDUIT SERVING PERIMETER PARKING LIGHTS AT CLASSROOM BUILDING WERE
SEVERED BY PAVING CONTRACTOR. SAID ELECTRICAL FEED MUST BE PROMPTLY RESTORED AS
IT APPEARS CUT HAS DISCONNECTED THE ENTIRE NORTHEAST CORNER OF THE CAMPUS'
PARKING LIGHTS. THE CONTRACTOR'S PROMPT RESPONSE TO THIS ITEM IS REQUESTED.
4.0 WORK PROGRESSING ON INTERIOR LAYOUT OF GROUND FLOOR: METAL STUD PARTITIONS IN PLACE
(SUBJECT TO CORRECTION OF ITEMS 01 AND 02); A/C UNITS INSTALLED, CHILLER LINES UP
__ ^ - -.- TO UNIT .,(NOT CONNECTED); CONDENSATE LINES IN:PLACE (NOT CONNECTED TO UNITS) ; DUCTWORK
NOT _.INPLACE; EXTERIOR METAL FRAMES INSTALLED GROUND FLOOR, APPROX. 50% ON SECOND
FLOOR.1_WOOD TRUSSES HAVE NOT ARRIVED- NO OTHER PROGRESS ON SECOND FLOOR DUE TO
APPARENT DELAY IN DELIVERY OF SAME. CLASSROOM BUILDING REPORT: FILL AND COMPACTION
COMPLETED• MASONRY UP TO UNDERSIDE OF PERIMETER TIE BEAM
COPIES TO T. CZERNIEC; C. CURRIER & ASSOC.
1
DATE I JOB NO. .
June 18, . .. ! 8630.00
?RCJECT
WEST HALL / PHASE I
:.3C.A
Miami Shores, Florida
'4.4 f •7AcT :R i :4JNER
LMCC 'BARRY UNIVERSITY
Clear - :: 12:30
=1
FRAGA AND FEITO / architects - •fanners
3663 SW 8th Street Suite 200
MIAMI, FLORIDA 33135
Phone 444.6248
L. MILTON CONSTRUCTION CORP.
Att.: A. Perez
Report on job site visit of June 12, 1987
1.0 Masonry wall reinforcement as indicated on Drawing S7, General Note #6, missing
on all ground floor walls. Contractor was instructed to provide and install
on all stucco surface openings and /or corners fiber mesh stucco reinforcement
a minimum of 8 inches from the edge or corner and /or opening wrapping same on
both sides of corner. At Contractor's option, entire wall may be covered with
mesh to avoid labor in cutting desired strips. Structural Engineer of Record
assures this deletion will not represent a structural problem. However, the
deletion will invariably result in unacceptable cracking of stucco surfaces.
Contractor is advised to make sure specified reinforcement is installed in
accordance with Contract Documents on the second floor.
2.0 On the North Stair wall, east stair, first vertical rebar on the lowest section
was missing. Contractor instructed to provide same in accordance with
plans. Other locations found acceptable.
/ / / / //L A S T ITEM T H I S R E P O R T/////////// / / / / / / / / / / / / / / / / / / / / / / / / / / / / ///
T. Czerniec /BU; G. Santiago /S &A
COPIES TO F. Lubien /Miami Shores
By: J. A. Rodriguez, AIA
24'14 hv zOble fro /4'4
con Mass. 01450
J. A. Rodriguez, AIA
SIGNED
Tr
ir
FRAGA AND FEITO / architects - • tanners
3663 SW 8th Street Suite 200
MIAMI, FLORIDA 33135
Phone 444 -6248
L. MILTON CONSTRUCTION CORP.
Attn.: A. Perez
June 09, As 8630.00
o
1 WEST HALL PHASE I
Miami Shores, Florida
4
i LMCC 'BARRY UNIVERSITY
i AM
i Clear 89 -- 3:30 p
x
J. A. Rodriguez, AIA
R
i Andres Gonzalez / LMCC
Construction fence in place from Exist. Pump Station to Tennis Court; West & South still to be
enclosed; Contractor notified of contract requirements on this point.
*Fill complete; Site Drainage installation complete; Catch basins in place.
*Masonry walls up to underside of tie beam location for first floor; steel reinforcement for
perimeter beam at job site; in process of installation.
*Steel columns at job site; not installed.
*Contractor informed us work on structure began 26 May, 1987, upon completion and acceptance
of field compaction.
*Noted some minor misalignment on masonry work at north wall.
*Contractor informed us plumbing rough -in had passed mechanical inspection by Miami Shores.
*Architect to update plans and forward three copies to field regarding relocated smoke
detector locations as per permit drawings approved by County and Village.
*Structural Engineer's Report to follow under separate cover
/ / /// LAS T ITEM T H I S R E P O R T////////////////// / / / / / / / / / / / / / / / / / / / / / / / / / / / / ///
T. Czerniec /BU; F. Lubien /Miami Shores
File 8630.00.51
By: J.A. Rodriguez, AIA
DATE
ff
JOB NO.
r7--106 -
PROJECT
QV U. aess1z404 4 swak
LOCAflON
CONTRACTOR
1.0 • M ( MO at677
OWNER
aZinM 0 I
TEMP
° at AM
ft ° at 44 02 iVI
WEATHER
0.60X-
PRESENT AT SITE
fixis_6zarmgm____
......... _ _
TO
Ade
SANTIAGO & ASSOATES,
ENGINEERS, INC.
6850 Coral Way, Suite 300
MIAMI, FL. 33155
(305) 662-5740
THE FOLLOWING WAS NOTED:
6 wewev tw2A.3 c wi £c raYraxos
krt74 4ax0,
Cetu7mcrept
kA Fkwha izmunfiwea ritton__swoR aeOfizelres 7MT
_ &FA) azweaven_ 0( 002,08 4-creet4(1 7 _AfireitreP
_11466744 /A) AtotLic- 12AiAllitagg TAW 12F62111/14f0i Ak Mixis roc.°
Dio5G6 cmce,_ ea. (0.0 4-mictircremot jipoicis
_ _gag Loortiew) ,7--&-Iiibaur-extioir6 di= 4zeup )4-/kraze2'1u./ 41-c
N_tot4- - 77P-( Zb izritoo) - 200tut) 73 huspcur tofrer /5 /477 ReerY
VrFri
70c..ox1J7p _koz
TO
SANTIAGO & ASSOATES,
ENGINEERS, INC.
6850 Coral Way, Suite 300
MIAMI. FL 33155
191-Acoaer
(305) 662-5740
THE FOLLOWING WAS NOTED:
_
1th 07//cretz- Rect5P7gis kryterro
COPIES TO ___OATMCZat-
DATE JOB NO.
pROJECT
/f7 87—Afx
'We( a Clidogewi reoeuas
CONTRACTOR
L. Miw) &AT.
WEATHER
PRESENT AT SITE
so& auzeurz-
-7-Au7 "lbw 5oPPot7 77zot --t7dIf_71)12___73575L__ALTfie-
_ 77a0-7701 tr 7t) pis ut6 7th5e7' /2e)90* AQ /t-
- air W4 7-01.4 To pourif TN& loceroA) grartieet-
Mst4
OWNER
ziratiif a
TEMP. ° at /0
14- °at
-4130
TM EPeTk,`,.'
inr4161-f
SIGNED —
TO
..,.
f ° ` SANTIAGO & ASSc, TES,
F
ENGINEERS, �rh..
6850 Coral Way, Suite 300
MIAMI, FL 33155
(305) 662 -5740
THE FOLLOWING WAS NOTED:
1)0__0774:tif2. 6 tt 046 P071
DATE d'As/a 7
PROJECT
CONTRACTOR
PRESENT AT SITE
lJ� • (15MS GW
w 0 . Gtissgrten v�
LOCATION
L. MLL OL)
WEATHER eti TIM
JOB NO
r) -tae.
OWNER
bitsit.pf v,
TEMP. at
� ° at
CWI"et6A -_ Tac0.. - / D° d't x 4N- o "6i77Df4 i 6 -_ _57 4--
spud /NOT aver A- Cd t uM O Cg- Coal? 41/0
A M
I'
TO
SANTIAGO & ASSC 4 0 TES,
ENGINEERS, Wu.
6850 Coral Way, Suite 300
MIAMI, FL 33155
(305) 662-5740
IR 1 Ne Pr
THE FOLLOWING WAS NOTED:
- CeirarD juTspoli, 6120 04 FLOILS_LAse TVA 111511et_3_01_414
CaErLACtell■ ati5 to A90 rwo ofor g __.5ferraws_or_NIDIAM__
A
axe .,
- !JO_ _arkett- ece-8777NS /MEV.
DATE " L JOE
paw cc, tY I Siff NO. n - 106
L
LA
LOVALtrasaat-Msatuo:
CONTRACTOR
L4 PAM
WEATHER
COWL
PRESENT AT SITE
R i g10
OWNER
13w a
TEMP. a at AM
eat4:15
TO
SANTIAGO & ASSO,TES,
ENGINEERS, INC.
6850 Coral Way, Suite 300
MINA FL 33155
THE FOLLOWING WAS NOTED
viii 80-ot Film sizr_ akas entriL,
Cun No1 ridov 7"o
_Gastle. re*G-ritme- To
--7 Sc S& a/a-gal-Y
_ P kr cam- srey Av5- Ivbr 4 sr-OT aht-
Secnxis ao LLD 7b Iwimr 07DP Aegs
• lusix APARrocArr omo$g 5'1i25 TIegatf.
5oFigeigoo 7.us/aT
taa_ -- ltN01 2 410 s'er• hof 4 (4x
e9F5t.ek/
PcidEPPOvS 1 to7
COPIES TO - -
Aita0 03
IMMO
Ate.
PRESENT AT SITE
TEMP.
1
PRESENT AT SITE
• . „
; 2 JOB NO.
48 7 10 C
cW
la OPIO 0465 rkal4 re/SO
ffo &C
CONTRACTOR
NitAU( tg
WEATHER
eteri
--12fr-dUga—`a) coScAm 5eatio FidDx- 5c4)
C 102 gebtr 5UL- PDT CCM F46 td6 biza- Reit-nal fit) 2iGots2,
OWNER
1 317111 r
° at ipda,
qt. Oat
TEMP.
PM
N.1,....-",
DATE
6/zahp 1
JOH NO.
7-IO(o
. I
1
PROJECT
LOCATION
CONTRACTOR
I- i Mitzni) anr;
OWNER
a
WEATHER
41254247
TEMP.
- *
° at
° at
AM
PRESENT AT SITE
- P...efri 06
1
1
TO
(305) 662-5740
1 a+zr-th NarretTs
THE FOLLOWING WAS NOTED
----- accracpbfi 5 pal 1 5 0 ,
Azi'Llez cep33 Speg-7799 Pia-4c* Sp/2g e ItAx2741_
_ 00112_, .ivr-t5 2 ro 3 1 6/6 vaz KL HtE ,55ratf5 _VttF_Morz._
6 ?Er5 7 779.45-7 vzytu7 aock67 15- Feae-m,f5x)
Thar-6 s •73 RzargYT vDbor
COPIES TO
_J126 fivagetto__7241%_cid _
v_ oar_ 1:26.0FEezelk
gpapap.....100.
'/AiP
SIGNED
at17145 7n1M144114,E
DATE
/7/37
JOB NO.
X7-10,6
oxen
;
Pao EcT
0- Caspottsi,
LOCATION
TRACTO
., /y1 1LTt o Caus7%
OWNER
� y C,UJi
WEATHER
0V Ufr7
TEM. O at pJ t 'Ay, .
u
° at '-,-
PRESENT AT SITE
a
1
TO
. SANTIAGO & ASSTES,
ENGINEERS, INC.
6850 Coral Way, Suite 300
MIAMI, FL 33155
(305) 662-5740
'Polar* #Ferto_Aativrerts
THE FOLLOWING WAS NOTED:
oOL- 45 ucfrutor Th -7 - o &' - &a i o
aP gm & O ,esJics 11/4) ODIC- P/�6 - 0ss
matt__ std - /F m7,7) 9ovE 7'r t-'
/0a z'v - pcc'llzus ,O 2
SANTIAGO & ASS( 'TES,
, ENGINEERS, 6,
6850 Coral Way, Suite 300
MIAMI, FL 33155
(305) 662-5740
TO
THE FOLLOWING WAS NOTED
enzto
(12n teropi_RALCIge
- Sois v 3)Hs cam Airssiao T735 776 unt_ 771-6 OpEos,
_____cavnurstAt _cos row To 400 77J04
6g2v7EP Crste-5 P/29 Nor MAC- aseiu 0073 frribto
- - - - rim= or to% 0.) riier 7 £c/_g7 t _W/U-ao
TA5 4/P7 iebt0A)
)7.257i'7tk 764102444) 1211_ ALSPecrgi
c;IGNF.n
- SANTIAGO & ASSL;ATES,
ENGINEERS, INC.
6850 Coral Way, Suite 300
' MIAMI, FL. 33155
TO
THE FOLLOWING WAS NOTED:
_
_40014- 11.45_ 4040_770_ _ /4_04c-5 __h3b_e_._F_t.caa___
Mkr-5 23150-46s/ex. dG7 zete- 01,670hoo,5 _Wry_er1-0
- -1 2 - 454 ablz-e-of& au-rim UDQ5 Ukr- jilt azioa tem -ro ft LL Suacr._
_CPU, Uwe- PePeessitios
_ 1 /Loci agilikaML. - a) .top cayusm mis
'PP 07146%.- `iculsPrimus Perrepi
-
LX/N@ ( 121 - - -
PRESENT AT SITE
IIQIE
SIGNED
1 v
DATE fif ,
lit 4
JOB HO. . .,.' ,.
3 7 . 1 °6 '
*taw
OJECT
0 I CiAsSgoowt
Lett.'
CONTRACTOR
1,.. lAttloo CatiV."
OWN R
U.
WEATHER
MIA ir,
TEMP. ° at AM
86 ° at (fl 0 a&
PRESENT AT SITE
6 4414 S
THE FOLLOWING WAS NOTED
_Abscearg___sivrewaoc__suzos Porto wo, (El:mos
7_1 Titaalis9 taps _ S_TTLC. 1- To D5 padeco
1
90--kr 413 RIM/J(0_ 1i- 1=o tveus _FM toatc- A /A) 7B6- 517a
_ _ fArr toit kor yer /4) Pone.
0771671. ilarraPpos i toTrze
'JO 2 Pin
JOB NO
PROJECT
Votallg 0 Citscerubm Afrw)
LOCATION
CONTRACTOR
L ,mtubcaf.sT.
13euv.( U ,
TEMP ° at Cr; a
alio ° at PM
WEATHER
atrot,
PRESENT AT SITE
&M
1
1
•
1 mi._
.0. SANTIAGO & ASSOosnThS,
,I
"A ENGINEERS, INC.
6850 Coral Way, Suite 300
4 P MIAMI, FL 33155
TO
THE FOLLOWING WAS NOTED
7grturs0 73aRs_Vtg
e "Ltigettc avtla- LAtagt thivOixi_Cl WAD Tee arraitA 'greet- Teo titO .
Mac WILL kl) O. . 2#5 9,07TOM I l e /aSOVO 5rrerom or_Sesionl
C169-1- r4 Vrre
_ _13_etirrIC ARA214 tWT17 M07" 96 efba&P k 77413 704E._
aziristeom
(305) 662-5740
F6trt Atrairreras
WINGERTIR LABORATORIES, INC.
Laboratory and Inspection Service
1820 NE 144th Street
North Miami, FL 33181
REVISED REPORT: Corrected order # as of
8 -29 -98 (Formerly order #15280.10 (557)
Required Strength: 3000 Psi in 28
TRUCK TICKET INFORMATION
Conc. supplier:
Ticket No.:
Mix Codes
Plant:
Time Batched:
Code Strength:
Truck No.:
Batch Sires
Central
N 00490
NF
Opa Locka
9:13 Air
3000 PSI
75
10 CY
Lab Sample Cyl.
No. No. Dia.
35808 6 6.0 28.27 26.8
35809 7 6.0 28.27 26.5
35810 8
35811 9
35812 10
REMARKS:
All field and laboratory tests and sample curing performed In accordance with
applicable ASTM test methods. Average of 28 day strengths complies with required
and /or mix code strength unless denoted with an asterisk. Cylinders are 6" x 12",
unless otherwise Indicated.
COPIES ISSUSED TO:
1 - L. Milton Construction
2 - F & F Architect
1 - Miami Shores Building & Zoing
2 - Invoice
COMPRESSIVE STRENGTH OF CONCRETE TEST CYLINDERS 8 -20 -87 sc
8 -21 -87 sc
CLIENT: L. Milton Construction REPORT NO.: 2 A
CONTRACTOR: L. Milton Construction ORDER NO.: 15280.12 (537)
PROJECT: Barry University - West Hall I BUILDING
PERMIT NO.:
PROJECT LOCATION: N.E. 111th St. & North Miami Ave.. Miami Shores. Fl
INFORMATION FURNISHED BY CLIENT:
days per A. Gonzales Pour Location:
FIELD TEST AND DATA
Technician: R. Gates
Field Mark: RG 37
Time Sampled: 10:25
Batch Time: 1 Hour 12 mins
Slump: 5.00"
Air, Percents -
Conc. Temp.: -
Air Temp.: -
LABORATORY TEST DATA
Area Weight Date Date
(So.In.) ( Lbs) Made Tested
8 -14 -87 8 -18 -87
8 -14 -87 8 -21 -87
Classroom building ground floor SW room -cent
Unit Weight:
Yield:
Cubic Yd. Sampled:
No. Cyls. Made:
Weather:
Water Added:
Age /Type of
(Days) Break
4
7
elix A, he:q
C
C
#A =Cone
B =Cone & Split
C =Cone & Shear
D =Shear
E= columnar
3
5 - —
Cloudy
Total Compressive
Load (P) . Strength(PSI)
88,000 3,113
92,000 3,254
Respectfully submitted,
WINGERTER _ ABORATO
r
5, INC.
ro- Guerrero, .
Florida Reg,i : ration No.34473
The original of this report was signed and sealed by the above registered engineer in accordance with Rule2lH- 18.11,Ch. 471,FL.Statute.
As a mutual protection to clients, the public and ourselves, all reports are submitted as the conficleraial property of clients, and
authorization for publication of statements, conclusions or extracts from or regarding our reports is reserved pending our written
annrnvaI. \ \ �
ix
RNGHO
46 WINGERTER L BOR ORI d► ,1 C.
Laboratory and Inspection Service
1820 NE 144th Street
North Miami, FL 33181
REVISED REPORT: Corrected order # as of
8 -28 -87 (formerly order #15280.10 (537)
Required Strength: 3000 Psi In 28
TRUCK TICKET RIFORMATION
Conc. suppliers
Ticket No.:
Mix Code:
Plant:
Time Batched:
Code Strength:
Truck No.:
Batch Size:
Lab
s . �
35803
35804
35805
35806
35807
Central
C -10402
NF
South Miami
6:59 AM
3000 PSI
82
10 CY
Sample Cyl. Area
No. Dia. (Sq. In.)
1 6.0" 28.27
2 6.0" 28.27
3
4
5
COPIES ISSUSED TO:
1 - L. Milton Construction
2 - F b F Architect
1 - Miami Shores Building & Zoing
2 - Invoice
COMPR
CLIENT: L. Milton Construction REPORT NO.: 1 A
CONTRACTOR: L. Milton Construction ORDER NO.s 15280.12, , (537)
PROJECT: Barry University - West Hall I BUILDING
PERMIT NO.:
PROJECT LOCATION: N.E. 111th St. & North Miami Ave.. Miami Shores_ Fl
INFORMATION FURNISHED BY CLIENT:
days per Andras Gonzales Pour Locations Classroom building ground floor
room 04- center of room
FIELD TEST AND DATA
Technician:
Field Mark:
Time Sampled:
Batch Time:
Slumps
Air, Percent:
Conc. Temp.:
Air Temp.:
R. Gates
RG 36
8:10 AM
1 Hour 11 mins
6.25"
CONCR
LABORATORY TEST DATA
Weight Date Date
(Lbs_ M ade Tested
26.8 8 -14 -87 8 -18 -87
26.9 8 -14 -87 8 -21 -87
REMARKS: NOTE EXCESSIVE SLUMP
All field and laboratory tests and sample curing performed in accordance with
applicable ASTM test methods. Average of 28 day strengths complies with required
and/or mix code strength unless denoted with an asterisk. Cylinders are 6" x 12",
unless otherwise Indicated.
Unit Weight:
Yield:
Cubic Yd. Sampled:
No. Cyls. Mader
Weather:
Water Added:
Age 'Type of
(Days) , Break
4 C
7 C
D 8 -20 -87 sc 8 -21 -87 sc
DA -Cone
B =Cone & Split
C =Cone & Shear
D=Shear
= Columnar
Respectfully sub fitted,
WINGERTEI& aRRAT
e ,
8
5 —
Cloudy
2 gals
after test
Total Compressive
Load (P) Strength(PSI)
71,000 2,511
76,000 2,688
INC.
elix A. l'egi _ ro- Guerrero. .
Florida Reg' ration No.34473
The original of this report was signed and sealed by the above registered engineer in accordance with Ru1e21H- 1S.11,Ch. 471,FL.Statute.
As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and
authorization for publication of statements, conclusions or extracts from or regarding our reports is reserved pending our written
WINGERTTR LABORATORI'. ,1 C.
Laboratory and Inspection Service
1820 NE 144th Street
North Miami, FL 33181
Required Strength: 3000 Psi in 28
TRUCK TICKET INFORMATION
Conc. supplier:
Ticket No.:
Mix Code:
Plant:
Time Batched:
Code Strengths
Truck No.:
Batch Slze:
Central
N 00490
NF
Opa Locka
9:13 APB
3000 PSI
75
10 CY
Lab Sample Cyl.
No. No. Dia.
35808 6 6.0
35809 7 6.0
35810 8
35811 9
35812 10
REMARKS:
All field and laboratory tests and sample curing performed in accordance with
applicable ASTM test methods. Average of 28 day strengths complies with required
and /or mix code strength unless denoted with an asterisk. Cylinders are 6" x 12",
unless otherwise Indicated.
COPIES ISSUSED TO:
1 - L. Milton Construction
2 - F & F Architect
1 - Miami Shores Building & Zoing
2 - Invoice
Area
(Sq. In.)
28.27
28.27
COMPRESSIVE STRENGTH OF CONCRETE TEST CYLINDERS 8 -20 -87 sc
8- 212 A
sc
CLIENT: L. Milton Construction REPORT NO.:
CONTRACTOR: L. Milton Construction ORDER NMI 15280.10 (537)
PROJECT: Barry University - West Hall I BUILDING
PERMIT NO.:
PROJECT LOCATION: N.E. 111th St. & North Miami Ave.. Miami Shnrps. FI
INFORMATION FURNISHED BY CLIENT:
days per A. Gonzales Pour Location: Classroom building ground floor SW room - cent
FIELD TEST AND DATA
Technician: R. Gates
Field Mark: RG 37
Time Sampled: 10:25
Batch Time: 1 Hour 12 mins
Slump: 5.00
Air, Percent: -
Conc. Temp.s -
Air Temp.: -
LABORATORY TEST DATA
Weight Date Date Age
( Lbs) Made Tested (Days)
26.E 8 -14 -87 8 -18 -87 4
26.5 8 -14 -87 8 -21 -87 7
Unit Weight:
Yield:
Cubic Yd. Sampled:
No. Cyls. Made:
Weather:
Water Added:
bA =Cone
B =Cone & Split
C =Cone & Shear
1)- Smear
Er-Columnar
3 _
5 - —
Cloudy
(Type of Total
Break Load (P)
C 88,000
C 92,000
Respectfully submitted,
WINGERTER ABORATO ES, INC.
elix A. Peg* ; ro- Guerrero, .E.
Florida Regi . ration No.34473
Compressive
Strength(PSI)
3,113
3,254
The original of this report was signed and sealed by the above registered engineer in accordance with Ruie21H i8.11,Ch. 471,FL.Statute.
As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and
authorization for publication of statements, conclusions or extracts from or regarding our reports is reserved pending our written
aonroval. ∎ e
WINGER1%R LABORATORI d►,1 C.
Laboratory and Inspection Service
1820 NE 144th Street
North MIamI, FL 33181
Required Strengths 3000 Ni in 28
TRUCK TICKET INFORMATION
Conc. suppliers
Ticket No.:
Mix Code:
Plant:
Time Batched:
Code Strengths
Truck No.:
Batch Sizes
Central
C -10402
NF
South Miami
6:59 AM
3000 PSI
82
10 CY
Lab Sample Cyl.
No. No. Dia.
35803 1 6.0" 28.27
35804 2 6.0" 28.27
35805 3
35806 4
35807 5
COPIES ISSUSED TO:
1 - L. Milton Construction
2 - F & F Architect
1 - Miami Shores Building & Zoing
2 - Invoice
OMPR IY
REPORT NO.s
ORDER NO.:
BUILDING
PERMIT NO.:
PROJECT LOCATION: N.E. 111th St. & North Miami Ave.. Miami Shores.
CLIENT:
CONTRACTOR:
PROJECT:
R NG H OF ONCR
L. Milton Construction
L. Milton Construction
Barry University- West Hall I
REMARKS: NOTE EXCESSIVE SLUMP
All field and laboratory tests and sample curing performed In accordance with
applicable ASTM test methods. Average of 28 day strengths complies with required
and /or mix code strength unless denoted with an asterisk. Cylinders are 6" x 12",
unless otherwise indicated.
8 -20 -87 sc 8 -21 -87 sc
1A
15280.10 (537)
INFORMATION FURNISHED BY CLIENT:
days per Andras Gonzales Pour Location: Classroom building ground floor
FIELD TEST AND DATA room 04- center of room
Technician: R. Gates Unit Weight:
Field Mark: RG 36 Yield:
Time Sampled: 8:10 AM Cubic Yd. Sampled:
Batch Times 1 Hour 11 rti ns No. Cyls. Made:
Slumps 6.25" Weather:
Air, Percent: Water Added:
Conc. Temp.: -
Air Temp.:
LABORATORY TEST DATA
Area Weight Date
(Lbs) Made
26.8 8 -14 -87 8 -18 -87
26.9 8 -14 -87 8 -21 -87
Age /Type of
(Days) , Break
4 C
7 C
Date
Tested
BA =Cone
B =Cone & Split
C =Cone & Shear
D_Shear
E =Columnar
FL
8
5
Cloudy •
2 gals after test
Total Compressive
Load (P) Strength(P51)
71,000 2,511
76,000 2,688
Respectfully submitted,
WINGERTER ABORATO `> ", INC.
ells A.1'cg!�ro- Guerrero,'`.
Florida Regi . ration No.34473
The original of this report was signed and sealed by the above registered engineer in accordance with Rule21H- 18.11,Ch. 471,FL.Statute.
As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and
authorization for publication of statements, conclusions or extracts from or regarding our reports is reserved pending our written )