Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
37590
ssee /T 1 ,. Brian 0 Kelly CC CO56667 Municipal # AtthitectlEngineer Baxling Company • PERMIT APPLICATION FOR MIAMI SHORES VILLAGE Job Address 11300 NE 2nd Ave Tax Folio Historically Designated: Yes (f ki O? f APtW Master Permit # 3 590 Y - Y Address Estimated Cost (value) 1500.00 SS# Phone 305- 491 -717+6 Ins. Co. Keniary Competency # Address Address Address 1 a rink Type (circle one): BUILDING ELECTRICAL PLUMBING MECIIANICA PAYING FENCE SI RK DESCRIPTION Tin tag a 301b ASTM mop on 901b paper put on flas' And Lay Tiles ARNING TO OWNER: YOU MUST RECORD A NOTICE OF COMMENCEMENT AND YOUR FAILURE TO DO SO MAY T IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY (11? YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT.) pplication is hereby made to obtain a permit to do work and, installation as indicated above, and on the attached addendum (if applicable). i ertify that all work will be performed to meet the standards of all laws regulating construction in this jurisdiction. I understand that separate ,pgrnAits are required for ELECTRICAL, PLUMBING, SIGNS, POOLS, ROOFING and MECHANICAL WORK. WNER'S AFFIDAVIT: I certify that all the foregoing information is accurate arflArat all work will be done in compli s regulating cbnstruction and zoning. `Furthermore, I authorize the above - named. tractor to do the work stated. acket MY ission Expires: ROVED: of owner and/or Condo President Date ." - 4/28/05 Date RADON C °� NOTARY TOTAL DUE 'Mlq� Electrical Date \ Job Address k `3� QC" e Legal Description Square Ft. PERMIT APPLICATION FOR MIAMI SHORES VILLAGE J 10, AN-20_,_ Tax Folio U s e/rSr S -3 333,8 4 13 - r5 Owner / Lessee / Tenant Address WGp Contracting Co. tk 4. -1k -t. Address Phone State #t c( 44411G unicipal # Competency # Ins.Co, Architect /Engineer Address Bonding Company Address Mortgagor Address Permit Type(circle one)' :UILDING ELECTRICAL PLUMBING MECHANICAL OOFINGPAVING PENCE SIGN WORK DESCRIPTION Phone Estimated Cost(value) WARNING TO OWNER: YOU MUST RECORD A NOTICE OF COMMENCEMENT AND YOUR FAILURE TO DO SO MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY (IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT). Application is hereby made to obtain a permit to do work and installation as indicated above, and on the attached addendum (if applicable). I certify that all work will be performed to meet the standards of all laws regulating construction in this jurisdiction. I understand that separate permits are required for ELECTRICAL,, PLUMBING, SIGNS, POOLS, ROOFING and MECHANICAL WORK. OWNER'S AFFIDAVIT: I certify that all the foregoing information is accurate and that all work will be done n compliance with all applicable laws regulating construction and zoning. Furthermore, I au or t e ••ve amed ntractor to dq a work s t S gna ure of o -r and /or Condo President Date: A tli/ = I% No ary :s to Owner and /or My Commission Expires: ** * FEES: PERMIT APPROVED: 3 -f COpiektreSialatil BAIDA GERBER My Commission CC370832 * Expires May, 08,1998 Bonded by HAI 42 Air * B00 -2 -1555 , * • . AI ` t1 Signaturelof Contractor or Date; Notary as to Contractor or Owner-Builder My Commission Expires: ** RADON %. C.C.F. I' fi NOTARY 1 TOTAL DUE 51. s Fire Other "4 /5°/cig Zoning Buildin ;� Electrical Mechanical Plumbixuz Engineering - Bui er E 1 l A, COUNTY OF DADE c frf• c • of ff (. L ; ; h c ii and Co way Courts G.C. NOTICE OF COMMENCEMENT A RECORDED COPY MUST BE POSTED ON THE JOB SITE AT TIME OF FIRST INSPECTION PERMIT NO. TAX FOLIO NO. 11=2136 =000 =0040 STATE OF FLORIDA: COUNTY OF DADE: 95R072072 1995 FEB 23 09 :51 THE UNDERSIGNED hereby gives notice that improvements will be made to certain real property, and in accordance with Chapter 713, Florida Statutes, the following information is provided in this Notice of Commencement. 1. Legal description of property and street address: A portion of the SE 1/4, of the NE 1/4 of Section 36, Township 52 South, Range 41 East of Dade County,Florida 2. Description of improvement: APR f4N Scf L.4r3 'uo vart oN Interest in property: Owner Name and address of fee simple titleholder: 3.Owner(s)nameandaddress: Barry University 11300 NE 2nd Avenue Miami Shores, FL 33161 4. Contractor's name and address: 1/ -S s v y Co.v s ra v c 7 o n! r C? e /3o J C / b 7 2-4/ PC ra-,.' r'- r7 o n/ -c-- 3 3 3 1 8 5. Surety:(Payment bond required by owner from contractor, if any) Name and address: None Amount of bond $ 6. Lender's name and address: None 7. Persons within the State of Florida designated by Owner upon whom notices or other documents may be served as provided by Section 713.13(1)(a)7., Florida Statutes, Name and address: 8. In addition to himself, Owner designates the following person(s) to receive a copy of the Lienor's Notice as provided in Section 713.13(1)(b), Florida Statutes. Name and address: George Webb, Director Of Facilities_ Barry University 9. Expiration date of this Notice of Commencement: (the expiration date is 1 year from the date of recording unless a different date is specified) September 30, 19 9 5 Barry 1Jniversity, Inc. by: Signature ofpw Print Owners Name Freddy U l l o a, Assoc VP Sworn to and subscribed before me this .23 day of AA/3 ,19 9.S' Notary Public 11300 NE 2nd Avenue Miami Shores, FL 33161 Print Notary's Name My Commission Expires: Prepared by: Freddy U l l o a Barry University cHERvLB Astimm s 1 1300 NE 2nd Ave m Shores, FL 33161 May. tffi';'t see Bonded by HAI 800 -422 -155$ 123.01.52 2/93 PLANNING BOARD AGENDA OF Present Zoning S Area of Present Building Area with Proposed Addition Parking Spaces Provided Parking Spaces Required with Addition Setbacks as per Code Setbacks Provided Council Action Required No Date of Applicant Notification d! Liami Jizores9flage F L OR ID A March 9, 1995 Address of Property, and /or Legal Description Planning Board Action ITEM NO. 5 Name of Owner /Applicant Barry University Phone No. 899 - 3790 11300 N.E. 2 Avenue Nature of Request Request for approval Qf utility room Anal -Hon Variances /Zoning Change No Council Action Director of Building and Zoning -J1 N.E 2n0 AVENUE Main (I Entrance VISITOR `t N PARKING BASEBALL FIELD TRACK R FIELD FACULTY /STAFF PARKING (F /$ DECAL) RESIDENT STUDENT PARKING (R/8 DECAL) COMMUTER STUDENT PARKING (C /8 DECAL) COMMUTER STUDENT PARKING &,,vt> tT104 PARKING BARRY UNIVERSITY CAMPUS MAP- (A) ADMISSIONS (1) COR JESU CHAPEL (2) LIBRARY (3) BROAD AUDITORIUM (4) FINE ARTS (5) WIEGAND (6) ADRIAN - SCIENCE (7) ADRIAN (8) FARRELL HALL (9) KELLEY HALL (t POOL (11) WEBER HALL (12) DUNSPAUGH HALL (13) DALTON HALL (14) LAVOIE HALL (16) THOMPSON HALL (17) RECEIVING (18) RENEE MOTTRAM DOSS HALL (19) GROUNDS SHOP (20) VILLA (21) ANDREAS SCHOOL OF BUSINESS (22) ADULT a CONTINUING EDUCATION ` 23) SCHOOL O PODI ATRIC MEDICINE (25) BROWNE HALL (26) TRIANGLE BUILDING (27) WIEGAND ANNEX (28) FLOOD HALL (29) HEALTH AND SPORTS CENTER (30) JAMES G. GARNER BUILDING 1 v..‘ , -) - T - Z S `( T?- - c> cut 4� Faprec..� �.z'c -) , eis ta t t kt, ►N ERQ►.L vR cL` a d,p t-kt *r fb 5 PLY WO TJLLW— X t3.. t tp'" c& S Y'L' - re ' 1 * s 2 / 50" Y. - : ;. c KER. tAikt. $" IAL■5q.4,,"icW(' Wr t- DUR -t-' P'1 Retw►( % /44 E V et 2„`t° 8Luc1c.: wRs.: 12' got'. ,l... 'F 6, z •Le Pc. FT L 1 A TLAS R OOFING CORPORATION July 07, 1994 East Coast Supply 5550 NW 12th Avenue Ft. Lauderdale, FL 33166 RE: ASTM #90 Slate Underlay Dear Tim: laU1 IILH PICK1L1HN This will serve as certification that the above referenced material produced by Atlas Roofing Corporation meets the following Federal and A.S.T.M. Specifications: ASTM #90 Slate Underlay and 90# Mineral Surface meets ASTM Specification D249 Type II The Atlas Specification 090 Slate Underlayment, referenced above, meets Dade County Building Code's weight requirements. Sincerely, Rar- Lind Ray Market Manager LR:bd COUNTY OF LAUDERDALE STATE OF MISSISSIPPI Sworn to and subscribed before me this the 07th :day of July, 1994. • • .i • , .... Notary Public ROUTE 6, BOX 776 • VALLEY ROAD • MERIDIAN, MISSISSIPPI 39307 - any u 1Aai x Da( rud JUL IUb ' y4 d'1: 4y 211 AWAPLAN 170 .e NAILABLE DECKS (GYPSUM AND LIGHTWEIGHT INSULATING CONCRETE) ( b TYPE III OR TYPE W ASPHALT TAMKO VAPOR CHAN — NAILED POURED DECK Material Requirements TAMKO VAPOR -CHAN Fiberglass Venting Asphalt Base Sheet 1 Ply TAMKO AWAPIAN 170 (Granule Surfaced) 1 Ply Asphalt (Per 100 sq. ft.) Approx. 23 lbs. Clinch-type nails for base sheet (Per 100 sq. ft.) Approx. 100 Nails Scope: Positive drainage up to 3 in. per linear ft. For slopes above 3/4 in. per linear ft., fastening of the AWAPLAN 1701s required (see Section 9.0). Deck The deck should conform to TAMKO general requirements (see Section 4.0.). Asphalt The asphalt should be certified by the manufacturer to meet ASTM D -312, Type III for slopes up to 1/4 in. and Type W for slopes up to 3 in. (see Section 11.0). VAPOR -CHAN: Starting at the low point of the roof, install 1 ply of TAMKO VAPOR CHAN, side lapped 2 in. and end lapped 4 is Apply at a right angle to the slope of the roof. Nail the sheets along the lap at intervals of no more than 9 in. Stagger -nail down the center of the sheet on 18 in. centers along 2 lines located 12 in. from each edge of the base sheet (see Section 10.0). AWAPLAN 170: Starting at the low point of the roof, install 1 layer of TAMKO AWAPLAN 170 granule surfaced sheet, side lapped 4 in. and end lapped 6 in. The AWAPLAN 170 should be solidly adhered to the base ply (pressed into the hot asphalt) with approximately 23 lbs. (s15 %) of specification asphalt per 100 sq. ft. The asphalt should be above 400°F at the point of application and mopped no more than 4 R in front of the roll (see Section &0). Flashing: The flashing material must be a TAMKO polyester reinforced modified asphalt flashing material (see Section 31.0). U.L Class A Requirements Noncombustible deck: maximum slope 1/4°. Insulation: none. Surfacing. flood coat & gravel, TAM-CAP, or accepted coating. Contact TAMKO for a list of accepted coatings or for further information on other U.L systems. NAILABLE DECKS (WOOD) 212 AWAPLAN 170 Material Requirements TAMKO TYPE 43 Coated Base Sheet or VERSA-BASE Base Sheet 1 PIy TAMKO AWAPLAN 170 (Granule Surfaced) 1 Ply Asphalt (Per 100 sq. ft.) Approx. 23 lbs. Clinch-type nails for base sheet (Per 100 sq. ft.) Approx. 100 Nails Slope: Positive drainage up to 3 in. per linear ft. For slopes above 3/4 in. per linear ft., fastening of the AWAPLAN 170 is required (see Section 9.0). Deck: The deck should conform to TAMKO general requirements (see Section 4.0). Asphalt The asphalt should be certified by the manufacturer to meet ASTM D-312, Type 11I for slopes up to 1/4 in. and Type IV for slopes up to 3 in. (see. Section 11.0). TYPE 43 Coated Base Sheet/VERSA -BASE: Starting at the low point of the roof, install 1 ply of TAMKO TYPE 43 Coated Base Sheet or VERSA-BASE, side lapped 2 in. and end lapped 4 in. Apply at a right angle to the slope of the roof. Nail the sheets along the lap at intervals of no more than 9 in. Stagger -nail on 18 in. centers along 2 lines located 12 in. from each edge of the base sheet (see Section 10.0). AWAPLAN 170: Starting at the :,w point of the roof, install 1 layer of TAMKO AWAPLAN 170 granule surfaced sheet, side lapped 4 in. and end lapped 6 in. The AWAPIAN 170 should be solidly adhered to the base ply (pressed into the hot asphalt) with approximately 23 lbs. (±15 %) of spccilkation asphalt per 100 sq. ft. The asphalt should be above 400°F at the point of application and mopped no more than 4 ft. in front of the roll (see Section 8.0). Fashhrg: The flashing material must be a TAMKO polyester reinforced modified asphalt flashing material (see Section 31.0). U.L Requirements: Contact TAMKO for information on U.L systems requirements. • Job Address: APPENDIX 'E' METRO -DADE UNIFORM BUILDING PERMIT SECTION II MORTAR OR ADHESIVE SET TILE SYSTEMS 1.. General 11300 N.E.2nd Ave Contractor: The information provided in this Section is required to confirm Product Control Approval of the proposed tile system assembly, confirm compliance with the wind load requirements of Chapter 23 of the South Florida Building Code (SFBC); and confirm compliance with Sections 3403.5 and 3404 of the South Florida Building Code. 2. Documentation The following documents are required for submission with the Uniform Building Permit application: ,. 3. ` Project Information Check one of the following: • 21 New Construction ❑ Re -Roof ▪ Two (2) copies of the proposed tile system assembly's and associated roofing component's : Approval(s). One (1) copy of the tile system assembly and/or roofing component(s) manufacturer's published application instructions and literature. Product Control All documents attached herein, filled out and completed in full. Note: Mortar • or adhesive set tile systems are not acceptable as recover applications. Watertight Roofing Bess No. Mortar or Adhesive Set Tile Systems Page - 1 Is the deck solid sheathed? (circle 'yes' or 'no') Deck Tyne (check one of the following): ❑ Nominal 'h" Plywood (for re -roof only) la Nominal' /E' Plywoot, ❑ Wood Plank " ❑ Other (fill in) Roof Pitch (fill in): no 4 " : 12" Note: Mortar or adhesive set tile systems shall not be installed at a pitch greater than 7W:12 ". Mortar or adhesive set tile applied at a pitch greater than 5 ":12" and less than or equal to 7 " :12" shall have the first three courses of tilt nailed with not less than one nail per tile. As an alternate, the first three courses of tile may be applied in mortar over a single layer of minimum 12 ga. wire mesh with square openings of not less than 3 4" which is mechanically attached to the sheathing with not less than one nail per 2 fe. Circle 'yes' or 'no' for each of the following: Have you attached two copies of the tile, system manufacturer's Product Control A • • royal for the proposed tile system? no Have you attached a copy of the tile system assembly and/or roofing component(s) manufacturer's published, application instructions and literature no Is the proposed underlayment approved for use with this tile system assembly? no Job Address: 1 , k SO O f,(, , Proiect Information (continued): If the proposed underlayment is self - adhered, have you complied with the venting requirements of Section 2913.3 (b), (c) and (d) of the South Florida Building Code? yes no Are all related accessories approved for use with this tile system assembly? Tile: Tile Name: Manufacturer orta or Adhesive: no Are the proposed edge metal attachment fasteners in compliance with the requirements of the South Florida Building Code (minimum 12 ga. annular rinnk, corrossion reisistant nails)? no The Tile System Assembly: The following information is required to confirm compliance with Subsections 3403.5(a) and (c) and Section 3404 of the South Florida Building Code. Tile Material: ❑ Clay 1q Concrete ❑ Other: Product Control Approval Number: y (017..:13 - Check one of the following which apply to the proposed tile securement for use with the proposed tile system assembly: Contractor: Vil4ier 4,4 ea. V .. Process No. Mortar or Adhesive Set Tile Systems Page - 2 01 Mortar: Manufacturer: ¶ Mixing Ratio: ❑ Adhesive: Type: Manufacturer: Tile Fasteners (for first three courses if roof pitch exceeds 5 ":1!" and is less than or equal to 7 ":12 1: Check one of the following which apply to the proposed tile fasteners (for the first three courses) for use with the proposed tile system assembly: ❑ Minimum 12 ga. galvanized roofing nail: Dr N/A Underlayment: Length: ❑ Other: Type: Length: " Note: All tiles shall be installed in compliance with the provisions set forth in the tile system assembly manufacturer's Product Control Approval and the minimum requirements set forth in Subsections 3403.5(c) and 3404.2 of the South Florida Building Code. Tile fasteners in the first three courses (if applicible) shall be of sufficient length to penetrate the sheathing a minimum of 1" or through the sheathing thickness a minimum of / ", whichever is less. The following information is required to confirm compliance with Section 3403.5(b) of the South Florida Building Code. Job Address: L 1, 300 0 Contractor: er4- L 4 v ,{ too; i Ai Process No. Underlayment (continued): Check all of the following which apply to the proposed underlayment for use with the proposed tile system assembly: i ASTM #30 asphalt saturated felt with: Manufacturer: T G t . 0 ASTM #15 asphalt saturated felt with: Manufacturer: CR Mineral Surfaced Roll Roofing with Manufacturer. "Other: Type: Manufacturer: • 0 Other: Type: • Length: Manufacturer: . " O 19" overlap O 6" overlap Iff 4" overlap O 19" overlap O 6" overlap ❑ 4" overlap ❑ 19" overlap O 6" overlap or 4" overlap Onderlayment Fasteners (if applicable): Check one of the following which apply to the proposed underlayment attachment: IR Minimum 12 ga. electro- galvanized roofing nail with minimum 32 ga. x 1 tin cap: Length; Manufacturer. Mortar or Adhesive Set Tile Systems Page - 3 Spacing (per tile system assembly Product Control Approval): Field: 2 o:c. Laps: 4 " o.c. 5. i Related Accessories: i w Edge Metal (refer to Section 3408.2 of the South Florida Building Code): Type: C Dimensions: — 3 or Thickness: Finish: Note: All edge metal shall be nailed on the flange and nailed or clipped at 'the face in compliance with the provisions set foith in Dade County Protocol PA 111, marked Appcndu► 'U' in the South Florida Building Code. Adhesives (check one of the following): 0 Cold Adhesive: Type: Manufacturer: lif Flashing Cement: Type: Manufacturer: y4S C- o goal FE5 b t o'$ Job Address: V t 3oc tU G. a N d Ati, Contractor: V1akerk4A per, ,„)c, Process No. Note: Application of adhesives shall be in compliance with the Roofing Component Product Control Approval and the minimum requirements set forth in Subsection 3403.5(e)(4)(cc) of the South Florida Building Code. Adhesives (continuedl: Additional Notes: Ventilation System (check one or more of the following): The following information is required to confirm compliance with Subsection 3401.4(e) of the South Florida Building Code. ❑ Ridge: Type Size Soffit: Type (o K'z\ Size 14 - 1 %tear Note: If underlayment is comprised of a self - adhered membrane, both soffit and ridge ventilation systems are required, unless a base sheet is applied as an anchor sheet below the self - adhered underlayment. Note: The Tile System Assembly shall be installed in strict compliance with the application instructions enumerated in the Product Control Approval. A permit shall be issued for application of the specified Tile System Assembly pnlv. Any change to the specified Tile System Assembly shall require submission of a revised SECTION 11 with a copy of SECTION I, noting the permit number issued. Mortar or Adhesive Set Tile Systems Page - 4 ti Job Address: 1.1 30 C) t N ck A:�t Contractor: c41- kct,)01- (Zoo c,„ Process No. Ridge Venting (Hipp►) 7. Q) \ W°o A-1A Underlayment: 3o ft54tA Underlaymcnt Fastener /4 e. RT5 12" FILL IN APPLICABLE ROOFING COMPONENTS WI IICI I MAKE UP TILE SYSTEM ASSEMBLY. INSERT ANY ADDITIONAL LEADERS INDICATING ADDITIONAL ROOFING COMPONENTS NOT SHOWN ON THIS PAGE. (Where Roofing Component not used in Tile System Assembly, fill in with "WA ". ) Head Lap Dimension: (_fat iearuless*thaw&esp dJret a, the tuespivs asseeiblyProduct Control APPraleD Mortar/Adhesive: left'40 i-1 6u.L k Tile Fastens. 11 Edge Metal or Gutter Fastener: e4 Bird Stop: (t/e) Edge Metal or Gutter: J Existing or Proposed Soffit Vetting: SA'tiJ CC G Ci n0 ti. e4c..k Lc, +1eN DETAIL #1 Job Site Identification: Mortar or Adhesive Set Tile Systems Page - 5 Job Address: k,‘ 3o O r'G f.[d, Rid$e Height: t 1!? feet Contractor: V ial- e' j, - IL° eC . a c Process No. Eave Height Roof Mean Height RIM (nSIeet BUILDING INFORMATION #1 Job Site Identification: Mortar or Adhesive Set Tile Systcms 1).te.. Ground Level Insert Building Ridge Height, Eave Height and Roof Mean Height. Also insert applicable information pataining to the building below. (SeeASCE 7.88 Fact Sheet Attached ) Exposure dory: Classification Category: At Hurries Oceanline?: Y N Basic Wind Speed at Building Looatiotr 110 mph Building Condition based on %ofopenings: (See Table 9 ofASCE 7-88) 1.i..Z0 0 04 awate, costractor vt&tii-t4+ z 04 :4 BunDING INFORMATION #2: Roof Plano with Perimeter and Comet Dimeosions JO Site Identification: Mortar or Adhesive Set Tile Systems Page - 7 Process No. Job Address: • l 300 N aci 4gt, The undersigned certifies that the Mortar or Adhesive Set Tile System Assembly is in compliance with the plans, specifications, and details submitted by the architect. STATE OF FLORIDA - COUNTY OF DADE Before me this day personally appeared 9,c., who, being First duly sworn, deposes and says that all information submitted herein is true and correct. Sworn to and subscribed 19 My commission expires: Licensed Contractor / Owner Signature before me this _Atitisicialy 061NB$PR . a` o � q .-.% OFrICIAI SEAL • I,: .a. i My Comm. txp 02 -17 -9 L el BONDED THROUGH AI AN INSURANCE SERVICES '"M+M'' ` CC 260390 r Contractor: • N• ary 'ublic State of Florida Mortar or Adhesive Set Tile Systems Page -8 r (ro 1AateC Q o oC ∎ 1 Process No. 4 Monier Roof Tile 1900 Northwest 21st Avenue Fort Lauderdale, l'L 331.11 PRODUCT NO. ACCEPTANCE NO.: EXPIRES: APPROVED: 305- 633 -9974 B I ELER — �.�..o. �...��...........�d..... .t,o17_1 DEC 13 1997 DEe• 1 3 1994 644 P01 MAY 11 '95 11:54 MCTiIO1'QUTAN BADE COUNTY; PLOhwwA MET11O•DADE FLAMER BUILDING. t1UILDINNO cODg COMPLIANCE UEf'MIITMI1I T SUITE 1803 METRO•DAbt1 ruin= CIUILDINO 140 WEST' FLMOLEll STREET MIAMI, FLORIDA 001304603 ' t$W1 t76.20o1 FAX MO j u7S -20oO tl ►� 1 1,4 1 1 1 1 1 Your application for Product Appro al of ca »U.. 1,n,a Rh ie'1 rteofna 'Cite un lcr Chnptcr 8 of the Metropolitan Dade County Codc governing the use of Alternate Materials and Types of Construction, and completely described in the plans, spccircations and calculations as subtnittcd by Redlanc Technologies, The Center for Applied Engineering, Inc. and Professional Service Industries, Inc. has been ret 7ntmendcd for acceptance by the Building Codc Compliance Department to be used in Dade County, Florida under t le specific and standard conditions set forth herein. The approval shalt be valid for a pc - iod of three years, The Building Code Compliance Department reserves the right to secure a product or mciteria; at any time for a Jobsite or manufacturer plant for quality control testing. If product or material fail to perform it the approved manner, the Code Compliance Department may revoke, modify or suspend the use of such product c:r material immediately. The Iluiltling Codc Complia Department reserves the right to require testing or this prc luct or material should any amendments to the South Florida Building Code be enacted affecting this product or material. The expense of such testing will be incurred by the Manufacturer. 1 Diamond, P.B. roduct Control Division Supervisor PLEASE NOTE - THIS IS THE COVERSI1 E !:.T. $EI. ADDITIONAL PAGES ItOR SPECIFIC AND GENERAL CONDITIONS. BUILDING CODE COMMITTEE This application for Product Approval has been reviewed by the Metropolitan Dadc' County Building Code Compliance Department and approved by the Building Code Consinittee to be used in Dade County, Florida. under the conditions set forth above. Charles Danger, P.IL, Director Building Code Compliance Department Metropolitan Dade County 305- 633 -9974 .,13IELER Monier Roof Tile 1900 Northwest 21st Avenue Fort Lauderdale, FL 33111 PRODUCT CONTROL NOTICE OF ACCEPTANCE ROOFING SYSTEM APPROVAL . . Prepared Roofing Suh- Category: 1110 Nall - on/Mortar Set/ Adhesive Set i. T yi : donercta $ystemscription • Monier Roof Tile is a member of the Rcdland Group, a world wide producer of primary building products and roof tile. Monier manufacturers concrete roof tile Tor nail -on, mortar set or adhesive set applications in plants throughout thc United States ranging rromVashington State to Florida. All tile is manufactured front extruded concrete consisting of Portland Cement, plasticizer, iron and metallic • oxides, and blended aggregates. •� ►' a �, - - S tilr �ra(i1�. Rdertl nnnro Monier sells Lilo systems through local distribution and directiy to consumers. Mt prohics have matching trim pieces used for rake hip, ridge hip, and valley terminations. Tile system accessories such as undcrlaymcnt, ventilation systems and flashing systems are also available.. These accessories are manufactured for all profiles and form a part of this Product Control Approval. Monier "Fiat Shake and Slate" roof tilt has been tested in compliance with thc South Florida Building Code requirements for concrete, nail -on, mortar set and adhesive set tile applications. The minimum roof slope for Monier's "Flat Shake and Slate" nail -on, mortar set or adhesive set tiles shall be 2 ":12 ". See the "Profile Drawing" section in this approval for the "Flat Shake and Slate" tile profile. Monicr's "Fiat Shake and Slate" tile profile has been tested for both wind characteristics and static uplift performance, therefore, any consideration for installation shall be done as a 'Moment Based Sysient'. Data for attachment calculations is noted in Tabies 1 through 4 of this approval. Contact: Reese H. Moody Technical Service Accessories Manager 1900 NW. 21st Avenue Ft. Lauderdale, FL 33311 (800) 432.2715 Product Control No.: 94J 0113 Approval Date: 1 3 1994 )expiration Date: D E C 1 3 19 9 7 644 P02 MAY 11 '95 11:55 305- 633 -9974 ,BIELER d .j •T TRADE NAlvIES OF PRODUCTS MANUFACTURED OR LA»SEL tD BY APPLICANT Test Product rrsduct fljmensjons Smifica Iiins ri=1111flau Monier Fiat Shake 1 -16 PA 112 Flat, interlocking, high pressure and Slate TO w or 13" extruded concrete shake and slate root V trick the equipped with two nail holes. For direct deck or battened nail -on, mortar or adhesive set applications. Trim Pieces 1- varies PA 112 Accessory trim, concrete root W - varies for use at hips, rakes, ridges and valley varying thickness terminations. Manufactured for each tile profile. 644 P03 MAY 11 '95 11:55 Product Control No.: 94- 1017,19 (?)/10;44/11.41.1ro7 Pro duct 1130 Felt 1143 Coated Dose Sheet Mineral Surface Cap Sheet Lenzingtcx -Z13 140 Underlaymcnt Rainproof ti !co and Water Shield Mopping Asphalt Flashing Cement 305- 633 -9974 ,BIELER d. g • TRADE NAMES OF PRODUCTS MANUFACTURED OTHERS ilbutidatU N/A NIA W A 59" x 164' roll 22 lbs/roll 30" x 75' roil 36" x 75' roll or 60" x 75' roll 36" x 75' roll N/A N/A Test StatirtCatans ASTM D 226 type It M ASTM D 2626 ASTM D 249 PA 104 PA 104 • PA 103 ASTM D 312 type 111 or IV ASTM D 4586 3 Product Control No.: X4,.;19 tit 1: Product nritanon Saturated organic felt to be used as a nailed anchor sheet. Saturated and coated organic base sheet for single or double ply underlayment. Mineral surfaced asphalt roll rooting for use as a top ply in a double ply underlayment system. Single ply, nail -on underlayment. Single ply, nail -on underlayment with 2" self - adhering top edge. Self-adhering underlayment for ISO as a top ply in atwo ply underleyment system with approved 1130 or 1143 as the base layer. Asphalt for bonding a mineral surface cap to a mach. attached base sheet in a doubte.pty underlayment system. Cut back, asphalt based, asbestos free, fiber reinforced, trowel grade cement for repair and flashing applications. 644 PO4 MAY 11 '95 11:56 Marutjacturer generic generic generic Lcnzing Performance, Inc. rcA /194.0527.05 Protect -© -Wrap, Inc. PCA 1194- 0714.0 ! W.R. Grace Co. PCA 1192- 1116.01 generic generic (7: Rooting Nails Tin Caps Wood Battens Tile Nails Tile Screws Roof Tile Mortar ( "Quikrete® Roof Tile Mortar ill 1401 305- 633 -9974 .BIELER 3 2 .a Test Product . Prodgti 'Dimensions Specifications licitziftliati Mnnufneturer Asphalt Primer N/A ASTNJ D 41 Cut back. asphalt generic based coating used to facilitate bonding of dissimilar materials. min. 12 ga. with PA 114 Annular ring shank, , generic '1," head Appendix a hot dipped, electro or mechanically gale. roofing nails for use in underlayment attachment. min. 32 ga. l ° /," o.d. MAX. 2" o.d, vertical Wood Preservers Salt pressure treated min. 1" x 4" Institute I..P - 2 or decay resistant lumber battens bathtub! ! min. l" x 4" for use with vertical battens or min, 1" x 2" for use alone min. 8d x 2'A" or PA 114 min. IOd x 3". Appendix E min. H8 x 2W or min. 010 x 2" PA 114 Appendix E PA 114 Appendix E Corrosion resistant circular disc for use in undcrlayment attachment Corrosion resistant, screw or smooth shank nails. Corrosion resistant, coated, coarse thread wood screws. 644 P05 MAY 11 '95 11:57 Product Control No.: generic generic generic generic Roof Tile Mortar N/A PA 123 Prepared mortar mix Bermuda Roof ( "TileTiteme") designed for mortar Company, Inc. set roof tile PCA 494- 06I4.01 applications. WA PA 123 Prepared mortar mix Quikrote Constructio designed for mortar Products set roof tile PCA 1194. 0808.01 applications. , ?Witte( 121111. tog Roof Tile Mortar N/A ( "BOWSAW.) Roof Tile Mortar Mix') Roof Tile Adhesive (Polyprotfit) AN 160) Hurricane Clip Si Fasteners Valley Flashing Drip Edge 305 - 633 -9974 t EIELER 644 P06 MAY 11 '95 11:57 d 2 T N/A Caipx PA 114 Corrosion resistant "miq, W width Appendix 2 bronze, aluminum, min. 0.060" thick stainless steel, galvanized steel or plastic attachment clips for supplemental tile attachment. Clips are installed with corrosion resistant roofing nails compatible with'the clip. A hurricane clip is required on all nail-on cave tiles. Clinil Sners min. 8d x 1 rain. 26 ga. min. 16" width • min. 26 ga. min. 2" face flange min. 2" deck mange Test 1flcatians PA 123 Product. Prepared mortar mix designed for mortar set roof tile applications. ASTM A 525 Galvanized steel valley flashing PA 110. Adhesive designed for use in roof the applications. • PA 111 Galvanized steel drip edge ,114 •1 • Product Control No.: ...24z11/12,11.. Mannrg etc rer W.R. Bonsai Co. PCA 1194" 0628.03 • Poly foam Products, Inc. PCAt194- 0401.01 generic generic generic 4/g, 305 -633 -9974 4 .13IELER Test Ageenney Redland Technologies Redland Technologies The Center for Applied Cngineering.lnc. • The Center for Applied Enigneering, Inc. Redland Technologies Redland Technologies Redland Technologies Redland Technologies The Center for Applied Engineering, inc. Professional Service Industries, Inc. TEST REPORTS Test,Tdentifier - 7161 -03 Appendix i11 7161-03 Appendix [II 94-084 94-060A 7161 -03 Appendix 11 Letter Dated Aug. 1, 1994 P0631.01 • ' PO402 Project N. 307025 Test IMDC•77 224- 47099 6 Cif Din . nd, P.G. Product Control No.; 94-10 7.1 L 'Pest Nnmefltepnrt Da.lt Static Uplift Testing Dec. 1991 PA 102 Static Uplift Testing Dec. 1991 PA 102(A) Static Uplift Testing PA 101 (Mortar Set) Static Uplift Testing PA 101 (Adhesive Set) Wind Tunnel Testing PA 108 (Nail -On). • Wind Tunnel Testing M 108 (Nall -On) Wind Tunnel Testing; PA 108' (Mortar Set) Withdrawal Resistance Testing ofscrew vs, smooth shank nails Wind Driven lain PA 100 644 P07 MAY 11 '95 11:58 • May 1994 March, 1994 Dec. 1.991 Aug. 1994 July 1994 Sept. 1993 Oct. 1994 Physical Properties Sept, 1994 PA112 Deck Type: Deck Description: SYSTEM A: Slope Range: Undcrlaymcnt: Vertical Battens: Roofing Tile: Comments: 305 - 633 -9974 .AIELER v Wood, Non - insulated SYST New Construction t '/ n " or greater plywood or wood plank, Counter - Batten Application 644 P08 MAY 11 '95 11:58 Product Control No.: , 94 1017.13 2 ":12" to 7 ":12" Note: Counter - Battens, ns noted below, are required for slope range 2 ":12" to less thnn 4 ":12" and are optional for slopes of 4 ":12" to • - 7 " :12 ". For slopes exceeding 7 ":12 ", refer to System C. Install choice of approved undcriayment system, noted on Page 1 or 2 of Dade County Protocol PA 1 IS, in compliance with Section 3.02 of PA 118. install vertical battens of pressure treated or decay resistant lumber having minimum dimensions of nominal 1" x 2 ", 'Vertical Battens shall be set in a continuous bed of flashing cement /" thick and sccurcd not greater than 24" o.c, into the sheathing with approved, corrosion resistant fasteners. Vertical battens shall be positioned over Alm top chord of the roof trusses. (Sec Section 2.10 and 3.09 of PA 118) Horizontal Battens: instal! horizontal battens of pressure treated or decay resistant lumber having miniinutn dimensions of nominal 1" x 4 ". Horizontal battens shall be installed over vertical battens at a spacing to provide a tile overlap not less than 3" and sccurcd through the •vortical batten and sheathing with approved, corrosion resistant fasteners. (Sec Sections 2.10 and 3.09 of PA 118.) Install tile in compliance with PA 118 using one of the approved methods of attachment for batten applications noted in Table 3, attached. The method of attachment utilized shall provide sufficient attachment resistance expressed as a moment to inert or exceed the required moment of resistance determined in compliance with PA 115 or PA 127, 1. For re-roof applications, "t plywood is art acceptable substrate. 2. Clips arc required on all cave tile. 305 - 633 -9974 BIELER ,! r SYSTEMS (CONTINUED) Deck Type: Wood, Non - insulated Deck Description: New construction `%_" or greater plywood or wood plank. SYSTEM B: Direct Deck Application Slope Range: 4":12" to 7":12" Note: System B Is only acceptable in this slope range. For siopos 1ess than 4 ":12 ", refer to System A. For slopes in excess of 7 " :12 ", refer to System C. Underlayment: Install choice of approved underlayment system, noted on Page I or 2 of Dade County Protocol PA 118, in compliance with Section 3.02 of PA 118. Roofing Tile: Install tile in compliance with PA 118 using one of the approved methods of attachment for direct deck applications noted in Table 3, attached. The method of attachment utilized shall provide sufficient attachment resistance expressed as a moment to meet or exceed the required moment of resistance determined in compliance with PA 11S or PA 127. ' Comments: 1. For re -roof applications, " //_" plywood is an acceptable substrate. 2. Clips are required on nil eave tile. • 644 P09 MAY 11 '95 11:59 Product Control No.: '.41917, 1'3 _ • • Deck Type: Deck Description: SYSTEM C: Slope Rnttge: Undcrlaytnent: Horizontal Battens: ' Comments: 305 -633 -9974 BIELER SYSTEMS (CONTINUED) Wood, Non insulated New construction 19 / 33 " or greater plywood or wood plank. Horizontal Datton Application •• 644 P10 MAY 11 '95 11:59 Product Control No.:. 94-1.1)1.7.13 4 " :12" or greater Note: Horizontal battens, as noted below, are required for slopes in excess of 7 ":I2" and are optional for slopes of 4 ":12" to 7 ":I2 ". For slopes - less than 4 ":I2 ", refer to System A. Install choice of approved undcrlayment system, noted on Page 1 or 2 of Dade County Protocol P/t 119, in compliance with Section 3.02 of PA 119. Install horizontal battens of pressure treated or decay resistant lumber having minimum dimensions of nominal 1" x 2" x 4 feet long allowing for a minimum ' /:" gap between each 4 foot length. Horizontal battens shall be installed over the undcrlaymcnt system spaced to provide a tilt overlap not less than 3" and secured through the sheathing not greater than 24" o.c. with approved, corrosion resistant fasteners. (See Sections 2.10 and 3.11 of PA 119.) Install the in compliance with PA 119 using one of the apnrovcd methods of attachment for batten applications noted in Table 3, attached. 'Mc method of attachment utilized shall provide sufficient attachment resistance expressed as a moment to tricot or exceed the required moment of resistance determined in compliance with PA 115 or PA 127. 1. For ro -roof applications, ' plywood is an acceptable substrate. 2. Clips are required for all calve tile. CH Dia . nd, P.C. 305- 633 -9974 4 EIELER SYSTEMS (CONTINUED) w 644 P11 MAY 11 '95 12:00 Product Control No.: j- 101713 Deck Type: Wood, Non - insulated Deck Description: New construction 19 / n " or greater plywood or wood plank. SYSTEM D: Mortar or Adhesive Set Application Slope Range: 2 ":12" to 7 ":12" Note: System D is only acccptabla in this slope range. For slopes in excess of 7":12", refer to System C. Roofing Tile: Underlaymant: Install choice of approved underlayment system, noted on Page 1 of Dade County Protocol PA. 120, in compliance with Section 3.02 of PA 120. See System Limitation 07. Install tile in compliance with PA 120 using one of the approved mortars or adhesives noted in this approval. Mortar or Adhesive shall be applied in compliance with the mortar manufacturer's Roofing Component Product Control Approval. The mortar or adhesive attachment shall provide sufficient attachment resistance expressed as a rnomcnt to meet or exceed the required moment of resistance determined in compliance with PA 115 or PA 127. The mortar and adhesive attachment data is noted in Table 4, attached. Comments: 1. For re -roof applications,' plywood is an acceptable substrate. 2. For mortar set applications, the first three courses dale shalt be nailed with not less than Iona nail per tile. As an alternate, the first three courses of tile shall be applied in mortar over a single layer of minimum 12 ga. wire mesh with square openings of not less than 3 / 2 " which is mechanically attached to the deck with not less t one roofing nail every 1 ft For roof pitches from 6 " :12" to 7 ":12 ", every third tile of every fifth course, beginning at the eighth course, shall be nailed with not less than one nail per tile. 10 011 Dion ad, P.G. • C. 305- 633 -9974 •IELER SYSTEM LIMITATIONS 1. The standard minimum roof pitch for Monier "Flat Shake And Slate ", nnll -on, mortar or adhesive set tile applications is 2" rise in 12" run (2 " :12"). The maximum roof pitch for mortar or adhesive set tilt applications is 7" rise in 12" run (7 ":12 "). 2. All nail -on tilt applications having a roof pitch less than 4 " :12" shall be installed over both vertical and horizontal battens ( "Counter - Battens "), as noted in System A. All nail -on tile applications having a roof pitch in excess of 7 " :12" shall be installed over horizontal battens as noted in System 3. For nail -on applications, brass or stainless steel screws for mechanical attachment of tiles shall have a head diameter larger than that of the preformed holes in the tile. 4. System installation shall be in compliance with the systcm,specifications outlined in this Product Control Approval. Nail -on tile shall be attached using one of the tnethods or attachmcnt noted in Table 3 of this Approval. Mortar or adhesive set tile shall be attached using an approved mortar or adhesive noted in this approval, the data of which is noted in Table 4 of this Approval. The method of attachment utilized shall provide sufficient attachment resistance expressed as a moment to meet or exceed the required moment of resistance determined in compliance with Dade County Protocol PA 115 or PA 127. 5. For nail -on tile applications, an cave clip is required on all cave tile. For mortar set applications, the first three courses of tile shall be nailed with not less than one nail per tile. As an alternate, the first three courses of tile shall be applied in mortar over a single layer of minimum 12 ga. wire mesh with square openings of not lass than 3/4" which is mechanically attached t: th+. deck with not less than one roofing nail every 1 W. Par roof pitches from 6 ":12" io 7 " :12 ", every third tile of every firth llh course, beginning at the eighth course, shall be nailed with not less than one nail per tile. 6. For mortar or adhesive set tilt applications, a field static uplift test by a Dade County accredited testing agency, in compliance with Dade County Protocol PA 106, shall be required not toss than 30 days offer application to confirm tile adhesion. The results of this testing shall be reported to the Building Official and the installer stating that the application has passed or failed PA 106 testing. If the application fails PA 106 testing, the report shall state which portion of the test was filed; Category 1 (examination for loose tile) or Category 2 (uplift testing of tile). Subsequent to testing, the installer may repair not more than 5% of field area tiles and 10% of perimeter arca (i.e. ridge /rake) tile with approved tile adhesive. The installer shall place an identifiable marking on each repaired tilt for future reference. Any PA 106 re -test shall not include any marked tile. 7. For mortar or adhesive sot tie applications, 30/90 hot mopped undcrlayment applications may be installed perpendicular to the roof pitch prior to June 1, 1995 unless stated otherwise by the material manufacturer. Thereafter, 30/90 undcrlayment systems shall be installed parallel to the roof pitch in compliance with Appendix W of Dade County Protocol PA 120. 644 P12 MAY 11 '95 12:00 Product Control No.: _ 305 - 633 -9974 pIELER 644 P13 MAY 11 '95 12:01 Product Control No. : SYSTEM LIMITATIONS (CorrrnNU1 D) 8. Ali tiles shall bear the imprint or identifiable marking of the manufacturer's name or logo for identificntion in the field. 9, The Monier "Flat Shake And Slate" tile profile has been tested for both wind characteristics and static uplift performance, therefore, attachment calculations for installation in compliance with Dade County Protocol PA 115 or PA 127 shall be'done as a 'Moment Based System' 10. Applications for roofing permits shall include n completed Section II of the Uniform Building Permit, a copy of Monier Roof Tile's current specifications and details, a copy of this Product Control Approve) and a copy of the Product Control Approval of any Roofing Component used in the proposed tile application. Reference shall be made to appropriate data for the required fire rating. 11. The applicant shall retain the services of a Dade County certified testing laboratory to maintain quality control in compliance with the South Florida Building Code and related protocols. Samples taken shall be in compliance with Dade County Protocol PA 112, Appendix 'A'. 12. Any amendments to these provisions shall be in compliance with Sections 203 and 204 of the South Florida Building Code. • • Table 1: Aerodynamic Multipliers - ). (ft') from PA 108 Testing Tile Profile Monier Flat Shake & Slate Tile (ft')" Batten Application 0.27 X (ft') Direct Deck Application 0. Table 2: Restoring Moments due to Gravity • M, (ft -lbf) from PA 102 Testing Tito Profile Monier Flat Shake & State Tile Profile Monier Flat Shako & Slate 305 -633 -9974 . IELER .r r 3 " :12" Battens Direct Battens Direct Battens Direbt Battens Direct Deck Deck , Deck Deck 6.67 7.52 8.47 7.43 6.33 7.27 • 6.17 7.09 Table 3: Attachment Resistance Expressed as a Moment - M (ft-lbf) from PA 102 and PA 102(A) Testing Tile Application Battens Direct Deck Tile Profile Monier Flat Shake & Slate DATA FOR ATTACHMENT CALCULATIONS 4":12" 5 " :12" Approved Nails i naii 2 nails 4.90 9.00 Mortar Set Adhesive Set Approved Screws 1 screw 7.40 5.40 18.80 25.30 Tile Application 2 screws 9.10 41.30 24.30 Product Control No. ‘4 40 M1 3 6 " Approved Field Clip With: 1 nail 24.20 2 nails 34.80 35.50 Table 4: Attachment Resistance Expressed as a Moment - M (ft -ibf) from PA 101 Testing 644 P14 MAY 11 '95 12:02 7 ":12" or greater Battens Direct Deck 6.00 Attachment Resistance Approved Eave Clip With: 39.00 115.90 1 nail 22.10 19.00 N/A 2 nails 32.20 31.90 M5-633-9974 13IELER PROFILE DRAWINGS , Product Control No.: 94'1011.13 SHAKE tI, SLATE TILL TOP VUW 0I UUL1 t:CnbpFManon of s rtQC$ and IN/06 hp kgri. Hall: onylkot pap.rg+a of Manta 9,d.e %Wac al theft M a to d .c� vr ol tlkol>lftnt NOW Of TI1 I 1+aad Vag PalCn sold II4O k+o Wbalt*n4 none lox and w van r chemda mar* soil Cnlawn/ cart* (41114n. SHAKE & SLATE TILES ACCESSORIES L. **. wei 4 3l4• w7 N.MHt#do't was.aag tCr n1110t1.N! *TIL1 �p1��tF , c i WetiN LO trYN ♦VT w41.at 0 ? '1M 1444r w'. �s OeiM wur MP MUM sicslie OA nt*aw1a $4 /4' RAUtR001 TIt1 UICTNHMII$AL Tor Oabl• ands to In robed • fat got* lobe =god *Nig /01,41 Or bOOKI. Wald on 00 WV at WV, bawd I4411 .....b .:Pl1 a wi !ftiotcibanttafotttstrfion1 tx Sod MONIER FLAT S1IAKE SLATE 644 P15 MAY 11 '95 12:02 305 -633 -9974 ELER This approval supersedes all previous approvals. Gil • iamond, P,E4 P oduct Control Division upervisor 644 P16 MAY 11 '95 12:03 METROPOUTAN DADE COUNTY, FLORIDA METRO-DADE FLAGLER BUILDING METRO & BUILDING CODE COMPLIANCE DEPARTMENT SUITE 1603 METRO-DADE FtAGL.ER BUILDING 140 WEST FLAGLER emu MIAMI, FLORIDA 33130 -1563 (305) 3754901 FAX 1305) 375 -2900 IYE)Tter .01: ACCE trrA NCR: STODARDsoltamolis . Extensions of Acceptance may be considered atlera now application has been filed and the supporting data, test reports no older than ten (10) years, have been re- evaluated. Alt reports of re- testing shall boar the seal, signature and date of an engineer registered in the State of Florida. 2. Any revision or c in the materials, use, or manufacture of the product or process shall automatically be cause for termination, unless prior approval is granted for revisions or change. 3. Any unsatisfactory performance of this product or process or a change in Code provisions shall be grounds for re-evaluation. 4. This acceptance shall not be used as an endorsement of any praluct for sales or advertising purposes. 5. The Notice of Acceptance number preceded by the words Dade County, Florida, and followed by the expiration date may be displayed in advertising literature. if any portion of the Notice of Acceptance is displayed, then it shall be done in its entirety. 6. Product approval drawings, where required for permit applications, shall be provided to the applicant by the manufacturer or his distributors unless otherwise noted in the Notice of Acceptance. The prints need not be re- sealed by an engineer. 7. Failure to comply with the Standard Conditions shall be cause for termination of the Approval. Pitch of Roof • Direct Deck Only Choice of Underiayments - Plastic or compatible cement at nails penetrating underlayment 2 ":12" to 7':12 "' 1. No. 30 or No. 43 organic base nailed to deck, tin. Required 74# organic cap sheet in type III or IV hot asph t. 2. No. 30 or No. 43 organic base nailed to deck, Product Control Approved min. 40 mil SBS mo fied cap sheet in type IV asphalt. Required 3. No. 30 or No. 43 organic base nailed to deck, , in. Required 74# organic cap sheet in Product Control Appn red • cold applied adhesive. 4. No. 30 or No. 43 organic base nailed to deck, approved self- adhered membrane bonded to t a Not Required base ply. See Component 5. Alternative / Component Approved Membrane Approval NOTE: Roof pitches > 7 ":12" require all provisions of the Dade County Model Nail )n Specification. (See Dade County Protocol PA 119) •ME�D• ADE; Note: DIVISION 7 ! ? METROPOLITAN DADE METRO -DADE Ft BUILDING CODE COMP METRO -DAD 140 WI MIAM DADE COUNTY BUILDING CODE COMPLIANCE OFFICE PROTOCOL PA 120 -94 ©1994 Metro-Dade Building Code Compliance Office SYSTEM #3: MODEL MORTAR OR ADHESIVE SET TILE SPECIFICATION INCLUDING APPROVI D UNDERLAYMENT ASSEMBLIES OUNTY, FLORIDA AGLER BUILDING .IANCE DEPARTMENT SUITE 1603 FLAGLER BUILDING ST FLAGLER STREET FLORIDA 33130.1503 (305) 375-2901 FAX (305) 375-2900 The following specification was developed for use within the jurisdiction of the South lorida Building Code. The following table provides the contractor with the choices available for underlaymc 1 systems. These systems can only be used on pitches designated in the tables below. This guide specification covers Low Profile and High Profile Roof Tile (See Dade Coll: ty Protocol PA 112 for definition) on minimum " / „” (reroofing) and 19 / „” (new construction) solid decking nailed in compliance with the requirements of The South Florida Building Code. MAY Page - I PA 120 a • 07300 - Shinglesand Roofing Tiles. 320 - . Roofing Tiles. - Mortar- Sgt'Tile Specification. This mortar or adhesive set tile specification is a model specification document developed to comply with the code requirements of the South Florida Building Code. It is important to recognize that these recommendations are neither warranties explicit or implicit, nor representative of the only method by which a mortar or adhesive set tile system can be installed. This document has summarized a guide method of installation of mortar or adhesive set tiles which has been developed from actual trade practice; trade industry recommendations and In compliance with the requirements of the South Florida Building Code. , PART 1 GENERAL 1.01 Related Work Specified Elsewhere A. Rough carpentry - Section 06100 B. Roof and deck insulation - Section 07220 C. Flashing and deck insulation - Section 07600 MAY D. Roof accessories - Section 07700 1.02 Quality Assurance A. Products 1. Concrete Roof Tile - In compliance with Dade County Protocol PA 112, as set forth in Appendix 'W' of the South Florida Building Code. 2. Clay Roof Tile - In compliance with ASTM Standard C 1167. 13. Requirements of regulatory agency 1. South Florida Building Code, Chapters 23 and 34 - 1994 Edition. 1.03 Submittals PA 120 A. Samples - tile type and color as selected. 13. Manufacturer's literature - including product descriptions and recommended installation procedures. C. Tile System Assembly Product Control Approval. D. The underlayment manufacturer'p Roofing Component Product Control Approval, indicating approval for use with the tile system assembly. Page - 2 MAY f Roofing Component Product Control Approval for any roofing component used in installation which is not listed in the tile system assembly Product Control Approval. 1.04 Product Delivery, Storage and Handling A. Distribute stacks of tile uniformly, not in concentrated loads. B. When stacking tile on roof top prior to installation, install battens under nose of tile stacks where required in the underlayment Product Control Approval. C. Care shall be taken to protect the underlayment during the tile loading and stacking process. 1.05 Job Conditions A. Do not install underlayment or tiles on wet surfaces. B. Insure other trades are aware of precautions required when loading and stacking of tile, and their responsibility for protection of tile during and upon loading and stacking completion. C. Any punctures or tears in the underlayment which occur during the loading and stacking of tile shall be immediately repaired with like materials. 1.06 Warranty A. Materials - manufacturer's limited warranty against defects in roof tile for years. (NOTE: Fill in appropriate number of years) PART II PRODUCTS 2.01 Roof tile shall be manufactured by a manufacturer who has obtained Product Control Approval for use of the Tile System Assembly from the Metro -Dade Product Control Supervisor. A. Tile Manufacturer: B. Tile Type: ,. _ .. __ • C. Accessory Tile Type: This is provided for reference only. A warranty is not required under the provisions of the South Florida Building Code. Page - 3 PA 120 MAY D. Suffacefinish: E. Color: F. Approximate Weight: G. Roof tile shall meet or exceed the minimum requirements set forth in Dade County Protocol PA 112 for concrete tile and ASTM Standard C 1167 for clay tile. 2.02 Asphalt Saturated Roofing Underlayments A. Organic, type 1I, commonly called No. 30 or 30 #, specifically ASTM Standard D 226, type II organic saturated felt used as an anchor sheet. B. Organic, type I, commonly called No. 43 or #43, specifically ASTM D 2626 asphalt coated base sheet used as an anchor sheet. B. Mineral surface roll roofing felt minimum 74# commonly called 90 #, specifically ASTM D 249. C. Modified Bitumen single ply membrane in compliance with Dade County Protocol PA 104, as set forth in Appendix '0' of the South Florida Building Code. D. Self adhered membrane in compliance with Dade County Protocol PA 103, as set forth in Appendix 'N' of the South Florida Building Code. E. Granular surface SBS modified bitumen membrane, minimum 40 mils at the selvage edge, approved for use in the South Florida Building Code jurisdiction. 2.03 Membranes A. Organic - Asphalt impregnated cotton membrane, minimum 4" wide. B. Inorganic - Asphalt impregnated fiberglass membrane, minimum 4" wide. 2.04 Fasteners A. Nails - corrosion resistant meeting ASTM A 641 Class 1 or approved equal (i.e. hot dipped galvanized, aluminum, copper or stainless steel) of sufficient length to properly penetrate deck minimum'/" or through thickness of deck a minimum of 3 / 1 6', whichever is less. Fasteners shall be in compliance with Dade County corrosion resistance testing set forth in Appendix 'E' of Dade County Protocol PA 114, as set forth in Appendix'1-I' of the South Florida Building Code. Page - 4 PA 120 MAY 13 Sciew Fasteners- corrosion resistant fasteners formed from coated or plated steel; 'silicone bronze brass; aluminum; copper; or stainless steel of sufficient length to properly penetrate the deck a minimum of or through deck a minimum of 3 / 16 ", whichever is less. Screw fasteners shall be in compliance with Dade County corrosion resistance testing set forth in Appendix 'E'-of Dade County Protocol PA 114, as set forth in Appendix '1-1' of the South Florida Building Code. C. Storm clips and storm clip fasteners - refer to specific manufacturer's Product Control Approval. 2.05 Metal Flashing A. Flashing shall be minimum 26 ga., G -90 corrosion resistant metal - conforming to ASTM A 525 and A 90; or other metal or composition profile materials which are approved under the South Florida Building Code, or have received Product Control Approval . B. Lead shall be minimum 2.5 lbs. per fe. 2.06 Adhesive / Sealant A. Asphalt plastic roof cement - conforming to ASTM D 4586, type II, non- asbestos, non - running, heavy body material composed of asphalt and other mineral ingredients. B. Cold process modified bitumen adhesive - conforming to ASTM D 3019, type 11. C. Structural bonding adhesive - conforming to ASTM C 55.7 or ASTM D 3498. D. Asphalt - conforming to ASTM D 312, type III and IV. (Note slope requirements in Section 34 of the South Florida Building Code). E. Proprietary adhesive compounds in compliance with the requirements set forth in Dade County Protocol PA 110 and having Roofing Component Product Control Approval. 2.07 Mortar A. Mortar mix shall have a Roofing Component Product Control Approval for use with the specific tile system being installed and shall be in compliance with Dade County Protocol PA 123. B. Mortar shall be mixed using the mixing ratio specified in the mortar manufacturer's Product Control Approval. Page - 5 PA 120 PART III EXECUTION MAY C. Mortar flow shall be determined using a cone penetrometer test, in compliance with ASTM C 780 (Appendix Al), the results of which shall be 2 ±' / (55 ± 3 mmYof penetration. 2.08 Lave Closure A. Prefabricated EPDM synthetic rubber conforming to ASTM C 1056. B. Prefabricated metal eave closure. C. Prefabricated concrete or clay eave closure. D. Mortar - color optional. 2.09 Coating A. Paint - color coordinated paint for painting tile, flashing and/or accessories, as required. B. Acrylic sealer - for point -up mortar (optional). C. Tint Seal - color coordinated sealer for staining tile or accessories as required. 2.10 Lumber • A. Sheathing - material shall conform to APA rated sheathing. 1. New Construction - 40/20 19 / 72 " APA rated sheathing . 2. Re- roofing - 32/16 ' / APA rated sheathing. 3.01 Inspection A. Verify that surfaces to receive underlayment and roof tile are uniform, smooth, clean, and dry. B. Do not start roofing, installation until the Building Official has inspected and approved the decking installation 3.02 Underlayment Application - choose one of the following • Page -6 PA 120 MAY A. I-Igt Mop 30/90 A two ply roof application commonly called a'I-Iot Mop' system. The roof cover ' is terminated at approved metal flashings. A No. 30 ASTM D 226, type 11 asphalt saturated anchor sheet shall be mechanically attached to the wood deck a with approved nails and tin caps spaced in a 12" grid staggered in two rows in the field, and 6" o.c. at the laps. Over properly installed anchor sheet, apply one layer of ASTM D 249 mineral surfaced cap sheet in a full 25 lbs /sq. ± 15% mopping of ASTM D 312, type IV asphalt. Asphalt shall be applied uniformly so that the felts do not touch. Side laps shall be a minimum of 6 ", and head laps shall be 2 ", nailed 12" o.c. and 6" o.c. respectively. B. Hot Mop 43/90 .t A two ply roof application commonly called a'I-lot Mop' system. The roof cover is terminated at approved metal flashings. A No. 43 ASTM D 2626, type II anchor sheet shall be mechanically attached to the wood deck a with approved nails and tin caps spaced in a 12" grid staggered in two rows in the field, and 6" o.c. at the laps. Over properly installed anchor sheet, apply one layer of ASTM D 249 mineral surfaced cap sheet in a full 25 lbs /sq. ± 15% mopping of ASTM D 312, type IV asphalt. Asphalt shall be applied uniformly so that the felts do not touch. Side laps shall be a minimum of 6 ", and head laps shall be 2 ", nailed 12" o.c. and 6" o.c., respectively. C. Hot Mop 30 / 'Modified Cap' A two ply roof application commonly called a 'I-Iot Mop' system. The roof cover is terminated at approved metal flashings. A No. 30 ASTM D 226, type I1 asphalt saturated anchor sheet shall be mechanically attached to the wood deck with approved nails and tin caps spaced in a 12" grid staggered in two rows in the field, and 6" o.c. at the laps. Over properly installed anchor sheet, apply one layer of Product Control Approved, minimum 40 mil, SBS cap sheet in a full 25 lbs/sq. ± 15% mopping of ASTM D 312, type IV asphalt. Asphalt shall be applied uniformly so that the felts do not touch. Side laps shall be a minimum of 6 ", and head laps shall be 2 ", nailed 12" o.c. and 6" o.c. respectively. D. Hot Mop 43/ 'Modified Cap' A two ply roof application commonly called a'l-lot Mop' system. The roof cover is terminated at approved metal flashings. A No. 43 ASTM D 2626, type II anchor sheet shall be mechanically attached to the wood deck a with approved nails and tin caps spaced in a 12" grid staggered in two tows in the field, and 6" o.c. at the laps. Over properly installed anchor sheet, apply one layer of Product Control Approved, minimum 40 mil, S13S cap sheet in a lull 25 lbs/sq. ± 15% mopping. of ASTM D 312, type IV asphalt. Asphalt shall be applied uniformly so that the felts do not touch. Side laps shall be a minimum of 3 ", and head laps shall be 6 ", nailed 12" o.c. and 6" o.c. respectively. Page -7 PA 120 1 MAY E. Cold Process 30/90 A two ply roof application commonly called a 'Cold Process' system. The roof • cover is terminated at approved metal flashings. A No. 30 ASTM D 226, type 1I anchor sheet shall be mechanically attached to the wood deck a with approved nails and tin caps spaced in a 12" grid staggered in two rows in the field, and 6" o.c. at the laps. Over properly installed anchor sheet, apply one layer of ASTM D 249 mineral surfaced cap sheet in a continuous layer of ASTM D 3019, type III cold process adhesive at the rate of 1.5 gal/sq. Adhesive shall be applied uniformly, with a squeegee or knotted brush, so that felts do not touch. F. Cold Process 43/90 A two ply roof application commonly called a 'Cold Process' system. The roof cover is terminated at approved metal flashings. A No. 43 ASTM D 2626, type II anchor sheet shall be mechanically attached to the wood deck a with approved nails and tin caps spaced in a 12" grid staggered in two rows in the field, and 6" o.c. at the laps. Over properly installed anchor sheet, apply one layer of ASTM D 249 mineral surfaced cap sheet in a continuous layer of ASTM D 3019, type III cold process adhesive at the rate of 1.5 gal /sq. Adhesive shall be applied uniformly with a squeegee or knotted brush, so that felts do not touch. G. Self- Adhered Underlayment/Anchor Sheet A two ply roof application utilizing a Product Control Approved, self - adhered single ply underlayment with a granulated top surface, in compliance with Dade County Protocol PA 103. The self adhered membrane shall have been tested for static uplift with the bonding material. The roof cover is terminated at approved metal flashings. Any approved No. 30 or No. 43 sheet shall be mechanically attached to the wood deck with approved nails and tin caps spaced in a 12" grid staggered in two rows in the field, and 6" o.c. at the laps. Over properly installed anchor sheet, apply one layer of any approved, self - adhered underlayment in compliance with the Roofing Component Product Control Approval. 3.03 Drip Edge Metal - choose one of the following A. Edge metal shall be installed at perimeters over a two ply underlayment system. The metal profile shall be placed,in an /8" continuous bed of ASTM D 4586, type II flashing cement and fastened 4" o.c. with 1112 ga. x PA" annular ring shay.!,, corrosion resistant roofing nails, placed 1" from the top edge of the deck flange. All bonding surfaces shall be fully primed with ASTM D 41 primer. All joints shall be lapped an minimum of 4" in a bed of approved flashing cement. The metal and granular surface cap sheet shall be joined with a 1 / 8 " bed of flashing cement and a 6" strip of asphalt saturated cotton or fiberglass fabric. The fabric shall be fully embedded in the flashing cement. As an alternate, the metal may be stripped in with a 6" strip of torch, hot asphalt or cold adhesive applied modified bitumen. Joints shall be feathered with adhesive to enhance water flow Page - 8 PA 120 MAY t 1DR, A. Edge metal shall be installed over the anchor sheet at all perimeters in a maximum s / continuous bed of ASTM D 4586 , type 11 flashing cement and fastened 4" o.c. with 1112 ga. x 11/4" annular ring shank, corrosion resistant roof nails placed not greater than 1" from the outside edge of the deck flange. All bonding surfaces shall be fully primed with ASTM D 41 primer. All joints shall be lapped an minimum of 4" in a bed of flashing cement. The mineral surface cap sheet shall be bonded to the metal with ASTM D 312, type IV asphalt. B. Continue from eave up rake/gable in same manner, insuring water shedding capabilities of all metal laps. - C. CARE SHALL BE TAKEN NOT TO COMBINE HOT ASPHALT WITH FLASHING CEMENT. 3.04 Valleys A. Install preformed closed valley of a minimum width of 16" (24" stretch out) with a minimum 2 '/2" height center divcrter and minimum 1" metal edge returns. Lap all joints a minimum of 6" and apply a coating or separator sheet for corrosion resistance when using all Ferrous metals. 1. Secure with approved clips fabricated from similar or compatible material at each batten. Clip 1" metal edge returns to either deck or batten strip with roofing nail through metal strap. 2. Trim metal at all valley /ridge junctions, insuring water shedding capabilities onto the valley. 3. Install lead soaker at all valley /ridge junctions. Turn lead up a minimum of 1" to create a water diverter, insuring water shedding capabilities onto the valley. Note: Where special conditions exist, it may be necessary to increase the finished width of the valley flashing material. 3.05 Valley Termination onto Roof Plane A. When valley terminates onto roof plane install in accordance with standard valley flashing procedures. 1. Apply an 18" x 18" lead soaker /skirt underneath the cave and end valley to carry water off the valley back onto the field tile. Page -9 PA 120 MAY 3.06 Flashing and Counterflashings at all Abutments A. A preformed metal wall tray, 5" vertical flange and 6" base flange and 1" metal edge return, shall be installed flush to base of walls over underlayment. Start at lower portion and work up to insure watertight application: 13. Sccurc with clips on the horizontal metal flange at each batten. Clip 1" metal edge diverter to deck or batten strip with approved roofing nail, that is compatible with the metal, through a metal strap. C. Nail vertical metal flange within 1" of metal edge. Secure as necessary to meet job conditions. Lap joints a minimum of 4" and apply flashing cement for corrosion resistance when using all ferrous metals. D. Seal along entire edge of vertical metal flange, covering all nail penetrations with approved flashing cement and membrane. E. When installing optional counterflashing, lap top flange of base flashing a minimum of 3 ". Nail metal within 1" of metal edge 6" o.c. or set metal into reglets and seat thoroughly. Lap joints a minimum of 3" and apply flashing cement or sealant between the laps. 3.07 Standard Curb Mounted Skylights, Chimneys, Etc. A. Install curbs at a sufficient height to meet the tile height. 13. Install a minimum 12" width lead at eave end of each curb. C. Secure with approved nails 6" o..c., insuring nails will be covered by skylight/hood vent flange. D. Continue with lead on both sides of the curb working up toward ridge. Trim as necessary to insure water shedding onto field tile. E. Secure with approved roofing nails 6" o.c. F. Install and ridge end of curb with a minimum of 24" width lead extending over the course of tile abutting the top of the curb and under the second course of the tile at the top of the curb or extend lead under both courses of tile at top of curb. Fold lead to crcate a 1" water diverter at the top and sides of 24" lead saddle. G. Seal all nail penetrations. lead/skylight or hood vent joints with approved sealant. Page - 10 PA 120 MAY Note: For self curbing or prefabricated skylights refer to the skylight manufacturer's installation instructions and the Roofing Component Product Control ) ' Approval. The Product Control Approval shall take precedence. 3.08 Head and Apron Flashing A. install apron flashing a minimum 4" on tile surface. Nail vertical flange on !lashing 1" of metal edge and secure as necessary. Lap metal 6" and seal laps with approved flashing cement. 3.09 Pipes, Turbines, Vents. Etc. A. Seal around stack with plastic cement. B. Apply 18" skirt lead stack over last field tile cut previously installed. Lead must extcnd under the course of tile above the pipe stack course. C. Seal with approved sealant. Note: Each tile manufacturer requires specialty accessories. Their accessories shall be installed in compliance with the tile system assembly Product Control Approval. 3.10 Tile Installation Methods Note: Installation instructions set forth in the tile system assembly Product Control Approval shall take precedence. A. Layout - horizontal 1. Chalk horizontal lines beginning one tile length from cave less desired overhang. Overhang shall be' /," to 2 ", depending on tile type, use of gutter, or other functional requirements. 2. For batten installation only, chalk horizontal line 1" to '/2" from ridge. 3. Chalk succeeding lines for a minimum 3" headlap unless restricted by product design. 4. Increase headlap when necessary for equal course spacing, or as needed for unusual application conditions. B. Layout - vertical - choose one of the following 1. Staggered /cross bond tile installation - recommended for flat tile Page - I l PA 120 MAY a, Gable end C. Tile Installation i. Chalk vertical lines one full tile and one half tile width plus 1" to 2" from starting gable to accommodate rake tile. OR, i Chalk verticals lines one full tile and one half tile width plus 1 / 4 " from starting gable to accommodate flush finish. ii. Chalk additional lines, if necessary, to maintain alignment. b. blip roof i. Chalk vertical line 90 degrees from eave line. ii. Chalk second line parallel to first to accommodate staggered/cross bonded tile. iii. Chalk additional lines, if necessary, to maintain alignment. OR, 1. Straight bond tile installation - not recommended for flat tile a. Gable end i. Chalk vertical line one full tile width plus 1" to 2" from starting gable. ii. Chalk additional lines, if necessary, to maintain alignment. b. Hip roof i. Chalk vertical lines, if necessary, to maintain alignment. 1. Stack tile to facilitate installation and minimize tile movement. Tile stacks shall not be greater than ten high. Battens shall be placed under the nose of tile stacks where required by the underlayment Product Control Approval. 2. Cave treatment - choose one of the following three options Page -12 PA 120 MAY .a• * a a. Prefabricated Rubber Cave Closure - install closure strip along eave in compliance with the tile system assembly Product Control Approval. OR, a. Metal Eavc Closure - install closure strip along cave in compliance with the tile system assembly Product Control Approval. OR, a. Raised Fascia/Wood Starter Strip- when using a l'''A" raised fascia, a 2" x 2" wood starter strip must be installed behind fascia. i. Install fascia board approximately %" above roof deck or a 1" x 2" wood starter strip at roof edge. ii. Install 8" tapered cant.strip at cave behind fascia and /or starter strip to support metal flashing when using drip edge. Tapered cant strip is optional when using anti - ponding metal. iii. Install a minimum 8" wide anti - ponding metal flashing of to insure positive drainage over fascia/starter strip. Nail top edge of flange onto roof. iv. Apply undcrlayment as per Section 3.02 3.11 Low Profile and High Profile Tile Note: Mortar or adhesive set tiles applied at an incline of 4 ":12" to 7 ":12" shall have the first three courses of tile nailed with not less than one nail per tile. As an alternate the first three courses shall be applied in mortar or adhesive over a single layer of minimum 12 ga. wire mesh with square openings of not less than 3/8" which is mechanically attached to the deck with not less than one roofing nail every square foot. For pitches from 6 ":12" to 7 ":12" every third tile of every fifth course, beginning at the eighth course shall be nailed. A. Starting at lower left corner (facing down roof) install first course of tile. Make certain all tile overhangs drip edge evenly along entire first course. B. Bond and /or secure field, perimeter and corner tile in compliance with the tile system assembly Product Control Approval. C. Cut/break tile for proper staggering of tile courses when using the staggered/cross bond method of installation. Page - 13 I'A 120 MAY D. Set tile in stepped course fashion or in a horizontal and/or vertical fashion when utif izingstraight bond method. E. Lay succeeding courses of field tile in same manner. F. If the tile system assembly has been tested for wind characteristics in compliance with Dade County Protocol PA 108, the tile shall be attached to resist the aerodynamic moment determined using the design pressures for the building, determined under Chapter 23 of the South Florida Building Code, and the attachment calculations set forth in Dade County Protocol PA 115, as set forth in Appendix 'S' of the South Florida Building Code. Confirmation of bonding performance shall be determined by the Building Official in compliance with Dade County Protocol PA 106 not less than.30 days after project completion. G. If the tile system assembly has not been tested for wind characteristics in compliance with Dade County Protocol PA 108, the tile shall be attached to resist the required uplift force determined using the design pressures for the building, determined in compliance with Chapter 23 of the South Florida Building Code, and the attachment calculations set forth in Dade County Protocol PA 115, as set forth in Appendix 'S' of the South Florida Building Code. Confirmation of bonding performance shall be determined by the Building Official in compliance with Dade County Protocol PA 106 not less than 30 days after project completion. I-I. Cut/break field tile to form straight edge at center of hip /ridge. I. Mortar application: Low, I-Iigh and Flat Profile Tile. 1. Set tile in a bed of approved mortar. Apply full 10" minimum length mason trowel full (approximately 4.5 to 5 pounds dry weight) a mortar vertically under pan closest to underlock of previously installed tile. For flat tile place mortar or adhesive adjacent to underlock of previously installed tile. Mortar should be placed from head of tile in previous course to head of tile being set. Do not apply mortar under headlug of tile, or onto the underlock of adjacent tile which may create a tilted or cocked tile. Mortar shall be placed in general compliance with the detail,.drawings attached to the tile system assembly Product Control Approval. 2. Use half starter /finisher tile when provided or cut/break tile for proper staggering of tile courses when using the staggered/cross bond method of installation. 3. Set tile in stepped course fashion or in a horizontal and / vertical fashion when utilizing straight bond method. Page - 14 PA 120 MAY 4. Lay succeeding courses of field tile in same manner. Bed of mortar or .}'' adhesive should make contact with head of the lower course of tile and underside of tile being set. J. Mortar application- Two -Piece Barrel Tile. 1. Apply 10" mason's trowel full of mortar (approximately 4 to 5 pounds dry weight) vertically over chalk line and under center of each pan with narrow end facing down roof. 2. Place bed of mortar or adhesive along inside edges of pans and set covers with wide end facing down roof. 3. Point mortar or adhesive to next acceptable straight -edge finish insuring good strong contact along edges. 4. Lay succeeding courses of field tile in same manner. Bed of mortar or • adhesive should make contact with head of lower course of tile and underside of tile being set. K. Adhesive set Application 1. Apply adhesive material to the underlayment and/or tile in strict compliance with the Product Control Approval. 2. Placement of adhesive shall be in compliance with the detail drawings attached to the Product Control Approval. 3.11 Valleys Note: It is not recommended to install trim tile in valleys. It may be necessary to remove the lugs from the field tile at walls and valley flashings for proper positioning of cut field tiles. A. Preformed Metal with 1" Returns 1. Closed Valley - Miter tile to form straight border on either side of water diverter. 2. Open Valley - Miter tile to form straight border on either side of two water diverters. 3.12 1-lip Starter - choose one of the following A. Prefabricated hip starter Page - 15 PA 120 1. Miter tile as hip starter to match eave lines. �.a 3.15 012, A. Use standard hip tiles as starter. 3.13 Hip and Ridge Installation- Choose one of the following A. Set hip and ridge tile in a continuous bed of color coordinated mortar, lapping tile minimum 1". Insure bed of mortar does not protrude in center of hip or ridge junction. Approximately 1" of field tile shall extend beyond bed of mortar. Point mortar and finish to match tile surface. OR, A. Mechanically fasten hip and ridge tiles to nailer board.. See section 3.16. B. A ridge vent or venting within 18" of ridge is required on all tile applications using self adhered underlayment direct to deck. Ridge vents shall have Roofing Component Product Control Approval. 3.14 Nailer Boards - as required by some tile system assemblies Rake/Gable Tile A. Rake /Gable Tile A. Install salt pressure treated nailer boards secured directly to trusses. 13. Install self adhered membrane over nailer board and seal to tile surface. Care should be taken to ensure no self adhered membrane is exposed to sunlight. C Fasten with nails or screws of sufficient length to penetrate minimum of into each truss. D. Use approved adhesive or clips at overlaps. 1. Install first rake tile to exposed length of first course of field tile with factory finish of rake tile towards the eave. 2. Nail rake Mile with minimum two 10d hot dipped galvanized or non - ferrous nails, or of sufficient length to penetrate the framing a minimum of W, whichever is more restrictive. Page - 16 MAY PA 120 MAY ' Abut each succeeding rake tile to the nose of the field 'tile above and maintain a constant headlap. B. Metal Finish 1. Install prefabricated gable metal with 1" water return. 2. Fasten by clipping 24" on center. Note: Rake tile application at finishing end may need special consideration to provide proper drainage, i.e. flashing or sealant may be needed. Refer to tile system assembly.Product Control Approval. 3.16 Wall Abutments A. Cut tile to fit approximately ' /z" to base of walls. Point -up mortar not recommended. Note: It may be necessary to remove the lugs from the field tile at wall flashing for proper positioning of cut field tiles. 3.17 Plumbing Stacks A. Metal Finish 1. Cut tile to fit close to plumbing stack. Over plumbing stack install a lead pipe flashing. Pipe flashing shall have a minimum 18" x 18" base. Flashing base shall be set in approved adhesive and form fitted to match the tile profile. Install pipe flashing 'in such a manner to allow shedding of water. The ridge edge of the pipe flashing base shall be installed under the nose of the tile above. Note: Rigid corrosion resistant metal may be substituted for lead on Ilat tile installations. 3.18 Coatings - optional A. Acrylic sealer may be applied to exposed mortar as in accordance with the Tile System Assembly as outlined in the Product Control Approval. B. Color coordinated paint may be applied to all metal flashings. 3.19 Tile Replacement A. Damaged Tile Page - 17 M 120 MAY 1. ,j3reak out and replace damaged roof tile. Do not disturb underlayment. Repair underlayment if necessary. 2. When battens are used, drive nail flush to batten with hammer and flat bar. 3. Apply minimum of ' / x 2 bead" of approved adhesive on tile in course below replacement tile. 4. Immediately set replacement tile in position assuring proper contact. 13. Small Valley and Hip Cuts 1. Elevate nose end of tile in course above small cut tile, apply a minimum of / x 2" bead of approved adhesive at head of cut tile. 2. Immediately set tile in course above in position which assures proper contact. Note: For roof pitches >7 ":12" , mechanical fastening is required. Refer to tile system assembly Product Control Approval. 3.20 Clean -Up A. Remove all broken tile, debris and excess tile from roof. 3.21 Miscellaneous recommendations A. Instructions shall be given to all parties involved cautioning against traffic of any kind allowed on finished roof. Damage to roof tiles and /or sub -roof may result. Refer to tile system assembly Product Control Approval for proper procedures for traffic on roof tile. Page - 18 PA 120 u ME. POPOLITAN DADE COUNTY, FLORIDA METRO Chairman Merino' S Ilhelium 17er- Chainnan 11.U. Lasseter .IIe,nhers Ronald iI ire J :Trims George Berlin 77 Al. Mock Lawrence :I. Ourcmri Ted Brills (hear thrown J,d Colpini Jurye de la 7inItense N. Corh.u, Becker A rn Goldman Rirluent .tl. lluruw Daniel Louis John Lin,lunnn Steven Lowe Joseph Mokher. Sr. Janes Power nillimrn Riley .•1 numnd .t'l. Rb 77 s Utter/ ma k .•Il(rer! IIiishnul Rudy 11 illiuwl • Doan! Consultant John Pi umrieu Staff L7arlrs Danger Satiny II'rinrrh Gil Diamond • . 4 Ohio Sealants, Inc. 7405 Production Drive Mentor, Oh. 44060. Your application for Product Approval of , _.ed- 2 -- R`t' -600 Rnnf T;1e Adhesive under Sections 203 and 204 of the South Florida Building Code governing the use of Alternate Materials and Types of Construction, and completely described in the plans, specifications and calculations =s submitted ted b, __12:4 .. 'c �t _so, - • . ' ! � d - has been - i - • -' • ' � � Specific Conditions set accepted by Product Control under the Sp forth on pages 2 -2a and the Standard Conditions on Page 3 • ACCEPTANCE No.: q1 Of 27 1 APPROVED EXPIRES Oct 2i 1994 -1- * *ELEAS NOTE ** 4,103WW F(3R_ rTr•TC AT t 110/111WIILE_ 01-6.CULTAII.C.E This application for Product Approval has been accepte d bb i the t1' Metropolitan Dade and Unincorporated areas County of Dade County n the norpora e under the conditions set forth above. APPROVED: October 21. 1 bar les "et METRO -DADE CENTER BOARD OF RULES AND AP APPEALS A 111 N.W. 1s1 STREET MIAMI. FLORIDA 00120.1074 (305) 075.2901 (305) 375 -2612 dette& Gil Diamond, P.C. Product Control Division Supervisor Charles Danger P.E. Deputy Secretary Metropolitan Dade.County Board of Rules and Appeals Ohio Sealants. Inc. or 1. This approves Pro - Series RT -600 TM a roof tile the repair of existing roofs. However, app may be used with new construction in addition to the requirements for a ,na,>>vstem.. 2. physical Properties Type Synthetic rubber and resins Color Multiple color availability Solids by Weight 65% Flash Point 0 F Flammability Extremely flammable while in use (See Cautions on label) Toxicity Toxic only if swallowed (See MSDS) . 20 minutes @ 70 F., 50% RH Open Time Cure Time ; Application Temperature Service Temperature Freeze -Thaw Stability Clean up t• -2- . 2 4 hours 30 F to 100 F -20 F to 180 F Will not freeze Mineral Spirits or Paint Thinner \ ACCEPTANCE No.: 91 60 27�1� Oct, 21, 1991 APPROVED EXPIRES nct 21. 1994 it Diamond, P.E. Product Control Division Supervisor • he • + , •h' •► 3. Limitations a) Use shall be limited to gluing tile itoatileeifstherroroof contains 25% or less of loose tile any roofing tiles. b) Use shall be limited to gluing title to tile to mortar pads if: • i) Roof contains 75.1 or less of loose tiles ii) Mortar pads are adequate in area, bonding and strength. c) Use shall not be allowed for roofs, with more than 75% loose tile. d) Contact of the adhesive with theunderlaYment manufacturerrs roofing membranes shall be limited, as per recommendations. 4. If the application of this adhesive Sub- section loose tile currently allowed South Florida Building Code will not plytfor tha pa the articu and therefore, all tiles must be bonded within the percentages as stated above. 5. Application will require a valid roofing permit by a licensed roofing contractor. 6. Installations to be in accordance with the manufacturer's instructions. • -2a- ACCEPTANCE No.: 91- 0627.1 APPROVED _ Oct 21. 1991 EXPIRES : Oct. 21, Lai__ Gi, Diamond, P.E. Product Control Division Supervisor • - METROPOLITAN DADE COL . +TY, FLORIDA Chairman lter nan S. Iliuxhnu• 1 ier- C•Irnirmaa 11.0 Laurier Akmbrn Run :I,grr .1 •c : I, i,,, George 1Ir•r•lin- 77uunrrs M. Mark lrnrrrncr .1. Rnrsari 7i d Brirlis Oscar firemin John Cull,ini Jorge de la rriemr 11. Carlton /)er krr Arnold Goldman Richard Al. 1/uru,n Daniel Lapis John 1_indsrrurn c. pen Lowe J. .1h)kher. Sr. J Prneer U7llir Riley Armando At Ri :o 7)uu Urrerbrrr•k ;UJrrd Ili isbmr! Rudy I rillir Board Cuneullunl John l'ishn•irto Staff C%urr•lrc 1)un.4rr Snnrlr th•iu,vh Gil Manifold -3- ► r y Y ^; �a7 rl METRO -DADE CENTER BOARD OF RULES AND APPEALS SUITE 1010 111 N.W. 1s1 STREET MIAMI. FLORIDA 33128-1974 (305) 375-2981 (305) 375 -2612 NOTICE OF ACCEPTANCE: STANDARD CONDITIONS 1. Extension of Acceptance may be considered after a new application has been filed and the supporting have prt data, test reports no older than ten (10) years, re- evaluated. All reports of re- testing shall bear the seal, signature and date of an engineer registered in the State of Florida. r 2. Any revision or change in the materials, use, or manufacture of the product or process automatically be cause for termination, unless prior approval is granted for revisions or change. 3. processsaorsfactchangeer product or in Code provisions shall be process for re- evaluation. 4. This acceptance shall not be used as an endorsement of any product for sales or advertising purposes. 5. The Notice of Acceptance number preceded by the words Dade County, Florida, and followed by the expiration date may be displayed in advertising literature. If any portion of the Notice of Acceptance is displayed, then it shall be done in its entirety. 6. Product approval drawings, where required for permit applications, shall be provided to the applicant by the manufacturer or his distributors; unless otherwise noted in the Notice of Acceptance. The prints need not -be re- sealed by an engineer. 7. Failure to comply with Standard Conditions shall be cause for termination of Approval. Diamond, '. . roduct Control Division Supervisor L.) Ob. . ‘. ,•• • +$ ,••. •:4 • • .•• • • • " • •/ H.9 ad-441. 6, e /c) aid( (cP A4 /' -h) e. e roe -e / ft.) AV NOTE: MORTAR CONTACT IS MADE WITH 3 TILES PM-cc_ A-0 h C..g/ e.. 0 Ne- (I ire .-0/1-rApv,46 NOTE: MORTAR SHALL NOT REACH /34 r ,t) 1 ‘,114c6;,-; a ONTO THE HEAD OF 11LE IN PREVIOUS o p COURSE OR ONTO UNDERLOCK OF ADJACENT TILE. 10" MASON TROWEL FULL OF TYPE "M" MORTAR Ni A l d /ta_. • HEADLAP — METAL EAVE DRIP THICKBUTT TILE FASCIA BOARD flePU ti 4 42. 'TILE & MORTAR PLACEMENT—FLAT 'ME 1. THE HEAD OF ONE TILE 2. THE UNDERLOCK SIDE A SECOND 11LE 3. THE UNDERSIDE OF THE TILE BEING SET BARGE BOARD SAWCUT HALF 11LE POINTED-UP MORTAR BED NAIL HERE THROUGH PLAST ROOF CEMENT (WHEN REQUIRE BY CODE) arisen. ii#11.4,1tr —lap w :_tcli'LL ,.._. L:t...c: L i le Lam _ yp BUILDING AND ZONING DEPARTMENT tN No. 2015 Lot Remarks: Permit 37590 10050 N.E. SECOND AVENUE MIAMI SHORES. F LORIDA 33138-2382 TELEPHONE (305) 799 -220 FAX (309) 796 -8972 CERTIFICATE OF OCCUPANCY Owner, Agent or Tenant of Building Barry University, Adrian Building Utility Room. Block Subdivision Street Address 11300 N.E. 2nd Avenue, Miami Shores Approved use by occupancy Storage Room Ntigh40, Date October 18, 1995 This Certificate of Occupancy is issued to the above named owner for building at above named location only upon the express provision that the applicant will abide by and comply with all conditions of Ordinances Nos. 92, 93, 94 and 97, known as the Zoning, Electrical, Plumbing and Building Ordinances of Miami Shores Village pertaining to the erection, construction, alteration or remodeling of buildings or structures. FRANK LUBIEN, DIRECTOR, BUILDING DIVISION DATE April 21, 1995 461 cerelly,, `. • Donald Mowry, Archiject DONALD R. M ARCHITECT 1076 SUNSET STRIP SUNRISE, FLORIDA 33313 TELEPHONE 791 -8984 TO: Miami Shores Village Building Department Attn: Mr. Frank Lubien FROM: Donald Mowry, Architect RE: Adrian Utility Building Building Permit No. 37590 Reinforcing Steel This is to confirm 'that the column and, tie bea}i1. steel has been installed per approved building permit plans. 5 cotraPan A tLa � t � c 850 NW 61st ST. FT. LAUDERDALE, FL. 33309 Ph # (305) 491 -3310 Fax (305) 491 -8231 ENG 1 BE ENG PACKAGE -l� BUILDING DEPT (SEALED) lj OFFICE (UNSEALED) ❑ JOBSITE (UNSEALED) CONTRACTOR JOS NAME: JOS ADDRESS: DATE: 9 9 JOB 194" LAYOUT / /D4 W ANG E RS E1-IUH 26 EHU1 -1 28 E1 -IU1 -I 26-2 SHUN 2S -2 E1 -IU1 -1 2S -3 45 DEGREE SPECIAL I-1GRS SPECIAL NAILS NO 1 -LANCE RS 40, D7t *t fkss1r G®N.sri, A PIV AN Yflkii'v Room 11380 >V �����• lollMml silo/ s pk. ATLANTIC TRUSS COMPANY. LTD. 850 NA 61st SMELT FL uuUERONC. Fl 33309 Set (305)491 -3310 Fac (305)491 -8237 wee: Mks Agave ummr ROOM 113031E WK. AU SHORES, 11.33161 fekshone Desaip6on 1 " .1* 11 04 -5 1: 46 1 Ode 4112/95 1 Ow.e Its 3 0 I 0 J5 J3 J1 7 T1 T1 Ti Ti T1 M In n H1 0 J5 J3 J1 17 -4 %P BRAIN' i = CJ 9 G V/; PDI NT 1-10,6 3 re 1- 2-0.0 2-0-0 4.000 1 co (0 I TOTAL NUMBER OF NAILS 1 OF FON BREAK EACH ' SIDE X (INCHES) MAXIMUM FORCE (LBS) 33% LOAD DURATION SYP DF SPF HF 2X4 2X6 2X4 2X6 2X4 2X6 2X4 2X6 2X4 2X6 14 -- 21 24' 2012- 3019 1856 2784 1573 2360 1603 2404 18 27 30' 2587 3881 2386 3580 2022 3034 2061 3091 22 33 36' 3163 4744 2917 4375 2472 3708 2519 3778 i 26 39 47 3738 5607 3447 5171 2922 4383 2977 4466 1 30 45 49' 4313 6469 3978 5967 3371 5057 3435 .5153 STANDARD REPAIR DETAIL FOR BROKEN CHORLS. WEBS AND DAMAGED OR MISSING CHORD SPUCES DMDE EQUALLY FRONT AND BACK ATTACH 2X _ SCAB OF THE SAME SIZE AND GRADE AS THE BROKEN MEMBER TO EACH FACE OFTRUSS (C64IERED ON BREAK OR SPLICE) W/ CONSIRUCIION DUALITY ADHESIVE AND 10d COMMON WIRE NAILS (IWO ROWS FOR 2X 4. THREE ROWS FOR 2X 6) SPACED 3' O.C. STAGGERED AS SHOWN. THE LENGTH OF THE BREAK (C) SHALL NOT EXCEED 17. (C - PLATE UEVGTH FOR SPLICE REPAIRS) THE MINIMUM OVERALL SCAB LENGTH REQUIRE? (1315 CALCUI.ATED AS FOLLOWS: L =fax +C . - 10d NAIL NEAR SIDE i- -10d NAIL FAR SIDE 6 MIN Mffek Industries. Inc. P.O. Box 7359 St. Louis. MO 63177 TRUSS CONFIGURATION MOB Ax LOCATIOVS FOR I LUSIRATION OAI�Y THE LOCATION OF.A BREAK MUST BE GREATS THAN OR EQUAL TO THE REQUIRED X DIMENSION FROM ANY PERIMETER BREAIC OR HEELJOWIANRA MNIMUM.OF 6 FROM ANY INTERIOR JOINT (SEE SKETCH ABOVE). . DO NOT USETO REPAIR JOINT SPUCES. LUISEASPEpRCREPAROETNLTO NE USED ONLY FOR 05 ORIGINAL MENTION HSREPASIWOESNOTWSLP llATINEREMAdWNGPORCH OFIETRISS5LINDAMACEDTNE DIME1SLICERIALLIIE t1 ENOV ER/aNORIMBtREMESARE RECIAID. WHEN1HE REPNASAREPROPEI ELYAPPLFiLHEWMWU.116CAPAECEOF suppcmc micas actrAIED ens maw. mum= amigo. 2.IW. ME#Afsnsmust BERETURMID OTHER C;11121MLPOISLfON5 BEFORE AMMO REPARI;'AD HELD I NRACEMINGAPPLX'J11i0NCIFREPNR &DE END OIAANLE. EDGE 1%STANCLA NDSP CPO OF NUS SHALL BE SUCH ASTOAVOID tliqUEM MOM OFTHEWOOLL 4. WHEN MUM 1HEZtiAE AHE USE OFAQAC,XUPINBORN RECO TOMO°LOC GOFIL$ CTORRATES ATTIEJOINTSCRWU= 5. INS REPAIR IS TO BE UM EOM:ENGLE PLYTRI S PIIHE?X_OiIIENQA1LON ONLY. AMU REPAST S MATED TOTRUSSES UCH NO140RETHANU LIROICEN MEMBERS. • S23 113 -23-94 5rt FIELD REPAIR DETAIL OF BROKEN WEB MEMBER, BROKEN SECTION. ION. • REPAIR • ?OCEDURE: 1 -APPLY TWO SCABS, SAME SIZE AND GRE AS T! - BROKEN WEB, NAILED ON EACH FACE OF TRUSS Wi 165 NAILS. (MIN. # OF NAILS IS. AS CALCULATED.) 2-NUIesa OF 1Bd COMMON WIRE NAILS TO BE . USED ON EACH SIDE OF BROKEN SECTION PER FACE. P • 2 }(NAIL VALUE)it14STR. INC.) N s NUMBER OF NAILS. P : AXIIAj_ FORCE OF t'E_MBElR, IN 1b3. NAIL VALUE : 141' FOR DF-L AND SP 120* FOR !-F AND SPr. STR. INC : STRESS INCREASE. 3 -SCAB LENGTH TO BE LONG ENOUGH TO PREVENT SPLITTING OF WEB MEMBER OR SCAB. WE RECakikEhn A MINIMlI4 OF 8 SOUARE- INCHES PER K IL - NAILS TO BE UNIFORMLY DISTRIBUTED k s li (+ / -) 3/1' EDGE DISTANCE MINIMUM LENGTH I5 -0`- • L - ttU OF SIDES)3t: OF NAILS) INCHES /NAIL» WIDTH OF LUMBER B - 'LENGTH OF CRACK, ALONG WEB. ; L - LENGTH H OF SCAB. mIkIMt1M GRADE OF LUMBER BL le REFER TO TRUSS w DRAWING. LOADING t .L . S7). 6 zCP • N/A. - BOTTOA SPACIAG: With -O.C. TPI -92 Crsi� SSSC -91 STR INCR. N/A- DRAWN BY I •J3 • c e—c ED. BY . JAI REP. 'STRESS:' YES = == flQ tiSTsk ] dsstries EXA."I?L 2X1 S' FORCE IN TFE •'aSER - 3590 LBS ALLOWABLE STr ItiCi . - 33 X 1502 N - 2 * 1 1-33 - 4-e0 USE 1 NAILS. - 2 * 1 * S 3 - 382S L'S= 35. _ LS= - TWO 2X1 ?S S' ON EACH FACE.. L -3-2', •5z NAIL °ER FACE. t 'ORLY lat.E-S TO.S81G= Y &5ER, +.!=L& E TRESS OILY MDT 1? ?L1C- E TO FRAY ES AND AMC Th SEES AIJ vE . ?S OCT SUB,E0 70 1)3.A` LOAD. : . CONSU_T MB: Da INC. ENGEERIRD DE'ARTtENT FOR S'=CIAL morn= AND LJ' VE i3 L. FORCE. +B rn °NJe ar I0A SIAM OE OR)O M at At Via — NOTE: THIS DETAIL IS VALID ONLY FOR COMPUTER OUTPUT GENERATED BY MITEK ROOF PROGRAMS AND SERVES AS AN INTERPRETATION OF CONTINUOUS LATERAL BRACING FOR WEBS IN COMPRESSION STRESS. OQ STANDARD LATERAL BRACE DETAIL BOTTOM CHORD 1/2 POINTS OR 1/3 POINTS BRACING 2x( ) SCAB END OF BRACING MEMBER SHALL BE CONNECTED TO A FIXED, RIGID POINT. 2 -10d NAILS TO THE COMP WEB BRACING MEM SHALL BE 2x3 OR 1x4 STANDARD OR BETTER LUMBER (SPF,HF,DFL,SP) CONTINUOUS LATERAL BRACE SPECIFIED BY MITEK ROOF PROGRAM 2xl ) SCAB SAME LUMBER SIZE AND GRADE AS WEB NAILED TO NARROW FACE OF WEB W/10d NAILS AT 6" o.c. OPTIONAL T -BRACE IN CASE THAT CONTINUOUS LATERAL BRACE CANNOT BE ACHIEVED • NOTE: REFER TO SEPERATE ENGINEERING DWGS. FOR MINIMUM LUMBER GRADES AND DESIGN LOADS. ray 7'0" CORNER SET P 9'ARED BY tuaII TOP CHORD CONNECTION: 7'0" JACKS - 4,10 -D NAILS 5'0" JACKS - 4,8 -0 NAILS 30` 8 1'0° JACKS - 2,8 -0 NAILS 12 • MIN. P -2.5 'MAX .P - 6.5 3X4 2x6 STD. H$ HT. HAx. \ 1 BOTTOM CHORD CONIECTION4 13'0' HAX 2,8 -D NAILS 1 3X4 OVERHUNG VARIES >• COMMON JACKS REACTION - SIZE 1 —sae 35 2-386 15 3- 397 15 2 3 16.97 2 P - 2X3 1-11-6 J. 9 -10-12 3'0" max - T T CORNER JACK 4 - 6 COMMON JACK (TYP) 7`0' JACKS U PARTI-AL ROOF LAYOUT 's'"' r DOUBLE BEVEL CUT AT THE END OF TOP AND BOTTOM CHORDS. 3 CORNER JACK ROTS THIS DESIGN HAS BEEN CHECKED FOR 110 NPH WD O LOAD, WALL HT 10 FT HAG PROVIDE FOR INUFT AT BEARING WALL CONNECTIONS. 150 LDS AT COMMON JACKS It 710 LDS AT CORNER JACK. 4,16 -D NAILS MINIMUM GRADE OF LUMBER T.0 . 2X4 Not 19 ;SP BJ` 2X4 Not 19 `j SP W ( rb s 2X4 No3 19'SP LOADING • L UPSF) TOP 30 15 BOTTOM 0 10 SPACING : 24 0:C TPI-92 G SSBC -91 • • • 0 0 0 0 co STR. INCR : 33 X DRAWN BY , TAN CHECKED BY : JAI REP. STRESS NO MiTek Industries Inc. a Approved for MiTek InR*usTries Inc._ GRADE OF . LUM35t 30 PSF SO .. I 2 PSF SOFFIT 2X4. . I • 2X $ l 2X4 ZC5 No2ND 39 SP + 2-8 -3 .3 -10-11 •1 :.2 -10-13 I 1 -2 -9 Not 19 SP I 2-9-15 I 4-0-11 3-0-12 4-4-11 No20 19 SP I 3 -0-2. .1-4 -7 . I 3 -3 -2 4-8-12 No.1ND 19 SP I 3-0-2 4-5-5 I 3 -3 -2 4 -9-11 Nat 19 SP 3 -1 -11 4-7-35 3-4-33 5-0-8 No.ID 19 SP - .3-3-3 4-9-10 • . 3-6-7 5-2-5 NDSS 19 SP 3 77 -3 5-5-12 4-0-13 5-0-1 SS 19 SP 3 -8 -1 5 1 -2-7 6-3-4 DSS 19 SP 3 -8 -13 • 5-10 -7 4 -3 -5 . . 6-5-7 LOADING L D TOP - 30 •• 15 fBOTTOM -8 10 • ' 1 SPACINCa'24 ' Inch O.C. • • OVERHANG RET. MINIMUM GRADE OF LUMBER •2X4 Na2t D 19 SP • 2X4 No2ND 19. SP plebs 2X4 No.3 19 SP MAXIMUM OVERHANGS. TPI-92 CMt. SSBC -91 STR. INCR. * 33 x DRAWN BY , U.A. • CHECKED BY $ JAI REP. STRESS YES 00 flQ • 0 = co MlTek Industries Inc.: O=TIO1 AL RETURN 'LEDGER BOLTED 73 T#E TIE BEAN er 31.1.1=0 • r • . OVERT -..ANG •RETIR•N No.1355g ' , • to • _ 2 � *1•• Ides In= ' This safety alert symbol is used to attract your' attention! PERSONAL SAFETY IS INVOLVED! When you see this symbol - BECOME ALERT - HEED iTS - MESSAGE. : A . • CAUTION: A.CAUTION identifies safe operating practices or indicates unsafe conditions that could result in personal injury or damage to structures. HIB - 91 Summary Sheet COMMENTARY and RECOMMENDATIONS for HANDLING, INSTALLING & BRACING METAL PLATE CONNECTED WOOD TRUSSES° It is the responsibility of the installer (builder, building contractor, licensed conbactor, erector or erection contractor) to properly receive, unload, store, handle, beta and brace metal plate connected wood trusses to protect life and o e fy The installer mustexercise the same high degree of safety awareness as with any other structural material TPl does not intend these recommendations to beintetpretedas superiortotheprojectArchitectsorEngineer'sdesignspcation (*Mending, installing andbracing woodtrussesforaparticularroof orfloor.These recommendations are based upon the collective experience of leading technical • • CAUTION:The builder, building co ntractor licensed - contractor, erector :erection o erection contractor- is= ad= A vised to obtain and read the entire booklet."Co m=; mentary and Recommendations for Handing, ln- stalling & Bracing Metal Plate Connected Wood Trusses, HtB -91• from the Truss Plate Institute. 8=10' 8-10' I Trussesstoredhorizontaltyshould besup- ported on blocking to prevent•excessive lateral bending and lessen moisture gain. 1 WARNING: Do not break banding unto installs -. Lion begins or lift bundled trusses by the bands. WARNING: Do not use damaged trusses. 1 CAUTION: Trusses should not be unloaded on rough terrain or uneven surfaces which could cause damage to the truss. Frame 1 1 DANGER: A DANGER designates a condition where failure to follow instructions or heed warn- ing will most likely result in serious personal injury or death or damage to s tructures:.=. W A WARNING describes a co where failure to follow instructions couid result in severe personal injury or damage to structures. is -di Ali._ TRUSS PLATE INSTITUTE 583 D'Onofrio Dr., Suite 200 Madison, Wisconsin 53719 (608) 833 -5900 personnel inthe wood truss industry, but must, due to the. nature of responsibilities ' involved, be presented as a guide forthe use of a qualified building designer or installer.Thus,theTruss Platelnstitute, Inc. expresslydisclaims any responsibility fordamages arising from the use, apprica6on orrekince,onthe recommendations and information contained herein by building designers, installers. and others. Copyright ® by Truss Plate Institute, Inc. All rights reserved. This document or any padthereof must not be reproduced in any form without wrutten permission of the pubtsher. Printed in the United States of America. - CAUTION: AUtemporary bracing should be no less --`'r_ than.2x4 grade marked lumber. 'AU connections should be made with minimum 2464 oafs Alt trusses assumed 2' on- center orless: All multPply trusses should be connected together in accor- dance with design drawings prior to installation. Trusses stored vertically should be braced to prevent toppling or upping. DANGER: Do not store bundles upright unless properly braced: 1 A DANGER: Walking on trusses which are lying flat isextremely dangerous andshould bestricUy prohibited. . 1A Tag Une Toe In Spreader Bar WARNING: Do not attach cables, chains, or hooks to the web members. w � ►�� ice' 1 1 Approximately 'A truss length Truss spans less than 30': Spreader Bar Approximately K to i'struss len Less than or equal to 60' Less than or equal to 60' Approximately Y. truss length Toe in Tag Line Toe fn -- Toe In Tag Une Approximately Yz to IS truss len • h F {MECHANICAL INSTALLATION Lifting devices should be connected to the truss top chord with a closed -loop attachment utilizing materials such as slings, chains, cables, nylon strapping, etc. of sufficient strength to carry the weight of the truss. Each truss should be set in proper position per the building designer's framing plan and held with the fitting device until the ends . of the truss are securely fastened and tempo- rary bracing is installed. Tag Une CAUTION: Temporary bracing shown in this summary sheet is adequate for the installation of ® trusses with. similar configurations. Consult a registered professional engineer If a 'different bracing arrangement is desired. The engineer may design bracing in accordance with TPPs Recommended Design Specification for Temporary Bracing of Metal Plate Connected Wood _ Trusses, DSB -89, and in some cases determine that a wider spacing is possible. Driven ground stakes CAUTION: Ground bracing required for all Installations. Frame 2 is WARNING: Do not lift single trusses with spans greater than 30' by the peak. Tag Une wour Anoroximatel irato V4 truss length Strongback/ SpreaderBar Greater than 60' . r /.././ • • ' 10' C G:'i dteEf TyPkal.haieonhlSsa mbKwkh' • • SPAN MINIMUM (ITCH TOP CHORD LATERAL BRACE: SPACING(LEid •:: TOP CHORD DIAGONAL BRACE SPACING' OBs) . - i, r tr ssis, . SP/DP: %- 15 Up to 32* 4/12 7' • 20 Over 32' - 48' 4/12 6' 10 7 Over 48' - 60' 4/12 5' 6 4 Over 60' See a registered professional engineer Topebotttothdato ktaallybraoed out buckle logettoproodeattoecoltepooltbereionedlago- oalbracing. Magma! bracing obotdd Weaned to*. ostdoroldoct the top choed when Nano ace atioetott to the topside al tho top doped. DF- Douglas FIr-Larch HF - Hem-fir 12 SP - Southem Pine SPF- Spruce-Pine-Fir 4 or greater All lateral braces lapped at least 2 trusses. Frame 3 OF - Douglas Fir-Larch 11F - Hem-Fir All lateral braces lapped at least 2 trusses. 12 5 Continuous Top Chord Lateral Brace Required SP - Southern Pine SPF - Spruce-Pine-Fir 10' or Greater Attachment Required I irlotiktt I A WARNING: Failure to follow these recommendations could result in A:t severe personal injury or damage to trusses or buildings; -. Topebotdsthat ktetattf Mooed cao buckle togedsocoodesooseotlapoolthentisoodtogo• inallsradag. Diagonal bride, should boistiled to Owl oodetoldeotthetapetwordvetwo puffins are attached to tho topside el the top ebotet, 1 S T Tdas 1 ig : ' .,=:;-'14'., IN M , PIT .;,,,, z ...,,, te CE --.,•,.. ,.-: TOp 4 ..CHORD - - TOPCHOR 1 .,.: DIAd Et Olqiir .....„ ....,..13ACE 7V-Ic-N6. (213,W.::'. 144u, 'eseS k• S I P/13F LATERAL ,ii 1.4.41 BRACE SPACING ..v - - . - .SP /H UP to 28' 2.5 7' 17 12 Over 28' - 42' 3.0 6' 9 6 Over 42' - 60' 3.0 5' 5 3 Over 60' I See a registered professional engineer . Topebotttothdato ktaallybraoed out buckle logettoproodeattoecoltepooltbereionedlago- oalbracing. Magma! bracing obotdd Weaned to*. ostdoroldoct the top choed when Nano ace atioetott to the topside al tho top doped. DF- Douglas FIr-Larch HF - Hem-fir 12 SP - Southem Pine SPF- Spruce-Pine-Fir 4 or greater All lateral braces lapped at least 2 trusses. Frame 3 OF - Douglas Fir-Larch 11F - Hem-Fir All lateral braces lapped at least 2 trusses. 12 5 Continuous Top Chord Lateral Brace Required SP - Southern Pine SPF - Spruce-Pine-Fir 10' or Greater Attachment Required I irlotiktt I A WARNING: Failure to follow these recommendations could result in A:t severe personal injury or damage to trusses or buildings; -. Topebotdsthat ktetattf Mooed cao buckle togedsocoodesooseotlapoolthentisoodtogo• inallsradag. Diagonal bride, should boistiled to Owl oodetoldeotthetapetwordvetwo puffins are attached to tho topside el the top ebotet, 1 S T Tdas 1 • SPAN : • • MINIMUM PITCH . BOTTOM CHORD DlAGONxAL LATERAL "BRACE SPACING 01 " - fl BOTTOM SPACI #Vutsesl SP /OF 6+ CHORD BRACE G ''..' : 5 • PF/HF-' 15 Up to 32' 4/12 15' 20 Over 32' - 48' 4/12 15' 10 7 Over 48' - 60' 4/12 15' 6 4 Over 60' See a registered professional engineer 3ottom chord diagonal bracing repeated it each end of the building and at same pIdng as top chord diagonal bracing. WEB MEIII� *P , Permanent eye continuous es lateral bracing ° as specified by the truss engineering. Frame 4 DF - Douglas Fir -Larch HF - Hem -Fir ti WARNING: Failure to followthese recommendations could result In A 3 : severe personal injury or- damage to trusses or buildings. SP F - Sp -P ne -Fir All lateral braces lapped at least 2 trusses. x 0#OF#D� 1 Cross bracing repeated at each end of the - buiiding and at 20' Intervals. • • .• SPAN - `MINIMUM • DEPTH ;''y TOP CHORD .:: . LATERAL"BRACE ':SPACING(LB TOP CHORD DIAGONALBRACE SPACING M , •f#trusse s ] SP /OF SPF /Hf Up to 32' 30" 8' 16 10 Over 32' - 48' 42" 6' 6 4 Over 48' - 60' 48" 5' 4 2 Over 60' See a registered professional engineer tF - Douglas Fir -Larch SP Southern Pine IF - Hem -Fir SPF - Spruce- Pine -Fir The end diagonal brace. tor cantilevered trusses must be placed on vertical webs in line with the support. ---m - --�� -- +- . WARNING.- failuretofollow these recommendations could result in :• ••= severe personal injtuy or damage to trusses or buildings: 4ic2:PARAL "`fik 7USS TOPRHORO•.•I Tcp chords thatarelateratlybraced can buckle togethersndcauseoofspsei tthereisnodiagc sat bracing. Diagonal bracing should bandied to the underside ot the top chord ashen pew ns ate attached to the topside ot the top chord. End diagonals are stability and must be d both ends of the truss system. End diagonals are stability and must be dup both ends of the truss system. Frame 5 2x4/2x6 PARALLEL CHORD TRUSS Top chords that are laterally braced can buckle tonetherand causecollapse ifthereisnodiago- nal bracing. Diagonal bracing should be nailed to the underside of the top chord when purfns are attached to the topside of the top chord. Continuous Top Chord Lateral Brace Required — ib' or Greater 30' or greater Attachment — Required � 3'14• Trusses must have ktai- bef oriented in the hod- zontal direction to use this brace spacing. SPAN.. . 200" D(!t), 12' 1/4" 1' 24" 1/2" 2' 36" 3/4" 3' 48" 1" 4' 60" 1 -1/4" 'l 5' 72" 1-1/2" 6' 84" 1 -3/4" 7' 96" 2" 8' 108" 2" 9' SPAN.. . 200" 1 16.7' 250" 1 -1/4" 20.8' 300" 1 -1/2" 25.0' SPAN.. . 50" 1/4" 4.2' 100" 112" 8.3' 150" 3/4" 12.5' SPAN.. . ;MINIMUM' • PITCH .: °:e . TOP CHORD . LATERAL BRACE ` SPACING(LBS) . • TOP CHORD DIAGONAL BRACE SPACING1°8s) .; [# trusses] SP /OF 17 SPF /HF 12 Upto24' 3/12 8' Over 24' - 42' 3/12 7' 10 6 Over 42 - 54' 3/12 6' 6 4 Over 54' See a registered professional engineer 3F - Douglas Fir -Larch �F - Hem -Fir Diagonal brace also required on end verticals. Topcloonlathatarelatecallybrocedcattbuckle tageq+sandauseoollapssittbcoatsasdiago- aal6raeLq. Diegoaatbraatapaladdbesailed tottawWaetdeolthetopehotdarhea purlieu; aro attached to the topside ot the topchord. eigafitgal PLUMB Truss Depth DO) A ..... • SP - Southern Pine SPF - Spruce - Pine -Fir A _ WARNING: Failure to follow these recommendations could result In severe personal injury or damage to misses or building ' - Lesser of D/50 or 2" Plumb Line h*: I 4w um 41sp:! . OUT-OF-PLUMB INSTALLATION TOLERANCES. . WARNING: Do not cut trusses. Lesser of L./200 or 2" Frame 6 L(in) 12 — 13 or e- greater / r �6 s! Length L(in) Continuous Top Chord Lateral Brace Required L(in) e • OUT -OF -PLANE INSTALLATION TOLERANCES. AU lateral braces lapped at least 2 trusses. Bow Lesser of L/200or A DANGER: Under no circumstances should construction loads of any description be placed on unbraced.trusses. . • ATLANTIC TRUSS CO. (MLR) 850 NW 61st ST. FT. LAUDERDALE, FL 33309 (305)491 -3310 Sold To: GEORGE MASSEY CONSTR Reaction Summary Page: 1 t e. Date: 04-12-1995 Job: 1104 -5 Account No: Project: ADRIAN UTILITY ROOM Block No: Model: Lot No: Contact Site: Office: Deliver To: 11300 NE 2nd AVE. MIAMI SHORES„ FL 33161 Designer: JJG Salesman: sa Layout No: 1104-5 Job No: 794 Name: Phone: Far 473-2567 Tentative Delivery Date: Profile: Qty: Truss Id: Span: Truss Type: Slope: Reactions: ` `� 5 11 78 lbs. each 17 - 4 - 0 ROOF TRUSS 3.000 0.000 Joint 1 Joint 5 1101 lbs. 1101 lbs. -601 lbs. -501 lbs. G�' .1 HI 79 lbs. each 17 -4 -0 ROOF TRUSS 3.000 0.000 Joint 1 Joint 7 2666 lbs. 2666 lbs. -1518 lbs. -1518 lbs. —NU 2 CJ9 46 lbs. each 9 -10 -13 ROOF TRUSS 1 Row tat Brace 2.121 0.000 Joint 2 Joint 4 1055 lbs. 1017 lbs. - 747 lbs. -569 lbs. 3 J7 24 lbs. each 7 - 0 - 0 ROOF TRUSS 3.000 0.000 Joint 1 Joint 2 Joint 3 546 lbs. 299 lbs. 66 lbs. -319 lbs. -248 lbs. - 4 J5 18 lbs. each 5 - 0 - 0 ROOF TRUSS 3 -000 0.000 Joint 1 Joint 2 Joint 3 436 lbs. 209 lbs. 46 lbs. -265 lbs. -174 lbs. , GEQ 4 J3 13 lbs. each 3 - 0 - 0 ROOF TRUSS §§ ei o Joint 1 Joint 2 Joint 3 326 lbs. 119 lbs. 26 lbs. -211 lbs. -101 lbs. G 4 J1 7 lbs. each 1 -0 - 0 ROOF TRUSS 3.000 0.000 Joint 1 Joint 2 Joint 3 180 lbs. 0 lbs. 3 lbs. -157 lbs. -28 lbs. • I ti Job 1104 -5 Truss Ti Truss Type ROOF TRUSS QIy 5 Ply 1 GEORGE MASSEY, ADRIAN UTILITY ROOM Manic Truss Co. (JJG) 3.200 s Mar 161995 MTek Industries, Inc. Wed Apr 19 1215:43 1995 Page 1 I -2-0-0 I 4-4-0 l 8-8-0 13-0-0 17-4-0 19-4-0 I I I l 2-0-0 4-4-0 4-4-0 44-0 4-4-0 2-0-0 4x4= 3 4.002P 0 r 2x4 = 2x4. 2 4 N 5x6 = ► 5 1 3x4= 3x4= I 8-8-0 17-4-0 l I 84-0 8-8-0 Plate Offer (X,Y): (6:0-0-0,0 -3-0) LOADING (psi) SPACING 2-0-0 CSI DEFL (m) (loc) Vde6 PLATES GRIP TCLL 30.0 Plates Increase 1.33 TC 0.30 Vert(LL) 0.12 6/5 999 M20(20ga) 258/216 TCDL 15.0 Lumber Increase 1.33 BC 0.62 VertTL) 0.22 6/5 924 sCLL 0.0 Rep Stress Ina YES WB 0.22 Haz(TL) 0.05 5 n/a BCDL 10.0 Code SFBC Min Length /LL dell = 240 Weight 79 (bs) LUMBER BRACING TOP CHORD 2X4 SYP No2ND TOP CHORD Sheathed or 3-4-11 on center purfm spacing. BOT CHORD 2X4 SYP No.2•0 BOT CHORD 1.8:5.9 -, 56:5.9 -6. WEBS 2X4SYPNo.3 REACTIONS (bsrsize) 1=1101/04-0, 5=1101/04-0 Max Haz 1=- 34(bed case 2) Max Uplift 1=- 483(bad case 4), 5=- 483(load case 4) FORCES TOP CHORD 1- 2= -1918, 2- 3=- 1393, 3-4=- 1393, 4-5= -1918 BOTCHORD 5-0=1802,1. 6=1802 WEBS 2- 6= -506, 34=487, 4 -6-506 NOTES •) This truss has been designed tar the wknd bads generated by 110.0 m.p.h. winds at 15.0 feet above ground level, using 5.0 pat top chard dead load and 5.0 pat bottom chord dead load, 1.0 roles from hurricane Darin, on a category I enclosed buidrig, of dimensions 67.7 by 34.8 w4h exposure C (ASCE 7-93). Lumber Increase = 1.60, Plate Increase = 1.60. No end verticals are exposed. LOAD CASE(S) Standard - APR 1 91995 j �� A. s�ASy Q° 0 1F10',A OG 0 C. 1�0 9 NO.18864 S'TA'TE OF OE ta ottiolt AO 811115 bS38L'ON Hs "if uo0 1j (0:10 01 901041199 b 1 4'£901 = 9'0'081= L'L'66Z-�,'L'66L = Y 't'66Z-�'0'OBt =LEA L1 O'OZ-411 41 6'0OZ-4 8'0'OZ = tL'0'O6= LiJ . 0'06 - -9 - 91106 - 4-4 b106 =b £11•06 ,,/ (Vied s9)09001wx110n EE1�seenul0101d 'En as epN ;WW1 (I (S)33V9 OV01 13 0p00d MIN 1Mnetd 01 0500104 0100b0Pe eP4r M (£ 'sma poleAua3uo3 Lioddns 0 1 pei sett (z Pesadta as WS= pua ON'09't = eseanUl Weld '091 = aseabt l.90n1 '(£6 30SV) O emsodh Wu 94£ All L19 suolsuawP1 ncl Pasepua l Axe e uo • atguaax a=IIIn4 =4 Se200 01 '4-001 PeOP P>xtp =AN l'S'd011 Peep Pbtp dot TS'd 0'9 60sn *GI Pu0o11 a *W1001011 10 013010 ydw 0'011 A9 901000106 spegpu eV 101 PauBlsap 0009 Se4 ssn4 SM. (1 S310N SL - 419 't4ZL$S'1PZL 01-£'SL-411-z S83M 9L09 =01-1 'P009011 '1'009 81'91091 0IOH0109 9999 '6/£9 1 009 - 4-P' 4009= 4 1 '6L£9-41 '9£S9 02IOH3 dO1 5332104 (4 ese 3 pe i) ut=L'(4 0 se 3 p8chJ 1pl4 114010 (Z a= WOW-4 Z H MY 09 =1'0 =1 04 SN0113V3s E'oN dAS4 XZ SEEM 01'°N dAS 4 X Z 02IOH3 108 9 1-9:69 91-£9-L'9-41.01-6 OMOHO 108 01'0N dAS 1 X Z 9 Bupeds utmd 181100 uo Z-9- JO PO41ee4S 0210H0 d01 dd02x3. OZON d14.910( Z 02i0H3 d01 ONImV218 amain (Sq) £9 3449M 04Z =9013 11 / 415001 uw *BM 3835 0903 0'01 1039 eN L £L'0 (11)L0H /CO 8M ON bel 00049 des 0'0 TI09 P612EZ (8691)911N 164 916 14'0 (114 9611 38 ££'t eseam4iaquml 0'SI 1031 92/89Z (e 006 816 ZZ'0 (Ton 0171 31 EE1. aseapu1 0'0£ 1131 dlUD S31Vld IRA (xi) (u) 1430 1S3 0 ONIOVdS Us ONIOVO1 (Zt z 499: L1'( 4 -z-0'O-0451 b-Z-Ob40:d'o0-o -s- - i1 :G'Xl Si9S90Q 4 0-0-1 09-1 0-9-1 0-0-1 0-P1.1 0-4-01 0-9-9 ) 0-0.1 = 985 =8xS L =91WlOLA9 =9x9 8 8 at t ■ 1 o CJI V1 111111111111111.1111111111111 9 fr Pr irl Z ro °i 1 S 4 £ ZL 000'b - = 4x4 = 4x4 0-01 0-9-5 09 09-1 0-9-1 09-E 09-£ 0 I 014-61 0.0-11 0-01-51 ) 0-b-o1 ) 09-9 ) 0.0-1 09-£ 0-0-Z- 1 abed 0661 05:6Z:Zt 611dV PBM '314 . s 8 19snPe1 PIN 966191 RN S OOZE ( r ) to SSnij 39000V NOON AlllllnNVISOVA3SSVW391039 1 R SSns1loom LH 91011 Aid edA1 ssrul ssnil cps . Job 1104-5 Truss CJ9 Truss To ROOF TRUSS Oly 2 pN 1 GEORGE MASSEY. ADRIAN UTWTY ROOM Mange Truss Co. (JJG) 3.200 s Mar 161995 MTek Industries, Inc. Wed Apr 191226:501995 Page 1 -2-9-15 1 4-4-3 ' 411 -1 7 -2 -2 9 -10-13 l i 2 -9-15 4-4 -3 0-6-13 2 -3-2 2-8-11 2x4 11 1 N 2.828 g 8 A 3x6: N s N O t>I oaf "' I .. 0 gag 7 5 9 2 2x4 II M. 2 4 3x4 = 4x6 = 4-4 -3 4-11 -1 7 -2 -2 9-8-1 9 - 4-4-3 0 -6-13 2-3-2 2-5-15 0-2-12 LOADING (pet) SPACING 2-0-0 CSI DEFL (in) (lot) Udell PLATES GRIP TCLL 30.0 Plates Increase 1.33 TC 0.92 Vert(LL) 0.08 5/9 999 M20(20ga) 2581216 TCDL 15.0 Lumber Increase 1.33 BC 0.76 Vert(TL} 0.15 5/9 748 BCU. 0.0 Rep Stress Incr NO WB 0.55 Horz(TL) 0.04 4 n/a BCDL 10.0 Code SFBC (Matrix) Min Length /LL del= 240 Weight 46 (bs) LUMBER BRACING TOP CHORD 2X4 SYP No2D TOP CHORD Sheathed or 3-4-5 on centerpurin spacing, BOT CHORD 2X4 SYP No.2ND except endvett*. WEBS 2X 4 SYP No.3 BOTCHORD 2- 7:4.6 -6, 5-9:4-5-6, 5-7:4-6-6, 4-9:4-5-6. WEBS 1 Row atmidpt 3-4 REACTIONS (bs1size) 2=1055/0-8-0, 4=1017/0-34 Max Harz 2= 236(bad case 2) MaxUpil 2=-738(bad case 2), 4=- 578(bad case 2) FORCES TOP CHORD 2.6= -2416, 3-0=- 2306, 3-8=- 92.1- 8=52,1.4 =330 BOT CHORD 2- 7= 2348, 5-7= 2348, 5 .9 = 2348, 4 = 2348 WEBS 3-4=-2423, 3 - NOTES 1) This truss has been designed for the wig loads generated by 110.0 m.ph winds at 15.0 feet above ground level, using 5.0 p st top chord dead load and 5.0 p s ibottom chord dead load, 1.0 miss from hin to a marine, on a category I endosed buidmg, of dmersions 677 by 34.8 with exposure C (ASCE 7-93). Lumber Increase = 1.60, Plate Increase = 1.60. No end ver8cals are mposed. LOAD CASE(S) 1) Lumber Uraease =1.33. Plate lncrease=1.33 Unlorm Loads (bs per ft Vert 2.6== -90.0, 3- 6.90.0, 3.8=- 90.0,1 -90.0, 2-7=-20.0, 5.7= 20.0, 5- 20.0, 4-9 -20.0 Concentrated Loads (bs) Vert2= 254.5, 6-238.1.7= 529.6=- 41 &1.9= -929 APR 19 19 o wi c4 e. , NO. 1 9664 STATE OF 4 k VAMP' 4 4, 4.4 EIDI 04 Job 1104-5 AEan6c Tess Co. (JJG) I LOADING (pat) TCLL 30.0 TCDL 15.0 Bq.l 0.0 BCDL 10.0 Truss J7 LUMBER TOP CHORD 2X 4 SYP No2ND BOT CHORD 2X4 SYP No.2ND FORCES TOP CHORD 1 -2=-99 BOT CHORD 1-3=0 LOAD CASE(S) Standard -2-0 -0 2-0-0 Truss Type ROOF TRUSS SPACING 2-0-0 Plates Increase 1.33 Lumber lnaease 1.33 Rep Stress Ina YES Code SFBC REACTIONS (bslsize) 1=546108-0.36610 - 1.8.2=29910.1 -8 Max Harz 1 =195(bad case 3) Max Uplift 1= 234(bad case 3). 2 - 206(bad case 3) 2x4 = CSI TC 0.88 BC 0.21 WB 0.00 () 7-0-0 7-0-0 7-0-0 7-0-0 DEFL on) (bc) yde8 Vert(LL) 0.06 113 999 Vert(TL) 0.12 1/3 682 Harz(TL) -0.00 2 nb Mum Length 1 LL del. 240 GEORGE MASSEY. ADRIAN UTILITY ROOM 3.200 s Mar 161995 MTek Industries. Inc. Wed Apr 1912:18:151995 Page 1 PLATES GRIP M20(20ge) 258/216 Weight 24 (bs) BRACING TOP CHORD Sheathed or 6-0-0 on centerpurin spacing. BOT CHORD Rigid ceding directly applied, or 10 -00-00 on center tracing. NOTES 1) This truss has been designed tor the bind loads generated by 110.0 m.p.h.winds 81 15.0 feet above ground level, using 5.0 p.si lop chord dead load and 5.0 p.s.tbottom dad dead load, 1.0 mies hurricane oceanin% on a category? I encbsed building, of dimensions 67.7 by34.8tab a>pssuae C (ASCE7 -93). Lumber Increase= 1.60. Plate Increase 1.60. No end verticals are exposed Job • 1104-5 Atlantic Truss Co. (JJG) l0 T ch 0 LOADING (psi) TCLL 30.0 TCDL 15.0 BCLL 0.0 BCDL 10.0 1 Truss J5 LUMBER TOP CHORD 2X 4 SYP No2ND BOT CHORD 2 X4 SYP No2ND Truss Type ROOF TRUSS -2-0 -0 2-0-0 SPACING 2-0-0 Plates Increase 1.33 Lumber increase 1.33 Rep Stress Ina YES Code SFBC REACTIONS (bslsize) 1=43610 -8-0, 3= 4610 48, 2=20910.1-8 Max Hon 1 =152(Iced case 3) Max Upif 1 — 196(bad case 3), 2 - 145(bad case 3) FORCES TOP CHORD 1 -2=71 BOT CHORD 1-34 LOAD CASE(S) Standard CSI TC 0.40 BC 0.10 WB 0.00 GEORGE MASSEY, ADRIAN UTILITY ROOM 5-0-0 5-0-0 5 5-0-0 DEFL (m) (tic) Udell Vert(LL) 0.02 1/3 999 Vert(TL) 0.03 1/3 999 Harz(TL) -0.00 2 nla Min Length /LL del= 240 BRACING TOP CHORD Sheathed cr 6-0-0 on center purin spacing. BOT CHORD Rigidce8ng died/ applied, or 10-00-00 on centerbradng. 3.200 s Mar 161995 M7ek Industries, Inc. Wed Apr 1912:19:591995 Page 1 PLATES GRIP M20(20ga) 2581216 Weight 18 (bs) NOTES 1) This truss has been designed tar the Mind loads generated by 110.0 m.p.h. vAnds at 15.0 feet above ground level, using 5.0 p.s.L top chord dead load and 5.0 p.stbottom chord dead load, 1.0 miesfrom hurricaneoceanine, on a category t enclosed bulking, of dimensions 67.7 by 34.8 with exposure C (ASCE 7-93). Lumber Increase = 1.60, Plate Increase = 1.60. No end tier8cais are exposed Job • 1104-5 Truss J3 Truss Type ROOF TRUSS COI 4 Py 1 GEORGE MASSEY, ADRIAN UTILITY ROOM Atlantic Truss Co. (JJG) -2-0-0 2-0-0 3-0-0 3-0-0 3-0-0 3-0-0 3200 s Mar 161995 MTek Industries. Inc. Wed* 19 1221:03 1995 Page 1 LOADING (pst) TCLL 30.0 TOOL 15.0 BCLL 0.0 BCDL 10.0 SPACING 2-0-0 Plates Increase 1.33 Lumber Incase 1.33 Rep Stress Ina YES Code SFBC CSI TC 0.11 BC 0.03 WB 0.00 (Malik) DEFL (in) ( ) Vdel Vert(LL) 0.00 113 999 Vert(TL) 0.00 143 999 Harz(TL) -0.00 2 Na Min Length 1LL det= 240 PLATES GRIP M20(20ga) 258216 Weight 13 (bs) LUMBER TOP CHORD 2 X 4 SYP No.2ND BOT CHORD 2X 4 SYP No2ND REACTIONS (bslsize) 1 =32610.80, 3=2610 -1.8, 2=119/04.8 Max Ham 1 =109(bad case 3) /tax UpBt 1=- 159(badcase 3), 2=- 84(bad case 3) FORCES TOP CHORD 1 -2=-42 BOT CHORD 1 -3=0 NOTES 1) This truss has been designed for the wind bads generated by 110.0 m.p.h. winds at 15.0 feet above ground level, using 5.0 p.s . top chord dead bad end 5.0 p.s i bottom chord dad bad. 1.0 rides from hurricane ocan6re, on a category t ended bidding, of dmenskms 67.7 by 34.8 rob espouse C (ASCE 7 -93). Lumber Increase = 1.60, Plate Increase = 1.60. No end verticals are i posed. LOAD CASE(S) Standard BRACING TOP CHORD Sheathed a 6.0-0 on center purin sparing. ROT CHORD Rigidceiing dredly °ppied, a 10-00.00 on center bradng. 1104 -5 LOADING (psi) TCLI. 30.0 TCDL 15.0 BCLL 0.0 BCOL 10.0 J1 LUMBER TOP CHORD 2X 4 SYP No.2ND BOT CHORD 2 X 4 SYP No2ND Truss Type ROOF TRUSS SPACING 2-0-0 Plates Increase 133 Lumber Increase 1.73 Rep Stress Ina YES Code SFBC REACTIONS (bslsize) 118&0.3=0l0-1-8.2=0l0-1.8 Max Hart 167(bad case 3) Max Uplift 1=- 122(bad case 3), 2=- 23(bad case 3) Max Vert 1 =180(bad case 1). 3=3(bad case 2) FORCES TOP CHORD 1 -243 BOT CHORD 13=0 LOAD CASE(S) Standard -2-0-0 2-0-0 CSI TC 0.00 BC 0.00 1418 0.00 ( ) DEFL (In) (la) VdelI Vert(LL) 0.00 / 999 Vert(TL) 0.00 1/3 999 Horz(TL) -0.00 2 We Min Length / LL del =240 GEORGE MASSEY.ADRIAN UTILITY ROOM Allende Truss Co. (JJG) 3200 s Mar 161995 MiTek Industries. Inc. WedApr 191222"181995 Page 1 1-0-0 1-0-0 1-0-0 1-0-0 PLATES GRIP M20(20ga) 2581216 Weight 7 (bs) BRACING TOP CHORD Sheared or6-0-0 on center putt sprang. BOT CHORD Rigld eating direc8y appied, or 10-00-00 on center bracing. NOTES 1) This bliss has been designed for the bind toads generated by 110.0m.p.h. binds at15.0feet above ground larel , using 5.0 psi top chord deal bat and 5. 0 pal bottom dad dead bad .1.0 mike from hw eaneoeean6re,ona category I =dosed building, of dunensiorw 67.7 by 34.8 nth exposure C (ASCE 7 -93). Lumber Increase = 1.60. Plate Increase = 1.60. No end verticals are reposed. 1x1.0 A. S % ` 41 O 41 '0 NO. 19554 STATE OF IS ? . 0 'Etch v THEE PLANS ARE APPROVED FOR ISSUANCE OF A BUILDING PERMIT VARIANCE(S) LISTED IN "REMARKS" MIAMI SNORES BUILDING AND ZONING UNLESS SPECIFICALLY LISTED BELOW. AND COUNTY LAWS MUST BE COMPLIED Aut ".ori?ed Signature Date • WITH NO VARIANCES 0 WITH NO OTHER DE" IATIO" S FROM THE ORDINANCES WILL BE PERMITTED ALL OTHER APP ?.!C^B?..E STATE WITH BY ALL PARTIES. FIRE DEPARTMENT PUBLIC WOR: POLICE DEPARTMEIT BUILDING DIRECTOR PLAN, r G & ZONING BOARD VILLAGE COUNCIL APPROVAL PRELIMINARY: EINAL* REMARKS: COMPLIANCE WITH THE SOUTH FLORIDA BUILDING CODE AS ADOPTED BY MIAMI SHORES VILLAGE IS REQUIRED. THE ARCHITECT, BUILDER & 'SUB CONTRACTORS ARE CHARGED WITH THE KNOWLEDGE OF ALL BUILD- • ING REGULATIONS WHETHER OR NOT SPECIFICALLY INDICATED HEREIN.