Loading...
38368PERMIT APPLICATION FOR MIAMI SHORES VILLAGE Date ob Address //59 " i Tax Folio Legal Description Owner / Lessee / Tenant �,'Vtr:e.,5'> 7 Master Permit # M361? Owner's Address / 9 7 4 1r: Phone "Yr° 3 7erer Contracting Co. /45; � ;;%$- - A ddress a/ / / 44r Qualifier / ' 76i sS� ' - �® - ,* 40 / 7 State # �e Municipal # Competency # Ins .Co Architect /Engineer Address Bonding Company Address Mortgagor Address Permit Type(circle one): BU DING ELECTRICAL WORK DESCRIPTION „ /71/ Square Ft. Estimated Cost(value) MECHANICAL ROOFING PAVIG FENCE SIGN WARNING TO OWNER: ' '0U- =MUST RECORD A NOTICE OF COMMENCEMENT AND YOUR FAILURE TO DO SO MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY (IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT). Application is hereby made to obtain a permit to do work and installation as indicated above, and on the attached addendum (if applicable). I certify that all work will be performed to meet the standards of all laws regulating construction in this jurisdiction. I understand that separatie permits are required for ELECTRICAL, PLUMBING, SIGNS, POOLS, ROOFING and MECHANICAL WORK. OWNER'S AFFIDAVIT: I certify that all the foregoing information is accurate and that all work will be done in compl'a e with all applicable laws regulating construction and zoning. Furthermore, ;I authori' e < dove ontractor to do the work stated. 41 Si s btu Date: 6 116 APPROVED: Zoning Cow ant My Comm Exp. 12/28/98 Bonded By Service Ins Notary as to Owner b denieloertp. My Commission Expires: Buildin Mechanical Plumbin Signature of Contractor or Owner- Builder Da Notary as to Contractor or Owner- Builder My Commiss ' n*+ -FYp+ res ** * * * * * * * * ,,J" FEES: PERMIT RADON C.C.F.' - % NOTARY TOTAL DUE Fire Other ,.. ARMANDO G. CUBAS my COMMISSION # CC 449735 - : :L� .� '� , DiCIRES: A$ 1999 * ' , .°.•• Bonded Thru Notary t Underadters Electrical Engineering Pv$ ♦pt! ?toy tin. SECTION SCALE Y 1 1300 NE 1. AO/ U 0 , to ' , q a 140 05EL /NL 10' 10 ,Q5 f As LlNE : OEN DATE PO 4 75 SHEET A.FE Pee* 237 Rer11/70 Pi Pi O SECTION SCALE DWG Burp N6 115 51 DATE 3 SHEET J O A FE 01 CRECR c .q so • FOR P ... ._ <.. .u: TOTAL LESS _ %DISCOUNT / LESS _- TOTAL DEDUCTIONS AMOUNT OP CHECK _- I, 08 58"' PAY TO THE ORDER OF [lame It Bank 00 3 S613 71e 1:0 6 700 39135C_ C f I ) A t.,0 cf rite , A 6 t -4611-6, STOBS BROS. CONSTRUCTION CO. REGULAR ACCOUNT 580 N.E. 92ND STREET M I A M I SHORES, F L 33138 May 2 19 9 5 Miami Shores Village MOBS BROS. Nir 037.039 9190 Biscayne Boulevard Miami Shores, Florida 33139 290 I $, 35687 DOLLARS 63- 398/670 38 300.00 May 1995 Barry University Lehman Building 1. Sewage: Meets Concurrency 2. Water: Meets Concurrency 4. Traffic Meets Concurrency MIAMI SHORES VILLAGE CONCURRENCY REPORT Lehman Building will generate 1,413 gpd based on 25,320 sf building area and 55.8 gal/1,000 sf. County -wide treatment system is at 97.27% of 133,000,000 gpd capacity Central Dade County sewer moratorium does not apply Data from Metro -Dade Concurrency Information Center Lehman Building will generate 1,648 gpd based on 25,320 sf building area and 65.1 gal/1,000 sf County -wide supply and treatment at 76.01% of 403,000,000 gpd capacity Data from Metro -Dade Concurrency Information Center Meets Concurrency 3. Solid Waste: Lehman Building will generate 253 lbs per day based on 25,320 building area and 10 lbs /1,000 sf Maximum additional trips generated by Lehman Building: 49 Trips based on 25,320 sf and 1.94 peak hour vehicles/1,000 sf. 1.94 peak hour trips /1,000 square feet estimated based on study conducted by Barton - Aschman for other Barry University development reviewed in 1993. Trips assigned 1/3 north on N Miami Avenue, 1/3 south on N Miami Avenue and 1/3 west on 113 Street. Westbound trips assigned to 113 Street because no count station on 115 Street. Capacities at count stations based on LOS D set forth in Policy 1.1.1 of TCE of MSVCP and on "Generalized Two -Way Peak Hour Volumes for Florida's Urbanized Areas," Page F - of Florida's Level of Service Standards and Guidelines Manual for Planning. Count Station No. 9314 (N Miami Ave South of 119) Capacity at Count Station 2,240 Existing Peak hour trips 1,397 Lehman Building trips 17 Remaining capacity at LOS D 826 Count Station No. 9312 (N Miami Ave North of 119) Capacity at Count Station 2,240 Existing Peak hour trips 1,764 Lehman Building trips 17 Remaining capacity at LOS D 1459 Meets Concurrency Count Station No. 9312 (N Miami Ave North of 119) Capacity at Count Station 2,240 Existing Peak hour trips 2,219 Lehman Building trips 15 Remaining capacity at LOS D 6 Meets Concurrency 5. Recreation: Not applicable 6. Drainage: Review by Village staff. Concurrency met if DERM retention requirements are met. P age. 1 of 1 METROPOLITAN DADE COUNTY, FLORIDA METRODADE Issued Date: 17 -MAY -1995 Expiration Date: 15 -AUG -1995 MR GEORGE R SEILER RODRIGUEZ AND QUIRIGA ARCHITECTS 4440 PONCE DE LEON BLVD. CORAL GABLES, FL 33146 Fax- Tel- 448 -7417 RE: Sewer System Treatment and Transmission Capacity Certification Dear MR SEILER: 1131111111MMTVENEEEMIE Project Name: BARRY UNIVERSITY NATIONAL CENTER Project Location: 11300 NE 2 AVE MIAMI SHORES Proposed Use: 24,000 SF CLASSROOM /OFFICE Previous Flow: 0 GPD Calculated Sewage Flow: 2400 GPD Sewer Utility: PRIVATE Receiving Pump Station: 99 -00050 ERM ENVIRONMENTAL RESOURCES MANAGEMENT WATER AND SEWER DIVISION 33 S.W. 2nd AVENUE SUITE 500 MIAMI, FLORIDA 33130 -1540 _ (305) 372 -6500 The Dade County Department of Environmental Resources Management (DERM) has received your application for approval of a sewer service connection to serve the following project which is more specifically described in the attached project summary. DERM has evaluated your request in accordance with the terms and conditions set forth in Paragraph 16 C of the First Partial Consent Decree (CASE NO. 93 -1109 CIV- MORENO) between the United States of America and Metropolitan Dade County. DERM hereby certifies that adequate treatment and transmission capacity, as herein defined, is available for the above described project. Please be aware that this certification is subject to the terms and conditions set forth in the Sewer Service Connection Affidavit filed by the applicant, a copy of which is hereby attached. By copy of this certification we are advising the appropiate building official of our Department's determination. Sincerely, John W. Renfrow, P.E. Director Department of Environmental Resources Management By: L, Vicente E. Arrebola, P.E. Chief, Water & Sewer Division Attachements (2) cc: Building Official (w /Attachments) Utility Official (w /Project Summary Attachment) 0' Date: 05 -18 -1995 Page: 1 Applicant's Name: MR GEORGE R SEILER Applicant's Address: 4440 PONCE DE LEON BLVD. DERM Number: 1995 - 0518 - 1250 -3981 Project: BARRY UNIVERSITY NATIONAL CENTER 11300 NE 2 AVE Proposed Use: 24,000 SF CLASSROOM /OFFICE Pump Station: 99 -00050 Allocated flows: Projected NAPOT: 1.26 (HR) # Folio Lot Block Flow (GPD) 1 11- 2136- 000 -0050 2400 2400 (GPD) • s Whole Building Performance Method for Commercial Buildings Form 400A -94 OWNER: AGENT: ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION Florida Department of Community Affairs FLA /COM -94 Version 2.1A PROJECT NAME_BARRY TRANSPOR. BLDG. PERMITTING OFFICE: ADDRESS: _NE. MIAMI AVE & 115 ST Miami Shores Village CLIMATE ZONE: 8 _BARRY UNIVERSITY PERMIT NO: JURISDICTION NO: 232600 BUILDING TYPE: _Business (Office) CONSTRUCTION CONDITION: New construction DESIGN COMPLETION: _Finished Building CONDITIONED FLOOR AREA: _19791 MAX. TONNAGE OF EQUIPMENT PER SYSTEM: COMPLIANCE CALCULATION: METHOD A DESIGN A. WHOLE BUILDING PRESCRIPTIVE REQUIREMENTS: LIGHTING EXTERIOR LIGHTING LIGHTING CONTROL REQUIREMENTS HVAC EQUIPMENT COOLING EQUIPMENT 1. COP IPLV HEATING EQUIPMENT 1. Et 2. Et 3. Et AIR DISTRIBUTION SYSTEM INSULATION 1. Conditioned Space 2. Conditioned Space 3. Conditioned Space WATER HEATING EQUIPMENT 1. EF 2. EF PIPING INSULATION REQUIREMENTS 1. Non - Circulating 2. Non - Circulating COMPLIANCE CERTIFICATION: I hereby certify that the plans and specifications co red by his calcu- lation are i _ •mpl .nce w th the Florida En -> gy ncy PREPARED B DATE: 8 . 5 - 5 • 48.37 1000.00 14.00 16.00 1.00 1.00 1.00 LEVEL 4.20 4.20 4.20 0.94 0.94 2.00 2.00 70 CRITERIA 17570.00 NUMBER OF ZONES: 3 100.00 3.80 3.-90 0.00 0.00 0.00 0.93 0.93 0.77 0.77 RESULT PASSES PASSES PASSES PASSES PASSES N/A N/A N/A N/A N/A N/A PASSES PASSES PASSES PASSES Review of the plans and specifica- tions covered by this calculation indicates compliance with the Florida Energy Efficiency Code. amo re construction is completed, this building will be inspected • .4 I hereby certify that this building is in compliance with the Florida Energy Efficiency Code. OWNER /AGENT: DATE: I hereby certify( *) that the system design is Energy Efficiency Code. SYSTEM DESIGNER ARCHITECT : RoDrz i&UEZ /QUi20G4 MECHANICAL: N G 1 N F 5 PLUMBING : F24GA LN61xE6125 /• iGA ELECTRICAL: F(Z46,6r / 1. 1,2A64 LIGHTING r &itJ [ 5 for compliance in accordance with Section 553.908, Florida Statutes. BUILDING OFFICIAL: DATE: in compliance with the Florida REGISTRATION /STATE EP r 3 Ft. /i.E .g 647- Fe E-e2 (14 73 ft. G L lei ZZ r lqz r: • r ( *) Signature is required where Florida law requires design to be performed by registered design professionals. Typed names and registration numbers may be used where all relevant information is contained on signed /sealed plans. • 401. GLAZING- -ZONE 1 Elevation North West 401. Elevation East South West Type Commercial Commercial GLAZING ZONE 2 Type Commercial Commercial Commercial 401. GLAZING ZONE 3 Elevation Type North East South West Commercial Commercial Commercial Commercial 402. WALLS - -ZONE 1 Elevation Type North East South West L & Hvywt. Concrete L & Hvywt. Concrete L & Hvywt. Concrete L & Hvywt. Concrete 402. WALLS ZONE 2 Elevation Type North East South West North East South West L & Hvywt. Concrete L & Hvywt. Concrete L & Hvywt. Concrete L & Hvywt. Concrete 402. WALLS ZONE 3 Elevation Type L & Hvywt. Concrete L & Hvywt. Concrete L & Hvywt. Concrete L & Hvywt. Concrete 403. DOORS ZONE 1 Elevation Type 403. DOORS ZONE 2 Elevation Type BUILDING INFORMATION U SC VLT Shading 1.04 .93 None 1.04 .93 None Total Glass Area in Zone 1 = U SC VLT Shading 1.04 .93 None 1.04 .93 None 1.04 .93 None Total Glass Area in Zone 2 = U SC VLT Shading 1.04 .93. None 1.04 .93 None 1.04 .93 None 1.04 .93 None Total Glass Areq in Zone 3 = Total Glass Area = Block: 8" He 0.172 0.0 Block: 8" He 0.172 0.0 Block: 8" He 0.172 0.0 Block: 8" He 0.172 0.0 Total Wall Area in Zone 1 = Block: 8" He 0.172 0.0 Block: 8" He 0.172 0.0 Block: 8" He 0.172 0.0 Biock: 8" He 0.172 0.0 Total Wall Area in Zone 2 = Block: 8" He 0.172 0 Block: 8" He 0.172 0 Biock: 8" He 0.172 0 Block: 8" He 0.172 0 Total Wall Area in Zone 3 = Total Gross Wall Area = North 1 -3/8 Wood Door -Solid core flush 0.39 Total Door Area in Zone 1 = COMPLIANCE CHECK v- Area (Sgft) 20 170 190 Area(Sqft) 60 135 162 357 Area(Sqft) 150 30 135 1512 1827 2374 U Added R Gross(Sqft) 1595 1015 1595 2262 6467 U Added R Gross(Sqft) 1593 1125 1593 2430 6741 U Added R Gross(Sqft) 1593 1215 1593 2430 6831 20039 U Area(Sqft) 2870 2870 U Area(Sqft) v v North 1 -3/8 Wood Door -Panel with 7/16" panels 0.57 1120 Total Door Area in Zone 2 = 1120 403. DOORS- -ZONE 3 Elevation Type U Area(Sqft) North 1 -3/8 Wood Door -Panel with 7/16" panels 0.57 1120 Total Door Area in Zone 3 = 1120 Total Door Area = 5110 404. ROOFS ZONE 1 Type Color U Added R Area(Sqft) 404. Type 404. Type 4" CONC.WITH INS. ROOFS ZONE 2 ROOFS ZONE 3 405. FLOORS ZONE 1 Type Slab on Grade /Uninsulated 405. FLOORS ZONE 2 Type 405. FLOORS -ZONE 3 Type No exterior floor 406. INFILTRATION Total Roof Area in Zone 1 = Total Roof Area in Zone 2 = Light 0.10 0 7513 Total Roof Area in Zone 3 = 7513 Total Roof Area = 7513 Color U Added R Area(Sqft) Color U Added R Area(Sqft) 0 4765 Total Floor Area in Zone 1 = 4765 Floor over Conditioned Space /Uninsulated 11 2748 Total Floor Area in Zone 2 = 2748 0 0 Total Floor Area in Zone 3 = 0 Total Floor Area = 7513 Infiltration Criteria in 406.1.ABC.1 have been met. 407, COOLING SYSTEMS Type No Efficiency IPLV Tons 1. Water Cooled 1 14.0 16 2. Served by Previous Zone Cool 3. Served by Previous Zone Cool 408. HEATING SYSTEMS Type No Efficiency 1. Electric Resistance 4 1.0 6000 2. Electric Resistance 4 1.0 10000 3. Electric Resistance 4 1.0 10000 409. VENTILATION Ventilation Criteria in 409.1.ABC.1 have been me 0 0 0 0 R Area(Sqft) R Area(Sqft) R Area(Sqft) (CHECK 70.00 0.00 0.00 BTU /hr 'CHECK 410. AIR DISTRIBUTION SYSTEM AHU Type 1. Variable Air Volume (VAV) 2. Variable Air Volume (VAV) 3. Variable Air Volume (VAV) 411. PUMPS AND PIPING ZONE 1 Type 1. Non - Circulating 411. PUMPS AND PIPING ZONE 2 Type 1. 411. PUMPS AND PIPING ZONE 3 Type 1. Non - Circulating 412. WATER HEATING SYSTEMS ZONE 1 Type Efficiency 412. WATER HEATING SYSTEMS -ZONE 3 1. Electric( < =12 KW) .94 413. ELECTRICAL POWER DISTRIBUTION Classroom/ 1 On /Off 415. LIGHTING SYSTEMS -ZONE 2 Reading, T 1 On /Off 415. LIGHTING SYSTEMS -ZONE 3 Reading, T 1 On /Off Duct Location Conditioned Space Conditioned Space Conditioned Space R- value /in Diameter Thickness 5 .75 R- value /in Diameter Thickness R- value /in Diameter Thickness 5 .75 StandbyLoss InputRate 1. Electric(<=12 KW) .94 .9 4.6 412. WATER HEATING SYSTEMS -ZONE 2 Type Efficiency Stand iyLoss InputRate Type Efficiency StandbyLoss InputRate .9 4.6 Metering criteria in 413.1.ABC.1 have been met.' Transformer criteria in 413.1.ABC.2 have been met. 414. MOTORS Motor efficiencies in 414.1.ABC.1 have been met. 415. LIGHTING SYSTEMS ZONE 1 Space Type No Control Type 1 No Control Type 2 No Watts Area(Sqft) 4 On /Off 4 9200 Total Watts for Zone 1 = Total Area for Zone 1 = Space Type No Control Type 1 No Control Type 2 No Watts Area(Sqft) 7 On /Off 9 12800 Total Watts for Zone 2 = Total Area for Zone 2 = Space Type No Control Type 1 No Control Type 2 No Watts Area(Sqft) 5 On /Off 5 13000 Total Watts for Zone 3 = Total Area for Zone 3 = Total Watts = Total Area = Lighting criteria in 415.1.ABC have been met. R -value 4.2 4.2 4.2 2 2 Gallons 0 Gallons Gallons 0 CHECK 4765 9200 4765 7513 12800 7513 7513 13000 7513 35000 19791 CHECK 16. HVAC load sizing has been performed. (407.1.ABC.1) 17. Duct sizing and design have been performed. (410.1.ABC.1.2) 18. Testing and balancing will be performed. (410.1.ABC.4) 19. Operation /maintenance manual will be provided to owner.(102.1) f PROJECT TITLE BUILDING TYPE BUILDING LOCATION BUILDING AREA (ft . DESIGN BUILDING ( %) 5.05 6.64 1.17 14.33 4.81 12.00 3.27 1.09 48.37 HEATING ENERGY Electric Resistance Electric Boiler COOLING ENERGY Direct Expansion Reciprocating Chiller DOMESTIC HOT WATER ENERGY Electric DHW System(s) BUILDING MISCELLANEOUS Lights Equipment SYSTEM MISCELLANEOUS Fans PLANT MISCELLANEOUS Cooling Tower Pumping TOTAL ENERGY CONSUMPTION : PROJECT TITLE BUILDING TYPE BUILDING LOCATION : BUILDING AREA(ft2): BUILDING DESIGN : Exterior Lighting Power BARRY TRANSPOR. BLDG. Business (Office) Miami Shores Village 24901 EXTERIOR LIGHTING CRITERIA: AREA AREA CODE DESCRIPTION 2 Entrance (without canopy) 4 Light Traffic BARRY TRANSPOR. BLDG. Business (Office) Miami Shores Village 24901 BUILDING ANNUAL ENERGY USE * * * * * ** PASSES * * * * ** 1000 W AREA OR LENGTH 287.00 1120.0 BASELINE BUILDING ( %) 5.23 58.86 1.18 14.98 4.81 14.91 0.03 100.00 ALLOWANCE WATTS 8610.00 4480.00 Cooling System Type Measure #1 #2 Minim. #1 Minim. #2 System Eff . #1 System Eff . #2 Result for #1 Result for #2 Water Cooled COP, IPLV 3.80 3.90 14.00 16.00 PASSES PASSES Heating System Measure Minimum Req. Efficiency Result Ele. Resis. Et 1.00 N/A Ele. Resis. Et 1.00 • N/A Ele. Resis. Et 1.00 N/A 4 Light Traffic Exterior Lighting Power Allowance 17570.00 W THE LIGHTING SYSTEM CONTROL REQUIREMENTS: SPACE NO. DESCRIPTION AREA TASKS TYPE 1 NO. TYPE 2 3 Classroom/ 4765.0 26 Reading, T 7513.0 26 Reading, T 7513.0 PROJECT TITLE BUILDING TYPE BUILDING LOCATION : BUILDING AREA(ft2): HVAC SYSTEMS PERFORMANCE: AIR DISTRIBUTION SYSTEM INSULATION LEVELS: Zone # Duct Location 1. Conditioned Space 2. Conditioned Space 3. Conditioned Space PROJECT TITLE • BUILDING TYPE BUILDING LOCATION : BUILDING AREA(ft2): * * * * * * ** PASSES * * * * * * ** NO. CONTROLS 1 1 1 On/Off On/Off On /Off 4 7 5 On /Off On /Off On /Off 4 9 5 * * * * * * ** PASSES * * * * * * ** BARRY TRANSPOR. BLDG. Business (Office) Miami Shores Village 24901 * * * * * * ** PASSES * * * * * * ** Minimum R -Value 0.00 0.00 0.00 * * ** Not Applicable * * ** BARRY TRANSPOR. BLDG. Business (Office) Miami Shores Village 24901 WATER HEATING SYSTEMS PRESCRIPTIVE CRITERIA 1 Measurel Minimum 1 Maximum 1 Des -- System 4 IV 1120.00 4480.00 TOTAL EQUIVALENT CONTROL POINTS NO. INSTLD. REQD. Design R -Value 4.20 4.20 4.20 6 8 8 Result N/A N/A N/A Design Result Type O.D.(in) EF / Et SL EF / Et SL 0.75 Electric <= 12kW EF 0.9300 0.0000 0.940 0.900 PASSES Electric <= 12kW EF 0.9300 0.0000 0.940 0.900 PASSES System Type O.D.(in) Minimum Req. Design Result Non - Circulating 0.75 0.770 2.00 PASSES Non - Circulating 0.75 0.770 2.00 PASSES PIPING INSULATION REQUIREMENTS: * * * * * * ** PASSES * * * * * * ** Pipe Insulation Thickness(in) * * * * * * ** PASSES * * * * * * ** Miami Shores, Fla. 33138 ATTN• Mr. Frank Lubien No. of Copies STOBS BROS. CONSTRUCTION CO. 580 N.E. 92ND STREET, MIAMI SHORES, FLORIDA 33138 TELEPHONE: (305) 751 -1692 C.G.C. 011055 FAx No.: 757 -6564 TO Village of Miami Shores DATE November 14, 1995 Building & Zoning Dept. 10050 N.E. 2nd Avenue JOB Barry University /Transportation Center We are forwarding to you: Herewith _XX Under Separate Cover Shop Drawings Brochures Samples Letter /Copy XX Other Drawing No. Title 1 ea. Memo from Architect /Donnell, DuQuesne /Threshold Inspectors for above project FOR APPROVAL APPROVED FOR YOUR USE APPROVED AS NOTED FOR YOUR INFORMATION XX CORRECT & RESUBMIT REMARKS COPIES TO STOBS BROS. CONSTRUCTION CO. BY Carl R. Cox, Vice President RAUL L. RODRIGUEZ, AIA AR 0006237 ANToNlo M. QumooA, AIA TO: cc: AR 0005384 FROM: PROJECT: PROJECT NO.: RE: DATE: RODRIGUEZ AND QUIROGA ARCHITECTS CHARTERED AA coma MEMORANDUM Carl Cox Stobs Bros. Construction Armando Trujillo Barry University /NCTER 9426/R &Q Threshold Inspections November 10, 1995 4440 PONCE DE LEON BOULEVARD CORAL GABLES, FLOR1DA 33146 TELEPHONE FACSIMILE (305) 448-7417 (305) 448-2712 Per Village of Miami Shores request, this letter indicates that Donnell, DuQuesne and Albaisa Consulting Engineers will provide Threshold Inspection Services for the above referenced project. Please forward a copy of this letter to the appropriate department at the Village. Freddy UlloaBarry University Pedro DuQuesne/Donnell, DuQuesne & Albaisa File N6cnybmd 1.10